1. ESTIMATES
1.1 Submitted 03
1.2 Awarded 06
2. REPORTS SUBMITTED 06
3. RESEARCH PAPERS
3.1 Submitted 07
3.2 Published 08
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 08
5. LECTURES DELIVERED 08
6. PARTICIPATION IN MEETINGS
6.1 Technical Committees 09
6.2 Other Committees 10
7. TRAINING OF PERSONNELS 10
8. IMPORTANT VISITORS 10
9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 10
10. TRAINING PROGRAMMES ORGANIZED 11
11. OTHER INFORMATION 12
Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in
2
Summary Information For 2008-2016
Years Jobs Awarded
_____________________
Nos. | Amount (Rs.)
Reports Submitted
Papers Published
Participation in Seminars/ Symposia/ Conferences
Lectures Delivered
Technical Committee Meetings
Training of Personnel
Training Programmes/ Conferences Organized
2008-09 130 15,74,38,098 89 41 24 36 20 38 01
2009-10 118 14,46,68,747 94 57 39 36 30 59 04
2010-11 159 17,06,34,397 95 94 38 52 23 61 11
2011-12 139 18,56,13,568 116 63 26 45 42 88 08
2012-13 150 22,53,10,859 120 67 44 57 24 55 08
2013-14 152 18,24,51,087 112 63 37 68 21 54 11
2014-15 153 25,69,14,032 113 62 58 47 12 62 09
2015-16 85 13,95,89,971 106 65 51 74 17 120 10
STUDIES AWARDED FOR CURRENT YEAR 2016-2017
Till Feb -17 105 25,19,62,310 80 87 112 79 18 300 16
During Mar -17 06 70,72,394 15 03 02 18 05 15 01
Total 111 25,90,34,704 95 90 114 97 23 315 17
Estimate submitted to Client but yet to be awarded
Mar 2017 32 15,36,63,015 - - - - - - -
CWPRS Information Bulletin March 2017
3
1. ESTIMATES
1.1 Submitted: (32 Nos. totaling to Rs. 15,36,63,015/- )
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1. Site inspection indentifying the Scope of Studies for Physical Verification regarding penetration of sheet piles for Sluice regulators at Harang Drainage Development Scheme, Cachar District of Assam.
Chief Vigilance Officer Brahmaputra Board, Basista, Guwahati-29, Assam.
GP 464,870.00
2. Stability and Settlement Analysis Study for proposed Breakwater training walls at Tenginagunai Alvekodi in Bhakal taluka at Uttara Kannada district in Karnataka.
The Executive Engineer, Port Division, Karwar Karnataka-581302
GE 776,580.00
3. Underwater Seismic reflection Survey for M/s Mazgaon Dock Shipbuilders Ltd. At Mumbai, Maharashtra.
AGM (SB-HS & ID), Mazagaon Dock Shipbuilders Ltd. Dockyard Road Mazogon, Mumbai-400010 Maharashtra.
GP 934,340.00
4. Physical Model Studies for the proposed two/four lane bridge including approaches over Brahmaputra between Dhubri on North bank and Phulbari on Souta bank in the state of Assam and Meghalaya respectively on NH-127 B
Regional Director Structure East & South AECOM Asia Company Limited 1st floor, Tower C DIF IT Park-18, Major arterial road Block AF, New Town, Kolkata-7000156
RH 20,139,771.00
5. Desk studies for the design of Coastal Protection works in Thiruvananthapuram Dist. Kerala.
Office of the Executive Engineer, Irrigation division Thiruvananthapuram, Kerala-695033
CHS-II 1,809,760.00
6. Physical Model studies for wave tranquility for development of Port infrastructure at Kamorta bay for Andaman Lakshadweep harbour works.
The Deputy Chief Engineer, ALHW Port Blair, Government of India, Ministry of Shipping Andaman Lakshadweep harbour works, Post Boy No.309, Port Blair-744101
PH-I 2,115,550.00
7. Physical Model studies for wave tranquility for development of Port infrastructure at Campbell bay for Andaman Lakshadweep harbour works.
