Grange BackUp Power Industrial Emissions Licence Review Application
32
D.1 Operational Information Requirements
D.1.1 Site Location and Environs
The site on which the facility will be located occupies an area of 1.23 hectares and is situated approximately
12 kilometres to the west of Dublin city centre in Grange Castle Business Park, Clondalkin, Dublin 22.
The Business Park has undergone significant change in recent years as previously agricultural lands have
been opened up with access roads and subdivided into plots for high-end industrial and business uses. The
most notable site occupants within the Business Park are Pfizer, Microsoft, Takeda and Aryzta, with further
developments currently under construction for Grifols and Microsoft.
The site of the proposed power station currently consists of mounds of topsoil which was placed on the site
following site clearance works for a previous development in the Business Park. This topsoil will be removed
prior to the start of the construction phase bringing the level of the site to a similar level to the ESB substation
access road which divides the site.
The site is bounded to the north by the existing ESB Grange Castle 110kV Substation; to the east by a
hedgerow; to the south by a Business Park internal road; and to the west by an area of hardstanding.
The nearest residences to the site are located to the north of the Grand Canal, to the south on the R134
Nangor Road, and to the west on the R120. There is also a large housing development, Kilmahuddrick to
the east across the R136. There are no residential properties within approximately 200 metres of the facility
boundary.
The Griffeen River was realigned during the construction of the Business Park and runs northwards
approximately 60 metres from the site. In addition, the Grand Canal is located approximately 140 metres
north of the site running from west to east.
The location of the facility is illustrated on Figure D.1.1 (A) and Figure D.1.1 (B).
D.1.2 Planning History
A planning application for the power plant was submitted to South Dublin County Council in March 2015
(Reference: SD15A/0061). The application was supported by an Environmental Report and a Stage 1
Screening for Appropriate Assessment. Planning permission was granted by South Dublin County Council
in June 2015.
A second planning application was submitted to South Dublin County Council in November 2016
(Reference SD16/0398). This application sought to amend the original permission to take account of the
following: reduction of capacity of the plant from 115MW to 96MW; removal of 1 duel fired engine;
alteration to the operational hours of the facility from 12 hours to 24 hours per day; increase of backup fuel
storage by 895m3; additional Selective Catalytic Reduction (SCR) Tank and increase in height from the
D Infrastructure and Operation
Grange BackUp Power Industrial Emissions Licence Review Application
32
D.1 Operational Information Requirements
D.1.1 Site Location and Environs
The site on which the facility will be located occupies an area of 1.23 hectares and is situated approximately
12 kilometres to the west of Dublin city centre in Grange Castle Business Park, Clondalkin, Dublin 22.
The Business Park has undergone significant change in recent years as previously agricultural lands have
been opened up with access roads and subdivided into plots for high-end industrial and business uses. The
most notable site occupants within the Business Park are Pfizer, Microsoft, Takeda and Aryzta, with further
developments currently under construction for Grifols and Microsoft.
The site of the proposed power station currently consists of mounds of topsoil which was placed on the site
following site clearance works for a previous development in the Business Park. This topsoil will be removed
prior to the start of the construction phase bringing the level of the site to a similar level to the ESB substation
access road which divides the site.
The site is bounded to the north by the existing ESB Grange Castle 110kV Substation; to the east by a
hedgerow; to the south by a Business Park internal road; and to the west by an area of hardstanding.
The nearest residences to the site are located to the north of the Grand Canal, to the south on the R134
Nangor Road, and to the west on the R120. There is also a large housing development, Kilmahuddrick to
the east across the R136. There are no residential properties within approximately 200 metres of the facility
boundary.
The Griffeen River was realigned during the construction of the Business Park and runs northwards
approximately 60 metres from the site. In addition, the Grand Canal is located approximately 140 metres
north of the site running from west to east.
The location of the facility is illustrated on Figure D.1.1 (A) and Figure D.1.1 (B).
D.1.2 Planning History
A planning application for the power plant was submitted to South Dublin County Council in March 2015
(Reference: SD15A/0061). The application was supported by an Environmental Report and a Stage 1
Screening for Appropriate Assessment. Planning permission was granted by South Dublin County Council
in June 2015.
A second planning application was submitted to South Dublin County Council in November 2016
(Reference SD16/0398). This application sought to amend the original permission to take account of the
following: reduction of capacity of the plant from 115MW to 96MW; removal of 1 duel fired engine;
alteration to the operational hours of the facility from 12 hours to 24 hours per day; increase of backup fuel
storage by 895m3; additional Selective Catalytic Reduction (SCR) Tank and increase in height from the
D Infrastructure and Operation
Grange BackUp PowerMott MacDonald
0.1 Operational Information Requirements
D.1.1 Site Location and Environs
The site on which the facility will be located occupies an area of 1.23 hectares and is situated approximately12 kilometres to the west of Dublin city centre in Grange Castle Business Park, Clondalkin, Dublin 22.
The Business Park has undergone significant change in recent years as previously agricultural lands havebeen opened up with access roads and subdivided into plots for high-end industrial and business uses. Themost notable site occupants within the Business Park are Pfizer, Microsoft, Takeda and Aryzta, with furtherdevelopments currently under construction for Grifols and Microsoft.
The site of the proposed power station currently consists of mounds of topsoil which was placed on the sitefollowing site clearance works for a previous development in the Business Park. This topsoil will be removedprior to the start of the construction phase bringing the level of the site to a similar level to the ESB substationaccess road which divides the site.
The site is bounded to the north by the existing ESB Grange Castle 110kV Substation; to the east by ahedgerow; to the south by a Business Park internal road; and to the west by an area of hardstanding.
The nearest residences to the site are located to the north of the Grand Canal, to the south on the R134Nangor Road, and to the west on the R120. There is also a large housing development, Kilmahuddrick tothe east across the R136. There are no residential properties within approximately 200 metres of the facilityboundary.
The Griffeen River was realigned during the construction of the Business Park and runs northwardsapproximately 60 metres from the site. In addition, the Grand Canal is located approximately 140 metresnorth of the site running from west to east.
The location of the facility is illustrated on Figure D.1.1 (A) and Figure D.1.1 (B).
D.1.2 Planning History
A planning application for the power plant was submitted to South Dublin County Council in March 2015(Reference: SD15A/0061). The application was supported by an Environmental Report and a Stage 1Screening for Appropriate Assessment. Planning permission was granted by South Dublin County Councilin June 2015.
A second planning application was submitted to South Dublin County Council in November 2016(Reference SD16/0398). This application sought to amend the original permission to take account of thefollowing: reduction of capacity of the plant from 115MW to 96MW; removal of 1 duel fired engine;alteration to the operational hours of the facility from 12 hours to 24 hours per day; increase of backup fuelstorage by 895m3; additional Selective Catalytic Reduction (SCR) Tank and increase in height from the
32
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
SITE LOCATION MAP 1
-
Ordnance Survey Map Ref No:
3261 - C , 3260 - D , 3325 - B & 3326 - A
P1 29/09/15 SHY For Planning
MMcC PK
Key to symbols
App’dCh’k’dDescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A0
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
Security
P:\Dublin\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.1(A)_P2.dwg Mar 15, 2017 - 4:16PM ric66327
TFW
©
Figure D.1.1(A)
Site Location Map
Grange Back Up Power Ltd
Others
S. Healy
M.McCarthy
Others
P.Kelly
1:2500 APR
MMD-349512-N-DR-00-XX-0003
P2 STD
Mott MacDonald
South Block, Rockfield,
Dundrum, Dublin 16,
Ireland
+353 (0)1 2916700
+353 (0)1 2916747
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Mott MacDonald
GRANGE BACK-UP POWER PLANT FACILITY - SITE LOCATION
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGS
AND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ALL COORDINATES ARE TO OSI NATIONAL GRID.
4. LEVELS ARE IN METRES RELATIVE TO ORDNANCE
SURVEY DATUM MALIN HEAD.
OS MAPPING
1:50000
NORTH
P2 10/03/17 ERN For PlanningMMcC PK
Ordnance Survey Ireland Licence No. EN0034517©Ordnance Survey Ireland/Government of Ireland
125m250m0
1:2500
N
SITE LOCATION
LAKE
GRANGE
CASTLE
GRANGE CASTLE
BUSINESS PARK
TAKEDA
GRAND CANAL
FOOTBRIDGE
GRIFOLS
MICROSOFT
CLUTTERLAND
ARYZTA / CdeF
BALLYBANE PITCH
AND PUTT COURSE
MILLTOWN BUSINESS AND
TECHNOLOGY PARK
KILCARBURY
BUSINESS PARK
GRANGE CASTLE
GOLF COURSE
PROFILE PARK
BUSINESS PARK
PFIZER
G
R
A
N
G
E
C
A
S
T
L
E
R
O
A
D
GRAND CANAL
MICROSOFT
BALLYBANE
F
U
T
U
R
E
R
1
2
0
A
L
I
G
N
M
E
N
T
ESB
SUBSTATION
110KV
MARKETING
SUITE
SITE
NOTICE
SITE
NOTICE
SITE
NOTICE
HOUSING ESTATE
KILCRONNAN
SITE LOCATION MAP 1
-
Ordnance Survey Map Ref No:
3261 - C , 3260 - D , 3325 - B & 3326 - A
P1 29/09/15 SHY For Planning
MMcC PK
Key to symbols
App’dCh’k’dDescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A0
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
Security
P:\Dublin\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.1(A)_P2.dwg Mar 15, 2017 - 4:16PM ric66327
TFW
©
Figure D.1.1(A)
Site Location Map
Grange Back Up Power Ltd
Others
S. Healy
M.McCarthy
Others
P.Kelly
1:2500 APR
MMD-349512-N-DR-00-XX-0003
P2 STD
Mott MacDonald
South Block, Rockfield,
Dundrum, Dublin 16,
Ireland
+353 (0)1 2916700
+353 (0)1 2916747
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Mott MacDonald
GRANGE BACK-UP POWER PLANT FACILITY - SITE LOCATION
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGS
AND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ALL COORDINATES ARE TO OSI NATIONAL GRID.
4. LEVELS ARE IN METRES RELATIVE TO ORDNANCE
SURVEY DATUM MALIN HEAD.
OS MAPPING
1:50000
NORTH
P2 10/03/17 ERN For PlanningMMcC PK
Ordnance Survey Ireland Licence No. EN0034517©Ordnance Survey Ireland/Government of Ireland
125m250m0
1:2500
N
SITE LOCATION
LAKE
GRANGE
CASTLE
GRANGE CASTLE
BUSINESS PARK
TAKEDA
GRAND CANAL
FOOTBRIDGE
GRIFOLS
MICROSOFT
CLUTTERLAND
ARYZTA / CdeF
BALLYBANE PITCH
AND PUTT COURSE
MILLTOWN BUSINESS AND
TECHNOLOGY PARK
KILCARBURY
BUSINESS PARK
GRANGE CASTLE
GOLF COURSE
PROFILE PARK
BUSINESS PARK
PFIZER
G
R
A
N
G
E
C
A
S
T
L
E
R
O
A
D
GRAND CANAL
MICROSOFT
BALLYBANE
F
U
T
U
R
E
R
1
2
0
A
L
I
G
N
M
E
N
T
ESB
SUBSTATION
110KV
MARKETING
SUITE
SITE
NOTICE
SITE
NOTICE
SITE
NOTICE
HOUSING ESTATE
KILCRONNAN
inn‘stown
//
2/ /Golli r
rrialierstownIMhér Bridge Ballymakaily
'79
Clutterland"‘ \u\
\
“ 1Millto nV73 Aungiersto
and.4 Ballybane
Griffin n CI’lU EI'I
t Kilmactalway
...,__. .15,Blund I "h-
Kilbride
'8 9%I ‘0
W ‘tmanstown "in. B onnelA1 o Irome
© Mott MacDonald
/IIili|
i|i\\\\
\‘\
BALLY AKAILY
CLUTTER
u?recGlebe ,\
Eske NorthI?
5 Gas
C K_ 94Q? sker South
Balg
Négd
SITE LOCATION 5MPay 11th 10th
- Lock k
S(U5e
\laL9f
5*5LL
DD
ARYZTA /
kin .nd Ganal
if? “5*ChurchSch
astle
4'Icarbery (”T ‘
Priest Town‘
.MemorialBaldonnell
oneegalioCommon
Lower
08 MAPPING1:50000
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
P:\Dublin\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.1(A)_P2.dwg Mar 15, 2017 - 4:16PM ri066327
1.83m R“
Pitch dc PuttCourse
om
12th Lock
MICROSOFT
/
BALLYBANE PITCHAND PUTT COURSE
DESI
E] Derravaragh
MILLTOWN BUSINESS ANDTECHNOLOGY PARK
Grand Canal
ESBSUBSTATION
110KV
,@
BALLYBAN E
‘uIGRIFOLS
SITENOTICE
1.83m RH
GRANGE CASTLEBUSINESS PARK
“"2
CROSOFT
KILCARBURYBUSINESS PARK
SITE LOCATION MAP mSCALE 1:2500 U
Brookside
at
PROFILE PARKBUSINESS PARK \.
