Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE SECRETARY Manila JUN 2 2 2020 DEPARTMENT ORDER ) 55 l NO. ) Series of 2019 dt ~1!ql1o~) SUBJECT: REVISED GUIDELINES IN THE PREPARATION OF CONCEPTUAL DESIGN, DETAILED ENGINEERING DESIGN, "AS-STAKED", REVISED, AND "AS-BUILT" PLANS FOR HIGHWAY, BRIDGE AND WATER PROJECTS a. Plan b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer and readable project plans, the following guidelines shall be observed by all concerned offices of this Department in the preparation of Conceptual Design, Detailed Engineering Design (DED), "As-Staked", Revised and "As-Built" plans for highway, bridge and water projects: 1. All sheets in the set of Conceptual Design, DED, "As-Staked", Revised and "As-Built" Plans for Highway, Bridge, Water Engineering and other related projects shall be uniform and of one standard A-2 size (420mm x S94mm) mylar paper. 2. The scale to be used for various parts of the design plans shall be as follows: - 1:700; 1:70; 1:100 (horizontal and vertical); - Appropriate scale depending on the width of the river/channel, and height of embankment/excavation; and e. Structural details, tables, notations, etc., shall vary depending on the scale and text fonts prescribed in the latest DGCS edition and/or the designer's discretion provided that each part shall be presented clearly and readable when printed in A-2 size paper. 3. Draftsmanship shall be of professional quality. All plans shall be printed and drafted using computer-aided design (CAD) software. 4. The meaning and intent of the provisions and/or specifications under the General Notes shall be made clear and specific and shall leave no room for misinterpretations that may lead to Variation Orders later on. 5. The title block for all sheets shall be made an integral part of the sheet of plan and not merely patched-up therein. Cover sheets and title blocks shall vary depending on the preparing and approving office. Formats for cover sheets and title blocks are as presented in the following annexes: • Cover Sheets: Annexes "A-1" to "A-16" Annexes "B-1" to "B-16" Annexes "C-1" to "C-6" Annexes "D-1" to "D-ll" Conceptual Design Plan Detailed Engineering Design Plans "As-Staked" Plans Revised Plans

Upload: others

Post on 27-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

OFFICE OF THE SECRETARYManila

JUN 2 2 2020DEPARTMENT ORDER )

55 lNO. )

Series of 2019dt ~1!ql1o~)

SUBJECT: REVISED GUIDELINES IN THEPREPARATION OF CONCEPTUALDESIGN, DETAILED ENGINEERINGDESIGN, "AS-STAKED", REVISED,AND "AS-BUILT" PLANS FORHIGHWAY, BRIDGE AND WATERPROJECTS

a. Planb. Profilec. Cross-sections (roads)d. Cross-sections

(river/channel)

To further improve the quality and for clearer and readable project plans, the followingguidelines shall be observed by all concerned offices of this Department in the preparation ofConceptual Design, Detailed Engineering Design (DED), "As-Staked", Revised and "As-Built"plans for highway, bridge and water projects:

1. All sheets in the set of Conceptual Design, DED, "As-Staked", Revised and "As-Built" Plansfor Highway, Bridge, Water Engineering and other related projects shall be uniform andof one standard A-2 size (420mm x S94mm) mylar paper.

2. The scale to be used for various parts of the design plans shall be as follows:

- 1:700;1:70;1:100 (horizontal and vertical);

- Appropriate scale depending on the width ofthe river/channel, and height ofembankment/excavation; and

e. Structural details, tables, notations, etc., shall vary depending on the scale and textfonts prescribed in the latest DGCSedition and/or the designer's discretion providedthat each part shall be presented clearly and readable when printed in A-2 sizepaper.

3. Draftsmanship shall be of professional quality. All plans shall be printed and drafted usingcomputer-aided design (CAD) software.

4. The meaning and intent of the provisions and/or specifications under the General Notesshall be made clear and specific and shall leave no room for misinterpretations that maylead to Variation Orders later on.

5. The title block for all sheets shall be made an integral part of the sheet of plan and notmerely patched-up therein. Cover sheets and title blocks shall vary depending on thepreparing and approving office. Formats for cover sheets and title blocks are as presentedin the following annexes:

• Cover Sheets:Annexes "A-1" to "A-16"Annexes "B-1" to "B-16"Annexes "C-1" to "C-6"Annexes "D-1" to "D-ll"

Conceptual Design PlanDetailed Engineering Design Plans"As-Staked" PlansRevised Plans

Page 2: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

D.O. No. -I Series of 2019Revised Guidelines in the Preparation of Conceptual

Design, Detailed Engineering Design, "As-Staked", Revised,and "As-Built" Plans for Highway, Bridge and Water Projects

Page 2 of 2

Annexes "E-1" to "E-6" "As-Built" Plans

• 1itle/Signature Blocks:Annexes "F-1" to "F-4" Conceptual Design PlanAnnexes "G-1" to "G-4" Detailed Engineering Design Plans

Annexes "H-1" to "H-2" "As-Staked" PlansAnnexes "1-1" to "1-3" Revised PlansAnnexes "J-1" to "J-2" "As-Built" Plans

NOTE: All dimensions to be shown are in millimeters.

6. For Conceptual and DED plans prepared by the Design Consultants and "As-Staked",Revised or "As-Built" Plans checked/reviewed by the Construction Supervision Consultants,all sheets including the cover page shall be provided with a liability waiver duly signed bytheir Project Manager. Similarly, for Design and Build Projects, all sheets of plan includingcover page shall be provided with liability waiver, as indicated in annexes "A-12" to "A-16"and annexes "B-12" to "B-16" duly signed by the Contractor's Project Manager. The waivershall also be made an integral part of all sheets and not merely patched-up. Format of theliability waivers shall be as presented in annexes "K-1" to "K-6".

7. All plans to be approved by the District Engineering Offices (DEO's) and Regional Offices(RO's), except for "As-Built" plans, shall be prepared or reviewed by the Chief of thePlanning and Design Section/Division.

8. All sheets of the set of plan shall be neat, clean and without any crossed-out or voidedportion therein. Plans with corrections made by reviewing offiCials/offices shall be returnedto the designing office for correction or replacement.

9. The text style shall be Arial for all parts of the plan. Text height may vary depending onthe designer's desired size as long as all words are maintained legible. However, standardtext heights for cover sheets and title blocks shall be as illustrated in annexes "L -1 to L-5".

Soft/electronic copy (in editable CAD file) of said "Annexes" and example drawing sheets canbe downloaded from DPWH (Bureau of Design) intranet.

This Order supersedes Department Order 77, Series of 2018 and shall take effect immediately.

