deep excavation softwaregeotechnical and foundation engineering advanced engineering services corso...

62
Deep excavation software Geotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction Deep Excavation LLC DeepEX 2015 – Advanced course 1

Upload: kelley-hutchinson

Post on 17-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Tutorial 1: Introduction

Deep Excavation LLC

DeepEX 2015 – Advanced course 1

Page 2: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

DeepEX is a software program for braced excavations in soils with 2D limit-equilibrium and non-

linear analysis methods, and structural verification of all elements (with AISC, ASD,

Eurocodes).

It offers the ability to analyze walls with multiple braces (tiebacks) in multilayered soils.

The non-linear analysis considers elastoplastic behavior for the whole soil-wall-support system.

The program also offers the ability to perform traditional limit-equilibrium analyses.

The graphical interface is completely interactive and the input is simplified to a great extend.

The program utilizes archives of wall types, structural and soil materials, ground anchors etc.

The analysis can be performed in either an utlimate state or at a service state (allowable

design, LRFD, or Eurocode 7 design approach methods).

The program offers the ability to automatically set all critical settings according to the desired

design methodology.

Corso Paratie, Milano 30 settembre 2009

INTRODUCTION

DeepEX 2015 – Advanced course 2

Page 3: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Program layout

Wall selectio

n

Project tree view

Design section

list(right click)

General input tabsFile menu (click)

Model stages (right click

options similar to excel)

Command prompt (enter coordinates)

Press to perform calculations.

Instruction box

Model space (left or right click on any

item)

Mouse is over item Units

DeepEX 2015 – Advanced course

3D Model

(Frames)

View and

other

Page 4: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Enter basic project information1. Select

this button2. Define the project name

etc.

3. Press OK

DeepEX 2015 – Advanced course

Page 5: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Move model elevations1. Select

this button2. Set new reference

elevation to 100 ft

3. Check All boreholes (this

moves all soil layers)

4. Press OK

Page 6: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

1. Add a 2nd wall2. Double click on right wall3. Change dimensions3.1 Change xwall= 60ftDepth L= 45ft

Page 7: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Define basic model limits (top, bottom, left, right)

1. Select this button

2. Set Top= 130ftBottom= 40ft

Left= -60ftRight= 120ft

3. Press OKDeepEX 2015 – Advanced course

Page 8: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Modify soil types (database of

soils)1. Select this button.

Or

Expand the Soils Tree and Double click on F

Options: Right click or press Delete

Note: In DeepEX you can use any soil type in more than one borehole. For example the F soil can be used in boring 1 or boring 2 etc.

You can use any Boring on any design section. Thus changing any property of the F soil will affect all the excavation Design Sections where F is used!

Boring with F soil

Page 9: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Soil type data form

Available soil types

Add new, copy,

delete, paste soil

DensityStrength

Short soil name, description and

color.

Soil type & initial clay behavior

Test data for estimating soil

properties

DeepEX 2015 – Advanced course

Page 10: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Soil type continuedSoil properties: GeneralSoil name: F (this appears in the boring)Description: Detailed soil description.Soil type: Sand gt= 125 kcf : Total unit weightgdry= 120 kcf : Dry unit weight (above water table)c‘= 0 : Effective cohesionF’= 30 degrees : Effective friction angle

v= 0.35 Poisson’s ratio

Kx = Horizontal permeabilityKz = Vertical permeability

Parameters only for claysSu = Undrained shear strengthFcv= Constant volume shearing angleFpeak= Peak shearing angle

DeepEX 2015 – Advanced course

Page 11: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Soil properties (Resistance and Elastic)

KoNC = At rest lateral earth pressure coefficient for normally consolidated state.

Enter elasticity values as shown before.

Click on > buttons for more options.

DeepEX 2015 – Advanced course

Page 12: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Bond resistance for ground anchors.

Enter ultimate skin friction (bond resistance) for tiebacks (ground anchors).Value is later divided by safety factor to obtain design capacity on each tieback.

Soil properties will be covered in more detail in

Training Course #2.

DeepEX 2015 – Advanced course

Page 13: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Soil S1Soil properties: Change S1A. GeneralSoil name: S1 (this appears in the boring)Description: Sand Detailed soil description.Soil type: Sand gt =125 pcf : Total unit weightgdry= 120 pcf: Dry unitc‘ 0: Effective cohesionF’ = 36 degrees : Effective friction angleV = 0.35 Poisson’s ratio

C. Elasto-plasticE = 500 ksfrEur = 3

D. BondUltimate bond = 30 psi

Press OK

Page 14: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Edit Borings (soil layers)To edit the soil layers double click on

the model boring.