D CANAL
SITENOTICE
KILIVIAHUD
PFIZER
NANCOR
SITENOTICE
Golf Course
Ordnance Survey Map Ref No:3261 -C,3260-D,3325-B & 3326-A
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGSAND SPECIFICATIONS.
DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
ALL COORDINATES ARE TO OSI NATIONAL GRID.
LEVELS ARE IN METRES RELATIVE TO ORDNANCESURVEY DATUM MALIN HEAD.
Key to symbols
— GRANGE BACK-UP POWER PLANT FACILITY - SITE LOCATION
\\\‘\‘\‘l'|'I‘I'I|_._;Ia._
\\\‘\‘\\\\
Reference drawings
Castlealto of)
012500 I I_I
P2 10/03/17 ERN For Planning MMcC PK
P1 29/09/15 SHY For Planning MMcC PK
Rev Date Drawn Description Ch’k’d App’d
Mott MacDonaldSouth Block, Rockfield,m
Mott MacDonald
Dundrum, Dublin 16,Ireland
T +353 (0)1 2916700F +353(0)12916747w www.mottmac.com
Client
cucky Grange Back Up Power Ltd
GE STLE Figure D.1.1(A)
Site Location Map
Designed Others Eng check Others
Drawn S. Healy Coordination
Dwg check M.McCarthy Approved P.Kelly
Scale at A0 Status Rev Security
Ordnance Ordnance Survey Ireland Licence No. EN0034517 -I Survey ©Ordnance Survey Ireland/Government of Ireland Drawmg Number
" Ireland MM D-349512-N-DR-OO-XX-OOO3
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
SITE LOCATION MAP 1
-
Ordnance Survey Map Ref No:
3261 - C , 3260 - D , 3325 - B & 3326 - A
P1 29/09/15 SHY For PlanningMMcC PK
Key to symbols
App’dCh’k’dDescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A0
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
Security
P:\Dublin\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.1(B)_P2.dwg Mar 15, 2017 - 4:17PM ric66327
TFW
©
Figure D.1.1 (B)
Site Location Map - Aerial View
Grange Back Up Power Ltd
Others
S. Healy
M.McCarthy
Others
P.Kelly
1:2500 APR
MMD-349512-N-DR-00-XX-0004
P2 STD
Mott MacDonald
South Block, Rockfield,
Dundrum, Dublin 16,
Ireland
+353 (0)1 2916700
+353 (0)1 2916747
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Mott MacDonald
GRANGE BACK-UP POWER PLANT FACILITY - SITE LOCATION
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGS
AND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ALL COORDINATES ARE TO OSI NATIONAL GRID.
4. LEVELS ARE IN METRES RELATIVE TO ORDNANCE
SURVEY DATUM MALIN HEAD.
OS MAPPING
1:50000
P2 10/03/17 ERN For PlanningMMcC PK
Ordnance Survey Ireland Licence No. EN0034517©Ordnance Survey Ireland/Government of Ireland
125m 250m0
1:2500
N
SITE LOCATION
GRAND CANAL
FOOTBRIDGE
F
U
T
U
R
E
R
1
2
0
A
L
I
G
N
M
E
N
T
ESB
SUBSTATION
110KV
SITE
NOTICE
SITE
NOTICE
SITE LOCATION MAP 1
-
Ordnance Survey Map Ref No:
3261 - C , 3260 - D , 3325 - B & 3326 - A
P1 29/09/15 SHY For PlanningMMcC PK
Key to symbols
App’dCh’k’dDescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A0
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
Security
P:\Dublin\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.1(B)_P2.dwg Mar 15, 2017 - 4:17PM ric66327
TFW
©
Figure D.1.1 (B)
Site Location Map - Aerial View
Grange Back Up Power Ltd
Others
S. Healy
M.McCarthy
Others
P.Kelly
1:2500 APR
MMD-349512-N-DR-00-XX-0004
P2 STD
Mott MacDonald
South Block, Rockfield,
Dundrum, Dublin 16,
Ireland
+353 (0)1 2916700
+353 (0)1 2916747
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Mott MacDonald
GRANGE BACK-UP POWER PLANT FACILITY - SITE LOCATION
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGS
AND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ALL COORDINATES ARE TO OSI NATIONAL GRID.
4. LEVELS ARE IN METRES RELATIVE TO ORDNANCE
SURVEY DATUM MALIN HEAD.
OS MAPPING
1:50000
P2 10/03/17 ERN For PlanningMMcC PK
Ordnance Survey Ireland Licence No. EN0034517©Ordnance Survey Ireland/Government of Ireland
125m 250m0
1:2500
N
SITE LOCATION
GRAND CANAL
FOOTBRIDGE
F
U
T
U
R
E
R
1
2
0
A
L
I
G
N
M
E
N
T
ESB
SUBSTATION
110KV
SITE
NOTICE
SITE
NOTICE
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGSAND SPECIFICATIONS.
DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
ALL COORDINATES ARE TO OSI NATIONAL GRID.
LEVELS ARE IN METRES RELATIVE TO ORDNANCESURVEY DATUM MALIN HEAD.
Key to symbols
— GRANGE BACK-UP POWER PLANT FACILITY - SITE LOCATION
SITENOTICE
SITENOTICE
II III III iii-ii" I: I
012500
- 10/03/17 - For Planning29/09/15 For Planning
SITENOTICE Zifiiyéii‘k’iiflckiew,
Dundrum, Dublin 16,Ireland
+353 012916700MO“ MQCDonald I +353I0I12916747*“fifillierstown
w www.mottmac.comBi‘icige"-.r~ .
Client
Grange Back Up Power Ltd/,
. ' 'i.Aungierstjvk
andBallybane 10.4, .,mm.\l Kilcarbery __ i ‘
Lf J ‘
Figure D.1.1 (B)
Site Location Map - Aerial View
es mans own , _ ____ ., _, .i _‘ ..
OS MAPPING Scale at A0 Status Rev Security: SITE LOCATION MAP E — > .
Ordnance Survey Map Ref No: ‘ Ordnance Ordnance Survey Ireland Licence No. EN0034SI 7 Drawing Number3261 _ C 3260 _ D 3325 _ B & 3326 _ A 3’ Survey ©Ordnance Survey Ireland/Government of IrelandThis document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. , , _. . . . .. . . . . . . . . . Ireland MMD-349512—N-DR-00-XX-0004We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omisswn which is due to an error or omisswn in data supplied to us by other parties.
‘ 'l5
© Mott MacDonald
P:\Dub|in\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.1(B)_P2.dwg Mar 15, 2017 - 4:17PM ric66327
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
33
approved SCR tank by 4.3m, 2 step-up transformers, gas pressure station skid; alterations to the approved
bund to the west of site; alterations to the approved layout of the tanks in the bund to the west of the site;
realignment of services to the west of the site; increase in storm water attenuation; minor alterations to
proposed landscaping, and all associated site works on a 1.233 hectare site. An Environmental Impact
Statement (EIS) was submitted with this application. Planning permission was granted by South Dublin
County Council in February 2017
It should be noted that Condition No. 2 of SD16A/0398 states that all conditions associated with the
previous permission (SD15A/0061) shall be complied with unless otherwise required in the schedule of
condition for SD16A/0398). For that reason, both planning permissions are referenced in this licence
application, as both are extant.
D.1.3 Overview of Key Plant Processes
The power plant will have a nominal capacity of 96 MW and will generate electricity for export to the national
electricity grid. The plant will be operated as a flexible power plant will have the capability to provide power
to an occupant in Grange Castle Business Park and also to the national grid by supporting high levels of
intermittent wind generation. The plant design will allow for fast flexible operation so that it can be utilised by
the System Operator (ESB Networks) to respond rapidly to voltage or frequency fluctuations on the electricity
grid and provide black start services.
Natural gas, supplied from the Gas Networks Ireland national grid, will be the primary fuel source for the
facility.
In order to comply with Commission for Energy Regulation (CER) regulations low sulphur distillate oil will be
stored as a backup fuel in the event of interruption to the natural gas supply. Up to 72 hours (3 days)
maximum running capacity of distillate is required to be stored on site (approximately 2,895m³) in a bunded
tank. It should be noted that the power plant is expected to operate primarily on natural gas and only in very
rare circumstance on distillate oil in the event of emergency scenarios or an interruption to gas supplies. This
operating requirement is recognised in the grant of planning permission issued by South Dublin County
Council (Planning Register: SD15A/0061) which states under Condition No. 3 that ‘oil fired power generation
shall only be used in the event of emergency operation…and shall not be used for any normal operating
period’. Furthermore Condition No. 8(b) of SD15A/0061 states that ‘emergency generator testing will take
place only once a month between the hours and 09.00 and 17.00 Monday to Friday’ and Condition No. 9(c)
which states ‘in the event of annual testing of the emergency generators for an extended period being
required, such testing will only take place between the hours of 09.00 and 17.00 Monday to Friday’’.
Two transformers will be required on the site. These will step up the voltage of power generated by the power
plant for export to the Electricity National Grid. These transformers will be bunded, fire and blast protected
to both EirGrid and relevant international standards such as National Fire Protection Agency (NFPA) 850.
Grange BackUp Power Industrial Emissions Licence Review Application
33
approved SCR tank by 4.3m, 2 step-up transformers, gas pressure station skid; alterations to the approved
bund to the west of site; alterations to the approved layout of the tanks in the bund to the west of the site;
realignment of services to the west of the site; increase in storm water attenuation; minor alterations to
proposed landscaping, and all associated site works on a 1.233 hectare site. An Environmental Impact
Statement (EIS) was submitted with this application. Planning permission was granted by South Dublin
County Council in February 2017
It should be noted that Condition No. 2 of SD16A/0398 states that all conditions associated with the
previous permission (SD15A/0061) shall be complied with unless otherwise required in the schedule of
condition for SD16A/0398). For that reason, both planning permissions are referenced in this licence
application, as both are extant.
D.1.3 Overview of Key Plant Processes
The power plant will have a nominal capacity of 96 MW and will generate electricity for export to the national
electricity grid. The plant will be operated as a flexible power plant will have the capability to provide power
to an occupant in Grange Castle Business Park and also to the national grid by supporting high levels of
intermittent wind generation. The plant design will allow for fast flexible operation so that it can be utilised by
the System Operator (ESB Networks) to respond rapidly to voltage or frequency fluctuations on the electricity
grid and provide black start services.
Natural gas, supplied from the Gas Networks Ireland national grid, will be the primary fuel source for the
facility.
In order to comply with Commission for Energy Regulation (CER) regulations low sulphur distillate oil will be
stored as a backup fuel in the event of interruption to the natural gas supply. Up to 72 hours (3 days)
maximum running capacity of distillate is required to be stored on site (approximately 2,895m³) in a bunded
tank. It should be noted that the power plant is expected to operate primarily on natural gas and only in very
rare circumstance on distillate oil in the event of emergency scenarios or an interruption to gas supplies. This
operating requirement is recognised in the grant of planning permission issued by South Dublin County
Council (Planning Register: SD15A/0061) which states under Condition No. 3 that ‘oil fired power generation
shall only be used in the event of emergency operation…and shall not be used for any normal operating
period’. Furthermore Condition No. 8(b) of SD15A/0061 states that ‘emergency generator testing will take
place only once a month between the hours and 09.00 and 17.00 Monday to Friday’ and Condition No. 9(c)
which states ‘in the event of annual testing of the emergency generators for an extended period being
required, such testing will only take place between the hours of 09.00 and 17.00 Monday to Friday’’.
Two transformers will be required on the site. These will step up the voltage of power generated by the power
plant for export to the Electricity National Grid. These transformers will be bunded, fire and blast protected
to both EirGrid and relevant international standards such as National Fire Protection Agency (NFPA) 850.
Grange BackUp PowerMott MacDonald
approved SCR tank by 4.3m, 2 step-up transformers, gas pressure station skid; alterations to the approvedbund to the west of site; alterations to the approved layout of the tanks in the bund to the west of the site;realignment of services to the west of the site; increase in storm water attenuation; minor alterations toproposed landscaping, and all associated site works on a 1.233 hectare site. An Environmental ImpactStatement (EIS) was submitted with this application. Planning permission was granted by South DublinCounty Council in February 2017
It should be noted that Condition No. 2 of SD16A/O398 states that all conditions associated with theprevious permission (SD15A/0061) shall be complied with unless otherwise required in the schedule ofcondition for SD16A/0398). For that reason, both planning permissions are referenced in this licenceapplication, as both are extant.
