    PMI2 Phase I Design Overview

    Programmatic Hierarchy represents Projects managed by the MissionDirectorates and consists of the following elements: Appropriation

    Mission

    Theme

    Program

    Project

    Project by Center

    WBS Lower Levels

    Institutional Hierarchy represents projects under Corporate G&A, WorkingCapital Fund (WCF), Institutional Investment (CoF & ECR), Agency ServicePools, Agency Fee for Services, Center Service Pools, and Center G&A.The hierarchy consist of the following elements: Appropriation

    Mission Equivalent Theme Equivalent

    Program Equivalent

    Project Equivalent

    Project Equivalent by Center

    WBS Lower Levels

  • 7/31/2019 Data Structures Standard Diagrams

    3/21

    Page 3

    PMI2 Phase I Design Overview

    1. Interface to SAP for Master Data Load(Funds Centers, Project WBS, Derivation Rules)

    Cost

    (CCR, Straightline,Misc, Assessment

    Cycles)

    AGENCY LEVEL(OCFO)

    Appropiation,Appropriation Transfer,

    Apportionment,Program

    Project Manager registersTechnical WBS Structure

    2. New Funds Distribution Process

    SAP PROGRAM LEVEL(Misson Directorate)Project, Project by

    Center

    CENTER LEVEL(Perfomring Center)Project by Center byCommittment Item(Labor, Travel, All

    Other, Pool Transfers)

    Purchasing

    Documents(PR and POs)

    Project A100001

    Project Mgmt100001.01

    Systems Eng100001.02

    3. New Project WBSHierarchy representing

    Technical WBS toLevel 7

    4. Downstream Cost Collection Impacts

    MdM

    (Meta DataManager)

    Accounts

    Payable andAccounts

    Receivable

    6. ExistingInterfaceImpacts

    Labor

    Travel

    5. Reporting

    Impacts(BW and R/3)

    S&MA100001.03

    Version 3 last updated 7/19/05

  • 7/31/2019 Data Structures Standard Diagrams

    4/21

    Page 4

    New NSM Funds Center Hierarchy

    Version 2 last updated 7/27/05

    1NASA

    MISSION THEME PROGRAM PROJECT

    PROJECTBY CENTER

    Level 1

    Level 2

    Level 3

    LABORPOOLS

    LABORPOOLS BYCENTER

    CENTERG&A THEMEEQUIVELENT

    CENTER G&ATHEME

    EQUIVELENTBY CENTER

  • 7/31/2019 Data Structures Standard Diagrams

    5/21

    Page 5

    AWCS (PY05) to NSM (PY06)Structure Comparison

    Space OperationsMission: SOMD

    Space Shuttle Theme:SSP

    Space Shuttle Program:

    538A

    SS Main Engine (SSME)Project: 522094

    External TankMSFC: 62-524238

    Solid Rocket Booster (SRB)Project: 522632

    External Tank Project:524238

    Reusable Solid Rocket Motor(RSRM) Project: 522632

    Space Shuttle GroundOps

    UPN: 374

    Space Shuttle Flight

    HardwareUPN: 376

    Space ShuttleProgram Integration

    UPN: 377

    External Tank

    MSFC: 62-376-10

    Space Shuttle MainEngine (SSME) MSFC:

    62-376-20

    Reusable Solid RocketMotor (RSRM) MSFC: 62-

    376-50

    External Tank ProductionMSFC: 62-376-10-10

    External Tank Test AnalysisMSFC: 62-376-10-15

    External Tank Plant OperationsMSFC: 62-376-10-18

    External Tank Project Mgmt Task 1MSFC: 524238.01.01

    External Tank System Eng Task 1MSFC: 524238.02.01

    External Tank S&MA Task 1 MSFC:

    524238.03.01

    Solid Rocket Booster

    (SRB) MSFC: 62-376-60

    Version 4 last updated 7/5/05

    FC

    FC= FundsCenter

    Rept FC =Funds Centerfor reportingpurposesonly

    WBS = WorkBreakdownStructure

    FC

    FC

    FC FC

    FC FC

    ReptFC

    WBS

    WBS

    WBS

    ReptFC

    FC FC

    FC FC

    FC

    WBS

    WBS

    WBS

    FC

  • 7/31/2019 Data Structures Standard Diagrams

    6/21

    Page 6

    Summary of NSM Data Elements

    NSM DataElements

    SAP DataElements

    Nomenclature NomenclatureExample

    Appropriation Fund 3-digit Appropriation Type, 2-digit Year of Availability,4-digit Program Year, 1-digit Fund Type