The borings can also be edited from:

a) Edit Borings Button.

Or from the:

b) Tree View – Stratigraphy – boreholes

Double click here (or right click) with the mouse.

DeepEX 2015 – Advanced course

Page 15: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Enter Soil LayersTo edit the soil layers click on the

blue button and enter the top of layer elevation.

For this example type 90 here:

Then select soil type S1 here:

DeepEX 2015 – Advanced course

Press OK

Page 16: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009DeepEX 2015 – Advanced course

Page 17: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Change water table elevation to El. 95m

Ground water levels can be changed from the Model Tab

Or

By double clicking on the water table on

the model screen.

Double click on button or on water table

DeepEX 2015 – Advanced course

Page 18: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

1. Change water levels

to 85m

2. Select option

3. Select option for analysis

type

4. Press OK

DeepEX 2015 – Advanced course

Page 19: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Double click on wall

DeepEX 2015 – Advanced course

Page 20: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

2. Select edit section data, to change wall

properties

1. Change wall depth to 45ft

DeepEX 2015 – Advanced course

Number of nodes controls the

divisions along the wall in a limit-

equilibrium analysis.

(Suggested 200 min, or set so that

small intervals (0.25 ft) are generated)

Page 21: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Change wall section AZ 19 sheet pile

1. Change wall type

2. Select AZ-19 section

3. Select A50 steel(fy= 50 ksi)

4. Select OK

DeepEX 2015 – Advanced course

Page 22: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Wall using AZ-19 wall section

Select OK

DeepEX 2015 – Advanced course

Page 23: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Add a new stage (Model Tab)

Or right click (to add a stage, similar to Excel)

DeepEX 2015 – Advanced course

Page 24: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Stage 1 change center El. 90

Stage 1

DeepEX 2015 – Advanced course

Page 25: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Add Stage 2: Add a strut at El. +92

Right click and add stage 2

DeepEX 2015 – Advanced course

Page 26: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

You can also drag the surface with your mouse

Page 27: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Select tool to add a tieback

Note: After selecting the “Draw ground anchor button” the program tells you to select/enter the 1st tieback point at the wall (x z)

DeepEX 2015 – Advanced course

Page 28: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Add tieback with mouse

1. Select 1st point on wall (we will modify the coordinates later)

2. Select 2nd point in the soil

3. Double click on new tieback

Page 29: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Edit tieback properties (support options)1. Change dimensions z= 92 ft (elevation)Lfree= 15ft, Lfix = 25 ft, a= 15 deg, spacing 8ft

2. Check adjust prestress option and use60 k prestress

Select OK

DeepEX 2015 – Advanced course

Page 30: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009DeepEX 2015 – Advanced course

Page 31: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Draw Tieback on right wall

DeepEX 2015 – Advanced course

Page 32: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Add a surcharge on the surface.Select this tool button.

DeepEX 2015 – Advanced course

Page 33: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Add surcharge with mouse

2. Select 2nd point on right

1. Select 1nd point on left

3. Double click on new surcharge

DeepEX 2015 – Advanced course

Page 34: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Modify surcharge

1. Change coordinates X1= -22 X2= -2

2. Change surchargeqz1= 0.6 ksf qz2= 0.6 ksf

Point 1 is on the left sidePoint 2 is on the right side

3. Select OK

DeepEX 2015 – Advanced course

Wall index refers to which wall the load is applied: 0 = left wall, 1= right wall,

-1 all walls

Page 35: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Add stage 3: Excavate to El. 80ft

Right click and add stage 3

DeepEX 2015 – Advanced course

Page 36: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

On stage 3: Go to Analysis tab

1. Change analysis mode to Limit equilibrium analysis

DeepEX 2015 – Advanced course

Page 37: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Thrust options: Automatic

1. Change wall friction to 50% of available soil friction

2. In this mode, the program automatically applies a method for wall friction on both wall sides.

3. In the auto mode, DeepEX automatically selects the best available (from program options) equation that appears to be appropriate for the given geometry or seismic conditions:

1. Coulomb when wall friction is zero (or surface with single angle)2. Caquot-Kerisel tables (extrapolation for intermediate values) when wall friction

is applied3. Lancellotta equations when seismic conditions are encountered

DeepEX 2015 – Advanced course

Page 38: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Thrust options: Approximate update of initial parameters

1. This mode allows you to change the wall friction options on each wall side

DeepEX 2015 – Advanced course

Page 39: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Analysis tab: Change wall friction1. Change wall friction behavior

(wall friction % of soil friction)2. Change wall friction to 50%

(of available soil friction)

3. Select Coulomb equation for wall friction on driving side(Driving side is the retained side)Select Yes to apply on all Stages!

