department of energy · communications and institutional liaison, public release composite for...

19
Department of Energy -- Richland Operations Office P.O. Box 550 Richland, Washington 99352 87-GTB-80 9, J1 13 A9:14 JUL 0 7198? WM R~oyfin tWM Pro ect_ .. A Mr. John J. Linehan, Acting Chief _ Operations Branch Pas Division of Waste Management U w¢L; U. S. Nuclear Regulatory Commission Washington, DC 20555 Dear Mr. Linehan: 6 3 S) ACTION ITEM FROM MAY 11-15, 1987, HANFORD SITE DRILLING DATA EXAMINATION In response to an action item from the subject Data Examination and subsequent discussions with Mr. H. Lefevre, we are providing you with a copy of the Subject Code List for the Basalt Records Management System. The Basalt Records Management System includes published and unpublished reports, data packages, etc., generated in the BWIP. Computer indexes of the documents are generated upon specification of the Subject Codes. Please contact Mr. D. K. Marjaniemi of my staff (FTS 444-7059) if you have any questions. Sincerely, 0. L. Olson, Acting Director BWI:DKM Basalt Waste Isolation Division Enclosure cc w/encl: S. H. Kale, DOE-HQ J. P. Knight, DOE-HQ R. Stein, DOE-HQ T. Husseman, State of Washington 0. Provost, State of Washington R. Jim, Yakima Indian Nation W. Burke, CTUIR R. Halfmoon, Nez Perce Tribe A. Alkezwenny, On-Site Tribal Rep. F. R. Cook, NRC W. Hanson, GAO 6712030036 870707 PR WASTE WM-10 PvDR

Upload: others

Post on 04-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

Department of Energy--Richland Operations Office

P.O. Box 550Richland, Washington 99352 87-GTB-80

9, J1 13 A9:14 JUL 0 7198?

WM R~oyfin tWM Pro ect_ .. AMr. John J. Linehan, Acting Chief _Operations Branch PasDivision of Waste Management U w¢L; U. S. Nuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Linehan: 6 3 S)

ACTION ITEM FROM MAY 11-15, 1987, HANFORD SITE DRILLING DATA EXAMINATION

In response to an action item from the subject Data Examination and subsequentdiscussions with Mr. H. Lefevre, we are providing you with a copy of theSubject Code List for the Basalt Records Management System.

The Basalt Records Management System includes published and unpublishedreports, data packages, etc., generated in the BWIP. Computer indexes of thedocuments are generated upon specification of the Subject Codes.

Please contact Mr. D. K. Marjaniemi of my staff (FTS 444-7059) if you have anyquestions.

Sincerely,

0. L. Olson, Acting DirectorBWI:DKM Basalt Waste Isolation Division

Enclosure

cc w/encl:S. H. Kale, DOE-HQJ. P. Knight, DOE-HQR. Stein, DOE-HQT. Husseman, State of Washington0. Provost, State of WashingtonR. Jim, Yakima Indian NationW. Burke, CTUIRR. Halfmoon, Nez Perce TribeA. Alkezwenny, On-Site Tribal Rep.F. R. Cook, NRCW. Hanson, GAO

6712030036 870707PR WASTEWM-10 PvDR

Page 2: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

. Page No.04/01187

1 1

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECTCODE___________________________________

.. .IS.

.,,- .,k.

E307Fl10F180F140B094BO83E306R217Q122il10R143E410W100P120E950P819P719907750528027B018

506150055022C730G8300540G125G440G625E961P091P009A352E440P094P090P096P092P093P095P033P005P063USS0os5

e036

112 INCH STEEL CASING2101-M LAB IGENERAL)222-S LAB (GENERAL)234-5 LAB, (GENERAL)3-ARM CALIPER4-ARM CALIPER72 INCH STEEL CASINGAlE PERFORMANCE EVALUATIONA/E SELECTION SUPPORT, ENGINEERING SUPPORTACCEPTANCE SPECIFICATION, WASTE FORMACCESS SHAFT PROCUREMENTSACQUISITION, TESTING EQUIPMENT ACQUISITIONACQUISITION, WASTE FORMS & WASTE FORMS DATAACTIVITY REPORTS/WEEKLY/MDNTHLYADVANCED MINING VERIFICATION PHASE IIIAGAPITO, JFT ASSOC INC. CONTRACT DOCS PERTAINING TO)AGREEMENTS AND COMMITMENTSAIR CHARTS & REPORTSALTERNATE DISPOSAL CONCEPTSANALYSIS OF SOLIDS CHARACTERIZATION FORM 222-S TESTANALYSIS OF SOLIDS REACTIONS (PHYSICAL AND CHEMICAL PROPERTIESTEST)ANALYSIS, PRECLOSURE SAFETY ANALYSISANALYSIS, SYSTEMSANALYSIS, TESTANALYTICAL DATA, HOST ROCK LITHOLOGYANALYTICAL DATA, HOST ROCK STRATIGRAPHYANALYTICAL DATA, STRUCTURAL GEOLOGIC SETTINGANALYTICAL DATA, SURFACE GEOLOGYANALYTICAL DATA, TECTONIC SETTINGANOMALLY DETECTION, GEOPHYSICAL, HOST ROCK GEOMETRYAPPARENT POROSITY TEST

.. (

ASSESSMENT.ASSESSMENT,ASSESSMENT,ASSESSMENT,ASSESSMENT,ASSESSMENT,ASSESSMENT,ASSESSMENT,ASSESSMENT,ACC5MflT

ENVIRONMENTAL (GENERAL)GENERALGROUNDWATERHYDROLOGIC ISOLATION'HYDROLOGYLICENSING COORDINATION GROUPPERFORMANCERISKSAFETY IWISAP)cneTnrnunwTr

AUDIT/REPORT/PLAN (QUALITY ASSURANCE CONTROL)AUTOMATED DATA PROCESSING (ADP)AWARD FEEBACKFILL MATERIALS TESTING (OTHER MATERIALS)EACKFILL SEAL HYDRAULIC CONDUCTIVITY TESTBACKFILL SEAL MECHANICAL PROPERTY TEST

Page 3: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

0f* Page No.

04101/E72

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECTCODE____ ___________________________________

94F165W720W400

L150

50435064E3039078&650

* N313N31490668099C950W660F120C951E318

- ; N176N175P004

- - E962- ~ROlS

90598062E097E71

* E714E715E716E712E929WSOOE415E07E30690918070B038B0699071P077A250

v-?w ~Cooo:; J E445

E446E447

BACKFILL SEAL MOISTURE DENSITY AND SHRINK LIMITBACKFILL TESTING LAB 2101-M (GENERAL)BARRIER MATERIALS INTERACTION (FOR DHLWIBARRIER SYSTEM DESIGN REQUIREMENTS (DESICN AND IBASELINE, MANAGEMENT (REPOSITORY)BASELINE, REGULATORYBASELINE, TECHNICAL BASELINE IPCD)BENCHMARKINGIVERIFICATION/VALIDATION, PERFORMANIBIG HOLE DRILLING CONTRACTBIT RECORDSBLIND SAMPLEJSTANDARDBLOCK TEST NO 1BLOCK TEST NO 2

TEST

ENGINEERING)