The Deputy Chief Engineer, ALHW Port Blair, Government of India, Ministry of Shipping Andaman Lakshadweep harbour works, Post Boy No.309, Port Blair-744101
PH-I 2,115,550.00
8. Hydraulic Model studies for Spillway and Energy Dissipators of Lakhwar Dam Uttarakhand, 3-D Comprehensive model
Shri Lalit Kumar, Executive Engineer (CD-111), Pashulok (Barrage), Rishikesh, Deharadun, Uttarakhand
SED 18,120,170.00
9. Hydraulic Model Studies for Spillway and Energy Dissipator of Lakhwhwar Dam, Uttarakhand 2 D Sectional Model.
Shri Lalit Kumar, Executive Engineer (CD-111), Pashulok (Barrage), Rishikesh, Deharadun, Uttarakhand
SED 7,396,520.00
10. Mathematical Model Studies for assessment of wave tranquility for Proposed harbour Layout at Mini Fishery Harbour at Chethi Kerala.
Office of the Chief Engineer, Harbour Engineering Department Kamaleshwaram, Manaaud- P.o. Thiruanathapuram-695009
MMCE-I 1,183,530.00
CWPRS Information Bulletin March 2017
4
11. Mathematical Model Studies for evolving suitable flood protection measures along river Baspa, District Kinnaur, Himachal Pradesh.
Executive Engineer Irrigation & R. H. Division Reekong Po, Himachal Pradesh-172107
RH 1,437,960.00
12. Hydraulic Model Studies for MRTS Viaduct over Hindon River Connecting Dilshad Garden to New Bus Stand, Ghazia bad, U. P.
Chief Project Manager/10 Delhi Metro Rail Corporation Jhilmil Metro station (Ground Floor) New Delhi-110095
RH 7,330,070.00
13. Part-A Setting up of Network and Installation of DMEQ equipment for Pancheshwar project, Uttarakhand.
The Chief Engineer (YBO) Central Water Commission, Kalindi Bhawan, B-5, Tara crescent Road, Qutal Institutional Area, New Delhi 110016
ES 3,110,100.00
14. Part-B Analysis and interpretation of DMEQ Data at Pancheshwar Project, Uttarakhand for a period of 10 year, after Successful installation of DMEQ equipments.
The Chief Engineer (YBO) Central Water Commission, Kalindi Bhawan, B-5, Tara crescent Road, Qutal Institutional Area, New Delhi 110016
ES 50,222,080.00
15. Laboratory Studies towards cementitious grout material mix design and estimation of engineering properties of self compacting design mix concrete for controlling seepage through dam body of Temghar dam, Maharashtra.
The Deputy Executive Engineer, Bhama Ashked Dam Division, Swargate, Near Mutha Canal, Pune-411037. Maharashtra.
CT 1,794,030.00
16. Monitoring of blast Vibrations in the Dolomite and Limestone Quarry at Satna for M/s Iconic Enviritech (P) Ltd. Bhopal, Madhya Pradesh.
Mr. N. U. Abbasi, Project Co-ordinator, M/s, Iconic Envirotech (P) Limited, 188, Centre Point Complex Jinsi Square, Bhopal-462008
VT 343,540.00
17. Desk Studies for the design of Coastal Protection work at Dumas-Sultanabad, Taluka-Chorjasi, Dist. Surat (Phase-II)
Executive Engineer, Surat Canal Division, Narmada Water Resources, Water Supply & Kulpasur Department Near M. T. B. Collage Athwalines, Surat-395001.
CHS-II 704,610.00
18. Visit to koldam Hydro Power Project, Himachal Pradesh for Inspection Spillway Plunge Pool Area, Discussions with project Engineers and to finalise the scope of Model Studies.
Shri P. K. Yadav AGM (FES/FQA/P&S/IT) kol Dam Hydro Power Project Post:Barmana, Distt:Bilaspur Himachal Pradesh-174013
SED 530,124.00
19. Hydraulic Model studies for Additional Spillway of Hirakund dam, Odisa 1:No scale, 2-D sectional model.
Shri Haramohan Pradhan, Chief Engineer and Basin Manager, Hirakund Dam, circle, Burde-768017, Odisa.
SED 7,088,960.00
20. Estimation of Site Specific Seismic Design Parameters for Rupalrgad Regulating Dam, India/Nepal for WAPCOS 1 Ltd.
Chief Engineer (D&RE) WAPCOS, 76-C Institutional Area, Sector-18, Gurgaon-122015 (Haryana) India.