    Fund: EXCX22006D

    Mission / MissionEquivalent

    Funds Center 4-digit smart coded alphanumeric Reporting Fund Center: ESMD

    Theme / ThemeEquivalent

    Funds Center 2-4 digit smart coded alphanumeric (use existing valuewhen applicable)

    Reporting Fund Center: CONS

    Program / ProgramEquivalent

    Funds CenterFunctional Area

    4-digit random alphanumeric with at least one alpha Fund Center: 987AFunctional Area: 987A

    DirectProgrammaticProject

    Project Definition /Project WBS

    Funds Center

    6-digit random numeric number with 3-digit per WBSlevel (include period delimiter) Up to 7 levels

    Project Definition: 379041

    WBS: 379041.02.03.04.05.06.07

    Funds Center: 379041

    Funds Center by Center: 62-379041

    Institutional Project

    Equivalent

    Project Definition /

    Project WBSFunds Center

    6-digit random numeric number with 3-digit per WBS

    level (include period delimiter) Up to 7 levels

    Project. Definition: 987654

    WBS: 987654.01.03.04.05.06.07

    Funds Center: 987654

    Funds Center by Center: 51-987654

    ReimbursableProject

    Project Definition /Project WBS

    Funds Center

    6-digit random numeric number (different fromBenefiting Project) with 3-digit (including perioddelimiter), 4-digit numeric Customer Purchase Orderplus 2-digit numeric Fund designation at WBS 2 - 4

    Project Definition: 249031

    WBS: 249031.01.9876.03

    Funds Center: 249031

    Funds Center by Center: 22-249031

    Funds Center Budgeting Object

    Reporting Funds Center No BudgetDistribution, but exists as Funds Center inSAP for Reporting roll-up

    Project Definition Project Summary Level

    Project WBS

    Cost ObjectFund Appropriation by Program YearFunctional Area Budgeting Object equal to NASA Program

    Version 4

    last updated 7/05/05

  • 7/31/2019 Data Structures Standard Diagrams

    7/21Page 7

    M3 Mapping in SAP

    Funds Center -Reporting only

    Funds Center -Reporting only

    Funds Center &Functional Area

    Funds Center, Project Definition,& Project WBS 1

    Version 2 last updated 7/5/05

  • 7/31/2019 Data Structures Standard Diagrams

    8/21Page 8

    THEME

    PROJECT

    MISSION

    1NASA(by Appropriation)

    TECHNICAL WBS XBY CENTER

    PROGRAM

    NSM in SAP Programmatic Budget Structure

    Distribution of

    Resource Authority

    Reporting rollup of actuals

    Commitment, Obligation,Cost, and Disbursement

    Funds Distribution

    Project Definition = PRJ DEF

    Work Breakdown Structure = WBS

    Fund Center

    PROJ DEF /WBS 1

    WBS Level X

    Budget structure

    resides in two

    modules and is linkedtogether at the funds

    control level through

    the use of derivation

    rules

    PROJECT

    PROJECT BYCENTER

    Center

    PostingLevel

    X represents the lowest level

    of the structure

    Version 2 last updated 6/26/05

  • 7/31/2019 Data Structures Standard Diagrams

    9/21Page 9

    AWCS (PY05) to NSM (PY06)Programmatic Budget DistributionComparison

    Project

    Program

    Project by

    Center

    1NASA

    UPN

    (506)

    UPN or UPN-

    SubSys by

    Center (506A)

    NASA

    PY05 and Prior PY06 Going Forward

    NASA Forms 506 and506A and Process needsto be reworked toaccommodate PY06Budget DistributionProcess

    Version 2 last updated 6/26/05

  • 7/31/2019 Data Structures Standard Diagrams

    10/21Page 10

    SAP SGL Account

    Sender

    SGL Account

    ReceiverAppropriation (APPR) DR4119.0000

    CR4450.0000

    DR1010.5000

    CR3101.0000

    Appropriation Transfer (ACTU) DR4450.0000CR4170.1000

    CR1010.5000

    DR3103.0000

    CR4450.0000

    DR4170.1000

    DR1010.5000

    CR3102.0000

    Apportionment (APPO) DR4450.0000CR1010.5000

    DR3101.0000

    CR4170.1000

    CR4510.0000

    DR1010.5000

    CR3101.0000

    DR4170.1000

    Program (AUTH) DR4510.0000CR1010.5000

    DR3101.0000

    CR4170.2000

    CR4610.0000

    DR1010.5000

    CR3101.0000

    DR4170.2000

    Project Project by Center DR4610.0000CR1010.5000

    DR3101.0000

    CR4170.2000

    CR4610.0000

    DR1010.5000

    CR3101.0000

    DR4170.2000

    Funds Distribution Overview

    Version 3 last updated 7/19/05

  • 7/31/2019 Data Structures Standard Diagrams

    11/21Page 11

    NSM Budget Distribution Project byCenter (Funds Control Level)

