defence capability plan · defence capability plan / 2009 / public version defence capability plan...
TRANSCRIPT
II
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acknowledgements:
This publication has been published by the Defence Materiel Organisation (DMO) and the Capability Development Group (CDG).
Copies of this publication are available from:Industry Division, Defence Materiel Organisation or on the DMO and CDG websites:
www.defence.gov.au/dmo/www.defence.gov.au/Capability/_home/Default.asp
© Commonwealth of Australia 2009
This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written permission from the Department of Defence.
ISBN: 978-0-642-29704-4
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
III
FOREWORD
The projects outlined in this public version of the Defence Capability Plan (DCP) reflect the strategic requirements outlined in the 2009 Defence White Paper, Defending Australia in the Asia Pacific Century: Force 2030 (the White Paper) and the emphasis of this Government on the development of Force 2030. In publishing this DCP, the Government provides advice to the Australian public, industry and defence commentators on the scope and scale of the future defence equipment capital program.
This DCP contains over $60 billion of projects and demonstrates the Government’s commitment to funding and building Force 2030 as outlined in the 2009 Defence White Paper.
The Government recognises the vital role that defence industry plays in support of ADF capability – from the provision and maintenance of military equipment to the delivery of a wide range of support services. Growing the capacity of local defence industry is an objective of the Government and will require ongoing investment in skills development, workforce growth and improved productivity. The Government will remain closely engaged with defence industry to ensure maximum support possible to the ADF in partnership to maintain control of cost, schedule and quality.
In the White Paper, the Government has highlighted the challenges facing both the Defence Materiel Organisation and industry in delivering essential capability to the ADF.
While Defence will seek to maximise the spending in local defence industry, such expenditure must be managed within the acceptable cost, schedule and risk constraints of the strategic guidance in the White Paper. Projects must aim to provide capability which reflects operational requirements, but they need to be tempered by an understanding of cost, schedule and risk. Defence must also take into account what the market can deliver ‘off-the-shelf’. The Government needs to make informed decisions about the appropriate mix of cost, risk and capability. Consequently, as highlighted in the White Paper, the Government has decided that Military-off-the-Shelf (MOTS) and Commercial-off-the–Shelf (COTS) solutions to Defence’s capability requirements will be the benchmark. Decisions to modify MOTS or COTS solutions will need to be based on a conscious acknowledgement of the costs and benefits to the military outcomes, and the risks involved.
Having a conscious approach to considering MOTS and COTS solutions requires an acknowledgment of the risks this brings to sustainment, particularly overseas manufactured MOTS or COTS systems. The support and sustainment of this equipment may expose Defence to long supply chains and dispersed global manufacturing. This Government will respond to these issues by encouraging Prime companies to increase local capability by investing in Australia.
We also recognise that small and medium enterprises form a large part of Australian industry and play an important and innovative role in supporting the ADF.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
IV
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
The Government is committed to ensuring as much of this DCP is procured in Australia as is practical, conscious of its requirement for value for money. To that end there are several substantial new programs planned as part of the White Paper for which local acquisition or construction is likely to be the preferred option. These programs will provide opportunities for Prime companies to collaborate with Australian small and medium enterprises in the development of new capability for the ADF and enhanced Defence infrastructure.
The information contained within this DCP is designed to allow the Australian public to see how their taxes are spent on the defence of Australia; industry to undertake strategic planning; and defence commentators to understand the future shape of the ADF. We will continue to engage with industry to ensure the ongoing relevance of the DCP process to the needs of the partnership between Defence and defence industry.
In response to an understanding that such a document should remain contemporary, Defence will maintain an electronic version of the DCP that will be updated every six months to reflect Government decisions. This document will be available on the DMO and CDG websites and updates will be advised through the D+I ePortal.
Defence industry and the capability it provides to the ADF is integral to Australia’s defence capacity. While both the national security and commercial implications in Defence’s relationship with industry can, at times, limit the information that can properly be put in the public arena, the Government is committed to ensuring defence industry has as much certainty and security as is possible. The Defence Capability Plan, now and in the future, aims to deliver that.
Senator the Hon. John FaulknerMinister for Defence
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
V
CONTENTS
About this Plan 1
Plan Composition 4
Industry Sector Implications 10
Planning for Capabilities Beyond 2013 16
DCP 2006 Proposals Approved 19
Proposals in Alphanumeric Order (Index) 20
Proposal Summaries 23
Proposals by Acquisition Category (Index) 204
Proposals by Indicative Year-of-Decision (Index) 207
Industry Opportunities Summary 210
Proposal Contact Officers 217
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
1
ABOUT THIS PLAN
The Defence Capability Plan: Public Version 2009 (DCP) provides an account of major capital equipment proposals that are currently planned for Government consideration (either first or second pass approval) in the period 2009-2013 (the Forward Estimates period). A number of substantial programs identified in the 2009 Defence White Paper, Defending Australia in the Asia Pacific Century: Force 2030 (the White Paper) are not included in this DCP as they will be presented for Government consideration beyond the Forward Estimates period. They are expected to be included in subsequent DCPs.
Details relating to a small number of classified and sensitive proposals have been withheld. These proposals represent less than three percent of the total value of projects.
The Government is also committed to ensuring that investment in future capability is maintained at appropriate levels. To achieve this, funding for the DCP is adjusted periodically to take account of the effects of inflation and movements in foreign exchange rates. This DCP contains over $60 billion of projects which is equivalent to around $77 billion out-turned (taking account of projected inflation rates).
Potential industry partners should note that proposals can undergo substantial changes over time. While the White Paper sets out the capability goals that the DCP is to deliver, the detailed project-level plan is subject to periodic review. Changing strategic or economic circumstances, new technologies and changed priorities will influence the specific proposals contained in the Plan as well as its overall composition. It must therefore be anticipated that changes will occur in coming years. Projects may be accelerated, deferred, enlarged or diminished as circumstances change.
In order to inform industry about the changes to projects, Defence will update the internet published version of the DCP at regular intervals. The changes made will reflect Government decisions on project budgets, scope and timing. The internet version of the Public DCP is available on the Defence Materiel Organisation (DMO) website at www.defence.gov.au/dmo under the ‘Industry Resources’, ‘Publications’ links, and on the Capability Development Group (CDG) website at www.defence.gov.au/capability.
When projects enter the DCP, the broad capability outcome sought is known, but often the specific means by which it is to be achieved is less clear. The budget provision made at this point is indicative only, often based on cost estimates of examples drawn from current technology.
The overall program is developed taking into account the available funding guidance from Government, the required delivery schedules of the capability, and the capacity of Defence and the Defence Materiel Organisation to develop and deliver the projects. There is also an element of over-programming built into the DCP. Over-programming is designed to provide flexibility and to aid in ensuring that best use is made of available funding in the event of delays to the development of individual projects. Over-programming means that a number of projects may move in timing based on their relative development maturity.
The Defence Chief Finance Officer, the Chief of Capability Development Group and the Chief Executive Officer of the Defence Materiel Organisation deem that the provisions for the individual projects in this DCP 2009 are appropriate for planning. Discounting for the over-programming mentioned above, the DCP 2009 expenditures expected over the next four years covered by this DCP are judged as affordable within Defence’s portfolio allocations.
Projects are developed and refined over time. In that process a range of options are considered and explored, new approaches may become feasible, and scope and cost estimates are modified accordingly. Details provided on proposals in the DCP should be useful for planning, but industry should consult closely with Defence for specific and updated information. Contact points for individual proposals have been provided.
Proposals consist of a number of self-contained phases. Each phase will typically be reviewed and approved separately by Government.
The Government will consider projects via a tailored application of the two-pass approval process, as has been recommended by the Defence Procurement and Sustainment Review 2008 (the Mortimer review). For simple or accelerated acquisitions the Government may allow projects to undertake source selection and a single second pass approval process. For other more complex projects with high degrees of cost, complexity, significant risk, or which make significant demands on national resources, these might undertake two passes or multiple passes where necessary.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
2
Under the traditional two-pass system at first pass the Government reviews the capability need or gap and the broad range of options that might address the gap. It is a requirement that at first pass one or more of the options presented must be ‘off-the-shelf’ (OTS), and those options will be the benchmark against which a rigorous cost-benefit analysis of the costs, military effects and schedule aspects of all proposals will be undertaken. At first pass approval the Government provides approval for Defence to investigate more fully a smaller set of options for further development and cost refinement, generally through the conduct of a Request for Tender (RFT). It should be noted that at this point Government has not committed to proceed with the project or with any specific capability option. Often the OTS option needs minimal modification to comply with Australian safety regulations and integrate with other ADF systems.
Considerable additional development work to refine scope and cost will continue after the first pass decision, leading to a full second pass approval decision with a defined scope and allocated budget. The key outcome of this process is that projects are approved when Defence has matured (de-risked) the project sufficiently.
In multiple pass projects, various incremental decisions may be made at each pass, with the overall intention being to reduce risk and retain flexibility as more is learnt about the overall capability and project.
The DMO will generate a Project Maturity Score for each option to assist Government in comparing the maturity of options as a measure of the relative confidence associated with them at the time they are considered. The Project Maturity Score is about quantifying the maturity of a project by way of a score at defined milestones in its capability development and acquisition phases and comparing this score with an ideal or benchmark score for that milestone.
The Project Maturity Score comprises a matrix of seven attributes that are examined during the capability development phase, i.e. pre-second pass, and the acquisition phase of a project which seek to quantify a project’s maturity through a set of focusing questions. In the capability development phase these are:
> Schedule – What confidence do we have in the schedule?
> Cost – What confidence do we have in the project cost estimate?
> Requirement – How well is the requirement defined and understood?
> Technical Understanding – How well do we understand the solutions?
> Technical Difficulty – What is the technical complexity in delivering the solution?
> Commercial – What confidence do we have that industry can deliver the solution?
> Operations and Support – Is the effect on the operating and support environment understood and planned?
A generic example of how maturity scores are presented for Government is illustrated in Figure 1. This example shows the Project Maturity Scores for an OTS option and a developmental option, at first pass and second pass (about 2 years apart). In this instance, the Government can choose the lower risk solution that is more likely to deliver the selected materiel system on time and within budget, or it can choose the higher risk developmental solution due to the expected capability benefits.
Contact with industry typically commences some time before first pass as proposal sponsors and managers undertake pre-approval study activity and prepare the necessary departmental documentation. More formal industry participation is sought during the period between first and second pass approval. Solicitation occurs through a Request for Proposal (RFP) and/or RFT, allowing projects to move quickly to contract post approval.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
3
Figure 1: Notional Project Maturity Score at first and second pass approval
Early contact with industry in the capability definition stages is facilitated through the various Environmental Working Groups. The points of contact provided for each project can provide further information on the timing and nature of industry involvement.
Defence procurement is underpinned by the principle of value for money. Within this framework, Australian industry is expected to have a key role in the majority of proposals during both the acquisition and through-life support stages of a proposal’s life cycle, in accordance with Australia’s military self-reliance objectives.
In order to better inform industry of the potential opportunities arising from DCP 2009, the information contained in each proposal has been expanded from that provided in the previous version DCP 2006. The schedule details for each project now contains the anticipated first pass dates, in order to guide industry on the possible release of RFTs and RFPs. Where possible, the description of each project has been expanded to include more detail on the anticipated outcomes or intent of each project. These changes are in line with the current Government policy of providing clear identification of industry requirements early in the capability development process.
70
63-69
56-62
49-55
42-48
35-41
28-34
21-27
14-20
7-13
Mat
urity
Sco
re
Year
1
Year
2
Year
3
Year
4
Year
5
Year
6
Year
7
Year
8
Year
9
Year
10
Year
11
Year
12
13
16
42
4550
55 57
6769 70
Ente
r DCP
Viab
le C
apab
ility
Opt
ions
Firs
t Pas
s
Indu
stry
Offe
rs
Seco
nd P
ass
Ente
r Con
trac
t
Prel
imin
ary
Des
ign
Rev
iew
Crit
ical
Des
ign
Rev
iew
Syst
em In
tegr
atio
n &
Tes
t
Acce
ptan
ce T
estin
g
Serv
ice
Rel
ease
Fina
l Con
trac
t Acc
epta
nce
Proj
ect C
ompl
etio
n
21
30
35
44
31
Benchmark Scores
Off-the-Shelf Project
This gap is the risk differential between the options at approval
Developmental Project
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
4
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
PLAN COMPOSITION
DCP 2009 contains equipment acquisition proposals planned for Government consideration (first or second pass approval) in the next four years, covering a range of Defence capabilities, including Land Forces, Air Forces, Maritime Forces (both surface and sub-surface), Strike and Network Centric Warfare. It does not include details on approved projects. Information on approved capital investment proposals can be found in the ‘Projects’ section of the Defence Materiel Organisation website at www.defence.gov.au/dmo.
DCP 2009 contains project specific information in the following subsets:
> Phase Scope – describes what is to be acquired under the indicated phases of the project.
> Background – details how each specific project phase relates to the overall capability requirement.
> Australian Industry Opportunities – identifies potential opportunities for Australian industry involvement in the acquisition and through-life support stages of the proposal. This section also identifies the Acquisition Categorisation (ACAT) level of the project, which is a measure of the scale, complexity and risk in the project.
> Planned Schedule Highlights – provides indicative first pass approval (if applicable), Year-of-Decision (second pass approval) and Initial Operating Capability years.
> Points of Contact – for both the proposal sponsor (usually Defence’s Capability Systems Division) and the capability acquirer (Defence Materiel Organisation), along with website information if applicable.
Further information on the content of some of these sections is provided below.
The proposals are listed in alphanumeric order (i.e. AIR, DEF, JP, LAND and SEA proposals in number order). Indexes are also provided - these categorise proposals by Year-of-Decision and ACAT. Summary tables provide consolidated information on Australian Industry Opportunities and Points of Contact.
Australian Industry Opportunities
This is a major focus of the DCP and reflects the potential opportunities for Australian industry to participate in acquisition or through-life support activities. The Government expects Defence to ensure best value for money in Defence spending, based on open and effective competition. The Government has also stated that, consistent with the principles of value for money and the need to consider off-the-shelf solutions, its policy is to ensure that as much of the Defence budget is spent in Australia as is practical. Finally the Government seeks to improve our Defence self-reliance through maintaining a focus on the local provision of a broad set of strategic industry capabilities. Through the application of the Australian Industry Capability (AIC) program Defence seeks to ensure that Australian defence industry is given the opportunity to be part of all contracts over $50 million, or where the contract involves a designated strategic industry capability. In such contracts, the RFT will include industry requirements, and tender responses will be expected to include an AIC Plan. Through this system, Defence seeks to maximise Australian industry participation in the acquisition and sustainment of ADF capability and to achieve the required strategic industry capability outcomes where this represents value for money.
Acquisition and Through-life Support
These sections are intended to provide information that will support industry’s strategic planning. A key element of that strategic planning will be to identify opportunities for participation, and to that end, where possible, the currently planned acquisition and sustainment concept has been described.
Industry Capabilities and Activities
This section contains information on the industry capability opportunities associated with each project. This is presented in a series of matrices that outline areas of industrial capability where it is anticipated that Australian industry could participate, together with corresponding activities expected for each industrial capability. To provide additional granularity, the tables provide an indication of the likely criticality of local industry activity to the ADF:
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
5
> D – The industry capability and activity is likely to be desirable in Australia.
> O – The industry capability and activity is likely to be optional in Australia.
These indicators do not imply that all the designated industry capability must be in Australia, but only that some level of local capacity is likely as part of project acquisition and / or ADF sustainment needs.
The industry activities listed in the matrix are those that are used in the Defence + Industry ePortal1 (www.dplusi.defence.gov.au). The industry capabilities identified in these matrices are those that have been highlighted in the White Paper as being the broad range of strategic industry capabilities that the Government will monitor. The tables may also contain additional project specific industry capability entries. Below is a further explanation of the major capabilities contained in the matrices:
> Acoustic technologies and systems. This capability includes the world class capabilities Australia has in the development and through-life support of underwater acoustic systems.
> Airborne Early Warning and Control (AEW&C) aircraft systems. This capability relates to the repair and maintenance of specialist AEW&C systems including the airborne tactical data system, Multi-role Electronically Scanned Array (MESA) radar, IFF, communications and electronic support systems.
> Anti-tampering capabilities. These capabilities are incorporated into components or systems to prevent the unauthorised opening of the system, access to the internal workings or Intellectual Property.
> Armoured vehicles. This capability relates to the repair, maintenance and some upgrades of specialist military vehicles i ncluding tanks and armoured personnel carriers.
> Combat clothing and personal equipment. This capability encompasses the ability to undertake ongoing development of the combat uniform and personal equipment fabrics, to include multi-spectral and other signature reducing characteristics, along with other enhancements to personal survivability.
> Communications security. This capability encompasses emanations security testing, which protects against unintentional emissions from communications and IT equipment, commonly known as Tempest testing, and the provision of support to cryptographic equipment.
> Composite and exotic materials. This is the ability to repair specialist alloys and composite materials, to develop new repair techniques and to undertake precision machining of such materials.
> Electronic Warfare. These industrial capabilities include Electronic Warfare (EW) counter-measures development and validation, EW re-programming, system integration and ‘tuning’ of overseas developed EW systems to meet our operational needs, the management of threat libraries and, importantly, selective strategic product development to maintain high-end EW knowledge and capability.
> HF and Phased Array Radars. This capability includes the ongoing development and support of the locally developed world leading capabilities embodied in the Jindalee Operational Radar Network (JORN) and the Phased Array Radar systems currently being installed on ANZAC frigates.
> ‘High end’ system and ‘system of systems’ integration. Relates to the integration of complex electronic and software systems onboard platforms and to conduct ‘system of systems integration’ of off-the-shelf capabilities into the broader ADF networks, which is critical to achieving the ADF’s network centric warfare goals.
> Infantry weapons and remote weapons stations. This capability is the provision of the required level of support to the ADF direct fire weapon fleets (pistols, rifles, machine guns, grenade launchers), and the relatively new capability of remote weapon stations.
> Protection of networks, computers and information including in the field of cyber defence. These capabilities safeguard ADF information, through the incorporation of encryption techniques, firewalls, anti-virus software and anti-tampering capabilities and devices.
> Rotary and fixed wing aircraft. These capabilities relate to the ability to provide repair and maintenance
1 The Defence + Industry ePortal provides improved opportunities for companies and Small to Medium Enterprises to join in defence acquisition and sustainment programs.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
6
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
services to maintain operational availability of military aircraft and undertake some selected upgrade, overhaul and rebuild activities.
> Secure test facilities and test ranges. This capability relates to the availability of maritime, air and land based ranges for test and evaluation of weapons, signatures and electronic warfare systems. Test ranges are likely to be owned by the Commonwealth with industry providing testing equipment and services.
> Selected ballistic munitions and explosives. This capability relates to the manufacture of some high usage munitions, ammunition components, propellants and explosives.
> Signature management. Includes the capabilities and coatings used for signature management on submarines, naval vessels, land and air platforms including sound minimisation, radar absorbent materials, infrared absorbent paint and materials, and other stealth technologies.
> Submarines. This capability includes specialist submarine design knowledge to enable Australia to be a smart buyer and the capabilities to enable construction of the future submarine in Australia. While Australia will not design a submarine from scratch, the ability to adapt an overseas design, or utilise ‘best of breed’ technologies to meet Australian requirements will be critical to the development of an effective submarine capability. There is also a repair and maintenance capability to maintain operational availability of submarines and to undertake some selected upgrade, overhaul and rebuild activities.
> Surface naval vessels. This capability incorporates naval design and engineering services, the construction of ships and ship modules and the repair and maintenance capabilities to maintain operational availability of naval vessels and undertake some selected upgrade, overhaul and rebuild activities. A specific need within this capability is for adequate access to dry dock facilities and common user facilities in strategically important locations around the Australian coastline for the repair and maintenance of ADF naval vessels in peacetime and in credible contingencies.
> System assurance capabilities (both hardware and software). Capabilities that assure ADF IT and software driven systems as suitable and available for service. This includes assessing the reliability of hardware and software, to ensure it is fit for purpose and function, and free of malicious code.
> System life cycle management. These capabilities extend the service life of ADF systems by undertaking active life management, including life extension, fatigue management and the development of novel repair techniques.
> Targeting and precision navigation. This capability relates to the provision of geospatial information and systems including software development. The capability is associated with both GPS based systems and inertial navigation systems.
> Through-life and real-time support of mission and safety critical software. These capabilities are for real-time, or near real-time, adjustment to software associated with critical systems (combat systems).
> Through-life support of guided weapons. This capability involves the inspection, repair, maintenance and testing of missiles and guided weapons to ensure that they are in working order and safe to use.
Acquisition Categorisation (ACAT) Scores
In accordance with the recommendations of the Defence Procurement and Sustainment Review 2008 (the Mortimer review), the Estimated Phase Expenditure bands of previous DCPs have been replaced by the Acquisition Category (ACAT) scores for the projects. The Defence Materiel Organisation has been using the ACAT framework since 2004, as it provides a consistent methodology for categorising projects. The ACAT framework operates in conjunction with the Project Manager Certification Framework to align the complexity of projects with the experience and competencies of project managers.
The ACAT framework is based on four Acquisition Categories that provide a graduated scale from the most demanding and complex projects to those that are less so. The largest, most demanding and complex projects are categorised as ACAT I and ACAT II, and the less demanding projects are categorised ACAT III and ACAT IV. The specific description of each level is as follows:
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
7
> ACAT I projects are major capital equipment acquisitions that are normally the ADF’s most strategically significant. They are characterised by extensive project and schedule management complexity and very high level of technical difficulty, operating, support and commercial arrangements.
> ACAT II projects are major capital equipment acquisitions that are strategically significant to the ADF. They are characterised by significant project and schedule management complexity and high levels of technical difficulty, operating, support arrangements and commercial arrangements.
> ACAT III projects are major or minor capital equipment acquisitions that have a moderate strategic significance to the ADF. They are characterised by the application of traditional project and schedule management techniques and moderate levels of technical difficulty, operating, support arrangements and commercial arrangements.
> ACAT IV projects are major or minor capital equipment acquisitions that have a lower level of strategic significance to the ADF. They are characterised by traditional project and schedule management requirements and lower levels of technical difficulty, operating, support arrangements and commercial arrangements.
The ACAT level of a project will provide industry with a more robust description of the scale, complexity and risks in the project. It should be noted that over the life of a project the ACAT score is continuously reviewed, especially as it passes through decision or milestone gates (such as first pass approval, critical design reviews, etc) and as the complexity or risk reduces, the ACAT score is expected to change.
The ACAT score consists of six attributes. Table 1 is the matrix which project staff use to assess the complexity levels of each attribute. This table will be useful to reference when consulting the ACAT score for each project. The attributes are scored and a calculator provides a weighted rating for the project. The attributes are:
> Acquisition Cost. The acquisition cost includes the cost of the materiel system (i.e. mission system plus support system), plus facilities costs. This does not include ongoing sustainment budgets. This is based on the current ‘constant dollar’ budget for the project.
> Project Management Complexity. This highlights complexity beyond that associated with traditional project management knowledge areas, which are characterised by a project execution environment which is novel and uncertain with very high-level political interactions.
> Schedule. This recognises the complexity brought about by schedule pressures on the project requiring the application of varying levels of sophistication in schedule management.
> Technical Difficulty. There are inherent complexities which are associated with technical undertakings of design and development, assembly, integration, test and acceptance.
> Operation and Support. An often neglected complexity is associated with the readiness of the organisation and environment into which the system will be operated and supported.
> Commercial. This attribute recognises the capability of industry to deliver and support the required system / equipment, the complexity of the commercial arrangements being managed including the number and level of interdependency of commercial arrangements managed by the DMO.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
8
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Table 1: The Acquisition Categorisation Framework Decision Support Matrix
Attribute Complexity Level 4 (Low) 3 (Moderate) 2 (High) 1 (Very High)
Acquisition Cost (Note 1)
<$100m $100m–$500m $500m–$1,500m >$1,500m
Project Management Complexity
Relies predominantly on traditional project management knowledge
Relies predominantly on traditional project management knowledge
Significant Extensive
Schedule
Routine schedule management issues
Requires the application of routine project monitoring and control measures
Difficult schedule management matters expected to arise from time to time
Requires the application of difficult remedial schedule management measures
Complex schedule management issues with competing priorities and persistent pressure on delivery date(s)
Requires the application of innovative schedule management initiatives
Extremely complex schedule management issues with competing/ conflicting priorities and persistent high-level pressure on delivery date(s)
Requires the application of innovative schedule management initiatives and frequent high-level management intervention
Technical Difficulty
Low system complexity
Limited hardware and/or critical software development
Limited amount of systems integration
Moderate system complexity
Moderate level of hardware and/or software development
Moderate systems integration
High system complexity
High level of hardware and/or software development
High systems integration
Very high system complexity
Very high level of hardware and/or software development
Very high systems integration
Operation and Support
Very similar system/ equipment exists in ADF
No new operation and support infrastructure changes needed
Sustainment can fit in an existing SPO
Similar system/ equipment exists in ADF
Some operation and support infrastructure changes needed
Sustainment can fit in an existing SPO with minimal change
Some systems/ equipment do not exist in ADF
Major operation and support infrastructure changes needed
Sustainment may require moderate changes to an existing SPO
Most major systems/ equipment do not exist in ADF
Significant operation and support infrastructure changes needed
Sustainment could require a new SPO to be put in place or major changes to existing SPO(s)
Commercial
Existing companies have supplied almost identical systems
Contracting arrangements and contracts are complex but contract management is routine
Companies have previously demonstrated capability to develop and produce systems
Contracting arrangements and contracts are complex and require a high level of contract management
Individual company capabilities exist but not previously combined to produce required capability
Project will challenge extant industry capabilities
Contracting arrangements are complex or there is high level of interdependency between a number of commercial arrangements being managed by the DMO
New industry capabilities may need to be introduced
Project is at the margins of extant industry capability maturity levels
Contracting arrangements are highly complex and there is very high level of interdependency between a number of commercial arrangements being managed by the DMO
Novel commercial practices required to undertake the project
Examples
SEA 1351 Ph 1, Replacement East Coast Tugs
JP 129 Ph 4, Tier 1 Unmanned Aerial Vehicle
AIR 9000 Ph 5C, Additional Heavy Lift Helicopter
JP 157 Ph 1, Replacement Refuelling Trucks
SEA 1439 Ph 6, Collins Sonar Replacement
LAND 17 Ph 1, Artillery Replacement
SEA 1000 Program, New Submarine
AIR 6000 Ph 2A/2B, New Air Combat Capability
Note 1: Not all acquisition ACAT scores will correlate with project dollar size. E.g. a large purchase of an established capability will be rated at a lower ACAT level.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
9
Planned Schedule Highlights
This section provides indicative first pass approval, year-of-decision (second pass approval) and Initial Operating Capability years. These dates are indicative only. Where the first pass approval and year-of-decision dates are the same this may indicate the project is undertaking a single second pass approval. The timing of some of the projects may be adjusted for a variety of reasons including a change in priorities, modified development timescales, or a change in project intent (e.g. from upgrade to replacement). As also highlighted earlier, there is an element of over-programming built into the DCP. This over-programming is a long-standing practice designed to provide flexibility and to aid in ensuring that best use is made of available funding in the event of delays to the development of individual projects.
The schedule highlights include new attributes from previous DCPs including an indication of when the project is expected to seek first pass approval under the two-pass approval process, as this is seen as a key date for industry strategic planning. It is usual for a RFT, or some other type of industry solicitation or cost refinement activity to be undertaken post first pass approval.
Also included in this section is an indication of when the Initial Operating Capability is required. This replaces the previous ‘In-service Delivery’ dates which indicated when the first major items of the system were to be delivered, to a measure that highlights when the first elements of the new system need to be operationally ready. This puts the planning and delivery focus on all elements of the system, including training and support, not just on the delivery of the equipment.
Points of Contact
The position and phone number of the points of contact are provided should additional information on specific proposals be required. The points of contact are from the Capability Staff and, where applicable, the Defence Materiel Organisation - or in some instances the Chief Information Officer Group. Project websites are also provided where applicable. Project information should in the first instance be sought from the Capability Staff contact or Chief Information Officer Group contact where they are the sponsor of the project.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
10
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
INDUSTRY SECTOR IMPLICATIONS
The following charts provide an indication of expected Defence acquisition and sustainment expenditure flowing to Australian industry from the DMO over the period FY 2009-10 to FY 2012–13. These charts show both the sustainment expenditure along with the approved and unapproved capital expenditure. All expenditure estimates are in constant year dollars.
Projections are based on the existing approved capital projects and current sustainment activities, and then add estimates for the unapproved projects included in DCP 2009, and their associated net personnel and operating costs.
There are a number of charts presented and these in total provide a comprehensive picture of order of magnitude of the work that can be expected by Australian industry. The initial chart shows the overall work that is expected to flow to Australian industry across the Forward Estimates period. Then there is summary information for Australian industry that has been broken down into five broad industry sectors:
> Aerospace;
> Maritime;
> Vehicles and Land;
> Weapons and Munitions; and
> Electronic Systems.
Proposals have been attributed to industry sectors based on the proportion of the estimated expenditure attributed to that sector. In particular, it should be noted that the major electronic systems elements of each capability are separated out from the platform element and included separately in the electronic systems sector. As such, the proposed expenditure outlined in the figures below for Aerospace, Maritime, and Vehicles and Land do not include the major electronic systems elements. For example, projects such as a new ship could have expenditure across three sectors – maritime (for the platform), electronic (for the command, control and communications system), and weapons and munitions (for missiles and guns).
Finally a projection is provided of the estimated direct local workforce required across the Defence industry sectors.
Total Acquisition and Sustainment
Figure 2 provides a graph of the total expected in-country work over the next four years. The graph shows slow growth in sustainment reflecting the expected efficiencies to be gained through the SMART sustainment initiatives. It also shows strong growth is expected in the overall acquisition expenditure in-country. The five year historical real growth trend for local industry was around 3.1 per cent per annum. The average growth projection is about 4 per cent per annum across the next four years.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
11
Figure 2: Total In-Country Expenditure.
Notes:
1. These charts show acquisition and sustainment of Defence equipment, and exclude ICT or facilities expenditures.
2. The in-country expenditure graph does not include the DMO service fee which is also spent locally. This adds around 8 per cent of total expenditure to the in-country totals. Over 60 per cent of expenditure is expected in-country.
Aerospace
Figure 3 shows that demand for acquisition work in the local aerospace sector is reducing. This is because the majority of air platforms are procured offshore. It is also apparent that there is slow growth in the need for sustainment capacity. This is because less reliable platforms are being retired from service and they are being replaced by more reliable modern platforms. The average annual growth in this sector is 0.1 per cent per annum across the next four years.
Figure 3: In-Country Expenditure within the Aerospace Sector.
6.0
5.0
4.0
3.0
2.0
1.0
0.008/09 09/10 10/11 11/12 12/13
A$ (B
illio
n) 0
9/10
Con
stan
t Pric
e an
d Ex
chan
ge
Acquisition In-country Sustainment In-country Total In-country Procurement
A$ (B
illio
n) 0
9/10
Con
stan
t Pric
e an
d Ex
chan
ge
Acquisition In-country Sustainment In-country Total In-country Procurement
0.0
0.5
1.0
1.5
08/09 09/10 10/11 11/12 12/13
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
12
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Maritime
Figure 4 shows there is considerable growth in new acquisition work. This is associated with the Air Warfare Destroyer and the Landing Helicopter Dock projects. The five year historical real growth trend for local industry in this sector was around 3.2 per cent per annum. The average growth projection is about 8.3 per cent per annum across the next four years.
Figure 4: In-Country Expenditure within the Maritime Sector.
Vehicles and Land
Figure 5 shows there is some expected growth in expenditure due to the major projects LAND 121 (Overlander) and LAND 17 (Artillery Replacement). The five year historical real growth trend for local industry in this sector was around 3.5 per cent per annum. The average growth projection is about 2.5 per cent per annum across the next four years.
Figure 5: In-Country Expenditure within the Vehicles and Land Sector.
A$ (B
illio
n) 0
9/10
Con
stan
t Pric
e an
d Ex
chan
ge
Acquisition In-country Sustainment In-country Total In-country Procurement
0.0
0.5
1.0
1.5
2.0
08/09 09/10 10/11 11/12 12/13
A$ (B
illio
n) 0
9/10
Con
stan
t Pric
e an
d Ex
chan
ge
Acquisition In-country Sustainment In-country Total In-country Procurement
0.0
1.0
0.5
1.5
08/09 09/10 10/11 11/12 12/13
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
13
Weapons and Munitions
Figure 6 shows that the demand from Defence is not likely to cause additional growth in this sector. While this DCP contains weapons projects, the majority of these are expected to be sourced offshore. The majority of the local weapons and munitions expenditure is directed to sustainment. The average growth (decline) projection is about –1.7 per cent per annum across the next four years.
Figure 6: In-Country Expenditure within the Weapons and Munitions Sector.
A$ (B
illio
n) 0
9/10
Con
stan
t Pric
e an
d Ex
chan
ge
Acquisition In-country Sustainment In-country Total In-country Procurement
0.0
0.1
0.2
0.3
08/09 09/10 10/11 11/12 12/13
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
14
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Electronics Sector
The electronics sector is associated with most major projects and as such there is considerable project based expenditure for Australian industry. As can be seen in Figure 7, there is a significant rise in local industry demand. This is associated with major projects such as SEA 4000 and a plethora of projects delivering command, control, communications, networking and data management. The five year historical real growth trend for local industry in this sector was around 3.4 per cent per annum. The average growth projection is about 4.8 per cent per annum across the next four years.
Figure 7: In-Country Expenditure within the Electronics Sector.
A$ (B
illio
n) 0
9/10
Con
stan
t Pric
e an
d Ex
chan
ge
Acquisition In-country Sustainment In-country Total In-country Procurement
0.0
0.5
1.0
1.5
2.0
2.5
08/09 09/10 10/11 11/12 12/13
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
15
Defence Industry Workforce
Also included at Figure 8 is an Australian industry workforce projection chart based on the above Defence expenditure projections. The workforce projection includes both direct and indirect workforce requirements, but does not include DMO workforce numbers. The local industry workforce chart indicates a significant rise in expected workforce numbers over the next four years. The average annual workforce growth is estimated to be around 3.1 per cent per annum, after assuming about 1 per cent per annum productivity improvement.
Figure 8: Australian Industry Workforce Projections.
Note:
1. This chart shows a smoothed moving average of the predicted workforce growth, to take account of project uncertainties and the recruiting and training times for skilled workers to deliver project outcomes.
In summary, the previous industry implications graphs have shown strong growth in demand for local industry over the next four years. The substantial capability plans in the 2009 White Paper foreshadows continuing strong demand growth beyond FY 2012-13. Defence would recommend to international and local industry that they ensure that their companies are positioned to respond to significant demand growth in this period and beyond.
Aust
ralia
n De
fenc
e In
dust
ry P
erso
nnel
(Dire
ct)
Total Workforce Requirement Sustainment Requirement Acquisition Requirement
0
5,000
10,000
15,000
25,000
20,000
35,000
30,000
40,000
08/09 09/10 10/11 11/12 12/13
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
16
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
PLANNING FOR CAPABILITIES BEYOND 2013
The 2009 White Paper is the Government’s comprehensive plan for Defence for the next 20 years. The primary outcome is to build Force 2030, and remediate the current and projected force, required for the defence of Australia and its approaches, and in relation to our unique strategic interests. The capabilities outlined in the White Paper will create one of the most capable Defence forces in our region, with the world’s best people, equipment and support systems.
While the Government has decided that this Public DCP 2009 will set out the expenditures we expect over the next four years, significant commitments have been made in the White Paper to Australia’s future military capabilities beyond this period.
Some projects related to these capabilities are not included in this DCP, however, Defence may be conducting capability development activities for a number of them during the period 2009-2013. These activities may include: technical studies to determine capability performance requirements and to assess technical risks; simulation activities and prototype development and evaluation; market studies to determine industry capacity and technological expertise in certain areas; costing studies to develop a robust understanding of acquisition and through-life costs associated with the future capabilities, facilities and supporting infrastructure; studies into human factors and training needs analysis; and analysis and studies to develop plans for the future support services and sustainment systems.
The information gathered through these activities will inform the development of subsequent DCPs. In addition companies who are seeking to understand the longer run plans as a result of the 2009 White Paper will gain some insight through regular participation in Environmental Working Groups and other industry participation activities.
Below is a summary of some of the major programs and phases expected to be included in subsequent DCPs to meet the capability goals of the White Paper:
> Armed Reconnaissance Helicopter Upgrades. Under AIR 87 there is likely to be a new phase (or phases) to maintain the effectiveness of the capability. This project is expected to provide system upgrades to the ARH consistent with the parent Franco/German Tiger helicopter program. These upgrades may include weapons, engines, software, aircraft mission management system and ground support system upgrades. This is likely to be an ACAT III project and Defence will commence work on developing this phase for Government consideration after 2016.
> AEW&C Upgrades. Under AIR 5077 there are likely to be new phases to maintain the effectiveness of the capability. These phases will be informed by the studies under Phase 4. Some initial plans include developing a comprehensive AEW&C test environment for upgrading aircraft and associated support segments, and to implement and test mandatory security and interoperability upgrades to the Wedgetail AEW&C capability. There will also be a comprehensive mid-life upgrade. These phases may be up to ACAT I and Defence will commence work on developing these phases for Government consideration beyond 2019.
> Multi-mission Unmanned Aerial Vehicle (MUAV). AIR 7000 Phase 1B is intending to acquire a High-Altitude Long-Endurance (HALE) Maritime Unmanned Aerial System (MUAS) capable of maritime and overland Intelligence, Surveillance and Reconnaissance (ISR) roles and Electronic Support (ES). This is likely to be an ACAT II project and Defence will commence work on developing this phase for Government consideration beyond 2019.
> Military Satellite Communications. Recent and planned phases of JP 2008 are providing a comprehensive satellite communications (SATCOM) capability to support ADF operations. One additional phase is being considered to deliver an ADF Ultra-High Frequency (UHF) SATCOM capability providing coverage in the Pacific Ocean region. This is likely to be an ACAT III project and Defence will commence work on developing this phase for Government consideration after 2016.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
17
> ADF Joint Command Support Environment. JP 2030 continues to build upon the capability delivered under previous phases of the project. A later phase is intended to further establish the framework for the Joint Command Support Environment to consolidate existing Command Support Systems into a single integrated environment linking all elements of the ADF. This is likely to be an ACAT III project and Defence will commence work on developing this phase for Government consideration after 2016.
> Defence GEOINT Capabilities. JP 2044 is a multi-phased proposal designed to develop and sustain a Defence capability to exploit geospatial data gathered from multiple sources including space-based surveillance. Later phases of this project will seek to further enhance the overall capability and enable Defence to maintain high level technology and effectiveness in this enterprise. These are likely to be ACAT III phases and Defence will commence work on developing the first of these phases for Government consideration after 2013.
> Strategic Sealift. A phase of JP 2048 will consider a strategic sealift capability. This capability would enable the ADF to transport bulk equipment, supplies and forces into a theatre of operations and provide significant ongoing support to deployed forces. Strategic sea lift is complementary to amphibious operations. This is likely to be an ACAT II project and Defence will commence work on developing this phase for Government consideration beyond 2019.
> Battlespace Communications Systems (Land). A later phase of JP 2072 is intended to continue the expansion of enhanced communications to support joint operations. The phase will continue to progressively equip the remaining elements of the land force. JP 2072 is an ACAT I Program and Defence will commence work on developing this phase for Government consideration after 2016.
> Maritime Strike Weapon for New Air Combat Capability. This new project aims to acquire a maritime strike weapon for the multi-role fighter being acquired under AIR 6000, the New Air Combat Capability. This is likely to be an ACAT III project and Defence will commence work on developing this project for Government consideration after 2016.
> Ground Based Air Defence Enhancements or Replacement. Under LAND 19 this phase is intended to enhance or replace the existing Ground Based Air Defence (GBAD) system (RBS 70 based). It will include technologies and weapon systems that are also capable of Countering Rockets, Artillery and Mortars (CRAM). This is likely to be an ACAT II project and Defence will be developing this phase for Government consideration after 2013.
> Army Battle Management System. LAND 75 is a multi-phase proposal to deliver a land Battle Management System (BMS). A later phase is planned to take the federated network of BMS type Command and Control systems to a common solution and provide major software releases to enhance interoperability with allied and other agency domains. This is likely to be an ACAT II phase and Defence will commence work on developing this project for Government consideration after 2016.
> ADF Small Arms Replacement. This new project aims to replace the ADF small arms inventory. Existing upgrade programs (such as LAND 125 Phase 3) will continue development of the AUSTEYR family of weapons. As such the new small arms will not be required until beyond 2019. This is likely to be an ACAT III project and Defence will commence work on developing this phase for Government consideration beyond 2019.