ES 1,217,500.00
21. Controlled blast Studies for dismantling of underwater RCC diaphragm walls at Vizag Port Trust for ITD Cementation India Ltd.
Mr. Pabitra Pabitra Roychowdhury, ITD Cementation India Ltd. C/o. Vishakhapatnam Port Trust, Eo-2 to Eo-5 Near Mahatma Gandhi Gate, Vishakhapatnam-530035 A. P.
VT 1,770,210.00
CWPRS Information Bulletin March 2017
5
22. Studies for the assessment of Suitability of Five Samples of Cementitious repair materials by determining their physical Parameters for Controlling Seepage through dam body of Temghar dam, Maharashtra.
The Deputy Executive Engineer, Bhama Ashked Dam Division Swargate, Near Mutha Canal, Pune-411037
CT 2,404,930.00
23. Mathematical Model Studies for Hydrodynamics and Siltation near the jetties of LNG Petronet, APPPL, GCPTCL and DHIL at Dahej, Gujrat.
Shri Amit K. Ashat Chief Manager-Port operations, Petronet LNG Limited, GIDC Industrial Estate, Plot No.7/A, Dahej-392130
MMCE-II 3,219,350.00
24. Non-destractive testing of Temghar Dam, Maharashtra.
Dy. Executive Engineer, Bhama Askhed, Dam Division Pune, 411037, Maharashtra.
VT 2,528,300.00
25. Mathematical Model Studies for Area Drainage and Storm Water Drainage System at Patalganga manufacturing Division of M/s RIL, Mumbai, for WAPCOS Maharashtra.
M/s Water and Power Consultancy Limited "Swastik" Building 2nd floor, Gulmohar Path, Near SNDT Rear Gate off Law College Road, Erandawane Pune 411004, Maharashtra.
HMET 1,728,560.00
26. Hydrodynamics & Siltation Studies to assess the impact of Proposed Port at Vadhavan on Tarapur Atomic Power station for M/s JNPT, Mumbai, Maharashtra.
The Chief Manager (PPD) Jawaharlal Nehru Port Trust Administrative Building Sheva, Taluka-Uran, Navi-Mumbai-400007
PH-III 1,569,750.00
27. Mathematical Model Studies to assess Possible impact of the proposed Vadhvan Port on the existing intake outfall locations of Tarapur automatic Power Plant for JNPT, Mumbai.
The Chief Manager (PPD) Jawaharlal Nehru Port Trust Administrative Building Sheva, Taluka-Uran, Navi-Mumbai-400007
MMCE-II 2,032,590.00
28. Mathematical Model Studies for assessment of wave tranquility for the development of Proposed Port at Vadhvan, Maharashtra.
The Chief Manager (PPD) Jawaharlal Nehru Port Trust Administrative Building Sheva, Taluka-Uran, Navi-Mumbai-400007
MMCE-I 2,001,800.00
29. Mathematical model studies for Shoreline changes for the development of Proposed Port at Vadhavan, Maharashtra.
The Chief Manager (PPD) Jawaharlal Nehru Port Trust Administrative Building Sheva, Taluka-Uran, Navi-Mumbai-400007
MMCE-I 1,501,900.00
30. Mathematical Model Studies for Tidal Hydrodynamics and Siltation for the development of a Port at Vadhavan for M/s. JNPT Mumbai, Maharashtra.
The Chief Manager (PPD) Jawaharlal Nehru Port Trust Administrative Building Sheva, Taluka-Uran, Navi-Mumbai-400007
PH-III 2,529,940.00
31. Desk and wave flume studies for the design of breakwaters for the development of Port Vadhavan Dahanu, Dist. Palghar, Maharashtra.
The Chief Manager (PPD) Jawaharlal Nehru Port Trust Administrative Building Sheva, Taluka-Uran, Navi-Mumbai-400007
CHS-II 2,440,820.00
32. Desk studies on feasibility of drawing river water for improvement of drinking water supply to Balasore Town in Odhisa State under AMRUT Scheme
The Executive Engineer,RH Public Health Division, Government of Orissa, Balasore, Odhisa
HMET 1,099,250.00
CWPRS Information Bulletin March 2017
6
1.2 Awarded: (06 Nos. totaling to Rs. 5,402,130.00/- + 16,70,264/- for calibration works 13 Nos.)
Sl. No.
