  • 7/31/2019 D9.6 Newsletter #3

    1/12

    NEWSLETTER

    Buildings account or around 40% o EU energyrequirements.

    In the last fve years, Socia Housing Organizationshave payed an exempary roe in improving theenergy efciency o the housing sector. Theyhave anticipated orthcoming national legislationand have punctually experimented with theconstruction o low-energy buildings and innovativeenergy reurbishment.

    AFTERaims to promote and continue this eortespecially in light o the obstacles and challengespresented by the current economic situation.

    The AFTER project aims to enable participatingand non-participating Social Housing Institutionsand Organizations all over Europe to improvethe energy efciency o their housing stock withcost optimal solutions. Its goal is to promote anddeveop existing European knoedge in theareas o energy saving strategies and encouragetheir implementation by companies in the housingsector.Social Housing Organizations in 6 dierentcountries (Czech Republic, Denmark, France,Germany, Italy, and Slovenia) and their partners-including National Housing Associations,

    Scientifc Committee and National TenantsAssociations- are cooperating to highlight andevaluate the most efcient and adaptable energysaving measures.

    AFTER asserts the importance o establishingenergy efciency as a major goal even aterconstruction o the building. The project promotesmeasures adapted to a variety o investments andsituations. A special emphasis is placed on theimportant contributions o operation maintenanceand management in the energy perormance obuidings.

    AFTER will participate directly to this eort inimproving energy efciency by 20% accordingto the target set or 2020 by the EuropeanCommission.

    THE PROJECT

    SUMMARY

    AFTER Presentation ...................... ........ p.1AFTER ESMs .................... ..................... . p.2Partners Intervies ...................... ......... p.4Revie o Current orks . .................... p.6AFTER Nes and Events .................... .. p.7Dissemination/EU Nes ....................... p.8Partners ................................................... p.9

    aterproject.eu

    NEwS-lETTER

    OCT.2012#3

  • 7/31/2019 D9.6 Newsletter #3

    2/122

    18 Piot Sites have been identifed by the participatingSocia Housing Organizations. According to the PiotESMs impemented on this Piot Sites, partnersproposed some optimization suggestions in order toimprove the efciency o the measures and guaranteetheir perormance.Quick overvie o the dierent Piot Sites connectedith frst inormation on the Optimization soutions thatare (or i be) impemented on fed.

    PILOT SITES AND

    OPTIMIZATION SUGGESTIONS

    OPERATING MANAGEMENT

    RUNNING MAINTENANCE

    REPLACEMENT OF SYSTEMS

    RECENTLY REFURBISHED BUILDINGS

    RECENT LOW ENERGY BUILDING

    AFTER Energy Saving Measures have beenpresented in the Newsletter #2 o the project.These Energy Saving Measures (ESMs) coveran exhaustive range o interventions on the

    social housing stock aiming at improving theenergy efciency o the buildings, their economicperormance both or the Social HousingOrganizations and their tenants.

    Reminder : AFTER coects and improvesEnergy Saving Measures

    An Energy Saving Measure can be described asollowed.An ESM:

    is implemented in order to improve the energy

    consumption o a building and related to heatingaspects, warm water or electric powering orheating equipment. its impacts can eventually be monitored andevaluated regarding kWh and heating energy costs. can be optimized/inuenced/present a potentialto be improved.

    These ESMs gather a large range o interventionsthat have been listed as ollows

    The objective o the second phase o the AFTERProject is now to optimize these ESMs fndingactions that will correct and improve theirefciency ater their implementation.

    Optimizing Energy Saving Measures

    An Optimization Solution is related to an ESMwhich show potential o improvement.Thispotential can concern the 3 ollowing objectives:

    - improve the economic model o the ESM.- enhance the energy efciency.- increase the social perormance and thereception o the ESM by tenants.)

    As a consequence the Optimization Solution can

    lead to several types o actions:

    - management & strategic decision- technical intervention (control, maintenance,replacement) on the systems and equipment.- improve the reception o the ESM by tenants.

    The objective is still to highlight simple and low-cost interventions that will improve the savingslinked to an Energy Saving Measure.Optimization solutions have been proposed by theAFTER participating Social Housing Organizationswith the sustain o the Scientifc partners. Theseoptimizations will be tested during the heating

    season in order to measure and to assess theirimpact on buildings.