~v--::=Secretary

5.1.3DlB/lND

Departrrent of Public Works and HighwaysOffice of the Secretary

11111111 III 11111111111111111111111 IIIWINOR01530

Page 3: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

•....,Q.oQ..,:5(;.,0>"0.,Ea~EEol')

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.> ~<DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTCONCEPTUAL DESIGN PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

IAnnex"A - 1"1

(Style - Ariaf )

H-6.4Omm Text~t=6.4Omm

(Style, Arial Bold )

H-9.00mm TextHeIght. 9.00mm

(Slylo-Arial )

H=7.8Omm Text~t=7.8Omm

(Slyle'Ariaf )

H-6.4Omm TextHeight=6.4Omm

(Style-Ariaf )

H-6.4Omm Text~'6.4Omm

(SlyIo=ArlaI )

H-6.4Omm TextHeight'6.4Omm

(Style - AriafBold )

H-8.0Omm Text~=8.00mm

(SlyIo-ArlaI )

H-6.00mm Text~t=6.00mm

•....,Q.oQ..,:5.•..o.,0>"0.,Eo~EE00

(SlyIe'Arial )I H=3.0mm TextHeight· 3.00mm

SUBMmED:

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN SECTION

DATE

(Style = Arial Bold )

H-4.40mm TextHoight'4.4Omm

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT DISTRICT ENGINEER

DATE

(Style-Arial )

H-3.00mm Text~'3.00mm

APPROVED:

DATE

H-2.5Omm

(Style 'AriaI )

TextH0i!llil = 2.5Omm

<SIGNATURE>

<NAME>DISTRICT ENGINEER

15mm from edge of the paperConceptual Design Plan prepared and approved by the District Engineering OffIce

Page 4: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the poper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

IAnnex"A - 2'"

... ...., .,a. a." "a. a.., .,;; ;;'0 C.Y. <YEAR> PROJECT '0.,

CONCEPTUAL DESIGN PLAN FOR.,

'" '".., ..,., .,E

<NAME OF PROJECT> E,g 0.eE EE <SECTION> E0 ~'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE ID>

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>DllTE

15mm from edge of the poper

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT DISTRICT ENGINEER

DATE

Conceptual Design Plan prepared by the Consultant and approved by the District Engineering Office

APPROVED:

DllTE

<SIGNATURE>

<NAME>DISTRICT ENGINEER

Page 5: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

IAnnex nA - 3"1

~ •...••Q. Q.0 0Q. Q.

•• ••:S :S'0 C.Y. <YEAR> PROJECT '0" CONCEPTUAL DESIGN PLAN FOR ••'" '""0 "0•• ••E

<NAME OF PROJECT> E,g a./::

E EE <SECTION> J50'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN SECTION

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

15mm from edge of the paperConceptual Design Plan prepared by the District Engineering Office and approved by the Regional Office

Page 6: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the poper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

IAnneX"A - 4"1

~ ..Q. ••Q." "Q. Q.

•• ••:5 :5- C.Y. <YEAR> PROJECT -0 0•• ••'" CONCEPTUAL DESIGN PLAN FOR '"..,•• ..,••E

<NAME OF PROJECT> E0 0.:: .::E EE

<SECTION> ~0...,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Conceptual Design Plan prepared by the Consultant, checked and recommended by the District Engineering Office and approved by the Regional Office15mm from edge of the paper

Page 7: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex"A - 5"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

~ ~., .,a. a.0 0a. a.., .,:5 :5.•.. C.Y. <YEAR> PROJECT '0a.,

CONCEPTUAL DESIGN PLAN FOR.,

'" '""0 "0Q) Q)

E<NAME OF PROJECT> E0 0.j: .j:

E EE E0 ~,..,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE 10>

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN DIVISION

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT REGiONAl DIRECTOR

DATE

Conceptual Design Plan prepared and approved by the Regional Office

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Page 8: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the poper

IAnnex nA - 6"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

•.. •..., ••Q. Q.0 0Q. Q.., ••:S :5.•. C.Y. <YEAR> PROJECT '00., ••'" CONCEPTUAL DESIGN PLAN FOR '"." ."•• ••E <NAME OF PROJECT> E0 g.j:

E EE <SECTION> E0 ~,..,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>DATE

15mm from edge of the paper

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT REGIONAL DIRECTOR

DATE

Conceptual Design Plan prepared by the Consultant and approved by the Regional Office

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

Page 9: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex"A - 7"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

~ •..••Q. Q.0 0Q. Q.

t) ••:S :S'0 C.Y. <YEAR> PROJECT '0t)

CONCEPTUAL DESIGN PLAN FOR ••0> 0>-0 -0•• ••s <NAME OF PROJECT> Ea.l:: .l::E EE <SECTION> ~0,.,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

SUBMITTED: RECOMMENDED: APPROVED:

<SIGNATURE>

<NAME>CHIEF, PlANNING AND DESIGN DIVISION

DATE DATE

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

15mm from edge of the paperConceptual Design Plan prepared by the Regional Office, checked and approved at the Central Office

Page 10: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the poper

IAnnex"A - 8"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

•.. •..'" '"Q. Q.0 0Q. Q.

'" '":S :S'0 C.Y. <YEAR> PROJECT '0

'" CONCEPTUAL DESIGN PLAN FOR '"0> 0>"0 "0

'" ••E <NAME OF PROJECT> E0 0~ ol:E EE <SECTION> E0 ~I')

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

flATE

Conceptual Design Plan prepared by the Consultant, checked and recommended by the Regional Office and approved at the Central Office15mm from edge of the paper

Page 11: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex nA - 9"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

•.. •..'" '"0- 0-0 00- 0-

'" '":S :S'0 C.Y. <YEAR> PROJECT '0

'" CONCEPTUAL DESIGN PLAN FOR ••0> 0>'tl 'tl•• ••~ <NAME OF PROJECT> E

0.l:

E EE <SECTION> E0 ~'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER<UPMO CLUSTER>

~TE

RECOMMENDED:

<SIGNATURE>

<NAME>PROJECT DIRECTOR

<UPMO CLUSTER>~TE

<SIGNATURE>

<NAME>DIRECTOR N. BUREAU OF DESIGN

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

15mm from edge of the paperConceptual Design Plan prepared by UPMO, checked and approved at the Central Office

Page 12: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex "A -10" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

... ...., CD0. 0.0 00. 0.CD CD:5 :5.•. C.Y. <YEAR> PROJECT .•.0 0.,

CONCEPTUAL DESIGN PLAN FORCD

'" '""0 "0., .,E <NAME OF PROJECT> E0 0./:: ./::E E~ <SECTION> E'" ~

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE ID>

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>PROJECT DIRECTOR<UPMO CLUSTER>

DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

Conceptual Design Plan prepared by the Consultant, checked and recommended by UPMO and approved at the Central Office15mm from edge of the paper

Page 13: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

BUREAU OF DESIGNMANILA

IAnnex"A - 11" I

~ •..••Q. Q.0 0Q. Q.

•• .,:S :S'0 C.Y. <YEAR> PROJECT .•...

