datacenter in novosibirsk (russia)

12
Datacenter in Novosibirsk project Made by Latkina Sofy 1

Upload: sofya-latkina

Post on 20-Jul-2015

75 views

Category:

Small Business & Entrepreneurship


0 download

TRANSCRIPT

Datacenter in Novosibirskproject

Made by Latkina Sofy

1

Novosibirsk: statistical data

• Population: 1 547 910 citizens

• GDP: 659,5 billion rubles

• GDP/citizen: 426 058 rubles

• Avg. salary: 25 877 rubles/month (310 524 rubles/year)

• Internet: 57 % of population

• Power consumption: 14 973.6 mil. kWh * year

• Cost of electricity: 2,09-2,18 rubles/kwh

• Cost of land: 290 431 rubles/m2

• Cost of rent: 9 931 rubles/m2 (for offices)2

Novosibirsk: datacenters

pcs users per 1 pc

Datacenters 7 126 044

Cabinets 2 828 312

Servers 56 560 16

Web sites 1.5 * 10^6 0.57

3

Service sale price

Colo provider PowerTier I

(per month)

Tier II

(per month)

Tier III

(per month)

Tier IV

(per month)

МегаФон 6 kWh — — 13 630 —

НвсФ ФГУП«ЦентрИнформ»

— individually on request

Ростелеком — — — — 15 800

РТКомм-Сибирь — individually on request

4

Your data: requirements

Country Russia

City Novosibirsk

1st Stage capacity 100 Cabinets 800 IT Power

Stage capacity 100 Cabs/ 800 kW

DC Capacity 300 Cabs / 2 400 kW

Power supply [N+1]

Cooling supply [N+1]

Rack sell price 1000 $ (8kW included)

Project time 3 years

5

Cooling costsPower cons,

KW

Capacity, KW CUE Dims, LxWxH m Unit cost *,

kRUR

Maintenance cost,

kRUR

Maintenance wrk hrs

Chiller without FC

CHILLER

Lessar LUC-

SSDA720CX 227 729 3.2 7.4x2.3x2.4 9 169 560.48 183 391.2 32

CHILLER

Lessar LUC-

SSDA800CX 251 810 3.2 8.4x2.3x2.4 9 877 411.51 197 548.23 32

CHILLER

Lessar LUC-

SSDA900CX 278 902 3,2 9,4x2,2x2,4 10 855 183.69 217 103.67 32

Air handler unit (chilled water)

Systemair TA

4500 HW

AIR

HANDLING

UNIT 1.592 1,62x0,87x1,98 247 983 4 959.66 22

6

Power costs

Capacity, KW

Efficiency

50/90 Dims, LxWxH m

Product cost *,

RUR

Maintenance

cost, RUR

Maintenance

wrk hrs

Genset

DOOSAN

P086Ti 200 0.8 30х13.2х18.5 1 445 000 28 900 150

DOOSAN

P158LE 437.5 0.8 30.2х14.6х18.8 2 267 000 45 340 150

DOOSAN

P222LE 625 0.8 36.5х14.2х20 3 550 000 71 000 150

UPS

Ippon Back

Verso 400 2 0.5 2.02х1.24х1.66 2 888.13 57.76 32

Ippon Back

Power Pro 600 3.6 0.6 1×1.4×3.3 3 556.19 71.12 48

IPPON Smart

Winner 3000 21 0.7 4.38 x 0.86 x 5.82 29 820.69 596.4 64

7

Operation staff• Security:

• Security officer— 1 / 2 500 sq. m.• Guard— 1 / Check Point

• DC Engineers:• 24x7 — 2 for 1 shift

• Client support:• Remote hands: 3 in shift per 100 cabinets• Manager: 3 per 300 cabinets

• Building/office:• Engineer — 1 per 2 500 sq.m.• Support/storekeeper — 1 person• Driver — 1• Cleaner — 2 / 2 500 sq.m.• Receptionist — 1

• IT support / monitoring:• 1 / 100 cabinets

• Datacenter manager: — 1 / DC

8

Data: design

• Land: 3 000 sq.m.

• Building: 2 500 x 3 sq.m.

• Technology:• Number of GenSets: 4

• 5 x 625 kW (DGU)• 2 x 227kW + 278kW (CHILLER)• 20 x 210kW (UPS)

• Number of UPS: 7 (7 x 360kW)• Number of Cooling units:

• (2 * 902 = 1 804 kW)• (3 * 729 = 2 187 kW)

9

Investment costs

• Cooling = 49 219 049

• Standby power = 113 613 926

• UPS power = 596 414

• Wages = 24 360 000

• Land cost = 871 293 000

• Building cost = 74 482 500

• 72 000 * 300 * 12 * x = 1 133 564 889

• x = 4.4

10

Contacts

Latkina Sofy

[email protected]

12