E ASSESSMENT

BOREHOLE BASALT CORE DATA LOGSBOREHOLE CAMERA VIDEO TAPEBOREHOLE DATA, GENERALBOREHOLE SEALING ES MATERIALS TESTINGBOREHOLE SEALING LAB 2101-M (GENERAL)BOREHOLE SURVEY DATABOREHOLE, HORIZON VERIFICATIONBOTTOM LOAD TRANSPORTER, (CONTRACT) CONSTRUCTIONBOTTOM LOAD TRANSPORTER, (ROCKWELL) CONSTRUCTIONBUDGETIMATERIAL CONTROLBULK DENSITY TESTCIM SELECTION SUPPORTCABLE TOOLCALCULATION FOR CEMENTING CASINGCALIBRATIONSCANDIDATE-HORIZON CHARACTERIZATION, DESIGN REQUIREMENTS(GENERAL)CANDIDATE-HORIZON CHARACTERIZATION. GEOLOGY CONDITIONCANDIDATE-HORIZON CHARACTERIZATION, HYDROLOGIC TEST RESULTSCANDIDATE-HORIZON CHARACTERIZATION, ROCK MECHANIC PARAMETERSCANDIDATE-HORIZON SELECTION, DESIGN REQUIREMENTS (GENERAL)CANISTER TESTSCANISTER/OVERPACK MATERIALS (METAL BARRIERS)CAPITAL TEST EQUIPMENTCASING, 112 STEEL CASINGCASING, 72 INCH STEEL CASINGCEMENT BOND LOGCEMENT LAB TESTS (SUBCONTRACTOR)CEMENT TESTINGCEMENTING ANALYSIS REPORTSCENTRALIZER PROGRAMCHANGE CONTROL BOARDS, COMMITTEES/DOCUMENT PERTAINING TOCHARACTERIZATION, ENVIRONMENTALCHARACTERIZATION, GEOLOGICALCHARACTERIZATION, GEOTECHNICAL CHARACTERIZATION (GENERAL)CHARACTERIZATION, GEOTECHNICAL, GEOLOGYCHARACTERIZATION, GEOTECHNICAL, ROCK MECHANICS

f

Page 4: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

Page No.04/01157

CODE

a

BRMC SUBJECT LISTSY DESCRIPTION

SUBJECT

E4225066G715C815C615C9150515G115G415G605070509050905

CHEMISTRY,COLD CREEKCOLD CREEKCOLD CREEKCOLD CREEKCOLD CREEKCOLD CREEKCOLD CREEKCOLD CREEKCOLUMBIA PtCOLUMBIA PLCOLUMBIA PtCOLUMBIA PLCOLUMBIA PtCOLUMBIA PLCOLUMBIA PtCOLUMBIA PLCOLUMBIA PL

SYNCLIiSYNCLIISYNCLIISYNCLI?SYNCLIISYNCLI?SYNCLIl

.ATEAU,

.ATEAU,

.ATEAU,ATEAU,

.ATEAU ,'

.ATEAU,ATEAU,ATEAU,.ATEAU,

NE,

IE,NE,NE,

HOST ROCK LITHOLOGYHOST ROCK STRATIRAPHYHOST ROCK SYNCLINEINTEGRATION OF GEOLOGIC DATASTRUCTURAL CEOLOGIC SETTINGSURFACE GEOLOGY7grTnm7JT crTTrn

HYDRO AND CEO LAB TESTINGSYNCLINE MODEL, PERFORMANCE ASSESSMENT

-D

C205CS05G1050405C305P719L300L304B096E963S070FISOPOOSE204H400F125A2S1S042E220A302A901B001BOOSLE02ESOE802ES12E3SN176N175E302N134N1S5E305E301N017NiSI

HOST ROCK GEOMETRYHOST ROCK LITHOLOGYHOST ROCK STRATICRAPHYINTECRATION.OF GEOLOGIC DATARESOURCE POTENTIALSTRUCTURAL GEOLOGIC SETTINGSURFACE GEOLOGYTECTONIC SETTINGVOLCANIC POTENTIAL

..4

COMmITTKENTS AND AGREEMENTSCOMMUNICATIONS AND INSTITUTIONAL LIAISONCOMMUNICATIONS AND INSTITUTIONAL LIAISON, PUBLIC RELEASECOMPOSITE FOR CORRELATIONCOMPRESSIVE STENCTH TESTCOMPUTER CODES, PERFORMANCE ASSESSMENTCOMPUTER MAINTENANCE, LABORATORYCOMPUTER SUPPORTCONCEPTUAL DESIGNCONCEPTUAL MODEL, HYDROLOGICCONCRETE AND MATERIALS TESTING LAB (GENERALICONDITIONS, ENVIRONMENTALCONFIGURATION MANAGEMENTCONSIDERATIONS, ENVIRONMENTALCONSIDERATIONS, SOCIOECONOMICCONSIDERATIONS, SOCIOPOLITICALCONSTANT DRAWDOWN TESTCONSTANT HEAD INJECTION TESTCONSTRUCTION AUTHORIZATION (LICENSING APPLICATIONS)CONSTRUCTION MANAGEMENTCONSTRUCTION OF DRIFTSCONSTRUCTION SURFACE FACILITIES UTILITIES SERVICES)CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,

BIG HOLE DRILLING CONTRACTBOTTOM LOAD TRANSPORTER (CONTRACT)BOTTOM LOAD TRANSPORTER (ROCKWELL)DRILL STEM AND TOOL PROCUREMENTELECTRICAL DISTRIBUTION LINE JAJ)ELECTRICAL DISTRIBUTION LINE (ROCKWELL)HEAD FRAME AND HOIST WORKSLONG LEAD PROCUREMENT SUPPORTMANAGEMENT (GENERAL)PROCUREMENT GENERAL

Page 5: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

I .Page No.04t01/E7

4

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECTCODE

___________________________________

E801ESISR167E304R166E316ESISE917ES11EsISE310.N13N138N132E803R165N137W300e0595021P817N23P005RillN015L204W720W730W740710

8026E911BossK003W730W400W500E200W610Rle2T100W400E7T3

E712E720E210E204N016E203

CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION.CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,

PROCUREMENT OF EXCAVATING AND SUPPORT MATERIALSRRL AND HORIZON VERIFICATION BOREHOLESSERVICE SYSTEMSSHAFT LINERSHAFTSSUBSURFACE DRILLED SHAFTSUBSURFACE FACILITIES GENERALSUBSURFACE UNDERGROUND SHAFTSURFACE FACILITIES GRADINGSURFACE FACILITIES SERVICE STRUCTURESSURFACE FACILITIES SUPPORTTEST AND INSTRUMENT HOLESTITLE IIITUNNELS AND EXCAVATIONUTILITIES INSTALLATIONWASTE HANDLINGWATER LINE

CONTAINMENT MATERIALS TESTING METAL BARRIERS)CORE DRILLINGCRITERIA, TECHNICALDAMES AND MOORE CONTRACT (DOCUMENTS PERTAINING TO)DATA ACQUISITION SYSTEMDATA MANAGEMENT/DATA PROCESSINGDATABASE DEVELOPMENTDECOMMISSIONINGDECOMMISSIONING LICENSE (LICENSING APPLICATIONS)DEFENSE HIGH LEVEL WASTE, BARRIER MATERIALSDEFENSE HIGH LEVEL WASTE, DESIGN AND DEVELOPMENTDEFENSE HIGH LEVEL WASTE, PERFORMANCE EVALUATIONDEFENSE HIGH LEVEL WASTE, WASTE FORM ACQUISITIONDEFENSE WASTE INTERACTION EXPERIMENTS 222-SDEFORMATION MEASUREMENTS TESTINGDENSITYDEPARTMENT OF ENERGYDESIGNDESIGNDESIGNDES ICNDESIGNDESIGNDESIGNDESIGNDESIGN

& DEVELOPMENT (FOR DHLW1& ENGINEERING (BARRIER SYSTEM DESIGN)ANALYSIS (PERFORMANCE/RELIABILITY SAFETY ANALYSIS)CRITERIA (FUNCTIONAL DESIGN CRITERIA)DEVELOPMENT TESTING (REPOSITORY)DEVELOPMENT, SEALMANAGEMENTREQUIREMENTS, BARRIER SYSTEMREQUIREMENTS, CANDIDATE-HORIZON CHARACTERIZATION

(GENERAL)DESIGN REQUIREMENTS, CANDIDATE-HORIZON SELECTION (GENERAL)DESIGN REQUIREMENTS, ENVIRONMENTAL CONSIDERATIONSDESIGN REQUIREMENTS, GENERALDESIGN, CONCEPTUALDESIGN, MANAGEMENTDESIGN, PRECONCEPTUAL

Page 6: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

Page No.04/01/87

CODE

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECT

___________________________________

R133ROlSR196R1SR134RigsAliSN123N124E20SN1iSN126E205R199P074W430Rilli11610

:. -oS024

R019ROEO

RoleBOIS

9087

P715H33 0Pile

* . ~LSOI9097BOOSEeo2ESOSE916H210H200H250H240H290H21 0EgOsE964HS20

- . , ,.NIS.

