Government of India
Ministry of Water Resources River Development & Ganga Rejuvenation Central Water & Power Research Station
Khadakwasla, Pune – 411 024
Issue No.: 11 November 2018
____________________________________________________________________
CWPRS MONTHLY INFORMATION BULLETIN ________________________________________________________________________________
1. ESTIMATES
1.1 Submitted 03
1.2 Awarded 04
2. REPORTS SUBMITTED 05
3. RESEARCH PAPERS
3.1 Submitted 05
3.2 Published 06
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 06
5. LECTURES DELIVERED 06
6. PARTICIPATION IN MEETINGS
6.1 Technical Committees 06
6.2 Other Committees 06
7. TRAINING OF PERSONNELS 07
8. IMPORTANT VISITORS 09
9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 09
10. TRAINING PROGRAMMES ORGANIZED 10
11. OTHER INFORMATION 11
Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in
2
Summary Information For 2010-2018
Years Jobs Awarded
_____________________
Nos. | Amount (Rs.)
Reports Submitted
Papers Published
Participation in Seminars/ Symposia/ Conferences
Lectures Delivered
Technical Committee Meetings
Training of Personnel
Training Programmes/ Conferences Organized
2010-11 159 17,06,34,397 95 94 38 52 23 61 11
2011-12 139 18,56,13,568 116 63 26 45 42 88 08
2012-13 150 22,53,10,859 120 67 44 57 24 55 08
2013-14 152 18,24,51,087 112 63 37 68 21 54 11
2014-15 153 25,69,14,032 113 62 58 47 12 62 09
2015-16 85 13,95,89,971 106 65 51 74 17 120 10
2016-17 111 25,90,34,704 95 90 114 97 23 315 17
2017-18 147 33,97,19,710 105 58 64 38 38 823 18
STUDIES AWARDED FOR CURRENT YEAR 2018-2019 Till October
2018 80 14,76,60,326 45 51 43 32 22 250 09
During November -18
09 2,26,22,260
06 - 03 05 - 54 02
Total 89 17,02,82,586 51 51 46 37 22 304 11
Estimate submitted to Client but yet to be awarded
November 2018 19 3,50,39,588
- - - - - - -
CWPRS Information Bulletin November, 2018
3
1. ESTIMATES
1.1 Submitted: ( 19 Nos. totaling to Rs. 3,50,39,588/- )
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1 Mathematical model studies to assess the effect of deepening for naval facility of Visakhapatnam on hydrodynamics and morphological behaviour of streams
The Project Director, Ship Building Centre Base Post, Krishna Gate, Naval Base Post, Vishakhapatnam-530014,Andhra Pradesh
PH 11,29,800
2 Slope stability analysis on LHS and RHS OF Insuli Border check Post Banda, Savantwadi, Dist-Sindhudurga Maharashtra
Shri Mukesh Wadkar, Ex.Engineer, M.S.R.D.C.(Ltd) Mumbai, Opp. Bandra Reclamation Bus Depot. Near Lilavati Hospital, K.C.Marg,Bandra (W) Mumbai-400050
GE-II 7,66,824
3 Additional hydraulic model studies for modified design of Devsari dam spillway, Uttarakhand 1:40 scale 3-D sectional model
Shri Sanjeev Gupta, Sr.Additional Manger (Design),SJVN Ltd, Corporate Office Complex, Shakti Sadan,Shanan,Shimla-17006,H.P.
