Definitions & Terminology. - Eaves are BASIX calculations. What is BASIX. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Definitions & Terminology
Page 2: Definitions & Terminology

Definitions & Terminology

- Eaves are BASIX calculations

Page 3: Definitions & Terminology

What is BASIX• What is BASIX ? BASIX is the Building Sustainability

Index. It is a web-based planning tool that is designed to assess Water, Thermal Comfort and Energy performance of a new home, extension or swimming pool (over 40 000 Litres).

• • Who needs a BASIX Certificate? A BASIX Certificate is

required on all new single dwellings, dual occupancy, villas, townhouses and multi-units in NSW. A certificate is also required for alterations and additions over $50 000 and swimming pools at or over 40 000 Litres

Page 4: Definitions & Terminology

Types of EavesBoxed Eaves

Eaves Trimmers also called Soffit Bearers

Page 5: Definitions & Terminology

AS 1684 Allowable Methods

Soffit Bearers Minimum Sizes

Page 6: Definitions & Terminology

Types of EavesOpen Eaves

Page 7: Definitions & Terminology

Types of EavesOpen Slat Eaves

Page 8: Definitions & Terminology

Types of EavesRaked Eaves

Page 9: Definitions & Terminology

Types of EavesFlush Eaves

Page 10: Definitions & Terminology

Flush Eaves

• Saves Cost– Scaffold– Material– Labour

• Problems – IF Gutter Fails– Water Runs Down Walls– Pools Formed at Footings– Causing Erosion, Swelling

Page 11: Definitions & Terminology

Rafter 90 x 45Ridge 125 x 19

Eaves Width

1. Eaves on plans are usually measured from external walls

Page 12: Definitions & Terminology

OverhangPlan usually from external wall

Page 13: Definitions & Terminology

Always Confirm

In This case 740mm from internal wall

Page 14: Definitions & Terminology
Page 15: Definitions & Terminology

Rafter 90 x 45Pitch 25⁰

Drop OffDistance From Top Plate to Bottom of Overhang

Page 16: Definitions & Terminology

Rafter 90 x 45Pitch 25⁰

Calculating Drop OffSTEP 1 Calculate the RISE of Hatched Triangle

Page 17: Definitions & Terminology

Rafter 90 x 45Pitch 25⁰

Calculating Drop OffSTEP 1 Calculate the RISE of Hatched Triangle

450mm x Tan 25⁰ = 210mm

Page 18: Definitions & Terminology

Rafter 90 x 45Pitch 25⁰

Calculating Drop OffSTEP 1 Calculate the RISE of Hatched Triangle450mm x Tan 25⁰ = 210mm

STEP 2 Add Birdsmouth

210 + 33 =

Page 19: Definitions & Terminology

Rafter 90 x 45Pitch 25⁰

Calculating Drop OffSTEP 1 Calculate the RISE of Hatched Triangle450mm x Tan 25⁰ = 210mm

STEP 2 Add Birdsmouth

210 + 33 = 243

Page 20: Definitions & Terminology

Rafter 90 x 45Pitch 25⁰

Remember Overhang Usually Specified From External Wall but Calculated For

Back of Birdsmouth

What is the Drop OffCavity = 40mBrick = 110mWhat is the Drop Off

Page 21: Definitions & Terminology

Rafter 90 x 45Pitch 25⁰

Drop Off

Page 22: Definitions & Terminology

Rafter 90 x 45Pitch 25⁰

Drop Off

Remember to allow for min 12mm Clearance

Page 23: Definitions & Terminology

Rafter 90 x 45Pitch 25⁰

Its Possible to have a Varying Drop Off

Page 24: Definitions & Terminology

Hazards

• Fall from Heights• Contact with Live Electrical Wires• Materials, Tools falling From Heights• Scaffold Collapse or Toppling over• Dust

• Complete Safe Work Method Statement

Page 25: Definitions & Terminology
Page 26: Definitions & Terminology

Cutting FC Sheeting

• Fibro Cutters• Score & Snap Knife• Grinder with Diamond Blade (Dust Mask

Required)

Page 27: Definitions & Terminology

Estimating

Step 1- Calculate Number of Soffit Bearers

12500 / 600 = 20.83 = 21 +1 = 22 x2= 44

44 x 0.6 x 5% = 44 x 0.63

Fixing Plate 2 @ 12.5

Page 28: Definitions & Terminology

No. LengthSoffit Bearers 70 x 35 F5 44 0.630 27.720 27.900 1.90$ 53.01$

Wall Plate 70 x 35 F5 2 12.500 12.600 25.200 1.90$ 47.88$

Cost Order

Item Section Size Material Linear Total Linear Rate / lm

Note – In this case as waste has been added already we don’t take the individual bearers up to the next 300mm as there will be to much waste.