D.1.3 Overview of Key Plant Processes
The power plant will have a nominal capacity of 96 MW and will generate electricity for export to the nationalelectricity grid. The plant will be operated as a flexible power plant will have the capability to provide powerto an occupant in Grange Castle Business Park and also to the national grid by supporting high levels ofintermittent wind generation. The plant design will allow for fast flexible operation so that it can be utilised bythe System Operator (ESB Networks) to respond rapidly to voltage or frequency fluctuations on the electricitygrid and provide black start services.
Natural gas, supplied from the Gas Networks Ireland national grid, will be the primary fuel source for thefacility.
In order to comply with Commission for Energy Regulation (CER) regulations low sulphur distillate oil will bestored as a backup fuel in the event of interruption to the natural gas supply. Up to 72 hours (3 days)maximum running capacity of distillate is required to be stored on site (approximately 2,895m3) in a bundedtank. It should be noted that the power plant is expected to operate primarily on natural gas and only in veryrare circumstance on distillate oil in the event of emergency scenarios or an interruption to gas supplies. Thisoperating requirement is recognised in the grant of planning permission issued by South Dublin CountyCouncil (Planning Register: SD15A/0061) which states under Condition No. 3 that ‘oil firedpowergenerationshall only be used in the event of emergency operation...and shall not be used for any normal operatingperiod’. Furthermore Condition No. 8(b) of SD15A/0061 states that ‘emergency generator testing will takeplace only once a month between the hours and 09.00 and 17.00 Monday to Friday’and Condition No. 9(c)which states ‘in the event of annual testing of the emergency generators for an extended period beingrequired, such testing will only take place between the hours of 09.00 and 17.00 Monday to Friday”.
Two transformers will be required on the site. These will step up the voltage of power generated by the powerplant for export to the Electricity National Grid. These transformers will be bunded, fire and blast protectedto both EirGrid and relevant international standards such as National Fire Protection Agency (NFPA) 850.
33
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
34
The power plant electrical generator will be connected to the transformer compound to step the voltage up
to 110kV. This will connect to the on-site switchyard, a fenced compound containing electrical switchgear
and circuit breakers.
The electricity will be exported to the national grid via a new 110kV cable to the ESB Grange Castle 110kV
Substation located to the immediate north of the power plant.
The power plant will also be capable of providing power to a nearby occupant in Grange Castle Business
Park. An underground route that will be used for the electrical cabling to connect the power plant to the
occupant. This route will be underground for its full length and has been agreed with South Dublin County
Council, Grange Castle management and its engineers.
The plant is expected to be operational for 25 years.
D.1.4 Power Plant Infrastructure and Equipment
The power plant will comprise the following main components:
� Engine hall comprising:
– 6 no. Wärtsilä 50DF engines;
– 2 no 25 metre Exhaust stacks;
– Compressor Room;
– Store Workshop;
– Low Voltage (LV) Switchgear Room;
– Medium Voltage (MV) Switchgear Room;
– Control Room;
– Coffee Room;
– Toilets;
� Compact Workshop and Warehouse;
� Fuel Oil Storage Tank;
� Fuel Oil Tank Unloading Bay;
� Leak Fuel Tank (clean);
� Leak Fuel Tank (dirty);
� 2 no. SCR Reagent Tanks (Urea);
� Sludge Tank;
� Water Treatment Unit;
� Treated Water Tank;
� Pump House;
� Raw Water and Fire Water Tank;
� Fire Pump Station;
� Pipe Bridge;
� Oily Water Collection Pit;
� Station Transformer;
Grange BackUp Power Industrial Emissions Licence Review Application
34
The power plant electrical generator will be connected to the transformer compound to step the voltage up
to 110kV. This will connect to the on-site switchyard, a fenced compound containing electrical switchgear
and circuit breakers.
The electricity will be exported to the national grid via a new 110kV cable to the ESB Grange Castle 110kV
Substation located to the immediate north of the power plant.
The power plant will also be capable of providing power to a nearby occupant in Grange Castle Business
Park. An underground route that will be used for the electrical cabling to connect the power plant to the
occupant. This route will be underground for its full length and has been agreed with South Dublin County
Council, Grange Castle management and its engineers.
The plant is expected to be operational for 25 years.
D.1.4 Power Plant Infrastructure and Equipment
The power plant will comprise the following main components:
� Engine hall comprising:
– 6 no. Wärtsilä 50DF engines;
– 2 no 25 metre Exhaust stacks;
– Compressor Room;
– Store Workshop;
– Low Voltage (LV) Switchgear Room;
– Medium Voltage (MV) Switchgear Room;
– Control Room;
– Coffee Room;
– Toilets;
� Compact Workshop and Warehouse;
� Fuel Oil Storage Tank;
� Fuel Oil Tank Unloading Bay;
� Leak Fuel Tank (clean);
� Leak Fuel Tank (dirty);
� 2 no. SCR Reagent Tanks (Urea);
� Sludge Tank;
� Water Treatment Unit;
� Treated Water Tank;
� Pump House;
� Raw Water and Fire Water Tank;
� Fire Pump Station;
� Pipe Bridge;
� Oily Water Collection Pit;
� Station Transformer;
Grange BackUp PowerMott MacDonald
The power plant electrical generator will be connected to the transformer compound to step the voltage upto 110kV. This will connect to the on-site switchyard, a fenced compound containing electrical switchgearand circuit breakers.
The electricity will be exported to the national grid via a new 110kV cable to the ESB Grange Castle 110kVSubstation located to the immediate north of the power plant.
The power plant will also be capable of providing power to a nearby occupant in Grange Castle BusinessPark. An underground route that will be used for the electrical cabling to connect the power plant to theoccupant. This route will be underground for its full length and has been agreed with South Dublin CountyCouncil, Grange Castle management and its engineers.
The plant is expected to be operational for 25 years.
D.1.4 Power Plant Infrastructure and Equipment
The power plant will comprise the following main components:
Engine hall comprising:6 no. Wértsila 50DF engines;2 no 25 metre Exhaust stacks;Compressor Room;Store Workshop;Low Voltage (LV) Switchgear Room;Medium Voltage (MV) Switchgear Room;Control Room;Coffee Room;Toilets;
Compact Workshop and Warehouse;Fuel Oil Storage Tank;Fuel Oil Tank Unloading Bay;Leak Fuel Tank (clean);Leak Fuel Tank (dirty);2 no. SCR Reagent Tanks (Urea);Sludge Tank;Water Treatment Unit;Treated Water Tank;Pump House;Raw Water and Fire Water Tank;Fire Pump Station;Pipe Bridge;Oily Water Collection Pit;Station Transformer;
34
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
35
� Block Transformer;
� 2.4 metre high fencing;
� Security Kiosk;
� Car Park.
The layout of the power plant is illustrated in Figure D.1.2 (A) and Figure D.1.2 (B). Engineering drawings
(submitted to South Dublin County Council as part of the planning application for this plant) are also provided
at the end of this section.
D.1.5 Description of Key Plant Processes and Operating Procedures
General
Based on the design characteristics of the Wärtsilä 50DF engine, the power plant can operate on stand-by,
emergency, peak and mid-merit load applications. The engine is a four stroke, dual fuel engine which is
designed for operation either on natural gas with light fuel oil (LFO) as pilot fuel, or on low sulphur distillate
oil, as a back-up fuel only. The Wärtsilä 50DF multi-fuel engines have been selected for the Grange BackUp
Power plant due to:
� High operational efficiency;
� Operational flexibility and reliability;
� Fast starts: 10-minute start from cold to full power;
� Can operate equally well on gas and liquid fuel and switch between them on the run;
� Load following and cycling capabilities; and
� Environmental performance: High efficiency means the plant will produce lower emissions (e.g. Nitrogen
Oxides (NOx), Carbon Monoxide (CO), etc.) to atmosphere per unit of energy produced compared to
similar engines available on the market.
The total electricity output will be 96MW during optimum conditions reaching thermal efficiencies in excess
of approximately 47%, which is higher than any other gas engine available on the market.
Power Generation Process
A site layout plan showing the layout of the principal buildings and plant on site is shown on Figure D.1.2 (A)
& (B). The overall power generation process can be summarised as follows:
1. Gas Operation Mode
In gas operation mode, the engine works according to the lean burn Otto-cycle. In this process the gas-air
mixture is mixed with air before the inlet valves, during the air intake period. After the compression phase,
the gas-air mixture is ignited by a small amount of pilot fuel. The pilot fuel is pressurised, and fed into
cylinders by a small common rail system. The combustion is fast, and after the working phase, the exhaust
Grange BackUp Power Industrial Emissions Licence Review Application
35
� Block Transformer;
� 2.4 metre high fencing;
� Security Kiosk;
� Car Park.
The layout of the power plant is illustrated in Figure D.1.2 (A) and Figure D.1.2 (B). Engineering drawings
(submitted to South Dublin County Council as part of the planning application for this plant) are also provided
at the end of this section.
D.1.5 Description of Key Plant Processes and Operating Procedures
General
Based on the design characteristics of the Wärtsilä 50DF engine, the power plant can operate on stand-by,
emergency, peak and mid-merit load applications. The engine is a four stroke, dual fuel engine which is
designed for operation either on natural gas with light fuel oil (LFO) as pilot fuel, or on low sulphur distillate
oil, as a back-up fuel only. The Wärtsilä 50DF multi-fuel engines have been selected for the Grange BackUp
Power plant due to:
� High operational efficiency;
� Operational flexibility and reliability;
� Fast starts: 10-minute start from cold to full power;
� Can operate equally well on gas and liquid fuel and switch between them on the run;
� Load following and cycling capabilities; and
� Environmental performance: High efficiency means the plant will produce lower emissions (e.g. Nitrogen
Oxides (NOx), Carbon Monoxide (CO), etc.) to atmosphere per unit of energy produced compared to
similar engines available on the market.
The total electricity output will be 96MW during optimum conditions reaching thermal efficiencies in excess
of approximately 47%, which is higher than any other gas engine available on the market.
Power Generation Process
A site layout plan showing the layout of the principal buildings and plant on site is shown on Figure D.1.2 (A)
& (B). The overall power generation process can be summarised as follows:
1. Gas Operation Mode
In gas operation mode, the engine works according to the lean burn Otto-cycle. In this process the gas-air
mixture is mixed with air before the inlet valves, during the air intake period. After the compression phase,
the gas-air mixture is ignited by a small amount of pilot fuel. The pilot fuel is pressurised, and fed into
cylinders by a small common rail system. The combustion is fast, and after the working phase, the exhaust
Grange BackUp PowerMott MacDonald
Block Transformer;2.4 metre high fencing;Security Kiosk;Car Park.
The layout of the power plant is illustrated in Figure D.1.2 (A) and Figure D.1.2 (B). Engineering drawings(submitted to South Dublin County Council as part of the planning application for this plant) are also providedat the end of this section.
D.1.5 Description of Key Plant Processes and Operating Procedures
General
Based on the design characteristics of the Wértsila 50DF engine, the power plant can operate on stand-by,emergency, peak and mid-merit load applications. The engine is a four stroke, dual fuel engine which isdesigned for operation either on natural gas with light fuel oil (LFO) as pilot fuel, or on low sulphur distillateoil, as a back-up fuel only. The Wértsila 50DF multi-fuel engines have been selected for the Grange BackUpPower plant due to:
High operational efficiency;Operational flexibility and reliability;Fast starts: 10-minute start from cold to full power;Can operate equally well on gas and liquid fuel and switch between them on the run;Load following and cycling capabilities; andEnvironmental performance: High efficiency means the plant will produce lower emissions (e.g. NitrogenOxides (NOX), Carbon Monoxide (CO), etc.) to atmosphere per unit of energy produced compared tosimilar engines available on the market.
The total electricity output will be 96MW during optimum conditions reaching thermal efficiencies in excessof approximately 47%, which is higher than any other gas engine available on the market.