Niss

-.--;>. -- R185

P071

H500

DESIGN,DESIGN,DESIGN,DESIGN,DESIGN,DESIGN,DESIGN,DESIGN,DESIGN,DESIGN,-DESIGN.DESIGN,DESIGN,DESIGN,

REMOTE/HANDLINGREPOSITORYSHAFTSUBSURFACE FACILITIESSURFACE FACILITIESSYSTEMSTECHNICAL MANAGEMENTTITLE I DESIGN KAISER)TITLE I DESIGN (ROCKWELL)TITLE I PRELIMINARY DESIGNTITLE II DESIGN KAISER)TITLE II DESIGN ROCKWELL)TITLE II FINAL DESIGNUPDATE CONCEPTUAL DESIGN

DES IGN/TEST REV IEW, COMMITTEESIDOCUMENTDEVELOPMENT TESTING

PERTAINING TO

DEVELOPMENT, DATABASEDEVELOPMENT, DESIGN DEVELOPMENT TESTING REPOSITORY)DEVELOPMENT, ENGINEERING MODELDEVELOPMENT, EQUIPMENTDEVELOPMENT, INSTRUMENTATIONDEVELOPMENT, MATERIAL (SEAL)DEVELOPMENT, MODELDEVELOPMENT, SEALDIELECTRICDIPMETERDIRECTIVE AUTHORIZATION OF MODIFICATION, DOC PERTAINING TO:DISPERSITY, HYDROLOGIC PROPERTIESDOE ORDERSDOEtNWTS LICENSING COMMUNICATIONSDOWELL SEAL RING TESTINGDRAWDOWN PUMPING TESTDRIFTS CONSTRUCTIONDRILL STEM AND TOOL PROCUREMENTDRILLED SHAFT, SUBSURFACE CONSTRUCTIONDRILLING AND TESTING, DRILLING TECHNOLOGYDRILLING AND TESTING, GENERALDRILLING AND TESTING, GEOPHYSICAL TESTSDRILLING AND TESTING, HYDROLOGY TESTSDRILLING AND TESTING, SPECIFIC HOLE RECORDIHISTORYDRILLING TECHNOLOGY, DRILLING AND TESTINGDRILLING. BIG HOLE DRILLING CONTRACTDYNAMIC ELASTICITY PROPERTIESEFFECTIVE POROSITY, HYDROLOGIC PROPERTIESELECTRICAL DISTRIBUTION LINE, IJAJ) CONSTRUCTIONELECTRICAL DISTRIBUTION LINE, (ROCKWELL) CONSTRUCTIONELECTRICAL, GEOPHYSICAL STUDIESEMPLACEMENT, ENVIRONMENT CHARACTERIZATIONEND FUNCTION, COMMITTEES/DOC PERTAINING TOENGINEERING EALUATION PERFORMANCE/RELIABILITY SAFETYANALYSIS)

Page 7: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

1* f I Page Na.04101187

6

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECTCODE

___________________________________

-7:

5024E211N221N222R012R122E200W400W450W250P091A353A250wusoA2S1E220E720E050A252L250N141R019

:--;R194R192195

R191R193N236

-. - E415A350S023A300E801P072E955E102E400

- N136H510R11480928023

1079P812010

N311-- - N312

E200BOO3

ENGINEERING MODEL DEVELOPMENTENGINEERING STUDIES (GENERAL)ENGINEERING STUDIES, ROCK ENGINEERINGENGINEERING STUDIES, SPECIAL STUDIESENGINEERING SUPPORT (GENERAL)ENGINEERING SUPPORT, AE SELECTION SUPPORTENGINEERING SUPPORT, FUNCTIONAL DESIGN CRITERIAENGINEERING, DESIGN AND ENGINEERING (BARRIER SYSTEM DESIGN)ENVIRONMENT ANALYSIS, NEAR FIELD RADIONUCLIDE BEHAVIORENVIRONMENT TESTINGENVIRONMENTAL ASSESSMENT (GENERAL)ENVIRONMENTAL ASSESSMENTS, SYSTEMSENVIRONMENTAL CHARACTERIZATION (GENERAL)ENVIRONMENTAL CHARACTERIZATION, EMPLACEMENTENVIRONMENTAL CONDITIONSENVIRONMENTAL CONSIDERATIONS (GENERAL)ENVIRONMENTAL CONSIDERATIONS, DESIGN REQUIREMENTSENVIRONMENTAL COORDINATING GROUPENVIRONMENTAL IMPACTSENVIRONMENTAL REPORT NEPA)ENVIRONMENTAL REVIEWEQUIPMENT DEVELOPMENT (GENERAL)EQUIPMENT DEVELOPMENT, MINE SERVICE SYSTEMSEQUIPMENT DEVELOPMENT, MINING EXCAVATIONEQUIPMENT DEVELOPMENT, SEALING EQUIPMENTEQUIPMENT DEVELOPMENT, SHAFT SINKINGEQUIPMENT DEVELOPMENT, WASTE HANDLINGEQUIPMENT INSTALLATIONEQUIPMENT, CAPITAL TEST EQUIPMENTEVALUATION, PERFORMANCE EVALUATION (GENERAL)EVALUATION, SITEEVALUATION, SOCIOECONOMICEXCAVATING AND SUPPORT MATERIALS PROCUREMENTEXECUTIVE-PROGRAM REVIEWS (TECH), COMMITTEESIDOC PERTAINING TO:EXPLORATION, SUBSURFACE PHASE IVFACILITY MANAGEMENTFACILITY OPERATION (GENERALIFACILITY REQUIREMENTS AND SITE WORKFAR-FIELD MODEL INPUT/OUTPUT, HYDROLOGIC NUMERICAL MODELFIELD TESTFLOW METERFLOW-THROUGH NON-RADIOACTIVE, TRACER-LEVEL, FULLY RADIOACTIVEHYDROTH r

FLUID TEMPERATUREFOUNDATION SCIENCES INC. (DOCUMENTS PERTAINING TO)FRACTURE FLOW FLUID BEHAVIOR TESTFULL SCALE TEST NO 1FULL SCALE TEST NO 2FUNCTIONAL DESIGN CRITERIA ENGINEERING SUPPORTGAMMA LOG

- -. 't Z251 . -

Page 8: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

I . Page No.04/01187

CODE

7

OCNW.,

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECT

_________________________________

B076E422W250C835C925C545C445C735c180B068E902N122

C06OE714E21 30625B004

:...:-: :-- 01C85C15001550C190

. .... *.;it G. 0160.C170C175H250

GAS DETECTION CHARTSCEO AND HYDRO CHEMISTRY TESTINGCEOCHEMISTRY, NEAR FIELD (ENVIRONMENTAL TESTING)GEOGRAPHICGEOGRAPHICGEOGRAPHICGEOGRAPHICGEOGRAPHICGEOGRAPHIC

INFORMATIONINFORMATIONINFORMATIONINFORMATIONINFORMATIONINFORMATION

SYSTEM, HOST ROCK STRATICRAPHYSYSTEM, INTEGRATION OF CEOLOGIC DATASYSTEM, STRUCTURAL GEOLOGIC SETTINGSYSTEM, TECTONIC SETTINGSYSTEMS, HOST ROCK LITHOLOGY-SYSTEMS, SURFACE GEOLOGY

