REMINDER Check in on the COLLABORATE mobile app Demonstrating Multiple Phases in Multiple Colors on One Line in P6 Prepared by: Marie Gunnerson Global Primavera Manager Parsons Brinckerhoff Technique for summary in one project or summarizing multiple projects Session ID#: 15438 1

Upload: p6academy

Post on 22-Jan-2017

415 views

Category:

Business


3 download

TRANSCRIPT

Page 1: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

REMINDERCheck in on the

COLLABORATE mobile app

Demonstrating Multiple Phases in Multiple Colors on One Line in P6

Prepared by:Marie GunnersonGlobal Primavera ManagerParsons Brinckerhoff

Technique for summary in one project or summarizing multiple projects

Session ID#: 15438

1

Page 2: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Presenter Information – Marie Gunnerson

■ Professional ▪ Manages Primavera software for Parsons Brinckerhoff▪ Provides internal training in Primavera P6 and for clients

■ Volunteer▪ OPSIG Co-chair▪ Project Management Institute (PMI)

— PMBOK® Guide

— Practice Standard for Scheduling

▪ Other— GAO Schedule Assessment Guide

■ Personal▪ Home is Boston, MA▪ Travel has its benefits

Page 3: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Company Information■ Global professional services firm supporting

clients across the lifecycle of infrastructure projects

■ Approx. 14,000 employees in 150 offices worldwide

■ Broad range of Services and Markets

▪ Strategic Consulting; Planning; Design; Program and Construction Management; Operations and Maintenance

▪ Transportation; Power & Energy; Buildings; Mining; Environmental; Water and Wastewater; Urban and Community Development

■ The Professional Services Division of the Balfour Beatty Group, an international infrastructure services organization

Page 4: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Communicating Project Schedule Information (with actual human beings)

Page 5: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Problem■ Bottom-up project schedule provides a good estimate■ But lots of detail

Need■ Simple, clear depiction of plan

Insight■ Compress activities into several phase segments per line■ Differentiate the multiple segments with color

Solution■ Multi-bar Gantt Chart

Page 6: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Multi-bar Gantt Concept

■ Represent a number of activity bars with a segmented bar:

Page 7: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Example Traditional project schedule GanttMulti-bar Gantt Chart

Page 8: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

The Multi-bar Method

Using P6 PPM

Page 9: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

What Do the Human Beings Want to See?

■ What is the purpose of the chart?

■ What key information is to be conveyed?

■ What level of summary is required?

■ What is the color scheme?

■ What other data is to be included in the layout?

Page 10: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Analyze Requirements Against Data

■ Review existing project schedule data

■ Identify the activities to be summarized

■ Determine the number of Multi-bar segments

■ Evaluate means of determining segment end points

■ Identify data to be added to create Multi-bar Gantt chart▪ Dates▪ Activity codes

Page 11: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Required Elements for Multi-bar Method

■ User defined bars for Multi-bar segments

■ Start and Finish dates to delineate Multi-bar segments

■ Technique to determine Start and Finish points

■ Configuration of segments

■ Layouts for Multi-bar views▪ Group & Sort▪ Filters▪ Columns

Page 12: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

User Defined Bars

■ Created in Bars dialog box■ One bar for each Multi-Bar segment■ Defined by Start and Finish dates

▪ Start and Finish points of segments

▪ Duration for segments

Start Finish

Page 13: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Multi-bar Start and Finish point techniques■ Technique 1

▪ Differentiated user defined bar segments

▪ User Defined Fields to hold date information

■ Technique 2

▪ Collapsed bars to create segments

▪ LOE activities

▪ WBS summary activities

Page 14: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

User Defined Fields Start and Finish PointsTechnique 1

Page 15: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Identify User Defined Fields Needed for Multi-bar

■ Number of fields depends on number of segments

▪ Define segments with start date or finish date data types

■ Segment duration fields

▪ Define segment duration with numeric data type

■ Use a “placeholder” user defined date field for activities with only one segment

Technique 1

Page 16: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Methods for Entering User Defined Fields Start and Finish Dates

■ Manual data entry

■ Import/Export via Excel

■ Global Change

Technique 1

Page 17: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Manual Data Entry in LayoutTechnique 1

Page 18: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Tips for Manual Data Entry of Multi-bar Start and Finish Dates

■ Add column for each User Defined Field required for Multi-bar

■ Table view will provide most space for data entry

■ Save version of layout with columns for data entry and update

■ Save a layout to display for Multi-bar without columns

Technique 1

Page 19: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Steps for Import/Export of Multi-Bar Start and Finish Dates■ Add some data into each field using manual data entry■ File/Export to Spreadsheet to create Excel import worksheet ■ Create Multi-bar template for export

▪ Selecting User Defined Fields to be included in template▪ Three key fields required by P6

