From: Rajesh Kumar Jha To: [email protected] Cc: [email protected] ; Shalin Shah ; Manoranjan Tripathy ; Harsh Yadav ; Hebin Chenthamarakshan ; Jesse Benjamin Fullonton Subject: EC No. 1416/EC1/2019/SEIAA dated 27.02.2020 - Half Yearly Compliance Report - Oct 2019 to Mar 2020 - Reg. Date: 14 May 2020 17:02:30 Attachments: image.png EC No. 1416_EC1_2019_SEIAA dated 27.02.2020_Half Yealy Compliance Report-Oct19-Mar20.pdf Dear Sir/Madam, This is with reference to the Environmental Clearance (EC) Order No. 1416/EC1/2019/SEIAA dated 27.02.2020 issued by State Environment Impact Authority (SEIAA), Kerala to issued to Adani Vizhinjam Port Private Limited (AVPPL) for Granite Building Stone Quarry Project in Block No.29, Re-Survey No.120/10 in Manickal Village, Nedumangad Taluk, Thiruvananthapuram District, Kerala. Since the EC was granted on 27.02.2020, as on date, AVPPL have not initiated any work at the site. Therefore, the EC compliance for the half yearly period (October 2019 to March 2020) ending 31.03.2020 is not substantial. In the meantime, AVPPL have complied with all the conditions that are applicable prior to commencement of operations; as detailed in the attached letter (Ref: AVPPL/MOEF/2020-21/1127 dated 13.05.2020). Thanks & Regards, Rajesh Jha MD & CEO Adani Vizhinjam Port Pvt. Ltd. 2 nd Floor, Vipanchika Tower, PO-Thycaud, Trivandrum- 695014, Kerala, India Direct Line: 0471 277 2116 | www.adani.com

Upload: others

Post on 13-Feb-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

  • From: Rajesh Kumar JhaTo: [email protected]: [email protected]; Shalin Shah; Manoranjan Tripathy; Harsh Yadav; Hebin Chenthamarakshan;

    Jesse Benjamin FullontonSubject: EC No. 1416/EC1/2019/SEIAA dated 27.02.2020 - Half Yearly Compliance Report - Oct 2019 to Mar 2020 -

    Reg.Date: 14 May 2020 17:02:30Attachments: image.png

    EC No. 1416_EC1_2019_SEIAA dated 27.02.2020_Half Yealy Compliance Report-Oct19-Mar20.pdf

    Dear Sir/Madam, This is with reference to the Environmental Clearance (EC) Order No.1416/EC1/2019/SEIAA dated 27.02.2020 issued by State Environment ImpactAuthority (SEIAA), Kerala to issued to Adani Vizhinjam Port Private Limited(AVPPL) for Granite Building Stone Quarry Project in Block No.29, Re-SurveyNo.120/10 in Manickal Village, Nedumangad Taluk, Thiruvananthapuram District,Kerala. Since the EC was granted on 27.02.2020, as on date, AVPPL have not initiatedany work at the site. Therefore, the EC compliance for the half yearly period(October 2019 to March 2020) ending 31.03.2020 is not substantial. In themeantime, AVPPL have complied with all the conditions that are applicable priorto commencement of operations; as detailed in the attached letter (Ref:AVPPL/MOEF/2020-21/1127 dated 13.05.2020). Thanks & Regards,

    Rajesh JhaMD & CEOAdani Vizhinjam Port Pvt. Ltd.

    2nd Floor, Vipanchika Tower, PO-Thycaud, Trivandrum- 695014, Kerala, IndiaDirect Line: 0471 277 2116 | www.adani.com

  • Annexure I: CTO from KSPCB

  • Page1

    FILE NO : PCB/TVM-DO/ICO/NDD-12806757/2020 Date of issue : 16/03/2020

    KERALA STATE POLLUTION CONTROL BOARD

    CONSENT TO

    OPERATE/AUTHORISATION/REGISTRATION

    ISSUED UNDER

    The Water (Prevention & Control of Pollution) Act, 1974

    The Air (Prevention & Control of Pollution) Act, 1981

    and

    The Environment (Protection) Act, 1986

    As per Application No. :12806757 Dated:11-03-2020

    TO

    M/s BUILDING STONE QUARRY OF ADANI VIZHINJAM PORT PRIVATE LIMITEDManickal Village,

    Nedumangad Taluk

    Consent No. :PCB/TVM-DO/ICO/NDD/QRY/29/2020 Valid Upto :26/02/2025

  • Page2

    1. GENERAL 1.1.This integrated consent is granted subject to the power of the Board to withdraw consent, review and make

    variation in or revoke all or any of the conditions as the Board deems fit.