> Land Combat Vehicles. The LAND 400 project will aim to replace and enhance those combat systems currently provided by M113, ASLAV and Bushmaster. The project is likely to be split into phases to deal with vehicle classes or capabilities. This is likely to be an ACAT I Program and Defence will commence work on developing this project for Government consideration after 2016.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
18
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
> Long Range Subsurface Detection. This SEA 1100 phase intends to provide the ability to reliably and effectively employ a towed array sonar from the ANZAC Class FFHs with a high probability of deterring or detecting underwater threats at tactically useful ranges. This is likely to be an ACAT III project and Defence will commence work on developing this project for Government consideration after 2013.
> Maritime Extended Range Air Defence. This proposed new project seeks to provide the Royal Australian Navy with an extended range air defence weapon for the Air Warfare Destroyers. This is likely to be an ACAT II project and Defence will commence work on developing this phase for Government consideration beyond 2019.
> Maritime Operational Support Capability. This phase of SEA 1654 seeks to replace the capability provided by HMAS Success. This is likely to be an ACAT II project and Defence will commence work on developing this project for Government consideration after 2016.
> Air Warfare Destroyer (AWD) – Strike Capability. This new phase of SEA 4000 seeks to provide an enhanced sea based long range strike capability for the HOBART Class destroyers. This is likely to be an ACAT III project and Defence will commence work on developing this phase for Government consideration beyond 2019.
> Future Frigate. This new project SEA 5000 will introduce into service the next generation of naval surface combatants that will have a strong emphasis on anti-submarine warfare and be capable of independent and task group operations. This is likely to be an ACAT I Program and Defence will commence work on developing this project for Government consideration beyond 2019.
The White Paper also outlines the Government’s commitment to further enhance existing platforms, including:
> ensuring that the ANZAC Class frigates continue to be able to operate effectively until they are replaced by the Future Frigates, including putting the ships through the anti-ship missile defence program, subject to successful trials in a lead ship;
> continuing to upgrade the protection, mobility and firepower of the M113 armoured personnel carriers, some of which are already in service;
> continuing to enhance the capabilities of the individual soldier in dismounted close combat to improve combat power, survivability, and command and control.
The Government has also made a commitment to:
> make a substantial investment in intelligence, surveillance and reconnaissance capabilities;
> make major enhancements to Defence’s cyber warfare capability;
> focus on strengthening the ADF’s electronic warfare capabilities;
> enhance Defence’s joint command support system; and
> build a networked ADF through progressively delivering networked maritime, land, air and intelligence, surveillance and reconnaissance domains.
In addition to the capabilities highlighted in the White Paper, there are many smaller projects and phases that together deliver many of the essential support capabilities for the ADF. These projects provide capabilities that enable other major systems to realise their full effectiveness and provide extensive opportunities for Australian small to medium enterprises.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
19
The table below shows the Public DCP 2006 proposals that have been approved, and as a consequence do not appear in this Public DCP 2009. Information on the approved projects is available through the Defence Materiel Organisation website (www.defence.gov.au/dmo).
Proposal Number Phase Name Estimated Expenditure Band
AIR 5276 8B AP-3C Electronic Support Measure – Acquisition $100m to $150m
AIR 5276 CAP1 AP-3C Capability Assurance Program $50m to $75m
AIR 5376 3.2C Hornet Structural Refurbishment Stage 2 – Additional $50m to $75m
AIR 5376 2.3C F/A-18 EWSP - Jammers $50m to $75m
JP 126 2 Joint Theatre Distribution System $150m to $200m
JP 2008 3F Military Satellite Capability $75m to $100m
JP 2008 4 Military Satellite Capability $750m to $1000m
JP 2048 4A/4B Amphibious Ships $2500m to $3500m
JP 2069 1B High Grade Cryptographic Equipment – Secure Telephony Less than $20m
JP 2077 2B Improved Logistics Information Systems (this project was split into Phases 2B.1 and 2B.2, both have received second pass approval)
$200m to $250m
JP 2080 2B Defence Management Systems Improvement (this project has been split into Phases 2B.1 and 2B.2; Phase 2B.2 – ROMAN has received second pass approval; Phase 2B.1 – PMKeyS is in this DCP)
$20m to $30m
JP 2089 2 Tactical Information Exchange Domain (Data Links) (this project has been split into Phase 2A and 2B; Phase 2A has received second pass approval; Phase 2B is in this DCP)
$75m to $100m
JP 2097 1 REDFIN – Enhancements to Special Operations Capability (this project has been split into Phase 1A and 1B; Phase 1A has received second pass approval; Phase 1B is in this DCP)
$75m to $100m
LAND 40 2 Direct Fire Support Weapon $150m to $200m
LAND 58 3 Weapon Locating Radar Life of Type Extension $20m to $30m
LAND 121 3A and 3B Overlander – Field Vehicles and Trailers (these phases were merged and approved as Land 121 Phase 3)
$2500m to $3500m
LAND 144 1 Counter Mine Capability $30m to $50m
SEA 1428 4 Evolved Seasparrow Missiles $75m to $100m
SEA 4000 3 Air Warfare Destroyer $6000m to $7500m
DEF 224 3 Force Level Electronic Warfare $100m to $150m
DCP 2006 PROJECTS APPROVED
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
20
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
PROPOSALS IN ALPHANUMERIC ORDER
Project Number Project Name PageAIR 5077 Ph 4 AEW&C Sustainment Study 23AIR 5232 Ph 1 Air Combat Officer Training System 24AIR 5276 CAP 2 AP-3C Capability Assurance Program 26AIR 5397 Ph 2 Upgrade Australian Military Airspace Communications and Control System (AMACCS) 28AIR 5405 Ph 1 Replacement Mobile Regional Operations Centre 30AIR 5416 Ph 4B1 C-130J Radar Warning Receiver (RWR) 32AIR 5416 Ph 4B2 C-130J Large Aircraft Infrared Countermeasures (LAIRCM) 32AIR 5428 Ph 1 Pilot Training System 34AIR 5431 Ph 1 Deployable Air Traffic Management and Control System 36AIR 5431 Ph 2/3 Fixed Base Air Traffic Management and Control System 36AIR 5432 Ph 1 Communications, Navigation, Surveillance/Air Traffic Management 38AIR 5438 Ph 1A Lead-In Fighter Capability Assurance Program 40AIR 5440 Ph 1 C-130J Block Upgrade Program 7.0 42AIR 5440 Ph 2 C-130J Block Upgrade Program 8.0 42AIR 6000 Ph 2A/2B New Air Combat Capability – 3 Squadrons 44AIR 6000 Ph 3 Weapons for New Air Combat Capability 44AIR 6000 Ph 5 Future Air-to-Air Weapons for New Air Combat Capability and Super Hornet 44AIR 7000 Ph 2B Maritime Patrol Aircraft Replacement 49AIR 8000 Ph 1 Battlefield Airlift – Additional C-130J 51AIR 8000 Ph 2 Battlefield Airlift – Caribou Replacement 51AIR 9000 Overview 53AIR 9000 Ph 5C Additional Heavy Lift Helicopter 54AIR 9000 Ph 7 Helicopter Aircrew Training System 56AIR 9000 Ph 8 Future Naval Aviation Combat System 58AIR 9000 SCAP1 Seahawk Capability Assurance Program 1 60AIR 9000 SCAP2 Seahawk Capability Assurance Program 2 60DEF 7013 Ph 4 Joint Intelligence Support System 62JP 66 Ph 1 Replacement for Air Defence Targets 64JP 90 Ph 1 ADF Identification Friend or Foe 66JP 129 Ph 4 Tier 1 Unmanned Aerial Vehicle (UAV) 68JP 154 Ph 1 Joint Counter Improvised Explosive Device 70JP 154 Ph 2 Joint Counter Improvised Explosive Device 70JP 157 Ph 1 Replacement Refuelling Trucks 73JP 1544 Ph 1 Project Eden – Document Handling System 75JP 1770 Ph 1 Rapid Environmental Assessment 77JP 1771 Ph 1 Geomatic Support System 79JP 2008 Ph 3H Military Satellite Capability – Wideband Terrestrial Terminals 81JP 2008 Ph 5B Military Satellite Capability – Wideband Terrestrial Infrastructure 81JP 2025 Ph 6 Jindalee Operational Radar Network (JORN) 84JP 2030 Ph 8 ADF Joint Command Support Environment 86JP 2044 Ph 3A.1 Project Eagle Eye 88JP 2044 Ph 4 Digital Topographical Systems (DTS) Upgrade 88JP 2047 Ph 3 Wide Area Communications Network Replacement 90JP 2048 Ph 3 Amphibious Watercraft Replacement 92JP 2048 Ph 5 Landing Craft Heavy Replacement 92JP 2060 Ph 3 ADF Deployable Health Capability 95JP 2064 Ph 3 Geospatial Information Infrastructure & Services 97JP 2065 Ph 2 Integrated Broadcast System 99JP 2065 Ph 3 Integrated Broadcast System 99JP 2068 Ph 2B.2 Computer Network Defence 101JP 2069 Ph 2 High Grade Cryptographic Equipment 103JP 2070 Ph 4 AP-3C Light Weight Torpedo Integration 105JP 2072 Ph 2A Battlespace Communications System (Land) 107JP 2072 Ph 2B Battlespace Communications System (Land) 107JP 2072 Ph 3 Battlespace Communications System (Land) 107
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
21
Project Number Project Name PageJP 2077 Ph 2D Improved Logistics Information Systems 110JP 2078 Ph 2 Hyper-Spectral Imaging 112JP 2080 Ph 2B.1 Defence Management Systems Improvement – Personnel Systems Modernisation 114JP 2080 Ph 3 Defence Management Systems Improvement – Finance System 114JP 2085 Ph 2/3 Explosive Ordnance Warstock 116JP 2089 Ph 2B Tactical Information Exchange Domain (Data Links) 118JP 2089 Ph 3 Tactical Information Exchange Domain (Data Links) 118JP 2090 Ph 1C Combined Information Environment 121JP 2096 Ph 1 Surveillance Enhancement 123JP 2097 Ph 1B REDFIN – Enhancements to Special Operations Capability 125JP 2099 Ph 1 Identity Management – Project CERTE 127JP 2110 Ph 1A Chemical, Biological, Radiological, Nuclear Defence 130JP 2110 Ph 1B Chemical, Biological, Radiological, Nuclear Defence 130JP 3011 Ph 1 Non-Lethal Weapons 132JP 3021 Ph 1 Joint Combined Training Capability (JCTC) 134JP 3024 Ph 1 Woomera Range Remediation 136JP 3025 Ph 1 Deployable Incident Response Regiment (IRR) Capability 138JP 3027 Ph 1 JDAM Enhancements 140JP 3028 Ph 1 Defence Simulation Program 142JP 5408 Ph 3 ADF Navigation Warfare (NAVWAR) Capability 144LAND 17 Ph 1 Artillery Replacement 146LAND 53 Ph 1BR NINOX – Night Fighting Equipment Technology Refresh 149LAND 75 Ph 3.4 Battlefield Command Support System 151LAND 75 Ph 4 Battlefield Command Support System 151LAND 112 Ph 4 ASLAV Enhancement 154LAND 121 Ph 4 Overlander 156LAND 121 Ph 5A Overlander 156LAND 125 Ph 3A Soldier Enhancement Version 2 – C4I Component 159LAND 125 Ph 3B Soldier Enhancement Version 2 – Survivability 159LAND 125 Ph 3C Soldier Enhancement Version 2 – Lethality 159LAND 125 Ph 4 Soldier Enhancement Version 3 159LAND 136 Ph 1 Land Force Mortar Replacement 163LAND 146 Ph 2 Combat Identification for Land Forces 165LAND 155 Ph 1 Enhanced Gap Crossing Capability 167LAND 998 Ph 1 Replacement Aviation Fire Trucks 169SEA 1000 Ph 1A Future Submarine – Concept Design 171SEA 1000 Ph 1B Future Submarine – Preliminary Design 171SEA 1000 Ph 1C Future Submarine – Detailed Design 171SEA 1180 Ph 1 Patrol Boat, Mine Hunter Coastal and Hydrographic Ship Replacement Project 173SEA 1350 Ph 1 Navy Surface and Subsurface Ranges 175SEA 1351 Ph 1 Replacement East Coast Tugs 177SEA 1352 Ph 1 Evolved Sea Sparrow Missile (ESSM) Upgrade and Inventory Replenishment 179SEA 1354 Ph 1 Submarine Escape Rescue and Abandonment Systems (SERAS) 181SEA 1357 Ph 1 Close-In Weapons System (CIWS) Phalanx Block Upgrade 183SEA 1358 Ph 1 Mini Typhoon for ANZAC Class 185SEA 1397 Ph 5A Nulka Missile Decoy Enhancements 187SEA 1397 Ph 5B Nulka Missile Decoy Enhancements 187SEA 1408 Ph 2 Torpedo Self-defence 189SEA 1430 Ph 5 Digital Hydro Display System Upgrade 191SEA 1439 Ph 3.1 Collins Obsolescence Management 193SEA 1439 Ph 5B.2 Collins Continuous Improvement Program 193SEA 1439 Ph 6 Collins Sonar Replacement 193SEA 1442 Ph 4 Maritime Communication Modernisation 197SEA 1448 Ph 4A ANZAC Electronic Support System Improvements 199SEA 1448 Ph 4B ANZAC Air Search Radar Replacement 199SEA 1778 Ph 1 Deployable MCM – Organic Mine Counter Measures 202
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
22
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
23
AIR 5077Phase 4 AEW&C Sustainment Study
Phase Scope
Phase 4 aims to conduct studies and planning to assure the Wedgetail Airborne Early Warning and Control (AEW&C) capability throughout life-of-type.
Background
The Wedgetail capability comprises six aircraft and associated support systems and facilities.
Phase 4 is intended to provide scientific, engineering and interoperability studies to develop a costed management plan to support the AEW&C capability out to its end of life.
It is expected that upgrade phases will be developed as a result of this study.
Australian Industry Opportunities
Acquisition
The studies may be conducted by consultants who would be engaged through the various contracting methodologies available to Defence.
Through-life Support
As Phase 4 is a study phase, there are no through-life support aspects.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
AEW
&C
Sy
stem
s
Modelling / Simulation O
Project Manage O
Systems Definition / Development D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
Planned Schedule Highlights
First Pass Approval FY 2012-13 to FY 2014-15Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability Not applicable
Points of Contact
Capability Staff: Defence Material Organisation: Deputy DirectorBattlespace Management(02) 6265 5561
Director Project Management UnitAEW&C Systems Program Office(02) 4928 5220
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
24
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Air Combat Officer Training SystemAIR 5232
Phase Scope
This Project is intended to provide the ADF with an Air Combat Officer (ACO) training system tailored to meet the training needs of future ADF ACO aircrew.
Background
The project aims to utilise advanced training systems to increase the efficiency and effectiveness of the ACO aircrew training system. The system aims to deliver the fundamental core training for all ACO and then accommodate the specialist training needs of Navy Observers and Air Force ACO aircrew. Specialist training of Air Force ACO battlespace managers is not within the scope of Phase 1.
The complete system may not be replaced at once, but rather will be dependant on a Training Needs Analysis, expiration of current contracts and obsolescence of elements in the current system.
Australian Industry Opportunities
Acquisition
It is anticipated that Australian industry will have the opportunity to design, develop and implement the ACO training system.
Through-life Support
It is anticipated that Australian industry will have involvement with the through-life support aspects of the ACO training system, including the management, ongoing development, delivery, logistics and operational support.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Rot
ary
&
Fixe
d W
ing
Airc
raft
Trai
ning
Sy
stem
s
Assemble / Install D D
Design D
Education / Training D D
In-Service / Through-life Support D D
Logistics Support D D
Manufacture / Construct O O
Modelling / Simulation D
Project Manage D
Repair and Maintain D
Software Development / Support D
Systems Definition / Development D D
Systems Integration D D
Test and Evaluate D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
25
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m-$1500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11 Year-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2015 to 2017
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Training (02) 6265 5450
Directorate of Emerging Aerospace ProjectsProject Manager 1 – Fixed Wing(02) 6265 5534
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
26
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
CAP 2 AP-3C Capability Assurance ProgramAIR 5276
Phase Scope
AP-3C Capability Assurance Program (CAP) 2 is intended to treat AP-3C data management system, electronic support measures and ground support system obsolescence and investigate acoustic warfare system and data link upgrades.
Background
AIR 5276 is a multi-phased project to update the Air Force AP-3C Orion Maritime Patrol Aircraft. The remaining unapproved phases of AIR 5276 have been restructured into the AP-3C CAP to deliver AIR 5276 in coordinated and integrated blocks, with a focus on capability outcomes and improved efficiency of delivery. A number of AIR 5276 approved phases, including CAP 1 are complete or being delivered. The former CAP 3 scope has been subsumed by CAP 2.
The AP-3C CAP will be delivered as integrated elements of the AP-3C Block Upgrade Program (BUP). The AP-3C BUP is the preferred delivery mechanism for all current AP-3C projects including in-work AIR 5276 Phases, AP-3C CAP and RAAF Minor Projects.
CAP 2 is intended to treat AP-3C data management system, electronic support measures, and ground support systems obsolescence and sustainment issues. Treatment of these systems is essential to ensure the continued availability of AP-3C capabilities. Acoustic warfare and data link system upgrades will be considered to ensure the AP-3C capability edge is maintained until the aircraft’s planned withdrawal date.
Australian Industry Opportunities
Acquisition
A Prime System Integrator or direct engagement of original equipment manufacturers (OEM) is expected to be required to support integration of the new capabilities introduced by CAP 2 onto the AP-3C weapon system. The Integrator and/or OEMs will be required to introduce CAP 2 capabilities under a Block Upgrade concept to maximise operational availability of aircraft and support systems.
Through-life Support
Either the Prime System Integrator, individual OEMs or existing through-life support (TLS) contractors will be expected to provide TLS for CAP 2 capabilities. It is anticipated that all elements delivered through CAP 2 will be supported through amendments to existing TLS contracts.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Acou
stic
Te
chno
logi
es &
Sy
stem
s
Com
mun
icat
ions
Se
curi
ty
Elec
tron
ic
War
fare
Supp
ort o
f M
issi
on &
Saf
ety
Cri
tical
Sof
twar
e
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sy
stem
s)
Assemble / Install D D D D D
Design O O D D D
Education / Training O O O D D
In-Service / Through-life Support D D D D D
Logistics Support O D O O O
Project Manage O O O O O
Repair and Maintain D D D D D
Software Development / Support D D D D D
Systems Integration D D D D D
Test and Evaluate D D D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
27
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11Year-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Maritime Patroland Response 2(02) 6265 5447
Director P3 Block Upgrade Program (08) 8393 3318
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
28
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 2 Upgrade Australian Military Airspace Communications and Control System (AMACCS)AIR 5397
Phase Scope
This phase is a technology refresh for the UHF/VHF/HF communications systems delivered under Phase 1.
Background
AIR 5397 Phase 1 delivered fixed and deployable Air Traffic and Air Defence communications systems across the ADF. Communications technology for Air Traffic Control has advanced since the introduction of Phase 1. Phase 2 is expected to reassess the communications requirements within each Air Traffic and Air Defence system and consider the introduction of new technology.
The introduction of Internet Protocol (IP) over radio, voice over IP and data communications over radio are to be assessed for relevance to ADF air-ground-air communications.
Australian Industry Opportunities
Acquisition
The method of acquisition is expected to be Commercial- or Military-off-the-Shelf (COTS or MOTS) to the maximum extent possible through open tender. Australian industry opportunities are expected to be for the supply, installation and integration of the new capability. It is likely that any new radios sourced from overseas manufacturers will require Australian in-country partners to manage, at site level, the network design and integration, installation, and set to work program. Opportunities to standardise the fleet of Pilot Monitoring Facility radios and Air Defence Ground Environment radios may also be available.
Through-life Support
Through-life support to the maximum extent possible using extant Defence corporate logistics tools and processes is expected for this capability. This includes seeking to have engineering, maintenance and logistics support contracts signed at the same time as acquisition.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sy
stem
s)
Faci
litie
s &
In
fras
truc
ture
Assemble / Install D D
Design D D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct O
Project Manage D
Repair and Maintain D
Software Development / Support D
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
29
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2012-13 to FY 2014-15Year-of-Decision FY 2014-15 to FY 2016-17Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Battlespace Management (02) 6265 5561
Director Project Development & Integration Surveillance and Control Branch(02) 6265 6291
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
30
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Replacement Mobile Regional Operations CentreAIR 5405
Phase Scope
Phase 1 is intended to provide a new Mobile Regional Operations Centre (MROC) to replace the current Tactical Air Defence System (TADS).
Background
MROC provides a deployable integrated air defence command and control system. The current TADS is reaching its life-of-type and needs to be replaced with a modern and flexible air battle management system that will be an important node in the networked battlespace.
Phase 1 will provide the replacement MROC.
Australian Industry Opportunities
Acquisition
It is anticipated that Phase 1 will provide the following industry opportunities:
> provision of MROC system;
> integration of the new MROC into the Australian Aerospace Battle Management systems;
> test and evaluation;
> removal and disposal of existing systems; and
> development of appropriate training systems, provision of maintenance staff and, if applicable, integration within extant simulation and/or training systems.
Through-life Support
The industry requirements will be based around developing and maintaining sufficient capability within Australian industry to undertake the range of through-life maintenance and support activities necessary to sustain the system(s).
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Capability
Activity
Mob
ile
Reg
iona
l O
pera
tions
C
entr
e
Assemble / Install D
Design O
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Project Manage D
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
31
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13
Year-of-Decision FY 2013-14 to FY 2015-16
Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Battlespace Management 1(02) 6265 2216
Director Project Development & IntegrationSurveillance and Control Branch(02) 6265 6291
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
32
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 4B1 C-130J Radar Warning Receiver (RWR)Phase 4B2 C-130J Large Aircraft Infrared Countermeasures (LAIRCM)AIR 5416
Phase Scope
Phases 4B1 and 4B2 are intended to provide additional Electronic Warfare Self Protection (EWSP) for the C-130J aircraft consisting of radar warning and infrared counter-measure systems.
Background
AIR 5416 (Echidna) is a multi-phase project dealing with improving EWSP across a number of aircraft. Phase 4 was to acquire EWSP for C-130J aircraft. It has been restructured as follows:
> Phase 4A (approved in 2005) was brought forward from the original Phase 4 and provided a missile warning and flare dispensing capability for the C-130J.
> Phase 4B1 plans to acquire a radar warning receiver (RWR) for the C-130J.
> Phase 4B2 plans to acquire a laser-based infrared countermeasure system for the C-130J.
Australian Industry Opportunities
Acquisition
Both of these phases rely heavily on the provision of Military-off-the-Shelf (MOTS) EWSP systems via US Foreign Military Sales (FMS).
The C-130J aircraft is already configured for the ALR-56 RWR but the RWR systems have not been installed. The installation and test of the installed RWR systems is likely to occur in Australia following delivery of the RWR equipment from the US. A Request for Tender for the RWR installation and test activities is likely to be released in 2010.
The installation of the laser based infrared countermeasures systems may be carried out under FMS arrangements or under commercial arrangements with support from Australian industry.
Through-life Support
Due to the US centred FMS nature of the proposed procurements, Australian industry involvement in system support is expected to be limited.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 4B1 Capability
Activity
Elec
tron
ic
War
fare
Rot
ary
& F
ixed
W
ing
Airc
raft
Assemble / Install D
Test and Evaluate D D
Phase 4B2 Capability
Activity
Elec
tron
ic
War
fare
Rot
ary
& F
ixed
W
ing
Airc
raft
Assemble / Install D
Repair and Maintain D
Test and Evaluate D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
33
Acquisition Category (ACAT)Phase 4B1
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Phase 4B2
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phases 4B1 and 4B2 FY 2009-10 to FY 2010-11Year-of-Decision Phases 4B1 and 4B2 FY 2009-10 to FY 2010-11Initial Operating Capability Phases 4B1 and 4B2 2010 to 2012
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 4B1 and 4B2
Deputy Director Aircraft Survivability(02) 6265 5734
Director Airborne Self Protection Systems Program Office(02) 6265 1615
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
34
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Pilot Training SystemAIR 5428
Phase Scope
This project intends to provide Air Force, Army and Navy with a new fixed wing Pilot Training System (PTS). The system will provide platforms for flight screening and cover all facets of undergraduate pilot training from basic flying up to entry into Air Force Lead-In Fighter and Operational Conversion Units. The system will also provide candidates for the Helicopter Aircrew Training System (HATS) to be delivered under Project AIR 9000 Phase 7.
The PTS is also responsible for the initial training of Qualified Flying Instructors (QFIs) to support the PTS and fixed-wing operational training. Airborne platforms selected for pilot training will also be assessed for their suitability for use by the Forward Air Control Development Unit (FACDU) and Air Operations Support Group (AOSG). If suitable, these aircraft will be acquired under AIR 5428.
Background
The project aims to utilise basic and advanced training systems to increase the efficiency and effectiveness of the fixed wing PTS. Specifically the system will:
> enable an increase in graduation numbers;
> generate pilot skills consistent with advanced 4th/5th generation aircraft;
> enable the withdrawal of current training media; and
> provide solutions for the integration of synthetic training systems.
All pilot training will be conducted within Australia. The ADF intends to retain the military elements of the existing PTS, including military flying schools and the use of predominantly military QFI for student instruction.
Australian Industry Opportunities
Acquisition
Although the industry requirements are yet to be determined, the requirements are anticipated to include:
> development of the PTS (including curriculum, training media such as training aids, manuals and supporting software). It is expected that Australian industry and overseas Original Equipment Manufacturers (OEM) will establish teaming arrangements for software development and other training requirements;
> development and maintenance of a Training Management Information System;
> participation on a cost-effective competitive basis in the global supply chain of the aircraft OEM; and
> development and/or support of PTS related infrastructure.
The training aircraft are expected to be Commercial- or Military-off-the-Shelf. It is anticipated that the acquisition will provide the level of technical transfer and Intellectual Property (IP) access from the OEM necessary to ensure Australian industry is in a position to provide the necessary support of the aircraft in-country.
Through-life Support
Subject to further definition, through-life industry involvement is anticipated to include:
> updating and enhancing the PTS (including curriculum, training media such as training aids, manuals and supporting software);
> provision of support services to training aircraft, the synthetic training environment, facilities and systems;
> maintenance of a Training Management Information System; and
> training delivery.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
35
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Rot
ary
and
Fixe
d W
ing
Airc
raft
Faci
litie
s &
In
fras
truc
ture
Assemble / Install D
Design O D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct D
Modelling / Simulation D
Project Manage D D
Repair and Maintain D D
Software Development / Support D
Systems Definition / Development D
Systems Integration D
Test and Evaluate D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 1 Very High >$1500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT II.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2015 to 2017
Points of Contact
Capability Staff: Defence Materiel Organisation:AIR 5428 Desk Officer(02) 6265 5121
Project Manager AIR 5428(03) 9256 3434
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
36
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
AIR 5431 Phase 1 Deployable Air Traffic Management and Control SystemPhase 2/3 Fixed Base Air Traffic Management and Control System
Phase Scope
Phase 1 seeks to provide a deployable Defence Air Traffic Management and Control System (DATMCS) to replace the existing system and to add additional capability.
Phase 2 seeks to provide Air Traffic Control (ATC) Surveillance Sensors to replace existing sensors at ADF fixed base locations.
Phase 3 seeks to provide an Air Traffic Management and Control System to replace the existing systems at ADF fixed base locations and a radar simulator at the School of Air Traffic Control (SATC).
Background
This project seeks to procure a new DATMCS to replace the existing Australian Defence Air Traffic System (ADATS) acquired under AIR 5186, which reaches life-of-type in 2015. The DATMCS is expected to comprise deployable and fixed surveillance sensors and command and control systems.
Phase 1 is intended to provide a number of deployable DATMCS. The current capability comprises a single Tactical Airfield Surveillance Radar (TASR).
Phase 2 seeks to acquire ATC sensors to replace existing Alenia radars at RAAF Bases East Sale and Tindal and the Army Aviation Centre at Oakey, and to replace the ADATS radars at RAAF Bases Amberley, Darwin, Pearce, Townsville and Williamtown and the Naval Air Station at Nowra.
Phase 3 seeks to acquire a fixed DATMCS for 11 ADF fixed air bases and a simulator for the SATC at RAAF Base East Sale.
Australian Industry Opportunities
Acquisition
The areas in which industry opportunities for Phase 1 are anticipated include:
> integration of the new deployable DATMCS with extant Air Traffic Management (ATM) systems, e.g. ADATS and the Australian Advanced Air Traffic System (AAATS); and
> test and evaluation.
The areas in which industry opportunities for Phase 2/3 are anticipated include:
> removal and disposal of existing systems;
> provision of new ATM systems;
> integration of the new systems with extant ATM systems, e.g. ADATS and the AAATS;
> development of appropriate training systems and maintenance staff and, if applicable, integration within extant simulation and/or training systems; and
> test and evaluation.
Through-life Support
The industry opportunities are expected around developing and maintaining sufficient capability within Australian industry to undertake the range of through-life maintenance and support activities necessary to sustain the system(s).
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
37
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 1 and 2/3 Capability
Activity
Air
Traf
fic
Con
trol
Sy
stem
Assemble / Install D
Design D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct O
Project Manage D
Systems Integration D
Test and Evaluate D
Acquisition Category (ACAT)Phase 1
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 2/3
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 $100m-$500m (Towards the upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 1Phase 2/3
FY 2010-11 to FY 2011-12FY 2010-11 to FY 2011-12
Year-of-Decision Phase 1Phase 2/3
FY 2012-13 to FY 2014-15FY 2011-12 to FY 2012-13
Initial Operating Capability Phase 1Phase 2/3
2014 to 20162013 to 2015
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 1 and 2/3 Staff Officer Battlespace
Management 3(02) 6266 7317
Director Project Development and Integration Surveillance and Control Branch(02) 6265 6291
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
38
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Communications, Navigation, Surveillance/Air Traffic ManagementAIR 5432
Phase Scope
This project aims to update ADF platforms and systems to ensure continued optimal use of civil and military airspace. In response to the plans for Australian adoption of the Automatic Dependent Surveillance – Broadcast (ADS-B) system for surveillance of en route air traffic, this phase will focus on the introduction of ADS-B which utilises Mode S. In parallel with this project JP 90 is being developed to update the ADF from Mode 4 Identification Friend or Foe (IFF) to Mode 5. Common transponders and interrogators can be used for both projects.
Background
International advances in Air Traffic Management (ATM) systems will necessitate near and long-term updates to ADF platforms and surveillance systems. The advances affect communications, navigation and surveillance systems within airborne platforms and ground surveillance and control systems.
ADS-B is one of the technology elements of the future Airspace Management landscape which has a clear schedule for introduction. The ADF has agreed to aim for ADS-B compliance for all military aircraft by 2018.
Future phases of this project are expected to address other aspects of ATM technology.
Australian Industry Opportunities
Acquisition
The requirements are anticipated to include initially undertaking a project definition study. Australian industry involvement is likely to include complex integration of new systems procured from overseas, with a range of existing sensor and data systems, along with associated test and evaluation.
Phase 1 is focused on the introduction of Mode S and ADS-B to ADF airborne platforms. This activity will be conducted in conjunction with the introduction of Mode 5 IFF under JP 90 Phase 1.
Through-life Support
The industry involvement is expected to be based around developing and maintaining sufficient capability within Australian industry to undertake the through-life maintenance and support activities associated with the components and systems introduced into service by this project.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Com
mun
icat
ions
Sy
stem
s (A
ir
Traf
fic C
ontr
ol –
IF
F M
odes
)
Assemble / Install D
Design D
Project Manage D
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
39
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the upper end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2012-13 to FY 2014-15Year-of-Decision FY 2014-15 to FY 2016-17Initial Operating Capability 2018 to 2020
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Battlespace Management 2(02) 6265 7530
Director Project Development and Integration Surveillance and Control Branch(02) 6265 6291
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
40
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1A Lead-In Fighter Capability Assurance ProgramAIR 5438
Phase Scope
This phase is intended to ensure the Lead-In Fighter Training System (LIFTS) remains effective, efficient and supportable until the Hawk planned withdrawal date. Capability improvements and obsolescence mitigation will be harmonised to the greatest possible extent, resulting in an affordable, high quality training system which can adapt to meet future ‘fast-jet’ training requirements.
Background
The LIFTS, comprising the Hawk Mk 127 and ground based training support equipment, including flight simulators, will be upgraded to address identified obsolescence issues and provide capability enhancements. A number of project definition activities will be undertaken to scope obsolescence mitigation and capability requirements, including the associated engineering effort, schedule implications, cost and risk.
Australian Industry Opportunities
Acquisition
The acquisition approach for the aircraft modification has yet to be determined, but the project intends to procure an essentially ‘off-the-shelf’ solution with minimal non-recurring expenditure (NRE), technical risk and certification overheads. Military- or Commercial-off-the-Shelf (MOTS or COTS) components will be utilised wherever practical.
The simulator component is likely to be competed between manufacturers who are able to provide solutions with minimal NRE.
Through-life Support
The industry requirements will be based around developing and maintaining sufficient capability within Australian industry to undertake through-life maintenance and support activities associated with the systems introduced into service by this project.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Rot
ary
& F
ixed
W
ing
Airc
raft
Syst
em
Life
Cyc
le
Man
agem
ent
Faci
litie
s &
In
fras
truc
ture
Assemble / Install D D
Education / Training D
In-Service / Through-life Support D D
Logistics Support D
Repair and Maintain D
Systems Integration D
Test and Evaluate O
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
41
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11 Year-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2015 to 2017
Point of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Firepower(02) 6265 5568
Director Lead-In Fighter Management Unit(02) 4928 6906
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
42
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 C-130J Block Upgrade Program 7.0Phase 2 C-130J Block Upgrade Program 8.0AIR 5440
Phase Scope
This project consists of a number of phases each of which will constitute the respective Block Upgrades to the C-130J Hercules. The scope of each phase is likely to contain elements of software and system reliability and maintainability, technology refresh, technology obsolescence, and new capability. The final composition of each phase is intended to be determined collaboratively between all C-130J user nations and take into account the respective national priorities.
Background
The C-130J Hercules features software and hardware systems and functionality which require regular upgrades throughout the life of the aircraft. Accordingly, C-130J users need to, as a minimum, combat obsolescence and maintain reliability and maintainability of systems through regular upgrades to their respective C-130J fleets. The C-130J Block Upgrade Program (BUP) was set up by the international users to manage these upgrades in an effective and efficient manner. The C-130J BUP is managed by the C-130J Joint User Group (JUG) in conjunction with the original equipment manufacturer, Lockheed Martin (LM Aero). The scope of each Block Upgrade is collaboratively established by the joint user community (seven nations) and consists of five key elements being; requirements definition, design development, modification development and acquisition, national installation and through-life support arrangements.
Australian Industry Opportunities
Acquisition
There is limited scope for Australian industry involvement in the Block Upgrades. There is no scope within the design development and modification development elements of the project because of ongoing arrangements with other C-130J users and LM Aero, and also because the method of procurement and contracting will be through the US Foreign Military Sales process.
Through-life Support
The national installation and the through-life support (TLS) element of the project will be undertaken as Australian unique activities and will require Australian industry participation. Australian industry participation is expected to continue throughout future phases.
Industry capabilities and activities for Phase 1 will involve installing the tested and certified Block 7.0 Upgrade package onto the C-130J fleet and providing TLS for the Block 7.0 life-of-type. These activities will be undertaken using extant C-130J support contracts, and will include:
> changes to the supply support systems – codification, identification and acceptance of assets;
> assistance with the engineering effort to augment the project team’s resources during the test, design acceptance and certification activities;
> development and incorporation of the changes to the full-flight simulator;
> upgrade to the other training systems and training courseware and material; and
> in-service support.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
43
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 1 and 2 Capability
Activity
Rot
ary
&
Fixe
d W
ing
Airc
raft
In-Service / Through-life Support D
Logistics Support D
Modelling / Simulation O
Repair and Maintain D
Test and Evaluate O
Acquisition Category (ACAT)Phases 1 and 2
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band) (for each phase)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for each of these Phases is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 1Phase 2
FY 2009-10 to FY 2010-11FY 2012-13 to FY 2014-15
Year-of-Decision Phase 1Phase 2
FY 2009-10 to FY 2010-11FY 2012-13 to FY 2014-15
Initial Operating Capability Phase 1Phase 2
2012 to 20142015 to 2017
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 1 and 2 Deputy Director Combat Mobility
(02) 6265 1073Project Director AIR 5440Airlift Systems Program Office(02) 4588 1165
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
44
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 2A/2B New Air Combat Capability – 3 Squadrons Phase 3 Weapons for New Air Combat CapabilityPhase 5 Future Air-to-Air Weapons for New AirCombat Capability and Super HornetAIR 6000
Phase Scope
Phase 2A/2B for the New Air Combat Capability (NACC) will acquire three operational squadrons and a training unit of F-35 Joint Strike Fighter (JSF) combat aircraft for the RAAF to replace F/A-18A/B Hornets as they are withdrawn from service. Initially the JSF aircraft will be complemented by one squadron of F/A-18F Super Hornets.
Phase 3 intends to acquire reserve stock holdings of the air-to-ground weapons, including 25 mm gun ammunition, and electronic warfare expendables for use on the JSF aircraft.
Phase 5 intends to acquire reserve and training stock holdings of the future air-to-air weapons for theJSF aircraft and F/A-18F Super Hornets.
Background
In the 2009 Defence White Paper the Australian Government announced that it would acquire F35 JSF, along with supporting systems and weapons, as the new air combat capability platform for the RAAF. This decision was based on extensive previous engagement in the JSF Program, including:
> In October 2002 Australia was the eighth (and last) country to join the System Development and Demonstration (SDD) phase of the JSF Program.
> In December 2006 Australia entered the next stage of the JSF Program by signing the multilateral Production, Sustainment and Follow-On Development (PSFD) Memorandum of Understanding (MoU). (All the original SDD partners have signed the PSFD MoU.)
> The JSF is still in the developmental and test phase; however, the Australian Government has made a decision on purchasing the JSF because of confidence that the JSF will be capable of delivering the capability promised, and that the capability will be delivered on time and within budget.
AIR 6000 Phase 1B (approved) undertook a program of detailed definition and analysis activities necessary to provide Government with the information to support Phase 2 approval.
AIR 6000 Phase 2A/2B is the acquisition phase for three operational squadrons, comprising of not fewer than 72 aircraft, to fulfill the functions of air dominance and strike currently provided by the ADF’s F/A 18A/B and F-111 aircraft.
As indicated in the 2009 Defence White Paper, an additional acquisition phase (Phase 2C) is intended to acquire a fourth squadron of JSF aircraft in conjunction with the withdrawal of the F/A-18F Super Hornet to bring the total number of JSFs to around 100. This is expected to be programmed in subsequent DCPs.
A critical component of an air combat system is advanced weaponry that can prosecute a full range of targets and threats. Phase 2 will also certify and acquire the initial inventory of weapons, ammunition and countermeasures for the JSF. Phases 3 and 5 are intended to provide the weapons stocks necessary for air-to-air and air-to-surface roles. Provision for a new maritime strike weapon, as identified in the 2009 White Paper, is expected to be programmed in subsequent DCPs.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
45
Australian Industry Opportunities
Acquisition
A key aim of Australia’s involvement in the JSF Program is to embed Australian industry in the JSF global supply and support chain for the life of the JSF project under the program’s ‘Best Value’ model. ‘Best Value’ is determined by the prime contractors through international competition. JSF production commenced with the initial development of 19 aircraft or ‘test articles’ in which Australian industry won design and manufacturing contracts. Low rate initial production (2007 to 2015) of some 550 aircraft is now underway. Full rate production is scheduled to increase the numbers of JSF to over 3000 throughout the next 20 years. The production phase provides major manufacturing opportunities for internationally competitive Australian companies.
Through-life Support
Through-life support of the global JSF fleet will be provided by Lockheed Martin Corporation and the two engine manufacturers under the JSF Autonomic Logistics Global Sustainment (ALGS) system using a performance-based logistics approach.
Australian industry will continue to play a key role in supporting our combat aircraft. Defence will, however, be aiming to achieve maximum cost effectiveness in sustainment by balancing the need to meet defence self-reliance requirements with the expected cost benefits of the global ALGS system. Australian industry will also have the opportunity to participate in the global system on a best value basis, including for other JSF aircraft operating in the region. Defence and the Department of Innovation, Industry, Science and Research (DIISR) will continue to work with Australian industry and the JSF prime contractors to maximise opportunities for Australian industry as part of the global system.