0.,CONCEPTUAL DESIGN PLAN FOR ••'" '""0 "0•• ••

E <NAME OF PROJECT> E~ 0

-=E EE <SECTION> .§0n

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, <CONCERNED DIVISION>

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FOR

TECHNICAL SERVICESDATE

15mm from edge of the paperConceptual Design Plan prepared by the Bureau of Design

Page 14: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

..C>0-o0-

C>:S.•.oC>

'""C>

E.gEE~

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTCONCEPTUAL DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

IAnnex "A -12" I

-TN!_O'T~ ~V. __ ifIOJ7TYOOh

MCJl' __ T_o.orA_I'U.l.YCOIIIll'CT.IJ'.'n').l)O\'f'(._

~~;-IU.~~"""TrTWIl1.\lSI!llllTSlII!lJON_ ••••• O~, ••• D~

..C>0-o0-Q)

:S'0Q)

'""Q)

E.gEE

If)

SUBMITTED:

<SIGNAlURE>

<NAME>CHIEF, PlANNING AND DESIGN SECTION

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT DISTRICT ENGINEER

DATE

APPROVED:

DATE

<SIGNAlURE>

<NAME>DISTRICT ENGINEER

15mm from edge of the poperConceptual Design Plan prepared and approved by the District Engineering Office (for Design and Build Projects)

Page 15: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

•...,Q.oQ..,:5(;

••0>"<l••EoJ::

E8'"

15mm from edge of the paper

IAnnex"A - 13" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTCONCEPTUAL DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

•...,Q.oQ..,:5(;.,0>

"<l.,Eo

J::

EEIII

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, PlANNING AND DESIGN SECTION

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Conceptual Design Plan prepared by the District Engineering Office and approved by the Regional Office (for Design and Build Projects)15mm from edge of the poper

Page 16: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

...,0-o0-.,:5(;.,ClI

".,

EEo...,

15mm from edge of the paper

IAnnex "A - 14" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

C.Y. <YEAR> PROJECTCONCEPTUAL DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

"-CD0-o0-

••:5.•..a••ClI

"CD

EaJ::

EEIf)

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN DIVISION

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT REGIONAL DIRECTOR

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

15mm from edge of th e paperConceptual Design Plan prepared and approved by the Regional Office (for Design and Build Projects)

Page 17: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

•..t>0-o0-t>:S•..ot>

'""t>

EEo,...,

15mm from edge of the paper

IAnnex"A - 15" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

C.Y. <YEAR> PROJECTCONCEPTUAL DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

•..t>0-o0-Q)

:S'0Q)

'""Q)

Eo.j:

EEIt'l

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN DIVISION

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

Conceptual Design Plan prepared by the Regional Office, checked and approved at the Central Office (for Design and Build Projects)15mm from edge of the paper

Page 18: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

....,0.o0..,:5.•..o.,'"..,"Eo~E

~

15mm from edge of the paper

IAnnex "A - 16"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

C.Y. <YEAR> PROJECTCONCEPTUAL DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

....,0.o0..,:5.•..o.,'"..,.,Eo~EEto

SUBMITTED:

<SIGNATURE>

RECOMMENDED:

<SIGNATURE> <SIGNATURE> <SIGNATURE>

APPROVED:

<SIGNATURE>

DATE

<NAME>PROJECT MANAGER<UPMO CLUSTER>

<NAME>PROJECT DIRECTOR

<UPMO CLUSTER>DATE

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

15mm from edge of the paperConceptual Design Plan prepared by UPMO, checked and approved at the Central Office (for Design and Build Projects)

Page 19: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

iQ.oQ.

'":5-a'"'"'iEo.l::EEo'"

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.> ~<DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

IAnnex"e _1"1

(SlyIe=ArlaI )

H=6.4Omm TeJrt He;;jIrt = 6.4Omm

(' Style = Arlal Bold )

H=9.00mm TeJrtHe;;jlrt=9.00mm

(Style-Ariel )

H=7.BOmm TeJrt~=1.1lOmm

(Style-Ariel )

H=6.4Omm TeJrtHeIght=6.4Omm

(StyIe=Aria/ )

H=6.4Omm TeJrtHelght=6.4Omm

(Style-Ariel )

H=6.4Omm TexI~=6.4Dmm

B (Style = Anal Bold )

H= .OOmm TeJrt He;;jIrt = 8.00mm

(Style = Arlal )

H=6.0Omm TeJrt HeIght = 6.00mm

•..'"Q.oQ.

'":5'0

'"'""'"

EEIt)

(Style-Aria! )I H=3.0mm TexlHeiglll=3.aomm

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, PlANNING AND DESIGN SECTION

DATE

(Style - Aria!Bold )

HK4.40mm TeJrtH.,;ght=4.4Omm

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT DISTRICT ENGINEER

DATE

(Style-Ariel )

HK3.00mm TeJrt~=3.00mm

APPROVED:

DATE

H-2.50mm

(Style = Aria! )

Text ~l = 2.5Omm

<SIGNATURE>

<NAME>DISTRICT ENGINEER

15mm from edge of the paperDetailed Engineering Design Plan prepared and approved by the District Engineering Office

Page 20: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

....,Q.oQ..,:5.•..o.,'"~EoJ::

EEo

I")

15mm from edge of the poper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE ID>

IAnnex"8 - 2"1

....,Q.oQ..,:5'0.,'""0.,EoJ::

EE10

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT DISTRICT ENGINEER

DATE

APPROVED:

DATE

<SIGNATURE>

<NAME>DISTRICT ENGINEER

15mm from edge of the paperDetailed Engineering Design Plan prepared by the Consultant and approved by the District Engineering Office

Page 21: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

~Q.oQ.

'":S(;

'"'"]Eo~EEo,..,

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

IAnnex "8 - 3"1

..'"Q.oQ..,:S(;

'"'""0

'"Eo~EE

10

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, PlANNING AND DESIGN SECTION

DAlE

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DAlE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DAlE

Detailed Engineering Design Plan prepared by the District Engineering Office and approved by the concerned Regional Office15mm from edge of the paper

Page 22: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

•.."C-oc-

":5(;

"01.""

EEg

15mm from edge of the paper

IAnnex -B - 4"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

1'H!'-"CCII\8U.TMTlIW.I.lIElfiIl'\U"~I'Of!ne..Tl'lUCI'UIIAI. OEnC''' ••1\_Of JHI! '_'~'(I,lII1'O~AU.'N__ ~-'»J)~1'QfJ-'rolllMl'

~_WltIIOU1'1'lcE~Ol'1'H!~T~---

•..Q)c-oc-Q)

:5.•..oQ)01."Q)

Eo.t:

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the District Engineering Office and approved by the concerned Regional Office15mm from edge of the paper

Page 23: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex "B - 5" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

~ ...'"Q. Q.

0 0Q. Q.