Power Generation Process
A site layout plan showing the layout of the principal buildings and plant on site is shown on Figure D.1.2 (A)& (B). The overall power generation process can be summarised as follows:
1. Gas Operation Mode
ln gas operation mode, the engine works according to the lean burn Otto-cycle. In this process the gas-airmixture is mixed with air before the inlet valves, during the air intake period. After the compression phase,the gas-air mixture is ignited by a small amount of pilot fuel. The pilot fuel is pressurised, and fed intocylinders by a small common rail system. The combustion is fast, and after the working phase, the exhaust
35
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
P1 29/09/15 SHY For PlanningMMcC PK
Key to symbols
App’dCh’k’dDescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A0
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
Security
P:\Dublin\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.2(A)_P2.dwg Mar 16, 2017 - 9:40AM ric66327
TFW
©
Figure D.1.2 (A)
Site Layout
Plan View
Grange Back Up Power Ltd
Others
S. Healy
M.McCarthy
Others
P.Kellly
1:200 APR
MMD-349512-N-DR-00-XX-0005
P2 STD
Mott MacDonald
South Block, Rockfield,
Dundrum, Dublin 16,
Ireland
+353 (0)1 2916700
+353 (0)1 2916747
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Mott MacDonald
1
2
3
4
5
6
8
9
10
11
13
16
17
18
19
20
7
14
21
15
22
23
24
25
30
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGS
AND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ANY DISCREPANCIES TO BE REPORTED TO THE
ARCHITECT.
4. ALL DIMENSIONS ARE IN MILLIMETERS.
5. ALL LEVELS ARE IN METRES RELATIVE TO ORDNANCE
SURVEY DATUM MALIN HEAD.
26
37
38
P2 10/03/17 ERN For Planning
MMcC PK
28
29
39
40
³ SURFACE WATER ATTENUATION TANK
³
IED APPLICATION SITE BOUNDARY
ENGINE HALL - ROOF PLAN
ANCILLIARY TANKS, PLANT, EQUIPMENT AND BUILDINGS
10m20m0
1:200
N
1
22
22
22
22
22
22
6
5
18
10
11
16
8
4
19
25
19
2423
21
14
3
7
20
15
2
14
26
17
37
38
9
16
28
29
30
3940
³
³
P1 29/09/15 SHY For PlanningMMcC PK
Key to symbols
App’dCh’k’dDescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A0
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
Security
P:\Dublin\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.2(A)_P2.dwg Mar 16, 2017 - 9:40AM ric66327
TFW
©
Figure D.1.2 (A)
Site Layout
Plan View
Grange Back Up Power Ltd
Others
S. Healy
M.McCarthy
Others
P.Kellly
1:200 APR
MMD-349512-N-DR-00-XX-0005
P2 STD
Mott MacDonald
South Block, Rockfield,
Dundrum, Dublin 16,
Ireland
+353 (0)1 2916700
+353 (0)1 2916747
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Mott MacDonald
1
2
3
4
5
6
8
9
10
11
13
16
17
18
19
20
7
14
21
15
22
23
24
25
30
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGS
AND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ANY DISCREPANCIES TO BE REPORTED TO THE
ARCHITECT.
4. ALL DIMENSIONS ARE IN MILLIMETERS.
5. ALL LEVELS ARE IN METRES RELATIVE TO ORDNANCE
SURVEY DATUM MALIN HEAD.
26
37
38
P2 10/03/17 ERN For Planning
MMcC PK
28
29
39
40
³ SURFACE WATER ATTENUATION TANK
³
IED APPLICATION SITE BOUNDARY
ENGINE HALL - ROOF PLAN
ANCILLIARY TANKS, PLANT, EQUIPMENT AND BUILDINGS
10m20m0
1:200
N
1
22
22
22
22
22
22
6
5
18
10
11
16
8
4
19
25
19
2423
21
14
3
7
20
15
2
14
26
17
37
38
9
16
28
29
30
3940
³
³
Notes
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGSAND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ANY DISCREPANCIES TO BE REPORTED TO THEARCHITECT.
4. ALL DIMENSIONS ARE IN MILLIMETERS.
5. ALL LEVELS ARE IN METRES RELATIVE TO ORDNANCESURVEY DATUM MALIN HEAD.
Key to symbols
- I - I - I - IED APPLICATION SITE BOUNDARY
ENGINE HALL - ROOF PLAN
EXISTING ESB MAINENTRANCE TO RETAIN.—\
\ ANCILLIARY TANKS, PLANT, EQUIPMENT AND BUILDINGST._=_=_=_@==_-_=_=_=___=_=_=__:R=_F‘ —=—-=..==__.=_.=._=-__._
Reference drawingsPUMPFISFATION @ @ L0 TANK 1 9
@ (DIRTY)
II @ PEAKING PLANT SITE ENTRANCE
II ®I @®|| SCR
REGENT 2400mm HIGH SECURITY KIOSKEXTERNAL FACTORYTANK PALISADE METAL RENDER WITH GROVESFENCING. TO BE OIL UNLOADING BAYON INSULATEDPAINTED IN DARK.__GREEN COLOR. PRECAST CONCRETE
PANELS WITH SLUDGE TANKII C) SELECTED COLOR.
RAW / FIRE Q DISTILLATE OIL STORAGE TANKWATER TANK OIL ENGINE HALL
2400mm HIGH BUNDBRIE III/I STORAGE I IPAINTED. IN DARK u TANK RESGCERNT PIPE ROUTE
WATER TREATMENT UNIT SHELTER
TREATED WATER TANK
GREEN COLOR. TAN KLO TANK(CLEAN)
@ SLUDGEfl TANK @
rI I_ll rI
FIRE PUMP STATION
LO TANK (CLEAN)aOI?
: ® PROPOSED PIPEBRIDGE
A 7 gF 2 PUMP
WATER TREATMENT 311:0 HOUSEUNIT SHELTER I: TREATEDWATER
TANKE II
V
AUTOMATED FOLDING: GATE TO MANUFACTURER
lIIII @I
I
2400mm HIGH LO TANK (DIRTY)
II
II
II
fl PALISADE METALFENCING. TO BE
nn—PAINTED IN DARK“ GREEN COLOR.
I :II
" GAS ENGINE EXHAUST STACKS (2 No.)
PIPE BRIDGE
2 No. SCR REAGENT TANKS (UREA)QQ
CM
ND
OO
CM
ND
OO
CM
ND
QC
MN
DQ
OO
CN
DO
OQ
QC
MN
DQ
OO
CM
ND
OQ
OC
MN
DQ
OO
CM
ND
OQ
OC
MN
DQ
OC
KN
DO
OO
OC
MN
DO
OO
CM
ND
OO
CK
ND
OO
OO
CM
ND
OO
CM
ND
OQ
OO
CM
ND
QO
OC
MN
DO
OO
CK
ND
QO
OC
MN
DO
OO
CK
ND
Q
COMPACT WORKSHOP & WAREHOUSE
RAW WATER TANK / FIRE WATER TANK
2 No. OILY WATER COLLECTION PITS
CAR PARK (5 + 1 NO OF SPACES)TANKER UNLOADING HUT
CONTROL PIT
SCREEN FENCING
STATION TRANSFORMER
BLOCK TRANSFORMER
PUMP HOUSEll
ENGINE HALL
TRANSFORMEROC
KN
DQ
OO
CK
ND
OO
DO
CK
ND
OO
QC
MN
DO
OC
KN
DO
CM
ND
QO
OC
KN
DO
OQ
CM
ND
QO
OC
KN
DO
OQ
CK
ND
OO
OC
MN
DO
OO
CM
ND
QO
OC
KM
DO
OO
CK
ND
OO
OC
KM
DO
OO
CM
ND
QO
OC
MN
DQ
OO
CK
MD
OO
OC
MN
DQ
OO
CK
MD
OO
OC
MN
DQ
O
TRANSFORMER
GAS SKID
COMPACT WORKSHOP FOUL PUMP CHAMBER& WAR E Fl O U S E PROCESS WASTEWATER DISCHARGE CHAMBER
150m3 SURFACE WATER ATTENUATION TANK
6®®
®Q
Q@
6®®
®®
®®
66©
6@9@
®6©
6®@
®®
@
80m3 SURFACE WATER ATTENUATION TANKI50m3 SURFACE WATER ATTENUATION TANK @ fl
\ SECURITY V —— ——_ __
I GED80m3 SURFACE WATERATTENUATION TANK
_ _ _ —
l GAS SKIDlRETAINING WALL
-—=—===-=-—l=—===-——==_- = - —__ ...=._...=....=....=.=...=.._S..._. a.Q)..,=____=_..=.=._.=_.=.@.=.=.=._.=.__ _
0 10m 20m1:200 | | | I
P2 10/03/17 ERN For Planning MMcC PK
P1 29/09/15 SHY For Planning MMcC PK2400MM HIGH . . ’ v ,
FENCING AROUND Rev Date Drawn DescrIptIon Chkd AppdBOUNDARY LINE. —
EXISTING INDUSTRIAL Mott MacDonaldESTATE EXIT ROAD South Block, Rockfield,
Dundrum, Dublin 16,Ireland
T +353 (0)1 2916700Mott Macponald F +353(0)12916747
w www.mottmac.com
EXISTING INDUSTRIAL ClientESTATE ENTRANCE ROAD
Grange Back Up Power Ltd
Title
Figure D.1.2 (A)
Site LayoutPlan View
Designed Others Eng check Others
Drawn S. Healy Coordination
Dwg check M.McCarthy Approved P.KeIIIy
Scale at A0 Status Rev Security
1:200 APR P2 STD© Mott MacDonald
Drawing NumberThis document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. M M D-349512-N-D R-OO-XX-0005We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
P:\Dub|in\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.2(A)_P2.dwg Mar 16, 2017 - 9:40AM ri066327
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
GROUND FLOOR LAYOUT PLAN
ENGINE HALL:FIRST FLOOR LAYOUT
P1 29/09/15 SHY For PlanningMMcC PK
Key to symbols
App’dCh’k’dDescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A0
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
Security
P:\Dublin\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.2(B)_P2.dwg Mar 15, 2017 - 4:31PM ric66327
TFW
©
Figure D.1.2 (B)
Site Layout
(Internal View of Engine Hall)
Grange Back Up Power Ltd
Others
S. Healy
M.McCarthy
Others
P.Kellly
1:200 APR
MMD-349512-N-DR-00-XX-0006
P2 STD
Mott MacDonald
South Block, Rockfield,
Dundrum, Dublin 16,
Ireland
+353 (0)1 2916700
+353 (0)1 2916747
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Mott MacDonald
1
2
3
4
5
6
8
9
10
11
13
16
17
18
19
20
7
14
21
15
22
23
24
25
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGS
AND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ANY DISCREPANCIES TO BE REPORTED TO THE
ARCHITECT.
4. ALL DIMENSIONS ARE IN MILLIMETERS.
5. ALL LEVELS ARE IN METRES RELATIVE TO ORDNANCE
SURVEY DATUM MALIN HEAD.
30
34
37
38
28
29
P2 10/03/17 ERN For Planning
MMcC PK
31
32
33
36
35
26
39
40
³ SURFACE WATER ATTENUATION TANK
³
IED APPLICATION SITE BOUNDARY
ENGINE HALL - INTERNAL VIEW
ANCILLIARY TANKS, PLANT, EQUIPMENT AND BUILDINGS
10m20m0
1:200
N
76.4m²
23m²
27m²
72.7m²
62.5m²
31.6m²
200m²
13.5m²
B
00
08
B
00
08
A
0008
A
0008
1
22
22
22
22
22
22
6
5
18
10
11
16
8
4
19
25
19
2423
21
26
14
3
7
20
15
2
14
36 36 36 36 3636
17
37
38
9
16
28
29
30
26
26
26 3940
³
³
31
32
35
33
34
34
GROUND FLOOR LAYOUT PLAN
ENGINE HALL:FIRST FLOOR LAYOUT
P1 29/09/15 SHY For PlanningMMcC PK
Key to symbols
App’dCh’k’dDescriptionDrawnDateRev
RevStatus
Drawing Number
Scale at A0
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
Security
P:\Dublin\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.2(B)_P2.dwg Mar 15, 2017 - 4:31PM ric66327
TFW
©
Figure D.1.2 (B)
Site Layout
(Internal View of Engine Hall)
Grange Back Up Power Ltd
Others
S. Healy
M.McCarthy
Others
P.Kellly
1:200 APR
MMD-349512-N-DR-00-XX-0006
P2 STD
Mott MacDonald
South Block, Rockfield,
Dundrum, Dublin 16,
Ireland
+353 (0)1 2916700
+353 (0)1 2916747
www.mottmac.com
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
Mott MacDonald
1
2
3
4
5
6
8
9
10
11
13
16
17
18
19
20
7
14
21
15
22
23
24
25
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGS
AND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ANY DISCREPANCIES TO BE REPORTED TO THE
ARCHITECT.
4. ALL DIMENSIONS ARE IN MILLIMETERS.
5. ALL LEVELS ARE IN METRES RELATIVE TO ORDNANCE
SURVEY DATUM MALIN HEAD.