    2. CONDITIONS AS PER The Water(Prevention and Control of Pollution)Act, 1974

    1 VALIDITY 26/02/2025

    2 Name and Address ofthe establishment

    BUILDING STONE QUARRY OF ADANIVIZHINJAM PORT PRIVATE LIMITEDMANICKAL VILLAGE, NEDUMANGADTALUK 695607

    3 Communication Telephone :91-9099056757Fax :04712-2325600E-mail:[email protected]

    4 Occupier Details Rajesh JhaCEOAdani Vizhinjam Port Pvt Limited | Second Floor,Vipanchika Tower, Thycaud, Trivandrum,

    5 Local Body MANICKAL

    6 Survey Number Re- survey Block 29 , Re survey no: 120/10

    7 Village Manickal

    8 Taluk NEDUMANGAD

    9 District THIRUVANANTHAPURAM

    10 Capital Investment(Rs in Lakhs) 400

    11 Scale Small

    12 Category RED

    13 Annual fee(Rs)

    Total Fee remitted(Rs)

    Rs 40000/-

    Rs 200000/-

    14 RAW MATERIAL PRODUCTS

    Quarrying in 1.1081 Ha Rock @281033 Metric Tonnes

    15 Total Power Required (HP) -

    2.1 In case of generation of trade effluent from the industry, effluent treatment system consisting oftreatment units having adequate capacity established as per the Integrated Consent to Establish issuedshall be operational at all times during which the industry is functional. Additional facilities required, ifany, to achieve the standards laid down by the Board u/s 17(1) (g) of the Water Act shall also be madealong with.

    2.2 Water consumption: 2KLD

    2.3 Effluent generation: -

    2.4 The characteristics of effluent after treatment shall confirm to the following tolerance limits:

    SI.NO. Characteristics Unit Tolerance Limit

    Sewage Trade Effluent

  • Page3

    3. CONDITIONS AS PER The Air(Prevention and Control of Pollution)Act, 1981

    4. CONDITIONS AS PER The Environment (Protection) Act, 1986.

    2.5 Mode of disposal of treated effluent: -

    3.1 Adequate air pollution control measures shall be operational at all times during the functioning of theindustry. Additional facilities required, if any, to achieve the standards laid down by the Board shallalso be made along with.

    StackNo.

    Sources of Emission EmissionRate(Nm3/Hr)

    Stack Height above Control Equipment

    GroundLevel

    Roof Level

    3.2 Emission characteristics shall not exceed the following:

    SI.No. Parameter Limiting Standards (mg/Nm3)

    4.1 The operation of the industry shall be strictly in compliance with the provisions of the Noise Pollution(Regulation and Control) Rules 2000.

    4.2 Used lead acid batteries shall be disposed of as per the Batteries (Management and Handling) Rules,2001

    4.3 Hazardous waste generated, if any, shall be handled as per the Hazardous and Other Wastes(Management and Transboundary Movement) Rules, 2016.

