IMPROVEMENT OF WORKFLOW, PROCESSES AND CONDITIONS IN CENTRAL KITCHEN OF CHANGI PRISON COMPLEX COMPANY BACKGROUND PROBLEM DESCRIPTION 1. Reduce manpower at dishing and warewash sections by 20%. 2. Streamline work processes at dishing and warewash sections via lean management methodologies. OBJECTIVES Team Members: Gerald Ng Chi Siong | Koh Chong Keng | Lee Joon Fai | Ma Zhuoyuan | Yang Xiaozhou Advisors: Prof. Tang Loon Ching, Assoc. Prof. Aaron Chia Eng Seng (NUS) | Ms. Waida Jumaat, Mr. Khairull Danial Ramlan (SCORE) Department of Industrial Systems Engineering and Management | IE3100R Systems Design Project 2016/17 ABSTRACT: This project aims to minimise low-skilled jobs involved and improve work processes in the Central Kitchen of Changi Prison Complex. It begins with the analysis of current processes of kitchen operations through lean management methodologies, and it concludes with recommendations to meet the proposed objectives. ANALYSIS WAREWASH SECTION RECOMMENDATIONS ANALYSIS RECOMMENDATIONS DISHING SECTION Many non-essential tasks Unmotivated inmates Tools not specialized for tasks Root Cause Analysis High defect rate Large variation in station lead time Value Stream Map Uncoordinated changeovers Different changeover durations Non-value-added (NVA) actions present Process Map CAP 126s 97% TRAY 131s 97% RICE 9s 98% 61% VEG 105s 97% 37% GRAVY 144s 96% 41% MEAT 125s 97% C/O Uptime Defect Rate 0.9s Ineffective pre-wash procedure No fixed standard of cleanliness Root Cause Analysis Non-value added actions exist at pre- wash section Inefficient sorting process Process Map Reduced by three, as indicated above Tray feeding taken over by automatic feeding machine Constant rice top-up replaced by coordinated changeover No need for stacking trays before loading into warmer Reduced Manpower Conveyor & Tray-feeding Machine: Dish trays are moved along the line by a motorised, food-safe roller/conveyor at constant pace. Empty trays are fed to the line by a tray-feeding machine. Manual override is possible. 1 2 Coordinated Changeovers: Periodically, the line is paused and all stations execute changeover simultaneously. Food container size is also adjusted to suit the changeover interval. Sort Trays by Colour: Trays and covers are sorted by color before they are sent for pre-washing. 1 Basket-by-Basket Pre-Wash: Trays and covers are slotted into dishwashing basket before pre-wash, ensuring the effectiveness of pre-wash. 2 Redesigned Pre-Wash Basin: A more ergonomic design of the pre-wash basin allows the worker to simply slide basket through water with low resistance. 3 Holding trays and covers in baskets error proofs pre-wash process of food residue removal Simplifies tray collection Improved Work Process Reduced by two at collection section as trays will have been pre-sorted by colour and base/cover. Reduces by one at warmer washing/tray unloading section Reduced Manpower Validation and cost-benefit analysis of recommendations Optimisation of dishing section layout Analysis of design of trays and covers FUTURE WORK 1.2s 1.2s 0.9s 1.6s 2.7s 1.2s 1.4s 4.2s 6s 3.5s 4s Streamlines dishing process Consistent pace minimises rushing, hence improves portioning and reduces spillage Reduces the need for line cleaning as food debris falls between rollers Improved Work Process POOR DISHING QUALITY Environment Equipment Inmates Methods Noisy Hot, humid Tendency to rush Many non- essential tasks Desire for longer breaks Mundane tasks Difficult to control portioning POOR WAREWASH QUALITY Machine Measurement Inmates Methods Not suited for Asian diet (oil, gravy) Tendency to cut corners Fatigue Ineffective pre-wash Subjective definition of cleanliness Low adherence to requirement Low adherence to requirements Singapore Corporation of Rehabilitative Enterprises (SCORE) is a statutory board under the Ministry of Home Affairs (MHA) which aims to rehabilitate and reintegrate offenders as contributing members of society. Part of this is achieved by equipping offenders with relevant employable skills. SCORE operates a Central Kitchen in Changi Prison Complex that prepares around 23,000 meals daily. SCORE wants to minimise the number of inmates allocated to low-skilled jobs and improve the process efficiency and productivity, particularly in the dishing and warewash sections.