•• '":5 :5(; C.Y. <YEAR> PROJECT (;.,

DETAILED ENGINEERING DESIGN PLAN FOR '"0> 0>

" "., .,s <NAME OF PROJECT> E

0J:: J::

E EE <SECTION> E0 ~,..,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN DIVISION

DATE

15mm from edge of the paper

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT REGIONAl DIRECTOR

DATE

Detailed Engineering Design Plan prepared and approved by the Regional Office

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Page 24: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of th e paper

IAnnex "B - 6" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

~ •..••Q. Q.0 0Q. Q.

•• ••:S £;(; C.Y. <YEAR> PROJECT .•.

0Q)

DETAILED ENGINEERING DESIGN PLAN FORQ)co co"0 "0•• ••

~ <NAME OF PROJECT> E0.t:

E EE <SECTION> E0 ~'"<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

~--SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>DATE

15mm from edge of the paper

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT REGiONAl DIRECTOR

DATE

Detailed Engineering Design Plan prepared by the Consultant and approved by the Regional Office

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

Page 25: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex "8 - 7"I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

'- '-.,'"Q. Q.0 0Q. Q..,'":5 :5- C.Y. <YEAR> PROJECT -0 0.,

DETAILED ENGINEERING DESIGN PLAN FOR '"'" '""0 "0.,'"§ <NAME OF PROJECT> E0.::: .:::

E EE <SECTION> E0 ~'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH><ROAD SECTION / BRIDGE 10>

SUBMITTED: RECOMMENDED: APPROVED:

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN DIVISION

Ilo\TE Ilo\TE

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

<SIGNA TIJRE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

Ilo\TE

<SIGNA TIJRE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESIlo\TE

<SIGNATIJRE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

Ilo\TE

15mm from edge of the paperDetailed Engineering Design Plan prepared by the Regional Office and approved at the Central Office

Page 26: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex "B - 8" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

•.. •..•• ••0- 0-" "0- 0-•• ••:5 :5(; C.Y. <YEAR> PROJECT (;•• ••'" DETAILED ENGINEERING DESIGN PLAN FOR '"il "••~ <NAME OF PROJECT> E

0~E EE <SECTION> E0 ~'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>

RECOMMENDED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICES

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the Regional Office and approved at the Central Office15mm from edge of the poper

Page 27: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex "B - g"l

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>•.. •..., .,

Q. Q.0 0Q. Q.., .,:5 :5

"- C.Y. <YEAR> PROJECT "-0 0.,DETAILED ENGINEERING DESIGN PLAN FOR

.,.g- O>"0., .,

E <NAME OF PROJECT> E0 0.l: .l:E EE <SECTION> E0 ~..,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER<UPMO CLUSTER>

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>PROJECT DIRECTOR

<UPIJIO CLUSTER>DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

15mm from edge of the paperDetailed Engineering Design Plan prepared by the concemed UPMO Cluster and approved at the Central Office

Page 28: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex "B -10" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

~ ...Q.

Q)Q.

0 0Q. Q.

•• Q)

:5 :5'0 C.Y. <YEAR> PROJECT .....

0

•• DETAILED ENGINEERING DESIGN PLAN FORQ)

'" '""0 "0•• Q)

~ <NAME OF PROJECT> E0~

E EE <SECTION> J50,..,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSULTANT NAME>llo\TE

RECOMMENDED:

<SIGNATURE>

<NAME>PROJECT DIRECTOR

<UPMO CLUSTER>DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

llA.TE

Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the concerned UPMO Cluster and approved at the Central Office15mm from edge of the paper

Page 29: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

...'"a.oa.

'":5'0

'"'"'"'"

EEo'"

15mm from edge of the poper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

BUREAU OF DESIGNMANILA

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

IAnnex"B _11" I

...'"a.oa.

'":5'0

'"'"'"'"Eo>l=EJj

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, <CONCERNED DIVISION>

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAl SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

15mm from edge of the paperDetailed Engineering Design Plan prepared by the Bureau of Design

Page 30: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

•..••0-

"0-

••:5-o••'"ilEo

.j::

EEo...,

15mm from edge of the paper

IAnnex "B - 12" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

TIIIi_outD_Q~-".tolR~-.&_lIl£~QI'l..j[DCl_~~PC_~OFne:lI'1IIUCI\lIIe~CJfTrC~!ll.Cl't__ ncllOlII'rHEi~EtITJI't_

1Ml!Cl)fRM(:'IOIIl_l.HBJ)A.uY~FQlO'THE-..cntIW.~""1'tIll~·~CUE·IO---'J" ___ lI __ WEClD.1DdUCPl'l'llI'IlIEQttofOOU_1lfTM;lo.Irll'lE~0l' •••••QOII11IW:TOIt

•..••0-

"0-

••:5(;

••'"..,••Eo

.j::

EE10

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT DISTRICT ENGINEER

DATE

APPROVED:

DATE

<SIGNATURE>

<NAME>DISTRICT ENGINEER

Detailed Engineering Design Plan prepared by the Contractor and approved by the District Engineering Office (for Design and Build Projects)15mm from edge of the paper

Page 31: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

~Q.oQ..,:5(;.,'""0.,Eo

.l::EEo'"

15mm from edge of the poper

IAnnex "B -13" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE ID>

"'~1IlIi DIi __ -.o~lOll-'" ilIi IOUaY IIE-.& FOIllIE~TYIYT-EWAUD_t8IGIlI,...1t*

='::~~Of1>lli'"-""'CVAl.CWl

_COIlTlW;1Oll-..c • .-...ofI.UV~I'llIiTHE~ __DIi~~OI.' __ ~~OlL'JO"""'l"f~::::::.~..a:...~~FQfIMo....-e-

~Q.oQ..,:5(;.,'""0.,Eo.l::EE

10

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office15mm from edge of the paper

Page 32: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

....,a.oa..,:5'0.,'""0.,EoJ::

EEo,..,

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

IAnnex "8 - 14"1

....,a.oa..,:5'0.,'""0.,EoJ::

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT REGIONAL DIRECTOR

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Detailed Engineering Design Plan prepared by the Contractor and approved by the Regional Office (for Design and Build Projects)15mm from edge of the paper

Page 33: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

~Q.oQ..,:5.•..o.,0>"0.,

EEo...,

15mm from edge of the poper

IAnnex "B -15" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE ID>

....,Q.oQ..,:5.•..o.,0>"0.,Eo.l:EE

It)

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office (for Design and BuRd Projects)15mm from edge of the poper

Page 34: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

...OlQ.oQ.

Ol:5'0Ol

'"'0Ol

EoJ:EEo,.,

15mm from edge of the poper

IAnnex "B - 16"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

C.Y. <YEAR> PROJECTDETAILED ENGINEERING DESIGN PLAN (DESIGN AND BUILD) FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH><ROAD SECTION I BRIDGE ID>

___ -..t:OIimocfOlll~.9QI.R~_li_

lIIE~OFHEDETMlttI_CIiia:lN1MJlK~QFTHf-STllUC!'Ulll!IIlIIbI"!C:TfoQFT>E .N.M__ 1JJHIJr''I1tE~a<rtn'.