30
34
37
38
28
29
P2 10/03/17 ERN For Planning
MMcC PK
31
32
33
36
35
26
39
40
³ SURFACE WATER ATTENUATION TANK
³
IED APPLICATION SITE BOUNDARY
ENGINE HALL - INTERNAL VIEW
ANCILLIARY TANKS, PLANT, EQUIPMENT AND BUILDINGS
10m20m0
1:200
N
76.4m²
23m²
27m²
72.7m²
62.5m²
31.6m²
200m²
13.5m²
B
00
08
B
00
08
A
0008
A
0008
1
22
22
22
22
22
22
6
5
18
10
11
16
8
4
19
25
19
2423
21
26
14
3
7
20
15
2
14
36 36 36 36 3636
17
37
38
9
16
28
29
30
26
26
26 3940
³
³
31
32
35
33
34
34
Notes
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGSAND SPECIFICATIONS.
2. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY.
3. ANY DISCREPANCIES TO BE REPORTED TO THEARCHITECT.
4. ALL DIMENSIONS ARE IN MILLIMETERS.
5. ALL LEVELS ARE IN METRES RELATIVE TO ORDNANCESURVEY DATUM MALIN HEAD.
Key to symbols
- I - I - I - IED APPLICATION SITE BOUNDARY8o w00 ENGINE HALL - INTERNAL VIEW
EXISTING ESB MAINENTRANCE To RETAIN.
\ H ANCILLIARY TANKS, PLANT, EQUIPMENT AND BUILDINGS
W=l==£========l=l==-—==l——-=‘==_==l=l=—_—§—=—: =- = _—= = —— = n ——— — — — = = - = = - - = =
TRANSFORMER IISITE BOUNDARY LINE—>ll E nI—
l—
; I
" E TRANSFORMER u
I OPEN E IUTILITYAREA
CONTROL PITFIRE
l PUMP STATION LO TANK 26(DIRTY) JIT\ I @Y WATER Reference drawings""""""— COLLECTION PIT
& @ ROOF ACCESS Q) PEAKING PLANT SITE ENTRANCESCR STAIRS ®II REGENT 24-00mm HIGH D D D D _ D SECURITY KIOSKTANK PALISADE METAL II EXTERNAL FACTORY
OIL UNLOADING BAY
SLUDGE TANK
. RENDER WITH GROVESF IN . TPAIENNTCEDCTN SARR CC ME RESSOR ON INSULATED LINE INDICATES WAYLEAVE<—¥GREEN COLOR DOOM ‘ PRECAST CONCRETE. PANELS WITH
C) SELECTED COLOR- EXTERNAL FACTORY RENDERRAW / FIRE I. WITH GROVES ON INSULATED DISTILLATE OIL STORAGE TANKWATER TANK 0 PRECAST CONCRETE PANELS VOI VER2400mm HIGH OIL m WITH SELECTED COLOR. COM 880R BUND
PALISADE METAL STORAGE 3 gFENCING. TO BEERENETNEDCCIJIEODRARK “ TANK REcERW . PIPE ROUTE
' TANK II WATER TREATMENT UNIT SHELTERLO TANK =(CLEAN) 2 =2; " TREATED WATER TANK
a PROPOSED PIPEBRIDGE T0" SLUDGE BE ENCLOSED BOTH SIDE FIRE PUMP STATION
TANK STORE/ U U U U U U U U U U U U U U U U U U " WITH SELECTED PERFORATEDH U A WORKSHOP Q RAIN—SCREEN & COLOR To L0 TANK (CLEAN)/ a \ SELECTION.\ J? / 0 2400mm HIGH LO TANK (DIRTY)
A u L T\ PALISADE METALFENCING. TO BE GAS ENGINE EXHAUST STACKS (2 No.)0008 u.— PAINTED IN DARKGREEN COLOR.PROPOSED PIPEBRIDGE LV
>W| TCH GEAR
D
QROOM; Q
D
PIPE BRIDGE
In
2 No. SCR REAGENT TANKS (UREA)
COMPACT WORKSHOP & WAREHOUSE
\ Dllllll
||II
II D 4 I:l
WATER TREATMENT IIIIO PUMPUNIT SHELTER I: HOUSE — RAW WATER TANK / FIRE WATER TANK32
TREATED 2 No. OILY WATER COLLECTION PITSE jWATER :l D l_--—
U U U \ TANKTANKER UNLOADING HUT
V ENGINE HALL
A _ —
AUTOMATED FOLDINGGATE TO MANUFACTURER \/ U U D H U U
>—DETAIL. —/ .3 IT :HGEAF
% ROOM
6 5 4 3 2 1 i WIIHV ‘ U"
i; QCOMPACT WORKSHOP
T TV & WAREHOUSE SECURITY D I
L\\' 3 0K///L
I“ |__
CAR PARK (5 + 1 NO OF SPACES)3334
ALUMINIUM FRAME DOUBLEGLAZED WINDOWS UNIT WITH
SELECTED COLOR TINT.
34
CONTROL PIT
SCREEN FENCING
STATION TRANSFORMER
BLOCK TRANSFORMER
PUMP HOUSE
ENGINE HALL
TRANSFORMER
TRANSFORMER. 35“MI
GAS SKID
LOCKER ROOM
COFFEE ROOM
LOBBY
=I=
I=
=u
==
==
==
TI'I
_Ll
J H
2 N o. OFFICES@II
/ ENGINE HALL:FIRST FLOOR LAYOUT_ AI SCALE 1:200
CONTROL ROOM
GAS ENGINE80m3 SURFACE WATERATTENUATION TANK u
FOUL PUMP CHAMBERIE"— I I
669@
6@9C
OC
K?®
99@
6®®
®®
®®
66®
6@9@
®6©
6®@
©®
@
llRETAINING WALL GAS SK'D | PROCESS WASTEWATER DISCHARGE CHAMBER
@ 80m3 SURFACE WATER ATTENUATION TANK
0 10m 20m1:200 | | | I
P2 10/03/17 ERN For Planning MMcC PK
P1 29/09/15 SHY For Planning MMcC PK24OOMM HIGHFENCING AROUND 0 Rev Date Drawn Description Ch’k’d App’dBOUNDARY LINE. — 0 w
8EXISTING INDUSTRIAL Mott MacDonaldESTATE EXIT ROAD South Block, Rockfield,
Dundrum, Dublin 16,Ireland
T +353 (0)1 2916700Mott Macponald F +353(0)12916747
w www.mottmac.com
EXISTING INDUSTRIAL ClientESTATE ENTRANCE ROAD
Grange Back Up Power Ltd
Title
$599!? FLOOR LAYOUT PLAN Figure D.1.2 (B)Site Layout(Internal View of Engine Hall)
Designed Others Eng check Others
Drawn S. Healy Coordination
Dwg check M.McCarthy Approved P.KeIIIy
Scale at A0 Status Rev Security
© Mott MacDonald 1:200 APR P2 STDDrawing Number
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. M M D'3495 1 2'N 'D R'OO'XX'O006
P:\Dub|in\MPD\349512 - Grange Power\CAD\Drawings\Figure D.1.2(B)_P2.dwg Mar 15, 2017 - 4:31 PM ri066327
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
36
gas valves open, and the cylinder is emptied of exhaust gases. The intake air is turbocharged and
intercooled.
When the engine is started in gas mode, it is started with pilot fuel injection only, without gas admission.
When the combustion is stabilized in every cylinder, the gas admission is activated.
2. Back-up Operation Mode
In back-up fuel operation mode, the engine works according to the low sulphur distillate oil process. In this
process, the liquid fuel is injected in the cylinder at high pressure by camshaft operated pumps. The fuel is
ignited instantly due to the high temperature resulting from the compression. Combustion takes place under
constant pressure with fuel injected into the cylinder during the combustion. After the working phase, the
exhaust gas valves open, and the cylinder is emptied of exhaust gases.
Grange BackUp Power Industrial Emissions Licence Review Application
36
gas valves open, and the cylinder is emptied of exhaust gases. The intake air is turbocharged and
intercooled.
When the engine is started in gas mode, it is started with pilot fuel injection only, without gas admission.
When the combustion is stabilized in every cylinder, the gas admission is activated.
2. Back-up Operation Mode
In back-up fuel operation mode, the engine works according to the low sulphur distillate oil process. In this
process, the liquid fuel is injected in the cylinder at high pressure by camshaft operated pumps. The fuel is
ignited instantly due to the high temperature resulting from the compression. Combustion takes place under
constant pressure with fuel injected into the cylinder during the combustion. After the working phase, the
exhaust gas valves open, and the cylinder is emptied of exhaust gases.
Grange BackUp PowerMott MacDonald
gas valves open, and the cylinder is emptied of exhaust gases. The intake air is turbocharged andintercooled.
When the engine is started in gas mode, it is started with pilot fuel injection only, without gas admission.When the combustion is stabilized in every cylinder, the gas admission is activated.
INJECTION VALVESH=i+Control E _. d
—'; system :5 E|_..i.._‘ O I— E
PRESSURE I_ ‘ II :3 ain—u—u—u—u—u-u—u—u—u—n—u—u— u—u—u—u—u—u—uT-1I: _________ g E E
i re 1 El 5 %i a fil 2 $. U]BOOSTER : E '@ ”I E EPUMP j ”- a El 0 0.UNIT : } .
\.
PILOT FUEL PUMP UNIT
FUELTANK
WM"?! 500': as a pure gas englne Wlln pilot only, avallable for power plant Installations.
2. Back-up Operation Mode
ln back-up fuel operation mode, the engine works according to the low sulphur distillate oil process. In thisprocess, the liquid fuel is injected in the cylinder at high pressure by camshaft operated pumps. The fuel isignited instantly due to the high temperature resulting from the compression. Combustion takes place underconstant pressure with fuel injected into the cylinder during the combustion. After the working phase, theexhaust gas valves open, and the cylinder is emptied of exhaust gases.
36
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
37
3. Turbocharger and Air to Fuel Ratio Control System
Due to the high degree of integrated functions built into the design of the Wärtsilä 50DF engine, only a
minimum amount of support from external systems is needed, thus minimising the interconnections to
external systems. An embedded engine control system controls the combustion process, individually in each
cylinder.
To maintain a correct air-fuel ratio, the engine is equipped with an exhaust gas wastegate. It keeps the air
pressure in the receiver at an optimal level all over the power output range.
The exhaust gas wastegate valve by-passes the exhaust gases past the turbocharger. The wastegate valve
works as a regulator and adjusts the air-fuel ratio to the correct value, independent of variations in the site
conditions, such as ambient temperature and humidity.
The engine automation system monitors the average exhaust gas temperature after the cylinders. If the
average exhaust gas temperature is higher than the set-point, the engine control system will close the
wastegate gradually, until the correct value is reached.
The wastegate valve is actuated by compressed air and controlled by the engine control system.
4. Automation
Grange BackUp Power Industrial Emissions Licence Review Application
37
3. Turbocharger and Air to Fuel Ratio Control System
Due to the high degree of integrated functions built into the design of the Wärtsilä 50DF engine, only a
minimum amount of support from external systems is needed, thus minimising the interconnections to
external systems. An embedded engine control system controls the combustion process, individually in each
cylinder.
To maintain a correct air-fuel ratio, the engine is equipped with an exhaust gas wastegate. It keeps the air
pressure in the receiver at an optimal level all over the power output range.
The exhaust gas wastegate valve by-passes the exhaust gases past the turbocharger. The wastegate valve
works as a regulator and adjusts the air-fuel ratio to the correct value, independent of variations in the site
conditions, such as ambient temperature and humidity.
The engine automation system monitors the average exhaust gas temperature after the cylinders. If the
average exhaust gas temperature is higher than the set-point, the engine control system will close the
wastegate gradually, until the correct value is reached.
The wastegate valve is actuated by compressed air and controlled by the engine control system.
4. Automation
Grange BackUp PowerMott MacDonald
FUEL INJECTION PUMPS FORLIOUID FUEL OPERATION INJECTION VALVES
RETURN FUEL
Control (I: _. a—.- — LU, system I E a
' n D: ZI--"‘-. O I— I
PRESSURE —:' I '-:l'- 3 I2,' """""" ' ' ‘ ‘ ‘ ' ‘—"' """"""'=:1':- _._._._._i g a g' l “I : 5 aI a . g :3
BOOSTER BOOSTER i l @ §| : 0 §PUMP PUMP l l q.l I u aUNIT UNIT - r . I
i ia i .i ' 'i PILOT FUEL PUMP UNIT :
MAIN FUEL TANK PILOT FUEL TANKLFO or HFO LFO
wartslla 50DF fuel all system for light fuel and heavy fuel oil.
