DEN On-Call Project Controls Services

F E B R U A R Y 9 , 2 0 2 1

TANYA DAVISDEN COMMERCE HUB

Page 2: DEN On-Call Project Controls Services

Follow the DEN Commerce Hub Events on Eventbrite http://dencommercehubconnect.eventbrite.com

On-Call Environmental Testing Services SBE

Assigned Goal: 30% Estimated Project Value: $15M to $20MDescription: This request is for a single award to a staff augmentation consultant to provide on-call project controls services and project management support services, including estimating, cost management, scheduling, reporting, contract administration, change management and document management for the Airport Infrastructure Management (AIM) Development Capital Improvement Plan (CIP) Portfolio and the Concourse Expansion Program at Denver International Airport (DEN).

Event DetailsFebruary 18, 2021 at 1 p.m. Event Link

DEN Commerce Hub Upcoming Outreach Event

Page 3: DEN On-Call Project Controls Services

Follow the DEN Commerce Hub Events on Eventbrite

http://dencommercehubconnect.eventbrite.com

On-Call Drainage Design Services SBE

Assigned Goal: 30%Estimated Project Value: $450K to $500KDescription: This request is for a single award to a professional engineering services consultant to provide environmental design services to the Airport Infrastructure Management (AIM) Development division at Denver International Airport (DEN). The selected contractor will provide professional engineering services for environmental related projects on an as needed basis. Scope of work for each authorized task order is defined on a project-by-project basis and may include, but not be limited to, planning studies, condition assessments, design, system modeling, permitting, construction document preparation, construction administration, testing & reporting, scheduling & cost estimating, or other related engineering services that may be required.

Event DetailsMarch 23, 2021 at 1:30 p.m. Registration opens March 8 at 10 a.m.Event Link

DEN Commerce Hub Upcoming Outreach Event

Page 4: DEN On-Call Project Controls Services

• Participate on procurement review committee

• Gain insight to DEN’s procurement process for small businesses attempting to enter the airport marketplace

• Ensure that the procurement process is fair, open and transparent

For more information and to sign up http://business.flydenver.com/bizops/comHub-panelists.asp

DEN Commerce Hub Community Panelist Program

Page 5: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 5

COMMERCE HUB CONTACTS

General Inquiries: [email protected]

Concessions: [email protected]

Construction / Goods & Services: [email protected]

Policy: [email protected]

Website: https://business.flydenver.com/bizops/commerceHub.asp

Community Panelist Registration: https://business.flydenver.com/bizops/comHub-panelists.asp

Sign Up for Newsletter: https://bit.ly/33n6MZ6

Event Updates: http://dencommercehubconnect.eventbrite.com

Future Opportunities: http://business.flydenver.com/bizops/forecasts.asp

Current Bid Opportunities: https://www.bidnetdirect.com/colorado/cityandcountyofdenverdepartmentofaviation

Page 6: DEN On-Call Project Controls Services

DIVISION OF SMALL BUSINESS OPPORTUNITYCYNTHIA ESTES, COMPLIANCE OFFICER

Page 7: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT

DSBO MISSION

Be the bridge that promotes and improves the participation and engagement of small businesses

through the creation and implementation of programs, thereby achieving an equitable Denver economy.

Page 8: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 8

DIVISION OF SMALL BUSINESS OPPORTUNITYCreates and expands contract opportunities for small, minority and women-businesses

Certifying M/WBE, SBE, DBE and other firms

Monitoring and reporting compliance with project goals and ordinances

Conducting outreach to certified firms and providing technical assistance / capacity building services

Increasing opportunities for certified firms to perform as primes on projects

Establishing project specific goals for participation of certified firms on each project

Page 9: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 9

COMMITMENT TO MWBE UTILIZATION

• Aligning with the Division of Small Business Opportunity (DSBO) mission to promote and improve

access for the City’s small, minority, and women-owned business community, this contract’s small

business engagement initiatives are intended as a part of the City’s commitment to ensure, small,

minority, and women-owned businesses are actively and impactfully participating throughout the

life of the contracts.

• Respondents must comply with the terms and conditions of Article V of Chapter 28 of the

Denver Revised Municipal Code (DRMC) in submitting its proposal and, if awarded the Contract in

performing work thereunder.

Page 10: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 10

MWBE PARTICIPATION GOAL

Participation goals must be met with MWBE certified participants as set forth in Section 28-127,

DRMC or through the demonstration of a good faith effort under Section 28-128, DRMC.

Proposers must complete and submit at the time of the submittal due date:

• Commitment to MWBE Participation Form – Identifying the percentage of MWBE utilization the

Proposer is committed to,

• Form 1B – List of Proposed Subcontractors, Subconsultants, and/or Suppliers, and

• MWBE Utilization Plan – Requirements are outlined in the RFP

MWBE PARTICIPATION20%

Page 11: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT

MWBE UTILIZATION PLAN

The draft MWBE Utilization Plan is a required submittal as part of the response to the RFP and it will be scored. DSBO’s approval of the Utilization Plan will be required prior to receiving an executed contract.