  • 7/31/2019 D9.6 Newsletter #3

    3/12

  • 7/31/2019 D9.6 Newsletter #3

    4/124

    GERMANY

    ITAlY

    HEINHEIMER, Darmstadt30 deings

    MATHIlDEN, Darmstadt19 deings

    SElBERT, Darmstadt44 deings

    RIESI, Orbassano51 deings

    PASSONI, Turin12 deings

    PICCO, Turin28 deings

    Type o ESM: Hydraulic balancing o the heating systemOptimization Suggestion proposed: Regulation of the temperature settings and calibration of the heatingcurves (slop and level, rom 0.8 point to 2) once a month.

    Type o ESM: Insulation coat o 80mm. Single glazing substituted withhigh perormance double glazing.Optimization Suggestion proposed: No technical intervention can be implemented on the ventilationsystem. Direct intervention toward the tenants in order to keep the ESMefcient and avoid condensation will be implemented. Identifcationo the most perorming behavior, education toward tenants andmonitoring o the implementation o best practices by the tenants.

    Type o ESM: Installation o a new condensing boilerOptimization Suggestion proposed: Installation of an insulation cap for the heat exchanger who is notinsulated (Social Housing Organization has a good eedback on thistype o optimization on other buildings).

    Type o ESM: Replacement o a standard boiler by a calorifc boiler.Optimization Suggestion proposed: Radiators were not replaced and were sized according to the oldsupply temperature. Hydraulic balancing will ensured that eachradiator gets the same amount o heat.

    Type o ESM: Global reurbishmentOptimization Suggestion proposed: Ventilation system was installed that runs the entire year: running

    times o the ventilation system can be adapted to the users behavior,so as to temporarily switch o the ventilation system, or example insummer.Review o the control o the heating system as well as user behaviorare reviewed and adjusted, the heating system can possibly shut downat night.

    Type o ESM: New construction in Passiv House Standard.Optimization Suggestion proposed: Hot water demand in relation to total heating demand is very high(50%). Check to what extent the circulation pump can be turned o, orexample in the night time (heat losses are reduced signifcantly in thehot water pipes).

  • 7/31/2019 D9.6 Newsletter #3

    5/125

    H20 COllEGE, Herning51 deings

    lYSTRUP, lystrup25 deings

    MARSlET, Marset66 deings

    REVOlUCIJE, Trbovje

    52 deings

    FAKIN, Trbovje13 deings

    DENMARK

    SlOVENIA

    SAVINJSKA, Trbovje31 deings

    Type o ESM: Tenant inormation.Optimization Suggestion proposed: Energy data shows an unacceptable huge difference between highestand lowest consumption among Tenants : inormation will providesome general guidelines or living in a passive house as well as moretechnical inormation about the equipment in the dwelling.

    Type o ESM: Global retroftting to low-energy buildingOptimization Suggestion proposed: Separation between the heating recovering system and the

    underoor heating system adding a control valve or the heating coil othe ventilation system in order to make its control independent (to saveenergy at the beginning and at the end o the heating season).

    Type o ESM: LEB: Triple glazing, composite profles, woodconstruction: 450-500 mm insulation, double ow ventilation system.Optimization Suggestion proposed: Replacement o one comort valve o the heat exchanger or theDomestic Hot Water. The comort valve was soliciting permanently theheating system and consuming energy.

    Type o ESM: Hydraulic balacing o the heating system.Optimization Suggestion proposed (to be confrmed): Special context: SPEKTER doesnt own the heating station and, asa consequence, limited actions are possible on the system. Tenantsawareness on how to use thermostatic valves and ventilation with lowertemperature o the system will be a preerred lever to optimize theESM.

    Type o ESM: External shell insulation.Optimization Suggestion proposed (to be confrmed): Thermography and potential elimination of small thermal bridgescoupled with direct intervention toward tenants.

    Type o ESM: Low Energy Building (LEB) components. 10cm EPSshell insulation, min. 10cm EPS roof/ceiling insulation and 8cm EPSbasement oor insulation. Double glazed windows. No heat recovery orventilation systems.Optimization Suggestion proposed (to be determined):

  • 7/31/2019 D9.6 Newsletter #3

    6/126

    ATC Torino - AFTER Itaian Socia HousingOrganization - as estabished in 1907 by theTorino City Counci to suppy underpriviegedcitizens ith o-cost housing and at the sametime administering and managing their on reaestate and that entrusted to them by other pubicbodies. ATC manages around 31.000 deing unitsand 10.000 oned by ormer tenant.

    what is the roe o ATC ithin the AFTERProject ?

