  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    1/28

    June 2011

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    2/28

    Project Location

    Kunming

    India

    Dawei

    Europe

    Africa

    AsiaRegionalHubAsiaRegionalHub

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    3/28

    Strategic Location

    Kunming

    Dawei

    Chennai

    SouthernEconomicCorridor&SouthernEconomicCorridor&IndianOceanGatewayIndianOceanGateway

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    4/28

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    5/28

    Project Overview & Framework Agreement

    MOU signed between the Government of the Kingdom of Thailand and the Government of theUnion of Myanmar to develop the Dawei Deep Seaport and Road Link to Bangkok on May 19th 2008.

    MOU signed between ITD and Myanma Port Authority, Ministry of Transport on June 12th 2008

    granting ITD the sole right to develop, implement, and operate the Dawei Deep Seaport and Industrial

    Estate Project.

    Framework Agreement signed between ITD and Myanma Port Authority, Ministry of Transport on

    November 2nd 2010 for the development of the Dawei Deep Sea Port, Industrial Estate, and Road and

    Rail Link to Thailand on a BOT basis.

    Project established as a Special Economic Zone (SEZ)

    Concession Period: 60 Years + Possible Extension

    Land Lease Period: up to 75 Years

    o Deep Sea Port

    o Industrial estate incl. heavy industries such as:

    steel mill, oil refinery, petrochemical complex,

    fertilizer plant, power plant, and other utility services

    o Cross border road and rail link with connecting

    transmission lineso Township for residential and commercial development

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    6/28

    Dawei Special Economic Zone Law Structure

    Dawei Special Economic Zone Law enacted by the Myanmar Government on 27th January 2011

    Government President

    MinistryoftheOfficeofthe

    President

    Minister

    CentralBody

    ManagementCommittee

    Gov.departments&organizations

    Chairman

    Vice Chairman

    entra or ng o y

    Secretary JointSecretary

    Gov.of TanintharyiRegionSupportingWorkingBody

    representative(s)ofDaweiSpecialEconomicZone

    RelevantGov.departments &

    DeveloperorInvestor

    representative(s) representative(s)

    The Central Working Body established on 28th April 2011 by the Myanmar Government.

    e n ster o at ona ann ng an conom c ann ng as t e a rman.

    The Committee comprises of 15 other Deputy Ministers and Director Generals from various

    Ministries.

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    7/28

    Legal Framework of DSEZ Law

    250 km2 ProjectAreadefinedastheDaweiSpecialEconomicZoneIndustriesandbusinesses inDSEZshallbegrantedtheprotectionandspecialprivilegesasfollow:

    NoNationalization

    Therighttoown landfordevelopmentofindustriesandbusinesses

    The righttoimportrawmaterialsforprocessingandexportwithoutimportdutiesandcorporate

    incometaxexemption

    Production fordomesticconsumptionsubjectedtonormaltaxrate

    Theright toimportforeignmanagement andskilledlabor

    Allowance for financialtransactionsrequiredfornormalbusinessoperation

    ac tate mm grat onan wor perm t

    Facilitatecompanyandbusinessregistration,permits,andlicensesinONESTOPSERVICE

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    8/28

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    9/28

    Project Investigation

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    10/28

    ITD Investigation Site Selection

    Good Location for Port Development

    Natural water depth able toaccommodate lar e-size vessels.

    Natural shelter good for

    anchorage.

    No physical underwater & sub-soil obstructions for approachchannel & port basins.

    Sufficient flat hinterland forIndustrial Estate in order to support /

    create throughput for the PORT.

    Economical transportation for theRoad and Rail Links between

    DAWEI Port and Thailand.

    Sufficient supply of localconstruction material.

    Dawei Deep Sea Port and Industrial Estate will cover an area of 250 km2 or 61,775 acres.

    The Dawei Project will demand sufficient land area to prevent industrial congestion, environmental problems and

    for future project expansion will altogether promote the well-being and livelihood of the community.

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    11/28

    ITD Investigation Geotechnical Survey

    ON-SHORE SOIL BORING

    Heavy Industry 93 Bore Holes

    OFF-SHORE SOIL BORING 22 Bore HolesTOTAL 180 Bore Holes

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    12/28

    ITD Investigation Topographic Survey

    Top og raphic Survey

    Survey along the Shoreline

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    13/28

    Project Development Plan

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    14/28

    Project Development Plan

    Establishment ofDawei Development Company Limited in Myanmar to implement the Dawei

    Project.

    Development of Basic Infrastructure:

    Port

    Road and Rail Link

    a er upp y an rea men ys em

    Electricity

    Township

    Hired reputable consultants for detailed design study for port and road link.

    Upon approval by the Myanmar Government, Port (1st Phase) and Road Link will begin

    construction by early 2012 and expect to complete within 4 years.

    LAND AVAILABLE FOR IMMEDIATE RESERVATION BY INVESTORS.

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    15/28

    Basic Infrastructure Preparation

    DEEP SEA PORT and ROAD LINK TO THAILAND

    Appointed reputable consultants to conduct detailed design study

    Road: EPSILON; TESCO; MINDWAY

    Port: Servicing liquid cargo, agricultural products, general cargo, containers, and bulk cargo

    Road Link: 4-Lane Toll Highway with expansion to 8 lanes in later phase

    Temporary Small Port: NOW available for use.

    Access Road (Dawei Phu Nam Ron): 160 Kilometer. 90% completed.

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    16/28

    Corridor Link to ThailandCorridor Link to Thailand

    oa s

    Railways Transmission Lines

    Oil & Gas Pipelines

    200 m .

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    17/28

    Dawei Thailand: Road and Rail Link

    DAWEIPROJECT

    160 KM

    70 KM

    KANCHANABURIPHU NAM RON

    Myanmar ThailandBorder

    350 KM Trans-Border Cor r idor from Daw ei t o Bangkok

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    18/28

    Moto r way B ang Ya i Phu Nam Ron

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    19/28

    Basic Infrastructure Preparation

    WATER SUPPLY AND TREATMENT SYSTEM

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    20/28

    Basic Infrastructure Preparation

    ELECTRICITY

    Coal-Fired Power Plant:

    Land available up to 5,000 rai for power plant development to serve Dawei Industrial Estate

    Plot location next to Bulk Port

    oss y o eve op power p an o se o an w n e n us r a s a e un er a

    long-term contract (PPA)

    ,

    Tariff MOU.

    Hydro Power Plant

    Tanintharyi Hydro Power Development up to 1,040 MW to serve the Dawei Industrial Estate.

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    21/28

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    22/28

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    23/28

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    24/28

    Office Complex Conceptual Image

    o Offices o Auditorium

    o Exhibition Hall

    o Hotel

    o Resort

    o Reception Hall

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    25/28

    Gas Fields in the Gulf of Martaban

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    26/28

    Business Opportunity for Investors

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    27/28

    Dawei Development Company Limited (DDC)

    Concession HoldinInvestors

    DDC

    Strategic Level Partners

    TownshipPortCoal-Fired

    Power Plant

    World Class

    IndustrialEstate

    IntegratedSteel Mills

    RailwayToll

    RoadPetrochemical

    Complex

    Refinery &Fertilizer HydroUtility Shi ards Tele-

    Logistics

    Chemical Pulp &o ay esoras omp exan s ower anerv ces commun ca on omp ex aper

  • 8/6/2019 Dawei Final May 2011_roadshow Final_website

    28/28

    An Industrial Project That Could Change Myanmar