H.M. Government’s whole sector approach to implementation of digital, collaborative working Open BIM / COBie Field Trails Industry Feedback

Upload: others

Post on 11-Jun-2020

8 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

H.M. Government’s whole sector approach to implementation of digital, collaborative working

David PhilpBIM Task GroupHead of BIM

Open BIM / COBie Field TrailsIndustry Feedback

Page 2: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

2

Construction Sector:a time of change

"Tempori Parendum"- Be prepared for your time

Page 3: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

BIM, Procurement through computer readable data

Page 4: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

Drop 2BLooking good!

Level 2 training industry towards good quality consistent data transactions

Page 5: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

Built Environment enters aDigital Revolution

Page 6: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

Government strategyCollaborative 3D BIM with all project and asset information, documentation and data being electronic

By 2016 a staged plan will be published with mandated milestones showing measurable progress at the end of each year.

Page 7: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

Keep it simple; our hypothesis is:BIMGovernment as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information

Page 8: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

What is COBie

“a common language”

Page 9: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

9 | WWW.BENTLEY.COM

What is COBie?

Information Exchange to facilitate Digital transactions

Page 10: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

10

COBie UK 2012

COBie is formal schema that helps organise information about new and existing facilities. It is general enough that it can be used to document both Buildings and Infrastructure assets. It is simple enough that it can be transmitted using a spread-sheet. It is means of sharing structured information

Page 11: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

Purpose

COBie

Page 12: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

PIM to AIM

Page 13: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

13 | WWW.BENTLEY.COM

Data Procurement

Right amount of information at the right time

AIM (COBie is key)

Page 14: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

Allows data transactions at all tiersWith simplicity!

Page 15: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

BIM does not = correct information

Page 16: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

16 | WWW.BENTLEY.COM

Answer ‘English Questions’

PAS 1192:2 – Data Tranactions

Page 17: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

This is how we currentlypopulate the

CAFM systems

To help automate the process between Capex and Opex

Page 18: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

Where's that Maintenance

manualfor the hand drier

And the page you want is probably

missing anyway

Better asset management

Page 19: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

InteroperabilityLots of ways for the supply chain

to get there.One format many

routes

IFC

Manual input

Export tools

ProprietarySoftware

Page 20: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

COBie: Reusability, Many client Use cases!

Page 21: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

Data Hierarchy / Use Cases

StrategicSummary HMT

Portfolio Planning Depts

Asset Asset / Portfolio Depts

Full Atomic Detail

Asset & Systems Operations

Level of Detail Description Consumer

COST

IFC

COBie

Data

Page 22: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

22

A key component of Level 2 BIM maturity

Page 23: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

Level 2: process and deliverables

Page 24: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

What a client needs to make decisions

The purposes that the information might be used for .The information (reports etc) to inform decisions and purposes

The data

The drawing content that conveys information

Hierarchy of Information and the Work Stages

WISDOM

KNOWLEDGE

INFORMATION

DATA

Page 25: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

25 | WWW.BENTLEY.COM

PAS 1192/2Plain Language Questions

Page 26: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

26 | WWW.BENTLEY.COM

How are the PLQ’s linked to data?

Energy Analysis Requirements Humidity RequirementEnergy Analysis Requirements Radiant Heating RequirementEnergy Analysis Requirements Air Circulation RequirementEnergy Analysis Requirements Ventilation RequirementEnergy Analysis Requirements Temperature Range RequirementEnergy Analysis Requirements Energy Performance BasisEnergy Analysis Requirements HVAC Performance Basis

PLQ’s at Stage 02

How are the PLQ’s answered?

What is the data?

Page 27: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

27

BIM Level 2Practically applied

Page 28: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

28 | WWW.BENTLEY.COM

Page 29: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016

29 | WWW.BENTLEY.COM

Page 30: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016
Page 31: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016
Page 32: David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all project and asset information, documentation and data being electronic By 2016