3. Turbocharger and Air to Fuel Ratio Control System
Due to the high degree of integrated functions built into the design of the Wértsilé 50DF engine, only aminimum amount of support from external systems is needed, thus minimising the interconnections toexternal systems. An embedded engine control system controls the combustion process, individually in eachcylinder.
To maintain a correct air-fuel ratio, the engine is equipped with an exhaust gas wastegate. It keeps the airpressure in the receiver at an optimal level all over the power output range.
The exhaust gas wastegate valve by-passes the exhaust gases past the turbocharger. The wastegate valveworks as a regulator and adjusts the air-fuel ratio to the correct value, independent of variations in the siteconditions, such as ambient temperature and humidity.
The engine automation system monitors the average exhaust gas temperature after the cylinders. If theaverage exhaust gas temperature is higher than the set-point, the engine control system will close thewastegate gradually, until the correct value is reached.
The wastegate valve is actuated by compressed air and controlled by the engine control system.
4. Automation
37
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
38
The engine automation system is a complete embedded management system, integrated with an engine
control system for electronically controlled fuel injection. The engine control system is a distributed and bus
based system where the monitoring and control function is placed close to the point of measurement and
control. In this way, both the on and off engine wiring is significantly simplified. Advanced diagnostics and
control functions provide an outstanding performance, and the need for systems outside the engine is
significantly reduced.
For the field bus interconnection, Wärtsilä is committed to open standards. The physical interface of the
engine control system is a standard Ethernet connection for general process data, to both the WOIS and the
PLC systems. The system meets even the highest requirements on reliability, with selective redundancy and
fault tolerant design.
5. Emission Control System
The most commonly used secondary emission control method for NOX is the Selective Catalytic Reduction
(SCR) technique. In the SCR system the NOX (NO and NO2) are reduced with the help of a reducing agent,
a water solution of urea which will be stored in 2 no. dedicated tanks with a volume of 177m³. SCR does not
produce any liquid or solid by-products and is suitable for both liquid and gaseous fuels.
The SCR NOX abatement system is combined with an oxidation catalyst and is named Combined NOX and
CO control system.
The exhaust gases from the gas engines will be at a high temperature in excess of 360°C, and will be
discharged to atmosphere through 2 no. 25 metre high stacks.
Gas Supply
Grange Castle Business Park is fully serviced with natural gas so a connection will be made to this existing
natural gas infrastructure within the Business Park to the south of the site.
Low Sulphur Distillate Oil Supply and Storage
The power plant is expected to operate primarily on natural gas and only in very rare circumstance on
distillate oil in the event of emergency scenarios or an interruption to gas supplies.
Low sulphur distillate fuel will be delivered to site by road tankers. The maximum number of tankers expected
travelling to and from the site in any one day will be in the region of 2- 3 tankers, when the plant is in
continuous operation.
Distillate fuel will be stored in a dedicated tank in the northwest of the site with a capacity of 2,895m³ to allow
for the storage of enough fuel to accommodate three days of continuous operation in accordance with CER
requirements. The tank will be bunded in accordance with the requirements as set out in the EPA publication,
‘Storage and Transfer of Materials for Scheduled Activities’ (2004).to contain 110% of the volume of the tank
in the event of a tank rupture. The height of the bund wall will be 2.1 metres.
Grange BackUp Power Industrial Emissions Licence Review Application
38
The engine automation system is a complete embedded management system, integrated with an engine
control system for electronically controlled fuel injection. The engine control system is a distributed and bus
based system where the monitoring and control function is placed close to the point of measurement and
control. In this way, both the on and off engine wiring is significantly simplified. Advanced diagnostics and
control functions provide an outstanding performance, and the need for systems outside the engine is
significantly reduced.
For the field bus interconnection, Wärtsilä is committed to open standards. The physical interface of the
engine control system is a standard Ethernet connection for general process data, to both the WOIS and the
PLC systems. The system meets even the highest requirements on reliability, with selective redundancy and
fault tolerant design.
5. Emission Control System
The most commonly used secondary emission control method for NOX is the Selective Catalytic Reduction
(SCR) technique. In the SCR system the NOX (NO and NO2) are reduced with the help of a reducing agent,
a water solution of urea which will be stored in 2 no. dedicated tanks with a volume of 177m³. SCR does not
produce any liquid or solid by-products and is suitable for both liquid and gaseous fuels.
The SCR NOX abatement system is combined with an oxidation catalyst and is named Combined NOX and
CO control system.
The exhaust gases from the gas engines will be at a high temperature in excess of 360°C, and will be
discharged to atmosphere through 2 no. 25 metre high stacks.
Gas Supply
Grange Castle Business Park is fully serviced with natural gas so a connection will be made to this existing
natural gas infrastructure within the Business Park to the south of the site.
Low Sulphur Distillate Oil Supply and Storage
The power plant is expected to operate primarily on natural gas and only in very rare circumstance on
distillate oil in the event of emergency scenarios or an interruption to gas supplies.
Low sulphur distillate fuel will be delivered to site by road tankers. The maximum number of tankers expected
travelling to and from the site in any one day will be in the region of 2- 3 tankers, when the plant is in
continuous operation.
Distillate fuel will be stored in a dedicated tank in the northwest of the site with a capacity of 2,895m³ to allow
for the storage of enough fuel to accommodate three days of continuous operation in accordance with CER
requirements. The tank will be bunded in accordance with the requirements as set out in the EPA publication,
‘Storage and Transfer of Materials for Scheduled Activities’ (2004).to contain 110% of the volume of the tank
in the event of a tank rupture. The height of the bund wall will be 2.1 metres.
Grange BackUp PowerMott MacDonald
The engine automation system is a complete embedded management system, integrated with an enginecontrol system for electronically controlled fuel injection. The engine control system is a distributed and busbased system where the monitoring and control function is placed close to the point of measurement andcontrol. In this way, both the on and off engine wiring is significantly simplified. Advanced diagnostics andcontrol functions provide an outstanding performance, and the need for systems outside the engine issignificantly reduced.
For the field bus interconnection, Wértsilé is committed to open standards. The physical interface of theengine control system is a standard Ethernet connection for general process data, to both the WOIS and thePLC systems. The system meets even the highest requirements on reliability, with selective redundancy andfault tolerant design.
5. Emission Control System
The most commonly used secondary emission control method for NOX is the Selective Catalytic Reduction(SCR) technique. In the SCR system the NOX (NO and N02) are reduced with the help of a reducing agent,a water solution of urea which will be stored in 2 no. dedicated tanks with a volume of 177m3. SCR does notproduce any liquid or solid by-products and is suitable for both liquid and gaseous fuels.
The SCR NOX abatement system is combined with an oxidation catalyst and is named Combined NOx andCO control system.
The exhaust gases from the gas engines will be at a high temperature in excess of 360°C, and will bedischarged to atmosphere through 2 no. 25 metre high stacks.
Gas Supply
Grange Castle Business Park is fully serviced with natural gas so a connection will be made to this existingnatural gas infrastructure within the Business Park to the south of the site.
Low Sulphur Distillate Oil Supply and Storage
The power plant is expected to operate primarily on natural gas and only in very rare circumstance ondistillate oil in the event of emergency scenarios or an interruption to gas supplies.
Low sulphur distillate fuel will be delivered to site by road tankers. The maximum number of tankers expectedtravelling to and from the site in any one day will be in the region of 2— 3 tankers, when the plant is incontinuous operation.
Distillate fuel will be stored in a dedicated tank in the northwest of the site with a capacity of 2,895m3to allowfor the storage of enough fuel to accommodate three days of continuous operation in accordance with CERrequirements. The tank will be bunded in accordance with the requirements as set out in the EPA publication,‘Storage and Transfer of Materials for Scheduled Activities’ (2004).to contain 1 10% of the volume of the tankin the event of a tank rupture. The height of the bund wall will be 2.1 metres.
38
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
39
A standard operating procedure will be followed during tanker unloading and filling of the bulk tank and the
tank will be fitted with a high level alarm to prevent overfilling. There will be a dedicated tanker unloading
area surrounded by a drainage channel, which will drain to a Class 1 Enviroceptor. This separator will provide
for full retention of any material in the event of the complete rupture and spillage of a tanker compartment.
A shut-off device incorporated into the separator will close the outlet in the event of its capacity being
exceeded. All oil transfer lines will be over ground and accessible for inspection.
The distillate fuel will be transported from the oil tank to the engines in the east portion of the site through
appropriately designed pipes. A pipe rack will be constructed across the ESB Grange Castle 110kV
Substation access road to support the pipes as they pass over the road. The piperack will be constructed at
a height of approximately 6.5 metres to the underside of the rack, which is greater than the minimum height
of 5.7 metres as stated in the National Roads Authority (NRA) ‘Design Manual for Roads and Bridges’.
Heat Recovery
There has been no provision made for heat recovery because of the intermittent operating nature of the
anticipated power plant operations. The power plant layout has been optimised to accommodate heat
recovery in the future should it be required; however it would require the installation of some piping, pumps,
heat exchangers etc.
Water Supply and Treatment
The principal water usage requirements of the power plant can be summarised as follows:
� Potable water ca. 1m³/day used for domestic purposes (drinking water, toilets etc.);
� Water for injection to control NOx formation during the combustion process; and
� Water for fire-fighting purposes.
A supply of potable water for the site will be taken from the existing 200mm diameter water main which runs
under the main Business Park road to the south of the site. The total volume of water required for process
and potable purposes is less than 1m3/hr2. Mains water will be passed through a water treatment unit that
will filter the water to provide pure water for the process. This treated water will be stored in a dedicated
treated water tank with a volume of 500m³ before being pumped around the site as required.
Site Drainage: Surface Water Management
The surface water drainage system will connect to the existing Grange Castle Business Park surface water
drainage system to the south of the proposed site in two locations – one location will take the surface water
2 The process water demand from the public water mains is 0.822m3/hr. The potable water demand is <1m3/day.
Grange BackUp Power Industrial Emissions Licence Review Application
39
A standard operating procedure will be followed during tanker unloading and filling of the bulk tank and the
tank will be fitted with a high level alarm to prevent overfilling. There will be a dedicated tanker unloading
area surrounded by a drainage channel, which will drain to a Class 1 Enviroceptor. This separator will provide
for full retention of any material in the event of the complete rupture and spillage of a tanker compartment.
A shut-off device incorporated into the separator will close the outlet in the event of its capacity being
exceeded. All oil transfer lines will be over ground and accessible for inspection.
The distillate fuel will be transported from the oil tank to the engines in the east portion of the site through
appropriately designed pipes. A pipe rack will be constructed across the ESB Grange Castle 110kV
Substation access road to support the pipes as they pass over the road. The piperack will be constructed at
a height of approximately 6.5 metres to the underside of the rack, which is greater than the minimum height
of 5.7 metres as stated in the National Roads Authority (NRA) ‘Design Manual for Roads and Bridges’.
Heat Recovery
There has been no provision made for heat recovery because of the intermittent operating nature of the
anticipated power plant operations. The power plant layout has been optimised to accommodate heat
recovery in the future should it be required; however it would require the installation of some piping, pumps,
heat exchangers etc.
Water Supply and Treatment
The principal water usage requirements of the power plant can be summarised as follows:
� Potable water ca. 1m³/day used for domestic purposes (drinking water, toilets etc.);
� Water for injection to control NOx formation during the combustion process; and
� Water for fire-fighting purposes.
A supply of potable water for the site will be taken from the existing 200mm diameter water main which runs
under the main Business Park road to the south of the site. The total volume of water required for process
and potable purposes is less than 1m3/hr2. Mains water will be passed through a water treatment unit that
will filter the water to provide pure water for the process. This treated water will be stored in a dedicated
treated water tank with a volume of 500m³ before being pumped around the site as required.
Site Drainage: Surface Water Management
The surface water drainage system will connect to the existing Grange Castle Business Park surface water
drainage system to the south of the proposed site in two locations – one location will take the surface water
2 The process water demand from the public water mains is 0.822m3/hr. The potable water demand is <1m3/day.
Grange BackUp PowerMott MacDonald
A standard operating procedure will be followed during tanker unloading and filling of the bulk tank and thetank will be fitted with a high level alarm to prevent overfilling. There will be a dedicated tanker unloadingarea surrounded by a drainage channel, which will drain to a Class 1 Enviroceptor. This separator will providefor full retention of any material in the event of the complete rupture and spillage of a tanker compartment.A shut-off device incorporated into the separator will close the outlet in the event of its capacity beingexceeded. All oil transfer lines will be over ground and accessible for inspection.
