daily progress report shikarpur grid 10-02-2014
TRANSCRIPT
-
8/12/2019 Daily Progress Report Shikarpur Grid 10-02-2014
1/3
To,
Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Pile Work 54 2 6 19 40 40Excavation 6 6Pile Cap/Beam 6 6PedestalsBackfillingS.SS. ErrectionEquip. Erection
Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Pile Work 56Excavation 7 7Pile Cap/Beam 2 2PedestalsBackfillingS.SS. ErrectionEquip. Erection
Switch Yard Path (1208 m) Switch Yard Path Culverts (21Nos.)
Contractor: NEIE
NEIE
Al-Husain Traders & Contractors
Dated: 10/02/2014
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THEEXISTING 220 KV SHIKARPUR SUBSTATION TO 500 KV LEVEL.
Daily Progress Report
Auto Transformer (7 Nos.)Line Gantry (5 Nos.)
(20+10.75+9.25m)ATB Gantry (5 Nos.)
(20+10.75+9.25m)
D is con ne ctor ( 24 Se ts ) C ir cu it Br ea ke r (9 Se ts)
High Level Gantry (10 Nos.)(30.75+9.25m)
ActivitiesC .V.T (2 2 N os ) C ur re nt Tr as ns for me r ( 27 Nos )
Activities
Trenches (m)
500 kV Switch Yard
1 2 3 4
15
5 6 7
8 9 10 11 12 13 14
Post Insulator (72 Nos)Low Level Gantry (10 Nos.)
(20m)Surge Arrestor (18 Nos.)
Fire Wall (7 Nos.)
Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
ExcavationLean ConcreteSteel Work Form Work Conrete Work Bitumen CoatingBackfilling
Activities TYPE-ii (450 m) TYPE-iii (620 m) TYPE-iv (510 m)TYPE-i (140 m)
10- Surface Preparation of Moving Area is in Progress.
6- Drilling And Concrete Work of two Piles (500Kv) are completed.
Today Activities Perfomed:
7- Stone Masonry on the Edges of Bitumen Road is in progress.8- Steel Fixing of Pile Cap/Pad of Firewall-1 is Completed.
9- Form Work of Pile Cap/Pad of Firewall-1 is in Progress.
1- Bitumen Coating and B ack Filling of Fire wall(pile cap) And Auto Transformer (walls) are in Progress.2- Concrete Work of Transformer Way Panel (11.3 M) is completed.3- Bitumen Coating of Transformer way Culvert is completed.4-Back Filling of 11Kv feeder Trench is in progress.5- Laying of Sub-base material of Bitumen Road is in Progress.
-
8/12/2019 Daily Progress Report Shikarpur Grid 10-02-2014
2/3
NEIE DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220 KV SHIKARPUR
SUBSTATION TO 500 KV LEVEL.
To,
Al-Husain Traders & Contractors
a y rogress eport Dated: 10/02/2014
Contractor: NEIE
1 5 6 7
220 kV Switch Yard
2 3 4
Today ThisMonth
T o Da te T oda y ThisMonth
T o Da te T oda y ThisMonth
To Date ThisMonth
To Da te T oday ThisMonth
To Date Today ThisMonth
To Date Today ThisMonth
To Date
Pile Work 32 48 16
Excavation
Pile Cap/Beam
Pedestals
ActivitiesSurge Arrestor (12 Nos.)
High Level (4 Nos.)(13+5.5+4m)
High Level (8 Nos.)(18.5+4m)
Low Level (12 Nos.)(13+4m) C.V.T Line (12 Nos.) Post Insulator (26 Nos.)
Today
Current Transformer (18 Nos.)
Backfilling
S.SS. Errection
Equip. Erection
This To Da te Toda This T o Da te T oda This To Date Activit Toda This To Date Toda This To Date Activit Toda This Month To Date
Fencing (335m)
13
Path Way (257 m)
Activities
128 9 10 11
Disconnector (16 sets) Transformer Way(111 m)Bitumen Road (250 m)Circuit Breaker (6 Sets)
o ay
Month
Month
Month
Month
Month
Pile Work Sub Base 25 60 60 4 52m 76.6mBrick
Work/StoneMasonry
Excavation Base Copping
Pile Cap/Beam Carpet Fence Work
Pedestals
Backfilling
S.SS. Errection
Equip. Erection
This This This This ThisActivities
1514Transformer Way Culvert
(01 No.) TYPE-iii (260 m)Path Way Culverts (7 Nos)
16
TYPE-i (126 m) TYPE-iv (257 m)
Trenches (m)
Today
MonthT o Da te T oda y
Month
T o Da te T oda y
MonthTo Date Today
Month
To Date Today
MonthTo Date
Excavation 100% 100%
Lean Concrete 100% 100%
Steel Work 100% 100%
Form Work 100% 100%
Conrete Work 100% 100%
tumen oat ng 1 1
Backfilling
-
8/12/2019 Daily Progress Report Shikarpur Grid 10-02-2014
3/3
NEIE
JICA LOAN NO. PK P61 CONTRACT NO. SHK-001 (PACKAGE 1)
To,
Daily Progress Report
, , , ,KV SHIKARPUR SUBSTATION TO 500 KV LEVEL
Contractor: NEIE
AL-HUSSAIN TRADERSDated:10/02/2014
Sr. No. Status
1 Completed
Control House Building
Descripition of Activities
Pile Work
omp e e
3 In Progress
4 In Progress
5
Steel Work of Pile Caps, Foundation Beams, Columns Up to Plinth Level
xcava on or or oun a on eams n e aps
Form Work of Pile Caps and Foundation Beams
6
7
8
1- Steel Work Axis (1-5)
2- Form Work Axis (1-4)
Today (10-02-2014)
3- Bar Bending Schedule of Stair Case Submitted on 09-02-2014