daily progress report shikarpur grid 10-02-2014

Upload: yaser-majeed

Post on 03-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Daily Progress Report Shikarpur Grid 10-02-2014

    1/3

    To,

    Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date

    Pile Work 54 2 6 19 40 40Excavation 6 6Pile Cap/Beam 6 6PedestalsBackfillingS.SS. ErrectionEquip. Erection

    Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date

    Pile Work 56Excavation 7 7Pile Cap/Beam 2 2PedestalsBackfillingS.SS. ErrectionEquip. Erection

    Switch Yard Path (1208 m) Switch Yard Path Culverts (21Nos.)

    Contractor: NEIE

    NEIE

    Al-Husain Traders & Contractors

    Dated: 10/02/2014

    DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THEEXISTING 220 KV SHIKARPUR SUBSTATION TO 500 KV LEVEL.

    Daily Progress Report

    Auto Transformer (7 Nos.)Line Gantry (5 Nos.)

    (20+10.75+9.25m)ATB Gantry (5 Nos.)

    (20+10.75+9.25m)

    D is con ne ctor ( 24 Se ts ) C ir cu it Br ea ke r (9 Se ts)

    High Level Gantry (10 Nos.)(30.75+9.25m)

    ActivitiesC .V.T (2 2 N os ) C ur re nt Tr as ns for me r ( 27 Nos )

    Activities

    Trenches (m)

    500 kV Switch Yard

    1 2 3 4

    15

    5 6 7

    8 9 10 11 12 13 14

    Post Insulator (72 Nos)Low Level Gantry (10 Nos.)

    (20m)Surge Arrestor (18 Nos.)

    Fire Wall (7 Nos.)

    Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date

    ExcavationLean ConcreteSteel Work Form Work Conrete Work Bitumen CoatingBackfilling

    Activities TYPE-ii (450 m) TYPE-iii (620 m) TYPE-iv (510 m)TYPE-i (140 m)

    10- Surface Preparation of Moving Area is in Progress.

    6- Drilling And Concrete Work of two Piles (500Kv) are completed.

    Today Activities Perfomed:

    7- Stone Masonry on the Edges of Bitumen Road is in progress.8- Steel Fixing of Pile Cap/Pad of Firewall-1 is Completed.

    9- Form Work of Pile Cap/Pad of Firewall-1 is in Progress.

    1- Bitumen Coating and B ack Filling of Fire wall(pile cap) And Auto Transformer (walls) are in Progress.2- Concrete Work of Transformer Way Panel (11.3 M) is completed.3- Bitumen Coating of Transformer way Culvert is completed.4-Back Filling of 11Kv feeder Trench is in progress.5- Laying of Sub-base material of Bitumen Road is in Progress.

  • 8/12/2019 Daily Progress Report Shikarpur Grid 10-02-2014

    2/3

    NEIE DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220 KV SHIKARPUR

    SUBSTATION TO 500 KV LEVEL.

    To,

    Al-Husain Traders & Contractors

    a y rogress eport Dated: 10/02/2014

    Contractor: NEIE

    1 5 6 7

    220 kV Switch Yard

    2 3 4

    Today ThisMonth

    T o Da te T oda y ThisMonth

    T o Da te T oda y ThisMonth

    To Date ThisMonth

    To Da te T oday ThisMonth

    To Date Today ThisMonth

    To Date Today ThisMonth

    To Date

    Pile Work 32 48 16

    Excavation

    Pile Cap/Beam

    Pedestals

    ActivitiesSurge Arrestor (12 Nos.)

    High Level (4 Nos.)(13+5.5+4m)

    High Level (8 Nos.)(18.5+4m)

    Low Level (12 Nos.)(13+4m) C.V.T Line (12 Nos.) Post Insulator (26 Nos.)

    Today

    Current Transformer (18 Nos.)

    Backfilling

    S.SS. Errection

    Equip. Erection

    This To Da te Toda This T o Da te T oda This To Date Activit Toda This To Date Toda This To Date Activit Toda This Month To Date

    Fencing (335m)

    13

    Path Way (257 m)

    Activities

    128 9 10 11

    Disconnector (16 sets) Transformer Way(111 m)Bitumen Road (250 m)Circuit Breaker (6 Sets)

    o ay

    Month

    Month

    Month

    Month

    Month

    Pile Work Sub Base 25 60 60 4 52m 76.6mBrick

    Work/StoneMasonry

    Excavation Base Copping

    Pile Cap/Beam Carpet Fence Work

    Pedestals

    Backfilling

    S.SS. Errection

    Equip. Erection

    This This This This ThisActivities

    1514Transformer Way Culvert

    (01 No.) TYPE-iii (260 m)Path Way Culverts (7 Nos)

    16

    TYPE-i (126 m) TYPE-iv (257 m)

    Trenches (m)

    Today

    MonthT o Da te T oda y

    Month

    T o Da te T oda y

    MonthTo Date Today

    Month

    To Date Today

    MonthTo Date

    Excavation 100% 100%

    Lean Concrete 100% 100%

    Steel Work 100% 100%

    Form Work 100% 100%

    Conrete Work 100% 100%

    tumen oat ng 1 1

    Backfilling

  • 8/12/2019 Daily Progress Report Shikarpur Grid 10-02-2014

    3/3

    NEIE

    JICA LOAN NO. PK P61 CONTRACT NO. SHK-001 (PACKAGE 1)

    To,

    Daily Progress Report

    , , , ,KV SHIKARPUR SUBSTATION TO 500 KV LEVEL

    Contractor: NEIE

    AL-HUSSAIN TRADERSDated:10/02/2014

    Sr. No. Status

    1 Completed

    Control House Building

    Descripition of Activities

    Pile Work

    omp e e

    3 In Progress

    4 In Progress

    5

    Steel Work of Pile Caps, Foundation Beams, Columns Up to Plinth Level

    xcava on or or oun a on eams n e aps

    Form Work of Pile Caps and Foundation Beams

    6

    7

    8

    1- Steel Work Axis (1-5)

    2- Form Work Axis (1-4)

    Today (10-02-2014)

    3- Bar Bending Schedule of Stair Case Submitted on 09-02-2014