daily progress report shikarpur grid 28-02-2014
TRANSCRIPT
-
8/12/2019 Daily Progress Report Shikarpur Grid 28-02-2014
1/3
To,
Toda y Thi s Month To Date Today This Month To Da te Today This Month To Date Today This Month To Date Toda y This Month To Date Today This Month To Da te Today This Month To Date
Pile Work 2 56 9 20 40 40Excavation 7 7
Beam 6 6
Pile Cap/Pad 3 3
Pedestals
Backfilling
S.SS. Errection
Equip. Erection
Toda y Thi s Month To Date Today This Month To Da te Today This Month To Date Today This Month To Date Toda y This Month To Date Today This Month To Da te Today This Month To Date
Pile Work 56Excavation 7 7
Pile Cap/Beam 5 5
PedestalsBackfilling
Switch YardPath Culverts (21
Nos.)
Contractor: NEIE
Auto Transformer (7 Nos.)Line Gantry (5 Nos.)
(20+10.75+9.25m)
ATB Gantry (5 Nos.)
(20+10.75+9.25m)
Disconnecto r ( 24 Se ts) C ircu it Br ea ke r ( 9 S et s)
High Level Gantry (10 Nos.)
(30.75+9.25m)
ActivitiesC.V.T (22 Nos)
Activities
Switch YardPath (1208 m)Current Trasnsformer (27 Nos)
NEIE
Al-Husain Traders & ContractorsDated: 28/02/2014
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE
EXISTING 220 KV SHIKARPUR SUBSTATION TO 500 KV LEVEL.
Daily Progress Report
Fire Wall (7 Nos.)
500 kV Switch Yard
1 2 3 4 5 6 7
8 9 10 11 12 13 14
Post Insulator (72 Nos)Low Level Gantry (10 Nos.)
(20m)Surge Arrestor (18 Nos.)
S.SS. Errection
Equip. Erection
Toda y Thi s Month To Date Today This Month To Da te Today This Month To Date Today This Month To Date
Excavation
Lean Concrete
Steel Work
Form Work
Conrete Work
Bitumen Coating
Backfilling
3- Surface Preparation for Firewall-6 Bes is in Progress4- Surface preparation for lean concrete is in progress.
TYPE-iv (510m)
Today Activities Perfomed:1- Bitumen Coating and Back Filling of Fire wall(pile cap) And Auto Transformer (walls) are in Progress.2- Placement of M.s Rails and Levelling is in Progress
15
TYPE-ii(450m)Activities TYPE-iii(620m)
Trenches (m)
TYPE-i(140m)
-
8/12/2019 Daily Progress Report Shikarpur Grid 28-02-2014
2/3
To,
NEIE DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220 KV SHIKARPUR SUBSTATION TO 500
KV LEVEL.
Al-Husain Traders & Contractors
Daily Progress Report
Activities Surge Arrestor (12 Nos.)
High Level (4 Nos.)
(13+5.5+4m)
High Level (8 Nos.)
(18.5+4m)
Low Level (12 Nos.)
(13+4m) C.V.T Line (12 Nos.)
Dated: 28/02/2014
Contractor: NEIE
220 kV Switch Yard
Post Insulator (26 Nos.)
1 2 5 6 7
Current Transformer (18 Nos.)
3 4
TodayThis
MonthT o Da te T oda y
This
MonthT o D at e T od ay
This
MonthTo Date
This
MonthT o Da te T oda y
This
MonthTo Date Today
This
MonthTo Date Today
This
MonthTo Date
Pile Work 32 48 16 6 6 6 6 4 4
Excavation
Pile Cap/Beam
Pedestals
Backfilling
S.SS. Errection
Today
Equip. Erection
TodayThis
MonthT o Da te T oda y
This
MonthT o D at e T od ay
This
MonthT o Date Ac tivity To day
This
MonthT o Da te T oda y
This
MonthTo Date Activity Today This Month To Date
Pile Work 12 12 3 3 3 Sub Base 146.7 146.7 76.65 88.65
Brick
Work/Stone
Masonry
Activities
128 9 10 11
Disconnector (16 sets) Transformer Way(111 m) Fencing (335m)
13
Cir cui t Br eaker (6 Sets) Path Way (257 m) Bi tumen Road (250 m)
Excavation Base 146.7 146.7 Copping
Pile Cap/Beam Carpet Fence Work
Pedestals
Backfilling
S.SS. Errection
Equip. Erection
17
1514 16
TodayThis
MonthT o Da te T oda y
This
MonthT o D at e T od ay
This
MonthTo Date Today
This
MonthTo Date Today
This
MonthTo Date Today
This
MonthTo Date
Excavation 100% 100% Excavation 100% 100%
Lean Concrete 100% 100% Lean Concrete 92.7 92.7
Steel Work 100% 100% Steel Work
Transformer Moving Area (118.7 M)
Trenches (m)Path Way Culverts (7 Nos)
Activities
Transformer Way Culvert
(01 No.) TYPE-iii (260 m) ActivitiesTYPE-i (126 m) TYPE-iv (257 m)
Form Work 100% 100% Form Work
Conrete Work 100% 100% Conrete Work
Bitumen Coating 100% 100%
Backfilling
Today Activities Perfomed:
2- Back Filling of Bitumen Road shoulders is completed
1- Laying of base material of Bitumen Road is completed
7- Steel Cutting and Bending of 11kV Feeder Trench is in Progress
5- Compaction of Bitumen Road dis in Progress
6- Lean Concrete of 11kV Feeder Trench is completed
4- Pile Work of 220Kv Equipment Piles is in Progress
3- Surface Preparation of Moving Area is in Progress.
-
8/12/2019 Daily Progress Report Shikarpur Grid 28-02-2014
3/3
NEIE DESIGN MANUFACTURE SUPPLY INSTALLATION TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220
To,
Dated:28/02/2014
Daily Progress Report
Control House Building
KV SHIKARPUR SUBSTATION TO 500 KV LEVEL
Contractor: NEIE
AL-HUSSAIN TRADERS
Sr. No. Status
1 Completed
2 Completed
Excavation Work for Foundation Beams And Pile Caps
Descripition of Activities
Pile Work
3 In Progress
4 In Progress
5 In Progress
6 In Progress
Steel Work of Pile Caps, Foundation Beams, Columns Up to Plinth Level
Concrete Work of Pile Caps and Foundation Beams
Form Work of Pile Caps and Foundation Beams
Form Work of Columns upto Plinth Level
7
8
Today Activities Performed
3- Form Work of Columns upto Plinth Level is in Progress
1- Steel Work of Foundation Beams Axis (5-8) is in progress
2- Form Work of Foundation Beams Axis (5-8) is in progress.
7- Bitumen Coating on Foundation Beams is in Progress
-
ee
x
ng o a
r ase oun a on s n rogress
5- Concrete Work of Pile Caps and Foundation Beams Axis (1~5- A~D) is completed
6- Opening & Shifting of Form work is in progress.
8- Bar Bending Schedule of Stair Case Submitted on 09-02-2014
9- Bar Bending Schedule of Columns ( Plinth Level upto 1st Floor ) Submitted on 09-02-2014
10- Bar Bending Schedule of 1st Floor Beams Submitted on 21-02-2014