SED 33,47,738
4 Mathematical model studies for shoreline changes due to second stage development of Hajemadi Kodi, breakwater in Udupi District-Karnataka
Ex. Engineer, Port & Fisheries Division,2nd floor, Shamil Hall,Ambalapady, Udupi, Karnataka -576103
PH-I 10,01,030
5 Desk and wave flume studies for the design of breakwaters for the development of port at Honnavar, Karnataka
Manish Khan, Director, Honnavar Pvt. Ltd, #103,Laleshzar Apartment,45/1-2 Palace Road, Banglore-560001,Karnataka
CHS-II 18,99,100
6 Seepage and stability studies for Udandpur Balancing reservoir zoned Earth Dam, Telangana for CDO, Hyderabad
Shri T. Srinivas, Chief Engineer, Central Designs Organization,6th floor Erranmarzil Jalsoudha,Hyderabad-500082
GE-II 8,89,700
7 Geotechnical studies for determination of safe slopes of Dredge Pits/Sand traps in naval flood channel of ship building centre, Vishakhapatnam
The Project Director,Ship Building Centre Base Post, Krishna Gate, Naval Base Post, Vishakhapatnam-530014,Andhra Pradesh
GE-II 9,19,880
8 Mathematical model studies for hydrodynamics and siltation to validate flood mitigation measures for Phase-II expansion of Project Varsha
CMDE Jaya Gopal, ISQ MOD(Navy)DNSP1, Room No. 422.D-11 wing Sena Bhawan, New Delhi-110011
PH-II 45,85,430
9 Geotechnical stability for Earthen bund at Lakya reservoir Kudremukh, Karnataka for KIOCL
Shri N.V.Vidyananda, Director (P & P- Production & Projects)K.I.O.C.L. Pnambur,Manglore-575010
GE-II 15,08,976
10 Micro earthquake study for kuri-Gongri HEP, Bhutan for WAPCOS Ltd.
Shri Amit Gawande, Project Manager, Kuri-Gongri, H.E. Project, 76-C,Institutional AREA, Sector-18, Gurugram-122015,Haryana
ES 49,11,190
11 Desk and wave flume studies for the design of breakwater cross-sections for the protection to the spillway structure, Kalpasar Project in Gujarat
Superintending Engineer, Narmada Water Resources, Water Supply, Kalpasar Department, Government of Gujarat ,Gandhinagar-364001
CHS-II 50,94,460
12 Water Flow Measurement in Rourkee Steel plant, Rourkela, Sundergarh District, Odisha
S.S.Batwe, DGM & PC,FS & PD,MECON Ltd,Ranchi,Jharkhand-834001
HMC 19,09,236
13 Desk studies for suggesting suitable protection works along the national waterways 3 at Kuttanand, Kerala for IWAI
Director, IWAI, National waterway Road, Kannadikkadu, Maradu, Eranakulam-682001
RH 4,03,680
CWPRS Information Bulletin November, 2018
4
14 Analysis and Interpretation of Instrumentation Data of Power House for the period Jan-2019-Dec 2020 Indira Sagar H.E.Project, Narmada Sagar, Khandwa,(M.P.)
Senior Manager(Civil),Power House Civil Division, Indira Sagar Power Station, NHDC Ltd, NHDC Office Complex, Narmada Nagar, Diff Khandwa-450119,M.P.
SMA 14,10,540
15 Site visit for Inspection of the dam & barrages for finalization of core locations for determination of in-situ properties and carrying out 3D stress analysis of massanjore dam and four barrages namely Tilpura Mitrilal Durgapur Mahananda and Teesta in west Bengal for M/s WAPCOS Ltd.
Chief Engineer & RM(ER),WAPCOS Ltd, Regional Office, Eastern Region, 10th floor Jalsampad Bhawan, Salt lake city Kolkata-700091,West Bengal
CT 3,82,450
16 Desk & wave flume studies for the design of offshore reef for coastal protection at Someshwara, Karnataka under SCPMIP-Tranche-2 ADB Project
Project Director, Office of Project Director, Project Management Unit, SCPMIP Old Port office Building Manglore-575001,Karnataka
CHS-II 10,08,110
17 Desk studies for flood Estimation and Evaporation Losses for river Rejuvenation and development plan for Pawana and Indrayani River in PCMC, Maharashtra
Shri Kunal Patel, Director(Strategic Planning),HCP Design, Planning & Management Pvt.Ltd,Paritosh,Usmanpura,Ahemdabad-380013
HMET 23,99,990
18 Site inspection and discussion regarding safety of Krishnarja Sagara dam Karnataka, from the adverse effects of nearby Blasting activities
Chief Engineer, Irrigation(South) C.N.N.L., Mysore Cauvery Neeravati Nigama Ltd, Public Offices Buildings, New Sayyajirao Road, Mysore-570024
VT 2,19,910
19 Hydrographic survey (Depth Profile) at Left Bank including in front of proposed additional spillway of Hirakud Dam, Odisha
Er. Jyotirmaya Rath, Chief Engineer & Basin Manager,Upper Mahanadi Basin, Hirakud Dam Circle, Burla, Odisha-768017
HI 12,51,544
1.2 Awarded: ( 08 Nos. totaling to Rs. 2,06,18,440/- + Rs. 20,03,820/- for calibration works 08 Nos.)
Sl. No.
