d23 – white bay (tile vogue blanc)

1
Future State Current State Merchan t: IPM: Project Overview D23 – White Bay (Tile Vogue Blanc) Andrew Murray Updated: 01/26/2022 THIS IS CONFIDENTIAL & PROPRIETARY INFORMATION CURRENT STATE Current bay was set by Mosaic CR teams, this is only 2 additional articles SCOPE OF WORK Locate Vogue Blanc bay Remove the 2 “mosaic” boards that say “coming soon” Replace with 2 new boards Take a new after photo (and upload) Sign the BSR Update Hours There will be no highlights on the layout to support this STATUS 2 hours have been allotted for this project EXIT STRATEG Y • Example “8 exiting articles” or “all exiting articles are clearance/ sell through” RESET DETAILS TOTAL STORES: 180 DURATION : 1 night PROJEC T: RF 3 NO. OF BAYS: 1

Upload: mingan

Post on 22-Feb-2016

26 views

Category:

Documents


0 download

DESCRIPTION

D23 – White Bay (Tile Vogue Blanc). Andrew Murray. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: D23 – White Bay (Tile Vogue Blanc)

Future State

Current State

Merchant:

IPM:Project OverviewD23 – White Bay (Tile Vogue Blanc)

Andrew Murray

Updated: 04/22/2023THIS IS CONFIDENTIAL & PROPRIETARY INFORMATION

CURRENT STATE

Current bay was set by Mosaic CR teams, this is only 2 additional articles

SCOPE OF WORK

Locate Vogue Blanc bay Remove the 2 “mosaic” boards that say

“coming soon” Replace with 2 new boards Take a new after photo (and upload) Sign the BSR Update Hours There will be no highlights on the layout to

support this

STATUS 2 hours have been allotted for this project

EXIT STRATEGY

• Example “8 exiting articles” or “all exiting articles are clearance/ sell through”

RESET DETAILSTOTAL

STORES: 180 DURATION: 1 night PROJECT: RF 3

NO. OF BAYS: 1