    4.3.1 Activities for which Authorisation is granted

    Collection transport

    Reception Storage

    Treatment Reprocessing/Disposal

    4.3.2 Type, quantity and mode of storage/collection/disposal of hazardous wastes shall be as follows:

    SI.No. Hazardous Waste Schedule Category Quantity Tonne/year

    Mode of

    Storage Disposal

    4.4 E-waste shall be disposed off safely as per the E-Waste (Management)Rules, 2016.

  • Page4

    5. SPECIFIC CONDITIONS 5.1 Quarrying is restricted to the land bearing Sy nos: 120/10. 5.2 This consent is granted subject to the power of the Board to review and make variations in all or any ofthe conditions as per section 21 of the Air (Prevention and Control of Pollution) Act 1981 and section 25 ofthe Water (Prevention and Control of pollution) Act 1974. 5.3 Any change in the particulars furnished in the references and/or in the identity of the occupier /authorized agent shall be intimated to the Board within a week. 5.4 It is the responsibility of occupier to ensure that quarrying activities are restricted to only area shown inthe attached drawing and at a distance more than 50 m from the nearby residential buildings, places ofworship, public buildings, public road having vehicular traffic, river or lake, railway line and bridges. 5.5 After excavation at the site is completed, the land may be reclaimed or used for rain water harvestingwith protective barriers/any other suitable purpose like aquaculture approved by the authority. 5.6 All the necessary control measures provided should be maintained properly to ensure that the system isadequate to control the air and water pollution caused by the functioning of the unit within the limit. 5.7 Regular wetting of the roads in the premises of the quarry and approach roads near the quarry shall bedone for avoiding excessive dust emission within and outside the boundary of the unit. 5.8 Boundary of quarrying area shall be fenced and demarcated. 5.9 Fugitive emission from the quarry premises and road leading to quarry shall be suppressed using watersprinkling. 5.10 The suspended particulate matter (SPM) at boundary of the premises of the quarry shall not exceed thefollowing limit applicable to that area as per the National Ambient Air Quality Standards. a) The PM 10 inambient air at the boundary shall not exceed 100 microg/m3 b) The PM 2.5 in ambient air at 1m outside theboundary shall not exceed 60 microg/m3. 5.11 The sound level measured at 1.0 m outside the boundary shall not exceed the limit as per the AmbientAir Quality Standards in respect of Noise. 5.12 The operation of the unit shall be commenced/done only after obtaining clearances from all concernedauthorities. 5.13 The quarry shall be operated only from 6am to 6pm. 5.14 For renewal of the consent in case of continuance of operation of the industry, application in the

  • Page5

    prescribed form shall be submitted through the web portal of the Board http://krocmms.nic.infor renewingthe Consent on or before two month in advance to expiry date. Late application will be accepted with 10%(for application before expiry date) & 50% of yearly fee as late fee for application after due date. 5.15 This Consent is granted on the basis of ENVIRONMENTAL CLEARANCE DATED: 27/02/2020 andother documents furnished by the applicant. If any document is found false, the consent issued will becancelled/ revoked.5.16 This consent is granted subject to the Environmental Clearance No: 1416/EC1/2019/SEIAA dated27/02/2020 issued by proceedings of State Environmental Impact Assessment Authority, SEIAA.

    To Building Stone Quarry of ADANI VIZHINJAM PORT PRIVATE LIMITEDManickal Village,Nedumangad Taluk 1. This digitally signed document is legally valid as per the Information Technology Act 2000

    2. For verifying this document please go to krocmms.nic.in and search using date of issue/name of the

    unit/Application Number in “Consent Granted Applications” link in the home page of the Board’s Online Consent

    Management and Monitoring System.

    DATE :16/03/2020 SIGNATURE & SEAL OF ISSUING AUTHORITY

    ENVIRONMENTAL ENGINEERDISTRICT OFFICE, THIRUVANANTHAPURAM

    RAMYA GDigitally signed by RAMYA G Date: 2020.03.16 16:50:08 +05'30'

  • BUILDING STONE QUARRY OF ADANIVIZHINJAM PORT PRIVATE LIMITEDMANICKAL VILLAGE

    RAMYA G Digitally signed by RAMYA G Date: 2020.03.16 16:50:42 +05'30'

  • Annexure II: Newspaper

    Advertisements

  • THE HINDU --SUNDAY, MARCH 1, 2020

    !,,.Timings THIRUVAHANTHAPURAM SUNDAf,MAR,01 RISE 06:35 SET18:ll \..RISE 11:01 SET2]:44MONOAY,MAR.02 RISE 06:lS SETl!:ll I...RISE 11:46 SETOO:0O TUESDAl,MAR.01 RISE 06:lS SET18:3] \..RISE 12:34 SET00:34 --max min Attiogal 34 24 Nedumangad 34 24 Thlruvarlanthapuram34 24 Thlruvan11oth1p1.11111T1Todl}' S4"CThe skywlllbecloudy overlhe city. A warm end diy day is likely. The night is likelytobepleasanl. Thlrwanal'l!Mpuram Tomorniw 3""C An easy morning is likety.Awarmand drydayls expected. The nightlslikelyto bepleasant.