GEOLOGIC LOGGEOLOGIC MAPPING AND MODELINGGEOLOGIC SURVEILLANCEGEOLOGICAL CHARACTERIZATIONGEOLOGRAPH CHARTSGEOLOGY CONDITION, CANDIDATE-HORIZON CHARACTERIZATIONGEOLOGY, SITE CONDITIONSGEOPHYSICALGEOPHYSICALGEOPHYSICALGEOPHYSICALGEOPHYSICALGEOPHYSICALGEOPHYSICALGEOPHYSICALGEOPHYSICALGEOPHYSICALGEOPHYSICAL

ANOMALLY DETECTION, HOST ROCK GEOMETRYLOGSTUDIES, ELECTRICALSTUDIES, GENERALSTUDIES, GRAVITYSTUDIES, INTEGRATED SITE SPECIFICSTUDIES, MAGNETICSTUDIES, PARAMETERSTUDIES, SEISMIC REFLECTIONSTUDIES, SEISMIC REFRACTIONTESTS, DRILLING AND TESTING

* E445E446E447P125

* L302E3119040C155A352H60080298074E305P061P0789032N231P7209016

- "'P062* E30S

..ESISE318C615

GEOTECHNICAL CHARACTERIZATION (GENERAL)GEOTECHNICAL CHARACTERIZATION, GEOLOGYGEOTECHNICAL CHARACTERIZATION, ROCK MECHANICSGLOSSARYGOVERNMENT LIAISON, STATE AND LOCALGRADING, SURFACE FACILITIESGRANTSGRAVITY, GEOPHYSICAL STUDIESGROUNDWATER ASSESSMENTSGROUNDWATER MONITORINGGROUNDWATER SAMPLING AND ANALYSISGYRO SURVEYHEAD FRAME AMD HOIST WORKSHEALTH, SAFETY AND ENVIRONMENTALHEARINGS, COMMITTEES/DOCUMENTS PERTAINING TOHEAT CAPACITY DEVELOPMENT TESTING CAPABILITIES OF BASALT COREHEATERS ANd CONTROLLERSHIGH LEVEL NUCLEAR WASTE MANAGEMENT TASK FORCEHIGH/LOW TEMPERATURE LONG TERM HYDROTHERMAL NON-RADIOACTIVE TESTHISTORICAL ATAHOIST WORKS, HEAD FRAME ANDHORIZON VERIFICATION AND RL 2 SUBSURFACE CONSTRUCTIONHOST ROCK GEOMETRY, COLD CREEK SYNCLINE

Page 9: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

Page No.. 04101187

BRMC SUBJECT LISTBY DESCRIPTION

CODE SUBJECT

-----------------------------------

C605C600C625G650C610C620C730C715C705C700c735C770C725710

C74007200850r815C805

-. .:- .-~ 800

C820F15- 10

. ..... . LI~7f

HOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST ROCKHOST.ROCK

GEOMETRY, COLUMBIA PLATEAUGEOMETRY, GENERALGEOMETRY, GEOPHYSICAL ANOMALLY DETECTIONGEOMETRY, INTRAFLOW STRUCTURE INFORMATIONGEOMETRY, PASCO BASINGEOMETRY, REFERENCE REPOSITORY LOCATIONISITELITHOLOGY, ANALYTICAL DATALITHOLOGY, COLD CREEK SYNCLINELITHOLOGY, COLUMBIA PLATEAULITHOLOGY, GENERALLITHOLOGY, GEOGRAPHIC INFORMATION SYSTEMSLITHOLOGY, MINERALOGYIPETROLOGY INFORMATIONLITHOLOGY, PALEOMAGNETICSLITHOLOGY, PASCO BASINLITHOLOGY, PRIMARY FRACTURE INFORMATIONLITHOLOGY, REFERENCE REPOSITORY LOCATIONISITESTRATIGRAPHY, ANALYTICAL DATASTRATIGRAPHY, COLD CREEK SYNCLINESTRATIGRAPHY, COLUMBIA PLATEAUSTRATIGRAPHY, GENERALSTRATICRAPHY, GEOGRAPHIC INFORMATION SYSTEMSTRATIGRAPHY, PALEOMAGNETICSSTRATIGRAPHY, PASCO BASINSTRATIGRAPHY, REFERENCE REPOSITORY LOCATION/SITE

..

HOT CELL FACILITY (GENERAL)HYDRAULIC CONDUCTIVITY, EQUIVALENT, HYDROLOGICHYDRAULIC HEAD, HYDROLOGIC PROPERTIESHYDRO AND CEO CHEMISTRY TESTING

PROPERTIES

E422

H400H700H31E440ASS1H500HS 10H520E423H3SOH320H300H310H370H340H350H360E715£908P094H240

HYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGICHYDROLOGIC

CHARACTERIZATION (GENERAL)CONCEPTUAL MOOELDATA. INTEGRATION OFFREQUENCY ANALYSISISOLATION ASSESSMENTMODEL.PREDICTIONSNUMERICAL MODEL (GENERAL)NUMERICAL MODEL, FAR-FIELD MODEL INPUT/OUTPUTNUMERICAL MODEL, NEAR-FIELD MODEL INPUT/OUTPUTPROPERTIES TESTING (CENERALIPROPERTIES,PROPERTIES,PROPERTIES,PROPERTIES,PROPERTIES,PROPERTIES,PROPERTIES,PROPERTIES,

DISPERSITYEFFECTIVE POROSITYGENERAL *-HYDRAULIC CONDUCTIVITY, EQUIVALENTHYDRAULIC HEADSTORATIVITYTRANSMISSIVITYVERTICAL HYDRAULIC CONDUCTIVITY

TEST RESULTS, CANDIDATE-HORIZON CHARACTERIZATIONTESTING

HYDROLOGY ASSESSMENTHYDROLOGY TESTS, DRILLING AND TESTING

Page 10: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

9 U-Page No.04101187

CODE

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECT

___________________________________

E926E2148075A252E433E432E431H260E430P1179053L303E501B0058009L300

020R216C190

m .. ; .._ 91509050900

:. :- : - 925-G910920

I3~AR

HYDROLOGY, LARGE SCALE TESTSHYDROLOGY, SITE CONDITIONSIADC REPORTSIMPACTS, ENVIRONMENTALIN SITU SHAFT SEALINGIN SITU SHAFT SINKINGIN SITU SHAFT TESTINGIN SITU STRESS TESTSIN SITU TESTING, GENERALlINDIAN CONCERNS, DOCUMENTS PERTAINING TOINFORMATION MGT. PROGRAM/PLAN IRMP)INFORMATION SERVICES, LICENSINGINSPECTION SERVICES, TITLE IIIINSTANTANEOUS PULSE TESTINSTANTANEOUS SLUG TESTINSTITUTIONAL LIAISON, COMMUNICATIONS ANDINSTITUTIONAL/SOCIOECONOMIC COORDINATING GROUPINSTRUMENTATION DEVELOPMENTINSTRUMENTATION DEVELOPMENT, LOW LEVEL NUCLEAR WASTE MTINTEGRATED SITE SPECIFIC, GEOPHYSICAL STUDIESINTEGRATIONINTEGRATION