    As a social housing organization, ATC is in charge,in the rame o AFTER, o reporting energy savingmeasures and testing new optimized measures.

    what kind o ESM is more idey appied inyour country?

    According to our experience in the feld o energysaving measures applied to new and existingbuildings, the most common ESMs consist inplant optimizations (e.g.: lighting, heating, coolingsystems). ATC, based on its building stock and

    money supply, has:

    -installed smart metering systems,-improved heating systems by installing newboilers and substituting individual with centralheating systems,-placed external insulation on buildings allowingthis kind o intervention,-substituted windows.By the way, the most common and challengingissue to be aced in Italy concerns interventionson ancient buildings: our historical centres areprotected by a very strict system o prohibitionsand regulations, orcing technicians to choose

    between the limited range o ESMs unable to aectthe integrity o the building and its exterior look.

    what kind o probems did you ace duringthe ESM seection process?

    The biggest challenge was undoubtedly the lack oa common methodology, as each building has itsown management protocol, and even its own way tocollect data, measure systems being dierent romone building to another. However, these problemshighlighted the value o our SIGE managementsystem, a good resource or the management otenants and monitoring protocols. Maybe in theuture it should be implemented and made able tomanage technical and energy aspects too.

    In your ESM seection are economic, energyand socia aspects baanced? I not peaseexpain.

    The economic and energy aspects played aprevailing role in our ESMs selection. This becausethe tenants are not owners of the ats they livein, and the interventions on buildings have tobe paid by ATC, so we must try to guarantee thebest result we can achieve using a limited moneysupply. However, AFTER project will allow us, inthe next months, to give out a questionnaire aimedat inquiring into tenants satisaction about ourbuilding management, so we will at least get a

    eedback on our actions.

    INTERVIEW WITH

    GIANFRANCO

    TARABUZZI - ATC

  • 7/31/2019 D9.6 Newsletter #3

    7/127

    what is the roe o Bl ithin the AFTERProject ?

    BL is working on its members and residentsinterests by inuencing the social housing sectordevelopment, both economically, technically andsocially. In practice BL represents the socialhousing companies in relation to public authorities.It also has a strong inuence on its membersinvestment choices, particularly regarding energysavings.BL is engaged in climate politics, energy reductionand sustainability. At the national level BL isrepresented in a governmental committee workingon a national strategy or energy reductions.In the context o AFTER project, BL is in charge toguarantee the reproducibility o the project outputsnotably through dissemination activities. BL willalso report and experiment innovative energysavings measures.

    what kind o ESM is more idey appied inyour country?

    I like to distinguish ESMs into two categories:ESMs with high or low investment. The highinvestment ESMs are typically Global retroftting.This is because it is much more proftable thanrenovating only one component o a building. But I

    know that this is not necessarily the case in othercountries. Widely applied low investment ESMswould be Tenant inormation and campaigns, lightcontrol, regulation o ventilation systems etc.

    what kind o probems did you ace duringthe ESM seection process?

    Probably the most difcult part during the ESMselection process was the data collection. A loto required inormation is about respectivelymaintenance, operation and management costs.These kind o data were not easy to fnd; they arerare and or many ESMs I ended up with only onefgure representing the sum o all three types ocosts. Furthermore, I was not able to fnd costs othe relatively cheap ESMs - simply because theywere not computed or estimated at all. I guessthe reason or missing data is that many SHOsdont see it as normal business. And thats a pity.Without such data it is hard to create the basis or

    energy savings. On the other hand: this is why wedo the AFTER project.

    In your ESM seection are economic, energyand socia aspects baanced? I not peaseexpain.

    I think some o the best ESMs are otencharacterized by a good balance betweeneconomic, energy and social aspects. In myselection I also ound some well balanced ESMs.But whereas economic and energy aspects arerelative easy to measure, the same is not the case

    or the sot aspects. So, in the real world it is notstraight orward to evaluate whether i an ESMis balanced or not. Pilot Sites some optimizationsolutions in order to

    Bl is the nationa Danish socia housingassociation. It has 700 socia housing companiesas members ith a tota o more than 545.000deings (amost 20 % o a deings inDenmark).

    INTERVIEW WITH

    OLAV KIRCHHOF

    - BL

  • 7/31/2019 D9.6 Newsletter #3

    8/128

    FOCUS ON...