'IIlII'1X)ImMC'JOII_l.HBllF\,UY~oao'l1tElJTI'I.IC'TII __ -CT~QE_~DO.IElO"""lY_

~1l!DIIIOIt_lII"!CII'Dt_ucvrroA~O\O.NlIa~wrrtIOUrlMriCXWOlllr.YOF"JH!Cl.:IIfTM(:T(:l

~--

...OlQ.oQ.

••:5.•..oOl

'"'0••EoJ:EE

0{)

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>PROJECT DIRECTOR

<UPMO CLUSTER>DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

Detailed Engineering Design Plan prepared by the Contractor, checkBd and recommended by the concerned UPMO Cluster and approved at the Central Office (for Design and Build Projects)15mm from edge of the poper

Page 35: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

~"a-aa-

":5'0

"'""0'"EoJ::

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.> :=J<DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTliAS-STAKED" PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

IAnnex we _ 1"1

(style"- )H=6.4Omm TextHelght=6.4Omm

(style. _ Bold )

H=9.00mm TextHeIght-9.00mm

(style=- )H= 7.8Omm Text HeIght. 7.60mm

(style = Arial )

H=6.4Omm TextHelght'6.4Omm

(Style'- )

H=6.4Omm Text Heig/1I= 6.40mm

(style'Aria! )

H=6.4Omm Text HeIght = 6.40mm

(style- Ariel Bold )

H-8.00mm TextHeig/1l=6.00mm

(style=- )

H-6.00mm TextHelght-6.00mm

~a-aa-Q)

:5'0Q)

'""0Q)

EaJ::

EEIII

I H=3.0mm UZ:~~·3.00mm)

PREPARED: REVIEWEDANDSUBMITTED:

<SIGNATURE> <SIGNATURE>

<NAME> <NAME>PROJECTMANAGER CHIEF.<IMPLEMENTINGSECTION>

<CONTRACTORNAME>

(Style, Mol Bokl )

H=4.4Omm TextHeig/1l-4.4Omm

<SIGNATURE>

<NAME>CHIEF,PLANNINGANDDESIGNSECTION

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANTDISTRICTENGINEER

(SlyIe'MoI )

H=3.00mm Text Height. 3.00rnm

APPROVED:

<SIGNATURE>

<NAME>DISTRICTENGINEER

DATE DATE DATE DATE DATE H=2.5Omm

(Style Aria! )

Text Heigtw. 2.5Omm

"As-Staked" Plan prepared by the Contractor and approved by the District Engineering Office15mm from edge of the paper

Page 36: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex we _ 2"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>~ ~" ••0.0.000.0." ••:S:5'0 C.Y. <YEAR> PROJECT '0" ••Cll liAS-STAKED" PLAN FOR Cll" "" ••E

<NAME OF PROJECT> E00~ ~EEE

<SECTION> E~ ~

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>

REVIEWED AND SUBMITTED:

<SIGNATURE> <SIGNATURE>

<NAME> <NAME>CHIEF, <IMPLEMENTING SECTION> CHIEF, PlANNING AND DESIGN SECTION

RECOMMENDED:

<SIGNA~>

<NAME>DISTRICT ENGINEER

<SIGNATURE>

<NAME>ASSISTANT REGIONAL DIRECTOR

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE DATE DATE DATE DATE

·As-Staked" Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office15mm from edge of the paper

Page 37: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the poper

IAnnex we - 3"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>... ...., .,0-

0-000-0-., ••:S :S.•.. C.Y. <YEAR> PROJECT .•..00., ••'" liAS-STAKED" PLAN FOR '".., ..,., ••

E

<NAME OF PROJECT> E00~ ./::

E E

~ <SECTION> E~

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE 10>

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

REVIEWED AND SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, <IMPLEMENTING DIVISION>

DATE

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN DIVISION

DATE

RECOMMENDED:

<SIGNAnJRE>

<NAME>ASSISTANT REGIONAL DIRECTOR

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

ffAs-StakedffPlan prepared by the Contractor and approved by the Regional Office15mm from edge of the poper

Page 38: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the poper

IAnnex "C - 4"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

~ •...,Q. Q.0 0Q. Q.., ••:5 :5(; C.Y. <YEAR> PROJECT (;

'" "AS-STAKED" PLAN FOR ••'" '""0 "0., ••E <NAME OF PROJECT> E,g 0

J:E EE <SECTION> E0 ~'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

<SIGNATURE>

<NAME>CHIEF, <IMPLEMENTING DIVISION>

DATE

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

<SIGNATURE>

<NAME>UNOERSECRETARYFORTECHNICAL SERVICES

DATE

·As-Staked· Plan prepared by the Contractor, checked by the Regional Office and approved at the Central Office15mm from edge of the paper

Page 39: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex"C - 5"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

... ...•• ••Q. Q.<> <>Q. Q.

•• ••:5 :5'0 C.Y. <YEAR> PROJECT .•...

0

•• "AS-STAKED" PLAN FOR ••'" '"'" '0•• ••~ <NAME OF PROJECT> E

0~E EE <SECTION> E0 ~",

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

PREPARED: SUBMITTED: RECOMMENDED:

<SIGNATURE> <SIGNATURE> <SIGNATURE>

<NAME> <NAME> <NAME>PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR

<CONTRACTOR NAME> <UPMO CLUSTER> <UPMO CLUSTER>DAl1' DAl1' DAl1'

<SIGNATURE>

<NAME>DIRECTOR N, BUREAU OF DESIGN

DAl1'

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDAl1'

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DAl1'

"As-Staked" Plan prepared by the Contractor, checked by the concerned UPMO Cluster and approved at the Central Office15mm from edge of the paper

Page 40: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

...Q)C-oc-Q)

:5'0Q)0>'0Q)

EoJ::

EEo...,

15mm from edge of the poper

IAnnex "C - 6"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

C.Y. <YEAR> PROJECT"AS-STAKED" PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE 10>

...Q)c-oc-Q)

:5'0••0>..,Q)

EoJ::

EEIt)

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

REVIEWED AND SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSRUCTION SUPERVISION CONSULTANT>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>PROJECT DIRECTOR<UPMO CLUSTER>

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

'As-Staked" Plan for UPMO implemented projects with Construction Supervision Consultant. prepared by the Contractor, checked by the Consultant,15mm from edge of the poper checked and recommended by UPMO, and approved at the Central Office

Page 41: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

•....,0-o0-.,:5'0C>en~Eo~

15mm from edge of the paper

R=28.0mmR-25.0mm

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.> ~<DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTREVISED PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

IAnnex "0 - 1"1

(S\yIe.Aria! )

H-6.4Omm TextHeight=6.40mm

(S\yIe - ArialBold )