    IH■,mii Grievance redressal adalat

    LIFE makes a dream come nue for many Many homeless senior citizens in district finally manage to build a house of their own

    S.R,l'RAVEEN TffllWVANANTl!.APURAlol For the past forty years, 70-year old Omana Amma and 62-year old Padmini Amma have been neighbours, staying in rundown sheds. While Padmlni A; nma stayed with her husbam' andchildren, Padmlni Al 1ma has always been alone. � heir· only source of income has been the occasional work as part of the Mahatma Gandhi National Rural Employment . Guarantee Scheme (MGNREGS). On Saturday, to celebrate them occasion of both ofthem getting new houses as part of the State goVernment's Livelihood, Inclusion, Financial Empowerment (LlFE) housing, theytravelled together to thePutharikkandam Maithanam in Thiruvananthapuram to witness Chief Minister Pinarayi Vijayan making the declaration of LIFB crossing the two lakh milestone. "We have been staying in those old sheds for so long . It feels good to finally live in a

    , Beneficuirfesofthe LIFE project: (From left) Padmini Amma and Omana Amma, Padmavathy and Sarojam. proper house. I have always been living alone, and I got my house as part of the special scheme for those who do not have anyone to look after themt says Padmini Amma. Padmavathy (62) from Ma layinkeezh and her children also used to stay in a house, which had become too hard to live in, long back. "When my husband passed away • some years back, I got job as an ayahara nearby school. During my retirement, I

    got an amount of US,000. Adding this with the N lakhs I got from LIFE, I could builda proper house," says Padmavathy. Struggled a lot Sarojam (66) from Chenkal panchayat had to struggle alot to complete her house, as the nearest road was locatedquite far from the location of herhol(Se. This meant that she had to pay extra amounts to those who would carry the build-

    ing materials all the way from the road. "I have been living in a hut, before 1he ward member approached me to be part of the LIFB beneficiary list. Much of the work is complete. After completion, I will shift to the new house. Lackof drinking water is an issue, even though the house is located close to a river," she says. Madhavikutty Amma from Vilappil panchayat had the added pleasure of not only

    getting a new house after a wait of more than 25 years, but also getting the opportunity to hand over the lamp to the Chief Minister, for in:augurating the event marking the 2 lakh milestone. Family get-together Beneficiary families of the UFE project from across thecapital district R3Cticipa1ed in the family get-together or ganised as part o f the event.

    CMrevie1

    Pongalac Government sa1 STAPP Rl!PORTER TlllllUVAlfAHTHAPUllAM Chief Minister Pinarayi jayan convened a high-I meeting on Saturday tcview the arrangements the AttukalPongala. Besides issuing instl tions to each departmito adopt the neces!' steps, Mr. Vijayan ord1 measures to ensure av: bility of drinking waterthe devotees who will braving searing heat. H,so stressed the need create wide awarene�ensure strict impleme tion of the green protooThe government sanctioned f2.8 crore the ongoing arrangeme As many as 200 voluntiwill be deployed by th� venue Department for diter mitigation efforts.' Thiruvananthapuram c poration will deploy 3,: workers for the sanitalactivities. Besides, ! green army volunteers be tasked with the mai: nance of green proto

    District Cotlector K. Gopa{•krishnan wiU conduct a grlevanceredressal adatat at theNedumangadtaluk officeonMarch3from10 a.m onwards.Thosehalling from thi?Nedumangadtaluk limits willbe ableto submit CQ!Tlplaintsat the adalat. Operation Headgear begins in city today

    COVID-19: Central

    official reviews plan

    "" , S1:1TE BJ\N� Man arrested A 40-�ar-old man was arrested by the Venjaramoodu policeforatlegedattemptto molest awomanwith hearlng Impairment. The accused was identifled asBaljuof Alanthara.Hehas been accused ofthea!methathad taken place in October last.

    After HC order on enforcement of rule Satisfied with State's response

    DDCmeeting A meeting of the District Development Committee was convened by the District Collector K. Gopalakrishnan inthepresenceof legistators C.K.Har�ndran,K.Ansalan, D.K. Murali and V.K. Prasanthon S;iturday. The meeting took stock of the development works that were taken up during the 2019·20 fiscal.

    + li�ttfiSd#liiiH►i

    P.H. P;,niclttr f-411JO

  • Annexure III: Signed EC

  • AttNe'r-v R�- III

    Validi�ires on 26.02.2025

  • Annexure IV: Screenshot of EC

    uploaded to Adani Ports Website

  • 30029671Highlight

    30029671Highlight

    30029671Highlight

    30029671Highlight

  • Annexure V: Notarized Affidavit

  • ANl'I (:; 1- \j .p__� -V