Specific areas for Australian industry support of the Australian JSF fleet would be expected to include ALGS coordination, deeper maintenance, signature maintenance, training, simulation, supply chain management, engine maintenance, prognostics and health management, and provision and maintenance of support equipment.
Through-life support is also required for weapons delivered through Phases 3 and 5 and, in future, a new maritime strike weapon. Industry requirements will be based around developing and maintaining sufficient capability to undertake the necessary through-life support activities within Australia. Opportunities may also exist to induct an Australian Explosive Ordnance manufacturing capability into the JSF global supply chain.
Follow-on Development
The JSF PSFD MoU incorporates a two-yearly follow-on development program for the JSF. In the development phase of these upgrades, Australian industry would have the opportunity to compete for development, production and sustainment of future capabilities.
Defence and DIISR will work with selected Australian universities, research and development organisations and industry to maximise the opportunities for Australian industry to contribute to JSF future technology refreshes, block upgrades, or to improve JSF manufacturing processes.
Industry Capabilities and Activities
For Australia’s involvement in the JSF Program, Defence and DIISR are working with Australian industry as ‘JSF Team Australia’ to help companies enter and remain in the JSF global supply chain. Industrial Participation Plans that open up major opportunities in the global JSF Program for qualified Australian companies have been agreed with Lockheed Martin Corporation and the two JSF engine manufacturers. This participation process will continue over the life of Australia’s involvement in the JSF Program.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
46
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 2A/2B Capability
Activity
Acou
stic
Tec
hnol
ogie
s &
Sys
tem
s
Com
bat C
loth
ing
& P
erso
nal E
quip
men
t
Com
mun
icat
ions
Sec
urity
Com
posi
te &
Exo
tic M
ater
ial
Elec
tron
ic W
arfa
re
Gui
ded
Wea
pons
Pro
tect
ion
of N
etw
orks
, Com
pute
rs &
Info
rmat
ion
Rot
ary
& F
ixed
Win
g Ai
rcra
ft
Sele
cted
Bal
listic
Mun
ition
s &
Exp
losi
ves
Sign
atur
e M
anag
emen
t
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em A
ssur
ance
Cap
abili
ties
(H’w
are
& S
’war
e)
Targ
etin
g An
d P
reci
sion
Nav
igat
ion
Faci
litie
s &
Infr
astr
uctu
re
Mis
sion
Sys
tem
s an
d Av
ioni
cs
Vehi
cle
Syst
ems
Airf
ram
e &
Pro
puls
ion
syst
em
Assemble / Install D D D D D
Design D O D D D
Education / Training D D D D D D
In-Service / Through-life Support
D D D D D O D D D
Logistics Support D D D D D D
Manufacture / Construct D D D D D D D D D D
Modelling / Simulation D D
Project Manage D D
Refurbish / Upgrade D D D D D D D
Repair and Maintain D O D D D D D D D D D D D
Research and Development
O D O D D D D D
Software Development / Support
D D O
Systems Definition / Development
Systems Integration D D
Test and Evaluate D O D D D D D D D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
47
Phase 3 Capability
Activity
Gui
ded
Wea
pons
Sele
cted
B
allis
tic
Mun
ition
s &
Ex
plos
ives
Assemble / Install D
Design D
In-Service / Through-life Support D D
Logistics Support D D
Manufacture / Construct D
Modelling / Simulation D
Project Manage D D
Research and Development D
Software Development / Support D
Systems Integration D
Test and Evaluate D D
Phase 5 Capability
Activity
Gui
ded
Wea
pons
In-Service / Through-life Support D
Logistics Support D
Project Manage D
Acquisition Category (ACAT)
Phase 2A/2B
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 1 Very High >$1500m
Project Management Complexity Level 1 Very High
Schedule Level 1 Very High
Technical Difficulty Level 1 Very High
Operation and Support Level 1 Very High
Commercial Level 1 Very High
The ACAT Level assessed for this Phase is ACAT I.
Phase 3
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m-$1500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
48
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 5
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m–$1500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 2A/2BPhases 3 and 5
CompleteFY 2012-13 to FY 2014-15
Year-of-Decision Phase 2A/2BPhases 3 and 5
FY 2009-10 to FY 2010-11FY 2014-15 to FY 2016-17
Initial Operating Capability Phase 2A/2BPhase 3Phase 5
2017 to 20192018 to 20202017 to 2019
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phase 2A/2B Program Manager
New Air Combat Capability(02) 6127 0001
Director CommercialNew Air Combat Capability(02) 6127 0086
Phases 3 and 5 Deputy Director Combat EnablersAerospace Development Branch(02) 6265 5442
Director Emerging ProjectsGuided Weapons Branch(02) 6265 1464
Project Website:
www.defence.gov.au/dmo/lsp/joint%20Strike%20Fighter%20(JSF.cfm
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
49
Phase 2B Maritime Patrol Aircraft Replacement AIR 7000
Phase Scope
This phase is intended to acquire a replacement manned aircraft for the AP-3C Orion, capable of Maritime Intelligence, Surveillance, Reconnaissance and Response (MISRR) roles, overland Intelligence, Surveillance, Reconnaissance (ISR), and Electronic Support (ES).
Background
AP-3C Orion life-of-type is dependant upon ongoing airframe fatigue and corrosion, aircraft system supportability and mission system obsolescence. Specifically, aircraft engines, hydraulics, electrical, oxygen and fuel systems are increasingly costly to support as the platform ages. Although limited mission system obsolescence treatments provided by Project AIR 5276 will assist in facilitating a 2018-19 AP-3C planned withdrawal date, further preclusively costly airframe, aircraft and mission system upgrades would be required to operate the AP-3C post-2018.
This project will replace the AP-3C after taking future ADF MISRR requirements into consideration. This consideration will include the exploration of a broad range of options including manned aircraft replacement, and the use of a Multi-mission Unmanned Aerial System (MUAS) as an adjunct to the manned platform. While this project is focussed on acquisition of a capability centred on MISRR roles, the capability will also support ES and overland ISR roles.
Australian Industry Opportunities
Acquisition
This phase will acquire eight Military-off-the-Shelf (MOTS) Maritime Patrol and Response Aircraft (MPRA) through a government-to-government cooperative program. The areas of anticipated Australian industry involvement opportunities are:
> integration of the ground mission support system to the Defence Information Environment; and
> sub-contractor support and supply of components for the MPRA program.
Through-life Support
Through-life support of MPRA will most likely be through an ongoing sustainment arrangement established through a government-to-government arrangement. There would be opportunity for Australian industry to be part of the MRPA global support system.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
50
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Acou
stic
Tec
hnol
ogie
s &
Sys
tem
s
Com
posi
te &
Exo
tic
Mat
eria
ls
Elec
tron
ic W
arfa
re
Rot
ary
& F
ixed
Win
g Ai
rcra
ft
Supp
ort o
f Mis
sion
&
Safe
ty C
ritic
al S
oftw
are
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’
war
e)
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Faci
litie
s &
Infr
astr
uctu
re
Assemble / Install O O O O D D
Design O D O O D D
Education / Training D
In-Service / Through-life Support O D D D O O D
Logistics Support D D D O O D
Manufacture / Construct D D O O D D
Modelling / Simulation D D D
Project Manage O O D
Refurbish / Upgrade D D D D O O D D
Repair and Maintain D D D D O O D D
Research and Development O O
Software Development / Support O D D O O D
Systems Definition / Development O D
Systems Integration D D O O D
Test and Evaluate D D O O D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 1 Very High >$1500m
Project Management Complexity Level 2 High
Schedule Level 1 Very High
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT II.
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2017 to 2019
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Maritime Patrol and Response(02) 6265 3852
Project Manager AIR 7000 Phase 2B (02) 6265 1628
Project Website:www.defence.gov.au/dmo/asd/air7000/air7000.cfm
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
51
Phase 1 Battlefield Airlift - Additional C-130JPhase 2 Battlefield Airlift - Caribou Replacement AIR 8000
Phase Scope
Phase 1 is intended to rationalise the capability delivered by the C-130 fleet.
Phase 2 is intended to replace the RAAF DHC-4 Caribou transport aircraft to provide a light tactical fixed wing airlift capability.
Background
Phase 1 is intended to rationalise the C-130 fleet, noting the acquisition of C 17 and planned withdrawal of C-130H aircraft by acquiring an additional two C-130J aircraft.
Phase 2 is intended to enhance the ADF’s intra-theatre and regional airlift capability. This capability will focus on the provision of an intra-theatre airlift solution with some inter-theatre application. This capability will be able to operate from a wide range of rudimentary airstrips with useful payload, range and in-theatre survivability. Phase 2 may also provide appropriate training support, which could include the provision of a Full Flight Simulator. Notably, the capability will require careful consideration of the interaction between rotary-wing assets and light / medium fixed wing platforms in the tactical environment and the total airlift fleet mix.
Australian Industry Opportunities
Acquisition
For Phase 1 it is anticipated that the additional C-130J will be sourced from the original equipment manufacturer with few Australian industry opportunities.
For Phase 2 it is anticipated that a Military-off-the-Shelf (MOTS) light tactical fixed wing airlift capability will be sourced from an original equipment manufacturer or through government-to-government (Foreign Military Sales) arrangements with few Australian industry opportunities.
Through-life Support
Deeper maintenance and other through-life support activities are likely to be provided under contracts within Australia.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 1 Capability
Activity
Rot
ary
&
Fixe
d W
ing
Airc
raft
Assemble / Install O
In-Service / Through-life Support D
Logistics Support D
Repair and Maintain D
Test and Evaluate O
Phase 2 Capability
Activity
Rot
ary
&
Fixe
d W
ing
Airc
raft
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Repair and Maintain D
Test and Evaluate O
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
52
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
Phase 1
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m-$1500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Phase 2
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 1 Very High >$1500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT II.
Planned Schedule Highlights
First Pass Approval Phase 1Phase 2
FY 2009-10 to FY 2010-11 FY 2010-11 to FY 2011-12
Year-of-Decision Phase 1Phase 2
FY 2011-12 to FY 2012-13FY 2012-13 to FY 2014-15
Initial Operating Capability Phase 1Phase 2
2013 to 20152014 to 2016
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 1 and 2 Deputy Director Combat Mobility
(02) 6265 1073Director New Airlift Program Office(02) 6127 2614
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
53
AIR 9000Overview
Background
Project AIR 9000 seeks to provide the ADF with the most appropriate force mix of helicopters. Fundamental to this is a strategic plan for the efficient management of all ADF helicopter fleets, in order to meet operational requirements in a range of roles (airmobile, armed reconnaissance, medium lift, maritime support, anti-submarine, anti-surface warfare, training and support to special forces).
To achieve its aim, Project AIR 9000 has been broken down into a number of phases:
> Phase 1 (ongoing) is the continuation of the ADF Helicopter Strategic Master Plan Development and Program Management;
> Phase 2 (in progress) is the acquisition of Additional Troop-Lift Helicopters (MRH-90);
> SCAP 1 and 2 is providing a Seahawk Capability Assurance Program;
> Phase 4 (in progress) is the Black Hawk Replacement (with MRH-90);
> Phase 5 is the Chinook upgrade/replacement with Phase 5A (Early Engine Upgrade) complete and Phase 5C seeking to replace the current D-Model fleet with F-Models;
> Phase 6 (approved) is the Maritime Support Helicopter Replacement (with MRH-90);
> Phase 7 is the new Helicopter Aircrew Training System; and
> Phase 8 is to provide at least 24 new Anti-Submarine Warfare/Anti-Surface Warfare Helicopters.
A key part of efficiently managing the ADF’s helicopter fleets is the rationalisation of types where this is appropriate, efficient and operationally effective. In 2009 there are nine helicopter types in or entering ADF service (Kiowa, Iroquois, Black Hawk, Chinook, Tiger, MRH-90, Squirrel, Sea King and Seahawk). The ADF Helicopter Strategic Master Plan intends to reduce the number of helicopter types to realise synergies and efficiencies across personnel, tools, spares, training and facilities. Future ADF Helicopter Strategic Master Plan development will provide a contemporary and contextual basis to developing the ADF helicopter capability over the next 15 years.
Project AIR 9000 also seeks to engage Australian industry in developing a regional sustainable aerospace industrial base that can provide high levels of support to the ADF, regional support opportunities, and compete as part of the global supply chain.
Points of Contact
Capability Staff: Defence Materiel Organisation:Director Training and Rotary Wing Development(02) 6265 4301
Business DirectorHelicopter Systems Division (02) 6265 2950
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
54
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 5C Additional Heavy Lift HelicopterAIR 9000
Phase Scope
Phase 5C will replace the Australian Army’s current fleet of six CH-47D Chinook helicopters with seven CH-47F Chinook helicopters and associated Transportable Flight Proficiency Simulators.
Background
Previously Phase 5 intended to address current and future capability deficiencies in the Chinook weapon system. Previous sub-phases included:
> Phase 5A (complete) which replaced the engines in the ADF CH-47D Chinook. The new engines have improved performance and lowered operating costs, as well as providing commonality with the US Army CH-47D configuration;
> Phase 5C (first pass approval 13 September 2007) intended to acquire three additional CH-47F Chinook helicopters; and
> Phase 5B intended to upgrade the extant ADF CH-47D fleet to the same configuration as Phase 5C, that is CH-47F. The previously planned combined outcome of the previous Phases 5C and 5B was a homogenous fleet of CH-47F Chinook helicopters.
The new Phase 5C combines the objectives of the previous Phases 5C and 5B under a single project. The new Phase 5C ensures that the ADF has a viable future Chinook helicopter capability which is aligned to the US Army configuration and support systems throughout its life-of-type.
Australian Industry Opportunities
Acquisition
Phase 5C intends to acquire CH-47F Chinook helicopters from the US Army through a Foreign Military Sales acquisition. There are opportunities for Australian industry involvement through:
> design and fitment of additional mission equipment to the CH-47F aircraft once they are delivered to Australia;
> management, construction and maintenance of facilities to be built at Townsville;
> provision of support to the Transportable Flight Proficiency Simulators; and
> provision of contracted support to the DMO Cargo Helicopter Project Office from 2010.
Through-life Support
It is anticipated that, in the same approach as the CH-47D capability, unit-level maintenance could be carried out by Army personnel while deeper maintenance and other support will be contracted to Australian industry. The CH-47D Deeper Maintenance Request for Tender will be released later in 2009 for work commencing in 2010. The scope of this Request for Tender may also include CH-47F deeper maintenance from 2015 onwards.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
55
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Elec
tron
ic W
arfa
re
Rot
ary
& F
ixed
W
ing
Airc
raft
Supp
ort o
f Mis
sion
&
Saf
ety
Cri
tical
So
ftw
are
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’w
are)
Faci
litie
s &
In
fras
truc
ture
Assemble / Install O
Design D D
In-Service / Through-life Support O D D D D
Logistics Support O D
Manufacture / Construct O D
Modelling / Simulation O
Project Manage D
Repair and Maintain D D D D
Research and Development O
Software Development / Support D D D
Test and Evaluate O O
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m-$1500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2010-11 to FY 2011-12Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Army Aviation 5(02) 6265 6435
Project Manager AIR 9000 Phase 5C(02) 6265 6611
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
56
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 7 Helicopter Aircrew Training SystemAIR 9000
Phase Scope
Phase 7, the Helicopter Aircrew Training System (HATS) is intended to provide a rotary wing training capability for Navy and Army, to meet the future rotary wing training needs of the ADF. The project aims to deliver a system that encompasses elements of live, synthetic and classroom aviation instruction, to overcome the broadening gap between the current rotary training systems and the advanced operational helicopters in the current and planned future ADF inventories. There are a broad range of options under consideration which could involve a direct capital acquisition or privately financed lease, or elements of both.
Background
Initially, an improved rotary wing training capability was to be provided under two projects – Phase 7A for Navy and Phase 7B for Army. Under the AIR 9000 rationalisation programme these projects were combined to form a joint training system.
Australian Industry Opportunities
Acquisition
The helicopters are likely to be Commercial- or Military-off-the-Shelf (COTS or MOTS). There is potential for Australian industry involvement in assembly of the aircraft and the development of the training system. The training system potentially includes an Aviation Training Vessel which would have significant potential for Australian industry involvement in design and construction.
Environmental Working Groups and industry briefing sessions have been conducted and more are planned to coincide with significant milestones moving toward second pass approval. Adequate notice of these events will be promulgated by Defence.
Through-life Support
Through-life support for the HATS will include, but not be limited to, the ongoing operation, maintenance and support of the HATS aircraft, potentially an Aviation Training Vessel, simulation and training systems and devices, and all associated facilities. These activities are intended to be conducted in Australia.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
57
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Com
mun
icat
ions
Sec
urity
Com
posi
te &
Exo
tic M
ater
ials
Rot
ary
& F
ixed
Win
g Ai
rcra
ft
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Surf
ace
Nav
al V
esse
ls
Syst
em A
ssur
ance
Cap
abili
ties
(H’w
are
& S
’war
e)
Syst
em L
ife C
ycle
Man
agem
ent
Syst
ems
Inte
grat
ion
(Hig
h En
d,
Syst
em o
f Sys
tem
s)
Targ
etin
g &
Pre
cisi
on N
avig
atio
n
Faci
litie
s &
Infr
astr
uctu
re
Trai
ning
Aid
s &
Sol
utio
ns
Sim
ulat
ion
Sens
or S
yste
ms
Assemble / Install O O O O O O O O
Design O O O O O O O
Education / Training O O O O O O O O
In-Service / Through-life Support O O O O O O O O O O O O O
Logistics Support O O O O O O O O O O O O O
Manufacture / Construct O O O O O O O O O O O
Modelling / Simulation O O O O O O O
Project Manage O O O O O O O O O O O
Refurbish / Upgrade O O O O O O O O O O O
Repair and Maintain O O O O O O O O O O O O O
Research and Development O O O O O
Software Development / Support O O O O O O O O
Systems Definition / Development O O O O O O O O O
Systems Integration O O O O O O O O O O O O
Test and Evaluate O O O O O O O O O O O O O
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m–$1500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3Moderate
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Maritime Aviation(02) 6265 6435
Project Manager AIR 9000 Phase 7 (02) 4424 1676
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
58
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 8 Future Naval Aviation Combat SystemAIR 9000
Scope
This phase is intended to provide an organic combat aviation capability to Navy’s surface combatant fleet. This includes the acquisition of multi-role naval combat helicopters, weapons, synthetic training, infrastructure, logistics and other support systems.
Background
The Navy’s current tactical helicopter capability is provided by the Seahawk S-70B-2. A surface warfare strike capability was to have been provided by the cancelled Seasprite program. The White Paper indicated that as a matter of urgency the Government would acquire at least 24 new naval combat helicopters. The new aircraft will possess advanced anti-submarine warfare capabilities along with an ability to fire air-to-surface missiles.
Australian Industry Opportunities
Acquisition
In order to minimise technical, schedule, and financial risks it is envisaged that a Military-off-the-Shelf (MOTS) solution will be sourced from overseas. There may be some opportunity for Australian industry in aircraft assembly, and development of some support systems.
Through-life Support
The retention of an off-the-shelf configuration is considered important for cost effective Australian based deeper level maintenance, engineering and through-life support.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Acou
stic
Tec
hnol
ogie
s &
Sys
tem
s
AEW
&C
Sys
tem
s
Com
mun
icat
ions
Sec
urity
Com
posi
te &
Exo
tic M
ater
ials
Elec
tron
ic W
arfa
re
Gui
ded
Wea
pons
Rot
ary
& F
ixed
Win
g Ai
rcra
ft
Sele
cted
Bal
listic
Mun
ition
s &
Exp
losi
ves
Sign
atur
e M
anag
emen
t
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em L
ife C
ycle
Man
agem
ent
Targ
etin
g &
Pre
cisi
on N
avig
atio
n
Assemble / Install D D D
Education / Training D D D D D D D D D O D
In-Service / Through-life Support D D D D D D D D O D O D
Logistics Support D D D D D D D D O D
Manufacture / Construct D
Modelling / Simulation D D D D D D O D
Project Manage D D D D D D D D D O D
Refurbish / Upgrade D D D D D D D D D
Repair and Maintain D D D D D D D D D
Research and Development O O O O O O O O O
Test and Evaluate O O O O O O O O D O
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
59
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 1 Very High> $1500m
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 1 Very High
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT II.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11Year-of-Decision FY 2010-11 to FY 2011-12Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Maritime Aviation(02) 6265 6435
Director Emerging Aerospace Projects(02) 6265 6298
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
60
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
SCAP1 Seahawk Capability Assurance Program 1SCAP2 Seahawk Capability Assurance Program 2AIR 9000
Phase Scope
SCAP1 is to address immediate Seahawk obsolescence issues including Tactical Display Units, Engine Control Units, Automatic Flight Control System, Identification Friend or Foe (IFF) and the Mission System Simulator.
SCAP2 seeks to address Seahawk obsolescence beyond the scope of SCAP 1 until the aircraft’s withdrawal from service. SCAP 2 primarily addresses replacement of the Seahawk’s main mission computer, the Display Generator Unit.
Background
The future management of Seahawk capability was originally to be provided under AIR 9000 Phase 3 as the Seahawk Mid-life Upgrade and Extension. The strategy for maintaining Seahawk capability until the transition to AIR 9000 Phase 8 is now focused on maximising the number of aircraft available for operations by undertaking a lower risk program that only addresses obsolescence without capability enhancements. SCAP 1 is the first phase of this program designed to address immediate obsolescence. SCAP 2 is the second phase of this program that addresses obsolescence issues not covered under SCAP 1.
Australian Industry Opportunities
Acquisition
It is anticipated that the components will be sourced from specialist original equipment manufacturers in Australia or overseas, and fitted in the aircraft in Australia.
Through-life Support
Deeper level maintenance and through-life support is intended to be conducted in Australia and overseas under the Seahawk support arrangements.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
SCAP 1 Capability
Activity
Com
mun
icat
ions
Se
curi
ty
Rot
ary
& F
ixed
W
ing
Airc
raft
Assemble / Install D
Education / Training D
In-Service / Through-life Support D D
Logistics Support D
Modelling / Simulation D
Project Manage D
Repair and Maintain D
Software Development / Support D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
61
SCAP 2 Capability
Activity
Rot
ary
& F
ixed
W
ing
Airc
raft
Supp
ort o
f M
issi
on &
Sa
fety
Cri
tical
So
ftw
are
Assemble / Install D
Education / Training D
In-Service / Through-life Support D D
Logistics Support D
Project Manage D D
Refurbish / Upgrade D
Repair and Maintain D
Software Development / Support D D
Systems Integration D
Test and Evaluate D
Acquisition Category (ACAT)
SCAP 1 and SCAP 2
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band) (for each phase)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 2 High
The ACAT Level assessed for each of these Phases is ACAT III.
Planned Schedule Highlights
First Pass Approval SCAP1SCAP2
CompleteFY 2010-11 to FY 2011-12
Year-of-Decision SCAP1SCAP2
FY 2009-10 to FY 2010-11FY 2010-11 to FY 2011-12
Initial Operating Capability SCAP1SCAP2
2010 to 20122012 to 2014
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:SCAP 1 and 2 Deputy Director Maritime Aviation
(02) 6265 6435Manager Seahawk Capability Assurance Program (02) 4424 3349
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
62
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 4 Joint Intelligence Support SystemDEF 7013
Phase Scope
This phase is intended to provide for further development and evolution of the Joint Intelligence Support System (JISS) for the support of the Australian Defence Intelligence Community. Phase 4 takes greater cognisance of the ADF’s migration towards networked operations and the increased demands on Defence intelligence assets to perform effectively within shorter decision cycles. It provides similar functionality in multiple security domains and embraces service oriented architecture concepts.
Background
DEF 7013 is a multi-phased project that provides the ADF’s intelligence staff and units with specialised tools and access to shared databases and support applications networked between organisations that have an intelligence role at the strategic, operational and tactical levels of command. The system allows rapid acquisition of intelligence data from all sources, storage, fusion and transformation of data into value-added intelligence and the dissemination of that intelligence in a secure and timely manner to commanders, the command support systems that require it, and other decision makers.
Other phases include:
> Phase 1 (complete) delivered the initial network and high priority databases. It also evaluated a number of Government-off-the-Shelf databases;
> Phase 2 (complete) expanded JISS to a fully operational capability with the addition of a mature infrastructure, the development of information repositories and the evaluation of analytical tools;
> Phase 3A (complete) delivered a deployable capability for JISS; and
> Phase 3B (in progress) is extending JISS to the tactical level. It will provide a more mature deployable and transportable capability that further develops the system to support the intelligence community.
Australian Industry Opportunities
Acquisition
The acquisition prime contractor is likely to be an established Australian entity with experience and expertise in the field of knowledge exploitation. The selected prime contractor may enter into relationships with other companies (local or international), who can provide relevant solutions or expertise.
Through-life Support
Selected vendors will be required to commit to the ongoing support and enhancement of what is intended to be the key element of the future Defence Intelligence Information Environment.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
63
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em A
ssur
ance
Cap
abili
ties
(H’w
are
& S
’war
e)
Syst
em L
ife C
ycle
Man
agem
ent
Syst
ems
Inte
grat
ion
(Hig
h En
d,
Syst
em o
f Sys
tem
s)
Geo
spat
ial D
atab
ase
Syst
ems
Design D D D O
Education / Training D D
In-Service / Through-life Support D D D D D
Logistics Support D D D
Manufacture / Construct D
Modelling / Simulation D
Project Manage D D D D D D
Refurbish / Upgrade D
Repair and Maintain D
Software Development / Support D D D D O
Systems Definition / Development D D D D D
Systems Integration D D D D D
Test and Evaluate D D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Director Intelligence & Geospatial Development(02) 6265 3489
Director Military Geographic Information Systems Program Office(02) 6265 5268
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
64
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Replacement for Air Defence Targets JP 66
Phase Scope
This phase is intended to introduce a new air target system, to support operational training, and test and evaluation (T&E) of current and future air defence weapon systems.
Background
Current ADF air target capabilities have limited capacity to meet the ADF’s future training and T&E needs. This project aims to introduce a new Air Defence Target System (ADTS) through a service provision contract. The service provided to the Commonwealth is expected to consist of flights of physical targets capable of emulating specified threats, along with target launch, recovery and control systems, and any other required supporting services.
It is envisaged that target assets will be contractor owned, operated and maintained. Australian Government Furnished Materiel (AGFM) is expected to be limited to Australian Government Furnished Facilities (AGFF) at range areas and may, as an example, consist of target launch pads, basic utilities (power and water) and temporary Explosive Ordnance storage during ADTS presentations.
Due to the diverse range of ADF end-user requirements, it is anticipated that the target assets used may comprise of various types of Unmanned Aerial Target (UAT) otherwise referred to as target drones, and may also include the use of manned aircraft, with or without towed targets.
The Commonwealth does not intend to mandate any of the above target asset types or delivery methods.
The ADTS is intended to operate within the existing approved air defence training environment, for the purposes of end-to-end exercise of ADF air defence weapon systems up to and including on-occasion engagement of the target vehicle by live weapons.
The ADTS is expected to have a service life of 10 years.
Australian Industry Opportunities
Acquisition
The capability is to be provided through a service provision contract. The Commonwealth expects to conduct an open tender process in FY 2009-10 seeking responses from entities desiring to serve as a prime contractor to deliver the entire ADTS. The precise threat emulation characteristics to be supplied, rate of effort and date of commencement will be dependent upon a range of related projects, including the FFG Upgrade, Air Warfare Destroyer (AWD), Super Hornet and New Air Combat Capability (NACC).
Through-life Support
The Commonwealth seeks a ‘turnkey’ service providing aerial target presentations in line with an agreed annual schedule. All target assets are to be contractor owned, operated and maintained. All contracted logistic and facility support is to be within the scope of the single contract for services.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
65
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Com
posi
te &
Exo
tic
Mat
eria
ls
Rot
ary
& F
ixed
Win
g Ai
rcra
ft
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’
war
e)
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Targ
etin
g &
Pre
cisi
on
Nav
igat
ion
Faci
litie
s &
Infr
astr
uctu
re
Assemble / Install O O
Education / Training O
In-Service / Through-life Support O D D D D O D
Logistics Support O D O D O
Manufacture / Construct O O
Modelling / Simulation O
Project Manage D D D D D
Refurbish / Upgrade D
Repair and Maintain O D O
Research and Development O
Systems Integration O D O
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2010-11 to FY 2011-12Initial Operating Capability 2012 to 2014
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Future Strike Systems(02) 6265 5592
JP 66 Project Office(07) 5467 8165 [email protected]
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
66
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 ADF Identification Friend or FoeJP 90
Phase Scope
This project aims to update ADF platforms to comply with the Mark XIIA Identification Friend or Foe (IFF)standard. The project intends to focus on platforms that have an existing Mode 4 capability and newly delivered platforms which may not be Mode 5 compliant. In parallel with this project AIR 5432 is being developed in response to the plans for Australian adoption of Automatic Dependent Surveillance – Broadcast (ADS-B) for surveillance of en route air traffic (Mode S).
Background
The US and NATO nations have agreed to adopt the Mark XIIA standard by 2019. The IFF Mode 5 waveform, included in the Mark XIIA family, is the means through which sea and air platforms verify their identity to interrogating platforms.
Australian Industry Opportunities
Acquisition
It is expected that industry will focus on aspects that include:
> participation in and contribution to Project Development Studies (PDS) conducted by subject matter experts within Australian industry;
> design and development of any relevant support systems; and
> development and integration of Mode 5 IFF systems into ADF aircraft, ships and ground based units.
Through-life Support
Full through-life support is needed and more specific requirements are to be determined by the PDS for each type of equipment identified. Specific support arrangements are to be assessed on a case-by-case basis as purchasing occurs.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Com
mun
icat
ion
Syst
ems
(Air
Tra
ffic
C
ontr
ol –
IFF
Mod
es)
Assemble / Install D
Design D
Project Manage D
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
67
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Battlespace Management 2(02) 6265 7530
Navigation Warfare Engineer 1Navigation Warfare Systems Program Office(02) 6265 7798
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
68
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 4 Tier 1 Unmanned Aerial Vehicle (UAV)JP 129
Scope
This phase is intended to provide organic Intelligence, Surveillance and Reconnaissance (ISR) support for primarily land force operations through the acquisition of small (Tier 1) Unmanned Aerial Systems (UAS).
Background
Phase 4 intends to provide an ongoing organic ISR capability for land force operations, as well as provision of a system that can be operated from or within confined areas (such as in urban environments). The small UAS to be acquired under Phase 4 are intended to provide units with enhanced situational awareness and increased force protection. The Australian Army currently operates the Elbit Skylark UAS. These were acquired as an interim solution and were not intended to provide an ongoing capability.
At present, it is intended to acquire non-developmental systems based on proven designs. The small UAS is expected to have a service life of 10 years.
Australian Industry Opportunities
Acquisition
It is anticipated that Australian industry will have the opportunity to enhance or upgrade the UAS, and potentially have the opportunity to team with foreign suppliers to implement the small UAS.
Through-life Support
It is anticipated that Australian industry will have involvement with the through-life support aspects of the ADF tactical and small UAS.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Com
posi
te &
Exo
tic
Mat
eria
ls
Rot
ary
& F
ixed
Win
g Ai
rcra
ft
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Targ
etin
g &
Pre
cisi
on
Nav
igat
ion
Faci
litie
s &
Infr
astr
uctu
re
Assemble / Install D D
Design D
Education / Training D D
In-Service / Through-life Support D D O D
Logistics Support D D D
Manufacture / Construct O D
Modelling / Simulation D O O
Project Manage D
Refurbish / Upgrade D D
Repair and Maintain D D
Software Development / Support D D O
Systems Integration D O O O
Test and Evaluate D D O
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
69
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the upper end of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Unmanned Aerial Systems 2(02) 6265 2386
Directorate of Emerging Aerospace Projects(02) 6265 6298
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
70
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Joint Counter Improvised Explosive DevicePhase 2 Joint Counter Improvised Explosive DeviceJP 154
Phase Scope
Phase 1 is intended to introduce the core Electronic Warfare (EW) operational, engineering, maintenance, supply and training support systems for the ADF Force Protection Electronic Countermeasures (FP-ECM) capability and provide a technology refresh of the range of ADF Counter Improvised Explosive Device (CIED) systems.
Phase 2 is intended to encompass a further technology refresh of CIED mission and support systems to ensure that the ADF’s FP-ECM capability remains contemporary against the Improvised Explosive Device (IED) threats. Phase 2 also intends to introduce new IED detection equipment and establish a weapons technical intelligence capability to enhance CIED systems’ effectiveness.
Background
The ADF’s CIED capability encompasses a range of systems and measures to mitigate or defeat the effects of an adversary’s use of IEDs. This project aims to develop those systems and measures in accordance with strategic priorities while remaining sufficiently flexible to respond to unpredictable changes in the threat environment and take advantage of technological advances.
First pass approval for Phase 1 was achieved in December 2008. Approval was given to investigate options to update the existing ADF CIED systems, and progress toward the establishment of an indigenous capability that would allow the ADF to counter the IED threat when operating as a lead nation or independently, without reliance on data from Australian allies. Phase 1 has been structured to provide an acquisition framework that later phases can build upon while retaining sufficient flexibility to respond to the rapidly evolving IED threat.
Australian Industry Opportunities
Acquisition
Phase 1 is focused on capability delivery for current operations. As such, it is anticipated that the majority of the primary mission systems will be Military-off-the-Shelf (MOTS) acquired from coalition partners. Australian industry opportunities may include vehicle integration, test and evaluation, software support, training and simulation. Phase 2 is also likely to include these opportunities in addition to possible prime equipment and domestic software development, production, and increased integrated logistic support.
Through-life Support
Through-life support of the Phase 1 capability will generally be limited to ADF sustainment activities associated with vehicle integration and training systems. Phase 2 represents a wider provisioning and is likely to encompass increased levels of industry support, including maintenance and repair.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
71
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 1 Capability
Activity
Elec
tron
ic W
arfa
re
Secu
re T
est
Faci
litie
s &
Tes
t R
ange
s
Faci
litie
s &
In
fras
truc
ture
Trai
ning
Sys
tem
s &
Sim
ulat
ion
Assemble / Install O D D D
Design O D D D
Education / Training D O D D
In-Service / Through-life Support D D D D
Logistics Support D D D D
Manufacture / Construct O D D D
Project Manage O D D D
Refurbish / Upgrade O D D D
Repair and Maintain D D D D
Research and Development O D O O
Software Development / Support D D D
Systems Definition / Development O D O O
Systems Integration D D O
Test and Evaluate D D D
Phase 2 Capability
Activity
Elec
tron
ic W
arfa
re
Secu
re T
est F
acili
ties
& T
est R
ange
s
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sy
stem
s)
Faci
litie
s &
In
fras
truc
ture
Trai
ning
Sys
tem
s &
Si
mul
atio
n
Assemble / Install D D D D D
Design O D D D D
Education / Training D D D D
In-Service / Through-life Support D D D D
Logistics Support D D D D
Manufacture / Construct D D D D D
Project Manage D D D D D
Refurbish / Upgrade D D D D
Repair and Maintain D D D D
Research and Development D D D O O
Software Development / Support D D D D
Systems Definition / Development D D D O O
Systems Integration D D D O
Test and Evaluate D D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
72
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
Phase 1
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 2
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 1Phase 2
CompleteFY 2011-12 to FY 2012-13
Year-of-Decision Phase 1Phase 2
FY 2009-10 to FY 2010-11FY 2013-14 to FY 2015-16
Initial Operating Capability Phase 1Phase 2
2010 to 20122014 to 2016
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 1 and 2 Staff Officer Electronic Warfare
(02) 6265 1884JP 154 Project Manager(02) 6265 2743
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
73
Phase 1 Replacement Refuelling Trucks JP 157
Phase Scope
This phase is intended to enhance or replace the existing ADF aviation ground refuelling capability, including vehicles and hydrant carts, within the National Support Base.
Background
This project seeks to modernise and replace the current ADF aviation ground refuelling equipment fleet, including vehicles and hydrant carts, ensuring sustainment of all current and future ADF fixed and rotary wing aircraft fleets.
Australian Industry Opportunities
Acquisition
The likely acquisition strategy is not clear at this stage but depending on the maturity of systems within the market, the procurement may consider one of the following or a combination:
> Commercial- and/or Military-off-the-Shelf; or
> open tender for ADF ownership or lease.
Through-life Support
Depending on the procurement (ADF ownership or lease) strategy, the through-life support concept for this project will consider supportability options for fleet management, repair and maintenance, storage and distribution, provision of technical data and training as a minimum. It also sees use being made of current in-service capacity and facilities, or original equipment manufacturer support or a combination of both. Contracts for such support will generally be considered at the same time as acquisition.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Avia
tion
Gro
und
Supp
ort
Equi
pmen
t
Assemble / Install D
Design O
Education / Training O
In-Service / Through-life Support O
Logistics Support O
Manufacture / Construct O
Refurbish / Upgrade O
Repair and Maintain O
Systems Integration O
Test and Evaluate O
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
74
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Joint Theatre Distribution(02) 6265 4934
Land Systems Division Emerging Project Team(03) 9282 6933
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
75
JP 1544Phase 1 Project Eden – Document Handling System
Phase Scope
This phase is intended to deliver a corporate Enterprise Content Management (ECM) system across the Defence business and operational domains. The project is expected to select, acquire and implement an Electronic Document and Records Management solution that will meet Defence’s legislated compliance obligations for recordkeeping.
Background
This project is proposed as a solution to improve Defence’s current levels of effectiveness and efficiency in managing its holdings of physical and electronic records and ensure ongoing compliance with legislated and standards-based mandatory Commonwealth recordkeeping obligations.
The project will leverage off additional capability that the selected solution might provide in order to realise additional benefits that contribute towards meeting the information and content management business needs of Defence users accessing the Defence Restricted and Secret Networks.
The deployed solution is intended to overcome deficiencies associated with the use of disparate records and document management systems across the department through utilisation of a standard ECM tool, standardisation of business processes and enhanced capability that enables departmental knowledge management and business intelligence initiatives.
Australian Industry Opportunities
Acquisition
Hardware and software is anticipated to be acquired as Commercial-off-the-Shelf (COTS) items available from Australian suppliers. Significant industry opportunity is anticipated for the provision of services that encompass information communications technology (ICT) systems design, integration, installation and commissioning of system components. The project is expected to be a major business change management initiative and significant opportunity for industry involvement is anticipated in the fields of information architecture, business analysis and process engineering, change management and user training.
Phase 1 will be effected through a Request for Tender (RFT). Evaluation will encompass functional demonstration, functional validation and technical qualification assessment of short-listed solutions.
Through-life Support
The through-life support requirements are expected to be heavily influenced by advances in technology and ongoing maturity of the ICT element of the Strategic Reform Program (as set out in the 2009 Defence White Paper).
Industry requirements are expected to be based around developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life maintenance and support activities. Through-life support is likely to be undertaken within the Australian information technology and services delivery sector and these services are likely to be incorporated into the acquisition contract.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
76
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Ente
rpri
se
Con
tent
M
anag
emen
t
Design D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct D
Modelling / Simulation D
Project Manage O
Refurbish / Upgrade D
Repair and Maintain D
Research and Development D
Software Development / Support D
Systems Definition / Development D
Systems Integration D
Test and Evaluate D
Application Support Services D
Data Cleansing/Migration D
Business Process Analysis/Engineering D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2013 to 2015
Point of Contact
Chief Information Officer Group:Project Director Common Services Document and Records Management(02) 6266 4577
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
77
Phase 1 Rapid Environmental Assessment JP 1770
Phase Scope
This phase is intended to enhance the direction, collection, processing and dissemination of environmental data to provide a comprehensive and thorough understanding of the physical maritime operating environment and its likely impact on military operations. Phase 1 is expected to focus solely on the maritime environment and although not yet committed, the project is expected to have integral links to future land and air phases.
Background
Knowledge of the environment is a critical factor in the conduct of successful joint military operations. The ADF has a keen interest in improving its capabilities to collect, analyse and disseminate geospatial information. Rapid Environmental Assessment allows relevant geospatial and environmental information relating to a particular area of military operations to be collected, processed and disseminated to military planners, decision makers and operational forces in a coordinated, systematic and timely manner. This geospatial and environmental information includes hydrographic, topographic, oceanographic, and atmospheric data that may be sourced from both archived data and data collected in real-time. The provision of reliable and relevant geospatial and environmental data facilitates comprehensive situational awareness and decision superiority in the battlespace environment, and enables the optimal employment of platforms, weapons systems and sensors. The Rapid Environmental Assessment capability to be delivered by Phase 1 of the project is expected to introduce the improved sensor and collection systems, and enhanced information management and dissemination structures across ADF and the Australian Defence Organisation.