    Successu RCx in lystrup (DK)

    The retro commissioning (RCx) process -c. Nesetter

    #2 or better defnition- ed by Aarhus Kommune servicesidentifed some optimization soutions or the to Danish PiotSites. Feedback on one o the Piot Buidings : lYSTRUP.These soutions i be tested and monitored during theimpementation phase o AFTER.

    AFTER Socia Housing Organization:Aarhus KommuneAdress o the Piot Site:Lystrup Centervej 30, 8250 LystrupTota iving space:924 m2 - 14 dwellingsDate o construction:1984

    Energy Saving Measure impemented:

    2011: Total reurbishment. Everything wasmodernised, except for walls (Windows / Doors / Roofinsulation / Heating system / Ventilation system /Electrical system / Photovoltic panels).New ventilation and photocoltic panels ware added.Energy consumption beore renovation:Approximately 150kWh/M2 per. years.Energy consumption ater renovation:Approximately 74kWh/M2 per. years.

    Ne heating system:Water based district heating: district heatingsupplied, directly injected, shunt and thermostatregulated underoor heating. Divided into 5 zoneswith WAVIN Tigris AHC Wireless Floor HeatingControl System.

    Ne ventiation system:Balanced mechanical ventilation with heat recovery,by-pass unction and a heating coil. DANFOSS AIRw2 ventilations unit, with DANFOSS AIR DAIL

    wireless control panel.

    The AFTER Pilot Site LYSTRUP in Denmark hasbeen reurbished in 2011. The objective o the RCxprocess, was to identifed some weak points inthe energy consumption o the building in order toimprove its post-reurbishment perormance.

    In the system after refurbishment, underoor

    heating and heat recovery ventilation systems werepartially interdependent. I the heating recoveringventilation system was on, the underoor heatingwould have to be on. In order to avoid drat comingrom the ventilation system, tenants would have toturn on the heating system.In order to optimize this system, Aarhus Kommunesta proposed to separate the two systems addinga control valve or the heating coil o the ventilationsystem in order to make its control independentfrom the underoor heating.

    As a consequence, especially at the beginning and atthe end o the heating season (when temperaturesare still intermediary) - tenants could use only theheat recovery o the ventilation system and thenatural sun effect. Underoor heating will be turnon later during the season in order to save energy.

  • 7/31/2019 D9.6 Newsletter #3

    9/129

    % % % %

    Retro-CommissioningPiot Sites

    Piot Measures

    FactsheetsData coection

    Typoogies Handbook Evauation Protoco

    AFTER project is based on a severa stepsapproach. Beore the summer and the beginning o

    the heating season, AFTER partners mainy ocused on thevaidation o the scientifc documents and the identifcationo reevant Piot ESMs and Piot Sites to impementoptimization soutions.

    Optimization Soutions

    Thanks to the RCx Process, Social HousingOrganizations identifed in their Pilot ESMs and

    Pilot Sites some optimization solutions in order toimprove the existing efciency o their buildings.

    These optimizations aim at adding perormanceto the savings planned with an ESM. Thanks tolow-cost investment and small intevrentions, theoptimization solutions will correct defciencieslinked with the original implementation o oneESM. I every building has its own problems, AFTERmethodology will allow to identiy real technicaland operational improvements.

    This optimization identifcation process has beenimplemented thanks to the knowledge o the SocialHousing Organizations regarding their housingstock and their planned works. WP leaders 3 to 7provided a scientifc sustain to the SHOs proposalssuggesting some other solution ater assessing theRCx Investigation Plans completed by our SHOs.

    Impementing AFTER Optimization Soutions

    The Optimization Solutions will be implemented bythe participating SHOs or -at least one complete

    heating season.The implementation process will be organizedaccording to the SHOs routines and work plans inorder to ft with the activities o the companies. A20 000 EUR budget per country will be associatedto the optimization solutions implementation inorder to strengthen metering equipment and tocollect more data or the assessment o our testingresults.

    A Common Evaluation Protocol has beendevelopped by the scientifc partners in order toollow the implementation o the optimizationsolutions. This Common Evaluation Protocol bothdevelop a complete process to assess/adjust datarelated to our topics and an Excel fle customizingthe common methodology to the characteristics oevery Pilot ESM tested.