■ Finish Export

■ Enter User Defined Fields data in Excel spreadsheet▪ Enter data, not formulas

■ Don’t change column headers in rows 1 and 2▪ Don’t add columns

■ Save edits■ File/Import Spreadsheet (XLS) with Multi-bar data into project

Technique 1

Page 20: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Import/Export User Defined Fields Technique 1

Page 21: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Global ChangeTechnique 1

Page 22: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Hints for Calculating User Defined Fields with Global Change

■ May be easier to create 2 Global Change specifications than 1

■ Equation: User Defined Field = result of expression

■ Define equation to calculate Multi-bar data points▪ User Defined Field Start and Finish dates▪ User Defined Field Segment Duration

■ All standard warnings about Global Change apply▪ You can cancel after viewing▪ Keep log - just in case

Technique 1

Page 23: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Examples of Global Change EquationsTechnique 1

■ Know total duration, use factor to calculate segment duration

Phase-II-OD = Original Duration x .5Phase-III-OD = Original Duration x .33

■ Know segment durations, calculate total duration through addition

Original Duration = Phase-I-OD + Phase-II-ODOriginal Duration = Original Duration + Phase-III-OD

■ With duration, calculate start and finish datesPhase-II-Start = Phase-I-End + 1Phase-II-End = Phase-II-Start + Phase-II-OD

Page 24: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Start and Finish Dates with Technique 2

■ Add an activity per phase to serve as the Multi-bar summary activity that reflects duration of the phase▪ LOE activities▪ WBS summary activities

■ Add activity codes as required

■ Add relationships for LOE activities

■ Schedule the project to calculate dates for Multi-bar summary activities

Page 25: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

LOE Activities Added and Scheduled

■ This is the first bullet of text■ This is the second bullet of text at the same level

▪ This is a sub-bullet of text— This is a secondary sub-bullet of text (and should be as far sub-

bullets indent)– This tertiary sub-bullet will be seldom used, but available

▪ This is another sub-bullet of text■ And this is the third bullet of text

Technique 2

Page 26: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Define Collapsed Bar Segments

■ Add user defined bars for each phase

■ Add filter for each bar for Multi-bar summary activities

■ In Bar settings check “Show bar when collapsed”

Technique 2

Page 27: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Configuration of Multi-bar Segments

Page 28: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Tips for Configuring Multi-bar in Gantt Chart

■ One bar per segment is needed▪ Order matters▪ Name included in legend

■ Carefully select:▪ Time scale – “User Dates”▪ User Start Dates▪ User Finish Dates▪ Filter for each phase for Technique 2

■ Bar style for shape and color■ Bar labels may be placed on segments■ May need underlying bar for relationship lines if Multi-bar user

define start and finish dates don’t coincide with calculated dates

Page 29: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

■ Create Filter to select Multi-bar activities to collapse to■ May require more than one filter

Filter to Multi-bar summary activities

Page 30: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Creating the Multi-bar Layout

■ Technique for calculating Multi-bar dates affects layout▪ Technique 1 using activities may be grouped or not▪ Technique 2 using collapsed activities requires grouping

■ Determine columns to be included in data table■ For Group & Sort determine what data to group on

▪ Activity Codes▪ WBS▪ Level

■ Usual decisions for sort, display options, and color schemes■ Select filter to limit view to Multi-bar bar summary activities■ SAVE THE LAYOUT!

Page 31: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Give the Multi-bar View to the Human Beings

Page 32: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Or this Multi-Bar View with Technique 2

Page 33: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Using the Multi-bar Methodto Summarize Projects

This is a subtitle or bulleted list

Page 34: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Applying Multi-bar Method at Project Level

■ Works best where projects have common elements■ Use Multi-bar techniques to create Multi-bar activities in each

project▪ Designate activities to represent “phases” for each project

■ Use Activities rather than Projects window■ Open all projects you want in Multi-bar Gantt chart■ Filter activities to the Multi-bar activities in each project■ Open Multi-bar layout you have saved■ Modify and save layout for project level view■ If use Technique 2 group by project to get project Multi-bar

Page 35: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Summary of Projects with Multi-bar View

Sample data for demonstration only. Not to be construed as actual project data or to be used for project planning.

Page 36: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Multi-bar Method Demonstration

36

Page 37: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Features That Would Enhance Multi-bar

■ Calculated user defined fields at activity level

■ User defined fields values calculated from other activities

■ Enhanced bar formatting

▪ Bar thickness

▪ Bar label placement for User Dates

■ Allow same bar formatting at project level as activity level

Page 38: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Thank you for attending- at the end of the day!

■ Marie Gunnerson

[email protected]

■ +1-617-960-4884

■ Co-chair OPSIG▪ www.primaverasig.com

■ LinkedIn

Speaker Contact Info:

Page 39: Demonstrating multiple phases in multiple colors for one project or many - Oracle Primavera P6 Collaborate 14

Please complete the session evaluationWe appreciate your feedback and insight

You may complete the session evaluation either on paper or online via the mobile app 39