deconstruct asbestos removal london case study - community centres

1
Deconstruct (UK) Limited Silver House, 31-35 Beak Street, London W1F 9DP Tel: 020 7734 6655 Fax: 020 7734 6626 Email: ashley.griffi[email protected] www.deconstructuk.com Decontamination of asbestos from a boiler house in the local community centre. Client: Ayerst Environmental Ltd Location: Community Centre, London W6 Contractor: Deconstruct UK Ltd Completion Date: April 2011 Sector: Public Buildings About the project: The calorifier vessels and pipework within the boiler room had been subjected to damage over the years and an effective repair was necessary. The damaged pipework was cleaned using h-type vacuum cleaners and ‘tac’ rags before being repaired using calico wrap and elastomeric paint. The boiler house was thoroughly decontaminated and the timber enclosure to the calorifiers was made good. Project challenges: This project was undertaken adjacent to a live Community Centre that was in constant use, so it was imperative that our operatives carried out the works as discretely as possible and conducted themselves professionally at all times. The access to the working area was directly off the public highway, so a secure timber hoarding had to be erected around the entrance to the boiler room. An operative was stationed outside the entrance to the enclosure at all times, during working hours, to ensure that no unauthorised people entered the work area. Our services: Deconstruction Services Demolition Services Enabling Works Asbestos Removal Services 3 Asbestos Surveying Services Ground Works Services Piling Services Steelwork Installations Builders Works Emergency Dangerous Structures Temporary Works For further information on our Asbestos Removal and Deconstruction services, please call us now on 020 7734 6655 or visit www.deconstructuk.com

Upload: simply-marcomms

Post on 28-Mar-2016

221 views

Category:

Documents


0 download

DESCRIPTION

Asbestos Removal Case Study for Community Centres.

TRANSCRIPT

Deconstruct (UK) Limited Silver House, 31-35 Beak Street, London W1F 9DPTel: 020 7734 6655 Fax: 020 7734 6626 Email: [email protected] www.deconstructuk.com

Decontamination of asbestos from a boiler house in the local community centre.

Client: Ayerst Environmental LtdLocation: Community Centre, London W6Contractor: Deconstruct UK Ltd Completion Date: April 2011 Sector: Public Buildings

About the project:

The calorifier vessels and pipework within the boiler room had been subjected to damage over the years and an effective repair was necessary. The damaged pipework was cleaned using h-type vacuum cleaners and ‘tac’ rags before being repaired using calico wrap and elastomeric paint. The boiler house was thoroughly decontaminated and the timber enclosure to the calorifiers was made good.

Project challenges:

This project was undertaken adjacent to a live Community Centre that was in constant use, so it was imperative that our operatives carried out the works as discretely as possible and conducted themselves professionally at all times. The access to the working area was directly off the public highway, so a secure timber hoarding had to be erected around the entrance to the boiler room. An operative was stationed outside the entrance to the enclosure at all times, during working hours, to ensure that no unauthorised people entered the work area.

Our services:

Deconstruction Services

Demolition Services

Enabling Works

Asbestos Removal Services 3

Asbestos Surveying Services

Ground Works Services

Piling Services

Steelwork Installations

Builders Works

Emergency Dangerous Structures

Temporary Works

For further information on our Asbestos Removal and Deconstruction services, please call us now on 020 7734 6655 or visit www.deconstructuk.com