dell solutions tour 2015 - hvordan bygger man et optimalt grønt datasenter i dag fra gulvet til...
TRANSCRIPT
1
Presenters
2
Petter Tømmeraas
Sales Director
+47 930 13 923
Finn Amundsen
Subject Matter Expert Cloud
+47 928 57 547
Agenda
Hvordan bygger man et optimalt grønt datasenter i dag fra gulvet tilapplikasjonen (Kunde eksempel)
• Grønt datasenter og grønne løsninger i praksis
• Dell teknologi som understøtter grønt datasenter og fleksibel infrastruktur
• Skyinfrastruktur med ekte pay-as-you-go
• Eksempel fra CGI’s konsept In-da-house som er basert på grønt datasenter, skyinfrastruktur, pay-as-you-go og legger opp til et ekosystem av partnere.
3
Green Mountain is the leading green data centre operator in the
Norwegian market
Setting the green standard!
Working with customers in the
Nordics, Europe, US and Far East
Winner of multiple international data
centre awards
Major clients in Bank and Finance,
Public, Oil, Technology and IT
Cutting edge green technology->Lower
cost of operation
Very strong financial backing
Offices in Oslo, Stavanger, Rjukan
and London
Colocation data centre solutions
Very high physical security level
Welcome to Green Mountain Data Centres
• Rennesøy (Stavanger)– 25 MW facility (+)
– 12 000 m2 white space
– Mountain halls
– 100% Hydro power
– Water cooling
• Rjukan– 10 MW facility (+)
– 5 000+ m2 white space
– Buildings
– 100% hydro power
– Air & water cooling
The greenest
data centresin the world!
• Owners with experience in the data centre industry
• Reuse of existing NATO facility
• Strong technology partners
• Cooling solution utilizing year round cold sea water
• No use of refrigerant gases
• 100 % renewable energy
• No carbon footprint
• Using energy close to where it is produced
• Certifications(ISO 9001, 14001, 27001, Uptime Institute Tier III)
• Waste management system
• Green is good, but money talks……….
6
How did we build our green data centre
Reuse of existing NATO facility
7
The Ocean (fjord)
Reuse of existing NATO facility
The Ocean (fjord)
Reuse of existing NATO facility
The Ocean (fjord)
100 m330 ft
30 m
Data roomIn-rowcoolers
8 oC46 oF
Cooling station
• 2000 x efficiency
• 1 kW power
• 100 kW cooling
• Consistent 24/7/365
Cooling solution utilizing year round cold sea water
The Ocean (fjord)
Video
Dell’s green commitment
12
CGI is a global end-to-end IT and business
process services leader
5000 clientsacross the globe
95% on-time,
on-budget delivery
World’s 5th largest independent IT and BPS firm
100+ mission-critical
IP-based
solutions
$10B annual revenue
68,000 professionals,
75% shareholders
High-end business and
IT consulting
400 offices,
40 countries around the world
System integration,
IT and business process
outsourcing
The struggle has been real!
14
Customer Point of View
• Always On There is no downtime in the cloud. Build infrastructure that automatically reallocates resources so maintenance
windows or system failures do not affect the end users.
• On Demand The customer choses at any point in time when and where to consume the service.
• Pay as you go The customer only pays for the services they consume.
• Self-service The customer have the ability to leverage the services without any IT involvement.
15
Cloud model
16
• On-demand self-service
• Broad network access
• Resource pooling
• Rapid elasticity
• Measured service
Just a normal day and yet another project
Plan 2010
• Purpose
• Scope
• People
• Financials
• Timescale
• Risk
• Implementation
Where we failed 2011
• Purpose
• Scope
• People
• Financials
• Timescale
• Risk
• Implementation
Value chain
The project has focused on the cloud model applied to the whole value chain.
• Sales
• Market
• Finance
• HR
• Operations
• Vendors
• …
18
Integration existing solutions
19
Existing
SW
New
SW
Existing
HW/Datacenter
New
HW/Datacenter
IaaS
PaaS
SaaS
IaaS
PaaS
SaaS
Microsoft Cloud Platform System
For Enterprises and Service Providers
Dell as Hardware partner
Windows Server 2012 R2, System Center 2012
R2, WAP
Microsoft-validated hardware and software
Optimized for hosting Microsoft applications
OEM Hardware Infrastructure
Scale Out File
Server (SMB
3.0) &
Storage
Spaces
Hyper-V HostsHyper-V Network
Virtualization
SQL
ServerVirtual Machines
Management API
Service Admin Portal Tenant Portal
Cloud Platform System – Capabilities
• Pre-Deployed Infrastructure
• Switches, Load Balancer, Storage, Compute, SDN stack
• N + 2 fault tolerance (N +1 for networking)
• Pre-configured as per best practices
• Integrated Management
• Configure, deploy, patching
• Monitoring
• Backup and DR
• Automation
• 8000 VM’s*, 0.7 PB of usable workload storage
• First party validation for workloads
Future platform
• Converged infrastructure with servers, data storage devices, networking equipment and
software for IT infrastructure management, automation and orchestration
• Norwegian based
• Green
• Flexible
• Do not compete with public clouds, we integrate with public clouds…
• A ready to run Azure consistent cloud in the datacenter
22
Our color palette
23
Primary color Secondary colors
CGI Red (Cherry)
R - 227
G - 25
B - 55
CGI Beet
R - 153
G - 31
B - 61
CGI Pumpkin
R - 255
G - 106
B - 0
CGI Honey
R - 242
G - 162
B - 0
CGI Cloud
R - 165
G - 172
B - 176
CGI Ice
R - 161
G - 196
B - 208
Additional chart colors
R - 230
G - 115
B - 134
R - 255
G - 170
B - 153
R - 255
G - 217
B - 178
Summary
• Green technology put to use, but money talks…….
• Green hardware solutions from Dell
• Smart management solutions from CGI
• Norwegian based solution
• High security from data center to user level
• Green, flexible, scalable, affordable!
24
25
Møterom 305tredje etasje fra kl 13 – 14
Representanter fra CGI, DELL og Green Mountain
er tilgjengelig for mer detaljerte spørsmål
26