Name of Work
Sponsoring Agency Division Amount (Rs.)
1. Micro earthquake study for Sawalkote HEP, Ramban, J&K
Chief Engineer Geologist, Jammu and Kashmir Power Development Corporation, Geological Wing, CID Block, PDD Complex, Bemina, Srinagar, 190018, Camp Office, 480-F, Nitco Lane, Talab Tillo, Jammu
ES 3,491,730.00
2. Preliminary visit for Automation of river head regulator at Nangal Dam
Director, Hydrology Project Phase-III, BBMP, Chandigarh-160019
INST 230,730.00
3. Mathematical Model Studies for shoreline changes for long term protection work at Tannirbuvi beach, Mangalore for ONGC MRPL, Karnataka
General Manger (TS: Insp & Engg) Mangalore Refinery (Petrochemicals Limited) Kuthethor PO Via Katipalla, Mangalore - 575 030
MMCE 643,100.00
4. Desk Studies for the design of coastal protection work to the exposed MRPL - ONGC Eruide pipelne near Tannirbavi Beach, Mangalore, Karnataka
General Manger (TS: Insp & Engg) Mangalore Refinery (Petrochemicals Limited) Kuthethor PO Via Katipalla, Mangalore - 575 030
CHS-II 700,970.00
5. Field studies for measurement of velocity / discharge for Ulhas River Thane, Distt, Maharashtra
Prof. & Head, Dept of Electronics & Science, Savitri Bai Phule, Pune, University, Pune
HAPT 258,000.00
6. Site inspection of Kadona dam, Gujarat for Seismic tomography survey for Gujarat Engineering Research Institute, Vadodara.
The Chief Engineer & Director, Gujrat Engineering Research Institute, Race Course Vadodara-390007, Gujarat.
GP 77,600.00
2. REPORTS SUBMITTED: (15 Nos.)
Sl. No.
Title Report No
Month/Year
1. Mathematical Models Studies for Shoreline Changes due to development of Port at Betul, Goa.
5469 March, 2017
2. Mathematical Model Studies for Hydrodynamics and Sedimentation for development of Port at Betul Goa.
5470 March, 2017
3. Hydraulic Performance and Overload Tests on Submersible Pump Sets of 153m3/n and Various Head Capabilities for irrigation development, Uttar Pradesh.
5471 March, 2017
4. Hydraulic Performance and Overload Tests on Submersible pump sets of 102 m3/n and various head capabilities for irrigation development, U. P-2016
5472 March, 2017
5. Desk and wave flume studies for the confirmation of breakwater Work Section for the Tharangambadi Fishery harbour Nagapattnam district in Tamilnadu.
5473 March, 2017
6. Hydraulic sump model studies of intake well on river Sabri for M/s Mecon Ltd, Ranch.
5474 March, 2017
7. Study to improve the drawal capability of raw water into the existing intake of M/s Adhunik Power and Natural Resources Limited in River Subarnarekha, Jharkhand.
5475 March, 2017
8. Review of Storm Surge analysis of Storm wave hind casting for the proposed Water Power Plant at Kowada, A. P.
5476 March, 2017
CWPRS Information Bulletin March 2017
7
9. Monitoring of blast Vibrations during excavation of rock for Integrated Nuclear Recycle Plant construction (INRPC) Project for BARC, Tarapur Maharashtra.
5477 March, 2017
10. Physical Hydraulic model studies for development of Navi Mumbai international airport near Panvel for M/s CIDCO.
5478 March, 2017
11. Mathematical Model Studies for Tidal Hydrodynamics, and Siltation aspects for existing Fishery Harbour at Neendakara, Kollam Dist. Kerala.
5479 March, 2017
12. Mathematical Model Studies for Hydrodynamics and Siltation for revised alignments of offshore breakwater at Paradeep Port, Odisha.
5480 March, 2017
13. Hydraulic Physical Model Studies for development of LNG and Bulk cargo berth in the Proposed Outer Harbour at New Mangalore Port.
