data presentation. what the mark scheme says: section a - channel shape
DESCRIPTION
Section A - Channel ShapeTRANSCRIPT
Data Presentation
What the mark scheme says:
Section A - Channel Shape
1.Channel shape graph for the Lower Course (site 1)
Width 1cm = 1m
Dep
th 1
cm =
10
cm
10
20
30
00 1m 2m
Scale: Depth: 1cm =10 cmWidth: 1cm = 1m
2. Bar graph showing average width of the Glenarm river at the Lower, Middle, Upper
course (Sites 1,2,3)
(You must convert all your depth measurements into meters. i.e they will be 0.56m etc)
River Width Depth data.xls
Section B -River speed / velocity
1. Velocity across the channel
To calculate velocity you must remember to:
Distance ÷ time = velocity
10 ÷ average time in seconds = m/ seconds
(X3 graphs for each site)
00.2
0.40.6
0.81
Near Middle Far
Steam position (w idth)
Velo
city
acr
oss
the
chan
nel m
/s
Line graph to show the changes in the velocity across the channel in the Lower course (Site 1)
2. Average Velocity comparison graph
0
0.2
0.4
0.6
0.8
Lower Middle Upper
River Sites
Average Velocity
for Channel
m/s
Bar graph to compare the average velocity between the Lower, Middle, Upper course (Site 1,2, 3)
Section C - Bedlaod
1. Av Bedload shape
5 = very angular4= angular 3= sub-angular2= rounded 1= well rounded
4.85
3.543.25
0
1
2
3
4
5
6
Lower Middle UpperRiver Site
Av B
edla
od s
hape
2. Av Bedload size
24.122.5
16.5
0
5
10
15
20
25
30
Lower Middle UpperRiver Site
Aver
age
Bedl
oad
Size
Scatter Graph to show the relationship between bedload size and bedload shape for the Lower, Middle, Upper course (Sites 1,2,3)
0
1
2
3
4
5
6
0 10 20 30 40Bedload size
Bed
load
sha
pe
3. Relationship between bedload size and shape