.INTEGRATIONINTEGRATION

*INTEGRATIONINTEGRATIONINTEGRATION

OF GEOLOGIC DATA,OF GEOLOGIC DATA,OF GEOLOGIC DATA,OF GEOLOGIC DATA,OF GEOLOGIC DATA,OF GEOLOGIC DATA,OF HYDROLOGIC DAT$

COLD CREEK SYNCLINECOLUMBIA PLATEAUGENERALGEOGRAPHIC INFORMATION SYSTEMPASCO BASINREFERENCE REPOSITORY LOCATION/SITE

nu u5002P073

* G650P816

* P815F145E420E422Fll10F130F140F165F120F150F125FIBSFl 15F155FlSSF160

- PillE926E926E932

INTEGRATION, SYSTEMSINTERFACE CONTROL, COMMITTEES/DOCUMENT PERTAINING TOINTRAFLOW STRUCTURE INFORMATION, HOST ROCK GEOMETRYJONES (JAJI, (DOCUMENTS PERTAINING TO)KAISER ENGINEERING (KEPB) CONTRACT, DOCS PERTAINING TO)LABORATORYLABORATORYLABORATORYLABORATORY,LABORATORY,LABORATORY,LABORATORY,LABORATORY,LABORATORY,LABORATORY,LABORATORY,LABORATORY,LABORATORY,LABORATORY,

PLANNINGTESTING (GENERAL)TESTING, HYDRO AND CEO CHEMISTRY2101-M (GENERAL)222-S LAB (GENERAL)234-5 LAB IGENERAL)BACKFILL TESTING 2101-K (GENERAL)BOREHOLE SEALING LAB (GENERAL)COMPUTER MAINTENANCECONCRETE LAB 2101-M (GENERAL)HOT CELL FACILITY (GENERAL)ROCK MECHANICS 2101-M (GENERAL)SOLIDS CHARACTERIZATION 2101-M (GENERAL)SOLUTIONS CHEMISTRY 2101-M LAB (GENERAL)

s;-

LAND ACQUISITIONLARGE SCALE HYDROLOGIC STRESS TESTINGLARGE SCALE HYDROLOGY TESTLARGE SCALE PUMPING TEST

Page 11: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

* Page N.** 0410117

CODE

10

BffC SUBJECT LISTBY DESCRIPTION

SUBJECT

___________ __ ________ __________

E925P818E912P116L200L202L204L203L201L301

* GG -. P090L3OSB041E927

-' ESO I

P811R2 16017

- B090

G160- --- ^B05S

P716

Roll5042ES00

K.2. N016E102

- A- -. lSOPool

* -.* . E106*-- E105

El04--- -- E1OS

-, 5001--- '- RAlai

P115E902

* N3608072R181P082P004P041E215602

W300R194

LARGE SCALE TESTS, GENERALLAWRENCE LIVERMORE LABS (DOCUMENTS PERTAINING TO)LEADING TESTSLEGALLICENSINGLICENSINGLICENSINGLICENSINGLICENSINGLICENSINGLICENSINGLICENSINGLICENSING

APPLICATIONS (GENERALIAPPLICATIONS CONSTRUCTION AUTHORIZATIONAPPLICATIONS, OECOMMISSIONING LICENSEAPPLICATIONS, OPERATING LICENSEAPPLICATIONS, SITE RELATED DOCUMENTSCOMMUNICATION, DOE/NWTSCOORDINATING GROUP ASSESSMENTSINFORMATION SERVICESSUPPORT SYSTEMS ILSS)

LONG HORIZONTAL BOREHOLES TESTSLONG LEAD PROCUREMENT SUPPORT, CONSTRUCTIONLONG-LEAD PROCUREMENT SUPPORTLOS ALAMOS TECHNICAL ASSOC. CONTRACT (DOCUMENTS PERTAINING TOILOW LEVEL NUCLEAR WASTE MGT;, INSTRUMENTATION DEVELOPMENTLOWER TEMPERATURE LIMIT FOR DEHYDRATION OF BENTONITE UNDER DRYHEATMAGNETICMAGNETIC, GEOPHYSICAL STUDIESMAJOR SYSTEMS ACQUISITION MSAIMANAGEMENT OVERSIGHT AND RISK TREE, COMMIDOCS PERTAINING TOMANAGEMENT, BASELINEMANAGEMENT, CONFIGURATIONMANAGEMENT, CONSTRUCTIONMANAGEMENT, DESIGNMANAGEMENT, FACILITYMANAGEMENT, GENERALMANAGEMENT; PROJECTMANAGEMENT, QUALITY ASSURANCEMANAGEMENT, SAFETYMANAGEMENT, SECURITYMANAGEMENT, STAFFINGMANAGEMENT, SYSTEMSMANAGEMENT, TECHNICAL DESIGN MANAGEMENTMANPOWERMAPPING, GEOLOGIC MAPPING AND MODELINGMAPPING, PHOTOMATERIAL CERTIFICATIONMATERIAL DEVELOPMENT, SEALMATERIAL REVIEW BOARDMATERIALIBUDGET CONTROLMATERIAL/BUDGET, PURCHASE ORDER/SUBCONTRACTOR RELATEDMATERIALS PROPERTIES, SITE IROCK MECHANICS) CONDITIONSMATERIALS TESTINGMEETINGSMETAL BARRIERSMINE SERVICE SYSTEMS, EQUIPMENT DEVELOPMENT

Page 12: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

/

i ,Page No.04/01187

11

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECTCODE____ ___________________________________

9054C770R192P121R112A3S150245065.E902C450P713H600P120P820

B082250

H520450W450L250

80819093

*.~~ -.:8 080- 9052M002P712

*y .M001

L203W350E960P075P813902SB0289015

W350C725C825C53004300190

C610C710C810C91 0C210C510C110

MINED GEOLOGICAL DISPOSAL SYSTEM (MGD5)MINEROLOCY/PETROLOGY INFORMATION, HOST ROCK LITHOLOGYMINING EXCAVATION, EQUIPMENT DEVELOPMENTMISSION PLANMODEL DEVELOPMENTMODEL PREDICTIONS, HYDROLOGICMODEL, ENGINEERING MODEL DEVELOPMENTMODELING TASK FORCE, PERFORMANCE ASSESSMENTMODELING. GEOLOGIC MAPPING AND MODELINGMODELING, TECTONIC SETTINGMONITORED RETRIEVABLE STORAGE FACILITY, OCS PERTAINING TO:MONITORING, GROUNDWATERMONTHLY STATUS REPORTSMORRISON-KNUDSON (DOCUMENTS PERTAINING TOIMUD ENGINEERING REPORTSNATURAL GAMMANEAR FIELD GEOCHEMISTRY (ENVIRONMENT TESTING)NEAR FIELD MODEL INPUT/OUTPUT, HYDROLOGIC NUMERICAL MODELNEAR FIELD PERFORMANCE EVALUATION (ENVIRONMENT ANALYSIS)NEAR FIELD RADIONUCLIDE BEHAVIOR (ENVIRONMENT ANALYSIS)NEPA DOCUMENTSNEUTRON-EPITHERMAL NEUTRONNEUTRON-GAMMANEUTRON-THERMAL NEUTRONNRC REGULATORY GUIDELINESNUCLEAR REGULATORY COMMISSION (NRC)NUCLEAR WASTE TERMINAL STORAGE NWTS), DOCS PERTAINING TO:OFFICE OF NUCLEAR WASTE ISOLATION (ONWI)OPERATING LICENSE, LICENSING APPLICATIONSOTHER MATERIALS, WASTE PACKAGEOVERCORING ACTIVITIESOVERVIEW, COMMITTEES/DOCUMENTS PERTAINING TOPACIFIC NORTHWEST LAB CONTRACT (DOCUMENTS PERTAINING TO$PACKING MATERIAL FABRICATION DEVELOPMENT TESTPACKING MATERIAL FABRICATION PROCESS (DEFENSE)PACKING MATERIAL SOLUTION ANALYSES PHYSICAL AND CHEMICALPROPERTIESPACKING MATERIALS TESTING (OTHER MATERIALS)PALEOMAGNETICS, HOST ROCK LITHOLOGYPALEOMAGNETICS, HOST ROCK STRATIGRAPHYPALEOMACNETICS, STRUCTURAL GEOLOGIC SETTINGPALEOMAGNETICS, TECTONIC SETTINGPARAMETER, GEOPHYSICAL STUDIES

i

PASCOPASCOPASCOPASCOPASCOPASCOPASCO

BASIN,BASIN,BASIN,BASIN,BASIN,BASIN,BASIN,

HOST ROCK GEOMETRYHOST ROCK LITHOLOGYHOST ROCK STRATIGRAPHYINTEGRATION OF GEOLOGIC DATARESOURCE POTENTIALSTRUCTURAL GEOLOGIC SETTINGSURFACE GEOLOGY