5481 March, 2017
14. Desk and wave Flume studies for the confirmation of breakwater Cross-sections for the Vellapallam Fishery Harbour Nagapattanam Dist. in Tamilnadu.
5482 March, 2017
15. Hydraulic Model studies for Spillway Indira Sagar Polavaram Project, Andhra Pradesh 1:50 scale, 2D Sectional model.
5483 March, 2017
3. RESEARCH PAPERS
3.1 Submitted – (10 Nos.)
1. Paper titled “Nadiyon ko Jodne se Jalpurti Yava Vikas Main Yogdan"” by A. K. Sigh, Naval S. Jagtap, L. R. Ranganath for possible publication National Journal in Rastriya Jalvikas Abhikaran, Vadodara.
2. Paper titled “Review of uniform diffraction coefficient in MIKE-21 BW studies"" by.Dr. J.D. Agrawal,H.C. Patil, Saga Chanda for possible publication in APAC.
3. Paper titled " Hydraulic model studies for channelization of river Kosi for a reach from Chatra to Kosi barrage using Hockey stick shape spur"” by Dr.S.A. Burele, Dr. Nayan Sharma, Dr. Z. Ahmad , Dr. I.D. Gupta for possible publication in ASCE Journal of Hydraulic Engineering.
4. Paper titled " Seismic Microzonation study for Jabalpur city, Madhya pradesh " by Dr. Dhanujaya Naidu, S. Selvan, Dr. G.R. Tripathy,. L.R. Pattanur for possible publication in Scientific Journal – National Hazards.
5. Paper titled " Study of extremal behavior of annual rainfall using truncated GEV distribution in a threshold mixture frame work” by R.S. Jagtap, Dr. U.V. Naik – Nimbalkar for possible publication in Model Assisted Statistics Applications SJR Scimago J. Publication, Netherland ISSN-1574-1699 or other suitable journal.
6. Paper titled " Tracing dam seepage using nuclear logging and tracer techniques - case study" by G.A. Panvalkar, A.D. Chunade for possible publication in ISH Journal of Hydraulic Engineering through Taylor & Francis.
7. Paper Titled " Role of Hydraulic Model Studies in Finalising the design of Spillway and Energy Dissipator for Dhauli Ganga HE Project Uttarakhand India" by B. S. Sundarlal, Dr. M. R. Bhajantri, Dr. V. V. Bhosekar, B. M. Shimpiger, Sangeeta Patnaik, Vaishali Gadhe CBIP Water Energy.
8. Paper Titled” Nadhi jodo yojana yeva ishkey mukya pahulu” by M.K. Pawar, Kum .Madhavi Gajre for possible publication in journal of Interlinking of river.
9. Paper Titled “Jal se Jodo dhil" by M.K. Pawar for possible publication in Rastriya jal vikas abhikaran, Delhi
CWPRS Information Bulletin March 2017
8
10. Paper Titled “ Nadhi Jod pariyojana” by Chavan Bal krishna Shankar, Hrudaya Prakash for possible publication in Rashtriya jal vikas abhikaran, journal.
3.2 Published: (03 Nos.)
1. Paper Titled " Remote sensing and GIS tool – an aid in site delineation for hydrological
structures” by Rolland Andrade published in National Conference on “Recent Advancements in Civil Engineering(RACE 2017) at Chennai, Tamilnadu - issue March 2017-Vol. pg.No.1
2. Paper Titled “Aspects of safety in engineering structures: Need for investigation – Special emphasis to Dams” by Andrade Rolland., Panvalkar G.A., Deshpande N.V., published in National Conference on “Recent Advancements in Civil Engineering(RACE 2017) at Chennai, Tamilnadu – issue March 2017- Vol. pg. No.2
3. Paper Titled " Tracer an effective tool in detecting canal seepage-case studies from northern India" by Andrade R., Bhowmick S., Pund A.K., Sustainable water resources management Journal February, 2017- Online publication., DOI. 10 – 1007/s40899-017-0083-x.
