D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Production Status of the

Quad Spool J Morgan – Engineer

Bellows ModuleSoon-Hong Lee - Engineer

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Quad Spool

ProductionLaser Weld

Plate and EP

Clean

BakeOven Bake – 200 deg C for 24 hours

RGA Bake – 200 deg C for 24 hours then RGA scan

Package

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Quad Spool Status and Schedule

All spools have been laser welded

The rate limiting step is the plating and EP

Seven have been shipped already to SLAC

The balance (30) will arrive to SLAC during the month of May.

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Bellows Module

Eight units are being assembled and are expected to arrive to SLAC on May 5, 2008The other (27) units are in the pipe line and are schedule to arrive to SLAC on May 23, 2008

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Beam Finder Wire (BFW)LCLS Week Review

Heinz-Dieter Nuhn Physicist

Jim Morgan Engineer

Jim Bailey Engineer

Don Ghilardi Designer

Scott Doran Designer

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Status of Production

Repeatability Problems

Start up of Chamber Aluminum Coating

Organization of Baking

Schedule

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Repeatability Testing

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Repeatability Test BFW S#04Sensor Readings

-30

-20

-10

0

10

0 20 40 60 80 100

Cycles

Dis

plac

emen

t (M

icro

ns)

Pt. C

Pt. BPt. A

Repeatability Test BFW S#04Calculated Displacements at Card Centerline

-10

0

10

20

30

0 20 40 60 80 100 120

Cycles

Dis

plac

emen

t (M

icro

ns)

Horizontal

Vertical

“Keyence” Displacement Sensors (Typ.)

Repeatability Test Arrangement

BFW Repeatability Test Arrangement and Results

Physics Requirements: 80 Micron Horizontal & 30 Micron Vertical (RMS)

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

BFW Vacuum ChamberAluminum Coating

• The difficulty in coating the chambers has been in the tuning of the equipment.

• The tuning has been completed and the processing of chambers has been started.

• As of 4/28/08 4 chambers have been processed.

• It is possible to process as many as 8 chambers per week.

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Baking of Beam Finder Wire

Dedicated Baking Station for the BFWStation has the ability to handle 1 to 3 units simultaneously.First units were baked at 80 deg C since it was assembled first then baked, later units will be baked (150 deg C) and then assembled.Maximum weekly throughput of 6 units

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Status

Frame Weldment– Delivery Complete

BFW Vacuum Chamber– Delivery Complete

One unit shipped

Two more units will be shipped 4/29/08

Two more units in the process of baking and Assembly. These are due to be shipped on 5/2/08

D Walters

Undulator Systems – BFW Diagnostics [email protected]

April 30, 2008

Beam Finder WireSchedule

4/25/2008 1

4/29/2008 3

5/2/2008 5

5/9/2008 9

5/13/2008 15

5/20/2008 21

5/27/2008 27

6/3/2008 33

6/10/2008 37