The distillate fuel will be transported from the oil tank to the engines in the east portion of the site throughappropriately designed pipes. A pipe rack will be constructed across the ESB Grange Castle 110kVSubstation access road to support the pipes as they pass over the road. The piperack will be constructed ata height of approximately 6.5 metres to the underside of the rack, which is greater than the minimum heightof 5.7 metres as stated in the National Roads Authority (NRA) ‘Design Manual for Roads and Bridges’.
Heat Recovery
There has been no provision made for heat recovery because of the intermittent operating nature of theanticipated power plant operations. The power plant layout has been optimised to accommodate heatrecovery in the future should it be required; however it would require the installation of some piping, pumps,heat exchangers etc.
Water Supply and Treatment
The principal water usage requirements of the power plant can be summarised as follows:
Potable water ca. 1m3/day used for domestic purposes (drinking water, toilets etc.);Water for injection to control NO. formation during the combustion process; andWater for fire-fighting purposes.
A supply of potable water for the site will be taken from the existing 200mm diameter water main which runsunder the main Business Park road to the south of the site. The total volume of water required for processand potable purposes is less than 1m3/hr2. Mains water will be passed through a water treatment unit thatwill filter the water to provide pure water for the process. This treated water will be stored in a dedicatedtreated water tank with a volume of 500m3 before being pumped around the site as required.
Site Drainage: Surface Water Management
The surface water drainage system will connect to the existing Grange Castle Business Park surface waterdrainage system to the south of the proposed site in two locations — one location will take the surface water
39
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
40
generated on the west side of the site, while the other location will take the surface water generated on the
east side of the site. The surface water drainage system on site is illustrated on Figure E.3.1
All surface water generated on site will ultimately discharge to an attenuation pond to the north east of the
Business Park. It should be noted also in this respect that no development on site shall commence until
such time as a Connection Agreement has been signed with Irish Water [SD16A/0398 Planning
Permission Note No. 3] and proposals for surface water monitoring have been with South Dublin County
Council and Inland Fisheries Ireland [SD15A/0061 Planning Permission Note Planning Condition No. 9].
Site Drainage: Foul and Process Wastewater Management
Foul wastewater from the power plant will consist of domestic effluent from the toilets, sinks, etc. on-site.
The amount of foul wastewater will be minimal due to the low requirement for personnel onsite during the
operational phase. This wastewater will be discharged from the site via an appropriately sized pipe and will
connect to the existing foul sewer network in Grange Castle Business Park to the south east (which ultimately
connects to the surrounding area foul sewage system which is treated in the Ringsend Wastewater
Treatment Plant).
Process wastewater to be generated by the facility will consist of the waste stream arising from the treatment
of purified water for injection into the engine during the combustion process to control NOx emissions. This
wastewater will have a volume of approximately 0.5m3/hr as indicated in the schematic over.
The foul and process wastewater drainage system on site is illustrated on Figure E.4.1
Grange BackUp Power Industrial Emissions Licence Review Application
40
generated on the west side of the site, while the other location will take the surface water generated on the
east side of the site. The surface water drainage system on site is illustrated on Figure E.3.1
All surface water generated on site will ultimately discharge to an attenuation pond to the north east of the
Business Park. It should be noted also in this respect that no development on site shall commence until
such time as a Connection Agreement has been signed with Irish Water [SD16A/0398 Planning
Permission Note No. 3] and proposals for surface water monitoring have been with South Dublin County
Council and Inland Fisheries Ireland [SD15A/0061 Planning Permission Note Planning Condition No. 9].
Site Drainage: Foul and Process Wastewater Management
Foul wastewater from the power plant will consist of domestic effluent from the toilets, sinks, etc. on-site.
The amount of foul wastewater will be minimal due to the low requirement for personnel onsite during the
operational phase. This wastewater will be discharged from the site via an appropriately sized pipe and will
connect to the existing foul sewer network in Grange Castle Business Park to the south east (which ultimately
connects to the surrounding area foul sewage system which is treated in the Ringsend Wastewater
Treatment Plant).
Process wastewater to be generated by the facility will consist of the waste stream arising from the treatment
of purified water for injection into the engine during the combustion process to control NOx emissions. This
wastewater will have a volume of approximately 0.5m3/hr as indicated in the schematic over.
The foul and process wastewater drainage system on site is illustrated on Figure E.4.1
Grange BackUp PowerMott MacDonald
generated on the west side of the site, while the other location will take the surface water generated on theeast side of the site. The surface water drainage system on site is illustrated on Figure E.3.1
All surface water generated on site will ultimately discharge to an attenuation pond to the north east of theBusiness Park. It should be noted also in this respect that no development on site shall commence untilsuch time as a Connection Agreement has been signed with Irish Water [SD16A/0398 PlanningPermission Note No. 3] and proposals for surface water monitoring have been with South Dublin CountyCouncil and Inland Fisheries Ireland [SD15A/0061 Planning Permission Note Planning Condition No. 9].
Site Drainage: Foul and Process Wastewater Management
Foul wastewater from the power plant will consist of domestic effluent from the toilets, sinks, etc. on-site.The amount of foul wastewater will be minimal due to the low requirement for personnel onsite during theoperational phase. This wastewater will be discharged from the site via an appropriately sized pipe and willconnect to the existing foul sewer network in Grange Castle Business Park to the south east (which ultimatelyconnects to the surrounding area foul sewage system which is treated in the Ringsend WastewaterTreatment Plant).
Process wastewater to be generated by the facility will consist of the waste stream arising from the treatmentof purified water for injection into the engine during the combustion process to control NOx emissions. Thiswastewater will have a volume of approximately 0.5m3/hr as indicated in the schematic over.
The foul and process wastewater drainage system on site is illustrated on Figure E.4.1
4o
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
41
Schematic D.1: Process Wastewater Requirements and Waste Stream
Leak Fuel Tank (clean)
Clean leak fuel is drained by gravity from the engine. The fuel is collected in a separate clean leak fuel
tank, from where it can be pumped to the main distillate fuel tank and reused without separation. The tank
and the pipes will be heated and insulated. The leak fuel piping will be fully closed to prevent dirt from
entering the system.
Grange BackUp Power Industrial Emissions Licence Review Application
41
Schematic D.1: Process Wastewater Requirements and Waste Stream
Leak Fuel Tank (clean)
Clean leak fuel is drained by gravity from the engine. The fuel is collected in a separate clean leak fuel
tank, from where it can be pumped to the main distillate fuel tank and reused without separation. The tank
and the pipes will be heated and insulated. The leak fuel piping will be fully closed to prevent dirt from
entering the system.
Grange BackUp PowerIndustrial Emissions Licence Review Application
Schematic D.1: Process Wastewater Requirements and Waste Stream
Leak Fuel Tank (clean)
Mott MacDonald
0.822 "1"3/h
I
f 1.03 m‘3/hTreatment reject 0.112 WWII
Treatment > SE1
£ a 0259 mm2; 0.0259 mm Engine ' m .,_ Eva porateg m ‘°°""'3 in Process
H5 an8 o'N.o
g 0i water 0.0291l'l'l‘3flE —) Sludge Tank
0.0513 m‘sfh Turbo 0.00513 rrwam % (off-sitewashing 3 disposal)
3g0.0139 wsm‘ Workshop 0.0239 mun- )_
—) =I washing etc 0
a:‘1‘
"imH
V?G
”9mm Water can m"! , urea solution M66 m»: .pm
Clean leak fuel is drained by gravity from the engine. The fuel is collected in a separate clean leak fueltank, from where it can be pumped to the main distillate fuel tank and reused without separation. The tankand the pipes will be heated and insulated. The leak fuel piping will be fully closed to prevent dirt fromentering the system.
41
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
42
Leak Fuel Tank (dirty)
In normal operation no fuel will leak out from the components of the fuel system. However in connection
with maintenance, or due to unforeseen leaks, there is potential for fuel or water to spill in the hot box of
the engine. The spilled liquids will be collected and drained by gravity from the engine through the dirty fuel
connection. Dirty leak fuel will be led to a sludge tank.
Fire-Fighting System
The fire-fighting protection system philosophy is based on widely recognized National Fire Protection
Association (NFPA) standards. Piping and equipment may still follow standards used by the fire protection
equipment supplier.
The stand pipe system inside the engine hall follows ‘NFPA14 class II stand pipe system’ requirements.
Additionally, mobile foam units will be provided. For immediate action against small local fires, the power
house is equipped with a number of powder extinguishers at strategic locations, and CO2 extinguishers for
electrical fires (spacing as per NFPA10). The fire main will be built using the design guideline ‘NFPA24
Private fire service main’.
The firefighting pump will operate on diesel. The pump will be located within the fire pump house. The pump
will only be used in an emergency and for short duration testing, for a maximum of 30 minutes once a week.
The pump will have an electrical output of less than 100 kW.
The tank area design is based on NFPA30, with the safety distances and cooling water streams spaced for
exposure protection.
Administration Area
The administration area will be located within the main building on the eastern portion of the site, adjacent
to the engine hall on its western side. This administration area will be located on the first floor of this building
and will comprise a meeting room, a manager’s room, a kitchen area and toilet facilities.
Electrical Area
The electrical area will be located within the main building on the eastern portion of the site, adjacent to the
engine hall on its western side. This administration area will be located on the ground floor of this building
and will comprise a control room, an MV (medium voltage)-switchgear, an LV (low voltage)-switchgear and
a DC (direct current)-system.
The power plant will be self-sufficient in providing electricity to power the various facilities, equipment and
utilities on site. During plant downtime (e.g. plant maintenance) a feed will be taken from the existing ESB
network serving Grange Castle Business Park. It is expected that there will be adequate capacity in the grid
to accommodate this demand during plant downtime.
Grange BackUp Power Industrial Emissions Licence Review Application
42
Leak Fuel Tank (dirty)
In normal operation no fuel will leak out from the components of the fuel system. However in connection
with maintenance, or due to unforeseen leaks, there is potential for fuel or water to spill in the hot box of
the engine. The spilled liquids will be collected and drained by gravity from the engine through the dirty fuel
connection. Dirty leak fuel will be led to a sludge tank.
Fire-Fighting System
The fire-fighting protection system philosophy is based on widely recognized National Fire Protection
Association (NFPA) standards. Piping and equipment may still follow standards used by the fire protection
equipment supplier.
The stand pipe system inside the engine hall follows ‘NFPA14 class II stand pipe system’ requirements.
Additionally, mobile foam units will be provided. For immediate action against small local fires, the power
house is equipped with a number of powder extinguishers at strategic locations, and CO2 extinguishers for
electrical fires (spacing as per NFPA10). The fire main will be built using the design guideline ‘NFPA24
Private fire service main’.
The firefighting pump will operate on diesel. The pump will be located within the fire pump house. The pump
will only be used in an emergency and for short duration testing, for a maximum of 30 minutes once a week.
The pump will have an electrical output of less than 100 kW.
The tank area design is based on NFPA30, with the safety distances and cooling water streams spaced for
exposure protection.
Administration Area
The administration area will be located within the main building on the eastern portion of the site, adjacent
to the engine hall on its western side. This administration area will be located on the first floor of this building
and will comprise a meeting room, a manager’s room, a kitchen area and toilet facilities.
Electrical Area
The electrical area will be located within the main building on the eastern portion of the site, adjacent to the
engine hall on its western side. This administration area will be located on the ground floor of this building
and will comprise a control room, an MV (medium voltage)-switchgear, an LV (low voltage)-switchgear and
a DC (direct current)-system.
The power plant will be self-sufficient in providing electricity to power the various facilities, equipment and
utilities on site. During plant downtime (e.g. plant maintenance) a feed will be taken from the existing ESB
network serving Grange Castle Business Park. It is expected that there will be adequate capacity in the grid
to accommodate this demand during plant downtime.
Grange BackUp PowerMott MacDonald
Leak Fuel Tank (dirty)
In normal operation no fuel will leak out from the components of the fuel system. However in connectionwith maintenance, or due to unforeseen leaks, there is potential for fuel or water to spill in the hot box ofthe engine. The spilled liquids will be collected and drained by gravity from the engine through the dirty fuelconnection. Dirty leak fuel will be led to a sludge tank.
Fire-Fighting System
The fire-fighting protection system philosophy is based on widely recognized National Fire ProtectionAssociation (NFPA) standards. Piping and equipment may still follow standards used by the fire protectionequipment supplier.
The stand pipe system inside the engine hall follows ‘NFPA14 class /I stand pipe system’ requirements.Additionally, mobile foam units will be provided. For immediate action against small local fires, the powerhouse is equipped with a number of powder extinguishers at strategic locations, and C02 extinguishers forelectrical fires (spacing as per NFPA10). The fire main will be built using the design guideline ‘NFPA24Private fire service main’.