H-9.00mm TextHeight=9.00mm

(S\yIe = Artol )

H-7.8Omm Text Height= 7.8Omm

_ (S\yIe=Aria! )H-6.4Omm TextHeight=6.40mm

(S\yIe • Ariel )

H-6.4Omm TextHeight=6.40mm

(S\yIe = Ariel )

H-6.4Omm TextHeight=6.4Omm

(S\yIe = ArtelBold )

H-8.0Omm Text Height. 6.00mm

(Style - Arial )

H-6.0Omm Text~'6.00mm

•....,0-o0-.,:5'0.,en'0.,Eo~EEon

(S\jIIe=_ )I H=3.0mm TOldHe;ght-3.00mm

PREPARED: REVIEWEDANDSUBMITTED:

<SIGNATURE> <SIGNATURE>

<NAME> <NAME>PROJECTMANAGER CHIEF,<IMPLEMENTINGSECTION>

<CONTRACTORNAME>

(Style- Anol Bold )

H-4.40mm TextHeight-4.4Omm

<SIGNATURE>

<NAME>CHIEF,PLANNINGAND DESIGNSECTION

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANTDISTRICTENGINEER

(StyIe'Ariol )

H=3.00mm Text Height. 3.0Qmm

APPROVED:

<SIGNATURE>

<NAME>DISTRICTENGINEER

DATE DATE DATE DATE DATE H-2.5Omm

(Style Ariel )

Text Height:= 2.5Omm

Revised Plan prepared by the Contractor and approved by the District Engineering Office15mm from edge of the paper

Page 42: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

IAnnex RD - 2"1

... ...tl Q)0- 0-" "0- 0-tl Q)

:5 :5~ C.Y. <YEAR> PROJECT '0"tl Q)co REVISED PLAN FOR co.., ..,tl Q)

E<NAME OF PROJECT> E.g ".to

E E

~ <SECTION> E~

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

_1O''' •••'0I'_1lI ••• _1lU ~l -.cT1:lIIJO _

1'l:l_~Of __ ~HXJIWIQtA ___ ••n. "-"_Af"'"_, __ TI>IS_llU.loIO< ••••••• _....,rv ___ ~~lfS~ __

I H=3.Omm (=~1=3.00mm)PREPARED: REVIEWED AND SUBMITTED:

<SIGNATURE> <SIGNATURE>

<NAME> <NAME>PROJECT MANAGER CHIEF, <IMPlEMENTING SECTION>

<CONTRACTOR NAME>

(Style=ArlalBoid )

H=4.4Omm TextHeighI=4.4Omm

<SIGNATURE>

<NAME>CHIEF, PlANNING AND DESIGN SECTION

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT DISTRICT ENGINEER

(Style=ArlaI )

H=3.00mm Text Height = 3.QOnwn

APPROVED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DATE DATE DATE DATE DATE H=2.5Omm

(Style -Ariel )

Text Height. == 2.5Qmm

Revised Plan prepared by the Contractor, concurred by the Design Consultant and approved by the District Engineering Office15mm from edge of the paper

Page 43: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex "0 - 3"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>•.. •..I> .,0- 0-0 00- 0-I> .,:S :S.•. C.Y. <YEAR> PROJECT '00

I> .,0> REVISED PLAN FOR 0>"0 "0I> .,§ <NAME OF PROJECT> E

0J: J:E EE <SECTION> E0 ~'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

REVIEWED AND SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, <IMPLEMENTING SECTION>

DATE

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN SECTION

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DATE

<SIGNATURE>

<NAME>ASSISTANT REGIONAl DIRECTOR

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Revised Plan prepared by the Contractor. checked and recommended by the District Engineering Office and approved by the concerned Regional Office15mm from edge of the paper

Page 44: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>

IAnnex "0 - 4"1

L.

L.

.,Q)

0-

0-

0

00-

0-.,

Q):5

:5'0 C.Y. <YEAR> PROJECT'0

., .,0>

REVISED PLAN FOR 0>"0

"0

.,Q)E

<NAME OF PROJECT> Eg0J:EEE

<SECTION> Ea

~P')

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

"'-, 10".•••' •••__ ...,...,.·_000 .••. _gn••.••__ OOIIlIll.T"" •••• _~TOY __"O __ .•••• QI' __ OHla:._ ••••_- ..---_ ...~_A__ ._' ••••• •••.•.ICf__ ~_IiImrt'_-.. •••._OII'I!I-...r __

-,---PREPARED;

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

REVIEWED AND SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, <IMPLEMENTING SECTION>

DATE

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN SECTION

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DATE

<SIGNATURE>

<NAME>ASSISTANT REGIONAl DIRECTOR

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Page 45: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex "D - 5"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

•.. •.." CDa. a.Cl Cla. a.

" CD..,; ..,;(; C.Y. <YEAR> PROJECT (;

" CDCll REVISED PLAN FOR Cll~ "0••E

<NAME OF PROJECT> Ea a.l:: .j:

E E~ <SECTION> E'" ~

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE ID>

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DAlE

REVIEWED AND SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, <IMPLEMENTING DIVISION>

DAlE

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN DIVISION

DAlE

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT REGIONAL DIRECTOR

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DAlE

Revised Plan prepared by the Contractor and approved by the Regional Office15mm from edge of th e paper

Page 46: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex 80 - 6"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>.. ...,

CD0- 0-0 00- 0-.,

CD:5 :5.•. C.Y. <YEAR> PROJECT '00.,

CD

'" REVISED PLAN FOR '""'tl "'tl.,CD

E <NAME OF PROJECT> E0 0J: J:E EE <SECTION> E0 ~,...,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

.........,10" •.• ' ... 000. _DU••• __ ~r_..._-..c:ntJMTO""'"ro __ 11Q00I' lC(IOIl_lMl __ •• ,•• I'IODIlI::l'_~ _

_ ,__ T_IDlINoQ!;_~t«Jl __ ••••lHl!IIflIIY_

~l"'DIHIQB"'mr...-rrrr<l!ll_

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

REVIEWED AND SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, <IMPLEMENTING DIVISION>

DATE

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN DIVISION

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT REGIONAL DIRECTOR

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

Revised Plan prepared by the Contractor, concurred by the Design Conslultant and approved by the Regional Office15mm from edge of the paper

Page 47: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the poper

IAnnex "0 - 7"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

'- '-'".,

0. 0.0 00. 0.

'".,

:5 :5.•.. C.Y. <YEAR> PROJECT .•..0 0

'".,

'" REVISED PLAN FOR '""0 "0

'".,

E<NAME OF PROJECT> E0 0J:: J::

E EE <SECTION> E0 :!!'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE 10>

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DAn

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF, <IMPLEMENTING DIVISION>

RECOMMENDED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICES

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

Revised Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office15mm from edge of the poper

Page 48: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex no - 8"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

~ ~••Q. Q.a 0Q. Q.