Australian Industry Opportunities
Acquisition
Although industry requirements in support of this phase are yet to be developed, the following industry opportunities are anticipated:
> specialist consulting services in the identification of suitable hardware and software in order to enhance operational capability and future developments;
> systems engineering (including design) and integration, including the integration of Commercial-off-the-Shelf systems (COTS), project management, system acquisition and support, and testing of equipment and services; and
> software development that may be required to support the integration of the various subsystems into the overall solution.
Through-life Support
Full through-life support is needed for the specific components of Phase 1. The detailed requirements are to be determined during future scoping studies. Synergies with other projects are to be investigated.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
78
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em A
ssur
ance
Cap
abili
ties
(H’w
are
& S
’war
e)
Syst
em L
ife C
ycle
Man
agem
ent
Syst
ems
Inte
grat
ion
(Hig
h En
d,
Syst
em o
f Sys
tem
s)
Rap
id E
nvir
onm
enta
l Dat
a C
olle
ctio
n Sy
stem
Assemble / Install D D D
Design D D D O
Education / Training D D
In-Service / Through-life Support D D D D D D
Logistics Support D D D D D D
Manufacture / Construct D D O
Modelling / Simulation O
Project Manage D D D D D D
Refurbish / Upgrade D D D D
Repair and Maintain D D D D
Software Development / Support D D D D D
Systems Definition / Development D D D D D
Systems Integration D D D D D
Test and Evaluate D D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low<$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2015 to 2017
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Patrol and Hydrographic(02) 6265 6467
Director Military Geographic Information Systems Program Office(02) 6265 5635
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
79
JP 1771Phase 1 Geomatic Support System
Phase Scope
This phase aims to provide accurate and timely geospatial and survey support to the ADF. Geomatic support is used to gain a better appreciation of the impact of the physical environment on the conduct of military operations and to assist with infrastructure development in support of operations in a deployed environment. It is required to achieve an accurate ‘Common Operating Picture and Situational Awareness’ across the theatre of operations. This phase intends to modernise the ability for land forces to conduct geospatial collection, production, survey operations, geospatial data management and presentation of geospatial information.
Background
This phase seeks to modernise land geospatial capability from the current largely manual approaches to an increasingly automated process. This phase seeks to enhance the ability of land forces to collect, process and expose geospatial data with minimum production time and effort. The capability aims to have a large IT focus and see an increase of computerisation for deployed geospatial force elements. Improved survey, mapping and profiling equipment enhances the ability of deployed forces to conduct combat support functions and to support infrastructure tasks in the deployed environment. Improved utilisation of modern technology improves the ability for geomatic support to be provided to highly mobile force elements as well as down to individual soldiers if the communications links exist.
Australian Industry Opportunities
Acquisition
Opportunities may exist for an Australian contractor to purchase on behalf of the Commonwealth the necessary hardware (servers, desktops, monitors, laptops and additional items) and software in support of the project.
Opportunities for an Australian company to conduct the design, development, integration and delivery of the software and hardware for the project may also be presented. It is anticipated that the required software needs will be quite sophisticated.
Discussion with Australian industry is likely to commence around 2013.
Through-life Support
Following the successful completion of this phase, there may be opportunities for the prime contractor to provide in-service support.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
80
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em A
ssur
ance
Cap
abili
ties
(H’w
are
& S
’war
e)
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Geo
mat
ic S
yste
ms
Assemble / Install D D D D
Design D D D D
Education / Training D D D
In-Service / Through-life Support D D D D D D
Logistics Support D D D D D D
Manufacture / Construct D D
Modelling / Simulation D
Project Manage D D D D D D
Refurbish / Upgrade D D D
Repair and Maintain D D D
Software Development / Support D D D D D
Systems Definition / Development D D D D D
Systems Integration D D D D D
Test and Evaluate D D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2012-13 to FY 2014-15Year-of-Decision FY 2014-15 to FY 2016-17Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Imagery and Geospatial Information Systems(02) 6265 3897
Director Military Geographic Information Systems Program Office(02) 6265 5635
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
81
Phase 3H Military Satellite Capability – Wideband Terrestrial Terminals Phase 5B Military Satellite Capability – Wideband Terrestrial Infrastructure JP 2008
Phase Scope
Phase 3H intends to optimise the early use of the Wideband Global Satellite (WGS) system by rapidly replacing satellite communications (SATCOM) terminal installations in the Middle East with WGS certified terminals and introduce WGS certified terminals to deliver services currently provided by narrowband and L-Band terminals.
Phase 5B will enhance the Australian Defence SATCOM capability through the delivery of a satellite ground station in the east of Australia for WGS system anchoring and the delivery of transportable wideband ground terminals for land forces.
Background
JP 2008 is a multi-phased proposal that provides strategic and tactical satellite communications capabilities to support ADF operations. Other phases include:
> Phase 1 (completed) comprised of studies undertaken in support of the development of a mobile SATCOM capability;
> Phase 2 (complete) is acquiring a SATCOM capability for mobile assets;
> Phase 3A (complete) was a study into the feasibility of options for a suitable interim SATCOM system to meet ADF requirements;
> Phase 3C (in progress) is developing a Theatre Broadcast System concept and technology demonstrator for high, medium and low data rate satellite broadcast capabilities;
> Phase 3D (complete) has delivered a Defence SATCOM capability on the SingTel/Optus C1 satellite and the associated ground control infrastructure;
> Phase 3E (in progress) is providing the terrestrial infrastructure to utilise the SATCOM capabilities of the Defence payload on the SingTel/Optus C1 satellite through the delivery of the Advanced SATCOM Terrestrial Infrastructure System (ASTIS) inclusive of the wideband maritime SATCOM terminals (M-ASTIS) and land force Compact Transmit/Receive System (CTRS);
> Phase 3F (approved) intends to enhance the Australian Defence SATCOM capability through the delivery of a satellite ground station in the west of Australia and a satellite communications network management system. The satellite ground station and network management system will interface deployed forces accessing the WGS system with the Defence Wide Area Network and Australian Defence headquarters and support elements;
> Phase 4 (in progress) is establishing the space and control segments of the future ADF wideband SATCOM capability by providing access to the WGS constellation through a memorandum of understanding (MOU) with the US; and
> Phase 5A (in progress) intends to deliver an ADF UHF SATCOM capability providing coverage over the Indian Ocean Region (IOR) including the Middle East Area of Operations. A contract for the provision of a hosted UHF payload was signed with Intelsat in April 2009.
Australian Industry Opportunities
Acquisition
For Phases 3H and 5B the intention is to acquire the capabilities through tender. In all cases Defence is to investigate the range of options before moving to acquisition.
Through-life Support
The industry requirements will be based around developing and maintaining sufficient capability within Australian industry to undertake a range of through-life maintenance and support activities for ground segments.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
82
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 3H Capability
Activity
Wid
eban
d SA
TCO
M
Term
inal
s
Assemble / Install D
Design D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct D
Project Manage D
Refurbish / Upgrade D
Repair and Maintain D
Systems Definition / Development D
Systems Integration D
Test and Evaluate D
Phase 5B Capability
Activity
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
SATC
OM
Gro
und
Term
inal
s
Assemble / Install D
Design D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct D
Modelling / Simulation D
Project Manage D
Refurbish / Upgrade D
Repair and Maintain D
Research and Development D
Software Development / Support D
Systems Definition / Development D
Systems Integration O D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
83
Acquisition Category (ACAT)
Phase 3H
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 5B
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m-$1500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 3H Phase 5B
FY 2009-10 to FY 2010-11FY 2012-13 to FY 2014-15
Year-of-Decision Phase 3H FY 2009-10 to FY 2010-11Phase 5B FY 2014-15 to FY 2016-17
Initial Operating Capability Phase 3H 2012 to 2014Phase 5B 2016 to 2018
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 3H and 5B Deputy Director
Long Range Communications(02) 6265 6502
Director Satellites Space Systems Program Office(02) 6265 4155
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
84
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 6 Jindalee Operational Radar Network (JORN)JP 2025
Phase Scope
This phase is intended to enhance the Jindalee Operational Radar Network (JORN) capability.
Background
The JORN capability comprises three Over-the-Horizon Radars (OTHR), a JORN Coordination Centre at RAAF Edinburgh, and a Frequency Management System of sounders and transponders located at numerous sites throughout Australia.
This phase is intended to address OTHR sustainability issues and take advantage of Australia’s world class OTHR research and development, and technology.
The upgrades are expected to include sensor hardware and software, signals processing, data fusion, communications and information systems, enhanced simulation and operator training facilities, and operator human-machine interface improvements.
Australian Industry Opportunities
Acquisition
It is anticipated that solutions are to involve a very high level of Australian content. A range of possible contracting solutions are anticipated during this phase including a mixture of acquisition and enhancement elements, phased roll-out and prime systems integration.
The areas on which industry requirements are anticipated to focus include:
> provision of new sensors and systems;
> upgrades to existing signal processing and data fusion software;
> enhanced simulation and operator training facilities;
> improvements to operator-machine interfaces;
> integration of the new and upgraded systems into existing JORN systems;
> test and evaluation; and
> removal and disposal of existing systems.
Through-life Support
Australian based full through-life support is required. Through-life support contracting arrangements are anticipated to be turn-key in nature and involve a separate tendering process to the acquisition elements.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
85
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Rad
ar (H
F &
PAR
)
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’
war
e)
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sy
stem
s)
Targ
etin
g &
Pre
cisi
on
Nav
igat
ion
Pro
tect
ion
of
Net
wor
ks, C
ompu
ters
&
Info
rmat
ion
Sim
ulat
ors
Assemble / Install D D D D D D
Design D D D D D D
Education / Training O O O O O O
In-Service / Through-life Support D D D D D D
Logistics Support D D D D D D
Manufacture / Construct D D D D D D
Modelling / Simulation D D D D D D
Project Manage D D D D D D
Refurbish / Upgrade D D D D D D
Repair and Maintain D D D D D D
Research and Development D D D D D D
Software Development / Support D D D D D D
Systems Definition / Development D D D D D D
Systems Integration D D D D D D
Test and Evaluate D D D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2016-2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Battlespace Management(02) 6265 5561
Officer Commanding Over The Horizon Radar Systems Program Office(08) 8259 4001
Project Website:www.defence.gov.au/dmo/esd/jp2025/jp2025.cfm
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
86
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 8 ADF Joint Command Support EnvironmentJP 2030
Phase Scope
Phase 8 is intended to build upon the capability delivered under previous phases of the project and in particular, extend the functionality through the development of applications that support the planning and conduct of ADF networked operations.
Background
The Joint Command Support Environment is evolving from the development and integration of several new and existing command support systems including the Joint Command Support System, Maritime Command Support System, Air Command Support System, Special Operations Command Support System and the Battlefield Command Support System (part of Project LAND 75).
Other phases include:
> Phases 1-6 (complete) delivered a ‘core’ command support system to support the planning and conduct of joint operations. This system was delivered to strategic, operational and tactical level headquarters as well as selected ADF units; and
> Phase 7 (in progress) is providing further roll-out and enhancement of the Joint and Air Command Support Systems.
Australian Industry Opportunities
Acquisition
Although many of the required products will be Commercial- and Military-off-the-Shelf items, existing and some new supplier capability would be required for system integration, limited bespoke software development, integrated logistics support development and transition into service. The acquisition strategy will be evolutionary, in which successive upgrades will add to functionality.
Through-life Support
Under existing and new arrangements, a long-term local support capability will be required.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Com
man
d &
Con
trol
Sy
stem
s
Assemble / Install D D
Design D D
Education / Training D D
In-Service / Through-life Support D D
Logistics Support D D
Project Manage D D
Refurbish / Upgrade D D
Repair and Maintain D D
Research and Development D D
Software Development / Support D D
Systems Definition / Development D D
Systems Integration D
Test and Evaluate D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
87
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2009-10 to FY 2012-13 (evolutionary, with progressive decisions
across this time period)Initial Operating Capability Various from 2011 onwards
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Command and Control Systems(02) 6265 4086
Director Joint Command Support Environment(02) 6270 8332
Project Website:www.defence.gov.au/dmo/esd/jp2030/jp2030ph8.cfm
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
88
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 3A.1 Project Eagle EyePhase 4 Digital Topographical Systems (DTS) UpgradeJP 2044
Phase Scope
Phase 3A.1 is intended to enhance the connectivity and interoperability between Defence geospatial intelligence agencies and units.
Phase 4 seeks to further improve capability by networking and developing interoperability of Defence geospatial intelligence agencies. This phase will also seek to enhance interoperability with our allies and maintain relevance, effectiveness and efficiency within an arena of rapidly changing technologies.
Background
JP 2044 is a multi-phased proposal designed to develop and sustain a Defence capability to exploit geospatial data gathered from multiple sources including space-based surveillance.
Other phases include:
> Phase 2A (complete) has delivered system updates and conducted risk reduction activities in preparation for the main acquisition phase;
> Phase 2B (in progress) is the major acquisition phase for information technology, communications and training infrastructure to support a space-based surveillance capability; and
> Phase 3B (almost complete) will extend the networking of Defence geospatial intelligence agencies to facilitate interoperability.
Australian Industry Opportunities
Acquisition
The security classification of much of the system provided under this project precludes the wide engagement of Australian industry in the upgrade or replacement of equipment.
Through-life Support
The ability to engage Australian industry for through-life support will be limited by the system security classification. Depending upon the security classification of the equipment delivered under these phases, there may be some limited opportunities for Australian industry to provide through-life support of the system.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 3A.1 and 4 Capability
Activity
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Targ
etin
g &
Pre
cisi
on
Nav
igat
ion
In-Service / Through-life Support O O
Project Manage O O
Refurbish / Upgrade O O
Repair and Maintain O O
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
89
Acquisition Category (ACAT)
Phase 3A.1
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 4
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 3A.1 Phase 4
FY 2009-10 to FY 2010-11 FY 2009-10 to FY 2010-11
Year-of-Decision Phase 3A.1Phase 4
FY 2010-11 to FY 2011-12FY 2012-13 to FY 2014-15
Initial Operating Capability Phase 3A.1 Phase 4
2012 to 20142014 to 2016
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 3A.1 and 4 Deputy Director Imagery and
Geospatial Information Systems(02) 6265 3897
Director Military Geographic Information Systems Program Office(02) 6265 5635
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
90
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 3 Wide Area Communications Network ReplacementJP 2047
Phase Scope
This phase will make major enhancements to enable Defence’s information network to improve the preparation for and conduct of military operations and improve the management of Defence business. The project is expected to deliver one network connecting fixed and deployed locations built on a single set of standards and products.
Background
JP 2047 is a multi-phased proposal to maintain and improve the Defence networked communications infrastructure. Other phases include:
> Phase 0 (complete) which encompassed a Project Definition Study and a network security and survivability study, to provide input to the capability requirements for later phases;
> Phase 1A (largely complete) which is modernising telecommunications switching at selected Defence sites. This provides a scalable broadband backbone network, upgraded encryption systems in the Secret domain and upgraded management tools to support the enhanced network;
> Phase 2A (in progress) which is a consolidation stage that strengthens enhancements made in phase 1A, implementing virtual private networking, strengthening the policy framework of the network environment and providing enhanced encryption services on both the Restricted and Secret networks; and
> the previously planned Phases 2B and 2C that have been amalgamated into Phase 3.
Australian Industry Opportunities
Acquisition
Although the industry requirements are yet to be fully developed, the areas in which industry may contribute are as follows:
> systems design, development and integration of both software and hardware in order to enhance Defence communications capability and take advantage of future developments in communications technology; and
> network security enhancements.
Through-life Support
Industry requirements are based around developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life maintenance and support activities. Through-life support activities are likely to be undertaken within the existing Australian and New Zealand based telecommunications sector.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
91
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Com
mun
icat
ions
Sec
urity
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Faci
litie
s &
Infr
astr
uctu
re
Assemble / Install D D D D D
Design D D D D O
Education / Training D D D D O
In-Service / Through-life Support O O O O O
Logistics Support O O O O O
Manufacture / Construct O
Modelling / Simulation O O O O O
Project Manage O O O O O
Refurbish / Upgrade O O O O O
Repair and Maintain O O O O O
Research and Development O O O O O
Software Development / Support D D D D D
Systems Definition / Development D D D D D
Systems Integration D D D D D
Test and Evaluate O O O O O
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12
Year-of-Decision FY 2012-13 to FY 2014-15
Initial Operating Capability 2015 to 2017
Point of Contact
Chief Information Officer Group:Project Director(02) 6265 3217
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
92
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 3 Amphibious Watercraft ReplacementPhase 5 Landing Craft Heavy ReplacementJP 2048
Phase Scope
This project aims to provide the ADF with the platforms necessary to create an amphibious manoeuvre capability in support of the ADF’s future operating concept “Joint Operations for the 21st Century”. The CANBERRA Class Landing Helicopter Dock (LHD) (currently under construction), and the remaining phases of the project will combine to provide a multi-dimensional manoeuvre capability through its aviation, landing craft and command and control facilities.
Phase 3 will provide landing craft to land vehicles and equipment from the CANBERRA Class LHDs. The landing craft will be integral to the ships’ equipment and will operate from the LHD’s internal docks. These landing crafts will be able to operate in a much wider range of weather conditions, at higher speed and with heavier loads than the existing system.
Phase 5 will acquire six new heavy landing craft with improved ocean going capabilities able to transport armoured vehicles, trucks, stores and people. It will provide a capability to conduct independent small scale regional amphibious operations or to support the CANBERRA Class as part of an Amphibious Task Group.
Background
This project arose from recognition of the need for a greater amphibious capability than was provided by the two KANIMBLA Class Landing Platform Amphibious Ships (LPA), the Heavy Landing Ship HMAS Tobruk, the six BALIKPAPAN Class Heavy Landing Craft and associated Army landing craft.
> Phase 3 is intended to provide the CANBERRA Class LHDs with landing craft to enable personnel, equipment and supplies to be loaded and offloaded over the beach. In addition it is anticipated that a small number of craft would be acquired to enable shore based training and maintenance.
> Phase 5 is intended to deliver ocean-going landing craft that are capable of independent amphibious operations or support the Amphibious Task Group.
As is highlighted in the 2009 White Paper, a future phase of this project is expected to acquire a large strategic sealift ship.
Australian Industry Opportunities
Acquisition
For Phase 3 the craft may either be constructed entirely overseas, entirely in Australia or as a mixed build. Identified industry opportunities that may relate to this phase include the production of landing craft and in-service support.
For Phase 5 industry requirements will be guided by the information gained through definition studies. Possible industry opportunities that may relate to these phases include design, design interpretation, ship production, ships propulsion systems, ships electrical and electronic systems, ship environmental systems, and in-service support.
Through-life Support
The industry requirements will be based around developing and maintaining sufficient capability within Australian industry to undertake as wide a range of through-life maintenance and support activities as practicable for all phases of the project.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
93
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 3 Capability
Activity
Surf
ace
Nav
al
Vess
els
Assemble / Install O
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct O
Project Manage O
Refurbish / Upgrade D
Repair and Maintain D
Test and Evaluate D
Phase 5 Capability
Activity
Surf
ace
Nav
al
Vess
els
Assemble / Install D
Design O
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct O
Modelling / Simulation O
Project Manage D
Refurbish / Upgrade D
Repair and Maintain D
Research and Development O
Software Development / Support D
Systems Definition / Development D
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
94
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
Phase 3
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 5
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m-$1500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 3Phase 5
CompleteFY 2012-13 to FY 2014-15
Year-of-Decision Phase 3Phase 5
FY 2011-12 to FY 2012-13FY 2015-16 to FY 2017-18
Initial Operating Capability Phase 3Phase 5
2014 to 2016Beyond 2019
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phase 3 Staff Officer Amphibious
Mobility(02) 6265 2429
Program Manager Amphibious Deployment and Sustainment Capability(02) 6266 7040
Phase 5 Staff Officer Amphibious and Afloat Support(02) 6265 4726
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
95
JP 2060Phase 3 ADF Deployable Health Capability
Phase Scope
JP 2060 is a multi-phase joint project which involves the identification and development of capabilities required to prevent, treat and evacuate casualties in joint operations in the defence of Australia and its interests.
This phase is intended to improve the existing ADF Deployable Health Capability to deliver optimum quality services for the prevention, treatment and evacuation of casualties. It intends to achieve this through the adoption of a ‘whole of system’ approach to the delivery of health support, addressing each of the following five Health Operating Systems:
> Preventive Health;
> Treatment;
> Medical Evacuation;
> Health Information Systems (command, control, communication, intelligence and information management systems); and
> Health Service Logistics.
Background
JP 2060 is comprised of five distinct elements:
> Phase 0 (completed 2001) was a preliminary phase;
> Phase 1 (completed 2003) was a Project Definition Study;
> Phase 2A (completed 2008) was an early acquisition of Portable Ultrasound systems and Intermediate Fidelity Mannequin systems;
> Phase 2B (in progress) is a main acquisition phase addressing the treatment aspects of surface and air evacuation, disease and injury prevention, facilities and equipment, and deployment flexibility; and
> Phase 3 will deliver the next generation ADF Deployable Health Capability. It is intended that the phase will continue to acquire new health technologies/systems and suitably train and equip the ADF with the materiel and information management capability to meet its future health support requirements.
Australian Industry Opportunities
Acquisition
The acquisition strategy for Phase 3 is yet to be determined. It is anticipated that local industry involvement will be an important feature of the acquisition strategy and may include the supply of medical support and equipment together with through-life support.
Through-life Support
Australian industry opportunities will be based around developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life maintenance and support activities.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
96
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Syst
em L
ife C
ycle
M
anag
emen
t
Faci
litie
s &
In
fras
truc
ture
Med
ical
Tec
hnol
ogy
Assemble / Install O O
Design D D
Education / Training D D
In-Service / Through-life Support D D
Logistics Support D D
Project Manage O O
Refurbish / Upgrade D D
Repair and Maintain D D
Research and Development O O
Software Development / Support D D
Systems Definition / Development O O
Systems Integration D D
Test and Evaluate D D
Outsourced Capability O O O
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Health(02) 6265 7689
Land Systems Division Emerging Project Team(03) 9282 4307
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
97
Phase 3 Geospatial Information Infrastructure and Services JP 2064
Phase Scope
This phase is intended to provide improved geospatial information databases and applications to benefit operational planners and the conduct of operations.
Background
This project is a multi-phased proposal to develop a geospatial information infrastructure and services capability to provide Defence clients with online access to geospatial information, geospatial information resource discovery mechanisms and geospatial services (i.e. tailored responses to customer requests for information). Simply expressed, this project provides users with ready visibility of, and access to, geospatial information.
Phase 3 covers all aspects of production, data storage, dissemination and service provision. The project implements solutions in all security domains and across a range of networks to support users in fixed and deployed locations. Access to data via this mechanism becomes the principal means by which command support systems of the ADF’s networked force and other systems obtain the geospatial information that they require.
Other phases include:
> Phase 1 (complete) has enhanced the geospatial production capability; and
> Phase 2 (acquisitions are now complete) is providing Defence information system network users with a single coherent picture of the total range of authorised trusted geospatial information products and provides simple web-enabled access to such products. In-service support for the Phase 2 system is now in-place.
Australian Industry Opportunities
Acquisition
There is the potential for an Australian contractor to purchase on behalf of the Commonwealth the hardware (servers, desktops, monitors, laptops and additional items) and software (enterprise and application software) from within Australia or from overseas vendors.
There is also the potential for an Australian company to conduct the design, development, integration and delivery of Phase 3. This would involve the installation of systems and the integration of software with current information systems at a number of Defence sites both in Australia and overseas.
Discussions with Australian industry would most likely commence around 2011.
Through-life Support
Following on from the acceptance of the Phase 3 products there is the potential for the acquisition contractor to provide in-service support.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
98
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em A
ssur
ance
Cap
abili
ties
(H’w
are
& S
’war
e)
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Geo
spat
ial D
atab
ase
Syst
ems
Assemble / Install D D D
Design D D D D
Education / Training D D
In-Service / Through-life Support D D D D D
Logistics Support D D D
Manufacture / Construct D D D
Project Manage D D D D D D
Refurbish / Upgrade D D D
Repair and Maintain D D
Research and Development D
Software Development / Support D D
Systems Definition / Development D D D D
Systems Integration D D D D D
Test and Evaluate D D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Imagery and Geospatial Information Systems(02) 6265 3897
Director Military Geographic Information Systems Program Office(02) 6265 5635
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
99
JP 2065Phase 2 Integrated Broadcast SystemPhase 3 Integrated Broadcast System
Phase Scope
Phase 2 is intended to upgrade the Australian Integrated Broadcast Service (IBS) to maintain compatibility with allies. It is expected to introduce new system capabilities, extend the ADF roll-out of the system and build upon infrastructure developed during Phase 1.
Phase 3 aims to further develop the capability of the existing Australian system and extend IBS capabilities to additional users. It is expected to include new technologies.
Background
Phase 1 (approved) delivered the IBS to the ADF. This system manages and disseminates directly to deployed forces the tactically significant information produced by Australian and allied assets. The Australian IBS vision includes an information management centre that manages and bridges information between computer networks and satellite components with suitable gateways to real-time tactical data links. This capability provides an important interface to Defence’s Tactical Information Exchange Environment and enhances allied interoperability.
Australian Industry Opportunities
Acquisition
IBS specific equipment and services are to be procured through government-to-government arrangements. Other equipment and services may be procured through Australian industry.
Through-life Support
The through-life support of IBS specific equipment is to be procured through government-to-government arrangements. The through-life support of all other IBS equipment is contracted to Australian industry.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 2 and 3 Capability
Activity
Elec
tron
ic W
arfa
re
Rot
ary
& F
ixed
W
ing
Airc
raft
Subm
arin
es
Surf
ace
Nav
al
Vess
els
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Faci
litie
s &
In
fras
truc
ture
Assemble / Install D D D D D D
Design D D D D D D
Education / Training D D D D D D
In-Service / Through-life Support D D D D D D
Logistics Support D D D D D D
Refurbish / Upgrade D D D D D D
Repair and Maintain D D D D D D
Systems Integration D D D D D D
Test and Evaluate D D D D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
100
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
Phase 2
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Phase 3
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 2 FY 2009-10 to FY 2010-11Phase 3 FY 2011-12 to FY 2012-13
Year-of-Decision Phase 2 FY 2010-11 to FY 2011-12Phase 3 FY 2012-13 to FY 2014-15
Initial Operating Capability Phase 2 2012 to 2014Phase 3 2014 to 2016
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 2 and 3 Deputy Director
Intelligence Systems(02) 6265 1222
Project Director JP 2065(02) 6265 3011
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
101
JP 2068Phase 2B.2 Computer Network Defence
Phase Scope
This phase is intended to reduce the vulnerability of Defence’s information systems through the provision of advanced Computer Network Defence (CND) hardware and software including a support facility to conduct ongoing development and maintenance.
Background
JP 2068 is a multi-phased proposal to progressively develop a survivable Defence Network Operation Centre capability, which will enable Defence to more effectively manage, monitor and secure its major communications networks and information systems. Phases of this project include:
> Phase 1A (approved) provided a Network Operations Centre facility at HMAS Harman in Canberra;
> Phase 1B (approved) trialled a Defence Science and Technology Organisation-developed CND pilot system on the Defence Restricted Network. Outcomes of this trial will be used to assess the need and functional requirements for a mature CND facility in JP 2068 Phase 2; and
> Phase 2B will further enhance the capabilities provided in Phase 1 by improving the management, monitoring, security and visibility of the Defence Information Environment. Phase 2B.1 (approved) will extend the network management facilities at HMAS Harman to facilitate collocation and integration of network and security operations functions. Phase 2B.2 will provide enhanced CND information and computer technology infrastructure, techniques and capabilities to protect Defence’s core information systems against intrusions.
Australian Industry Opportunities
Acquisition
Opportunities for Australian industry are expected in the areas of systems design, development and integration of both software and hardware in order to enhance Australia’s CND capability and associated future developments.
Through-life Support
Industry requirements will be based around developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life maintenance and support activities. Through-life support activities will likely be undertaken within the existing Australia and New Zealand based information technology sector.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
102
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Assemble / Install D
Design D
Education / Training D
In-Service / Through-life Support O
Logistics Support D
Manufacture / Construct O
Modelling / Simulation O
Project Manage O
Refurbish / Upgrade O
Repair and Maintain O
Research and Development D
Software Development / Support D
Systems Definition / Development D
Systems Integration D
Test and Evaluate D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2014 to 2016
Point of Contact
Capability Staff:Director Network Application Development(02) 6265 7983
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
103
JP 2069Phase 2 High Grade Cryptographic Equipment
Phase Scope
This phase will partially replace the existing ADF fleet of high grade cryptographic equipment. The proposal also includes management of the new fleet and associated cryptographic keys.
Background
The project is a multi-phased proposal to acquire replacement high grade cryptographic equipment for the ADF. High grade cryptographic equipment is used when there is a requirement to protect nationally classified information during electronic transmission. The proposal aims to modernise the ADF’s fleet of high grade cryptographic equipment to avoid obsolescence, take advantage of technology advancements and maintain interoperability with allies.
Other phases of JP 2069 include:
> Phase 1A (completed in 2006) defined the strategy and scope of the later phases of the project; and
> Phase 1B (largely complete) has acquired the new generation of secure telephony.
Australian Industry Opportunities
Acquisition
Although most equipment is likely to be sourced from overseas, either through Foreign Military Sales (FMS) or Direct Commercial Sales (DCS) arrangements, there is scope for integration and installation effort from Australian industry. The primary equipment is expected to be Commercial- or Military-off-the-Shelf products that will be integrated into both new and existing communication systems.
Through-life Support
In this phase it is intended that through-life support will be required but it is likely that the equipment procured will be either repaired under warranty or by replacement.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Com
mun
icat
ions
Se
curi
ty
Equi
pmen
t In
tegr
atio
n
Assemble / Install O D
Design D
Education / Training O D
In-Service / Through-life Support O
Logistics Support O D
Manufacture / Construct D
Project Manage D
Refurbish / Upgrade D
Repair and Maintain O
Systems Integration D D
Test and Evaluate D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
104
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2010-11 to FY 2011-12Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Director Network Application Development
Project Manager JP 2069(02) 6266 1893
(02) 6265 7983
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
105
JP 2070Phase 4 AP-3C Light Weight Torpedo Integration
Phase Scope
This phase will assess the need to supplement the AP-3C Light Weight Torpedo (LWT) capability provided by the MK 46 torpedo with either the MU90 LWT entering service with the Royal Australian Navy or another torpedo.
Background
A LWT that is effective against capable, modern submarines is an essential element of the AP-3C’s Anti-Submarine Warfare (ASW) capability. Should the assessment of the MK 46 torpedo recommend that it be supplemented by another torpedo, options include investigating the level of integration of the MU90 LWT or another torpedo onto the AP-3C. The torpedo selected must provide assurance of the ADF’s capability to conduct effective ASW operations in littoral environments. The torpedo solution chosen must be able to be quickly and simply integrated onto the AP-3C.
Australian Industry Opportunities
Acquisition
Although industry requirements are yet to be developed, the areas on which requirements are anticipated to focus include:
> aircraft system integration; and
> storage, handling and transport of weapon systems.
Through-life Support
The through-life support (TLS) prime contractor provides TLS for the AP-3C weapons system. It is anticipated that all aircraft related elements of the capability delivered through this project will be supported through the TLS prime contractor.
Limited TLS is required for the ordnance components delivered through this project. Support is expected to be limited to Integrated Logistic Support functions particularly in the handling, transport and storage specialisations.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Gui
ded
Wea
pons
Rot
ary
& F
ixed
W
ing
Airc
raft
Assemble / Install D
Design D
In-Service / Through-life Support D
Logistics Support D D
Systems Integration D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
106
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11Year-of-Decision FY 2009-10 to FY 2010-11Initial Operating Capability 2011 to 2013
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Combat EnablersAerospace Development Branch(02) 6265 5442
Director Emerging Projects Guided Weapons Branch(02) 6265 1464
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
107
JP 2072Phase 2A Battlespace Communications System (Land)Phase 2B Battlespace Communications System (Land)Phase 3 Battlespace Communications System (Land)
Phase Scope
Phase 2 is intended to continue the roll-out of modern communications infrastructure to high readiness land formations and units of the ADF through sub-phases 2A and 2B. Phase 2A aims to align with other Land Communications Information Systems (CIS) projects, in particular LAND 75 Phase 4 and is intended to provide the digital communications backbone and other low risk communication capabilities to address key shortfalls. Phase 2B aims to provide enhanced Command and Control (C2) services including enhanced trunking and switching infrastructure in the land environment. Phases 2A and 2B are key to achieving the ADF’s Network Centric Warfare (NCW) milestone of the Networked Brigade.
Phase 3 will continue the expansion of enhanced communications to support joint operations. This phase is intended to continue to equip a second brigade and its supporting elements, as well as other high readiness units. Equipment acquired in earlier phases may also be refreshed during this phase.
Background
JP 2072 is a multi-phased proposal to progressively define and acquire an integrated Battlespace Communications System for the ADF’s land elements.
Phase 1 (in progress) plans to acquire equipment to address urgent shortfalls to support the ADF’s land communications needs. This priority support will focus on providing the digital radio backbone for the Battlefield Command Support System already in service and Battlefield Management Systems intended to be procured under LAND 75 and LAND 125. This phase will assist in the achievement of the ADF’s NCW milestone of the Networked Battlegroup.
Australian Industry Opportunities
Acquisition
Although most equipment is likely to be procured from overseas sources, there is scope to acquire equipment from Australian industry. The primary equipment is expected to be Commercial- or Military-off-the-Shelf products that will be integrated into both new and legacy platforms and assemblages.
Through-life Support
The industry opportunities will be based around developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life maintenance and support activities.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
108
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 2A Capability
Activity
Com
mun
icat
ions
Se
curi
ty
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
&
Info
rmat
ion
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Com
man
d &
C
ontr
ol S
yste
ms
Assemble / Install D D D
Design D D D
Education / Training D D
In-Service / Through-life Support D D D D
Logistics Support D D D D
Manufacture / Construct D
Modelling / Simulation D D
Project Manage D D
Repair and Maintain D D D D
Research and Development D D
Software Development / Support D D
Systems Definition / Development D
Systems Integration D D D
Test and Evaluate D D D
Phase 2B Capability
Activity
Com
mun
icat
ions
Se
curi
ty
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
&
Info
rmat
ion
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Com
man
d &
C
ontr
ol S
yste
ms
Assemble / Install D D D
Design D D D
Education / Training D D D
In-Service / Through-life Support D D D D
Logistics Support D D D D
Manufacture / Construct D D
Modelling / Simulation D D D
Refurbish / Upgrade O O
Repair and Maintain D D D D
Research and Development D D D
Software Development / Support D D D
Systems Definition / Development D D
Systems Integration D D D
Test and Evaluate D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
109
Phase 3 Capability
Activity
Com
mun
icat
ions
Se
curi
ty
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
&
Info
rmat
ion
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Com
man
d &
C
ontr
ol S
yste
ms
Assemble / Install D D D
Design D D D
Education / Training D D D
In-Service / Through-life Support D D D D
Logistics Support D D D D
Manufacture / Construct D D
Modelling / Simulation D D D
Project Manage D D
Refurbish / Upgrade O
Repair and Maintain D D D D
Research and Development D D D
Software Development / Support D D D
Systems Definition / Development D D
Systems Integration D D D
Test and Evaluate D D D
Acquisition Category (ACAT)
JP 2072 Program
ACAT Attribute Complexity Level Assessment
Acquisition Cost – Phase 2AAcquisition Cost – Phase 2BAcquisition Cost – Phase 3
Level 2 High $500m-$1500m (Towards the middle of the band) Level 3 Moderate $100m-$500m (Towards the upper end of the band) Level 2 High $500m-$1500m (Towards the lower end of the band)
Project Management Complexity Level 1 Very High
Schedule Level 2 High
Technical Difficulty Level 1 Very High
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT level assessed for this Program is ACAT I.
Planned Schedule Highlights
First Pass Approval Phase 2APhases 2B and 3
FY 2009-10 to FY 2010-11FY 2010-11 to FY 2011-12
Year-of-Decision Phase 2APhases 2B and 3
FY 2010-11 to FY 2011-12FY 2012-13 to FY 2014-15
Initial Operating Capability Phase 2APhases 2B and 3
2012 to 20142014 to 2016
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 2A, 2B and 3 Staff Officer Mobile
Communications – Land(02) 6265 6501
Project Director JP 2072(02) 6265 4183
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
110
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 2D Improved Logistics Information SystemsJP 2077
Phase Scope
JP 2077 aims to incrementally upgrade and enhance Defence’s logistics information systems to ensure leading edge support continues to be provided in support of warfighting and corporate objectives.
This phase is intended to leverage and integrate existing systems and acquire new systems and capabilities to bring about enhancements in the areas of Engineering and Maintenance Management (including Repairable Items), Enterprise Reporting and Classified Assets management. Phase 2D also plans to address the underlying information systems architecture and management components along with providing Automated Materiel and Process Tracking in support of phase components. The necessary business process improvement and transformation activities necessary to exploit these initiatives are also part of this phase.
Background
The Defence Materiel Logistic Information System (MLIS) exists to support both day-to-day operations and the strategic management of the Department’s materiel resources. It underpins:
> the generation of combat power by providing ADF units with logistics information systems support in the Joint environment;
> the provision of support to Defence’s business activities; and
> high-level reporting to Government.
JP 2077 is a multi-phased proposal to improve Defence’s logistics information systems:
> Phase 1 (completed) set the context for the program and confirmed the scope and conceptual requirements for the improved MLIS;
> Phase 2A (completed) delivered a range of targeted products that served to refine the direction of the program. Together, these products established the enabling structures, processes and plans to ensure that the following phases pursued a ‘whole of capability’ approach to the development of the future MLIS;
> Phase 2B.1 (in acquisition) is upgrading the Standard Defence Supply System (SDSS) from Mincom Information Management System (MIMS) v4 to MIMS v6, which is a Military-off-the-Shelf (MOTS) variant of the current v5 product known as ‘Ellipse’. This upgrade is aimed at providing the foundation system for the establishment of an integrated MLIS, with an approved financial module that is compliant with the Australian Equivalent International Financial Reporting Standards;
> Phase 2B.2 (in acquisition) is intended to deliver a Deployable Logistics System (DLS) that will extend the reach of the Mincom Ellipse core transactional system to ADF force element groups deployed on operations, and integrate the existing ADF In-transit Visibility System into the Ellipse core; and
> Phase 2C (completed) delivered an interim Radio Frequency Identification (RFID) asset tracking system including both hardware and software, based on the proprietary Savi Tag system.
Australian Industry Opportunities
Acquisition
Phase 2D is intended to provide opportunities for the information technology (IT) industry in Australia. In particular, openings for Australian companies to partner with international suppliers for the delivery system overhaul, and ongoing support of applications being considered by the project, are expected. It is anticipated that the vast majority of the budget will be spent in Australia in the areas of project management, change management, help services (online, contextual and technical support), training solutions, and policy and procedure development.
A Request for Proposal (RFP) was released to global industry on 6 December 2007 and closed on 24 April 2008. All respondents to the RFP will proceed through to subsequent Request for Tender(s) to be conducted during 2010 and 2011. Additional Australian industry opportunities in ‘above the line’ activities in support of project acquisition activities are expected.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
111
Through-life Support
Australian industry is considered well placed to deliver in the areas of systems integration, systems support, data cleansing and migration, training and change management.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity CapabilitySu
ppor
t of M
issi
on &
Sa
fety
Cri
tical
Sof
twar
e
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’
war
e)
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Assemble / Install D D D D
Education / Training D D D D
In-Service / Through-life Support D D D
Logistics Support D D D
Refurbish / Upgrade D D D
Repair and Maintain D D D
Software Development / Support D D D
Test and Evaluate D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the upper end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT II.
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2011-12 to FY 2012-13 Initial Operating Capability 2015 to 2017
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Materiel Logistic Information Systems(02) 6265 1101
Project Director JP 2077 Phase 2D(03) 9256 3199
Project Website:www.defence.gov.au/dmo/coo/jp2077/index.cfm
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
112
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 2 Hyper–Spectral ImagingJP 2078
Phase Scope
This phase aims to develop an operational hyper-spectral imaging (HSI) capability. Hyper-spectral imaging provides remotely sensed detection, classification and identification of the earth’s features and other objects through spectral analysis of more than 100 bands of reflected and radiant energy in the visible and near-visible portion of the electro-magnetic spectrum.
Background
This capability is intended to aid in the detection and identification of hard to detect targets. This may include (but is not limited to) detecting facilities associated with the production of weapons of mass destruction and improvised explosive devices, as well as military equipment under camouflage or in deep hide. It also has the ability to provide information on soil conditions and mineral content, and to provide a passive unique target identification capability. Imaging sensors may be mounted on manned or unmanned aircraft or on space-based platforms.
