cyberdraft - chamber of mines proposed alterations - 2015

12
Proposed Chamber of Mines Alterations 5 Hollard Street 1 st - 3 rd Floor CHAMBER OF MINES OF SOUTH AFRICA Putting South Africa First

Upload: andrew-harrison

Post on 25-Jul-2016

214 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Proposed Chamber of Mines

Alterations

5 Hollard Street 1st - 3rd FloorCHAMBER OF MINES OF SOUTH AFRICA

Putting South Africa First

Chamber of Mines Proposed Alterations 5 Hollard Street 1st - 3rd Floor

ALTERATIONS

Lobby Area

- Lighting

- Door Fittings

- Paintings

- Furniture

- Rugs

- Signage

Rest Rooms

- Complete Interior

Refurbishment Concept

Offi ces

- Executive Interior Fit-Out

Concept

- Multiple Desk Interior Fit Out

Concept

Meeting Rooms

- Interior Refurbishment Concept

These alterations would apply

from the 1st to 3rd Floor of the

Chamber of Mines Premises.

Principles of Design- Respect of previous design

qualities

- Incorporation Company

aesthetics into design aesthetics

- Sleek and yet easily appliable

design components

ENTRANCE LOBBY

Proposed Alterations:

- Lighting

- Door Fittings

- Paintings

- Furniture

- Reception Desk

- Couches

- Side Tables

- Entrance Rug

- Exhibition Pieces

- Signage

ANCE LOBBY

Chamber of Mines Proposed Alterations 5 Hollard Street 1st - 3rd Floor

ENTRANCE LOBBY

Proposed Alterations:

- Lighting

- Door Fittings

- Paintings

- Furniture

- Reception Desk

- Couches

- Side Tables

- Entrance Rug

- Exhibition Pieces

- Signage

Chamber of Mines Proposed Alterations 5 Hollard Street 1st - 3rd Floor

REST ROOMS

Proposed Alterations:

- Complete Interior

Refurbishment Concept

- Mirror Alternative Concept 1

(Female Restroom)

REST ROOMS

Proposed Alterations:

- Complete Interior

Refurbishment Concept

- Mirror Alternative Concept 2

(Male Restroom)

Chamber of Mines Proposed Alterations 5 Hollard Street 1st - 3rd Floor

OFFICES

Proposed:

- Executive Offi ces Concept

OFFICES

Proposed Alteration:

- Multiple Desk Interior Fit Out

CES

Chamber of Mines Proposed Alterations 5 Hollard Street 1st - 3rd Floor

MEETING ROOM

Proposed:

- Interior Refurbishment

Concept