    OCFO performs budget distribution

    steps:Programmatic:Appropriation to Program

    AppropriationAppropriation

    TransferApportionment

    Project

    Program

    ProjectbyCenter

    Programmatic

    ThemeEquivalent

    ProjectEquivalent

    ProgramEquivalent

    ProjectEquivalentby

    Center

    Institutional

    Corp G&A

    Center G&A

    Service Pools

    Inst. Invest.

    LaborPool

    Labor Poolby Center

    Labor

    CenterG&A

    Funds

    ControlLevel-

    Theme

    EquivalentbyCenter

    Corp G&A,

    InstInvest,Service Pool,

    Agency

    Service Pool,AFS Funds

    ControlLevel

    -Project

    Equivalentby

    Center

    OCFO

    Centers perform budgetdistribution steps:

    Programmatic:Project by Center to Traveland Procurement Committment Items; Labor

    Pool, Service Pools, and Center G&Atransfers

    Institutional:Corp G&A, Service Pool, CenterG&A, Inst Invest, Agency Fee for Services,

    and Agency Service Pool to Travel andProcurement Committment Items; Labor Pool

    and Other Service Pool transfers

    CenterLabor

    2000

    TravelAllothers

    Procmnts

    2000

    Travel

    Allothers

    Procmnts

    Agency Fee

    for Services

    Agency Service Pool

    Mission Directorates perform budget

    distribution steps:Programmatic:Program t o Project by Center;Corp G&A, Inst Investment transfers; Project to

    Agency Service Pool Project Equivalent; Project toAgency Fee for Services Project Equivalent;Institutional:Corp G&A and Inst Inves t Theme

    Equivalent to Project Equivalent by Center

    Mission

    Version 5 last updated 7/26/05

  • 7/31/2019 Data Structures Standard Diagrams

    12/21Page 12

    Programmatic Direct Example

    Project WBS 2 WBS 3-7

    Project A123456

    Project AProj Mgmt123456.01

    Project ASystem Eng123456.02

    Project ASafety & Miss.Assur. (S&MA)

    123456.03Project AProj Mgmt

    Staff123456.01.01

    Project AProj Mgmt

    Assurance123456.01.02

    Project AMgmt

    123456.02.01

    Project ADeploy

    123456.02.02

    Project ADeep Space

    S&MA123456.03.01

    Project AReactor S&MA123456.03.02

    Project AMSFC DeepSpace S&MA

    123456.03.01.01Project A

    ARC DeepSpace S&MA

    123456.03.01.02Project A

    JPL DeepSpace S&MA

    123456.03.01.03Project A

    JPL Proj MgmtAcct Staff

    123456.01.01.01Project A

    Space Vehicle

    SystemAssurance

    123456.01.02.01Project A

    Space VehicleSystem Assurance

    Mgmt123456.01.02.01.01

    Project AJPL Space VehicleSyst Assurance Mgmt

    123456.01.02.01.01.01Project A

    MSFC Space VehicleSyst Assurance Mgmt

    123456.01.02.01.01.02

    Project A

    ARC Space VehicleSyst Assurance Mgmt

    123456.01.02.01.01.03

    Project AJPL System AEngineer Mgmt

    123456.02.01.01Project A

    JPL Ground DataSyst Deployment123456.02.02.01

    Level 1

    Level 2

    Level 3

    Level 4

    Level 5

    Level 6

    NOTE: - Level represents SAP Level and Technical WBS Level- Design will accommodate up to Level 7 of Technical WBS (only Level 6 is shown in this example)- Performing Center = Business Area (AIN) shown in upper right-hand corner of WBS box (01 = Agency)

    EX: 123456.02.03.04.05.06.07

    01

    01

    01 01

    01 01 01 0101 01

    01

    01

    55

    55

    55 55 55

    62

    62 21

    21

    System Eng System Eng

    Authorizing Centerattribute = 55 (JPL)