Elements of MWBE Utilization Plan

INNOVATIVEDescribes involvement

with small business initiatives, support services, bonding

assistance, mentoring programs, joint

ventures, etc. that may be utilized on the

project.

COMPREHENSIVE & TRANSPARENT

Define how MWBE opportunities will be

solicited andincorporated into the overall procurement

process. Documentation must

reflect the retention of such solicitation

efforts.

EQUITABLEProvide creative

strategies to incorporate new MWBE partners

inclusive of but not limited to provide an

ongoing list of certified firms that provide

capability statements and which of those certified firms were contacted regarding

solicitations related to this project.

RESPONSIVE Describe continuous

communication, debriefing process, coordination and

involvement efforts of the MWBE

subcontractors to ensure alignment of

scheduling, safety requirements, owner

direction, and performanceexpectations.

Page 12: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 12

NETWORKING/ENGAGEMENT

Contractors/Consultants and certified firms are strongly encouraged to begin networking/engaging now

to identify partnerships for the duration of the project.

• Tips for Contractors/Consultants

• Visit Small Business Certification and Contract Management System to locate certified firms.

• Tips for Certified Firms

• Utilize the plan holders list and registration list to identify what Contractors/Consultants to

develop potential partnership.

• Begin making introductions and sending capability statement.

• Make sure certifications are current and NAICS Codes are applicable to the work you

perform.

As an element of the Utilization Plan, proposers will be scored on their level of effort, engagement, and commitment.

Begin engaging now and documenting intentional and substantial efforts.

Page 13: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 13

NETWORKING/ENGAGEMENT

• Contractor Prompt Pay (Section 28-135, DRMC): For contracts $1M+, MWBE subcontractors

shall be paid within 35 days from the date their invoice is submitted and accepted for

completion by the Contractor/Consultant. Should the Contractor/Consultant not accept the

work of the MWBE subcontractor/subconsultant then they have 10 days to provide written

notification stating the reasoning.

• Termination, Substitution, and Reduction in Scope (Section 28-136, DRMC): A contractor/

consultant must have good cause to terminate, substitute or reduce scope of an MWBE.

There are 10 good cause reasoning for the intent to terminate, substitute or reduce scope;

the Contractor/Consultant shall provide their justification for their good cause to the MWBE,

DSBO and Department PM.

Page 14: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT

DSBO CONTACTS & RESOURCES

Cynthia Estes, Compliance Officer, DSBO [email protected]

Division of Small Business Opportunity – DEN OfficePhone: (303) 342-2180

E-mail: [email protected]

For more information about DSBO and to find certified firms, pleasevisit:

http://business.flydenver.com/bizops/smallBus.asp.

https://www.denvergov.org/content/denvergov/en/denver-office-of-economic-development/do-business-with-denver.html

Page 15: DEN On-Call Project Controls Services

AIRPORT CONTRACT SERVICESPAUL GILCHRIST, CONTRACT ADMINISTRATOR

Page 16: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT

PROCUREMENT PROCESS

• Projects are forecasted on business.flydenver.com• Includes brief project description.• Goal assignment.

• New E-Procurement System• Rocky Mountain E-Purchasing System (BidNet)

• https://www.bidnetdirect.com/colorado/cityandcountyofdenverdepartmentofaviation

• All project information will be available once advertised.• All submittals will occur through BidNet.• No cost to register and download bid documents; additional services available for

purchase.• Vendor Registration in advance is recommended and encouraged.

Page 17: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 17

PROCUREMENT PROCESS

BidNet Registration

Page 18: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 18

PROCUREMENT PROCESS

Planholder List

Page 19: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT

PROCUREMENT PROCESS

• Considerations when submitting • Check your document prior to submittal• Ensure that you have submitted all required documents• Acknowledged all addenda• Completed forms according to directions provided

• Ensure that you aware of opportunity due dates

Page 20: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 20

NEXT STEPS

Anticipated DatesEstimated Advertisement Date:Late February

Estimated Pre-Proposal Meeting: Early March

Estimated Last Day to Submit Questions: Mid March

Estimated Proposal Due Date:Late March

Dates are tentative and subject to change.

Contact InformationRandy Mata, Contract [email protected]

Page 21: DEN On-Call Project Controls Services

AIM DEVELOPMENTBERIT ORTWEIN, PMO DIRECTOR

Page 22: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 22

Conflicts of Interest

• Two conflicts of interest for prime vendors:

• Program Management contract 7th & 8th Runway

• Project Management Support Services (PMSS)

• Subcontractors can bid for all three contracts

• All vendors can bid for the On-Call Project Controls Services and the On-Call Systems Development

contracts

Page 23: DEN On-Call Project Controls Services

DENVER INTERNATIONAL AIRPORT 23

Scope of Work

• Compliance

• Project Management Support (training, guidance, negotiation support etc.)

• Estimating

• Cost Management

• Scheduling

• Change Management / Claim Avoidance

• Risk Management

• Contract Management

• Reporting

• Document Controls and Records Management

• Technical Writing

Page 24: DEN On-Call Project Controls Services

Questions & Answers