The desired outcomes of Phase 2 are:
> a definition study to provide Defence with an understanding of the potential uses and counter-uses of advanced hyper-spectral imaging techniques; and
> based on the outcomes of the study, provide Defence with a HSI capability, which may involve receiving HSI data from a collaborative partnership with either a commercial or existing international partner agency, for independent processing, exploitation and storage of HSI data by Australia.
Australian Industry Opportunities
Acquisition
The project has the potential for Australian industry and the Defence Science and Technology Organisation (DSTO) to work together on a HSI system from the planning and development stages to in-service implementation.
Opportunities may exist for Australian industry to conduct the preliminary definition study that would analyse the application of advanced hyper-spectral imaging techniques. DSTO may also be interested in undertaking this study or assisting in the provision of scientific expertise.
Opportunities may also exist for industry to participate in a collaborative partnership with an international commercial or partner agency, to assist in the development, marketing and support of a HSI system. Further opportunities may also exist for data processing and storage. This project has the potential to incorporate a number of airborne platforms that could provide additional opportunities for industry. Discussion with Australian industry is likely to commence around 2012.
Through-life Support
It is envisaged that the ongoing support of the HSI hardware and software would be arranged through a through-life support (TLS) contract. The TLS contract would incorporate the ongoing development of the HSI system and it is anticipated that DSTO would provide assistance with ongoing development and improvements.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
113
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’
war
e)
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Hyp
er-S
pect
ral T
echn
olog
y
Assemble / Install D D D
Design D D D D
Education / Training D D D
In-Service / Through-life Support D D D D D D
Logistics Support D D D D D D
Manufacture / Construct D D D
Modelling / Simulation D
Project Manage D D D D D D
Refurbish / Upgrade D D D
Repair and Maintain D D D
Research and Development D D
Software Development / Support D D D D D
Systems Definition / Development D D D D D
Systems Integration D D D D D
Test and Evaluate D D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2016-2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Space Systems(02) 6265 2970
Director Military Geographic Information Systems Program Office (02) 6265 5635
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
114
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 2B.1 Defence Management Systems Improvement – Personnel Systems ModernisationPhase 3 Defence Management Systems Improvement – Finance System JP 2080
Phase Scope
These phases are intended to enhance Defence’s core financial and personnel information systems to accommodate changes in user requirements, technical platforms and upgrades to the commercial applications on which they are based. This ensures the ongoing sustainability of the Defence Enterprise Resource Planning Systems to support Defence capability and decision making requirements.
Background
This project seeks to improve the range and quality of functionality and information available to managers, deliver business efficiencies and improve the interchange of management information within Defence’s corporate support systems. It also provides an opportunity for the coordination of existing management information initiatives from individual programs and is expected to address a range of architectures, policies, procedures and standards to guide the provision of management information and improve processes.
The project comprises of these phases:
> Phase 1 (completed) provided a number of urgent improvements to selected Defence management systems;
> Phase 2 (Phase 2A (completed) and Phase 2B.2 (completed) and Phase 2B.1 (unapproved)) is intended to improve the sustainability, efficiency and effectiveness of Defence’s finance and personnel management systems; and
> Phase 3 aims to further enhance and /or upgrade the finance management information systems to ensure that they continue to provide effective support to the Australian Defence Organisation.
Phase 2B has previously received first pass approval from Government, however the sub-phase 2B.1 will be required to seek an amended first pass and second pass approval.
Australian Industry Opportunities
Acquisition
Phases 2B.1 and 3 provide opportunities for the Information Technology (IT) industry in Australia. It is anticipated that through an open tender, IT service providers will have the opportunity to implement Commercial-off-the-Shelf (COTS) product solutions to meet Defence requirements. Services include project management, change management, training and process improvement.
Through-life Support
Industry support sought will be around the development and maintenance of sufficient capability within Australia to undertake a full range of implementation and through-life maintenance support activities.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 2B.1 and 3 Capability
Activity
Syst
em
Assu
ranc
e C
apab
ilitie
s (H
’war
e &
S’
war
e)
Syst
em
Life
Cyc
le
Man
agem
ent
Syst
ems
Inte
grat
ion
(Hig
h En
d,
Syst
em o
f Sy
stem
s)
Assemble / Install O O
Design D D D
Education / Training D
In-Service / Through-life Support D
Refurbish / Upgrade D D D
Software Development / Support D D D
Systems Definition / Development O D O
Systems Integration D D D
Test and Evaluate D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
115
Acquisition Category (ACAT)
Phase 2B.1
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 3
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low < $100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 2B.1 FY 2010-11 to FY 2011-12Phase 3 FY 2009-10 to FY 2010-11
Year-of-Decision Phase 2B.1 FY 2012-13 to FY 2014-15Phase 3 FY 2010-11 to FY 2011-12
Initial Operating Capability Phase 2B.1 2014 to 2016Phase 3 2012 to 2014
Point of Contact
Phase: Chief Information Officer Group:Phases 2B.1 and 3 Project Director
(02) 6266 4780
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
116
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 2/3 Explosive Ordnance WarstockJP 2085
Phase Scope
This phase seeks to remediate the ADF’s Explosive Ordnance (EO) stocks in order to ensure that joint forces have appropriate operational viability period stocks for a range of concurrent contingencies in accordance with Government expectations of Defence.
Background
This project seeks to reconstitute reserve stocks of EO. Recent operational tempo has placed pressure on reserve stockholdings. While routine operating stock replenishment activity will continue, this project seeks to re-establish appropriate quantities of EO reserve stocks. An earlier phase (Phase 1) was focused on the ADF’s highest priority EO natures. This phase will extend the project by increasing reserve stockholdings of other EO natures.
Australian Industry Opportunities
Acquisition
The scope of this phase is confined to increasing reserve stockholdings of EO natures that are currently in-service with the ADF. While Australian industry involvement will therefore probably be focused around existing local supply arrangements, Defence is keen to build on the strategic advantages offered by domestic manufacturing capability. Potential exists for new opportunities to emerge in the EO domain.
Through-life Support
Extensive opportunities exist for Australian industry to provide through-life support services to the ADF’s EO inventory, including activities such as training support, logistics support, refurbishment, repair, maintenance, systems integration, testing and evaluation. These opportunities will continue in support of the additional reserve stocks to be acquired under this phase.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Sele
cted
Bal
listic
M
uniti
ons
&
Expl
osiv
es
Assemble / Install D
Design D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct O
Modelling / Simulation O
Project Manage O
Refurbish / Upgrade D
Repair and Maintain O
Research and Development O
Software Development / Support O
Systems Definition / Development D
Systems Integration O
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
117
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m–$1500m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 4 Low
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Explosive Ordnance (02) 6265 1003
Guided Weapons:Deputy Director Emerging Projects (02) 6265 1464
Non-Guided Explosive Ordnance:Director Project Assurance and Capability Enhancement (02) 4737 0807
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
118
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 2B Tactical Information Exchange Domain (Data Links)Phase 3 Tactical Information Exchange Domain (Data Links)JP 2089
Phase Scope
This project is intended to establish a coherent and coordinated environment for tactical information exchange through a system-of-systems data network. The scope of the project is to:
> define the standards for the ADF Tactical Information Exchange Domain (TIED) to ensure Joint and Combined Interoperability;
> deliver the infrastructure to support the ADF TIED; and
> invest in legacy systems to enable them to operate to the required standards within the TIED.
Phase 2B is intended to implement a Variable Message Format (VMF) digital communication system on F/A-18A/B Hornet aircraft to provide greater interoperability with land forces during Close Air Support (CAS) missions.
Phase 3 is intended to implement a VMF Tactical Information Exchange (TIE) solution for the Tiger Armed Reconnaissance Helicopter (ARH) and to further develop the common support infrastructure to support the TIED.
Background
TIE systems, including Tactical Data Links, are key to information exchange connectivity within networked defence forces. Under JP 2089, the ADF is introducing a coherent and coordinated TIE environment and is systematically introducing TIE capability to selected legacy platforms.
Previous phases of JP 2089 include:
> Phase 1 was a project definition study to quantify TIE requirements to ensure all current and future ADF platforms can seamlessly exchange tactical information across the battlespace; and
> Phase 2A (in progress) will provide VMF and Link-16 integration with the Mark 3E Combat Management System on the ANZAC Class frigates and provide the initial common support infrastructure to support the TIED.
Australian Industry Opportunities
Acquisition
For Phase 2B it is expected that TIE solutions for F/A-18A/B Hornet aircraft will be achieved through leveraging off current project contracts and within existing maintenance and support arrangements.
For Phase 3 the industry requirements are yet to be fully developed, however Australian industry involvement is expected in the majority of the proposed activities.
Through-life Support
For Phase 2B it is expected that through-life support for the TIE solutions for the F/A-18A/B will be achieved through leveraging off current project contracts.
For Phase 3 the industry requirements will be based upon developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life operation, maintenance, and support activities.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
119
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 2B Capability
Activity
Rot
ary
& F
ixed
W
ing
Airc
raft
Supp
ort o
f Mis
sion
&
Saf
ety
Cri
tical
So
ftw
are
Assemble / Install D D
Design D D
Education / Training D D
In-Service / Through-life Support D D
Logistics Support D D
Modelling / Simulation D
Project Manage D
Repair and Maintain D
Software Development / Support D D
Systems Integration D
Test and Evaluate D D
Phase 3 Capability
Activity
Rot
ary
& F
ixed
W
ing
Airc
raft
Supp
ort o
f Mis
sion
&
Saf
ety
Cri
tical
So
ftw
are
Faci
litie
s &
In
fras
truc
ture
Assemble / Install D D D
Design D D D
Education / Training D D
In-Service / Through-life Support D D D
Logistics Support D D
Manufacture / Construct D
Modelling / Simulation D
Project Manage D D
Refurbish / Upgrade D
Repair and Maintain D D
Software Development / Support D D
Systems Integration D
Test and Evaluate D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
120
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
Phase 2B
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low < $100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Phase 3
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 2B CompletePhase 3 FY 2010-11 to FY 2011-12
Year-of-Decision Phase 2B FY 2009-10 to FY 2010-11Phase 3 FY 2012-13 to FY 2014-15
Initial Operating Capability Phase 2B 2012 to 2014Phase 3 2014 to 2016
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 2B and 3 Staff Officer Communications Air
(02) 6265 7215Project Director JP 2089 (02) 6266 0722
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
121
JP 2090Phase 1C Combined Information Environment
Phase Scope
This phase is intended to improve Defence’s ability to share information with allies and coalition partners.
Background
This project seeks to upgrade and augment the core infrastructure and services currently available to the Australian Defence Organisation (ADO), to facilitate classified information exchange with allied coalition partners. The project builds on the extant coalition and gateway infrastructure, developed under the Combined ENTerprise Regional Information eXchange System (CENTRIXS) and Griffin initiatives respectively, to improve and expand Australia’s multi-national collaboration capabilities. This capability is important for Defence to enable it to support both the planning and conduct of operations and the day-to-day business of Defence with other nations.
Other phases of JP 2090 include:
> Phase 1A (complete) has developed a capability demonstrator as a potential solution to multi-level information security in the coalition environment; and
> Phase 1B (in progress) is providing an initial bilateral information exchange capability with the United States and the United Kingdom, Canada and New Zealand.
Australian Industry Opportunities
Acquisition
Phase 1C is principally a systems integration project utilising multi-nationally agreed designs, to upgrade and augment the ADO’s existing information exchange capabilities. The Chief Information Officer Group (CIOG) is the prime systems integrator for the project, leading a team comprising of Defence and industry representatives and using existing CIOG sourcing arrangements. It is expected that elements of the project are to be contracted out to industry using these existing arrangements. The majority of both the hardware and software components are likely to be Commercial-off-the-Shelf (COTS) items, with some specialist items sourced as either Military-off-the-Shelf (MOTS) or COTS.
Through-life Support
Phase 1C is delivering a range of multi-national information sharing capabilities that are expected to be integrated into Defence’s existing Information and Communications Technology (ICT) through-life support arrangements to the maximum extent possible. Hence, the majority of industry involvement is through existing ICT sourcing arrangements. Additional through-life support arrangements for specialist hardware and software is organised during the acquisition phase and incorporated as part of the CIOG ICT sourcing arrangements.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
122
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Faci
litie
s &
Infr
astr
uctu
reAssemble / Install D D D D
Design D D D D
Education / Training D D D D
In-Service / Through-life Support D D O D
Logistics Support D D D D
Manufacture / Construct D O D D
Project Manage D D D D
Refurbish / Upgrade D D D D
Repair and Maintain D D D D
Research and Development O O O O
Software Development / Support D D D
Systems Definition / Development D D D D
Systems Integration D D D D
Test and Evaluate D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the upper end of the band)
Project Management Complexity Level 4 Low
Schedule Level 3 Moderate
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11
Year-of-Decision FY 2010-11 to FY 2011-12
Initial Operating Capability 2011 to 2013
Points of Contact
Capability Staff: Chief Information Officer Group:Staff Officer Coalition Infrastructure(02) 6265 1316
Director Coalition Networks and Wide Area(02) 6128 7176
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
123
JP 2096Phase 1 Surveillance Enhancement
Phase Scope
Phase 1 is intended to focus on the design and developments of an architecture that will provide networked access to the growing volumes of data sourced from multiple surveillance sensors available to the Australian Defence Organisation (ADO), and facilitate the related information management (including tasking and dissemination) of the sensor outputs.
Background
The Defence Capability Plan contains many projects that deliver platforms and capabilities that contribute to the supply of Intelligence, Surveillance and Reconnaissance (ISR) data. Allied systems and other ADF initiatives are also adding to this volume. The achievement of an information edge in a networked force requires that this information is managed and mustered to best affect Defence’s command and decision making. The intent of this project is to provide the means of managing and delivering information in a timely manner.
This project aims to enhance Defence ISR through the efficient management, analysis and integration of ISR assets into a Defence wide architecture. The project focuses on the provision of the means by which ISR assets across Defence are integrated into the Australian Defence ISR Integration Backbone (ADIIB) architecture and this phase is focussed on the design and development of that architecture. The use of appropriate communications and IT infrastructures will ensure that the right information is provided to the right person at the right time to provide Defence with information advantage over adversaries. This project will seek to ensure that ISR resources and information are effectively utilised by enabling coordinated tasking and exploitation of all ISR assets and effective dissemination of ISR data. This system-of-systems project also encompasses the provision of the means to achieve the federation and networking of distributed databases (the holding repositories for the collected data and the processed information and intelligence).
Australian Industry Opportunities
Acquisition
Although industry requirements in support of this project have not yet been developed, the following needs are anticipated:
> specialist consulting services in the design, development and integration of very sophisticated high level architecture to fulfil the ADIIB system requirements;
> sophisticated software along with a significant amount of hardware to enhance operational capability and future developments for the ADIIB system; and
> the provision of design, development and integration capabilities for the various products that will be identified as deliverables of the project.
Through-life Support
Opportunities are likely to exist for Australian industry in the through-life support of the software and hardware items provided under this project.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
124
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’
war
e)
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Hig
h Le
vel A
rchi
tect
ure
Des
ign
Design D D D D
Education / Training D D
In-Service / Through-life Support D D D D D
Logistics Support D D D
Modelling / Simulation D D
Project Manage D D D D D D
Refurbish / Upgrade D
Repair and Maintain D
Software Development / Support D D D D D
Systems Definition / Development D D D D D
Systems Integration D D D D D
Test and Evaluate D D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Director Intelligence and Geospatial Development(02) 6265 3489
Director Military Geographic Information Systems Program Office(02) 6265 5635
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
125
JP 2097Phase 1B REDFIN – Enhancements to Special Operations Capability
Phase Scope
This phase seeks to enhance two high priority Special Operations capabilities, in order to maintain a capability edge over emerging threats to Australia’s national interests:
> Land Mobility. It is intended that the land mobility capability provides three fleets of vehicles to support the tactical manoeuvre of Special Operations and to replace obsolete vehicles. This capability enhancement would focus on the key requirements of mobility, survivability, sustainability, knowledge and lethality.
> Networked Special Operations Capability (NSOC). The NSOC provides an integrated information environment and a range of electronic systems to support the spectrum of Special Operations. This capability enhancement focuses on the key requirements of information exchange, information management, situational awareness, decision support and battlespace sensing.
Background
The ADF Special Operations capability includes offensive operations (such as strike and direct action), special reconnaissance, special recovery, support operations and counter-terrorism.
Australian Industry Opportunities
Acquisition
This phase will seek to procure equipment systems that are highly interoperable with the remainder of the ADF as well as with coalition partners. Military-off-the-Shelf equipment will be sought for both the land mobility and NSOC elements of the project and integrated into the REDFIN capability. It is expected that there will be opportunities for Australian industry in this phase including component production, systems integration, trials and testing, training development, and training.
Through-life Support
It is expected that there will be opportunities for Australian industry to provide through-life support for Phase 1B, but due to the nature of some of the systems sought, through-life support will be provided by original equipment manufacturers. However, where possible it is envisaged that support services contracts would be competitively tendered. Possible opportunities for Australian industry to provide through-life support include scheduled maintenance, repairs, engineering and logistic analysis services, modifications, spare parts supply, technical documentation and training.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
126
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Faci
litie
s &
In
fras
truc
ture
Land
Veh
icle
s
Com
mun
icat
ions
Sy
stem
s
Com
man
d &
C
ontr
ol S
yste
ms
Assemble / Install O O O O
Design O
Education / Training O O O
In-Service / Through-life Support O O O O
Logistics Support O O O
Manufacture / Construct O
Modelling / Simulation O O
Project Manage O
Refurbish / Upgrade O O O
Repair and Maintain O O O O
Software Development / Support O O
Systems Definition / Development O O
Systems Integration O O O
Test and Evaluate O O O
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 4 Low
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11Year-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Special Operations(02) 6265 5215
Project Director JP 2097 Phase 1B(03) 9282 3957
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
127
JP 2099Phase 1 Identity Management – Project CERTE
Phase Scope
This project proposes a Defence-wide identity management capability to provide a comprehensive and trusted source of highly assured identities and manage the verification and control of Defence Identities throughout all phases of the Identity lifecycle. This standards compliant capability is expected to establish a common identity service that can be leveraged throughout Defence’s operational and corporate systems environment. The capability is expected to provide the basis for trust and security in the electronic environment through authentication, data integrity and non-repudiation to desktop. It provides personnel and systems with reliable, timely and authoritative confirmation of the electronic identity of other personnel and network-aware resources (including computing devices, sensors and weapon systems) operating across fixed and deployed components of Defence’s information environment. This phase is intended to:
> define and deliver policy, governance and assurance processes and standards to create and manage Defence Identity information throughout its lifecycle;
> establish a governance structure to manage and control Defence Identity; and
> implement the necessary technical infrastructure to deliver, integrate and support the operation of the common service as part of the Defence Information Environment.
Background
This project is a major information security enablement investment, requiring a significant business process re-engineering effort to support electronic authentication through mechanisms such as smart card and Public Key Infrastructure-based authentication technologies. Its principle objective is to achieve identity assurance and data integrity, both critical foundations for information assurance, and providing the security services required to achieve agreed network centric warfare outcomes. It is a key contributor to electronic interoperability with coalition partners.
The proposed capability recognises that a trusted source of identity, available as a common service, is increasingly critical as Defence’s operational dependence on data exchange and information sharing between networked personnel and systems continues to increase in all capability areas. The proposed capability enables Defence to adopt a coherent, strategic approach to Identity Management. Capability implementation focuses primarily on policy, governance and business processes and the cultural change required by Defence to achieve the capability outcomes.
Australian Industry Opportunities
Acquisition
Acquisition of a Commercial-off-the-Shelf (COTS) system, is to be conducted through a staged procurement process, involving an Open Request for Proposal (released November 2008) followed by a Select Request for Tender (scheduled for around November 2009).
Through this process, the Commonwealth intends to engage a Prime Systems Integrator (PSI) to deliver the required capability under two separate, but linked, contracts; an acquisition contract and a sustainment contract.
The acquisition contract is expected to implement the proposed Identity Management common service capability system, integrating the capability into the Defence Information Environment and supporting the necessary cultural and organisational change required to support the adoption of the capability.
Industry activities in support of this project would include:
> systems integration and ongoing support, incorporating systems engineering tasks (potentially including design and development for some components), project management, system acquisition and support, integration and testing of equipment and services;
> software development to support the integration of various subsystems into the overall solution;
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
128
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
> specialist consulting services, including organisational change management and security and identity management policy; and
> opportunities to locally source a range of COTS information technology hardware and software, including Smartcards, Smartcard readers, enrolment workstations, token printers, and server hardware and software.
The implementation of the capability is also expected to involve facility upgrades at a number of existing Defence Pass Offices. The upgrades are outside the scope of the acquisition contract proposed for the common service, and are to be managed regionally.
Through-life Support
A PSI is to be engaged under the sustainment contract to provide the necessary through-life support services for the support and maintenance of the identity management specific components of capability introduced by the project. Existing support contracts are to be used where appropriate.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Anti-
Tam
peri
ng
Cap
abili
ties
Com
mun
icat
ions
Sec
urity
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Secu
re T
est F
acili
ties
&
Test
Ran
ges
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Faci
litie
s &
Infr
astr
uctu
re
Assemble / Install D
Design D D D D
Education / Training D
In-Service / Through-life Support D D D D
Logistics Support D D
Manufacture / Construct D
Project Manage D D
Refurbish / Upgrade D D D
Software Development / Support D D
Systems Definition / Development D D O
Systems Integration D D D
Test and Evaluate D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 1 Very High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT II.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
129
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2012 to 2014
Points of Contact
Chief Information Officer Group:(Sponsor)
Chief Information Officer Group: (Acquisition & Sustainment)
Director Electronic Business Integration(02) 6128 7592
Project Manager Application Development Branch(02) 6266 3993
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
130
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1A Chemical, Biological, Radiological, Nuclear DefencePhase 1B Chemical, Biological, Radiological, Nuclear DefenceJP 2110
Phase Scope
Phase 1A is intended to purchase Military- or Commercial-off-the-Shelf (MOTS or COTS) chemical and radiological point detectors that are either already in use within the ADF or and allied defence force.
Phase 1B has a broader scope including items requiring systems integration or additional evaluation. It will address the five elements of Chemical, Biological, Radiological and Nuclear Defence (CBRND):
> detection, identification and monitoring;
> warning and reporting;
> physical protection;
> hazard management; and
> medical support.
Background
Recent deployments and terrorist activities have heightened concerns about CBRND challenges for the ADF. In almost all deployments, the possibility of Toxic Industrial Hazards (TIH) arises.
This project aims to improve the ADF CBRND capability through the protection of personnel from the strategic, tactical and physiological impacts of exposure to TIH and CBRN weapons. This will be achieved by anticipating, training and equipping for such eventualities, so that operations can continue in CBRN environments.
Australian Industry Opportunities
Acquisition
The acquisition strategy is currently being developed for Phase 1A and is likely to provide limited opportunities for Australian industry. The likely acquisition strategy for Phase 1B is not clear at this stage but depending upon the maturity of systems within the market, the procurement may consider one, or a combination of, the following:
> MOTS and/or government-to-government arrangements such as Foreign Military Sales; or
> open tender.
Through-life Support
The through-life support concept for Phase 1A is likely to be similar to through-life support for current in-service equipment. Phase 1B will consider supportability options for fleet management, repair and maintenance, storage and distribution, provision of technical data and training as a minimum. It is anticipated that this project will make use of current in-service capacity and facilities, or original equipment manufacturer support, or a combination of both. Contracts for such support will generally be considered at the time of acquisition.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
131
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 1A and 1B Capability
Activity
Com
bat C
loth
ing
& P
erso
nal
Equi
pmen
t
Che
mic
al,
Bio
logi
cal,
Rad
iolo
gica
l and
N
ucle
ar D
efen
ce
Education / Training D D
In-Service / Through-life Support D D
Logistics Support D D
Refurbish / Upgrade D
Repair and Maintain D
Systems Integration D D
Test and Evaluate D D
Acquisition Category (ACAT)
Phase 1A
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
Phase 1B
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 1APhase 1B
FY 2009-10 to FY 2010-11FY 2011-12 to FY 2012-13
Year-of-Decision Phase 1APhase 1B
FY 2009-10 to FY 2010-11FY 2013-14 to FY 2015-16
Initial Operating Capability Phase 1APhase 1B
2011 to 20132015 to 2017
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 1A and 1B Staff Officer Nuclear, Biological
and Chemical Defence(02) 6265 7850
Land Systems Division EmergingProject Team(03) 9282 6933
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
132
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Non-Lethal WeaponsJP 3011
Phase Scope
This phase seeks to update the current non-lethal capabilities of the ADF across all three Services and make them more relevant to the threats faced now and in the future. This phase will replace current non-lethal weapons and provide some enhanced non-lethal capabilities.
Background
This project seeks to address current limitations within the ADF’s Joint non-lethal capability. Capabilities that span a wide range of technology classifications are in development across the globe and this project will seek to take advantage of these developments as they mature.
Australian Industry Opportunities
Acquisition
The likely acquisition strategy is not clear at this stage but depending on the maturity of systems within the market, the procurement may consider one of the following or a combination:
> Military-off-the-Shelf and/or government-to-government arrangements such as Foreign Military Sales; or
> open tender.
Through-life Support
The through-life support concept for this project will consider supportability options for fleet management, repair and maintenance, storage and distribution, provision of technical data and training as a minimum. The support program will also take advantage of current in-service capacity and facilities, or original equipment manufacturer support or a combination of both. Contracts for such support will generally be considered at the same time as acquistion.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase inlcude:
Activity Capability
Non
-let
hal
Wea
pons
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Refurbish / Upgrade D
Repair and Maintain D
Software Development / Support D
Systems Integration D
Test and Evaluate D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
133
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Small Arms(02) 6265 1863
Land Systems Division Emerging Project Team(03) 9282 7165
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
134
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
JP 3021 Phase 1 Joint Combined Training Capability (JCTC)
Phase Scope
This phase is intended to expand the functionality of the Joint Combined Training Capability to assist in the training on electronic warfare systems and the responses to electronic warfare threats.
Background
The project seeks to provide the ADF with a capability to simulate electronic warfare threats in a training environment thus enhancing the realistic training and evaluation of ADF and allied platforms.
Australian Industry Opportunities
Acquisition
It is envisaged that the core of this capability will be acquired as off-the-shelf solutions from allied sources using government-to-government acquisition such as Foreign Military Sales. Opportunities for local industry involvement may exist in integration, mobile installation and servicing.
Through-life Support
The through-life support of the materiel systems delivered by this project is expected to be contracted to Australian industry.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Elec
tron
ic
War
fare
Assemble / Install D
Education / Training D
In-Service / Through-life Support D
Repair and Maintain O
Systems Integration D
Test and Evaluate D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the lower end of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
135
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Director Network Infrastructure Development(02) 6265 2079
Director Airborne Self Protection Systems Program Office (02) 6265 1615
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
136
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Woomera Range RemediationJP 3024
Phase Scope
This project seeks to replace the Aerospace Test and Evaluation (T&E) and Research and Experimentation (R&E) equipment at the Woomera Test Facility in order to effectively support Defence T&E and R&E activities in a reliable, controlled, secure and safe environment.
Background
The current systems used at the Woomera Test Facility are near the end of their useful life and will not meet the requirements to support future Defence aerospace experimental, developmental and operational T&E flight trials of air platforms and weapons. Replacement of the extant systems will enable Defence to support all types of aerospace T&E and R&E beyond 2015 including the extension of manned and unmanned aircraft performance envelopes, weapons assessment (including the ability to release stand-off/beyond visual range live weapons), T&E and R&E for intelligence and electronic warfare systems, and R&E into the effects of weapon systems.
Australian Industry Opportunities
Acquisition
The preferred method of acquisition is to seek Commercial- or Military-off-the-Shelf (COTS or MOTS) systems to the maximum extent possible through open tender. Industry opportunities will be available in the supply, installation and integration of the new capability. It is likely that any new equipment sourced from overseas manufacturers will require Australian in-country partners to manage the installation, integration and set-to-work at site level. Government-to-government or Foreign Military Sales may be an option for the acquisition of some systems.
Through-life Support
Through-life support to the maximum extent possible using extant Defence corporate logistics tools and processes is expected for this capability. This will include seeking that engineering, maintenance and logistics support contracts be signed at the same time as acquisition.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Syst
ems
Inte
grat
ion
(Hig
h En
d,
Syst
em o
f Sy
stem
s)
Assemble / Install D
Design D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct D
Modelling / Simulation D
Project Manage D
Repair and Maintain D
Research and Development D
Software Development / Support D
Systems Definition / Development D
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
137
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Director Network Infrastructure Development(02) 6265 2079
Deputy Director JP 3024(08) 8393 2206
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
138
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Deployable Incident Response Regiment (IRR) CapabilityJP 3025
Phase Scope
This phase aims to improve the specialist Chemical, Biological, Radiological, Nuclear and Explosive (CBRNE) defence capability within the ADF. This will be achieved by expanding current capabilities of the Incident Response Regiment (IRR) to provide a rapidly deployable, specialist CBRNE prevention and response capability. This expanded capability will include specialist CBRNE reconnaissance and search support to Special Forces operations.
Background
Global events and recent deployments have heightened awareness of the potential for large-scale CBRNE incidents. The IRR was raised to provide response to domestic CBRNE incidents and rescue within the broader ADF. Project JP 3025 is the next step in developing a mature CBRNE defensive capability for the ADF.
Capabilities to be provided by related projects JP 2110, LAND 125 and JP 3025 will provide an integrated CBRNE defensive capability for the ADF.
Australian Industry Opportunities
Acquisition
The likely acquisition strategy is not clear at this stage but depending on the maturity of systems within the market, the procurement may consider one of, or a combination of the following:
> Military-off-the-Shelf and/or government-to-government arrangements such as Foreign Military Sales; or
> open tender.
Through-life Support
The through-life support concept will consider supportability options for fleet management, repair and maintenance, storage and distribution, provision of technical data and training as a minimum. Use may be made of current in-service capacity and facilities, or original equipment manufacturer support or a combination of both. Contracts for such support will be considered at the time of acquisition.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Com
bat C
loth
ing
&
Per
sona
l Equ
ipm
ent
Che
mic
al, B
iolo
gica
l, R
adio
logi
cal a
nd N
ucle
ar
Def
ence
Education / Training D D
In-Service / Through-life Support D D
Logistics Support D D
Refurbish / Upgrade D
Repair and Maintain D
Systems Integration D D
Test and Evaluate D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
139
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Nuclear, Biological and Chemical Defence (NBCD)(02) 6265 7850
Land Systems Division Emerging Project Team(03) 9282 6933
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
140
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 JDAM EnhancementsJP 3027
Phase Scope
This phase intends to enhance the performance of the Joint Direct Attack Munitions (JDAM) family of weapons currently in-service with the Air Force. Possible enhancements include a range extension wing kit, improved guidance systems and improvements to the warhead.
Background
The JDAM is the principle direct attack weapon of the F/A-18 and relies on Global Positioning System (GPS) guidance to provide excellent accuracy. A Capability Technology Demonstrator (CTD) program conducted by the Defence Science and Technology Organisation (DSTO), Hawker De Havilland and Boeing IDS successfully demonstrated a significant range extension for the 500lb JDAM in flight trials at Woomera in 2008. The CTD employs a JDAM extended range (JDAM-ER) wing kit that allows the JDAM to glide to its designated target. This phase is intending to conduct activities to adapt this technology for production, conduct final certification of the JDAM-ER on the F/A-18A/B, and acquire a number of wing kits.
The improved guidance system may be based on a laser guidance system (Laser JDAM), that will provide the ability for strike aircraft to effectively attack moving targets, and targets where the coordinates are not adequately refined, by using its own or a third party’s laser designator; whilst retaining the original JDAM GPS guidance modes.
The improvements to the warhead could include a low collateral damage warhead that will provide strike aircraft with the ability to engage targets in urban or other collaterally sensitive areas with the minimum possible risk to surrounding structures and/or personnel.
Introduction of these enhancements will increase the range of targets available to strike aircraft resulting in increased flexibility and effectiveness with a reduced logistics footprint.
Australian Industry Opportunities
Acquisition
Australian industry will be involved in the design, development and manufacture of the JDAM-ER wing kit. The other possible enhancements have been developed overseas and thus procurement is likely to be from overseas suppliers.
Through-life Support
There may be opportunities for Australian industry to provide logistics support.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
ACTIVITY CAPABILITY
Gui
ded
Wea
pons
Assemble / Install D
Manufacture / Construct D
Modelling / Simulation D
Project Manage D
Research and Development O
Systems Integration D
Test and Evaluate O
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
141
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the upper end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2010-11 to FY 2011-12Initial Operating Capability 2012 to 2014
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Combat EnablersAerospace Development Branch(02) 6265 5442
Director Emerging Projects Guided Weapons Branch(02) 6265 1464
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
142
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Defence Simulation ProgramJP 3028
Phase Scope
This phase will deliver a variety of simulation systems and supporting infrastructure to the Australian Defence Organisation (ADO).
Background
Simulation provides a significant capability to Defence and ensures the ADF is well equipped, well trained and ultimately well prepared. It represents real situations without the cost of using real equipment or the risk (to personnel and equipment) associated with real military activities.
The Defence Simulation Roadmap 2006 details the ADO plan for the future development of simulation. It plans for an increase in the use of Navy, Army, Air Force and Joint simulation to enhance capability, reduce risk, and save resources. This project is the acquisition program that will provide the simulation systems required to deliver these benefits.
Australian Industry Opportunities
Acquisition
As an acquisition program, this project will acquire simulation systems and supporting infrastructure from multiple sources, with industry consultation commencing late in 2009. Australian industry will be able to compete for the provision of both the simulation systems and the supporting infrastructure.
Through-life Support
Australian industry will have the opportunity to be involved in the ongoing operation and maintenance of the various simulators acquired.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
ACTIVITY CAPABILITY
Acou
stic
Tec
hnol
ogie
s &
Sys
tem
s
AEW
&C
Sys
tem
s
Arm
oure
d Ve
hicl
es
Com
mun
icat
ions
Sec
urity
Elec
tron
ic W
arfa
re
Gui
ded
Wea
pons
Infa
ntry
Wea
pons
& R
emot
e W
eapo
ns S
tatio
ns
Pro
tect
ion
of N
etw
orks
, Com
pute
rs &
Info
rmat
ion
Rot
ary
& F
ixed
Win
g Ai
rcra
ft
Secu
re T
est F
acili
ties
& T
est R
ange
s
Sele
cted
Bal
listic
Mun
ition
s &
Exp
losi
ves
Subm
arin
es
Surf
ace
Nav
al V
esse
ls
Syst
em A
ssur
ance
Cap
abili
ties
(H’w
are
& S
’war
e)
Syst
em L
ife C
ycle
Man
agem
ent
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Targ
etin
g &
Pre
cisi
on N
avig
atio
n
Sim
ulat
ion
Syst
ems
for
Vari
ous
Pla
tfor
ms
Assemble / Install D
Design D
Education / Training O
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct D
Modelling / Simulation D O D D O D D D D D O D D D D D D D
Project Manage O
Refurbish / Upgrade D
Repair and Maintain D
Research and Development D
Software Development / Support D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
143
Acquisition Strategy (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m-$1500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT II.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability Various from 2017 onwards
Points of Contact
Capability Staff: Defence Materiel Organisation:JP 3028 Desk Officer(02) 6265 3451
Director Aerospace Simulators and Special Purpose Aircraft(02) 6127 2775
Project Website: www.defence.gov.au/capability/ADSO
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
144
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 3 ADF Navigation Warfare (NAVWAR) CapabilityJP 5408
Phase Scope
This project is intended to enhance Global Positioning Systems (GPS) on legacy ADF platforms by providing either protection or redundancy capabilities in response to GPS denial activities. The provision of such systems is expected to enable selected ADF capabilities to conduct operations in a navigation warfare environment. Phase 3 continues the implementation of those legacy platforms that were not included in Phase 2B.
Background
JP 5408 aims to provide GPS NAVWAR protection to key ADF platforms.
The phases include:
> Phase 1 (approved) is ongoing and included a project definition study that defined the scope of enhancements and replacements for the current GPS systems. The project definition study was delivered in 2002; and
> Phase 2B (approved) and Phase 3, are intended to incrementally implement the enhancements and replacements to the ADF’s GPS equipment as recommended by the results of the Phase 1 study.
Australian Industry Opportunities
Acquisition
Industry opportunities for Phase 3 may include the development and integration of GPS enhancement modifications into nominated ADF platforms and development of relevant support systems.
Through-life Support
Defence’s intent is for all phases of this project to be based around developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life maintenance and support activities.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Rot
ary
& F
ixed
W
ing
Airc
raft
Subm
arin
es
Surf
ace
Nav
al
Vess
els
Targ
etin
g &
P
reci
sion
N
avig
atio
n
Education / Training D
Repair and Maintain D
Systems Integration D D D D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
145
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the upper end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2010-11 to FY 2011-12Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Combat EnablersAerospace Development Branch(02) 6265 5442
Project Manager JP 5408Navigation Warfare Systems Program Office (02) 6265 1192
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
146
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Artillery Replacement LAND 17
Phase Scope
This phase is intended to enhance the Australian Army’s indirect fire support system through the replacement of the 105mm Hamel and 155mm M198 Howitzer fleets when they reach the end of their service life with a mix of towed and self-propelled 155mm guns.
Background
The Australian Army’s current offensive support system is based on procedures that date back to the 1960s, and ammunition and Howitzer technologies developed in the 1970s which were introduced into Australian service in the 1980s. The changing nature of operations in land and littoral environments require the Army’s offensive support system to have the ability to apply precise lethal and non-lethal effects from mortars, howitzers, ships and aircraft over large areas of the battlefield. The modernised offensive support system will be characterised by responsiveness, high tactical mobility, greater autonomy and survivability. It is intended that the modernised system will complement current and future ADF surveillance, target acquisition, digitisation and land logistic capabilities.
Australian Industry Opportunities
Acquisition
The project intends to utilise a conventional acquisition model. It is anticipated that the methods of procurement will be through open competition and the United States (US) Foreign Military Sales program.
Through-life Support
It is anticipated that through-life support will involve a combination of Commonwealth, contractor, and US Government (Foreign Military Sales) mechanisms. A performance based logistics approach will be investigated. In-service support concepts for each capability element will examine the potential benefits of a holistic approach to the delivery of platform support.
The overall objective is to have the full scope of support services in place by the time the delivery of the mission system has been completed.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
147
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Anti-
Tam
peri
ng C
apab
ilitie
s
Arm
oure
d Ve
hicl
es
Com
mun
icat
ions
Sec
urity
Com
posi
te &
Exo
tic M
ater
ials
Infa
ntry
Wea
pons
& R
emot
e W
eapo
ns S
tatio
ns
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em L
ife C
ycle
Man
agem
ent
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Targ
etin
g &
Pre
cisi
on N
avig
atio
n
Faci
litie
s &
Infr
astr
uctu
re
Assemble / Install D
Design D
Education / Training D D D
In-Service / Through-life Support D D D D D D D D
Logistics Support D D D D D D
Manufacture / Construct D
Modelling / Simulation O
Project Manage D D D
Refurbish / Upgrade O D D D
Repair and Maintain D D D D O D D
Research and Development O O
Software Development / Support O D O D
Systems Definition / Development O D
Systems Integration D D
Test and Evaluate D D D D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 1 Very High >$1500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT II.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
148
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2009-10 to FY 2010-11Initial Operating Capability 2012 to 2014
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Fire Support(02) 6265 1734
Project Director LAND 17(03) 9282 5832
Project Website: www.defence.gov.au/dmo/lsd/land17/land17.cfm
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
149
LAND 53Phase 1BR NINOX – Night Fighting Equipment Technology Refresh
Phase Scope
This phase aims to augment the current ADF Night Fighting Equipment (NFE), such as night vision goggles, night weapon sights and night aiming devices as they reach the end of their service life.
Background
LAND 53 is a multi-phased project intended to provide a suite of surveillance systems. These include perimeter surveillance equipment, night fighting equipment, ground surveillance radar and thermal surveillance systems which provide land forces with detection and recognition capabilities under various battlefield conditions.
There are presently no associated projects with Phase 1BR, but there may be interoperability linkages with future projects involving helmets and weapon systems used by soldiers.
Australian Industry Opportunities
Acquisition
The proposed acquisition approach is to seek Military-off-the-Shelf (MOTS) solutions through an open tender process. Depending on further analysis, the acquisition approach may be restricted should it be found that there are limited solutions to satisfy the scope of the project.
