2
• Progress• Excavation • Tower crane installed• Foundations and below slab utilities• Terrace level slab on grade
• 3 Month Look Ahead• Building structure
Hall of Science
3
Crane Installation
Hall of Science
4
Foundations
Hall of Science
5
Progress Photographs September – December 2018
Hall of Science
6