Page 13: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

0APage Na.04/01187

CODE

1Z

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECT

___________________________________

C410C310P076P096506450665070S0655067S069A350R217E502E501W5008019-

- 0020N360E424F145

:7 -5 - P064E4055068

0- P114-9014

cnA L

PASCO BASIN, TECTONIC SETTINGPASCO BASIN, VOLCANIC POTENTIALPEER REVIEW, COMMITTEES/DOCUMENTS PERTAINING TOPERFORMANCE ASSESSMENT (GENERAL)PERFORMANCE ASSESSMENT, 8ENCHMARKINGIVERIFICATIONIVALIDATIONPERFORMANCE ASSESSMENT, COLD CREEK SYNCLINE MODELPERFORMANCE ASSESSMENT, COMPUTER CODESPERFORMANCE ASSESSMENT, MODELING TASK FORCEPERFORMANCE ASSESSMENT, POSTCLOSUREPERFORMANCE ASSESSMENT, SUBSYSTEM PERFORMANCE REQUIRMENTSPERFORMANCE EVALUATION (GENERAL)PERFORMANCE EVALUATION, A/EPERFORMANCE EVALUATION, TEST DATA VERIFICATIONPERFORMANCE EVALUATION, TITLE III INSPECTION SERVICESPERFORMANCE, RELIABILITY SAFETY ANALYSISPERMEAMETER TEST STEAM/HYDROTHERMALLY ALTERED PACKING MATERIALPERMEAMETER/TRIAXIAL SWELL PRESSUREISEAR STRENGTH TESTPHOTO MAPPINGPHYSICAL PROPERTIESPLANNING, LABORATORY PLANNINGPLANNING, SCHEDULING/PLANNINGICONTROLPLANNING, TEST PLANNINGPLANS, PERFORMANCE ASSESSMENTPOLICIES/PROCEDURES (DOCUMENT REGARDING)POST-TEST ICROCHARACTERIZATION OF CORROSION SPECIMENSPOSTCLOSURE, PERFORMANCE ASSESSMENTPRECLOSURE SAFETY ANALYSISPRECONCEPTUAL DESIGNPRELIMINARY LICENSE APPLICATIONPRESENTATIONSPRIMARY FRACTURE INFORMATION, HOST ROCK LITHOLOGYPROBE COEFFICIENTPROBE INSTALLATION

.

avc

S061E2035031P122C740H602H601R142N131E302E01E301R146E304R144R142E405D1 As

PROCUREMENT,PROCUREMENT,PROCUREMENT,PROCUREMENT,PROCUREMENT,PROCUREMENT,PROCUREMENT,PROCUREMENT,PROCUREMENT,PROCUREMENT,Dnri IrMcmT

ACCESS SHAFT PROCUREMENTCONSTRUCTIONDRILL STEM AND TOOL PROCUREMENTEXCAVATING AND SUPPORT MATERIALSLONG LEAD PROCUREMENT SUPPORTSERVICE SYSTEMS PROCUREMENTSHAFT LINERSUBSURFACE FACILITY PROCUREMENTSURFACE FACILITY PROCUREMENTTESTING EQUIPMENT ACQUISITIONWASTE HANDLING SYSTEMS PROCUREMENTruz - z rrswwocalcz 8

5004 PROGRAM BASELINEP002 PROGRAM CONTROLE201 PROGRAM OBJECTIVE AND PROJECT DESCRIPTIONP120 PROGRESS REPORTSIWEEKLYIMONTHLYP710 PROJECT CHANGE BOARDA200 PROJECT CONTROL/TECHNICAL DIRECTION

Page 14: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

Page No.04/01/87

CODE

13

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECT

___________________________________

E20 1PoolL3041700P003P033P031P034B039E106M004P079504080069013C620G720C820C920CS20

PROJECT DESCRIPTION AND PROGRAM OBJECTIVEPROJECT MANAGEMENTPUBLIC RELEASE, COMMUNICATIONS AND INSTITUTION LIAISONQUALIFICATION TESTING, FIELD AND INSITU TESTINGQUALITYQUALITYQUALITYQUALITYQUALITYQUALITYQUALITY

ASSURANCEASSURANCEASSURANCEASSURANCEASSURANCEASSURANCE

CONTROL (GENERAL)CONTROL, QA AUDIT/REPORT/PLANCONTROL, SURVEILLANCE REPORTSCONTROL, TRAININGCOORDINATING GROUPMANAGEMENT

INFORMATION CENTERREADINESS REVIEW, COMMITTEES/DOCUMENTS PERTAINING TORECORDS MANAGEMENTRECOVERY PUMPING TESTREDOX CAPACITY HYDROTHERMAL EXPERIMENTSREFERENCEREFERENCEREFERENCEREFERENCEREFERENCEREFERENCEREFERENCE

REPOSITORYREPOSITORYREPOSITORYREPOSITORYREPOSITORYREPOSITORYREPOSITORY

LOCATION/SITE, HOST ROCK GEOMETRY .C

LOCATIONISITE,LOCATION/SITE,LOCATION/SITE,LOCATIONISITE,LOCATIONISITE,LOCATIONISITE,

HOST ROCK LITHOLOGYHOST ROCK STRATIGRAPHYINTEGRATION OF GEOLOGIC DATASTRUCTURAL GEOLOGIC SETTINGSURFACE GEOLOGYTECTONIC SETTINGI�R' -

4.,R U;. .', -% "1'-... w '

1-1

-

G120G420

.. 7

r .-.

L150. REGULATORY BASELINEN350 REMEDIAL SHOTCRETE TESTINGR133 REMOTE/HANDLING DESIGN8045 REPOSITORY COORDINATING GROUPR013 REPOSITORY DESIGN8047 REPOSITORY RETRIEVABILITYE210 REQUIREMENTS, DESIGN REQUIREMENTS (GENERAL)9086 RESISTIVITYC205 RESOURCE POTENTIAL, COLUMBIA PLATEAU*G200 RESOURCE POTENTIAL, GENERALC210 RESOURCE POTENTIAL, PASCO BASINP092 RISK ASSESSMENT9046 ROBOTICSE913 ROCK BOLTING INSTRUMENTATION TESTS9007 ROCK CORE SAMPLE CHARACTERIZATIONNZ21 ROCK ENGINEERING, ENGINEERING STUDIESN232 ROCK INSTRUMENTATIONE716 ROCK MECHANIC PARAMETERS, CANDIDATE-HORIZON CHARACTERIZATIONF11S ROCK MECHANICS LAB 2101-M (GENERAL)W600 ROCK MECHANICS SUPPORTE904 ROCK MECHANICS TESTINGE421 ROCK PROPERTIES TESTINGE928 ROCK STRENGTH TESTSE930 ROOM SCALE TESTING9057 ROTARY RIGP093 SAFETY WISAP), ASSESSMENTN014 SAFETY AND ENVIRONMENTAL ANALYSIS IGENERAL)N141 SAFETY AND ENVIRONMENTAL ANALYSIS, ENVIRONMENTAL REVIEW

Page 15: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

Page Na.04/01/87

14

ex ", T

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECTCODE

___________________________________

N142

SOS

N142E966E966P064

R182

R19SW660E104G535G435C170

* C1758021P113R167

. R146S056

.R106E304

SAFETYSAFETYSAFETYSAFETYSAMPLESAMPLE

AND ENVIRONMENTALAND ENVIRONMENTALMANAGEMENTREVIEWDESCRIPTIONDESCRIPTION TEST,

ANALYSIS, SAFETY REVIEWDOCUMENTATION

ROCK MECHANICS

..