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES/ - (02 Event, 02
Participants)
Sl. No. Title Place, Date Name of Officer
1. Water Conductor System for River Valley Projects
Hotel Floatel, Strand Road, Opp to SBI HQ, Kolkata. 17 March, 2017
Shri Agrawal A.K., Scientist-D
2. Framework for Sediment Management in Indian Rivers
CSMRS Auditorium, New Delhi, 17 March, 2017
Dr. M. K. Sinha, Director
5. LECTURES DELIVERED – (18 Nos.)
Sl. No. Title Event, Place, Date Name of Officer
1. Role of Hydraulic Model studies.
Induction Training Programme , NWA, Pune 02 March 2017
Shri Bhajantri M.R., Scientist-D
2. Canal Automation 29th Induction Training Program on Design and Research , NWA, Pune 10 March 2017
Shri Mukesh Kumar Arora Scientist-C
3 Coastal Vulnerability to climate change
Workshop on Coastal Vulnerability to climate change, IIT, Bombay 23 March 2017
Shri M. D Kudale Additional Director
4 Sedimentation in Indian River- Challenges and opportunities
Conference on Sediment Management in Indian Rivers CSMRS, Delhi - 17 March 2017
Dr. Patil R.G. Scientist- D
5 Specialised Materials and methods from the point of view of Dam Safety
29th Induction Training Program for directly appointed Officers of CWE NWA, Pune - 23 March 2017
Dr. M.K. Sinha, Director
6 Diaster Management Planning in case of Dam Break Event
29th Induction Training program for directly appointed Officers of CWE NWA, Pune - 23 March 2017
Dr.M.K. Sinha Director
CWPRS Information Bulletin March 2017
9
7 Application of Position Fixing techniques in Water Resources Sector
Irrigation Project Monitoring and management using Remote Sensing and GIS, NWA, Pune- 30 March 2017
Shri Selva Balan M Scientist-D
8 Use of Remote Sensing for River Hydrological Studies
Irrigation Project Monitoring and Management using Remote Sensing and GIS, NWA, Pune 27 March 2017
Shri Ranade S.D. Scientist-D
9 Remote sensing : Satellites and Sensors
Irrigation Project Monitoring and management using Remote Sensing and GIS, NWA, Pune 21 March 2017
Shri Ranade S.D. Scientist-D
10 Sand Mining/ Dredging Conference on Sediment Management in Indian Rivers CSMRS, New Delhi – 17 March 2017
Shri Nagendra T. Scientist-E
11 Seismic Parameter assessment and analysis for Safety Evaluation of Dams
29th Induction Training Program for directly appointed Officers of CWE NWA, Pune - 27 March 2017
Shri Selvan S. Scientist-B
12 Dam Acquisition, wireless data and transmission system for dam structure including Instrument of Dam
29th Induction Training Program NWA, Pune - 27 March 2017
Shri Selva Balan M Scientist-D
13 Safety review and rehabilitation of Embankment & rockfill dams and concrete Dams
29th Induction Training program NWA, Pune - 29 March 2017
Edlabadkar J. S. (Smt.) Scientist-B
14 Safety review and rehabilitation of Embankment & rockfill dams and concrete Dams
29th Induction Training program NWA, Pune - 29 March 2017
Shi Hanumanthappa M.S. Scientist-B
15 Techno Evolution JSPM’s Rajarshi Shahu College of Engg., Pune. 22 March 2017
Dr. M.K. Sinha Director
16 Reservoir Sedimentation Studies using position fixing Techniques - Case studies
Irrigation project monitoring and management using Remote Sensing and GIS 31 March 2017
Shri Selva Balan M, Scientist-D
17 Recent Advancements in Civil Engineering
MAM College of Engineering, Trichy 08 March 2017
Dr. Rolland Andrade Scientist-B
18 Framework for Sediment Management Policy
Central Soil & Materials Research Station (CSMRS) New Delhi 17 March, 2017
Dr. M.K. Sinha Director
6. PARTICIPATION IN MEETINGS 6.1 Technical Committee Meetings: (05 Nos.)
Sl. No.
