Jon Pettitt, EMEA DataCenter Business Development Manager 1
Data Centre Cooling Technologies
![Page 2: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/2.jpg)
• 3.000 Employees
• 30 Countries
• Turnover of €470 M
• HQ in Sweden
• Founded1955
• Global DC Support
•25+ Data Centers
• 95 MW+ Cooling
• 455 Installed units
2
Munters Group – Key facts
Munters – Your Perfect Climate
![Page 3: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/3.jpg)
Global Manufacturing & Logistics Support
Manufacturing plants
Logistic & assembly hubs
16 Manufacturing Plants
5 Logistic & Assembly Hubs
53 Sales & Service Centres
![Page 4: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/4.jpg)
1946 Munters CargoCaire
manufacture under
licence
2012 Acquire
Proflute
2008
Acquire TN
Belgium
2010 Acquired
by Nordic
Capital
2011 Acquire
Kerulai China
and Rotem
2007 Acquire Des
Champs USA
1955 Munters Sweden
bought UK/US
CargoCaire
1960
Munters
Worldwide
1997 on
Swedish stock
exchange
● Swedish inventor and entrepreneur
● A pioneer in desiccant rotor &
evaporative cooling/humidification
● Applied for close to 1,000 patents
● Invented Desiccant rotor technology
over 30 years ago Carl Munters (1897-1989)
A Corporate Culture of Technical Innovation
and a History of Customer Service
![Page 5: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/5.jpg)
Munters Data Centre Installations to May 2013
![Page 6: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/6.jpg)
Why Choose Munters?
6
• Stable Organisation - 66+ year history - Group sales approx €430m.
• Financial Strength - Consistently profitable with strong backing from Nordic Capital &
Rothschild.
• Commitment to the Data Centre Market - €600k invested in the Data Centre Test Facility
in Dison.
• Proven Technology - 13+ years of fault-free performance.
• Capacity for Large Projects - 15 manufacturing facilities worldwide, including 6 plants able
to produce Data Centre cooling systems.
• Global Support - 53 Sales & Service Centres in over 30 countries
• After Sales Support - 20+ Munters Service Engineers in Asia.
• Customer Service - Dedicated structure to support our Data Centre customers.
• Proven Track Record - 12 years experience in Data Centre Cooling, with over 85mW of
cooling installed worldwide.
![Page 8: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/8.jpg)
no. 8
• Challenges in DC Development
![Page 9: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/9.jpg)
Key Challenges & Drivers Impacting the Data Centre Industry
• Reliability/Uptime
• SLA’s
• Contamination
• Energy Costs
• Carbon Emissions
• Modularity
![Page 10: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/10.jpg)
Uptime & Reliability
• Tier 1: Non-redundant capacity components (single uplink and servers).
• Tier 2: Tier 1 + Redundant capacity components.
• Tier 3: Tier 1 + Tier 2 + Dual-powered equipment and multiple uplinks. • Tier 4: Tier 1 + Tier 2 + Tier 3 + all components are fully fault-tolerant including
uplinks, storage, chillers, HVAC systems, servers etc.
Everything is dual-powered.
The levels also describes the guaranteed availability of data from the hardware at a location:
• Tier 1: 99.671% availability.
• Tier 2: 99.741% availability.
• Tier 3: 99.982% availability. • Tier 4: 99.995% availability. RELIABILITY is THE Critical Success Factor
![Page 11: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/11.jpg)
Air Contamination
![Page 12: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/12.jpg)
Air Contamination
![Page 13: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/13.jpg)
Energy Efficiency and Carbon Footprint
![Page 14: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/14.jpg)
Industry 2013 - Future ?
+ + +
Future
?
?
?
?
![Page 15: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/15.jpg)
Sustainability
Green Grid introducing new metrics to measure and help DC owners improve
Sustainability with Data Centre’s
PUE = Power Usage Effectiveness
CUE = Carbon Usage Effectiveness
WUE = Water Usage Effectiveness
![Page 16: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/16.jpg)
Infrastructure
• Power Supplies
• Data Centre size is often restricted by availability of power to site.
• By reducing cooling power consumption, more power becomes
available for critical processes and server operations.
• Space
• Land cost
• Availability
• Planning Consents
• Water
• Availability
• Cost
![Page 17: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/17.jpg)
ASHRAE Recommended & Allowable Envelopes
5.5oC dew point
15oC dew point 60%
A1
A2
A3 A4
18oC 27oC
![Page 18: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/18.jpg)
no. 18
• Cooling Technologies
![Page 19: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/19.jpg)
no. 19
Indirect Evaporative Cooling
![Page 20: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/20.jpg)
Exhaust
Outside
35°C
23°C
Indirect Air Side Economizer Using Polymer Tube HX
![Page 21: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/21.jpg)
Three Modes of Operation
• Mode 1 – Cold Ambient
– Operation:- DRY MODE
– Air to Air Heat exchanger only
• Mode 2 – Warm Ambient
– Operation:- EVAP MODE
– Indirect Evaporative Cooling only
• Mode 3 – Very Warm/Hot Ambient (above approx 22°C WB)
– Operation:- EVAP + DX MODE
– Indirect Evaporative Air Cooling only + DX Cooling circuit
![Page 22: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/22.jpg)
Oasis IEC Video
Oasis video runs here
![Page 23: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/23.jpg)
23
Polymer Heat Exchanger
![Page 24: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/24.jpg)
24
● Flexible Polymer Tubes
● 2.44 meters length
● 75-80% approach to outdoor
scavenger air wet bulb temp
● 55% dry heat recovery
• Scale Limiting design
• Corrosion Resistant
• Independently tested
• UL 900 Class II
• Flame retardant (UL94-V0)
Polymer Heat Exchanger
![Page 25: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/25.jpg)
no. 27
Water Spray Operation
Video of water running through the H/Ex runs here
![Page 26: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/26.jpg)
26
Beneath the Heat Exchanger
![Page 27: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/27.jpg)
Beneath the Heat Exchanger, in Wet Mode
Scavenger
Air
![Page 28: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/28.jpg)
Legionella Risk Analysis
• The Risk Assessment of the OASIS unit
confirms that the risks of causing growth and
spread of Legionella bacteria are negligible.
