deimos-1: a fully commercial eo mission · electronic, mechanical, photocopying, recording or...

16
All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS DEIMOS - - 1: A Fully 1: A Fully Commercial EO Mission Commercial EO Mission GSCB ESRIN 18 GSCB ESRIN 18 th th - - 19 19 th th June 2009 June 2009 Alberto J. Fern Alberto J. Fern á á ndez ndez Head of the Operations Division Head of the Operations Division - - DEIMOS Imaging DEIMOS Imaging

Upload: others

Post on 22-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

DEIMOSDEIMOS--1: A Fully 1: A Fully Commercial EO MissionCommercial EO Mission

GSCB ESRIN 18GSCB ESRIN 18thth--1919thth June 2009June 2009

Alberto J. FernAlberto J. Fernáándezndez

Head of the Operations Division Head of the Operations Division -- DEIMOS ImagingDEIMOS Imaging

Page 2: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

2All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

AgendaAgenda

• Company Presentation

• DEIMOS-1 Mission Overview

– Flight Segment

– Ground Segment

– User Segment

• DEIMOS-1 Ground Segment

– Overview

– GSC-DA, HMA & HLMPS

Source: UK-DMC SST Ltd

Source: UK-DMC SST Ltd

Page 3: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

3All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

Company PresentationCompany Presentation

DEIMOS IMAGING

• Created by DEIMOS Space and LATUV in 2006

• Inherits DEIMOS Space`s experience and prestige in the

aerospace sector

• Inherits LATUV`s experience, know-how, historical records

and scientific knowledge in remote sensing

• Ensure imagery supply with its own EO system

• Control of the whole Production Chain (Vertical Integration of

the Operations)

Page 4: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

4All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

Mission OverviewMission Overview

• Earth Observation mission for mapping,

resource management and disaster

monitoring

• Regions for imaging are:

– Zone 1: Spain and Portugal

– Zone 2: ESA member states in Europe

– Zone 3: Eastern Europe

– Zone 4: Rest of the World

• Coverage of Spain in 4-5 days

• Coverage of Europe in 1 month

• Five (5) years operational lifetime• Altitude 680km, Inclination 98º

• Sun-synchronous ascending node orbit,

LTAN 10:30

• In phase with UK-DMC2 (deps on orbit)

Page 5: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

5All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

Mission OverviewMission Overview

Page 6: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

6All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

Mission OverviewMission Overview

Coverage of Spain

in 4-5 days

Page 7: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

7All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

Mission OverviewMission Overview

• Flight Segment

– DEIMOS-1 Satellite manufactured by SSTL

– Platform. SSTL-100 used in previous missions

• X-Band download at 20 Mbps / 40 Mbps (HSDR)

– Payload;

• 22m Multi-Spectral Imager; Red, Green and Near Infra-Red bands

(Landsat equivalents)

• Digitisation; 8 bits, 10 bits, 14 bits (only HSDR)

• Swath 640km – 8bits, 498 km – 10 bits

• 2 SSDRs; 2 GB per SSDR

• HSDR; 8 GB, 14 bits, 40 Mbps

Page 8: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

8All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

Mission OverviewMission Overview

• Launch

– DNEPR from Baikonur

– 25th July 2009

Page 9: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

9All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

DEIMOSDEIMOS--1 Ground Segment1 Ground Segment

• Ground Segment

– DEIMOS-1 GS located in Boecillo (Spain)

– Two ground stations; Boecillo - DMI, Svalbard –

KSAT

• S and X Band links (20/40 Mbps)

• Synchronous and asynchronous links

– Full IP network; Ground Segment and Flight

Segment belong to same IP network

– Download by means of modified FTP protocol

– Generate and process up to 130 Gb of data per

week

– Image processing performance; 45 MB/min

• 1.3 GB image -> 30 min (L1R automatically)

• 4 GB -> 91 min

Page 10: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

10All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

DEIMOSDEIMOS--1 Ground Segment1 Ground Segment

Page 11: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

11All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

Current GS configuration

FULLY AUTOMATIC

DEIMOSDEIMOS--1 Ground Segment1 Ground Segment

SCC

SCS Rack RF

MOC

MPS

Archive Catalogue

ProcessingServer

FIREW

ALL

INTERNETProducts (L1R)

Requests

Page 12: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

12All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

DEIMOS-1 GS upgrade

• DMCii and DMI will become ESA data provider in the frame of

GMES programme

• DMCii and DMI have jointly agreed to upgrade their GS and to

present a common interface to ESA

• GSC-DA, HMA:

– HMA. Partially compliant

– Implementation services plan;

• V1; Catalogue, Dissemination / Archive Data Access

• V2; Ordering, Sensor Programming

DEIMOSDEIMOS--1 Ground Segment1 Ground Segment

Page 13: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

13All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

DEIMOSDEIMOS--1 Ground Segment1 Ground Segment

• New GS context diagram

Page 14: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

14All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

New GS configuration

DEIMOSDEIMOS--1 Ground Segment1 Ground Segment

SCC

SCSRack RF

MOC

MPS

Archive Catalogue

ProcessingServer

FIREW

ALL

INTERNET

Products (L1R)

Requests

I/F Systems

CatalogueHMA driver

Order Handling

ReportingSystem

DisseminationSystem

GSC-DAESA

Page 15: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

15All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

DEIMOSDEIMOS--1 Ground Segment1 Ground Segment

• Key element of the GS is

the High-Level Mission

Planning (HLMPS)

• Main features of HLMPS:

– Cloud coverage

– Simulation of power of

the satellite including

charge of battery

– Graphical selection of areas of interest

– Strong heritage from Mission Planning and Analysis System

(MPAS)

– Client / Server architecture. Web service based

Page 16: DEIMOS-1: A Fully Commercial EO Mission · electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L. DEIMOS-1 Ground

All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of DEIMOS Imaging S.L.

DEIMOS Imaging: Your consulting

partner for Earth Observation

[email protected]

DEIMOS Imaging S.L.Edificio Galileo, Modulo Gris, Oficina 103,

47151 Boecillo – Valladolid

Spain

Telf: +34 983 54 89 23

Fax: +34 983 54 81 23