    Version 1 last updated 6/13/05

  • 7/31/2019 Data Structures Standard Diagrams

    13/21Page 13

    Project WBS to Funds CenterRelationship

    Project A123456

    Project AProj Mgmt123456.01

    Project AProj Mgmt

    Staff123456.01.01

    Project AProj MgmtAssurance

    123456.01.02

    Project A

    JPL Proj MgmtAcct Staff

    123456.01.01.01

    Project ASpace Vehicle

    SystemAssurance

    123456.01.02.01

    Project A

    Space VehicleSystem Assurance

    Mgmt123456.01.02.01.01

    Project A

    JPL Space VehicleSyst Assurance Mgmt

    123456.01.02.01.01.01

    Project A

    MSFC Space VehicleSyst Assurance Mgmt

    123456.01.02.01.01.02

    Project A

    ARC Space VehicleSyst Assurance Mgmt

    123456.01.02.01.01.03

    Level 1

    Level 2

    Level 3

    Level 4

    Level 5

    Level 6

    Project AProj Mgmt55-123456

    Project AProj Mgmt62-123456

    Project AProj Mgmt21-123456

    Project WBS Funds Center

    01

    01

    01 01

    55 01

    01

    55 62 21

    55

    62

    21

    A WBS can not be

    used in combinationwith a Centerattribute in fundscontrol and posting ofCommitments,

    Obligations, Costsand Disbursements.

    In this example, inorder to report totalSpace Vehicle Syst

    Assurance costsacross JPL, MSFC,and ARC, Level 6WBSs will roll-up toLevel 5 of WBS

    structureVersion 1 last updated 6/13/05

  • 7/31/2019 Data Structures Standard Diagrams

    14/21Page 14

    Service Pool WBS Example

    - Service Pool Project Equivalent represents Sub-Pool

    - Center level is a sample representation subject to change

    ARCFacility

    Services344100.01

    Level 1(Sub-Pool)

    Level 2

    Levels3-7

    DFRCFacility

    Services344100.02

    Facility

    Services344100

    GRCFacility

    Services344100.03

    GSFCFacility

    Services344100.04

    JSCFacility

    Services344100.05

    KSCFacility

    Services344100.06

    LARCFacility

    Services344100.07

    SSCFacility

    Services344100.09

    MSFCFacility

    Services344100.08

    ARC

    Center-Defined

    344100.01.XX

    DFRCCenter-

    Defined344100.02.XX

    GRCCenter-

    Defined344100.03.XX

    GSFCCenter-Defined

    344100.04.XX

    JSCCenter-

    Defined344100.05.XX

    KSCCenter-Defined

    344100.06.XX

    LARCCenter-

    Defined344100.07.XX

    MSFCCenter-Defined

    344100.08.XX

    SSCCenter-Defined

    344100.09.XX

    Version 1 last updated 6/13/05

  • 7/31/2019 Data Structures Standard Diagrams

    15/21Page 15

    Center G&A WBS Example

    Center level is a sample representation subject to change

    Level 3ARCCFO

    992858.01.01

    Level 1

    Level 2

    Levels4-7

    DFRCCFO

    992858.01.02

    InstitutionalAdmin

    992858

    GRCCFO

    992858.01.03

    GSFCCFO

    992858.01.04

    JSCCFO

    992858.01.05

    KSCCFO

    992858.01.06

    LARCCFO

    992858.01.07

    SSCCFO

    992858.01.09

    MSFCCFO

    992858.01.08

    Office of CFO992858.01

    ARCCenter-Defined

    992858.01.01.XX

    DFRCCenter-Defined

    992858.01.02.XX

    GRCCenter-Defined

    992858.01.03.XX

    GSFCCenter-Defined

    992858.01.04.XX

    JSCCenter-Defined

    992858.01.05.XX

    KSCCenter-Defined

    992858.01.06.XX

    LARCCenter-Defined

    992858.01.07.XX

    MSFCCenter-Defined

    992858.01.08.XX

    SSCCenter-Defined

    992858.01.09.XX

    Version 1 last updated 6/13/05

  • 7/31/2019 Data Structures Standard Diagrams

    16/21Page 16

    Reimbursable Example

    MSFC ExternalTank

    Reimbursable246879.01

    Level 1

    Level 2

    KSC ExternalTank

    Reimbursable246879.02

    External Tank

    Reimbursable

    246879

    MSFC ExternalTank Reimbursable

    Task 1246879.01.01

    Level 3

    KSC External TankReimbursable

    Customer Y246879.02.4321.01

    SSC External

    TankReimbursable

    246879.03

    SSC External Tank

    ReimbursableTask 1

    246879.03.01

    MSFC ExternalTank Reimbursable

    Task 1.1246879.01.01.01

    MSFC External TankReimbursable Task 1.1

    Customer X246879.01.01.01.1234.01

    Level 4

    Level 4 +CustomerOrder &

    Fund

    SSC External TankReimbursable

    Task 1Customer Z

    246879.03.01.2468.01

    -Reimbursables must represent WBS with CustomerPurchase Order and Fund Identifier at lowest level