•• ••:5 :5'0 C.Y. <YEAR> PROJECT '0•• ••0\ REVISED PLAN FOR 0\

" "•• ••~ <NAME OF PROJECT> E

0J=

E EE <SECTION> E0 ~I')

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

_'lO!TW'....- . •.••DlT ~1JolO1 ••.•• __ 1j)_.••• __ ""'*CIl' :lOflICE.N:CliIFOIIO. __a-_"' •.•_--..- __ ,__ ' •••__ llll,l._....- __ ~___ OF••• ..-"..1'ClII1VQl

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF. <IMPLEMENTING DIVISION>

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICES

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FOR

TECHNICAL SERVICESDATE

Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked and recommended by the Regional Office and approved at the Central Office15mm from edge of the paper

Page 49: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex no - g"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

~ ~Q) Q)Q. Q.

" "Q. Q.

Q) Q)

:5 :5(; C.Y. <YEAR> PROJECT (;Q)

REVISED PLAN FOR ••'" '"" "•• Q)

~ <NAME OF PROJECT> Ea~E EE <SECTION> ,g0'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

PREPARED: SUBMITTED; RECOMMENDED; APPROVED;

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE DATE

<SIGNATURE>

<NAME>PROJECT MANAGER<UPMO CLUSTER>

<SIGNATURE>

<NAME>PROJECT DIRECTOR

<UPMO CLUSTER>DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAl SERVICES

<SIGNATURE>

<NAME>UNDERSECRETARY FOR

TECHNICAL SERVICESDATE

Revised Plan prepared by the Contractor, checked and recommended by the concerned UPMO Cluster and approved at the Central Office15mm from edge of the paper

Page 50: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the poper

IAnnex "0 - 10" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

... ....,'"a. a.

" "a. a..,'":5 :5

'0 C.Y. <YEAR> PROJECT '0.,REVISED PLAN FOR

.,'" '"il ..,

'"E <NAME OF PROJECT> E" "./::: ./:::

E EE <SECTION> E0 ~,..,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

_fO ••.•••'''''~ __ r_''''' .•.__ '.•Dn ~T_-...c T()..,.,....'t(; __ TJOtIot> ••• __ ~ __c._ ..__ g~~ __ ---. ____ ' __ •••••.•• 111)1 •••••• __ """'"'-.._a._<lFItlu-.r. __

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER<UPMO CLUSTER>

RECOMMENDED:

<SIGNATURE>

<NAME>PROJECT DIRECTOR

<UPMO CLUSTER>DATE

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICES

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked and recommended by the concerned UPMO Cluster and approved at the Central Office15mm from edge of the poper

Page 51: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

~'"0-

"0-

'":S'0

'"'""0

'"~E.5'"

15mm from edge of the paper

IAnnex"O - 11" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

C.Y. <YEAR> PROJECTREVISED PLAN FOR

<NAME OF PROJECT><SECTION>

~'"0-

"0-

'":S'0

'"'""0

'"~EE

10

PREPARED: REVIEWED AND SUBMmED:

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

RECOMMENDED:

_TOI •.•••101'__ ~ __ Wl_JIlIl.THIDn CQoIU.T __ TIOlI TllYMr1'(> ~ •• r..wr___ c_.._~ ~__ fl._~,_1Wof""'_*L..:!l_'"",*"", __ T"~<ll''''~f<lfllllJ:k.

APPROVED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSRUCTION SUPERVISION CONSULTANT>DATE DATE

<SIGNATURE>

<NAME>PROJECT DIRECTOR<UPMO CLUSTER>

<SIGNATURE>

<NAME>DIRECTOR N, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

Revised Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by the Consultant,15mm from edge of the paper checked and recommended by UPMO, and approved at the Central Office

Page 52: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

~0-o0-

'":S'0

'"'""0'"~EEo'"

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.> ~<DISTRICT ENGINEERING OFFICE>

<ADDRESS>

C.Y. <YEAR> PROJECTliAS-BUILT" PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

IAnnex"E - 1"1

(Style- Arial )

H=6.4Omm TextHelgllt-6.4Onvn

(Style- ArialBold )

H=9.00mm Text HeIilhI- 9.00mm

(StyIe=ArlaI )

H= 7.8Omm Text HeIght = 7.llOmm

(StyIe-Arlai )

H=6.4Omm Text~-6.4Omm

(Style- Arial )

H=6.4Omm Text HelgIlt _ 6.4Onvn

(StyIe-Arlai )

H=6.4Omm Text.:i..ight _ 6.4Onvn

(Style- Arial Bold )

H=8.0Omm Text HeIght = 8.00mm

H 6 oOm (Style = Arial )=. m TextHeighl=6.00mm

"-II>0-o0-

Il>:S'0

'"'""0'"Eo~EEon

(Style-Arial )I H=J.Omm TextHeight-3.00mm

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

SUBMmED:

<SIGNATURE>

<NAME>CHIEF. <IMPLEMENTING SECTION>

DATE

(StyIe-AriatBold )

H=4.40mm TextHeight-4.4Omm

RECOMMENDED:

<SIGNATURE>

<NAME>ASSISTANT DISTRICT ENGINEER

DATE

(Style = Arial )

H-J.OOmm Text Height = 3.00mm

APPROVED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

DATE

H-2.50mm

(Style- Mol )

Text Hoight,=2.5Omm

15mm from edge of the paper"As-Built" Plan prepared by the Contractor and approved by the District Engineering Office

Page 53: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex"E - 2"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><DISTRICT ENGINEERING OFFICE>

<ADDRESS>•.. •..•• .,a. a.0 0a. a.•• .,:5 :5'0 C.Y. <YEAR> PROJECT '0•• .,'" "AS-BUlL T" PLAN FOR '""0 "0•• ••E <NAME OF PROJECT> E,g a

J::

E EE <SECTION> E0 ~'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE ID>

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

SUBMmED:

<SIGNATURE>

<NAME>CHIEF, <IMPLEMENTING SECTION>

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

<SIGNATURE>

<NAME>ASSISTANT REGIONAl DIRECTOR

DATE

APPROVED:

<SIGNATURE>

<NAME>REGIONAl DIRECTOR

"As-Built" Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office15mm from edge of the paper

Page 54: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex liE - 3-'

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

•... •...•• ••Q. Q.0 0Q. Q.

•• ••:5 :5.•. C.Y. <YEAR> PROJECT '00

•• ••'" "AS-BUILT" PLAN FOR '"II "••E

<NAME OF PROJECT> E0 0J:: J::E EE <SECTION> .R0...,

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>

<NAME> <NAME> <NAME> <NAME>PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION> ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

<CONTRACTOR NAME>DATE DATE DATE DATE

'As-Builr Plan prepared by the Contractor and approved by the Regional Office15mm from edge of the paper

Page 55: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex"E -4"1

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

ij ....,"- 0-0 0"- 0-., .,:5 :5'0 C.Y. <YEAR> PROJECT '0.,

"AS-BUlL T" PLAN FOR.,0> 0>'" '"., .,

E<NAME OF PROJECT> E.g .g

E EE <SECTION> E0 ~'"<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE 10>

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

SUBMITTED:

<SIGNATURE>

<NAME>CHIEF,<IMPlEMENTING DIVISION>

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

REGIONAl OPERATIONSDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FORREGIONAl OPERATIONS

DA.TE

"As-Built" Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office15mm from edge of the paper

Page 56: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

IAnnex "E - 5" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>~ ~., .,Q.