Name of Work
Sponsoring Agency Division Amount (Rs.)
1. Estimation of site specific seismic Design Parameters for Gargai Dam, Maharashtra
Chief Engineer, Water Supply Projects, Engineering Hub Building, 1st Floor, Dr.E Moses Road, Worli Naka, Worli, Mumbai-400018, Maharashtra
ES 12,37,320
2. Site inspection of river Mahanadi downstream of Hirakud dam and delta system, Odisha
G.P.Roy, Chief Engineer (Proj. Planning, Formulation & Inv)Deptt. of WR, Bhubaneswar, Odisha-751012
HAPT 6,36,360
3. Developing a safe & economical design for the toe-berm of breakwater cross-sections for the proposed SWAN LNG Project at Jafrabud,Gujarat
Zebec Marine Consultants & Services Pvt.Ltd, 411-414, Raikar Chambers, Opp.Neelkanth Complex, Gavandi(E), Mumbai-400088
CHS-I 13,21,250
4. Mathematical model studies for wave tranquility for the protection of spillway and allied structures from waves for proposed Kalpasar Project in Gujarat
Superintending Engineer, Narmada Water Resources, Water Supply & Klapsar Department Government of Gujarat, New Sachivalaya, 8th,7th floor, Gandhinagar, Gujarat
PH-II 19,88,170
5. Desk & wave flume studies for the design cross-sections for the protection
Superintending Engineer, Narmada Water Resources, Water
CHS-II 1,14,05,660
CWPRS Information Bulletin November, 2018
5
structure to the main dam of Kalpasar Project in Gujarat
Supply & Kalpasar Department Government of Gujarat, New Sachivalaya, 8th,7th floor, Gandhinagar, Gujarat
6. Laboratory studies towards cementitious grout material mix design for controlling seepage through body of Domihira dam Palghar, Maharashtra
Ex. Engineer, Thane Irrigation Division, Near Sahyadri Society, Opposite Sahakar Vidhyala, Klwa (West)Thane,Maharashtra-4000605
CT 7,63,870
7. Inspection and determination of permeability for providing the remedial measures to stop the seepage at Chandas Wathoda MI Project, Amravati, Maharashtra
Superintending Engineer, Urshav Wardha Sinchan Mandal,Amravati-444603,Dist-Amravati
GE-I 8,01,010
8. Storm water Drainage studies for Dungi,Pargoan, Dapoli, Kalche owale and Bhangarpada villages near NMIA.Niva Mumbai
Shri R.B.Dhayatkar, Chief Engineer(NMIA), cidco,3RD FLOOR, cidco Bhavan, CBD-Belapur, Navi Mumbai-400614
SWH 24,64,800
2. REPORTS SUBMITTED: (06 Nos.)
S. No.
Title Division Report No
1. Desk and Wave flume studies for the design of breakwater for the development of port at Vadhvan, Maharashtra
CHS-II 5648
2. Shoreline changes along the coast line of Mumbai and sediment movement pattern due to dumping of dredge material at site DS3 Mumbai using remote sensing techniques
RSA 5649
3. Hydrological studies for Estimation of flood & Evaporation for Riverfront Development for Tapi River in Surat city for SMC, Gujarat
HMET 5650
4 Hydrolographic survey and cross section profiles of Dibang river (NHPC) IN Arunachal Pradesh carried out using DGPS based echo sounder system
HI 5651
5 Mathematical model studies on Impact Assessment of Bunds near Belpada, Raigad Maharashtra for CIDCO, Mumbai
HMET 5652
6 Hydraulic physical model studies for wave tranquility & directional spread near proposed deep draft multipurpose berth (berth No.17) at new Mangalore port, Karnataka