Phase 1BR plans to consult with industry through information sessions and market surveys. Information gathered will assist in identifying possible NFE improvements to augment the current NFE used in the ADF. It is expected that these sessions will occur between first and second pass.
Through-life Support
The sustainment approach will permit the ADF to maintain NFE at operator, light grade and medium grade repair levels. It is proposed that an in-service support contract for medium and heavy grade repair levels will be established at the time of acquisition. It is likely that the NFE sub-systems will be sourced from overseas but it is preferable that through-life support is carried out in Australia.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
150
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Surv
eilla
nce
Assemble / Install O
Design O
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct O
Modelling / Simulation O
Project Manage D
Refurbish / Upgrade D
Repair and Maintain D
Research and Development O
Software Development / Support O
Systems Definition / Development O
Systems Integration D
Test and Evaluate D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Small Arms(02) 6265 4349
Project Director Surveillance(03) 9282 6057
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
151
LAND 75Phase 3.4 Battlefield Command Support SystemPhase 4 Battlefield Command Support System
Phase Scope
Phase 3.4 is intended to provide further development of the Battlefield Command Support System (BCSS) and acquire an initial Battle Management System (BMS) capability to equip up to a Brigade sized force. This force is augmented by support to both elements of Special Operations and RAAF Airfield Defence Guards.
Phase 4 aims to continue the roll-out of, and provide enhancement to, the Australian Army’s BMS procured under Phase 3.4. Phase 4 is intended to deliver the BMS to two Brigades, further elements of Special Forces and RAAF, whilst providing updates to the pre-existing fleet to maintain commonality. Phase 4 is expected to fund major software releases to enhance BCSS with a focus on enhancement and interoperability up to the Joint level.
The delivery and final definition of later phases of this project is highly dependant on the direction and decision of the previous phases and supporting projects. Later phases of this program are likely to align with the appropriate phases of JP 2072.
Background
LAND 75 is a multi-phased proposal to provide the Australian Army with a BMS and BCSS. These systems allow the transfer, processing and management of tactical level information necessary for the conduct and control of land operations.
Others phases include:
> Phases 1 and 2 (complete) were studies conducted throughout the 1980s under the auspices of the (then) Australian Army Tactical Command and Control System (AUSTCCS) project;
> Phase 3.1 (complete) delivered the first iteration of BCSS under a contract with CelciusTech Australia;
> Phase 3.2 (largely complete) moved BCSS from Unix to NT technology and delivered the NT-based BCSS to the Army’s 1st Brigade;
> Phase 3.3 (largely complete) simplified the user interface of BCSS through a contract with Saab Systems Australia (formerly CelciusTech Australia). To simplify the Phase 3.3 deliverables, responsibility for development of a Special Forces command support capability was transferred to JP 2030 – Joint Command Support Environment; and
> Phase 3.3B (in progress) continues to enhance the functionality, stability and interoperability of BCSS and roll-out the system within the Australian Regular Army.
Phase 3.4 has received first pass approval from Government.
Australian Industry Opportunities
Acquisition
It is anticipated that opportunities exist for Australian industry to provide BMS ancillary hardware and to integrate and install the equipment into Defence’s A and B vehicle fleets. Opportunities for BMS software development are limited as the ADF is seeking Military- or Commercial-off-the-Shelf (MOTS or COTS) solutions. Other projects associated with the BMS component of Phase 3.4 include LAND 125 Phase 3A and JP 2072 Phase 1 which were the subject of a joint RFT issued in May 2007. Included as part of the tender evaluation is a comprehensive Offer Definition Activity with the primary aim of reducing risk.
BCSS development continues to provide opportunity for application development and implementation.
Through-life Support
Through-life support is a key aspect of the BMS acquisition. There is a preference for systems to be supported and maintained in Australia. BCSS development continues to provide opportunity to Australian industry for its support and maintenance.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
152
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 3.4 Capability
Activity
Arm
oure
d Ve
hicl
es
Supp
ort o
f Mis
sion
&
Saf
ety
Cri
tical
So
ftw
are
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’w
are)
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sy
stem
s)
Faci
litie
s &
In
fras
truc
ture
Design D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Project Manage D
Refurbish / Upgrade D
Repair and Maintain D
Software Development / Support D
Systems Integration D D
Test and Evaluate D
Phase 4 Capability
Activity
Arm
oure
d Ve
hicl
es
Supp
ort o
f Mis
sion
&
Saf
ety
Cri
tical
So
ftw
are
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’w
are)
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sy
stem
s)
Faci
litie
s &
In
fras
truc
ture
Design D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Project Manage D
Refurbish / Upgrade D
Repair and Maintain D
Software Development / Support D
Systems Integration D D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
153
Acquisition Category (ACAT)
Phase 3.4
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 4
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the upper end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT II.
Planned Schedule Highlights
First Pass Approval Phase 3.4Phase 4
CompleteFY 2011-12 to FY 2012-13
Year-of-Decision Phase 3.4Phase 4
FY 2009-10 to FY 2010-11FY 2013-14 to FY 2015-16
Initial Operating Capability Phase 3.4Phase 4
2010 to 20122016 to 2018
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 3.4 and 4 Staff Officer LAND 75
(02) 6265 7809Project Manager LAND 75(02) 6266 7432
Project Website:www.defence.gov.au/dmo/esd/land75/index.cfm
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
154
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 4 ASLAV EnhancementLAND 112
Phase Scope
This phase is a survivability enhancement and mid-life upgrade to the fleet of Australian Light Armoured Vehicles (ASLAV). This phase may include some or all of the following:
> enhancing ASLAV survivability against current and future threats. Possible enhancements include:
– mine protection,
– ballistic protection,
– battlefield management system integration,
– signature management, or
– defensive aid suite;
> offsetting weight increases to the vehicle caused by the above survivability enhancements in order to maintain current amphibious and land mobility;
> upgrading or replacing the power pack; and / or
> enhancing the Crew Procedural Trainer.
Background
LAND 112 is a multi-phased proposal to provide a light armoured vehicle for the Australian Army. Other phases include:
> Phase 1 (complete) acquired 15 wheeled, light armoured vehicles from the United States Marine Corps for a concept evaluation of wheeled reconnaissance in the north of Australia;
> Phase 2 (complete) acquired 113 wheeled, light armoured vehicles. The vehicles were manufactured by General Motors Defence, of Canada, with final fit out in Australia completed by BAE Systems Australia; and
> Phase 3 (in progress) has acquired 144 additional ASLAV vehicles to equip the 2nd/14th Light Horse Regiment, to fully equip the 2nd Cavalry Regiment, and has retrofitted earlier Phase 2 ASLAV to the improved Phase 3 standard. The final ancillary items, such as the Multi-spectral Surveillance Suite, are currently being developed.
Australian Industry Opportunities
Acquisition
For the acquisition stage of this proposal, the industry requirements may include:
> installation of enhanced mission role kits;
> installation of the survivability kits and spall liners (for ASLAV interior);
> systems enhancements for electronic, communication and electro-mechanical components;
> manufacture of components and assemblies, storage and shipping containers, special tools and test equipment, consumables and other repair parts; and
> training and provision of technical documentation.
Opportunities for Australian industry may also exist in the integration of electronic and mechanical systems to armoured vehicles including mine protection, battlefield management, signature management and ballistic protection.
Through-life Support
It is anticipated that one or a number of Australian contractors may undertake through-life support activities. A Request for Tender for through-life support is being conducted and evaluated through 2009.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
155
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Arm
oure
d Ve
hicl
es
Sign
atur
e M
anag
emen
t
Assemble / Install D D
Design O O
Education / Training O D
In-Service / Through-life Support D D
Logistics Support D D
Manufacture / Construct D D
Modelling / Simulation O
Project Manage D O
Refurbish / Upgrade D D
Repair and Maintain D D
Systems Integration O D
Test and Evaluate O O
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Combat (Heavy)(02) 6265 4360
Project Manager ASLAV Phase 4(03) 9282 3926
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
156
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 4 OverlanderPhase 5A OverlanderLAND 121
Phase Scope
Phase 4 aims to provide light protected vehicles and trailers for command, liaison, utility and reconnaissance roles. This phase is expected to replace around one third of the current ADF Land Rover fleet.
Phase 5A is intended to provide unprotected light vehicles, modules and trailers to enable tactical training. This phase is expected to replace around one third of the current ADF Land Rover fleet.
Background
Overlander is a multi-phased proposal to provide the ADF with field vehicles and trailers to meet its mobility requirements. The ADF fleet of field vehicles and trailers is the backbone of its war fighting force and sustainment structure. These vehicles are used to transport personnel, combat supplies, materiel, and replacement combat systems and when necessary, evacuate casualties. They also serve as platforms and prime movers for command, control, communications, computer and intelligence (C4I) systems and numerous weapon systems.
Field vehicles and trailers are an essential element of combat, combat support and combat service support capabilities of the ADF. Vehicle characteristics must be tailored to suit the units and equipment they support as well as the conditions under which they are required to operate.
Around one third of the fleet of vehicles are to be armoured to protect personnel from the effects of mines, bullets and improvised explosive devices.
The current phases include:
> Phase 2A (in progress) is enhancing current vehicle capability for heavy recovery and bulk liquid transport. It also addresses excessive cabin noise and personnel/cargo restraint and segregation systems and rollover protection;
> Phase 3 (in progress) replaces the current fleet of ADF field vehicles and trailers with future field vehicles and trailers. This phase includes the acquisition of;
– around 1200 unprotected Mercedes G-Wagon light vehicles, with modules and trailers, to replace around one third of the current Land Rovers to enable tactical training;
– around 2300 medium and heavy trucks, at least 1300 of which will be protected to enable operational deployment, in total replacing around two thirds of the medium and heavy vehicle fleet; and
– around 290 Bushmaster Protected Mobility Vehicles to provide light troop transport functions currently provided by some Land Rovers;
> Phase 4 provides the core of the ADF operationally employable light protected vehicle fleet through the acquisition of around 1300 vehicles and trailers; and
> Phase 5A completes the replacement of light vehicles through the acquisition of unprotected vehicles to enable tactical training.
Australian Industry Opportunities
Acquisition
In order to pursue the capability sought by Phase 4, Australia has joined the technology development stage of the United States Joint Light Tactical Vehicle (JLTV) program. A decision on whether Australia will acquire the JLTV is to be made once the vehicles have passed key development and testing milestones, likely to be in 2010 - 2011. To support this decision, the project will also engage with industry to explore other options to provide protected light mobility vehicles.
The capability sought by Phase 5A may be acquired through the acquisition of additional quantities of unprotected capability acquired under Phase 3, or through market solicitation for a fleet of Commercial-off-the-Shelf vehicles modified to meet tactical training requirements.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
157
Through-life Support
The industry requirements are likely to be based around developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life maintenance and support activities to the maximum extent possible. The contract period for through-life support is expected to be 15 years with an option for a further 15 years.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 4 and 5A Capability
Activity
Fiel
d Ve
hicl
es
Assemble / Install D
Design D
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct O
Modelling / Simulation O
Project Manage D
Refurbish / Upgrade D
Repair and Maintain D
Research and Development O
Software Development / Support O
Systems Definition / Development D
Systems Integration D
Test and Evaluate D
Acquisition Category (ACAT)
LAND 121 Program
ACAT Attribute Complexity Level Assessment
Acquisition Cost – Phase 4Acquisition Cost – Phase 5A
Level 1 Very High >$1500m (Towards the lower end of the band)Level 3 Moderate $100m – $500m (Towards the upper end of the band)
Project Management Complexity Level 1 Very High
Schedule Level 2 High
Technical Difficulty Level 1 Very High
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT Level assessed for this Program is ACAT I.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
158
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Planned Schedule Highlights
First Pass Approval Phase 4Phase 5A
CompleteFY 2010-11 to FY 2011-12
Year-of-Decision Phase 4Phase 5A
FY 2012-13 to FY 2014-15FY 2010-11 to FY 2011-12
Initial Operating Capability Phase 4Phase 5A
2016 to 20182014 to 2016
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 4 and 5A Deputy Director Mobility
(02) 6265 7837Program Manager Overlander(03) 9282 7658
Project Website:www.defence.gov.au/dmo/lsd/land121/land121.cfm
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
159
LAND 125Phase 3A Soldier Enhancement Version 2 – C4I ComponentPhase 3B Soldier Enhancement Version 2 – SurvivabilityPhase 3C Soldier Enhancement Version 2 – LethalityPhase 4 Soldier Enhancement Version 3
Phase Scope
This project intends to develop and acquire an enhanced close combat capability for the Land Deployable Force.
Background
In the late 1980s, NATO and ABCA (America, Britain, Canada, Australia) recognised that digitisation, computers and electro-mechanical devices could be miniaturised to allow the infantry to take advantage of the existing or planned enhancements for naval and air forces. Project WUNDURRA was developed in 1994 from the NATO/ABCA requirements/functional subsystems and became Australia’s soldier modernisation program. WUNDURRA undertook requirements definition and detailed studies to acquire an integrated soldier combat system design. Due to development difficulties common across like programs, it was determined in 2004, that it was unlikely that a suitable integrated solution would be available by 2007. Project WUNDURRA then evolved into LAND 125, which stabilised in 2005 as a multi-phase program (Phases 2B, 3 and 4) that would provide incremental enhancements through a spiral development approach until suitable integrated soldier system solutions were available.
The program status is as follows:
> Phase 2B achieved second pass approval in February 2005. Initial deliveries to the regular infantry have been completed, with the Enhanced Land Force increment now being acquired. Components acquired include:
– individual equipment including helmet, load carriage and knee/elbow pads; and
– team equipment including thermal weapon sights and personal voice radios;
> Phase 3 achieved first pass approval in August 2005. Phase 3 builds on Phase 2B, while being a step in the journey to an integrated system. The provisioning has been expanded to equip combined arms and service teams. The three subsystems will now be delivered as separate entities through:
– Phase 3A - C4I, where it is intended that battalion to fire team commanders will receive a new voice network and add a data network as part of the combined LAND 75/125 Battle Management System acquisition. The enhancements will improve situation awareness, decision tempo and precision engagement. Phase 3A has completed an offer definition activity with Elbit Systems Ltd;
– Phase 3B - Survivability, where it is intended that soldier survivability will be modernised through improved body (modular combat body armour system) and eye protection (ballistic and laser ocular protection system). The enhancements will provide personal protection from blast, projectiles and laser threats; and
– Phase 3C - Lethality, where it is intended that the F88 rifle will be enhanced to support Army Capability Requirement Infantry 2012 with commander, marksman, grenadier and standard variants. The previous LAND 91 project for F88 development has now been incorporated into LAND 125. The enhancements will improve target acquisition, probability of hit and cooperative engagement. Phase 3C has engaged Thales Australia Pty Ltd for the design, development and production of the enhanced F88; and
> Phase 4 is intended to provide an effective integrated soldier system to deployed forces, within a joint inter-agency task force. A Phase 4 soldier will have a system that maximises commonality, is optimised for day/night all-weather disaggregated combat, humanitarian and stability operations against peer and irregular threats in any terrain. The soldier should be well-protected, carry robust weapons, have good situational awareness, and carry reliable communication systems. An effective soldier system will be easy to use, have an open architecture and be as lightweight as practicable to allow rapid adaptation to the tactical situation.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
160
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Australian Industry Opportunities
Acquisition
The Phase 3 acquisition strategy has been to source individual subsystems through functional systems integrators that provide both equipment and support services. Phase 3 elements have now progressed through source selection and future opportunities for Australian industry in this phase are expected to be limited.
As a strategy to improve overall systems integration and consolidate commercial and project management functions, Phase 4 may seek a Prime Systems Integrator (PSI) to oversee the design, development and support of the complete soldier system. The Phase 4 system will seek to utilise existing systems where possible and be cost-effective, as part of a robust, viable and open system architecture.
Phase 4 is expected to present significant opportunities for Australian and overseas suppliers. These companies must be capable of working as, or with, a potential PSI to improve existing subsystems. They will assist in introducing new soldier system capabilities or help develop technical solutions to support system-wide integration. Further Australian industry opportunities will be guided by information gained through the employment of earlier enhancements and research and development activities.
Through-life Support
Australian industry opportunities are expected to be based around developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life maintenance and support activities.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 3A, 3B and 3C Capability
Activity
Com
bat C
loth
ing
&
Per
sona
l Equ
ipm
ent
Com
posi
te &
Exo
tic
Mat
eria
ls
Infa
ntry
Wea
pons
&
Rem
ote
Wea
pons
St
atio
ns
Targ
etin
g &
Pre
cisi
on
Nav
igat
ion
Com
man
d, C
ontr
ol,
Com
mun
icat
ions
, C
ompu
ters
&
Inte
llige
nce
Syst
ems
Assemble / Install D D O O
Design O
Education / Training D D O D
In-Service / Through-life Support D D O D
Logistics Support D D D O O
Manufacture / Construct D D D O O
Project Manage D D O
Refurbish / Upgrade D D O O
Repair and Maintain D D D D
Software Development / Support D D
Systems Definition / Development O D
Systems Integration O D O O
Test and Evaluate D D O O
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
161
Phase 4 Capability
Activity
Com
bat C
loth
ing
&
Per
sona
l Equ
ipm
ent
Com
posi
te &
Exo
tic M
ater
ials
Infa
ntry
Wea
pons
& R
emot
e W
eapo
ns S
tatio
ns
Sign
atur
e M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d,
Syst
em o
f Sys
tem
s)
Targ
etin
g &
Pre
cisi
on N
avig
atio
n
Com
man
d, C
ontr
ol,
Com
mun
icat
ions
, Com
pute
rs
and
Inte
llige
nce
Syst
ems
Pow
er M
anag
emen
t
Assemble / Install D D O O
Design O D O O D
Education / Training D D O O D D
In-Service / Through-life Support D O O D D
Logistics Support D D D O O
Manufacture / Construct D D D D O O D
Project Manage D D D O
Refurbish / Upgrade D D O O D
Repair and Maintain D O D D D
Research and Development D O O
Software Development / Support D D
Systems Definition / Development O D O
Systems Integration O D O O O D
Test and Evaluate D D D D O O D
Acquisition Category (ACAT)
Phase 3A
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 1 Very High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 3B
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
162
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 3C
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m–$1500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 4
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m–$1500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT II.
Planned Schedule Highlights
First Pass Approval Phase 3APhase 3BPhase 3CPhase 4
CompleteCompleteCompleteFY 2010-11 to FY 2011-12
Year-of-Decision Phase 3APhase 3BPhase 3CPhase 4
FY 2009-10 to FY 2010-11FY 2010-11 to FY 2011-12FY 2009-10 to FY 2010-11FY 2012-13 to FY 2014-15
Initial Operating Capability Phase 3APhase 3BPhase 3CPhase 4
2010 to 20122011 to 20132011 to 20132014 to 2016
Points of Contact
Phases: Capability Staff: Defence Materiel Organisation:Phases 3A, 3B, 3C and 4
Staff Officer Soldier Combat Systems(02) 6265 2810
Project Director LAND 125(03) 9282 6486
Project Website: www.defence.gov.au/dmo/lsd/land125
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
163
LAND 136Phase 1 Land Force Mortar Replacement
Phase Scope
This phase is intended to replace the current Army mortar capability, including selected Army Reserve Artillery units, with a networked mortar capability.
Background
This project aims to replace and enhance the current Infantry Battalion mortar capability with a modern, robust and sustainable organic mortar capability, networked within the joint fires environment. This includes integration of the mortar capability into the joint fires network through acquisition of a networked ballistic calculator, acquisition of advanced munitions and future proofing for new munitions. The project also aims to meet the indirect fire support capability needs of the Army Reserve by equipping selected Reserve Artillery units with a mortar capability.
Australian Industry Opportunities
Acquisition
The likely acquisition strategy is not clear at this stage but depending on the maturity of systems within the market, the procurement may consider one of the following or a combination:
> Military-off-the-Shelf and/or government-to-government arrangements such as Foreign Military Sales; or
> open tender.
Through-life Support
The through-life support concept for this project will consider supportability options for fleet management, repair and maintenance, storage and distribution, provision of technical data and training as a minimum. This may be achieved through the use of current in-service capacity and facilities, original equipment manufacturer support or a combination of both. Contracts for such support will generally be considered at the same time as acquistion.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Infa
ntry
Wea
pons
&
Rem
ote
Wea
pons
Sta
tions
Sele
cted
Bal
listic
M
uniti
ons
& E
xplo
sive
s
Supp
ort o
f Mis
sion
&
Safe
ty C
ritic
al S
oftw
are
Com
man
d &
Con
trol
Manufacture / Construct O
Education / Training D D D D
In-Service / Through-life Support D D D D
Logistics Support D D D D
Refurbish / Upgrade D D D D
Repair and Maintain D D D D
Software Development / Support D D
Systems Integration D D D D
Test and Evaluate D D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
164
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the upper end of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR)(02) 6265 6519
Land Systems Division Emerging Projects Team(03) 9282 4307
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
165
LAND 146Phase 2 Combat Identification for Land Forces
Phase Scope
This is a multi-phased project that is intended to acquire and introduce a Combat Identification (CID) capability that enhances operational effectiveness of the ADF Land Force elements and minimises the risk of fratricide.
Phase 2 is expected to leverage on the capability delivered under Phase 1 by equipping the remainder of the Land Force with coalition compatible systems.
Background
CID is the process of determining an accurate understanding of objects and persons detected in the battlespace to allow the timely application of tactical options and weapons effects. The key role of the CID system is to positively identify the location and status of friendly forces to allow the precise and discriminative application of firepower in the battlespace and, therefore, minimise fratricide. The situational awareness expected to be provided by this capability is expected to form a significant building block of the Network Centric Warfare concept.
Phase 1 (approved) is conducting studies into CID approaches and technologies and is currently acquiring an interim CID capability for a Deployable Battle Group in the 1st Brigade. This capability is expected to see the Deployable Battle Group equipped with the recognised CID baseline for coalition operations.
Analysis of the technology maturity indicated that an electronic assured solution was not likely to be possible in the Phase 2 timeframe. At first pass Phase 2 was directed to acquire an extension of the capability delivered for Phase 1-General CID (GCID), and commence the acquisition process to acquire a Digital Terminal Control System (DTCS) to improve terminal attack control.
Since first pass approval the development of the various CID technologies has accelerated at different rates and in such a manner as to render some of the legacy GCID capabilities delivered in Phase 1 obsolete in a number of operational scenarios. To overcome this issue, the project direction for Phase 2 has moved toward CID capability for mounted and dismounted operations using passive and active cooperative technologies that operate in the near as well as mid- and far-portion of the electro-magnetic spectrum.
The DTCS solution for this phase is expected to be the same as that to be delivered under LAND 17 Phase 1.
Australian Industry Opportunities
Acquisition
It is anticipated that the GCID component is to be acquired through open tender. The DTCS component is intended to be acquired through a restricted tender, limited to the short listed companies identified through the LAND 17 ‘Battle Management System Fires - Forward Observer Invitation to Register’ (ITR).
Through-life Support
Yet to be determined.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
166
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Arm
oure
d Ve
hicl
es
Com
bat C
loth
ing
&
Per
sona
l Equ
ipm
ent
Sign
atur
e M
anag
emen
t
Targ
etin
g &
Pre
cisi
on
Nav
igat
ion
Assemble / Install D O D
Design D
Education / Training D
In-Service / Through-life Support D O D
Logistics Support D D
Manufacture / Construct D O
Repair and Maintain D
Research and Development D
Software Development / Support D
Systems Integration O D D
Test and Evaluate O
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval CompleteYear-of-Decision FY 2010-11 to FY 2011-12Initial Operating Capability 2011 to 2013
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Air(02) 6265 3875
Project Manager LAND 146-2(03) 9622 2801
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
167
Phase 1 Enhanced Gap Crossing Capability LAND 155
Phase Scope
This phase is intending to provide land forces with the ability to cross a range of wet and dry gaps in support of combat operations. It will provide the capability to tackle the complex physical terrain features such as rivers, ravines and other natural and man-made gaps to achieve the agility required in the future operating environment.
Background
Current ADF bridging operations are severely restricted through the available ageing bridging systems, the inability of most bridges to meet the Military Load Classification required for the modern ADF vehicles and the absence of viable rapidly emplaced bridging systems.
Australian Industry Opportunities
Acquisition
The likely acquisition strategy is not clear at this stage but depending on the maturity of systems within the market, the procurement may consider one of the following or a combination:
> Military-off-the-Shelf and/or government-to-government arrangements such as Foreign Military Sales; or
> open tender.
Through-life Support
The through-life support concept for this project will consider as a minimum supportability options for fleet management, repair and maintenance, storage and distribution, provision of technical data and training. It also sees the use of current in-service capacity and facilities, or original equipment manufacturer support or a combination of both. Contracts for such support are generally to be considered at the same time as acquisition.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Syst
em L
ife C
ycle
M
anag
emen
t
Faci
litie
s &
In
fras
truc
ture
(B
ridg
ing)
Education / Training D
In-Service / Through-life Support D D
Logistics Support D D
Refurbish / Upgrade D D
Repair and Maintain D D
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
168
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Engineers(02) 6265 4819
Land Systems Division Emerging Project Team(03) 9282 7165
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
169
LAND 998Phase 1 Replacement Aviation Fire Truck
Phase Scope
This phase intends to provide fire vehicles capable of aircraft crash response, emergency response and fire fighting. The vehicle is intended to be air portable and capable of being deployed on expeditionary operations.
Background
Army and Air Force currently use Titan fire fighting field trucks which require replacement. In addition, Army uses rural and barracks fire fighting vehicles with limited emergency response capability and nearing their end of life. This project will rationalise these capabilities into a single deployable emergency response vehicle to fulfil the aircraft crash rescue and fire fighting requirement for deployed forces.
Australian Industry Opportunities
Acquisition
Commercially available equipment, with necessary modifications, will be sought and integrated into the ADF fire fighting capability. It is likely that the original equipment manufacturer will be an overseas based company, however solicitation via open tender may result in an Australian solution being provided for consideration. Notwithstanding, Australian industry involvement may still exist in the areas of component production, trials and testing, training development and training delivery.
Through-life Support
It is expected that there will be opportunities for Australian industry to provide through-life support for the capability. Due to the nature of the system being sought, much of the through-life support will be provided by original equipment manufacturers. However, dedicated support services contracts may be competitively tendered, leading to opportunities for Australian industry to provide through-life support including maintenance, repairs, logistic analysis services, spare parts supply, technical documentation and training.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Faci
litie
s &
In
fras
truc
ture
Land
Veh
icle
s
Assemble / Install D O
Design D
Education / Training O
In-Service / Through-life Support O
Logistics Support O
Manufacture / Construct D
Project Manage O
Repair and Maintain O
Systems Integration D O
Test and Evaluate O
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
170
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate / Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Engineers(02) 6265 4819
Director Combat Support Vehicle Systems Program Office(03) 9282 4181
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
171
SEA 1000Phase 1A Future Submarine – Concept Design Phase 1B Future Submarine – Preliminary DesignPhase 1C Future Submarine – Detailed Design
Phase Scope
This project seeks to acquire an increased and enhanced submarine capability that will provide the ADF with a potent submarine capability beyond the planned withdrawal date of the COLLINS Class submarines.Phase 1 will commence the design of the new capability.
Background
As part of the 2009 Defence White Paper preparations, significant work was undertaken to identify and quantify the maritime capability developments that would be required to meet Government’s expectations. This process resulted in SEA 1000.
SEA 1000 will provide Australia with a new and more potent defence capability with greater range, longer patrol endurance and increased capability compared to the COLLINS Class. Key capabilities will be in the areas of anti-submarine warfare; anti-surface warfare; strike; intelligence, surveillance and reconnaissance; electronic warfare; mine warfare; and support to both special forces and advance force operations.
The project will undertake a competitive, staged acquisition process to acquire this capability. It is expected that the phases of this project will be:
> Initial Definition Phase (currently in progress). This will be complete in December 2009 and identify the top level requirements for the future submarine;
> Phase 1 – Design. This comprises Concept Design, Preliminary Design, and Detailed Design. Funding and commencement of each design stage will be approved separately by Government;
> Phase 2 – Construction. This will commence around 2016; and
> Phases 1 and 2 also intend to define and integrate the primary requirements for the weapons capabilities, including a precision strike capability, with the weapons to be acquired in later phases.
Australian Industry Opportunities
Acquisition
This project will place significant demands upon Australian industry and provide commensurate opportunities. Its scale will exceed that of any previous project. This project will need a project management, industrial, and research and support capability capable of constructing and sustaining the future submarine capability over its entire life-cycle and which encompasses all integrated logistics support elements.
The acquisition strategy is yet to be determined, however, it is expected that opportunities for Australian industry involvement will be significant, ultimately growing and developing the foundations of Australia’s technological and industrial based sectors.
Through-life Support
The support concepts are yet to be determined, however, it is expected that opportunities for Australian industry involvement will be significant, particularly as the future submarine will be maintained and sustained in Australia. The Royal Australian Navy, supported by DMO, will be the Parent Navy for the future submarine.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
172
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 1A, 1B and 1C Capability
Activity
Acou
stic
Tec
hnol
ogie
s &
Sys
tem
s
Com
posi
te &
Exo
tic M
ater
ials
Elec
tron
ic W
arfa
re
Gui
ded
Wea
pons
Sign
atur
e M
anag
emen
t
Subm
arin
es
Supp
ort o
f Mis
sion
& S
afet
y C
ritic
al S
oftw
are
Syst
em A
ssur
ance
Cap
abili
ties
(H’w
are
& S
’war
e)
Syst
em L
ife C
ycle
Man
agem
ent
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Targ
etin
g &
Pre
cisi
on N
avig
atio
n
Faci
litie
s &
Infr
astr
uctu
re
Design D D O O D O D D D D O D
Modelling / Simulation D D D D D D D D D D D D
Project Manage D D D D D D D D D D D D
Research and Development D D D O D D D D D D D D
Systems Definition / Development D D D D D D D D D D D D
Acquisition Category (ACAT)
SEA 1000 Program
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 1 Very High >$1500m
Project Management Complexity Level 1 Very High
Schedule Level 1 Very High
Technical Difficulty Level 1 Very High
Operation and Support Level 1 Very High
Commercial Level 1 Very High
The ACAT Level assessed for this Program is ACAT I.
Planned Schedule Highlights
Year-of-Decision Phase 1APhase 1BPhase 1C
FY 2009-10 to FY 2010-11 FY 2011-12 to FY 2012-13FY 2013-14 to FY 2015-16
Initial Operating Capability Phases 1A, 1B and 1C Not Applicable
Points of Contact
Capability Staff: Defence Materiel Organisation:Future Submarine Project Coordinator (02) 6265 6178
SEA 1000 Project Director(02) 6265 3519
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
173
SEA 1180Phase 1 Patrol Boat, Mine Hunter Coastal and Hydrographic Ship Replacement Project
Phase Scope
This project is intended to acquire replacements for the current ARMIDALE Class Patrol Boats, HUON Class Mine Hunter Coastals and Hydrographic Survey Fleet as these vessels reach their life-of-type.
Background
The rationalisation of the Royal Australian Navy’s smaller ships represents an opportunity to leverage the advantages of platform and systems commonality as far as it can be implemented to fulfil a range of maritime missions. It is intended to exploit the advantages of using either the same vessel or a family of vessels to conduct offshore security, mine countermeasure and hydrographic roles. Where possible, this vessel or family of vessels will employ modular concepts that enable each to be employed in multiple roles to meet the needs of particular operations or strategic circumstances.
Australian Industry Opportunities
Acquisition
Although industry requirements will be guided by the information gained through early feasibility studies, the areas on which requirements are anticipated to focus include:
> assistance for various concept studies including operations, infrastructure, crewing and support;
> design, development and construction of platfoms and systems (including adaptable payloads); and
> project management and support.
Through-life Support
Through-life support may take various forms depending on the outcomes of further studies. However, the Australian naval shipbuilding and repair industry is expected to play a significant role in the construction and support of this capability. An in-country capacity to maintain, repair and service any automated technologies acquired under the project is also considered important.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
174
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Acou
stic
Te
chno
logi
es &
Sy
stem
s
Com
posi
te &
Ex
otic
Mat
eria
ls
Sign
atur
e M
anag
emen
t
Supp
ort o
f Mis
sion
&
Saf
ety
Cri
tical
So
ftw
are
Surf
ace
Nav
al
Vess
els
Assemble / Install D O D D D
Design O O O O D
Education / Training D D D
In-Service / Through-life Support D O D D
Logistics Support D O D D
Manufacture / Construct O O O D
Modelling / Simulation O D O O
Project Manage O O O D D
Refurbish / Upgrade O O O O
Repair and Maintain D O D D
Research and Development O O O D
Software Development / Support O D D
Systems Definition / Development D D D
Systems Integration D D D
Test and Evaluate D O D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 1 Very High >$1500m
Project Management Complexity Level 1 Very High
Schedule Level 1 Very High
Technical Difficulty Level 2 High
Operation and Support Level 1 Very High
Commercial Level 1 Very High
The ACAT Level assessed for this Phase is ACAT I.
Planned Schedule Highlights
First Pass Approval FY 2012-13 to FY 2014-15Year-of-Decision FY 2018-19 to FY 2020-21Initial Operating Capability Beyond 2019
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Mine Warfare and Clearance Diving(02) 6265 5913
Director Maritime Acquisition Support(02) 6265 7757
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
175
SEA 1350Phase 1 Navy Surface and Subsurface Ranges
Phase Scope
This project seeks to provide maritime ranges capable of acoustic, magnetic, seismic and electric field measurement to provide vulnerability, capability and performance assessments, and certification at the platform, system and equipment level.
Background
This project is expected to deliver the following:
> a large ship magnetic treatment facility,
> a shallow water tracking range that will utilise facilities that are currently used by the deep water tracking range, and
> a portable tracking range.
Australian Industry Opportunities
Acquisition
The method of procurement is yet to be determined but illustratively the acquisition of the large ship magnetic treatment facility is likely to be coordinated by Defence through standing offer panels and non-panel restricted tenders. It is anticipated that the shallow water tracking range would be acquired through approved suppliers. The portable tracking range may be acquired through the extension of an existing sustainment in-service support system where the entire system would be re-baselined.
Through-life Support
It is anticipated that the through-life support of the large ship magnetic treatment facility will be managed by Defence personnel with the acquisition of components being carried out on an ad hoc basis. The maintenance of the shallow water tracking range is likely to be carried out by Defence personnel, possibly augmented by contractor operators. The portable tracking range is likely to utilise a sustainment in-service support system that is currently in place.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Acou
stic
Tec
hnol
ogie
s &
Sys
tem
s
Secu
re T
est F
acili
ties
& T
est R
ange
s
Sign
atur
e M
anag
emen
t
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’w
are)
Syst
em L
ife C
ycle
M
anag
emen
t
Faci
litie
s &
In
fras
truc
ture
Assemble / Install D D D D
Design D D
Education / Training D D D
In-Service / Through-life Support D D D D
Logistics Support D D D
Manufacture / Construct D D D D
Project Manage D D
Refurbish / Upgrade D D D D
Repair and Maintain D D D D D
Software Development / Support D D D
Systems Definition / Development D
Systems Integration D D D
Test and Evaluate D D D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
176
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Mine Warfare and Clearance Diving(02) 6265 6477
Director Maritime Ranges Systems Program Office and Sonar Group(02) 6265 2341
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
177
SEA 1351Phase 1 Replacement East Coast Tugs
Phase Scope
This project is intended to deliver tug services in support of nuclear powered warship visits to designated Australian ports.
Background
There is a requirement to ensure that tug services are available to support the visits of nuclear powered warships in designated Australian ports throughout the duration of such visits. Tugs will need to be available to move these ships at short notice. It is also a Government requirement that Royal Australian Navy personnel would operate the tugs in particular circumstances.
This project is focused on the provision of tug services rather than the acquisition of vessels. There is an associated need to provide for the training and qualification of Royal Australian Navy personnel in the operation of tugs.
Australian Industry Opportunities
Acquisition
Although the industry requirements are yet to be developed, potential project options include public private partnerships or similar ventures.
Through-life Support
Through-life support activities will depend on the acquisition approach, however, it is expected to involve Australian based industry.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Surf
ace
Nav
al V
esse
ls
Assemble / Install D
Design O
Education / Training D
In-Service / Through-life Support D
Logistics Support O
Manufacture / Construct O
Modelling / Simulation O
Project Manage D
Refurbish / Upgrade D
Repair and Maintain D
Research and Development D
Software Development / Support O
Systems Definition / Development O
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
178
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the upper end of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Mine Warfare and Clearance Diving(02) 6265 6477
Director Maritime Acquisition Support(02) 6265 7757
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
179
SEA 1352Phase 1 Evolved Sea Sparrow Missile (ESSM) Upgrade and Inventory Replenishment
Phase Scope
This project seeks to provide upgrades to the Evolved Sea Sparrow Missile (ESSM) to ensure the surface combatant force can defend against evolving anti-ship cruise missile threats, and also maintain inventory.
Background
Studies are currently underway by the NATO Sea Sparrow Project Office to develop an appropriate business and capability model proposal to be funded by member nations. The follow-on inventory remediation would be completed using the latest production versions of the missile.
Australian Industry Opportunities
Acquisition
The acquisition strategy for the weapon system is yet to be determined, however, it is expected that it will be based on the same concept used to develop and acquire the current ESSM. Australian industry involvement would be as subcontractors to a US prime contractor for the manufacture of missile components and subassemblies, proportional to Australia’s contribution to the Engineering, Manufacture and Development (EMD) phase of the project. In addition, Australian industry will be involved in the integration of the ESSM into Royal Australian Navy platforms including combat systems, launching systems and training/simulation systems.
Through-life Support
Industry requirements are yet to be determined but will be based around developing and maintaining sufficient capability within Australian industry to undertake a limited range of through-life maintenance and support activities. This requirement is expected to be spread across a number of subcontractors dealing with different prime contractors for the missile, launching system, ship combat system and training/simulation systems.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Gui
ded
Wea
pons
Design D
Education / Training D
Logistics Support D
Manufacture / Construct D
Research and Development D
Software Development / Support D
Systems Definition / Development D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
180
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 1 Very High >$1500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2012-13 to FY 2014-15Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2015 to 2017
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Systems(02) 6265 5466
Director Emerging Projects Guided Weapons Branch(02) 6265 1464
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
181
SEA 1354Phase 1 Submarine Escape Rescue and Abandonment Systems (SERAS)
Phase Scope
This phase is intended to replace the existing submarine escape rescue and abandonment system (SERAS).
Background
In 1995, the Royal Australian Navy acquired a submarine rescue capability which could be deployed to the scene of a disabled submarine on a mother ship in order to effect the rescue of personnel. An integral component of this rescue capability, the remotely operated rescue vehicle REMORA, will need to be withdrawn from service by 2018, necessitating the acquisition of a replacement rescue system.
This project seeks to replace the existing capability to recover and provide the necessary on-scene treatment of personnel from a disabled submarine, whether submerged or on the surface. The new system will be required to support both the COLLINS Class submarine and the future submarine (SEA 1000).
Australian Industry Opportunities
Acquisition
Definition studies will guide industry requirements, however, it is anticipated that Defence will seek to acquire a proven solution that can be adapted to the needs of the COLLINS Class submarine and the future submarine capability.
Through-life Support
Through-life support activities will be ideally undertaken by Australian based industry.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
ACTIVITY CAPABILITY
Subm
arin
es
Assemble / Install D
Design O
Education / Training D
In-Service / Through-life Support D
Logistics Support D
Manufacture / Construct D
Modelling / Simulation O
Project Manage D
Refurbish / Upgrade D
Repair and Maintain D
Research and Development O
Software Development / Support O
Systems Definition / Development D
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
182
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2015 to 2017
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Amphibious and Afloat Support(02) 6265 3415
Director COLLINS Systems Program Office (08) 9553 2494
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
183
SEA 1357Phase 1 Close-In Weapons System (CIWS) Phalanx Block Upgrade
Phase Scope
This project seeks to upgrade the Royal Australian Navy’s Phalanx Close-In Weapons System (CIWS) to an enhanced capability configuration.
Background
The Raytheon Phalanx CIWS is presently fitted to the four ADELAIDE Class FFGs. The enhanced configuration offers improved ship self-defence against anti-ship missiles, helicopters and small craft threats.
Australian Industry Opportunities
Acquisition
The Ship alteration (Shipalt FFG7-360) kits will be purchased under the existing Guided Missile Frigate System Program Office (FFGSPO) Foreign Military Sales (FMS) case and installed to existing CIWS mounts during their next scheduled overhaul in the USA.
The specific ‘ship fit’ components of the upgrade will be conducted in Australia under FFGSPO project management once the ship alteration has been approved under existing FFGSPO engineering change processes.