Name of Committee Date and Venue Participant(s)
1. Dam Design Review Panel meeting for Polavaram Project
07-08 March 2017 Rajahmundry
Dr. M. K. Sinha, Director
2. Discussions with Mumbai Municipal Corporation officials regarding evolving road Map for Mumbai water supply
09 March 2017 Mumbai
Dr. M. K. Sinha, Director
3. National Hydrology Project Tender Evaluation Committee meeting
21 March 2017 New Delhi
Dr. M. K. Sinha, Director
4. National framework Law, Draft River Basin Management Bill and Model bill of Groundwater under
27 March 2017 New Delhi
Dr. M. K. Sinha, Director
CWPRS Information Bulletin March 2017
10
the Chairmanship of Dr. Mihir Shah, Former Member, Planning Commission
5. Discussions with Municipal Commissioner regarding preparing road map for Mumbai water supply
30 March 2017 Mumbai
Dr. M. K. Sinha, Director
6.2 Other Meetings: (3 Nos.)
Sl. No.
Name of Committee Date and Venue Participant(s)
1. Fourth meeting of the committee for the preparation of DPR for river Jhelum and its tributaries, Phase II
20.02.2017 New Delhi
Dr. R.G. Patil, Sci-D Shri Arun Kumar, Sci-B
2. DCC in respect of 4 Superintendents and DPC to the post of 2 Superintendents
30.03.2017 CWPRS
Dr. Mukesh Kumar Sinha Director
3. Screening Committee Meeting for the assessment, Promotion form Scientist-C to Scientist-D
29.03.2017 CWPRS
Dr. Mukesh Kumar Sinha Director
7. TRAINING OF PERSONNEL – (04 Trainings and 15 Personnel)
Sl. No.
Title Event, Place, Date Name of Officer
1. Data Entry in eHRMS Ministry of Water Resources ,CWC, New Delhi 08-09 March 2017
Shri Hariyan R.J, MTS Shri Patil A.S. Steno.I Shri N.M.Pol, Supdt.
2. Hydraulic Modeling of Major Components of Hydropower Schemes
CWPRS, Pune 09-10 March 2017
Smt Jyothi Prakash A. Sci-B Shri S.B. Tayade (Mrs), ARO Shri Meshram Asit Premdas ARO Shri Rajesh K., RA
3. Irrigation Project Monitoring and management using Remote Sensing and GIS
NWA, Pune, 20 -31 March 2017
Shri Ajay Singh, ARO Shri Azhar G. Golandaj, ARO Shri Ujjal Chowdary, ARO Shri Rocky, RA Shri Vivek Saxena, RA Shri Shannel Saurabh Sao, RA Shri Pankaj Khairnar, RA
4. Hydrolologic forecasting for flood & Water Management Purposes
Bureau of Meterology, Australia under the NHP at NIH, Roorke 06-09 March 2017
Shri Vivekanandan N.,Sci-B
8. IMPORTANT VISITORS: NIL
9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS
Sl. No.
Name of Person Designation Division Date
New Entrants
NIL
CWPRS Information Bulletin March 2017
11
Promotions
1. Smt Jerin Paul ARO ES 14.03.2017
Retirement
1. Dr. M. M. Rao LIO LIBIS 31.03.2017
2. Shri. R. R. Shirke Sci-C VT 31.03.2017
3. Dr. C. B. Singh Sci-E BRT 14.03.2017
4. Shri Gopa Kumar AO Admin 31.03.2017
5. Shri R.D. Pophale C’ Man-B Pumphouse 31.03.2017
6. Shri R.S. Bhagat C’ Man-B CHS 31.03.2017
Voluntary Retirement
NIL
Repatriation/Transfer
NIL
Resignation
1. Shri Ankit S. Storekeeper Gr.III GP 17.03.2017
10. TRAINING PROGRAMMES/ CONFERENCES ORGANIZED: ( 1 No.) Hydraulic Modelling of Major Components of Hydropower Scheme during 09-10 March, 2017 at CWPRS, Pune.
CWPRS Information Bulletin March 2017
12
11. OTHER INFORMATION: 1. Submission of Final Report of the Expert Committee on Erosion and Siltation in Rivers
under the chairmanship of Dr. M.K. Sinha, Director, CWPRS was submitted on 31st March, 2017.
2. The Indian Geophysical Union has selected the Research paper title “Assessing Quality of
Masonry Dam using Seismic and Electrical Tomography” by Shri M.S. Chaudhari, Smt M. Majumder, Shri V. Bagade and S. Ranga published in the Journal of Indian Geophysical Union September 2016, Vol.20 No.5, pp:482-489 for “D. Lal Best Paper Award – 2016”.