Page 29: Definitions & Terminology

Estimating

Step 2- Calculate Fascia

Length + Verge O/H = (12.5 + 2 x 0.600) x 1.05 = 14.4 x 2

Page 30: Definitions & Terminology

No. LengthSoffit Bearers 70 x 35 F5 44 0.630 0.900 39.600 1.90$ 75.24$

Wall Plate 70 x 35 F5 2 12.500 12.600 25.200 1.90$ 47.88$ Fascia 190 x 25 H3 FJ 2 14.400 14.400 28.800 7.00$ 201.60$

Cost Order

Item Section Size Material Linear Total Linear Rate / lm

Page 31: Definitions & Terminology

Estimating

Step 3- Calculate Barge Board

Barge Run = Half Span + Eaves Width + Fascia + Gutter+ Plumb Cut + Waste

= (3450+600+25+200+tan 25 x190) x 1.05

Page 32: Definitions & Terminology

No. LengthSoffit Bearers 70 x 35 F5 44 0.630 0.900 39.600 1.90$ 75.24$

Wall Plate 70 x 35 F5 2 12.500 12.600 25.200 1.90$ 47.88$ Fascia 190 x 25 H3 FJ 2 13.700 13.800 27.600 7.00$ 193.20$

Barge Board 190 x 25 H3 FJ 4 5.046 5.100 20.400 7.00$ 142.80$

Cost Order

Item Section Size Material Linear Total Linear Rate / lm

Page 33: Definitions & Terminology

Estimating

Step 4- Soffit Lining

Soffit = 2 x Length + 4 x Barge

= 2 x 12500 + 4 x 4804

= 44.216 x 1.05(5% Waste) = 46.43 / 2.4(Sheet Length) = 19.34 = 20 Sheets

Page 34: Definitions & Terminology

No. LengthSoffit Bearers 70 x 35 F5 44 0.630 0.900 39.600 1.90$ 75.24$

Wall Plate 70 x 35 F5 2 12.500 12.600 25.200 1.90$ 47.88$ Fascia 190 x 25 H3 FJ 2 13.700 13.800 27.600 7.00$ 193.20$

Barge Board 190 x 25 H3 FJ 4 4.806 5.100 20.400 7.00$ 142.80$ Soffit Lining 600 FC 20 2.4 x 0.6 5.00$ 100.00$

Cost Order

Item Section Size Material Linear Total Linear Rate / lm

Page 35: Definitions & Terminology

Estimating

Step 5- Joining Mould

20 Sheets

21 Joins x 0.6 = 12.6 x 1.05 (5% Waste) = 13.23/2.4= 5.5 = 6 Lengths

Page 36: Definitions & Terminology

No. LengthSoffit Bearers 70 x 35 F5 44 0.630 0.900 39.600 1.90$ 75.24$

Wall Plate 70 x 35 F5 2 12.500 12.600 25.200 1.90$ 47.88$ Fascia 190 x 25 H3 FJ 2 13.700 13.800 27.600 7.00$ 193.20$

Barge Board 190 x 25 H3 FJ 4 4.806 5.100 20.400 7.00$ 142.80$ Soffit Lining 600 FC 20 2.4 x 0.6 5.00$ 100.00$ Joining Strip H Mould 6 2.400 2.400 14.400 1.58$ 22.80$

Cost Order

Item Section Size Material Linear Total Linear Rate / lm

Page 37: Definitions & Terminology

Estimating

Step 6- Quad

2 x Building Length + 4 x Verge length (Rafter Centreline) + 8 x Quad (Mitred)

2 x 12500 + 4 x 3806 + 8 x 19 = 40 376 x 1.05 (5% Waste)= 42 395

Page 38: Definitions & Terminology

No. LengthSoffit Bearers 70 x 35 F5 44 0.630 0.900 39.600 1.90$ 75.24$

Wall Plate 70 x 35 F5 2 12.500 12.600 25.200 1.90$ 47.88$ Fascia 190 x 25 H3 FJ 2 13.700 13.800 27.600 7.00$ 193.20$

Barge Board 190 x 25 H3 FJ 4 4.806 5.100 20.400 7.00$ 142.80$ Soffit Lining 600 FC 20 2.4 x 0.6 5.00$ 100.00$ Joining Strip H Mould 6 2.400 2.400 14.400 1.58$ 22.80$

Quad 19 x 19 H3 FJ 1 42.395 42.600 42.600 1.17$ 49.84$

Total 631.76$

Cost Order

Item Section Size Material Linear Total Linear Rate / lm