• If the temperature is below 25°C, no risk of
occurrence of Legionella in the system,
which is the case most of the time.
• In the operating conditions for water above
25°C, the system is designed so that water
flows continuously in the circuit so that there
is no stagnation of water and no risk of
emergence of bacteria.
• The Oasis IEC has an automatic emptying
system that starts if installation is at standstill
for agreed hours. Therefore no risk of
proliferation of legionella in the water
recovery pan.
![Page 29: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/29.jpg)
< 310 kW
54.000m3/h 66.000m3/h
2 prefab blocks
6.9 x 3.94 x 3.6 / 27.2m2
8.8 Ton
OASISTM IEC Range
Oasis 100 Oasis 200 Oasis 300
< 100 kW
18.000m3/h 22.000m3/h
1 block
6.9 x 1.4 x 3.6 / 9.4 m2
2.8 Ton
< 200 kW
36.000m3/h 44.000m3/h
1 block
6.9 x 2.6 x 3.6 / 17.8m2
6.6 Ton
![Page 30: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/30.jpg)
Perimeter format Oasis 200
30
![Page 31: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/31.jpg)
no. 33 Section 5
• #5: Performance & Cost Comparisons
![Page 32: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/32.jpg)
Independent Performance Verification
![Page 33: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/33.jpg)
Results of Independent Engineering Review
Benefits of Oasis™ IEC Cooling over
high efficiency free-cooling chillers:
• Lower capital costs
• Reduced Infrastructure
• 40% lower annual operating cost • Low partial PUE
Source: Cundall Product Engineering Review. Based on 1MW data centre (N+1)
![Page 34: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/34.jpg)
Oasis™ Indirect Evaporative Cooler Energy savings vs Chillers
![Page 35: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/35.jpg)
Oasis™ Indirect Evaporative Cooler Energy savings vs Chillers
![Page 36: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/36.jpg)
Hours pa that Oasis IEC can provide 23°C without Mechanical Cooling
Based on Hot Aisle return air temperature of 35DegC
Hours run with
EPX only
Hours run with
EPX and
supplementary
cooling
Hours of operation per year
![Page 37: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/37.jpg)
Based on Hot Aisle return air temperature of 39DegC
Hours run with
EPX only
Hours run with
EPX and
supplementary
cooling
Hours of operation per year
Hours pa that Oasis IEC can provide 27°C without Mechanical Cooling
![Page 38: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/38.jpg)
no. 39
Existing Installations
![Page 39: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/39.jpg)
Oasis™Indirect Evaporative Air Cooler (IEAC)
![Page 40: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/40.jpg)
Australia
![Page 41: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/41.jpg)
Australia
![Page 42: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/42.jpg)
Wenatchee, WA
![Page 43: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/43.jpg)
T5 El Segundo, CA.
![Page 44: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/44.jpg)
DCO2 Belgium – 5 MW
● Winner Datacenter Dynamics leadership award – 'Green Datacentre' 2011 & European Code of Conduct Award for new Data Centre 2011
● With free cooling system: dust & pollution from surrounding farmland caused - Frequent replacement of filters
- Required man power & frequent inspection
- Caused pressure drop & increased fan power
Solution: Munters Oasis Indirect Evaporative Cooler replaced full free cooling system
![Page 45: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/45.jpg)
no. 46
Sabey Intergate Quincy
![Page 46: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/46.jpg)
46
Sabey Case Study
Sabey video runs here
![Page 47: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/47.jpg)
Data Centre Test Facility
Wenatchee, WA
![Page 48: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/48.jpg)
48
All units can be FATesting in our Data Center Test Facility
• Performance testing
• Leakage testing
• Controls simulations
![Page 49: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/49.jpg)
Benefits Oasis™ IEC Systems
• Contamination Control
Supply and outdoor airflow do not mix
• Corrosion Prevention:
No added moisture/humidity to supply
• Usable for any kind of sweet water
Rain water harvesting
• Eliminating DX cooling
100% IEC Cooling in some regions
• IEC efficiency can increase further
As allowable supply air temperature to server inlet increases,
![Page 50: Data Centre Cooling Technologiesdatacooling.ru/public/uploads/munters2013.pdf · • Commitment to the Data Centre Market - €600k invested in the Data Centre ... • Data Centre](https://reader034.vdocuments.net/reader034/viewer/2022051523/5a78020c7f8b9aea3e8e74e6/html5/thumbnails/50.jpg)
no. 52
Thank you
Questions?