Data flow between P6 & CM (Save Time and Effort Utilizing the Primavera PCM - P6 System Integration)

Peter VanSickler, PMP

Alutiiq, LLC (ANC)

Construction Division

Page 2: Data flow between p6 and cm ppt

Alutiiq, LLC

• A corporation for the Indigenous People

of the Afognak Island, Alaska

• Alutiiq is owned by Afognak Native

Corporation, an Alaska Native

Corporation (ANC) formed under the

1971 Alaska Native Claims Settlement

Act.

Page 3: Data flow between p6 and cm ppt

Presentation Agenda

• Oracle Primavera provided integration

solution for PCM & P6

• The Integration of PCM & P6 systems

• Linking of a PCM Project P6 Project

Schedule

• PCM Daily Reports P6 Schedule

• P6 Schedule PCM Payment Requisition

Page 4: Data flow between p6 and cm ppt

Primavera Integration

between PCM & P6 • Each of the systems comes with the

integration piece provided as part of the system to link to the other.

• P6 Enterprise has the integration piece while P6 standalone does not.

• The integration of the two systems is as simple as configuring the location of the two systems.

Page 5: Data flow between p6 and cm ppt

The Integration of

PCM & P6 • PCM & P6 Systems

Configuration

• PCM System points to P6 System

• P6 System points to PCM System

• Master Note for Integrating Contract Management with P6 [ID 914068.1]

Page 6: Data flow between p6 and cm ppt

Linking the Project to

the Project Schedule • The Project P6 Schedule must be in the

system for it to be linked to the PCM

Project.

• The PCM Project must be in the system

for it to be linked to the Project P6

Schedule.

• Chicken or the Egg Scenario?

Page 7: Data flow between p6 and cm ppt

Data flow between

PCM and P6

Page 8: Data flow between p6 and cm ppt

PCM Daily Report –

P6 Schedule Update • Daily Report entry in PCM on the

schedule activities of the daily report period. (Activities that Start, Finish or In-Progress that day)

• The PCM Daily Reports information is imported into P6 System

• Upon review and approval, P6 schedule is updated.

Page 9: Data flow between p6 and cm ppt

PCM Daily Report –

P6 Schedule Update

Page 10: Data flow between p6 and cm ppt

PCM Daily Report –

P6 Schedule Update

Page 11: Data flow between p6 and cm ppt

P6 Schedule – PCM

Payment Requisition • Upon review and approval, P6 schedule

data is ready for use.

• The Payment Requisition for the Payment Period is created and SOV items linked to the Schedule Activities.

• “Update This Period” is selected and the Activity % Complete data populates the SOV % Complete, thus creating a billing/payment based on the Schedule.

Page 12: Data flow between p6 and cm ppt

P6 Schedule – PCM

Payment Requisition

Page 13: Data flow between p6 and cm ppt

Conclusion:

• Beneficial to utilize the Oracle Primavera Contract Management – P6 integration

• Provided with each systems & easy to set-up

• Time and effort is saved in just utilizing the project daily report activities to update the project schedule and in turn update and calculate the payment requisition schedules of values.

• There are many other benefits provided with the PCM – P6 integration not covered here which are documented on the Oracle “My Support” website in the knowledge base.