4. Select Caquot Kerisel for wall friction (log-spiral failure)Select Yes to apply on all Stages!

DeepEX 2015 – Advanced course

Page 40: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Analysis Tab Stage 3: Change earth pressure assumptions (Limit

equilibrium)1. Select Peck earth pressures for Stage 3

2. Select resisting earth pressuresPassive divided by safety factor FS

3. Double click on Button for more options

4. Apply to all stages

DeepEX 2015 – Advanced course

Page 41: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Select US structural codes (Design Tab)1. Select US allowable settings from Design tab

DeepEX 2015 – Advanced course

Page 42: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

1. Concrete code and Steel Code(1.6 is safety on Ultimate cap)

2. Clay behavior

3. Water pressure analysis

4. Driving pressures Ka + d-Coul = Active with coulomb wall friction5. Resisting pressures Kp/1.5 + D-Caquot = Passive divided by 1.5 with Caquot-Kerisel wall

friction

Review Assumptions (Yellow table Stage 2)

Review Assumptions (Yellow table Stage 3)

DeepEX 2015 – Advanced course

Page 43: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Analyze the model (current design section)

DeepEX 2015 – Advanced course

Analyzes all design sections

Page 44: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Summary table (all Design sections)

DeepEX 2015 – Advanced course

Page 45: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Summary table (Selected design section all stages)

Note: You may select another design section or another wall (when a 2nd wall is used) Press EXIT

DeepEX 2015 – Advanced course

Page 46: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Results Tab (for viewing results on model

screen)

Wall embedme

nt and other safety

factors

Wall moment, shear, axial,

displacement.Support

reaction R.

Display wall capacity

(moment and shear),

Stress ratios(ratios <1

OK)

Display stresses and pressures on

walls.

Display soil mass stresses (when water

flownet analysis is performed)

Click on Min-Max to display min and max

values.Show ENV= Show result

envelope (this design section)

Tables and

diagrams

DeepEX 2015 – Advanced course

Page 47: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

View moment and shear

DeepEX 2015 – Advanced course

Page 48: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

View moment and wall moment capacity

Red lines represent the design moment

capacity for this wall.

Page 49: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Support reaction and lateral soil stress and

Page 50: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

View embedment safety factors

Page 51: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Add 2nd Design section and perform non-linear analysis

1. Right click on Base modelSelect Add Section

2. Double click on New Section 1

DeepEX 2015 – Advanced course

Page 52: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Right click on New Section 1 (edit section name)

Change the name for the new design section to Non-linear analysis

DeepEX 2015 – Advanced course

Page 53: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009DeepEX 2015 – Advanced course

Design Section name has changed (now you are working on Design Section 1)

Page 54: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009DeepEX 2015 – Advanced course

Analysis Tab: Type-> Select Conventional and Beam Elastoplastic Foundations

Page 55: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Analyze All Design Sections

DeepEX 2015 – Advanced course

Page 56: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Extended Summary two design sections

DeepEX 2015 – Advanced course

Page 57: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Stage 0: Wall displacements – Support Reactions

Please select Stage 0

DeepEX 2015 – Advanced course

Page 58: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Stage 1: Wall displacements – Support Reactions

Please select Stage 1 (Horizontal displacement = 2.35cm)

DeepEX 2015 – Advanced course

Page 59: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Stage 2: Wall displacements – Support Reactions

Please select Stage 2 (Horizontal displacement reduced due to tieback prestress)

Support reaction66.67kNm

Equal to tiebackprestress

DeepEX 2015 – Advanced course

Page 60: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Stage 3: Wall displacements – Support Reactions

Please select Stage 3 (Horizontal displacements increased = 2.81 cm)

Support reaction 113.31 kN/m

DeepEX 2015 – Advanced course

Page 61: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

Tieback stress ratios (Load/Capacity)

Please select Stage 3

GEO= Geotechnical stress ratio 1.85>1STR= Structural stress ratio 0.544<1 ok

DeepEX 2015 – Advanced course

Page 62: Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction

Deep excavation software • Geotechnical and foundation engineering • Advanced Engineering Services

Corso Paratie, Milano 30 settembre 2009

View embedment safety factors

Limit equilibrium analysis safety factorsFS Embed = Based on lengthFS Rot = Based on rotation momentsFS Basal = Basal stabilityFS Hyd = Hydraulic heave

Non-linear analysis safety factorsPassive mob FS= Available passive

resistance /Mobilized passive Actice mob FS= Mobilized active / min.

active earth pressures.

DeepEX 2015 – Advanced course