.... ... ..

. , .

.. .. .... .

_ _ .... .... ... . .

.;. :

. . ... .. .... .. . .. . .

.. . .. .... .... .. ..

. . - .:

. . . . .

. . . . . .

Xl- -, .- .-.-,Jjw u - -

_ � _.s,* ........................ ...

... . ; _ - ....... .. . .

. .. , _ . .... ... ... .. .

: .:-, -: -

. E433R1.91E432E431R166N3508073AlS0A100

N2348049P717E212E213E214E2155023W5502030P095A302A300P080

A001- E024

SCHEDULINGIPLANNING CONTROLSEAL DESIGNSEAL DEVELOPMENTSEAL DEVELOPMENT, TESTINGSEALING EQUIPMENT. EQUIPMENT DEVELOPMENTSEALING, BOREHOLE SEALING AND MATERIALS TESTINGSECURITYSEISMIC MONITORING, STRUCTURAL GEOLOGIC SETTINGSEISMIC MONITORING, TECTONIC SETTINGSEISMIC REFLECTION, GEOPHYSICALSEISMIC REFRACTION, EOPHSICAL STUDIESSELENIUM SOLUABILITY TEST WITH BASALT AND ENTONITESEMINARS/SYMPOSIUMS/WORKSHOPS, ETCSERVICE SYSTEMS CONSTRUCTIONSERVICE SYSTEMS PROCUREMENTSSERVICES. TECHNICALSHAFT DESIGNSHAFT LINER PROCUREMENTSHAFT SEALING, IN SITU TESTINGSHAFT SINKING, EQUIPMENT DEVELOPMENTSHAFT SINKING, IN SITU TESTINGSHAFT, IN SITU SHAFT TESTINGSHAFTS, CONSTRUCTIONSHOTCRETE TESTINGSINGLE SHOT SURVEYSITE ANALYSIS MANAGEMENTSITE ANALYSIS, GENERALSITE CHARACTERIZATION GENERALISITE CHARACTERIZATION PLAN COORDINATING GROUPSITE CHARACTERIZATION PLAN/REPORT, COMM/DOCS PERTAINING TO:SITE.CONDITIONS, GENERALSITE CONDITIONS, GEOLOGYSITE CONDITIONS, HYDROLOGYSITE CONDITIONS, MATERIALS PROPERTIES ROCK MECHANICS)SITE EVALUATIONSITE SUPPORTSIZE/STRENGTH TEST ON COHASSETT CORESOCIOECONOMIC ASSESSMENTSOCIOECONOMIC CONSIDERATIONSSOCIOECONOMIC EVALUATIONSOCIOPOLITICAL AND ECONOMIC CONSIDERATIONS (COMM/DOC PERTAININGTO)SOCIOPOLITICAL CONSIDERATIONSSOLID REACTION ANALYSES FROM 222-S

Page 16: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

� . IPage No.04/01187

15

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECTCODE

___________________________________

F1559011B012F1609084W250N222P110H230N248N321N3229085E103L3029022

._ . _ _.._.P124

H340* ..* .:- E910

H260G54CS150505

G545C530G510C520

E211C155C190

- .C160

C1700175C150P0ElE318E955E315R135R144E316E317S069P112E10R134E311

SOLIDS CHARACTERIZATION 2101-H LAB (GENERALISOLIDS CHARACTERIZATION FOR FRACTURE ALTERATION TESTSOLUTION ANALYSES FOR REDOX, FRACTURE, AND HYDROGEN PEROXIDESOLUTIONS CHEMISTRY LAB 2101-M IENERALISONICSORPTION CHEMISTRY/SOLUBILITY (ENVIRONMENT TESTING)SPECIAL STUDIES, ENGINEERING SUPPORTSPECIAL SUPPORT, PROGRAM SUPPORTSPECIFIC HOLE RECORDIHISTORY, DRILLING AND TESTINGSPENT FUEL PREPARATIONSPENT FUEL TEST NO 1SPENT FUEL TEST NO 2SPONTANEOUS POTENTIALSTAFFING MANAGEMENTSTATE AND LOCAL GOVERNMENT LIAISONSTATIC DIFFUSION CELL AND FLOW-THROUGH EXPERIMENTSSTOP WORKSTORATIVITY, HYDROLOGIC PROPERTIESSTRESS MEASUREMENTS TESTINGSTRESS TESTS, IN SITU

4

STRUCTURALSTRUCTURALSTRUCTURALSTRUCTURALSTRUCTURALSTRUCTURALSTRUCTURALSTRUCTURALSTRUCTURALSTUDIES, ElSTUDIES, CESTUDIES, GISTUDIES, GESTUDIES, CISTUDIES, GESTUDIES, CECTrgnTYCC F

GEOLOGICGEOLOGICCEOLOGICGEOLOGICGEOLOGICGEOLOGICGEOLOGICGEOLOGICGEOLOGIC

SETTING,SETTING,SETTING,SETTING,SETTING,SETTING,SETTING,SETTING,SETTING,

ANALYTICAL DATACOLD CREEK SYNCLINECOLUMBIA PLATEAUGENERALGEOGRAPHIC INFORMATION SYSTEMPALEOMAGNETICSPASCO BASINREFERENCE REPOSITORY LOCATION/SITESEISMIC MONITORING(GENERAL)4WINEERING STUDIES

EOPHYSICAL GRAVITYEOPHYSICAL INTEGRAIEOPHYSICAL MAGNETICEOPHYSICAL PARAMETEEOPHYSICAL SEISMICEOPHYSICAL SEISMICFnDuYcST,& eTtinTFc

TED SITE SPECIFIC

.R

-REFLECTIONREFRACTIONI FtCID&I I

-u^; -cra^~ -u^G -uc. - - I. ....

SUBCONTRACTORS (GENERAL)SUBSURFACE CONSTRUCTION, RRL 2 AND HORIZON VERIFICATIONSUBSURFACE EXPLORATION PHASE IVSUBSURFACE FACILITIES CONSTRUCTION, GENERALSUBSURFACE FACILITIES DESIGNSUBSURFACE FACILITY PROCUREMENTSUBSURFACE, DRILLED SHAFT CONSTRUCTIONSUBSURFACE, UNDERGROUND SHAFT STATION CONSTRUCTIONSUBSYSTEM PERFORMANCE REQUIREMENTS, PERFORMANCE ASSESSMENTSUPPORT FACILITIESSURFACE FACILITIES CONSTRUCTION SUPPORTSURFACE FACILITIES DESIGNSURFACE FACILITIES GRADING

Page 17: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

.5* - Page No.04101/87

16

BRMC SUBJECT LISTBY ESCRIPTION

SUBJECTCODE

___________________________________

ES13R142ES12C125C115C105G100c1aoG110C120P031N122C951P119SOOS5051R1326042A355002

*-. 5001

50495041SC21E202A200R131S056G440G415.C405C400C445C450C430C4100420C495B0983350N313N3141660E929E415E964W300E911W430W620

SURFACESURFACESURFACESURFACESURFACESURFACESURFACESURFACESURFACESURFACE

FACILITYFACILITYGEOLOGY,GEOLOGY,GEOLOGY,GEOLOGY,GEOLOGY,GEOLOGY,GEOLOGY,

PROCUREMENTSUTILITIES SERVICESIANALYTICAL DATACOLD CREEK SYNCLINECOLUMBIA PLATEAUGENERALGEOGRAPHIC INFORMATION SYSTEMPASCO BASINREFERENCE REPOSITORY LOCATION/SITE

