deliverable documents planned status 1/2
DESCRIPTION
Deliverable documents planned status 1/2. Deliverable documents planned status 2/2. Summary and Actions. Participants : Elisabetta Campaiola (SES), A ndrea Morgagni(SES), Lucio Marcenaro ( Unige ), Mariana Esposito (ASTS), Paolo Azzoni (ETH), George Dramitinos (ISD) - PowerPoint PPT PresentationTRANSCRIPT
Deliverable documents planned status 1/2Del. no. Deliverable name WP
no.Responsibilit
y Reviewer
Nature/disseminatio
n Level
Delivery date from Annex I (proj month)
DeliveredYes/No Actual status
Actual / Forecast
delivery date
D1.2 Quality Control Guidelines 1 SES (Cecilia) SES/MAS
(Elisab/Jos) R/PP 3 Issue 1 Rejected
New draft has been sent to WP1 partner
31/07/2013
D8.4Build Secure Embedded Systems with nSHIELD v1
8 MGEP MAS R/PU 12 No Draft on Wiki15/07/2013
D1.6 Quality Control Report 1 1 SES (Cecilia) SES/MAS
(Elisab/Jos) R/PU 15 No To be started30/09/2013
D1.7 Periodic Management Report 1 SES (Cecilia) SES R/PP 18 No Draft on Wiki (waiting for
JN contribution)30/06/2013
D3.2Preliminary SPD node technologies prototype
3 ISD (Dramitinos) SES P,O/RE 18 Yes Waiting for reviewer
30/9/2013
D3.3Preliminary SPD node technologies prototype report
3 ISD (Dramitinos) SES R/PU 18 Yes Waiting for reviewer
30/9/2013
D4.2
Preliminary SPD network technologies prototype
4 SES (Cesena-Kresimir) ETH P,O/RE 18 No Available on Wiki
31/07/2013
D4.3
Preliminary SPD network technologies prototype report
4 SES (Cesena- Kresimir) ETH R/PU 18 No
Available on Wiki 31/07/2013
D5.2
Preliminary SPD middleware and overlay technologies prototype
5UNIROMA1
(Suraci-Fiaschetti)
P,O/RE 18 No On Wiki (80%)
31/07/2013
D5.3
Preliminary SPD middleware and overlay technologies prototype report
5 SES (Morgagni) UNIROMA1 R/PU 18 No On Wiki (95%)
31/07/2013
D6.1 Lifecycle and SPD Support Plan 6 TECNALIA
(Inaki) R/CO 18 No Available on Wiki30/06/2013
Deliverable documents planned status 2/2
Del. no. Deliverable name WP no. Responsibility Reviewer
Nature/
dissemination Level
Delivery date from Annex I (proj month)
DeliveredYes/No Actual status
Actual / Forecast
delivery date
D6.2 Prototype validation and verification 6 SES
(Morgagni) R/RE 20 No Available on Wiki (30%)
31/08/2013
D6.3 Prototype integration report 6
HAI (Nikolaos)R/RE 22
No 31/08/2013
D7.1Railways security demonstrator - integration and validation plan
7ASTS (Flammini) R/CO 22
No Available on Wiki
30/06/2013
D7.2Voice/Facial Recognition demonstrator - integration and validation plan
7ETH (Paolo)
R/CO 22No 15/07/2013
D7.3
Dependable Avionic Systems demonstrator - integration and validation plan
7SES (Traversone Larghi)
SESMR/CO 22
No 15/07/2013
D7.4Social Mobility and Networking integration and validation plan
7MAS (Josef)
R/CO 22No What kind of
document?
D1.8 Periodic Annual Report 2 1SES (Cecilia) SES
R/PP 24No 30/09/2013
D2.6Final System Requirements and Specifications
2
TECNALIA (With SES-ASTS-ETH-Mas support)
SES
R/PU 24
No 30/09/2013
D8.5 Preliminary Exploitation Plan 8
INDRA (Vasquez-Inasi)
R/PP 24No 30/09/2013
D8.6Build Secure Embedded Systems with nSHIELD v2
8MGEP (Roberto)
MASR/PU 24
No 30/09/2013
Summary and Actions
Action
D8.4(M12) and D8.6(M24): Lorena (AT), Elisabetta (SES) and Paolo (ETH) agreed with the opportunity to deliver two separate documents, as in the TA.
Cecilia (SES) will ask to Josef (MAS) and Roberto (MGEP) to deliver D8.4 as soon as possible, also if in a preliminary stage.
D1.6 Cecilia (SES) will prepare a draft copy of the deliverable
D1.6 Elisabetta (SES) and Lorena (SES) will support and review the document
D3.2 and D3.3 Cecilia (SES) will ask to M. Cesena (SES) to review the deliverables, before the updating on NEF.
D4.2 and D4.3 Paolo (ETH) will be the reviewer for the D4.2 and D4.3
D6.2 and D6.3 The deliverables are on delay because the number of prototypes is higher than expected or previously documented (35 instead 12). The real number of prototypes is one of the results of the meeting of Stockholm.
D7.1-D7.2-D7.3 (M22) A common «Table of contests» (partially derived from the D7.1 draft) will be proposed by SES by Friday 28th and then uploaded on Wiki. The same format could be used for the feasibility study.
Mariana (ASTS) and Paolo (ETH) will adapt their deliverables to the format proposed by SES
D2.6: Elisabetta (SES) and Andrea (SES) told that this deliverable is strictly connected with the D2.2 and that the only activity to be done is asking to each demonstrator leader to verify that the D2.2 includes all the requirements related to each demonstrator and, if is the case, to integrate additional requirements. Consequently the D2.6 leader should just coordinate the activities of each demonstrator leader. They suggested to ask to Inaki to accept the leadership of D2.6
Cecilia will contact Inaki by the middle of the coming week
TA Cecilia (SES) will contact Josef (MAS) for T7.4 short description
- Participants: Elisabetta Campaiola (SES), Andrea Morgagni(SES), Lucio Marcenaro (Unige), Mariana Esposito (ASTS), Paolo Azzoni (ETH), George Dramitinos (ISD)
- The first part of the meeting has been held on Webex, the second part continued on teleconference, because Lucio and Paolo were neither able to hear nor to be heard.