    REVIEW OF

    CURRENT WORK

  • 7/31/2019 D9.6 Newsletter #3

    10/1210

    URBANPROMO 2012

    Torino, Itaia 11th and 12th o October 2012

    Number o participants: 25Type o participants: National HousingAssociations, representatives, urbanists

    Urbanpromo 2012 Social Housing aims tohelp build a vision system or Social Housing,as a starting point or the ormulation o useulproposals or an organic development o the feld.This event is made up o several sessions ordebate and an exibition o projects.ATC exposed during the URBANPROMO Congressthe main stakes o the AFTER Project and

    detailled the state o the art o the project ocusingparticularly on the measures identifed or theItalian Social Housing context.

    website update

    Summer 2012

    AFTER website has been updated during thesummer 2012 with the last outputs produced by thepartners.All the project deliverables beneft rom apublic access on line and can be both read anddownloaded thanks to a Scribd plug-in.

    French Nationa Advisory Board

    Paris, France 10th o Juy 2012

    Number o participants: 16

    Type o participants: representatives romederation o industry or building sector, romederation o workers in building sector, romresearch institutes and rom tenants unions

    Danish Nationa Advisory Board

    Aarhus, Denmark 23rd oAugust 2012

    Number o participants: 9Type o participants: SHOs, Technical experts,Interest Group.

    Presentation o AFTER and status o the project;presentation o Pilot sites and pilot ESMs;discussion, suggestions and improvements.

    Coming eventsInterim Report - 5th o November 2012Turin, Itay 22nd.23rd o November 2012

    AFTER ouputs have been presented and discussedthanks to severa interventions directed toard aproessiona pubic.Overvie o our ast dissemination activities.

    atcoordination

    NEWS AND

    DISSEMINATION

    EVENTS

  • 7/31/2019 D9.6 Newsletter #3

    11/1211

    AFTER Franceworkshop #1 - Optimizing contracts

    Paris, France. 18th October 2012

    Number o participants: 7Type o participants: DELPHIS Social HousingOrganizations, Maintenance services.

    AFTER France has been implemented by DELPHISin order to translate AFTER objectives in a nationalFrench context.Workshops including a small number o SocialHousing Organizations, members o the DELPHISnetwork, will be organized in order to highlightthe best practices implemented by the companies.

    Factsheets and standard measures will bedisseminated thanks to this project.A selection process has been implemented to helpthe 24 DELPHIS SHOs to identiy their ESMs testedin their housing stock during the last 5 years.

    BECA project - Baanced EuropeanConservation Approach.(supported by the ICT Poicy SupportProgramme)

    The BECA project (Baanced European

    Conservation Approach ICT servicesor resource saving in socia housing)addresses the need to reduce energyconsumption in European socia housing bya very signifcant amount to meet overaemission reduction targets. To substantiayreduce peak and overa demand or energyand ater across EU socia housing, BECAi deveop a u set o innovative servicesor resource use aareness and resourcemanagement.Socia housing organisations in 7 Europeancountries (Germany, Itay, Spain, Seden,Bugaria, Czech Repubic, Serbia) and their

    partners are cooperating in the project toprovide ICT-based energy management andenergy aareness services directy to sociahousing tenants and service operators.Services i be pioted by approx. 5,000socia housing tenants across 7 sites in 7European countries.

    Sustained reductions in resource use areto be achieved through usabe ICT-basedservices directy to tenants, as e as byeective monitoring and contro o ocapoer generation and, or district heating,the u heat deivery chain.

    Severa AFTER partners are soparticipating in BECA hich ao a goodeedback and exchange o experiences andmethodoogies beteen the to projects.

    at

  • 7/31/2019 D9.6 Newsletter #3

    12/12

    10

    COORDINATION AND CONTACT

    PROJECT MANAGEMENT

    Julien [email protected]

    c/o DELPHIS

    33, rue Saint-Augustin Tel. : + 33 (0)1 56 08 54 2375002PARIS, France Fax : + 33 (0)1 56 08 01 09

    www. http://www.delphis-asso.org/

    * Started on May 2011 or a duration o 3 years.

    * 2,7M budget granted or 75 % by the European Commission.

    * 18 partners and 6 Socia nationa housing organisations managing 103 000housing units.

    * 200 proessionas participating in 3 Nationa orkshops and fna seminars

    * 3 pre-tested standard energy saving measures per countrytargeting an immediate energy reduction o 3 to 7,5%.

    * 3 piot sites per country to demonstrate the easibiity and efciency oe-deveoped energy saving measures.

    * Promoting o-cost innovations: under 500 EUR/housing unit.

    FACTS

    AND FIGURES