FACILITIES SERVICES STRUCTURES

SURVEILLANCE REPORTS, QUALITY ASSURANCE CONTROLSURVEILLANCE. GEOLOGICSURVEY DATA, BOREHOLESYMPOSIUMSIWORKSHOPS/SEMINARS, ETC.SYSTEMS ANSYSTEMS ANSYSTEMS DESYSTEMS ENSYSTEMS ENSYSTEMS INSYSTEMS MATECHNICALTECHNICALTECHNICALTECHNICALTECHNICALTECHNICALTECHNICALTECTONIC SiTECTONIC STECTONIC SiTECTONIC STECTONIC SiTECTONIC STECTONIC SlTECTONIC STECTONIC SITECTONIC STELEVIEWER

ALYSIS (GENERALIIALYSIS, TRADE STUDIESSIGNNGINEERING MANAGEMENT PLANVIRONMENTAL ASSESSMENTNTEGRATIONNAGEMENT

.. #

SEMP)

BASELINE PCDICOORDINATION, CONTROL TEAMCRITERIA-DIRECTIONDIRECTION/PROJECT CONTROLMANAGEMENT, DESIGNSERVICESETTING,ETTING,ETTING,ETTING,ETTING,ETTING,ETTING,ETTING,ETTING,ETTING,

ANALYTICAL DATACOLD CREEK SYNCLINECOLUMBIA PLATEAUGENERALGEOGRAPHIC INFORMATION SYSTEMMODELINGPALEOMAGNETICSPASCO BASINREFERENCE REPOSITORY LOCATION/SITESEISMIC MONITORING

TEST, BACKFILL MATERIALS TESTING (OTHER MATERIALS).TEST, BLOCK TEST NO ITEST, BLOCK TEST NO 2TEST, BOREHOLE SEALING AND MATERIALS TESTINGTEST, CANISTER TESTSTEST, CAPITAL TEST EQUIPMENTTEST, COMPRESSIVE STRENGTH TESTSTEST, CONTAINMENT MATERIALS TESTING (METAL BARRIERS)TEST, DEFORMATION MEASUREMENTS TESTINGTEST, DEVELOPMENT TESTINGTEST, DEVELOPMENT TESTING (WASTE PACKAGE)

. -)- -

Page 18: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

� .1� I .. Page No.04/01/87

17

BRMC SUBJECT LISTBY DESCRIPTION

SUBJECTCODE

D.

N235W250R114N311N312H250E422E423E903H240E433E432E431H260E420E926E932E925E912E9271602W50b700

TEST, ENGINEERING TEST SUPPORTTEST, ENVIRONMENTAL TESTING ENVIRONMENT TESTING)TEST, FIELDTEST, FULL SCALETEST NO 1TEST, FULL SCALE TEST NO 2TEST, GEOPHYSICAL TESTINGTEST, HYDRO AND GEO CHEMISTRY TESTINGTEST, HYDROLOGIC PROPERTIES TESTINGTEST, HYDROLOGIC TESTINGTEST, HYDROLOGY TESTINGTEST, IN SITU SHAFT SEALINGTEST, IN SITU SHAFT SINKINGTEST, IN SITU SHAFT TESTINGTEST, IN SITU STRESS TESTINGTEST, LABORATORY TESTING (CENERAL)TEST, LARGE SCALE HYDROLOGY TESTSTEST, LARGE SCALE PUMPING TESTSTEST, LARGE SCALE TESTS IGENERAL)TEST, LEADING TESTSTEST, LONG HORIZONTAL BOREHOLE TESTSTEST, MATERIALS TESTINGTEST, PACKING MATERIALS TESTING OTHER MATERIALS)TEST; QUALIFICATION TESTING FIELD AND IN SITU)TEST, ROCK BOLTING INSTRUMENTATION TESTSTEST, ROCK MECHANICS TESTINGTEST, ROCK PROPERTIES TESTINGTEST, ROCK STRENGTH TESTSTEST, ROOM SCALE TESTINGTEST, ROOM SCALE TESTSTEST, SEAL DEVELOPMENT TESTINGTEST, SPENT FUEL TEST NO 1TEST, SPENT FUEL TEST NO 2TEST. STRESS MEASUREMENTS TESTINGTEST, SYSTEMS TEST ANALYSISTEST, TEST AND INSTRUMENT HOLES CONSTRUCTIONTEST, TEST DATA VERIFICATIONTEST. TEST IMPLEMENTATION (GENERAL)TEST, TEST PLANNINGTEST, TESTING EQUIPMENT ACQUISITIONTEST, VITRIFIED WASTE FORM TESTTHERMAL EXPANSION AND CONDUCTIVITY DEVELOPMENT TEST OF BASALTCORETHERMAL PROPERTIES TEST ON RRL CORE

4f

913E904E421E928

-'I N315E930

N321- * N922

E9105022NISE945NosiE405E410Na23B031

BossN123E205N124

--. .H N125N126E205N138

TITLETITLETITLETITLETITLETITLETITLE

I DESIGN (KAISER)I DESIGN PRELIMINARYlI DESIGN (ROCKWELL)II DESIGN (KAISER)II DESIGN (ROCKWELL)II DESIGN, FINALIII CONSTRUCTION

Page 19: Department of Energy · communications and institutional liaison, public release composite for correlation compressive stencth test computer codes, performance assessment ... engineering,

- . .- I,I ,-, - 4 . iI

Page No.04101/87

CODE

18

ORMC SUBJECT LISTBY DESCRIPTION

SUBJECT

._________________________________

TISO* ~ESO1

. ~E5E965E9,658095

* - -. 056

5051* P034

H3500048

*_y 80568061E931N132E817

. _ . .... .RiS9. ;.:.- E803

H3609064N323

C305

G3110

*0 ~~110W710W100W100

* *_y R145R165

* R193P711B044w3508043

* W200N187P1209067P714P8140060

* P113

TITLE III INSPECTION SERVICETITLE II INSPECTION SERVICES, PERFORMANCE EVALUATIONTOLERANCE MEASUREMENTSTOLERANCE MEASUREMENTS TESTTRACER LOGSTRACKING/TRENDINGTRADE STUDIES, SYSTEMS ANALYSISTRAINING, QUALITY ASSURANCE CONTROLTRANSMISSIVITY, HYDROLOGIC PROPERTIESTRANSPORTATIONTRENDING/TRACKINGTUBULAR GOODS TALLYTUNNEL STABILITY DEMONSTRATIONTUNNELS AND EXCAVATION CONSTRUCTIONUNDERGROUND SHAFT, SUBSURFACE CONSTRUCTIONUPDATED CONCEPTUAL DESIGNUTILITIES INSTALLATION CONSTRUCTIONVERTICAL HYDRAULIC CONDUCTIVITY, HYDROLOGIC PROPERTIESVISULOGSVITRIFIED WASTE FORM TESTVOLCANIC POTENTIAL, COLUMBIA PLATEAU

-VOLCANIC POTENTIAL, GENERAL.VOLCANIC POTENTIAL, PASCO BASINWASTEWASTEWASTEWASTE

'WASTEWASTEWASTEWASTEWASTEWASTEWASTE

FORM ACCEPTANCE SPECIFICATIONFORM ACQUISITION DATA (FOR DHLWIFORMSFORMS DATA, ACQUISITION OFHANDLING SYSTEMS PROCUREMENTHANDLING, CONSTRUCTIONHANDLING, EQUIPMENT DEVELOPMENTISOLATION PILOT PROJECT, COMMIOOCSPACKAGE COORDINATION.GROUPPACKAGE, OTHER MATERIALSPACKAGE, ROD CONSOLIDATION

PERTAINING TO:

WASTE/BARRIERIROCK INTERACTIONWATERLINE CONSTRUCTIONWEEKLY STATUS REPORTWELL SERVICE REPORTSWISP, COMMITTEES/DOCUMENTS PERTAINING TO:WOODWARD CLYDE CONTRACT (DOCUMENTS PERTAINING TO)WORKOVER RIGWORKSHOPS/SEMINARS/SYMPOSZUMS, ETC

a .

I ...