PH-II 5653
3. RESEARCH PAPERS:
3.1 Submitted: ( 03 Nos.)
1. Dr. A.K.Singh, Naval S.Jagtap, L.R.Ranganath, “Assessment of morphological changes due to construction of jetty inside a lagoon”, in 23rd International Conference on Hydraulics, Water Resources and Coastal Engineering (HYDRO 2018) November 2018. 2. Parag Kashyape, Dr.Mohammad Jawed, “Performance assessment of clarification of water treatment plant- a case study” in International Conference on Sustainable Solutions in Industrial Pollution, Water and Wastewater treatment November 2018. 3. C.Srishailam, N.Vivekanandan, R.S.Jagtap “Assessment of extreme rainfall using Gumbell Distribution for estimation of peak flood discharge for ungauged catchments”, in 05th International Conference on Hydrology and Wastewater Management (ICHWAM-2018) November 2018.
CWPRS Information Bulletin November, 2018
6
3.2 Published: (NIL) 4. PARTICIPATION IN SEMINARS/SYMPOSIA/CONFERENCES/-(02 Event., 03 Participants )
Sl. No.
Title Event, Place, Date Name of Officer
1. Brainstorming session on world GIS Day 2018 with the theme E-Governance of Namami Gange Programme through Geospatial Technology”
NMCG , New Delhi 14th November 2018
Shri B. Suresh Kumar, Sci-C Shri P.S. Kunjeer, Sci-C
2. GPCON Conference 2018 organized by General Practitioners Association under Indian Medical Association
Pune 18th November 2018
Dr. Sachin Parhad, MO
5. LECTURES DELIVERED – (05 Events, 05 Participants)
Sl. No. Title Event, Place, Date Name of Officer
1 Mathematical modelling and field/experimental studies to assess the structural studies stability of hydraulic structures and remedial measures.
CBIP, Bhubaneswar 30th October – 01st November 2018
Shri M.S. Hanumanthappa, Sci-C
2. Principles of hydraulic modeling for spillways
CBIP, Bhubaneswar 30th October – 01st November 2018
Shri R.R.Bhate, Sci-B
3. Hydraulic design of bucket type energy dissipater
CBIP, Bhubaneswar 30th October – 01st November 2018
Shri R.R.Bhate, Sci-B
4. Repair of damages in spillways and energy dissipaters
CBIP, Bhubaneswar 30th October – 01st November 2018
Shri Sunil J.Pillai, Sci-B
5 Engineering Geophysics Applications in execution of Hydro Power Projects
CSMRS, New Delhi 29th November, 2018
Shri Ch.Subba Rao, Sci-B
6. PARTICIPATION IN MEETINGS: 6.1 Technical Committee Meetings: NIL
6.2 Other Meetings: ( 02 Events – 03 participants)
Sl. No.
Name of Committee Place and Date Participant(s)
1. NHP Meeting
New Delhi, 13th November 2018
Shri B Suresh Kumar, Sci-C
2. TEC Meeting for review of field survey and MMS for Karnataka coastal region
NCCR, Chennai Shri J.D. Agrawal, Sci-E Dr. R. Manivanan, Sci-B
CWPRS Information Bulletin November, 2018
7
7. TRAINING OF PERSONNEL – (06 Trainings, 54 Personnel)
Sl. No.