Upload: others

Post on 20-Aug-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Department of Industrial Systems Engineering and Management | … · 2019. 7. 1. · Part of this is achieved by equipping offenders with relevant employable skills. SCORE operates

IMPROVEMENT OF WORKFLOW, PROCESSES AND CONDITIONS INCENTRAL KITCHEN OF CHANGI PRISON COMPLEX

COMPANY BACKGROUND PROBLEM DESCRIPTION1. Reduce manpower at dishing and warewash

sections by 20%.

2. Streamline work processes at dishing and warewash sections via lean management methodologies.

OBJECTIVES

Team Members: Gerald Ng Chi Siong | Koh Chong Keng | Lee Joon Fai | Ma Zhuoyuan | Yang XiaozhouAdvisors: Prof. Tang Loon Ching, Assoc. Prof. Aaron Chia Eng Seng (NUS) | Ms. Waida Jumaat, Mr. Khairull Danial Ramlan (SCORE)

Department of Industrial Systems Engineering and Management | IE3100R Systems Design Project 2016/17

ABSTRACT: This project aims to minimise low-skilled jobs involved and improve work processes in the Central Kitchen of ChangiPrison Complex. It begins with the analysis of current processes of kitchen operations through lean management methodologies, andit concludes with recommendations to meet the proposed objectives.

ANALYSISWAREWASH SECTION

RECOMMENDATIONS

ANALYSIS

RECOMMENDATIONS

DISHING SECTION

Many non-essential tasksUnmotivated inmatesTools not specialized for

tasks

Root Cause Analysis

High defect rateLarge variation in station

lead time

Value Stream Map

Uncoordinated changeovers

Different changeover durations

Non-value-added (NVA) actions present

Process Map

CAP

126s

97%

TRAY

131s

97%

RICE

9s

98%

61%

VEG

105s

97%

37%

GRAVY

144s

96%

41%

MEAT

125s

97%

C/O

Uptime

Defect

Rate

0.9s

Ineffective pre-wash procedure

No fixed standard of cleanliness

Root Cause Analysis

Non-value added actions exist at pre-wash section

Inefficient sorting process

Process Map

Reduced by three, as indicated aboveTray feeding taken over by automatic

feeding machineConstant rice top-up replaced by

coordinated changeoverNo need for stacking trays before

loading into warmer

Reduced Manpower

Conveyor & Tray-feeding Machine: Dish trays are moved along the line by amotorised, food-safe roller/conveyor at constant pace. Empty trays are fed to theline by a tray-feeding machine. Manual override is possible.

1

2Coordinated Changeovers: Periodically, the line is paused and all stations execute changeover simultaneously. Food container size is also adjusted to suit the changeover interval.

Sort Trays by Colour: Trays and covers are sorted by color before they are sentfor pre-washing.1Basket-by-Basket Pre-Wash: Trays and covers are slotted into dishwashing basket before pre-wash, ensuring the effectiveness of pre-wash. 2Redesigned Pre-Wash Basin: A more ergonomic design of the pre-wash basin allows the worker to simply slide basket through water with low resistance.3

Holding trays and covers in baskets error proofs pre-wash process of food residue removal

Simplifies tray collection

Improved Work ProcessReduced by two at collection section

as trays will have been pre-sorted by colour and base/cover.

Reduces by one at warmer washing/tray unloading section

Reduced Manpower

Validation and cost-benefit analysis of recommendations

Optimisation of dishing section layout

Analysis of design of trays and covers

FUTURE WORK

1.2s

1.2s

0.9s

1.6s 2.7s 1.2s 1.4s

4.2s 6s 3.5s 4s

Streamlines dishing processConsistent pace minimises rushing,

hence improves portioning andreduces spillage

Reduces the need for line cleaning asfood debris falls between rollers

Improved Work Process

POOR

DISHING

QUALITY

Environment

EquipmentInmates

Methods

Noisy

Hot, humid

Tendency

to rush

Many non-

essential tasks

Desire for

longer breaksMundane tasks

Difficult to

control

portioning

POOR

WAREWASH

QUALITY

Machine

MeasurementInmates

MethodsNot suited

for Asian diet

(oil, gravy)

Tendency to

cut cornersFatigue

Ineffective

pre-wash

Subjective

definition of

cleanliness

Low adherence

to requirement

Low

adherence to

requirements

Singapore Corporation of Rehabilitative Enterprises(SCORE) is a statutory board under the Ministry ofHome Affairs (MHA) which aims to rehabilitate andreintegrate offenders as contributing members ofsociety. Part of this is achieved by equippingoffenders with relevant employable skills.

SCORE operates a Central Kitchen in Changi PrisonComplex that prepares around 23,000 meals daily.SCORE wants to minimise the number of inmatesallocated to low-skilled jobs and improve theprocess efficiency and productivity, particularly inthe dishing and warewash sections.