The firefighting pump will operate on diesel. The pump will be located within the fire pump house. The pumpwill only be used in an emergency and for short duration testing, for a maximum of 30 minutes once a week.The pump will have an electrical output of less than 100 kW.
The tank area design is based on NFPA30, with the safety distances and cooling water streams spaced forexposure protection.
Administration Area
The administration area will be located within the main building on the eastern portion of the site, adjacentto the engine hall on its western side. This administration area will be located on the first floor of this buildingand will comprise a meeting room, a manager’s room, a kitchen area and toilet facilities.
Electrical Area
The electrical area will be located within the main building on the eastern portion of the site, adjacent to theengine hall on its western side. This administration area will be located on the ground floor of this buildingand will comprise a control room, an MV (medium voltage)-switchgear, an LV (low voltage)-switchgear anda DC (direct current)-system.
The power plant will be self-sufficient in providing electricity to power the various facilities, equipment andutilities on site. During plant downtime (e.g. plant maintenance) a feed will be taken from the existing ESBnetwork serving Grange Castle Business Park. It is expected that there will be adequate capacity in the gridto accommodate this demand during plant downtime.
42
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
Grange BackUp Power Industrial Emissions Licence Review Application
43
Workshop and Warehouse
The compact workshop and warehouse building will be located in the western portion of the site, near the
entrance to the site. It will house stores, a maintenance workshop and a toilet, as well as a security area.
Traffic
The power plant will run in automated control as discussed in Attachment C of this application. Site
attendance will be limited to maintenance and occasional administrative meetings.
Maximum traffic generated by delivery vehicles, visitors and incidental workers / contractors will be in the
order of 3 vehicles per day inbound with the same number outbound.
A maximum volume of 2,895m³ of distillate fuel oil will be stored in 1 no. bunded tank on site. This quantity
is sufficient to operate the plant at maximum output for approximately 3 days of continuous operation. The
distillate fuel oil will be delivered to site by road tankers. The maximum number of tankers expected travelling
to and from the site in any one day will be in the region of 2- 3 tankers, when the plant is in continuous
operation.
Security
The site will be enclosed within a 2.4 metre boundary fence; security will be managed on site by a
specialist contractor. Car parking will be provided near the Compact Workshop and Warehouse building.
Only approved contractor, delivery, collection and site vehicles will be permitted access to the operational
area of the site.
Grange BackUp Power Industrial Emissions Licence Review Application
43
Workshop and Warehouse
The compact workshop and warehouse building will be located in the western portion of the site, near the
entrance to the site. It will house stores, a maintenance workshop and a toilet, as well as a security area.
Traffic
The power plant will run in automated control as discussed in Attachment C of this application. Site
attendance will be limited to maintenance and occasional administrative meetings.
Maximum traffic generated by delivery vehicles, visitors and incidental workers / contractors will be in the
order of 3 vehicles per day inbound with the same number outbound.
A maximum volume of 2,895m³ of distillate fuel oil will be stored in 1 no. bunded tank on site. This quantity
is sufficient to operate the plant at maximum output for approximately 3 days of continuous operation. The
distillate fuel oil will be delivered to site by road tankers. The maximum number of tankers expected travelling
to and from the site in any one day will be in the region of 2- 3 tankers, when the plant is in continuous
operation.
Security
The site will be enclosed within a 2.4 metre boundary fence; security will be managed on site by a
specialist contractor. Car parking will be provided near the Compact Workshop and Warehouse building.
Only approved contractor, delivery, collection and site vehicles will be permitted access to the operational
area of the site.
Grange BackUp PowerMott MacDonald
Workshop and Warehouse
The compact workshop and warehouse building will be located in the western portion of the site, near theentrance to the site. It will house stores, a maintenance workshop and a toilet, as well as a security area.
Traffic
The power plant will run in automated control as discussed in Attachment C of this application. Siteattendance will be limited to maintenance and occasional administrative meetings.
Maximum traffic generated by delivery vehicles, visitors and incidental workers / contractors will be in theorder of 3 vehicles per day inbound with the same number outbound.
A maximum volume of 2,895m3 of distillate fuel oil will be stored in 1 no. bunded tank on site. This quantityis sufficient to operate the plant at maximum output for approximately 3 days of continuous operation. Thedistillate fuel oil will be delivered to site by road tankers. The maximum number of tankers expected travellingto and from the site in any one day will be in the region of 2— 3 tankers, when the plant is in continuousoperation.
Security
The site will be enclosed within a 2.4 metre boundary fence; security will be managed on site by aspecialist contractor. Car parking will be provided near the Compact Workshop and Warehouse building.Only approved contractor, delivery, collection and site vehicles will be permitted access to the operationalarea of the site.
43
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
44
Grange BackUp Power Industrial Emissions Licence Review Application
Table D.1: Summary of Operational Emissions, Abatement and Control Systems
Unit Emission Type / Waste Abatement Measure / Treatment System / Recovery System Process Control System
Foul wastewater Treated foul water Foul wastewater will consist of domestic effluent from the toilets, sinks, etc. on-site. This wastewater will be discharged from the site via an appropriately sized pipe and will
connect to the existing foul sewer network in Grange Castle Business Park.
This discharge will be in accordance with the conditions of the industrial emissions as stipulated by the EPA
Monitoring
Inspections
PPMP
EMS
IE Licence
General Maintenance Engine area and tank bund cleaning
Treatment in silt trap and oil / water interceptor and treatment and monitoring. Good housekeeping Dedicated drainage channels
Monitoring
Inspections
PPMP
General Maintenance Contaminated rags and wipes / Filter elements / PPE etc
Removal from site by appropriately authorised contractors Good housekeeping
Document Control
EMS
Engine Combustion Process
Atmospheric Emissions Design to BAT
Fuel type
Selective Catalytic Reduction (SCR)
Advanced computerised control system
Monitoring
Inspections
PPMP
EMS
Low Sulphur Distillate Oil Tank
Spills / leaks
Catastrophic failure
Secondary containment
Surface water drainage system
Monitoring
Inspections
PPMP
EMS
Electricity Transformers Spills / leaks Bunds
Surface water drainage system
Monitoring
Inspections
PPMP
Diesel-fired firewater pump
Spills / leaks Atmospheric emissions
Infrequent use
Low sulphur distillate fuel
Bunds
Monitoring
Inspections
PPMP
44
Grange BackUp Power Industrial Emissions Licence Review Application
Table D.1: Summary of Operational Emissions, Abatement and Control Systems
Unit Emission Type / Waste Abatement Measure / Treatment System / Recovery System Process Control System
Foul wastewater Treated foul water Foul wastewater will consist of domestic effluent from the toilets, sinks, etc. on-site. This wastewater will be discharged from the site via an appropriately sized pipe and will
connect to the existing foul sewer network in Grange Castle Business Park.
This discharge will be in accordance with the conditions of the industrial emissions as stipulated by the EPA
Monitoring
Inspections
PPMP
EMS
IE Licence
General Maintenance Engine area and tank bund cleaning
Treatment in silt trap and oil / water interceptor and treatment and monitoring. Good housekeeping Dedicated drainage channels
Monitoring
Inspections
PPMP
General Maintenance Contaminated rags and wipes / Filter elements / PPE etc
Removal from site by appropriately authorised contractors Good housekeeping
Document Control
EMS
Engine Combustion Process
Atmospheric Emissions Design to BAT
Fuel type
Selective Catalytic Reduction (SCR)
Advanced computerised control system
Monitoring
Inspections
PPMP
EMS
Low Sulphur Distillate Oil Tank
Spills / leaks
Catastrophic failure
Secondary containment
Surface water drainage system
Monitoring
Inspections
PPMP
EMS
Electricity Transformers Spills / leaks Bunds
Surface water drainage system
Monitoring
Inspections
PPMP
Diesel-fired firewater pump
Spills / leaks Atmospheric emissions
Infrequent use
Low sulphur distillate fuel
Bunds
Monitoring
Inspections
PPMP
Grange BackUp PowerIndustrial Emissions Licence Review Application Molt MacDonald
Table D.1: Summary of Operational Emissions, Abatement and Control Systems
Emission Type / Waste Abatement Measure / Treatment System / Recovery System Process Control System
Foul wastewater Treated foul water Foul wastewater will consist of domestic effluent from the toilets, sinks, etc. on-site. This Monitoringwastewater will be discharged from the site via an'appropriately sized pipe and will Inspections
connect to the extsting foul sewer network In Grange Castle Bustness Park. PPMPThis discharge will be in accordance with the conditions of the industrial emissions as
stipulated by the EPA EMSIE Licence
General Maintenance Engine area and tank bund Treatment in silt trap and oil / water interceptor and treatment and monitoring. Good housekeeping Dedicatedcleaning drainage channels
MonitoringInspections
PPMP
General Maintenance Contaminated rags and wipes Removal from site by appropriately authorised contractors Good housekeeping/ Filter elements / PPE etc Document Control
EMS
Engine Combustion Atmospheric Emissions Design to BAT Advanced computerised controlProcess Fuel type system
Selective Catalytic Reduction (SCR) MonitoringInspections
PPMPEMS
Low Sulphur Distillate Spills / leaks Secondary containment Monitoring0” Tank Catastrophic failure Surface water drainage system Inspections
PPMPEMS
Electricity Transformers Spills / leaks Bunds MonitoringSurface water drainage system Inspections
PPMP
Diesel-fired firewater Spills / leaks Atmospheric Infrequent use Monitoringpump emissions Low sulphur distillate fuel Inspections
Bunds PPMP
44
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53
45
Grange BackUp Power Industrial Emissions Licence Review Application
Unit Emission Type / Waste Abatement Measure / Treatment System / Recovery System Process Control System
Surface water drainage system EMS
Fire Fighting System Firewater Surface water drainage system Subject to a comprehensive fire water retention study
Chemical Store Spills / leaks
Waste
Drip trays / spill pallets
UN approved containers
Inspections
Limited access
Good housekeeping
Document Control COSHH Assessment
Compliance with REACH
Water treatment chemicals to filter public water mains supply to provide pure water for NOx injection
Spills / leaks Bunds
Drip trays / spill pallets
UN approved containers
Surface water drainage system
UN approved containers
Inspections
PPMP
Good housekeeping
EMS
Oils and Greases Spills / leaks Bunds
Surface water drainage system
Vapour trap
UN approved containers
Monitoring
Inspections
PPMP
Ancillary Units General waste Removal from site by appropriately authorised contractors
UN approved containers, as required
Monitoring
Inspections
Good housekeeping
Document Control
45
Grange BackUp Power Industrial Emissions Licence Review Application
Unit Emission Type / Waste Abatement Measure / Treatment System / Recovery System Process Control System
Surface water drainage system EMS
Fire Fighting System Firewater Surface water drainage system Subject to a comprehensive fire water retention study
Chemical Store Spills / leaks
Waste
Drip trays / spill pallets
UN approved containers
Inspections
Limited access
Good housekeeping
Document Control COSHH Assessment
Compliance with REACH
Water treatment chemicals to filter public water mains supply to provide pure water for NOx injection
Spills / leaks Bunds
Drip trays / spill pallets
UN approved containers
Surface water drainage system
UN approved containers
Inspections
PPMP
Good housekeeping
EMS
Oils and Greases Spills / leaks Bunds
Surface water drainage system
Vapour trap
UN approved containers
Monitoring
Inspections
PPMP
Ancillary Units General waste Removal from site by appropriately authorised contractors
UN approved containers, as required
Monitoring
Inspections
Good housekeeping
Document Control
Grange BackUp PowerIndustrial Emissions Licence Review Application
Emission Type / Waste Abatement Measure / Treatment System / Recovery System
Molt MacDonald
Process Control System
Surface water drainage system EMS
Fire Fighting System Firewater Surface water drainage system Subject to a comprehensive firewater retention study
Chemical Store Spills / leaks Drip trays / spill pallets InspectionsWaste UN approved containers Limited access
Good housekeepingDocument Control COSHH
AssessmentCompliance with REACH
Water treatment Spills / leaks Bunds Inspectionschemicals to filter public Drip trays / spill pallets PPMPwater mains supply to , ,provide pure water for UN approved containers Good housekeepingNOX injection Surface water drainage system EMS
UN approved containers
Oils and Greases Spills / leaks Bunds MonitoringSurface water drainage system Inspections
Vapour trap PPMPUN approved containers
Ancillary Units General waste Removal from site by appropriately authorised contractors MonitoringUN approved containers, as required Inspections
Good housekeepingDocument Control
45
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 18-05-2017:03:04:53