Through-life Support
Upgraded CIWS mounts will be sustained through-life under a new FMS case similar to that already existing. This will include an overhaul program and supporting integrated logistic support requirements.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Surf
ace
Nav
al
Vess
els
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Faci
litie
s &
In
fras
truc
ture
Assemble / Install D
Logistics Support D D D
Project Manage D D D
Repair and Maintain D D
Systems Integration D D D
Test and Evaluate D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
184
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Planned Schedule Highlights
First Pass Approval FY 2012-13 to FY 2014-15Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Above Water Warfare(02) 6265 6630
Director FFG Systems Program Office(02) 9359 6285
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
185
SEA 1358Phase 1 Mini Typhoon for ANZAC Class
Phase Scope
This project seeks to provide short-range surface defence against asymmetric threats for the ANZAC Class frigates.
Background
Major surface combatants require protection against asymmetric surface attack through provision of advanced warning and effectors. Although the scope for this project is yet to be fully defined, it is likely to involve the purchase of weapons, training systems and an appropriate integrated logistics support package.
Australian Industry Opportunities
Acquisition
Some equipment has already been installed in the Class under rapid acquisition. Phase 1 is expected to extend the installation of the Mini Typhoon to the entire Class and formalise through-life support and initial spares.
Through-life Support
It is expected that there will be a need to establish a long-term through-life support capability utilising Australian industry.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Surf
ace
Nav
al
Vess
els
Infa
ntry
Wea
pons
&
Rem
ote
Wea
pons
Sta
tions
Assemble / Install D D
Design O D
Education / Training D D
In-Service / Through-life Support D D
Logistics Support D D
Manufacture / Construct O O
Modelling / Simulation D D
Project Manage D D
Refurbish / Upgrade D D
Repair and Maintain D D
Research and Development O O
Software Development / Support D D
Systems Definition / Development D D
Systems Integration D D
Test and Evaluate D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
186
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
Planned Schedule Highlights
First Pass Approval FY 2012-13 to FY 2014-15Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Above Water Warfare(02) 6265 6630
Director ANZAC Systems Program Office(08) 9591 9850
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
187
SEA 1397Phase 5A Nulka Missile Decoy Enhancements Phase 5B Nulka Missile Decoy Enhancements
Phase Scope
Phase 5 seeks to remediate ADF Nulka Active Missile Decoy (AMD) stockholdings and address system support issues.
Background
Nulka was developed under a Joint Australian and United States project arrangement. The AMD capability is currently deployed with the Navies of the United States, Canada and Australia.
Phase 5A seeks to procure additional Nulka rounds to align with current stockholding requirements.
Phase 5B seeks to facilitate the installation of Nulka capability into the CANBERRA Class platforms. The project also seeks to address obsolescence and sustainment issues associated with the fire control and launcher subsystems, including enhancements to the Nulka system’s human-machine interface.
Australian Industry Opportunities
Acquisition and Through-life Support
It is expected that the current Nulka prime contractor – BAE Systems Australia will be heavily involved in both Phases 5A and 5B in acquisition and through-life support.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phases 5A and 5B Capability
Activity
Elec
tron
ic
War
fare
Supp
ort o
f Mis
sion
&
Saf
ety
Cri
tical
So
ftw
are
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Assemble / Install D
Design D D
In-Service / Through-life Support D D
Logistics Support D
Manufacture / Construct D
Modelling / Simulation D
Project Manage D
Repair and Maintain D
Software Development / Support D
Systems Definition / Development D D D
Systems Integration D D D D
Test and Evaluate D D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
188
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Acquisition Category (ACAT)
Phase 5A
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 5B
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval Phase 5A FY 2009-10 to FY 2010-11 Phase 5B FY 2011-12 to FY 2012-13
Year-of-Decision Phase 5A FY 2009-10 to FY 2010-11 Phase 5B FY 2013-14 to FY 2015-16
Initial Operating Capability Phase 5A 2010 to 2012Phase 5B 2015 to 2017
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phases 5A and 5B Staff Officer Electronic Warfare
(02) 6265 5101Director Maritime Electronic Warfare Systems Program Office(02) 6265 1624
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
189
SEA 1408Phase 2 Torpedo Self-defence
Phase Scope
This project aims to complete provision of torpedo self-defence systems across the Surface Combatant, Amphibious and Afloat Support forces, which will offer a level of protective measures to reduce the threat and risk from heavy weight torpedoes.
Background
Torpedoes pose a significant and lethal threat as their acoustic, tactical and dynamic capabilities are advanced, rendering simple counter-manoeuvres or countermeasures ineffective.
Australian Industry Opportunities
Acquisition
It is expected that the torpedo self-defence system will be acquired through Foreign Military Sales.
Through-life Support
The industry requirement will be based on developing sufficient capability within Australian industry to undertake a range of through-life maintenance and support activities.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Acou
stic
Te
chno
logi
es
& S
yste
ms
Surf
ace
Nav
al
Vess
els
Assemble / Install O D
Education / Training O
In-Service / Through-life Support D
Logistics Support D
Project Manage D
Repair and Maintain D
Systems Definition / Development O
Systems Integration D D
Test and Evaluate D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 4 Low
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT IV.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
190
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Planned Schedule Highlights
First Pass Approval FY 2011-12 to FY 2012-13Year-of-Decision FY 2011-12 to FY 2012-13Initial Operating Capability 2013 to 2015
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Under Water Warfare(02) 6265 6371
Director Maritime Acquisition Support(02) 6265 2596
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
191
SEA 1430Phase 5 Digital Hydro Display System Upgrade
Phase Scope
This phase is intended to deliver an updated digital hydrographic data management and chart production capability to the Australian Hydrographic Office. The replacement digital hydrographic display system would include the capacity to process both classified and unclassified information.
Background
The digital hydrographic display system (operating at classified and unclassified levels), underpins digital data management and electronic chart generation requirements of the Australian Hydrographic Office. The system could be accessed by a range of users and must be capable of importing data from a variety of defence and civilian sources. As an updated capability, the system will manage more data and generate a greater demand for products from maritime geospatial information. It is expected to include data import and archive functionality, data assessment, data processing, data management and product generation, and also satisfy the assurances integral to the Australian Hydrographic Office’s current and future obligations with respect to national and international charting responsibilities.
Australian Industry Opportunities
Acquisition
Although the industry requirements are yet to be developed, it is expected that the opportunities for Australian industry will include:
> provision and adaptation of Commercial-off-the-Shelf (COTS) hardware and software;
> software integration; and
> systems integration (particularly with existing Defence information system infrastructures).
There should be a strong focus on obtaining COTS software to provide the required functionality.
There is the potential for an Australian contractor to purchase on behalf of the Commonwealth the hardware (servers, desktops, monitors and additional items) and software (enterprise and application software) from within Australia or from overseas vendors.
Accordingly, there is the potential for an Australian company to manage the integration and delivery of the Phase 5 activities. Integration will involve system installation and software integration at the Australian Hydrographic Office, Wollongong.
Through-life Support
The industry opportunities are expected to be based on the development and maintenance of sufficient capability within Australian industry to undertake a full range of through-life support activities. Following on from the acceptance of the Phase 5 products there is the potential for the acquisition contractor to provide in-service support.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
192
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Pro
tect
ion
of N
etw
orks
, C
ompu
ters
& In
form
atio
n
Supp
ort o
f Mis
sion
&
Safe
ty C
ritic
al S
oftw
are
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’
war
e)
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sys
tem
s)
Hyd
rogr
aphi
c D
atab
ase
Syst
ems
Assemble / Install D D D
Design D D D O
Education / Training D D
In-Service / Through-life Support D D D D D
Logistics Support D D D
Manufacture / Construct D D D
Modelling / Simulation D
Project Manage D D D D D D
Refurbish / Upgrade D D
Repair and Maintain D D
Research and Development D
Software Development / Support D O
Systems Definition / Development D D D D
Systems Integration D D D D D
Test and Evaluate D D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the middle of the band)
Project Management Complexity Level 4 Low
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2012-13 to FY 2014-15Year-of-Decision FY 2014-15 to FY 2016-17Initial Operating Capability 2016 to 2018
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Patrol and Hydrographic(02) 6265 6467
Director Military Geographic Information Systems Program Office(02) 6265 5635
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
193
SEA 1439Phase 3.1 Collins Obsolescence ManagementPhase 5B.2 Collins Continuous Improvement ProgramPhase 6 Collins Sonar Replacement
Phase Scope
Phase 3.1 is intended to replace the existing integrated ship control monitoring and management system for the COLLINS Class submarines.
Phase 5B.2 is intended to improve the electronic warfare and external communications systems fitted to the COLLINS Class through the acquisition of a high data rate satellite communications capability, replacement of the existing communications centre and enhancements to the fitted electronic warfare capability.
Phase 6 will upgrade the existing COLLINS Class sonar system including signal processors.
Background
Earlier phases of this project (Phases 1 and 2) involved the conduct of studies into modifications and improvements required to bring the COLLINS Class to full capability. The recommendations from those studies were implemented in Phase 3 - Sustainability & Reliability Enhancements, and Phase 4 - COLLINS Full Operational Capability (which included the acquisition of the replacement combat system).
Phases 3.1, 5B.2 and 6 address the requirement to update COLLINS Class ship control, communications, electronic warfare and sonar systems.
Australian Industry Opportunities
Acquisition
During all phases, it is likely that replacement systems will be based on similar and proven systems currently in-service in other navies. It is anticipated that the project phases will utilise significant levels of in-country capacity for project management, equipment assembly, system integration, training development and support.
Through-life Support
Industry requirements are likely to focus on developing optimum through-life support arrangements to manage and maintain the capabilities delivered by each phase. The Australian naval shipbuilding, refit and repair industry is expected to remain an integral component of this support.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
194
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 3.1 Capability
Activity
Subm
arin
es
Supp
ort o
f Mis
sion
&
Saf
ety
Cri
tical
So
ftw
are
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Faci
litie
s &
In
fras
truc
ture
Assemble / Install D D D D D
Design O D D D D
Education / Training D D D D D
In-Service / Through-life Support D D D D D
Logistics Support D D D D D
Manufacture / Construct D D D D D
Modelling / Simulation D D D D
Project Manage D D D D
Refurbish / Upgrade D D D D
Repair and Maintain D D D D D
Research and Development D D D D
Software Development / Support D D D D
Systems Definition / Development D D D D
Systems Integration D D D D
Test and Evaluate D D D D D
Phase 5B.2 Capability
Activity
Anti-
Tam
peri
ng
Cap
abili
ties
Elec
tron
ic W
arfa
re
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’w
are)
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m o
f Sy
stem
s)
Faci
litie
s &
In
fras
truc
ture
Subm
arin
e C
omm
unic
atio
n Sy
stem
s
Assemble / Install D D D D D D D
Design D O D D D D O
Education / Training D D D D D D D
In-Service / Through-life Support D D D D D D D
Logistics Support D D D D D D D
Manufacture / Construct O O O O O O O
Modelling / Simulation O O O O O O O
Project Manage D D D D D D D
Refurbish / Upgrade D D D D D D D
Repair and Maintain D D D D D D D
Research and Development O O O O O O O
Software Development / Support D D D D D D D
Systems Definition / Development D D D D D D D
Systems Integration D D D D D D D
Test and Evaluate D D D D D D D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
195
Phase 6 Capability
Activity
Acou
stic
Te
chno
logi
es
& S
yste
ms
Supp
ort o
f Mis
sion
&
Saf
ety
Cri
tical
So
ftw
are
Syst
em A
ssur
ance
C
apab
ilitie
s (H
’war
e &
S’w
are)
Syst
em L
ife C
ycle
M
anag
emen
t
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Assemble / Install D D D
Design O D D
Education / Training D D
In-Service / Through-life Support D D D D D
Logistics Support D D D D D
Manufacture / Construct O D O
Modelling / Simulation D D D
Project Manage D D
Refurbish / Upgrade D D D D D
Repair and Maintain D D D
Research and Development O D O
Acquisition Category (ACAT)
Phase 3.1
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 4 Low <$100m (Towards the upper end of the band)
Project Management Complexity Level 4 Low
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 5B.2
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 2 High
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
Phase 6
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 2 High $500m–$1500m (Towards the middle of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT II.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
196
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Planned Schedule Highlights
First Pass Approval Phase 3.1Phase 5B.2Phase 6
FY 2010-11 to FY 2011-12CompleteFY 2009-10 to FY 2010-11
Year of Decision Phase 3.1Phase 5B.2 Phase 6
FY 2011-12 to FY 2012-13FY 2011-12 to FY 2012-13FY 2011-12 to FY 2012-13
Initial Operating Capability Phase 3.1 2015 to 2017Phase 5B.2 2014 to 2016Phase 6 2015 to 2017
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phase 3.1 Deputy Director Submarines
(02) 6265 2134Project Manager SEA 1439 Phase 3.1(08) 9553 5507
Phase 5B.2 Deputy Director Submarines(02) 6265 2134
Project Manager SEA 1439 Phase 5B.2(02) 6266 7108
Phase 6 Deputy Director Submarines(02) 6265 2134
Generation Manager Submarine Combat Systems Program Office (02) 6265 1250
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
197
SEA 1442Phase 4 Maritime Communication Modernisation
Phase Scope
This phase is intended to enhance the Maritime Tactical Wide Area Network (MTWAN) including:
> expansion into Fleet units not equipped during earlier phases;
> integration of capabilities being delivered to maritime platforms by other approved communications projects; and
> possible replacement of radios, antennae and other systems to enhance maritime communications.
Background
This project has evolved from a simple radio replacement project to providing a Local Area Network/Wide Area Network (LAN/WAN) -at-sea and finally, to include the entire Maritime Tactical Communications System. SEA 1442 forms the basis of the Networked Fleet which is a major milestone in the ADF’s Network Centric Warfare (NCW) Roadmap.
Other phases include:
> Phase 2B (complete) was a Project Definition Study which refined the scope of work for Phases 3 and 4; and
> Phase 3 (in progress) is providing an enhanced ADF maritime communications capability with the introduction of the MTWAN to a number of Major Fleet Units.
Some of the communications and infrastructure is now being delivered through other projects such as JP 2008 Phase 3E Satellite Capability.
Australian Industry Opportunities
Acquisition
Opportunities for Australian industry exist in the field of naval communications. In particular project management, systems engineering, integrated logistics support, verification and validation, and systems integration into naval platforms. These skill sets will form the basis for the through-life support skills also needed from Australian industry.
The acquisition approach for this phase is likely to be open tender for the selection of a Prime Systems Integrator for the communications system and some ship integration, with other ship integration likely to be pursued through existing support mechanisms. The project will seek to maximise the use of Commercial- and Military-off-the-Shelf materiel.
Industry engagement will include consultation on requirements prior to any Request For Tender (RFT) release. Such engagement may include information sessions, workshops and opportunities to comment on draft capability definition documentation.
Through-life Support
The industry requirements will be based on developing and maintaining sufficient capability within Australian industry to undertake a full range of through-life support activities. In-service support may be tendered as part of the acquisition RFT with the intention of possibly selecting a single supplier for both acquisition and sustainment.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
198
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Com
mun
icat
ions
Se
curi
ty
Pro
tect
ion
of
Net
wor
ks, C
ompu
ters
&
Info
rmat
ion
Nav
al
Com
mun
icat
ions
Nav
al P
latf
orm
In
tegr
atio
nAssemble / Install D D D D
Design D D D D
Education / Training D D D D
In-Service / Through-life Support D D D D
Logistics Support D D D D
Manufacture / Construct D D D
Modelling / Simulation D D
Project Manage D D D D
Refurbish / Upgrade D D D D
Repair and Maintain D D D D
Software Development / Support D D D
Systems Definition / Development D D D D
Systems Integration D D D D
Test and Evaluate D D D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the middle of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 2 High
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT II.
Planned Schedule Highlights
First Pass Approval FY 2009-10 to FY 2010-11Year-of-Decision FY 2012-13 to FY 2014-15Initial Operating Capability 2014 to 2016
Points of Contact
Capability Staff: Defence Materiel Organisation:Deputy Director Communications 2(02) 6265 1316
Project Director SEA 1442(02) 6265 7515
Project Website:www.defence.gov.au/dmo/esd/sea1442/sea1442.cfm
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
199
SEA 1448Phase 4A ANZAC Electronic Support System ImprovementsPhase 4B ANZAC Air Search Radar Replacement
Phase Scope
Phase 4A seeks to either upgrade or replace the current ANZAC Class CENTAUR Electronic Support (ES) system to maintain regional ES capability parity.
Phase 4B seeks to replace the ageing AN/SPS-49 radar system with a modern, digital Air Search Radar that complements the capabilities and functionality of the Phased Array Radar system delivered under Phase 2 (approved).
Background
Phase 2 (approved) will provide the ANZAC Class with an enhanced self protection capability, as well as the ability to protect closely escorted assets such as amphibious ships, auxiliary support vessels and merchant vessels. Phase 2B includes the development of new Phased Array Radar capabilities.
Phase 4 continues the improvement and upgrade of the ANZAC Class sensor capability to align with modern threats. In particular, Phase 4A is intended to address the forecast supportability issues of the current ES system. This sensor is critical to the provision of long range warning and in its contribution to force level warfare. Phase 4B is intended to replace the AN/SPS-49 long range volume search radar capability which is critical to the provision of long range warning and for its contribution to unit and force level air warfare.
Australian Industry Opportunities
Acquisition
To the extent it can be achieved, there is a desire to align procurement activity of the ES system for ANZAC and LHD and, if possible, AWD. Industry engagement has occurred through the issue of a Request for Proposal (RFP). The replacement solution could include further development of Australian niche products to complement the replacement solution, or evolution of overseas equipment; project managed and supported in Australia.
Through-life Support
All principal through-life support management, integration and support, routine servicing and defect analysis and rectification are intended to be through Australian industry.
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in these phases include:
Phase 4A Capability
Activity
Elec
tron
ic W
arfa
re
Secu
re T
est F
acili
ties
& T
est R
ange
s
Syst
ems
Inte
grat
ion
(Hig
h En
d, S
yste
m
of S
yste
ms)
Assemble / Install D
Design D
Education / Training D
In-Service / Through-life Support D D
Logistics Support D D
Manufacture / Construct D D
Repair and Maintain D
Research and Development D D
Software Development / Support D D
Systems Integration D
Test and Evaluate D
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
200
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 4B Capability
Activity
Rad
ar (H
F &
PAR
)
Surf
ace
Nav
al
Vess
els
Assemble / Install D D
Design D D
Education / Training D D
In-Service / Through-life Support D D
Logistics Support D D
Manufacture / Construct D D
Modelling / Simulation D D
Project Manage D D
Refurbish / Upgrade D D
Repair and Maintain D D
Research and Development D D
Software Development / Support D D
Systems Definition / Development D D
Systems Integration D D
Test and Evaluate D D
Acquisition Category (ACAT)
Phase 4A
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 2 High
Schedule Level 2 High
Technical Difficulty Level 3 Moderate
Operation and Support Level 2 High
Commercial Level 2 High
The ACAT Level assessed for this Phase is ACAT II.
Phase 4B
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m-$500m (Towards the upper end of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 4 Low
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate
The ACAT Level assessed for this Phase is ACAT III.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
201
Planned Schedule Highlights
First Pass Approval Phase 4APhase 4B
FY 2009-10 to FY 2010-11FY 2011-12 to FY 2012-13
Year-of-Decision Phase 4A Phase 4B
FY 2011-12 to FY 2012-13 FY 2013-14 to FY 2015-16
Initial Operating Capability Phase 4A Phase 4B
2013 to 20152017 to 2019
Points of Contact
Phase: Capability Staff: Defence Materiel Organisation:Phase 4A Staff Officer Electronic Warfare
(02) 6265 5101Director Maritime Electronic Warfare Systems Program Office(02) 6265 1624
Phase 4B Deputy Director Systems(02) 6265 5466
Director ANZAC Systems Program Office(08) 9591 9850
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
202
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Phase 1 Deployable MCM – Organic Mine Counter MeasuresSEA 1778
Phase Scope
This phase is intended to introduce an initial deployable Mine Counter Measures (MCM) capability. It is based on the acquisition of a system of organic MCM components that can be embarked in the ships of a deploying task group, and employed to overcome mine threats encountered during task group operations.
Background
Deployable MCM will provide maritime forces with the capability to accomplish mine detection, classification, identification, avoidance and when necessary, neutralisation. It will be the initial means by which task groups will implement self-protective MCM along intended routes, through choke points and within objective areas. This capability will be complemented by the current dedicated MCM force, which will consolidate MCM effort within the area of operations.
Australian Industry Opportunities
Acquisition
Although the industry requirements are yet to be developed, they are expected to include:
> identification of system-based solutions in the field of deployable MCM;
> systems integration including integration of Military- or Commercial-off-the-Shelf (MOTS or COTS) systems;
> systems engineering, project management, system acquisition and support, integration and test of equipment and services; and
> software development that may be required to support the integration of the various subsystems into the overall solution.
The expendable mine neutralisation system capability is likely to be a fibre guided weapon with shaped or blast charge warhead, used to neutralise ground, moored or surface mines. The preference to acquire an in-service MOTS solution limits the opportunities for Australian industry. Local industry involvement may include project management, system acquisition, certification and support activities, integration and testing of equipment and services.
Through-life Support
Full through-life support will be needed and more specific requirements for each type of MCM systems will be determined during the scoping studies of this phase. Industry requirements are likely to be based around developing and maintaining sufficient capability within Australian industry to undertake a limited range of through-life maintenance and support activities. This requirement is expected to be spread across a number of subcontractors dealing with one or more prime contractors for the acquired systems.
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
203
Industry Capabilities and Activities
Capabilities and related activities that may provide opportunities for Australian industry in this phase include:
Activity Capability
Acou
stic
Te
chno
logi
es &
Sy
stem
s
Gui
ded
Wea
pons
Assemble / Install D
Design O
Education / Training D
In-Service / Through-life Support D D
Logistics Support D D
Manufacture / Construct O
Modelling / Simulation D
Project Manage D O
Refurbish / Upgrade D
Repair and Maintain D O
Research and Development D
Software Development / Support D
Systems Definition / Development D D
Systems Integration D D
Test and Evaluate D D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the lower end of the band)
Project Management Complexity Level 4 Low
Schedule Level 4 Low
Technical Difficulty Level 4 Low
Operation and Support Level 2 High
Commercial Level 4 Low
The ACAT Level assessed for this Phase is ACAT III.
Planned Schedule Highlights
First Pass Approval FY 2010-11 to FY 2011-12Year-of-Decision FY 2013-14 to FY 2015-16Initial Operating Capability 2015 to 2017
Points of Contact
Capability Staff: Defence Materiel Organisation:Staff Officer Mine Warfare and Clearance Diving(02) 6265 6477
Mine Hunter Coastal Project Officer(02) 9926 2686Explosive Ordnance Component:Director Emerging Projects Guided Weapons Branch(02) 6265 1464
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
204
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
PROPOSALS BY ACQUISITION CATEGORY
Proj ect Number Project Name Page No.
ACAT Level IAIR 6000 Ph 2A/2B New Air Combat Capability – 3 Squadrons 44
JP 2072 Program Battlespace Communications System (Land) 107
LAND 121 Program Overlander 156
SEA 1000 Program Future Submarine 171
SEA 1180 Ph 1 Patrol Boat, Mine Hunter Coastal and Hydrographic Ship Replacement Project 173
ACAT Level IIAIR 5428 Ph 1 Pilot Training System 34
AIR 7000 Ph 2B Maritime Patrol Aircraft Replacement 49
AIR 8000 Ph 2 Battlefield Airlift – Caribou Replacement 51
AIR 9000 Ph 8 Future Naval Aviation Combat System 58
JP 2077 Ph 2D Improved Logistics Information Systems 110
JP 2099 Ph 1 Identity Management – Project CERTE 127
JP 3028 Ph 1 Defence Simulation Program 142
LAND 17 Ph 1 Artillery Replacement 146
LAND 75 Ph 4 Battlefield Command Support System 151
LAND 125 Ph 4 Soldier Enhancement Version 3 159
SEA 1439 Ph 6 Collins Sonar Replacement 193
SEA 1442 Ph 4 Maritime Communication Modernisation 197
SEA 1448 Ph 4A ANZAC Electronic Support System Improvements 199
ACAT Level IIIAIR 5232 Ph 1 Air Combat Officer Training System 24
AIR 5276 CAP 2 AP-3C Capability Assurance Program 26
AIR 5397 Ph 2 Upgrade Australian Military Airspace Communications and Control System (AMACCS) 28
AIR 5405 Ph 1 Replacement Mobile Regional Operations Centre 30
AIR 5416 Ph 4B1 C-130J Radar Warning Received (RWR) 32
AIR 5416 Ph 4B2 C-130J Large Aircraft Infrared Countermeasures (LAIRCM) 32
AIR 5431 Ph 1 Deployable Air Traffic Management and Control System 36
AIR 5431 Ph 2/3 Fixed Base Air Traffic Management and Control System 36
AIR 5432 Ph 1 Communications, Navigation, Surveillance/Air Traffic Management 38
AIR 5438 Ph 1A Lead-In Fighter Capability Assurance Program 40
AIR 5440 Ph 1 C-130J Block Upgrade Program 7.0 42
AIR 5440 Ph 2 C-130J Block Upgrade Program 8.0 42
AIR 6000 Ph 3 Weapons for New Air Combat Capability 44
AIR 6000 Ph 5 Future Air-to-Air Weapons for New Air Combat Capability and Super Hornet 44
AIR 8000 Ph 1 Battlefield Airlift – Additional C-130J 51
AIR 9000 Ph 5C Additional Heavy Lift Helicopter 54
AIR 9000 Ph 7 Helicopter Aircrew Training System 56
AIR 9000 SCAP1 Seahawk Capability Assurance Program 1 60
AIR 9000 SCAP2 Seahawk Capability Assurance Program 2 60
JP 66 Ph 1 Replacement for Air Defence Targets 64
JP 90 Ph 1 ADF Identification Friend or Foe 66
JP 154 Ph 1 Joint Counter Improvised Explosive Device 70
JP 154 Ph 2 Joint Counter Improvised Explosive Device 70
JP 157 Ph 1 Replacement Refuelling Trucks 73
JP 1544 Ph 1 Project Eden – Document Handling System 75
JP 1770 Ph 1 Rapid Environmental Assessment 77
JP 1771 Ph 1 Geomatic Support System 79
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
205
Proj ect Number Project Name Page No.
JP 2008 Ph 3H Military Satellite Capability – Wideband Terrestrial Terminals 81
JP 2008 Ph 5B Military Satellite Capability – Wideband Terrestrial Infrastructure 81
JP 2025 Ph 6 Jindalee Operational Radar Network (JORN) 84
JP 2030 Ph 8 ADF Joint Command Support Environment 86
JP 2044 Ph 3A.1 Project Eagle Eye 88
JP 2044 Ph 4 Digital Topographical Systems (DTS) Upgrade 88
JP 2047 Ph 3 Wide Area Communications Network Replacement 90
JP 2048 Ph 3 Amphibious Watercraft Replacement 92
JP 2048 Ph 5 Landing Craft Heavy Replacement 92
JP 2060 Ph 3 ADF Deployable Health Capability 95
JP 2064 Ph 3 Geospatial Information Infrastructure & Services 97
JP 2065 Ph 2 Integrated Broadcast System 99
JP 2065 Ph 3 Integrated Broadcast System 99
JP 2068 Ph 2B.2 Computer Network Defence 101
JP 2069 Ph 2 High Grade Cryptographic Equipment 103
JP 2070 Ph 4 AP-3C Light Weight Torpedo Integration 105
JP 2078 Ph 2 Hyper-Spectral Imaging 112
JP 2080 Ph 2B.1 Defence Management Systems Improvement – Personnel Systems Modernisation 114
JP 2080 Ph 3 Defence Management Systems Improvement – Finance System 114
JP 2085 Ph 2/3 Explosive Ordnance Warstock 116
JP 2089 Ph 2B Tactical Information Exchange Domain (Data Links) 118
JP 2089 Ph 3 Tactical Information Exchange Domain (Data Links) 118
JP 2096 Ph 1 Surveillance Enhancement 123
JP 2097 Ph 1B REDFIN – Enhancements to Special Operations Capability 125
JP 2110 Ph 1B Chemical, Biological, Radiological, Nuclear Defence 130
JP 3011 Ph 1 Non-Lethal Weapons 132
JP 3021 Ph 1 Joint Combined Training Capability (JCTC) 134
JP 3024 Ph 1 Woomera Range Remediation 136
JP 3025 Ph 1 Deployable Incident Response Regiment (IRR) Capability 138
JP 3027 Ph 1 JDAM Enhancements 140
JP 5408 Ph 3 ADF Navigation Warfare (NAVWAR) Capability 144
LAND 53 Ph 1BR NINOX – Night Fighting Equipment Technology Refresh 149
LAND 75 Ph 3.4 Battlefield Command Support System 151
LAND 112 Ph 4 ASLAV Enhancement 154
LAND 125 Ph 3A Soldier Enhancement Version 2 – C4I Component 159
LAND 125 Ph 3B Soldier Enhancement Version 2 – Survivability 159
LAND 125 Ph 3C Soldier Enhancement Version 2 – Lethality 159
LAND 136 Ph 1 Land Force Mortar Replacement 163
LAND 146 Ph 2 Combat Identification for Land Forces 165
LAND 155 Ph 1 Enhanced Gap Crossing Capability 167
LAND 998 Ph 1 Replacement Aviation Fire Trucks 169
SEA 1352 Ph 1 Evolved Sea Sparrow Missile (ESSM) Upgrade and Inventory Replenishment 179
SEA 1354 Ph 1 Submarine Escape Rescue and Abandonment Systems (SERAS) 181
SEA 1397 Ph 5A Nulka Missile Decoy Enhancements 187
SEA 1397 Ph 5B Nulka Missile Decoy Enhancements 187
SEA 1430 Ph 5 Digital Hydro Display System Upgrade 191
SEA 1439 Ph 3.1 Collins Obsolescence Management 193
SEA 1439 Ph 5B.2 Collins Continuous Improvement Program 193
SEA 1448 Ph 4B ANZAC Air Search Radar Replacement 199
SEA 1778 Ph 1 Deployable MCM – Organic Mine Counter Measures 202
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
206
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Proj ect Number Project Name Page No.
ACAT Level IVAIR 5077 Ph 4 AEW&C Sustainment Study 23
DEF 7013 Ph 4 Joint Intelligence Support System 62
JP 129 Ph 4 Tier 1 Unmanned Aerial Vehicle (UAV) 68
JP 2090 Ph 1C Combined Information Environment 121
JP 2110 Ph 1A Chemical, Biological, Radiological, Nuclear Defence 130
SEA 1350 Ph 1 Navy Surface and Subsurface Ranges 175
SEA 1351 Ph 1 Replacement East Coast Tugs 177
SEA 1357 Ph 1 Close-In Weapons System (CIWS) Phalanx Block Upgrade 183
SEA 1358 Ph 1 Mini Typhoon for ANZAC Class 185
SEA 1408 Ph 2 Torpedo Self-defence 189
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
207
PROPOSALS BY INDICATIVE YEAR-OF-DECISION
Project Number Project Name Page No.
FY 2009-10 to FY 2010-11AIR 5416 Ph 4B1 C-130J Radar Warning Receiver (RWR) 32
AIR 5416 Ph 4B2 C-130J Large Aircraft Infrared Countermeasures (LAIRCM) 32
AIR 5440 Ph 1 C-130J Block Upgrade Program 7.0 42
AIR 6000 Ph 2A/2B New Air Combat Capability – 3 Squadrons 44
AIR 9000 SCAP1 Seahawk Capability Assurance Program 1 60
JP 154 Ph 1 Joint Counter Improvised Explosive Device 70
JP 2008 Ph 3H Military Satellite Capability – Wideband Terrestrial Terminals 81
JP 2030 Ph 8 ADF Joint Command Support Environment 86
JP 2070 Ph 4 AP-3C Light Weight Torpedo Integration 105
JP 2089 Ph 2B Tactical Information Exchange Domain (Data Links) 118
JP 2110 Ph 1A Chemical, Biological, Radiological, Nuclear Defence 130
LAND 17 Ph 1 Artillery Replacement 146
LAND 75 Ph 3.4 Battlefield Command Support System 151
LAND 125 Ph 3A Soldier Enhancement Version 2 – C4I Component 159
LAND 125 Ph 3C Soldier Enhancement Version 2 – Lethality 159
SEA 1000 Ph 1A Future Submarine – Concept Design 171
SEA 1397 Ph 5A Nulka Missile Decoy Enhancements 187
FY 2010-11 to FY 2011-12AIR 9000 Ph 5C Additional Heavy Lift Helicopter 54
AIR 9000 Ph 8 Future Naval Aviation Combat System 58
AIR 9000 SCAP2 Seahawk Capability Assurance Program 2 60
JP 66 Ph 1 Replacement for Air Defence Targets 64
JP 2044 Ph 3A.1 Project Eagle Eye 88
JP 2065 Ph 2 Integrated Broadcast System 99
JP 2069 Ph 2 High Grade Cryptographic Equipment 103
JP 2072 Ph 2A Battlespace Communications System (Land) 107
JP 2080 Ph 3 Defence Management Systems Improvement – Finance System 114
JP 2090 Ph 1C Combined Information Environment 121
JP 3027 Ph 1 JDAM Enhancements 140
JP 5408 Ph 3 ADF Navigation Warfare (NAVWAR) Capability 144
LAND 121 Ph 5A Overlander 156
LAND 125 Ph 3B Soldier Enhancement Version 2 – Survivability 159
LAND 146 Ph 2 Combat Identification for Land Forces 165
FY 2011-12 to FY 2012-13AIR 5232 Ph 1 Air Combat Officer Training System 24
AIR 5276 CAP 2 AP-3C Capability Assurance Program 26
AIR 5431 Ph 2/3 Fixed Base Air Traffic Management and Control System 36
AIR 5438 Ph 1A Lead-In Fighter Capability Assurance Program 40
AIR 8000 Ph 1 Battlefield Airlift – Additional C-130J 51
AIR 9000 Ph 7 Helicopter Aircrew Training System 56
DEF 7013 Ph 4 Joint Intelligence Support System 62
JP 129 Ph 4 Tier 1 Unmanned Aerial Vehicle (UAV) 68
JP 2048 Ph 3 Amphibious Watercraft Replacement 92
JP 2077 Ph 2D Improved Logistics Information Systems 110
JP 2096 Ph 1 Surveillance Enhancement 123
JP 2097 Ph 1B REDFIN – Enhancements to Special Operations Capability 125
JP 2099 Ph 1 Identity Management – Project CERTE 127
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
208
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Project Number Project Name Page No.
LAND 112 Ph 4 ASLAV Enhancement 154
SEA 1000 Ph 1B Future Submarine – Preliminary Design 171
SEA 1351 Ph 1 Replacement East Coast Tugs 177
SEA 1408 Ph 2 Torpedo Self-defence 189
SEA 1439 Ph 3.1 Collins Obsolescence Management 193
SEA 1439 Ph 5B.2 Collins Continuous Improvement Program 193
SEA 1439 Ph 6 Collins Sonar Replacement 193
SEA 1448 Ph 4A ANZAC Electronic Support System Improvements 199
FY 2012-13 or BeyondAIR 5077 Ph 4 AEW&C Sustainment Study 23
AIR 5397 Ph 2 Upgrade Australian Military Airspace Communications and Control System (AMACCS) 28
AIR 5405 Ph 1 Replacement Mobile Region Operations Centre 30
AIR 5428 Ph 1 Pilot Training System 34
AIR 5431 Ph 1 Deployable Air Traffic Management and Control System 36
AIR 5432 Ph 1 Communications, Navigation, Surveillance/Air Traffic Management 38
AIR 5440 Ph 2 C-130J Block Upgrade Program 8.0 42
AIR 6000 Ph 3 Weapons for New Air Combat Capability 44
AIR 6000 Ph 5 Future Air-to-Air Weapons for New Air Combat Capability and Super Hornet 44
AIR 7000 Ph 2B Maritime Patrol Aircraft Replacement 49
AIR 8000 Ph 2 Battlefield Airlift – Caribou Replacement 51
JP 90 Ph 1 ADF Identification Friend or Foe 66
JP 154 Ph 2 Joint Counter Improvised Explosive Device 70
JP 157 Ph 1 Replacement Refuelling Trucks 73
JP 1544 Ph 1 Project Eden – Document Handling System 75
JP 1770 Ph 1 Rapid Environmental Assessment 77
JP 1771 Ph 1 Geomatic Support System 79
JP 2008 Ph 5B Military Satellite Capability – Wideband Terrestrial Infrastructure 81
JP 2025 Ph 6 Jindalee Operational Radar Network (JORN) 84
JP 2044 Ph 4 Digital Topographical Systems (DTS) Upgrade 88
JP 2047 Ph 3 Wide Area Communications Network Replacement 90
JP 2048 Ph 5 Landing Craft Heavy Replacement 92
JP 2060 Ph 3 ADF Deployable Health Capability 95
JP 2064 Ph 3 Geospatial Information Infrastructure & Services 97
JP 2065 Ph 3 Integrated Broadcast System 99
JP 2068 Ph 2B.2 Computer Network Defence 101
JP 2072 Ph 2B Battlespace Communications System (Land) 107
JP 2072 Ph 3 Battlespace Communications System (Land) 107
JP 2078 Ph 2 Hyper-Spectral Imaging 112
JP 2080 Ph 2B.1 Defence Management Systems Improvement – Personnel Systems Modernisation 114
JP 2085 Ph 2/3 Explosive Ordnance Warstock 116
JP 2089 Ph 3 Tactical Information Exchange Domain (Data Links) 118
JP 2110 Ph 1B Chemical, Biological, Radiological, Nuclear Defence 130
JP 3011 Ph 1 Non-Lethal Weapons 132
JP 3021 Ph 1 Joint Combined Training Capability (JCTC) 134
JP 3024 Ph 1 Woomera Range Remediation 136
JP 3025 Ph 1 Deployable Incident Response Regiment (IRR) Capability 138
JP 3028 Ph 1 Defence Simulation Program 142
LAND 53 Ph 1BR NINOX – Night Fighting Equipment Technology Refresh 149
LAND 75 Ph 4 Battlefield Command Support System 151
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
209
Project Number Project Name Page No.
LAND 121 Ph 4 Overlander 156
LAND 125 Ph 4 Soldier Enhancement Version 3 159
LAND 136 Ph 1 Land Force Mortar Replacement 163
LAND 155 Ph 1 Enhanced Gap Crossing Capability 167
LAND 998 Ph 1 Replacement Aviation Fire Trucks 169
SEA 1000 Ph 1C Future Submarine – Detailed Design 171
SEA 1180 Ph 1 Patrol Boat, Mine Hunter Coastal and Hydrographic Ship Replacement Project 173
SEA 1350 Ph 1 Navy Surface and Subsurface Ranges 175
SEA 1352 Ph 1 Evolved Sea Sparrow Missile (ESSM) Upgrade and Inventory Replenishment 179
SEA 1354 Ph 1 Submarine Escape Rescue and Abandonment Systems (SERAS) 181
SEA 1357 Ph 1 Close-In Weapons System (CIWS) Phalanx Block Upgrade 183
SEA 1358 Ph 1 Mini Typhoon for ANZAC Class 185
SEA 1397 Ph 5B Nulka Missile Decoy Enhancements 187
SEA 1430 Ph 5 Digital Hydro Display System Upgrade 191
SEA 1442 Ph 4 Maritime Communication Modernisation 197
SEA 1448 Ph 4B ANZAC Air Search Radar Replacement 199
SEA 1778 Ph 1 Deployable MCM – Organic Mine Counter Measures 202
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
210
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
PROPOSALS BY AUSTRALIAN INDUSTRY OPPORTUNITIES
Pro
ject
Cap
abili
ty
Acoustic Technologies & Systems
AEW&C Systems
Anti-Tampering Capabilities
Armoured Vehicles
Combat Clothing & Personal Equipment
Communications Security
Composite & Exotic Materials
Electronic Warfare
Guided Weapons
Infantry Weapons & Remote Weapons Stations
Protection of Networks, Computers & Information
Radar (HF and PAR)
Rotary & Fixed Wing Aircraft
Secure Test Facilities & Test Ranges
Selected Ballistic Munitions & Explosives
Signature Management
Submarines
Support of Mission & Safety Critical Software
Surface Naval Vessels.
System Assurance Capabilities (H’ware & S’ware)
System Life Cycle Management.