    - Level 4 is the lowest level Technical WBS possible for

    ReimbursablesVersion 2 last updated 6/15/05

  • 7/31/2019 Data Structures Standard Diagrams

    17/21Page 17

    Working Capital Fund - SEWP Example

    - Level 7 is the lowest level Technical WBS possible for Operations-side of SEWP

    - Working Capital Fund must represent Reimbursable WBS with Customer Purchase Orderand Fund Identifier at lowest level for Customer billing

    - Business Area = 51 (GSFC) for all SEWP WBS

    Version 1 last updated 6/13/05

    Level 1

    Level 2SEWP

    Operations991564.01

    SEWP991564

    SEWP NorthrupGrumman

    991564.02.7207.01

    Levels 3SEWP GTSI

    991564.02.7208.01

    SEWP DLTSolutions

    991564.02.7209.01

    SEWPCustomers991564.02

    SEWP OperationsTask 1

    991564.01.01

    Levels 4-7

    SEWP Operations

    Sub-Tasks991564.01.01.XX

  • 7/31/2019 Data Structures Standard Diagrams

    18/21Page 18

    Derivation Rule Change Add Business Area

    Version 1 last updated 6/28/05

    PY05 and Prior Funds Use existing rule: Derive Funds Center from WBS, Cost Element, and Fund

    PY06 Funds Use new rule: Derive Funds Center from WBS, Business Area, Cost Element, and Fund

    Allows for same WBS range to be used for each Center

    Business Areaadded

    WBS Range

  • 7/31/2019 Data Structures Standard Diagrams

    19/21

    Back-Up

  • 7/31/2019 Data Structures Standard Diagrams

    20/21

    Page 20

    Transition Plan

    Assumptions

    No PMI2 activity in SAP will occur prior to FY2005 close to ensure noimpact to FY2005 Financial Statements

    Program Year 2006 funding will be executed in NSM Structure

    No retroactive changes to existing structures (no conversion)

    If Program Year 2005 and prior funds are committed and/or obligated asof Sept 30, 2005, the open documents will stay in current accountassignment structure

    If Program Year 2005 and prior funds are obligated in FY06, theobligation will be posted against the original account assignmentstructure that the commitment was posted to

    Existing Projects will have two budget structures to manage, execute,and report (PY2005 structure and PY2006 structure)

    Carry-forward of residual Budget and Open Items will be performed onPY2005 or prior account assignment structure

    NSM Budget Distribution

  • 7/31/2019 Data Structures Standard Diagrams

    21/21

    P 21

    NSM Budget Distribution

    Project WBS 2 by Center (optionalFunds Control Level)

    Project byCenter

    Programmatic

    Center G&ATheme

    Equivalent

    Institutional

    Labor Pool

    Labor Poolby Center

    2000Travel

    AllothersProcmnts

    Project WBS 2

    by Center

    Project WBS 2by Center

    Project WBS 2by Center

    2000Travel

    AllothersProcmnts

    2000Travel

    AllothersProcmnts

    MSFC

    Service Pool AProject

    Equivalent

    (Sub-Pool)

    2000Travel

    AllothersProcmnts

    Project WBS 2by Center

    Service Pool B

    ProjectEquivalent(Sub-Pool)

    Service Pool CProject

    Equivalent

    (Sub-Pool)

    Project byCenter

    Programmatic

    Center G&ATheme

    Equivalent

    Institutional

    Labor Pool

    Labor Poolby Center

    2000Travel

    AllothersProcmnts

    Project WBS 2

    by Center

    Project WBS 2by Center

    Project WBS 2by Center

    2000Travel

    AllothersProcmnts

    2000Travel

    AllothersProcmnts

    KSC

    Service Pool AProject

    Equivalent

    (Sub-Pool)

    2000Travel

    AllothersProcmnts

    Project WBS 2by Center

    Service Pool B

    ProjectEquivalent(Sub-Pool)

    Service Pool CProject

    Equivalent

    (Sub-Pool)

    Project

    If Project WBS 2 byCenter is chosen levelof Funds Distribution:

    - Must transfer budgetto Labor, Travel, Proc,Cntr G&A and Poolsfrom Project WBS 2by Center

    - Each Center withinProject must useProject WBS 2 byCenter (standardacross Project)

    - In this example, 7

    budget transfers ifProject by Center vs.32 budget transfersfor Project WBS 2 byCenter (per Center)

    Per OCFO decision on 6/7/05 optional WBS Level 2 will not be used for PY06 funding