Title Event, Place, Date Name of Officer
1. Advanced Techno-Management Programme for Scientists
ASC, Hyderabad 12th November – 07th December 2018
Shri V.K.Shukla, Sci-C Shri M.K.Verma, Sci-C
2. Earthquakes and Dam Safety CBIP, New Delhi 12th – 13th November 2018
Shri M.S.Hanumanthappa, Sci-C Shri Shyamali Paswan, Sci-B Shri Sachin N.Khupat, Sci-B Shri D.K.Awasthi, Sci-B Ms. Sheetal Waghmare, RA
3. Induction Programme CWPRS, Pune 13th – 16th November 2018
Shri Someshwar Milan Kumar, RA Shri Neeraj.M.Meena, RA Shri Kaur Kunal, RA Shri A. Sahu Ankit, RA Shri Kumar Vishnu Meena, RA Shri Singh Shobhit, RA Shri R. Medhe Vinit, RA Shri D.Sawant Rahul, RA Smt V. Mane Pranjal, RA Smt S.B. Ware, JE Shri Sachin Meena, JE Shri KumarVivek, JE Shri Patel Amit, JE Shri Mondal Suprabhat, JE Shri S.Omble Nitin, HD- MAN Shri Avin Meena, UDC Shri M. Shaikh Nida, S.K.Gr.II Shri Kumar Santosh, LDC Shri Kumar Manindar, LDC Shri Kumar Kaushik, LDC Shri Choudhari Mohit, LDC Shri Shukla Shubham, LDC Shri Yadhav Shashank, LDC Shri B. Garad Atul, D'MAN GR.I Shri T. Rathod. Rahul,D'MAN GR.I Shri S.Dasare Shivraj, D'MAN GR.I Shri M.Mehtar Pravin, LA.GR.II Shri S.Takakar Sainath, L A.GR.II Shri Deep Aamr, LA.GR.II Shri D. Poware Jayant, LA.GR.II Shri J.Gaikawad Virendra, LA.GR.II Shri Doddi Gangadhar, LA.GR.II Shri A. Nagdeve Subhash, LA.GR.II Shri S. Shinde Pradeep ,LA.GR.II Shri K. Kanthali Umesh, LA.GR.II Shri Bhardwaj Kumari Baby, LA.GR.II Shri Jha Deepak, LA.GR.II Shri Bhajan Lal Meena LA.GR.II Shri Pandey Mannu Kumar, LA.GR.II Shri A.D. Kolhe, Craftsman-C Shri R.A Chitapure, Craftsman- C Shri J. Hariyan Rishikesh, MTS Shri Kumar Sanjeev, MTS
4 Water information and analytics generation using free online tools
NWA Pune 26th – 30th November 2018
Dr.V.M. Prabhakar, Sci-B
CWPRS Information Bulletin November, 2018
8
5 Geospatial Techniques for Coastal Mapping and Monitoring (using QGIS)
INCOIS, Hyderabad 26th – 30th November 2018
Dr.R.Manivanan, Sci-B Shri H.C.Patil, Sci-B
6 Water information and analytics generation using free online tools
NWA Pune 26th – 30th November 2018
Shri N. Vyas Jitesh, Sci-B
8. IMPORTANT VISITORS:
1. Shri V.K. Sharda , G.M, SAIL, Burnpur visited CWPRS in November, 2018. 2. Shri Prem Ranjanb Kumar, GM, RITES visited CWPRS in November, 2018. 3. Shri R.S. Julani, Additional Secretary of Madhya Pradesh visited CWPRS on 19th November,
2018.
9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS
Sl. No.
Name of Person Designation Group Division Date
New Entrants
1. Shri Harsh UDC C Admin 22.11.2018
2. Shri Ranjeet Singh Nigam LDC C CPC 26.11.2018
3. Shri Vishnu Dhame LDC C CPC
27.11.2018
4. Shri Alan Kriti Tiwari LDC C CPC
29.11.2018
5. Shri Subhash Patel LA-II C HMET
01.11.2018
Promotions
NIL
Retirement
1. Shri M.V. Pawar LA-I C BE 30.11.2018
2. Smt. P.P Utagikar LA-I C RH 30.11.2018
CWPRS Information Bulletin November, 2018
9
Voluntary Retirement
NIL
Repatriation/Transfer
1. Smt. M.N. Kakde FO A FO Office 06.11.2018
Resignation
NIL
Demises
1. Ms. R.S. Gangle LIA B LIBIS 24.11.2018 10. TRAINING PROGRAMMES/ CONFERENCES ORGANIZED: ( 2 Nos.)
1. Training course on “Coastal Engineering and Modelling for site Engineering” organized during
14th – 16th November 2018 at CWPRS, Pune.
2. Training Course on “Induction Training Programme” organized during 13th -16th November 2018
at CWPRS Pune.
CWPRS Information Bulletin November, 2018
10
11. OTHER INFORMATION: 35th Technical Advisory Committee Meeting on 12 November 2018 at CWPRS, Pune.