Systems Integration (High End, System of Systems)
Targeting and Precision Navigation
Facilities and Infrastructure
Other
AIR
507
7 P
h 4
AEW
&C
Sus
tain
men
t Stu
dy•
AIR
523
2 P
h 1
Air
Com
bat O
ffic
er T
rain
ing
Syst
em•
•
AIR
527
6 C
AP 2
AP-3
C C
apab
ility
Ass
uran
ce
Pro
gram
••
••
•
AIR
539
7 P
h 2
Upg
rade
Aus
tral
ian
Mili
tary
Ai
rspa
ce C
omm
unic
atio
ns a
nd
Con
trol
Sys
tem
(AM
ACC
S)•
•
AIR
540
5 P
h 1
Rep
lace
men
t Mob
ile R
egio
nal
Ope
ratio
ns C
entr
e•
AIR
541
6 P
h 4B
1C
-130
J R
adar
War
ning
Rec
eive
r (R
WR
)•
•
AIR
541
6 P
h 4B
2C
-130
J La
rge
Airc
raft
Infr
ared
C
ount
erm
easu
res
(LAI
RC
M)
••
AIR
542
8 P
h 1
Pilo
t Tra
inin
g Sy
stem
••
AIR
543
1 P
h 1
Dep
loya
ble
Air
Traf
fic M
anag
emen
t an
d C
ontr
ol S
yste
m•
AIR
543
1 P
h 2/
3Fi
xed
Bas
e Ai
r Tr
affic
Man
agem
ent
and
Con
trol
Sys
tem
•
AIR
543
2 P
h 1
Com
mun
icat
ions
, Nav
igat
ion,
Su
rvei
llanc
e/Ai
r Tr
affic
M
anag
emen
t•
AIR
543
8 P
h 1A
Lead
-In
Figh
ter
Cap
abili
ty
Assu
ranc
e P
rogr
am•
••
AIR
544
0 P
h 1
C-1
30J
Blo
ck U
pgra
de P
rogr
am 7
.0•
AIR
544
0 P
h 2
C-1
30J
Blo
ck U
pgra
de P
rogr
am 8
.0•
AIR
600
0 P
h 2A
/2B
New
Air
Com
bat C
apab
ility
– 3
Sq
uadr
ons
••
••
••
••
••
••
••
•
AIR
600
0 P
h 3
Wea
pons
for
New
Air
Com
bat
Cap
abili
ty•
•
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
211 Pro
ject
Cap
abili
ty
Acoustic Technologies & Systems
AEW&C Systems
Anti-Tampering Capabilities
Armoured Vehicles
Combat Clothing & Personal Equipment
Communications Security
Composite & Exotic Materials
Electronic Warfare
Guided Weapons
Infantry Weapons & Remote Weapons Stations
Protection of Networks, Computers & Information
Radar (HF and PAR)
Rotary & Fixed Wing Aircraft
Secure Test Facilities & Test Ranges
Selected Ballistic Munitions & Explosives
Signature Management
Submarines
Support of Mission & Safety Critical Software
Surface Naval Vessels.
System Assurance Capabilities (H’ware & S’ware)
System Life Cycle Management.
Systems Integration (High End, System of Systems)
Targeting and Precision Navigation
Facilities and Infrastructure
Other
AIR
600
0 P
h 5
Futu
re A
ir-t
o-Ai
r W
eapo
ns fo
r N
ew
Air
Com
bat C
apab
ility
and
Sup
er
Hor
net
•
AIR
700
0 P
h 2B
Mar
itim
e P
atro
l Air
craf
t R
epla
cem
ent
••
••
••
••
AIR
800
0 P
h 1
Bat
tlefie
ld A
irlif
t – A
dditi
onal
C-1
30J
•
AIR
800
0 P
h 2
Bat
tlefie
ld A
irlif
t – C
arib
ou
Rep
lace
men
t•
AIR
900
0 P
h 5C
Addi
tiona
l Hea
vy L
ift H
elic
opte
r •
••
••
AIR
900
0 P
h 7
Hel
icop
ter
Airc
rew
Tra
inin
g Sy
stem
••
••
••
••
••
•
AIR
900
0 P
h 8
Futu
re N
aval
Avi
atio
n C
omba
t Sy
stem
•
••
••
••
••
••
•
AIR
900
0 SC
AP1
Seah
awk
Cap
abili
ty A
ssur
ance
P
rogr
am 1
••
AIR
900
0 SC
AP2
Seah
awk
Cap
abili
ty A
ssur
ance
P
rogr
am 2
••
DEF
701
3 P
h 4
Join
t Int
ellig
ence
Sup
port
Sys
tem
••
••
••
JP 6
6 P
h 1
Rep
lace
men
t for
Air
Def
ence
Ta
rget
s•
••
••
••
JP 9
0 P
h 1
ADF
Iden
tific
atio
n Fr
iend
or
Foe
•
JP 1
29 P
h 4
Tier
1 U
nman
ned
Aeri
al V
ehic
le
(UAV
) •
••
••
•
JP 1
54 P
h 1
Join
t Cou
nter
Impr
ovis
ed E
xplo
sive
D
evic
e•
••
•
JP 1
54 P
h 2
Join
t Cou
nter
Impr
ovis
ed E
xplo
sive
D
evic
e•
••
••
JP 1
57 P
h 1
Rep
lace
men
t Ref
uelli
ng T
ruck
s•
JP 1
544
Ph
1P
roje
ct E
den
– D
ocum
ent H
andl
ing
Syst
em•
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
212
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Pro
ject
Cap
abili
ty
Acoustic Technologies & Systems
AEW&C Systems
Anti-Tampering Capabilities
Armoured Vehicles
Combat Clothing & Personal Equipment
Communications Security
Composite & Exotic Materials
Electronic Warfare
Guided Weapons
Infantry Weapons & Remote Weapons Stations
Protection of Networks, Computers & Information
Radar (HF and PAR)
Rotary & Fixed Wing Aircraft
Secure Test Facilities & Test Ranges
Selected Ballistic Munitions & Explosives
Signature Management
Submarines
Support of Mission & Safety Critical Software
Surface Naval Vessels.
System Assurance Capabilities (H’ware & S’ware)
System Life Cycle Management.
Systems Integration (High End, System of Systems)
Targeting and Precision Navigation
Facilities and Infrastructure
Other
JP 1
770
Ph
1R
apid
Env
iron
men
tal A
sses
smen
t•
••
••
•
JP 1
771
Ph
1G
eom
atic
Sup
port
Sys
tem
••
••
••
JP 2
008
Ph
3HM
ilita
ry S
atel
lite
Cap
abili
ty –
W
ideb
and
Terr
estr
ial T
erm
inal
s •
JP 2
008
Ph
5BM
ilita
ry S
atel
lite
Cap
abili
ty –
W
ideb
and
Terr
estr
ial I
nfra
stru
ctur
e •
•
JP 2
025
Ph
6Ji
ndal
ee O
pera
tiona
l Rad
ar
Net
wor
k (J
OR
N)
••
••
••
JP 2
030
Ph
8AD
F Jo
int C
omm
and
Supp
ort
Envi
ronm
ent
••
JP 2
044
Ph
3A.1
Pro
ject
Eag
le E
ye•
•
JP 2
044
Ph
4D
igita
l Top
ogra
phic
al S
yste
ms
(DTS
) Upg
rade
••
JP 2
047
Ph
3W
ide
Area
Com
mun
icat
ions
N
etw
ork
Rep
lace
men
t•
••
••
JP 2
048
Ph
3Am
phib
ious
Wat
ercr
aft
Rep
lace
men
t•
JP 2
048
Ph
5La
ndin
g C
raft
Hea
vy R
epla
cem
ent
•
JP 2
060
Ph
3AD
F D
eplo
yabl
e H
ealt
h C
apab
ility
••
•
JP 2
064
Ph
3G
eosp
atia
l Inf
orm
atio
n In
fras
truc
ture
& S
ervi
ces
••
••
••
JP 2
065
Ph
2In
tegr
ated
Bro
adca
st S
yste
m•
••
••
•
JP 2
065
Ph
3In
tegr
ated
Bro
adca
st S
yste
m•
••
••
•
JP 2
068
Ph
2B.2
Com
pute
r N
etw
ork
Def
ence
•
JP 2
069
Ph
2H
igh
Gra
de C
rypt
ogra
phic
Eq
uipm
ent
••
JP 2
070
Ph
4AP
-3C
Lig
ht W
eigh
t Tor
pedo
In
tegr
atio
n•
•
JP 2
072
Ph
2AB
attle
spac
e C
omm
unic
atio
ns
Syst
em (L
and)
••
••
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
213 Pro
ject
Cap
abili
ty
Acoustic Technologies & Systems
AEW&C Systems
Anti-Tampering Capabilities
Armoured Vehicles
Combat Clothing & Personal Equipment
Communications Security
Composite & Exotic Materials
Electronic Warfare
Guided Weapons
Infantry Weapons & Remote Weapons Stations
Protection of Networks, Computers & Information
Radar (HF and PAR)
Rotary & Fixed Wing Aircraft
Secure Test Facilities & Test Ranges
Selected Ballistic Munitions & Explosives
Signature Management
Submarines
Support of Mission & Safety Critical Software
Surface Naval Vessels.
System Assurance Capabilities (H’ware & S’ware)
System Life Cycle Management.
Systems Integration (High End, System of Systems)
Targeting and Precision Navigation
Facilities and Infrastructure
Other
JP 2
072
Ph
2BB
attle
spac
e C
omm
unic
atio
ns
Syst
em (L
and)
••
••
JP 2
072
Ph
3B
attle
spac
e C
omm
unic
atio
ns
Syst
em (L
and)
••
••
JP 2
077
Ph
2DIm
prov
ed L
ogis
tics
Info
rmat
ion
Syst
ems
••
••
JP 2
078
Ph
2H
yper
-Spe
ctra
l Im
agin
g•
••
••
•
JP 2
080
Ph
2B.1
Def
ence
Man
agem
ent S
yste
ms
Impr
ovem
ent –
Per
sonn
el S
yste
ms
Mod
erni
satio
n•
••
JP 2
080
Ph
3D
efen
ce M
anag
emen
t Sys
tem
s Im
prov
emen
t – F
inan
ce S
yste
m•
••
JP 2
085
Ph
2/3
Expl
osiv
e O
rdna
nce
War
stoc
k•
JP 2
089
Ph
2BTa
ctic
al In
form
atio
n Ex
chan
ge
Dom
ain
(Dat
a Li
nks)
••
JP 2
089
Ph
3Ta
ctic
al In
form
atio
n Ex
chan
ge
Dom
ain
(Dat
a Li
nks)
••
•
JP 2
090
Ph
1CC
ombi
ned
Info
rmat
ion
Envi
ronm
ent
••
••
JP 2
096
Ph
1Su
rvei
llanc
e En
hanc
emen
t •
••
••
•
JP 2
097
Ph
1BR
EDFI
N –
Enh
ance
men
ts to
Sp
ecia
l Ope
ratio
ns C
apab
ility
••
JP 2
099
Ph
1Id
entit
y M
anag
emen
t – P
roje
ct
CER
TE•
••
••
•
JP 2
110
Ph
1AC
hem
ical
, Bio
logi
cal,
Rad
iolo
gica
l, N
ucle
ar D
efen
ce•
•
JP 2
110
Ph
1BC
hem
ical
, Bio
logi
cal,
Rad
iolo
gica
l, N
ucle
ar D
efen
ce•
•
JP 3
011
Ph
1N
on-L
etha
l Wea
pons
•
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
214
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Pro
ject
Cap
abili
ty
Acoustic Technologies & Systems
AEW&C Systems
Anti-Tampering Capabilities
Armoured Vehicles
Combat Clothing & Personal Equipment
Communications Security
Composite & Exotic Materials
Electronic Warfare
Guided Weapons
Infantry Weapons & Remote Weapons Stations
Protection of Networks, Computers & Information
Radar (HF and PAR)
Rotary & Fixed Wing Aircraft
Secure Test Facilities & Test Ranges
Selected Ballistic Munitions & Explosives
Signature Management
Submarines
Support of Mission & Safety Critical Software
Surface Naval Vessels.
System Assurance Capabilities (H’ware & S’ware)
System Life Cycle Management.
Systems Integration (High End, System of Systems)
Targeting and Precision Navigation
Facilities and Infrastructure
Other
JP 3
021
Ph
1Jo
int C
ombi
ned
Trai
ning
Cap
abili
ty
(JC
TC)
•
JP 3
024
Ph
1W
oom
era
Ran
ge R
emed
iatio
n•
JP 3
025
Ph
1D
eplo
yabl
e In
cide
nce
Res
pons
e R
egim
ent (
IRR
) Cap
abili
ty•
•
JP 3
027
Ph
1JD
AM E
nhan
cem
ents
•
JP 3
028
Ph
1D
efen
ce S
imul
atio
n P
rogr
am•
••
••
••
••
••
••
••
••
•
JP 5
408
Ph
3AD
F N
avig
atio
n W
arfa
re (N
AVW
AR)
Cap
abili
ty•
••
•
LAN
D 1
7 P
h 1
Artil
lery
Rep
lace
men
t•
••
••
••
••
•
LAN
D 5
3 P
h 1B
RN
INO
X –
Nig
ht F
ight
ing
Equi
pmen
t Te
chno
logy
Ref
resh
•
LAN
D 7
5 P
h 3.
4B
attle
field
Com
man
d Su
ppor
t Sy
stem
••
••
•
LAN
D 7
5 P
h 4
Bat
tlefie
ld C
omm
and
Supp
ort
Syst
em•
••
••
LAN
D 1
12 P
h 4
ASLA
V En
hanc
emen
t•
•
LAN
D 1
21 P
h 4
Ove
rlan
der
•
LAN
D 1
21 P
h 5A
Ove
rlan
der
•
LAN
D 1
25 P
h 3A
Sold
ier
Enha
ncem
ent V
ersi
on 2
–
C4I
Com
pone
nt•
••
••
LAN
D 1
25 P
h 3B
Sold
ier
Enha
ncem
ent V
ersi
on 2
–
Surv
ivab
ility
••
••
•
LAN
D 1
25 P
h 3C
Sold
ier
Enha
ncem
ent V
ersi
on 2
–
Leth
ality
••
••
•
LAN
D 1
25 P
h 4
Sold
ier
Enha
ncem
ent V
ersi
on 3
••
••
••
•
LAN
D 1
36 P
h 1
Land
For
ce M
orta
r R
epla
cem
ent
••
••
LAN
D 1
46 P
h 2
Com
bat I
dent
ifica
tion
for
Land
Fo
rces
••
••
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
215 Pro
ject
Cap
abili
ty
Acoustic Technologies & Systems
AEW&C Systems
Anti-Tampering Capabilities
Armoured Vehicles
Combat Clothing & Personal Equipment
Communications Security
Composite & Exotic Materials
Electronic Warfare
Guided Weapons
Infantry Weapons & Remote Weapons Stations
Protection of Networks, Computers & Information
Radar (HF and PAR)
Rotary & Fixed Wing Aircraft
Secure Test Facilities & Test Ranges
Selected Ballistic Munitions & Explosives
Signature Management
Submarines
Support of Mission & Safety Critical Software
Surface Naval Vessels.
System Assurance Capabilities (H’ware & S’ware)
System Life Cycle Management.
Systems Integration (High End, System of Systems)
Targeting and Precision Navigation
Facilities and Infrastructure
Other
LAN
D 1
55 P
h 1
Enha
nced
Gap
Cro
ssin
g C
apab
ility
••
LAN
D 9
98 P
h 1
Rep
lace
men
t Avi
atio
n Fi
re T
ruck
s•
•
SEA
1000
Ph
1AFu
ture
Sub
mar
ine
– C
once
pt
Des
ign
••
••
••
••
••
••
SEA
1000
Ph
1BFu
ture
Sub
mar
ine
– P
relim
inar
y D
esig
n •
••
••
••
••
••
•
SEA
1000
Ph
1CFu
ture
Sub
mar
ine
– D
etai
led
Des
ign
••
••
••
••
••
••
SEA
1180
Ph
1P
atro
l Boa
t, M
ine
Hun
ter
Coa
stal
and
Hyd
rogr
aphi
c Sh
ip
Rep
lace
men
t Pro
ject
••
••
•
SEA
1350
Ph
1N
avy
Surf
ace
and
Subs
urfa
ce
Ran
ges
••
••
••
SEA
1351
Ph
1R
epla
cem
ent E
ast C
oast
Tug
s•
SEA
1352
Ph
1Ev
olve
d Se
a Sp
arro
w M
issi
le
(ESS
M) U
pgra
de a
nd In
vent
ory
Rep
leni
shm
ent
•
SEA
1354
Ph
1Su
bmar
ine
Esca
pe R
escu
e an
d Ab
ando
nmen
t Sys
tem
s (S
ERAS
)•
SEA
1357
Ph
1C
lose
-In
Wea
pons
Sys
tem
(CIW
S)
Pha
lanx
Blo
ck U
pgra
de•
••
SEA
1358
Ph
1M
ini T
ypho
on fo
r AN
ZAC
Cla
ss•
•
SEA
1397
Ph
5AN
ulka
Mis
sile
Dec
oy
Enha
ncem
ents
••
••
SEA
1397
Ph
5BN
ulka
Mis
sile
Dec
oy
Enha
ncem
ents
••
••
SEA
1408
Ph
2To
rped
o Se
lf-de
fenc
e•
•
SEA
1430
Ph
5D
igita
l Hyd
ro D
ispl
ay S
yste
m
Upg
rade
••
••
••
SEA
1439
Ph
3.1
Col
lins
Obs
oles
cenc
e M
anag
emen
t•
••
••
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
216
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
Pro
ject
Cap
abili
ty
Acoustic Technologies & Systems
AEW&C Systems
Anti-Tampering Capabilities
Armoured Vehicles
Combat Clothing & Personal Equipment
Communications Security
Composite & Exotic Materials
Electronic Warfare
Guided Weapons
Infantry Weapons & Remote Weapons Stations
Protection of Networks, Computers & Information
Radar (HF and PAR)
Rotary & Fixed Wing Aircraft
Secure Test Facilities & Test Ranges
Selected Ballistic Munitions & Explosives
Signature Management
Submarines
Support of Mission & Safety Critical Software
Surface Naval Vessels.
System Assurance Capabilities (H’ware & S’ware)
System Life Cycle Management.
Systems Integration (High End, System of Systems)
Targeting and Precision Navigation
Facilities and Infrastructure
Other
SEA
1439
Ph
5B.2
Col
lins
Con
tinuo
us Im
prov
emen
t P
rogr
am•
••
••
••
SEA
1439
Ph
6C
ollin
s So
nar
Rep
lace
men
t•
••
••
SEA
1442
Ph
4M
ariti
me
Com
mun
icat
ion
Mod
erni
satio
n •
••
••
SEA
1448
Ph
4AAN
ZAC
Ele
ctro
nic
Supp
ort S
yste
m
Impr
ovem
ents
••
•
SEA
1448
Ph
4BAN
ZAC
Air
Sea
rch
Rad
ar
Rep
lace
men
t•
•
SEA
1778
Ph
1D
eplo
yabl
e M
CM
– O
rgan
ic M
ine
Cou
nter
Mea
sure
s•
•
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
217
PROPOSAL CONTACT OFFICERS
AIR 5077 Capability Staff: Defence Materiel Organisation:Director Project Management UnitAEW&C Systems Program Office(02) 4928 5220
Phase 4 AEW&C Sustainment Study Deputy Director Battlespace Management(02) 6265 5561
AIR 5232 Capability Staff: Defence Materiel Organisation: Phase 1 Air Combat Officer Training System Deputy Director Training
(02) 6265 5450Directorate of Emerging Aerospace ProjectsProject Manager 1 – Fixed Wing(02) 6265 5534
AIR 5276 Capability Staff: Defence Materiel Organisation: CAP 2 AP-3C Capability Assurance Program Staff Officer Maritime Patrol and
Response 2(02) 6265 5447
Director P3 Block Upgrade Program (08) 8393 3318
AIR 5397 Capability Staff: Defence Materiel Organisation: Phase 2 Upgrade Australian Military Airspace
Communications and Control System (AMACCS)
Deputy Director Battlespace Management (02) 6265 5561
Director Project Development & Integration Surveillance and Control Branch(02) 6265 6291
AIR 5405 Capability Staff: Defence Materiel Organisation: Phase 1
Replacement Mobile Regional Operations Centre
Staff Officer Battlespace Management 1(02) 6265 2216
Director Project Development & IntegrationSurveillance and Control Branch(02) 6265 6291
AIR 5416 Capability Staff: Defence Materiel Organisation: Phase 4B1 Phase 4B2
C-130J Radar Warning Receiver (RWR)C-130J Large Aircraft Infrared Countermeasures (LAIRCM)
Deputy Director Aircraft Survivability(02) 6265 5734
Director Airborne Self Protection Systems Program Office(02) 6265 1615
AIR 5428 Capability Staff: Defence Materiel Organisation: Phase 1 Pilot Training System AIR 5428 Desk Officer
(02) 6265 5121Project Manager AIR 5428(03) 9256 3434
AIR 5431 Capability Staff: Defence Materiel Organisation: Phase 1
Phase 2/3
Deployable Air Traffic Management and Control SystemFixed Base Air Traffic Management and Control System
Staff Officer Battlespace Management 3(02) 6266 7317
Director Project Development & Integration Surveillance and Control Branch(02) 6265 6291
AIR 5432 Capability Staff: Defence Materiel Organisation: Phase 1 Communications, Navigation,
Surveillance/Air Traffic ManagementStaff Officer Battlespace Management 2(02) 6265 7530
Director Project Development & IntegrationSurveillance and Control Branch(02) 6265 6291
AIR 5438 Capability Staff: Defence Materiel Organisation: Phase 1A Lead-In Fighter Capability Assurance
ProgramDeputy Director Firepower(02) 6265 5568
Director Lead-In Fighter Management Unit(02) 4928 6906
AIR 5440 Capability Staff: Defence Materiel Organisation: Phase 1 Phase 2
C-130J Block Upgrade Program 7.0C-130J Block Upgrade Program 8.0
Deputy Director Combat Mobility(02) 6265 1073
Project Director AIR 5440Airlift Systems Program Office(02) 4588 1165
AIR 6000 Capability Staff: Defence Materiel Organisation: Phase 2A/2B
Phase 3
Phase 5
New Aerospace Combat Capability – 3 Squadrons
Weapons for New Air Combat CapabilityFuture Air-to-Air Weapons for New Air Combat Capability and Super Hornet
Program ManagerNew Air Combat Capability(02) 6127 0001Deputy Director Combat EnablersAerospace Development Branch(02) 6265 5442
Director CommercialNew Air Combat Capability(02) 6127 0086Director Emerging ProjectsGuided Weapons Branch(02) 6265 1464
AIR 7000 Capability Staff: Defence Materiel Organisation: Phase 2B Maritime Patrol Aircraft Replacement Deputy Director
Maritime Patrol and Response(02) 6265 3852
Project ManagerAIR 7000 Phase 2B (02) 6265 1628
AIR 8000 Capability Staff: Defence Materiel Organisation: Phase 1 Phase 2
Battlefield Airlift – Additional C-130J Battlefield Airlift – Caribou Replacement
Deputy Director Combat Mobility(02) 6265 1073
Director New Airlift Program Office(02) 6127 2614
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
218
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
AIR 9000 Capability Staff: Defence Materiel Organisation: Phase 5C Additional Heavy Lift Helicopter Staff Officer Army Aviation 5
(02) 6265 6435Project Manager AIR 9000 Phase 5C(02) 6265 6611
AIR 9000 Capability Staff: Defence Materiel Organisation: Phase 7 Helicopter Aircrew Training System Deputy Director Maritime Aviation
(02) 6265 6435Project Manager AIR 9000 Phase 7 (02) 4424 1676
AIR 9000 Capability Staff: Defence Materiel Organisation: Phase 8 Future Naval Aviation Combat System Deputy Director Maritime Aviation
(02) 6265 6435Director Emerging Aerospace Projects(02) 6265 6298
AIR 9000 Capability Staff: Defence Materiel Organisation: SCAP 1
SCAP 2
Seahawk Capability Assurance Program 1 Seahawk Capability Assurance Program 2
Deputy Director Maritime Aviation(02) 6265 6435
Manager Seahawk Capability Assurance Program (02) 4424 3349
DEF 7013 Capability Staff: Defence Materiel Organisation: Phase 4 Joint Intelligence Support System Director Intelligence & Geospatial
Development(02) 6265 3489
Director Military Geographic Information Systems Program Office(02) 6265 5268
JP 66 Capability Staff: Defence Materiel Organisation: Phase 1 Replacement for Air Defence Targets Staff Officer Future Strike
Systems(02) 6265 5592
JP 66 Project Office(07) 5467 8165 [email protected]
JP 90 Capability Staff: Defence Materiel Organisation: Phase 1 ADF Identification Friend or Foe Staff Officer Battlespace
Management 2(02) 6265 7530
Navigation Warfare Engineer 1Navigation Warfare Systems Program Office(02) 6265 7798
JP 129 Capability Staff: Defence Materiel Organisation: Phase 4 Tier 1 Unmanned Aerial Vehicle (UAV) Staff Officer Unmanned Aerial
Systems 2(02) 6265 2386
Directorate of Emerging Aerospace Projects(02) 6265 6298
JP 154 Capability Staff: Defence Materiel Organisation: Phase 1
Phase 2
Joint Counter Improvised Explosive DeviceJoint Counter Improvised Explosive Device
Staff Officer Electronic Warfare(02) 6265 1884
JP 154 Project Manager(02) 6265 2743
JP 157 Capability Staff: Defence Materiel Organisation: Phase 1 Replacement Refuelling Trucks Staff Officer Joint Theatre
Distribution(02) 6265 4934
Land Systems Division Emerging Project Team(03) 9282 6933
JP 1544 Chief Information Officer Group: Phase 1 Project Eden – Document Handling
SystemProject Director Common Services Document and Records Management(02) 6266 4577
JP 1770 Capability Staff: Defence Materiel Organisation: Phase 1 Rapid Environmental Assessment Deputy Director Patrol and
Hydrographic(02) 6265 6467
Director Military Geographic Information Systems Program Office(02) 6265 5635
JP 1771 Capability Staff: Defence Materiel Organisation: Phase 1 Geomatic Support System Deputy Director Imagery and
Geospatial Information Systems(02) 6265 3897
Director Military Geographic Information Systems Program Office(02) 6265 5635
JP 2008 Capability Staff: Defence Materiel Organisation: Phase 3H
Phase 5B
Military Satellite Capability – Wideband Terrestrial Terminals Military Satellite Capability – Wideband Terrestrial Infrastructure
Deputy Director Long Range Communications(02) 6265 6502
Director Satellites Space Systems Program Office(02) 6265 4155
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
219
JP 2025 Capability Staff: Defence Materiel Organisation: Phase 6 Jindalee Operational Radar Network
(JORN)Deputy Director Battlespace Management(02) 6265 5561
Officer Commanding Over The Horizon Radar Systems Program Office(08) 8259 4001
JP 2030 Capability Staff: Defence Materiel Organisation: Phase 8 ADF Joint Command Support
EnvironmentDeputy Director Command and Control Systems(02) 6265 4086
Director Joint Command Support Environment(02) 6270 8332
JP 2044 Capability Staff: Defence Materiel Organisation: Phase 3A.1 Phase 4
Project Eagle EyeDigital Topographical Systems (DTS) Upgrade
Deputy Director Imagery and Geospatial Information Systems(02) 6265 3897
Director Military Geographic Information Systems Program Office(02) 6265 5635
JP 2047 Chief Information Officer Group: Phase 3 Wide Area Communications Network
ReplacementProject Director(02) 6265 3217
JP 2048 Capability Staff: Defence Materiel Organisation: Phase 3
Phase 5
Amphibious Watercraft Replacement
Landing Craft Heavy Replacement
Staff Officer Amphibious Mobility(02) 6265 2429Staff Officer Amphibious and Afloat Support(02) 6265 4726
Program Manager Amphibious Deployment and Sustainment Capability(02) 6266 7040
JP 2060 Capability Staff: Defence Materiel Organisation: Phase 3 ADF Deployable Health Capability Staff Officer Health
(02) 6265 7689Land Systems Division Emerging Project Team(03) 9282 4307
JP 2064 Capability Staff: Defence Materiel Organisation: Phase 3 Geospatial Information Infrastructure
and ServicesDeputy Director Imagery and Geospatial Information Systems(02) 6265 3897
Director Military Geographic Information Systems Program Office(02) 6265 5635
JP 2065 Capability Staff: Defence Materiel Organisation: Phase 2 Phase 3
Integrated Broadcast SystemIntegrated Broadcast System
Deputy Director Intelligence Systems(02) 6265 1222
Project Director JP 2065(02) 6265 3011
JP 2068 Capability Staff: Phase 2B.2 Computer Network Defence Director Network Application
Development(02) 6265 7983
JP 2069 Capability Staff: Defence Materiel Organisation: Phase 2 High Grade Cryptographic Equipment Director Network Application
Development(02) 6265 7983
Project Manager JP 2069(02) 6266 1893
JP 2070 Capability Staff: Defence Materiel Organisation: Phase 4 AP-3C Light Weight Torpedo
IntegrationDeputy Director Combat EnablersAerospace Development Branch(02) 6265 5442
Director Emerging Projects Guided Weapons Branch(02) 6265 1464
JP 2072 Capability Staff: Defence Materiel Organisation: Phase 2A
Phase 2B
Phase 3
Battlespace Communications System (Land)Battlespace Communications System (Land)Battlespace Communications System (Land)
Staff Officer Mobile Communications – Land(02) 6265 6501
JP 2072 Project Director(02) 6265 4183
JP 2077 Capability Staff: Defence Materiel Organisation: Phase 2D Improved Logistics Information
SystemsDeputy Director Materiel Logistic Information Systems(02) 6265 1101
Project Director JP 2077 Phase 2D(03) 9256 3199
JP 2078 Capability Staff: Defence Materiel Organisation: Phase 2 Hyper-Spectral Imaging Deputy Director Space Systems
(02) 6265 2970Director Military Geographic Information Systems Program Office(02) 6265 5635
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
220
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
JP 2080 Chief Information Officer Group: Phase 2B.1
Phase 3
Defence Management Systems Improvement – Personnel Systems Modernisation Defence Management Systems Improvement – Finance System
Project Director (02) 6266 4780
JP 2085 Capability Staff: Defence Materiel Organisation: Phase 2/3 Explosive Ordnance Warstock Deputy Director Explosive
Ordnance(02) 6265 1003
Guided Weapons: Deputy Director Emerging Projects (02) 6265 1464Non-Guided Explosive Ordnance: Deputy Director Project Assurance (02) 4737 0807
JP 2089 Capability Staff: Defence Materiel Organisation: Phase 2B
Phase 3
Tactical Information Exchange Domain (Data Links)Tactical Information Exchange Domain (Data Links)
Staff Officer Communications Air(02) 6265 7215
Project Director JP 2089 (02) 6266 0722
JP 2090 Capability Staff: Defence Materiel Organisation: Phase 1C Combined Information Environment Staff Officer Coalition
Infrastructure(02) 6265 1316
Director Coalition Networks and Wide Area(02) 6128 7176
JP 2096 Capability Staff: Defence Materiel Organisation: Phase 1 Surveillance Enhancement Director Intelligence and
Geospatial Development(02) 6265 3489
Director Military Geographic Information Systems Program Office(02) 6265 5635
JP 2097 Capability Staff: Defence Materiel Organisation: Phase 1B REDFIN – Enhancements to Special
Operations CapabilityDeputy Director Special Operations(02) 6265 5215
Project Director JP 2097 Phase 1B(03) 9282 3957
JP 2099 Chief Information Officer Group:(Sponsor)
Chief Information Officer Group:(Acquisition & Sustainment)
Phase 1 Identity Management – Project CERTE Director Electronic Business Integration(02) 6128 7592
Project Manager Application Development Branch(02) 6266 3993
JP 2110 Capability Staff: Defence Materiel Organisation: Phase 1A
Phase 1B
Chemical, Biological, Radiological, Nuclear DefenceChemical, Biological, Radiological, Nuclear Defence
Staff Officer Nuclear, Biological and Chemical Defence(02) 6265 7850
Land Systems Division EmergingProject Team(03) 9282 6933
JP 3011 Capability Staff: Defence Materiel Organisation: Phase 1 Non-Lethal Weapons Staff Officer Small Arms
(02) 6265 1863Land Systems Division Emerging Project Team(03) 9282 7165
JP 3021 Capability Staff: Defence Materiel Organisation: Phase 1 Joint Combined Training Capability
(JCTC)Director Network Infrastructure Development(02) 6265 2079
Director Airborne Self Protection Systems Program Office (02) 6265 1615
JP 3024 Capability Staff: Defence Materiel Organisation: Phase 1 Woomera Range Remediation Director Network Infrastructure
Development(02) 6265 2079
Deputy Dirtector JP 3024(08) 8393 2206
JP 3025 Capability Staff: Defence Materiel Organisation: Phase 1 Deployable Incident Response
Regiment (IRR) CapabilityStaff Officer Nuclear, Biological and Chemical Defence (02) 6265 7850
Land Systems Division Emerging Project Team(03) 9282 6933
JP 3027 Capability Staff: Defence Materiel Organisation: Phase 1 JDAM Enhancement Deputy Director Combat Enablers
Aerospace Development Branch(02) 6265 5442
Director Emerging Projects Guided Weapons Branch(02) 6265 1464
JP 3028 Capability Staff: Defence Materiel Organisation: Phase 1 Defence Simulation Program JP 3028 Desk Officer
(02) 6265 3451Director Aerospace Simulators and Special Purpose Aircraft(02) 6127 2775
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
221
JP 5408 Capability Staff: Defence Materiel Organisation: Phase 3 ADF Navigation Warfare (NAVWAR)
CapabilityDeputy Director Combat EnablersAerospace Development Branch(02) 6265 5442
Project Manager JP 5408Navigation Warfare Systems Program Office(02) 6265 1192
LAND 17 Capability Staff: Defence Materiel Organisation: Phase 1 Artillery Replacement Staff Officer Fire Support
(02) 6265 1734Project Director LAND 17(03) 9282 5832
LAND 53 Capability Staff: Defence Materiel Organisation: Phase 1BR NINOX – Night Fighting Equipment
Technology RefreshStaff Officer Small Arms(02) 6265 4349
Project Director Surveillance(03) 9282 6057
LAND 75 Capability Staff: Defence Materiel Organisation: Phase 3.4 Phase 4
Battlefield Command Support SystemBattlefield Command Support System
Staff Officer LAND 75(02) 6265 7809
Project Manager LAND 75(02) 6266 7432
LAND 112 Capability Staff: Defence Materiel Organisation: Phase 4 ASLAV Enhancement Staff Officer Combat (Heavy)
(02) 6265 4360Project Manager ASLAV Phase 4(03) 9282 3926
LAND 121 Capability Staff: Defence Materiel Organisation: Phase 4 Phase 5A
OverlanderOverlander
Deputy Director Mobility(02) 6265 7837
Program Manager Overlander(03) 9282 7658
LAND 125 Capability Staff: Defence Materiel Organisation: Phase 3A
Phase 3B
Phase 3C
Phase 4
Soldier Enhancement Version 2 – C4I ComponentSoldier Enhancement Version 2 – SurvivabilitySoldier Enhancement Version 2 – LethalitySoldier Enhancement Version 3
Staff Officer Soldier Combat Systems(02) 6265 2810
Project Director LAND 125(03) 9282 6486
LAND 136 Capability Staff: Defence Materiel Organisation: Phase 1 Land Force Mortar Replacement Staff Officer Intelligence,
Surveillance, Target Acquisition and Reconnaissance(02) 6265 6519
Land Systems Division Emerging Projects Team(03) 9282 4307
LAND 146 Capability Staff: Defence Materiel Organisation: Phase 2 Combat Identification for Land Forces Staff Officer Air
(02) 6265 3875LAND 146-2 Project Manager(03) 9622 2801
LAND 155 Capability Staff: Defence Materiel Organisation: Phase 1 Enhanced Gap Crossing Capability Staff Officer Engineers
(02) 6265 4819Land Systems Division Emerging Project Team(03) 9282 7165
LAND 998 Capability Staff: Defence Materiel Organisation: Phase 1 Replacement Aviation Fire Trucks Staff Officer Engineers
(02) 6265 4819Director Combat Support Vehicle Systems Program Office(03) 9282 4181
SEA 1000 Capability Staff: Defence Materiel Organisation: Phase 1A Phase 1B Phase 1C
Future Submarine – Concept DesignFuture Submarine – Preliminary Design Future Submarine – Detailed Design
Future Submarine Project Coordinator (02) 6265 6178
SEA 1000 Project Director(02) 6265 3519
SEA 1180 Capability Staff: Defence Materiel Organisation: Phase 1 Patrol Boat, Mine Hunter Coastal and
Hydrographic Ship Replacement ProjectDeputy Director Mine Warfare and Clearance Diving(02) 6265 5913
Director Maritime Acquisition Support(02) 6265 7757
SEA 1350 Capability Staff: Defence Materiel Organisation: Phase 1 Navy Surface and Subsurface Ranges Staff Officer Mine Warfare and
Clearance Diving(02) 6265 6477
Director Maritime Ranges Systems Program Office and Sonar Group(02) 6265 2341
SEA 1351 Capability Staff: Defence Materiel Organisation: Phase 1 Replacement East Coast Tugs Staff Officer Mine Warfare and
Clearance Diving(02) 6265 6477
Director Maritime Acquisition Support(02) 6265 7757
SEA 1352 Capability Staff: Defence Materiel Organisation: Phase 1 Evolved Sea Sparrow Missile (ESSM)
Upgrade and Inventory ReplenishmentDeputy Director Systems(02) 6265 5466
Director Emerging Projects Guided Weapons Branch(02) 6265 1464
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
222
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
SEA 1354 Capability Staff: Defence Materiel Organisation: Phase 1 Submarine Escape Rescue and
Abandonment Systems (SERAS)Deputy Director Amphibious and Afloat Support(02) 6265 3415
Director COLLINS Systems Program Office (08) 9553 2494
SEA 1357 Capability Staff: Defence Materiel Organisation: Phase 1 Close-In Weapons System (CIWS)
Phalanx Block UpgradeStaff Officer Above Water Warfare(02) 6265 6630
Director FFG Systems Program Office(02) 9359 6285
SEA 1358 Capability Staff: Defence Materiel Organisation: Phase 1 Mini Typhoon for ANZAC Class Staff Officer Above Water Warfare
(02) 6265 6630Director ANZAC Systems Program Office(08) 9591 9850
SEA 1397 Capability Staff: Defence Materiel Organisation: Phase 5A Phase 5B
Nulka Missile Decoy EnhancementsNulka Missile Decoy Enhancements
Staff Officer Electronic Warfare(02) 6265 5101
Director Maritime Electronic Warfare Systems Program Office(02) 6265 1624
SEA 1408 Capability Staff: Defence Materiel Organisation: Phase 2 Torpedo Self-defence Staff Officer Under Water Warfare
(02) 6265 6371Director Maritime Acquisition Support(02) 6265 2596
SEA 1430 Capability Staff: Defence Materiel Organisation: Phase 5 Digital Hydro Display System Upgrade Deputy Director Patrol and
Hydrographic(02) 6265 6467
Director Military Geographic Information Systems Program Office(02) 6265 5635
SEA 1439 Capability Staff: Defence Materiel Organisation: Phase 3.1
Phase 5B.2
Phase 6
Collins Obsolescence Management
Collins Continuous Improvement Program
Collins Sonar Replacement
Deputy Director Submarines(02) 6265 2134
Project Manager SEA 1439 Phase 3.1(08) 9553 5507Project Manager SEA 1439 Phase 5B.2(02) 6266 7108Generation ManagerSubmarine Combat Systems Program Office(02) 6265 1250
SEA 1442 Capability Staff: Defence Materiel Organisation: Phase 4 Maritime Communication
Modernisation Deputy Director Communications 2(02) 6265 1316
Project Director SEA 1442(02) 6265 7515
SEA 1448 Capability Staff: Defence Materiel Organisation: Phase 4A
Phase 4B
ANZAC Electronic Support System Improvements
ANZAC Air Search Radar Replacement
Staff Officer Electronic Warfare(02) 6265 5101
Deputy Director Systems(02) 6265 5466
Director Maritime Electronic Warfare Systems Program Office(02) 6265 1624Director ANZAC Systems Program Office(08) 9591 9850
SEA 1778 Capability Staff: Defence Materiel Organisation: Phase 1 Deployable MCM – Organic Mine
Counter MeasuresStaff Officer Mine Warfare and Clearance Diving(02) 6265 6477
Mine Hunter Coastal Project Officer(02) 9926 2686Explosive Ordnance Component:Director Emerging ProjectsGuided Weapons Branch(02) 6265 1464
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION
DEFEN
CE CA
PAB
ILITY PLA
N / 2009 / P
UB
LIC VER
SION