Q.0 0Q.Q.., ••.s .s.•... C.Y. <YEAR> PROJECT '00.,

"AS-BUILT" PLAN FOR.,'" '""0"0., .,

E

<NAME OF PROJECT> E0 g.t:E EE <SECTION> E0 ~'"

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

SUBMmED:

<SIGNATURE>

<NAME>PROJECT MANAGER<UPMO CLUSTER>

DATE

RECOMMENDED:

<SIGNATURE>

<NAME>PROJECT DIRECTOR<UPMO CLUSTER>

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

UPMO OPERATIONSDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FOR

UPMO OPERATIONSDATE

'As-Built' Plan prepared by the Contractor, checked and recommended by the concerned UPMO Cluster and approved at the Central Office15mm from edge of the poper

Page 57: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

~'"Q.oQ.

••:5'0••0>..,••E£EEo,..,

15mm from edge of the paper

IAnnex "E - 6" I

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

C.Y. <YEAR> PROJECT"AS-BUILT" PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION I BRIDGE ID>~'IO_&.4Of_"'lWllt!_~1IlIl28Mm __ •••..,..OFIVl.tl •• TJII1~~<XIN9Ul.TAIll'_lllE.llEM'(NlIIL.EFOR~11CNAM)OfECMOIO(JI'~_a.wmBOIFWCHl~frt_~"'_""'~fVMI,-"""'~ __ OF....•.

~••Q.oQ.

••:5'0••0>..,••Eo

ol=

PREPARED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>DATE

REVIEWED AND SUBMITTED:

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONSTRUCTION SUPERVISION CONSULTANT>DATE

RECOMMENDED:

<SIGNATURE>

<NAME>PROJECT DIRECTOR<UPMO CLUSTER>

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

UPMO OPERATIONSDATE

APPROVED:

<SIGNATURE>

<NAME>UNDERSECRETARY FOR

UPMO OPERATIONS

"As-Builf' Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by the Consultant,15mm from edge of the paper checked and recommended by UPMO, and approved at the Central Office

Page 58: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm romegeo e poper

I Annex"F - 1" I

FftO.ECfNAUE"NI:llClCllT1Olt $o!fEfCONTENT5: "..,.,." ~"'STOIlESDtCONCf.PT· ....,.,.,. -- -., ,.".. ....,..,.•--~-~DliPA~ OF PU8UCWORKS AND .-.wAYS ~r> @e-"""' •...<DISTRICT~ OFFICE> PflIEPAED: <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>.......... > ~RI CItEF.Pt.ANHlNGoI.NDCElIGNSECTtON """'ANTDIS1llICT~ WiTIl:ll;TINIJIE£H- ~~ .~

99.00 74.00 74.00 60.00 52.00 I 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00~.,

Conceptual Design Plan prepared and approved by the District Engineering OfficeQ.0Q..,0.,'" -, PROJl!CTN.WE.IlNDtOOlo~ """''''''''''''' R£W!W£OAS TOORlQtI ~ - -.,. "''''' •.....,.., <LOGOIS> •--~~---.<SIGNA'lllli,W ••••UE> DEPAR11IEVr OF PUIIUC WORKS AND HlGtMAY8

@eE -"""' •...0 - <DISTRICTENGINEERINGOfACE> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>

<CONSUL TANTIS> <SIGNA-",~E> ......... QlIl!F.f'lANoIlNGNoDDEIlIGNsecnow ASSISTAN'l"llISrRlC1~eR OBTRICTI~

E ~n ~n

E 58.00 I 58.00 I 74.00 I 74.00 99.00 52.00 52.00 52.00 17.00 17.00

L549.00

Conceptual Design Plan prepared by the Consultant and approved by the District Engineering Office

fIM).leCT~ANDLOCA'Jk»t """'- """""'" -, ...-.0, -- """""" "''''' ....,..,.• _~_"LP'~09AR1'IIeNT Of PU8UC WORIUJAND HIOtfW'AVS

@e.......•. """' •...<OIST1llCTENGINEERINGOFFICE> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>- aftt,I'I..MoNNO»IDDEa:lIlI!IECTION ~.PL,OlIIlNllOIGAMlCUll;lNOIIlllIOIC DIlITR1CTEffClMEER REGIOIIII\i.I»lECTlJR~~ ~~ ~~ ~~ ~~

95.00 60.00 80.00 52.00 52.00 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00

Conceptual Design Plan prepared by the District Engineering Office and approved by the Regional Office

-, PROlECT~.t.HDLOCAT1ON· """- .- RtVIEWEDASTODESl3HCONCePT: -- """""". "''''' ....,..,.<LOGOIS>

<SIGNA~R NAUE>

@e""'""'" ~=-==::=~Y1<SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME><CONSUL TANTIS>

<SlG~~E><OlSTRCT~OfFICE> CHEF.~NU»ID~8I:t;11UoI cttI'.~ANDIJESIONIMIKN Dlll:iTI(1CI~1III ReQCJlW.LWlELTOH-

55.00 I 58.00 I 71.50 I 11.50 I 53.00 I 52.00 I 52.00 52.00 52.00 17.00 17:00

549.00

Conceptual Design Plan prepared by the Consultant, checked and recommended by the District Engineering Office and approved by the Regional Office

L- 15mm from ed e of the Q er9 P P

f thd15

o'"

Page 59: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm romegeo e paper

I Annex"F - 2" I

PAOJE<lTNAJ.EANDl.OCA1Pf: '-';ET~NTS:""""" - ...."., . .....- - "'''' ,"",NO.•--~---DeP~ OF PU8UC WOIUCS AND HIGHWAYS ~1lWE> @8<REGIOl'W.OfFICENo.> _ .

<SIGNATURE OVER NAME> <SIGNAlURE OVER NAME> <SIGNA lURE OVER NAME. <SIGNA lURE OVER NAME.....•....... cteEF,~1JelIOtt8ECTlClN> CHEF. P\NNItG AIG DE8QtI C1'JI8IOH MlAlrM1R!:~~ REGION\l.lllREC1tIR> ~~ ~~ - ~~

99.00 74.00 I 74.00 I 60.00 52.00 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00

'-.,Conceptual Design Plan prepared and approved by the Regional OfficeQ.

0Q..,0.,'" _.

PROJECT,IjAtM;.AltDLOCAl1l:*, """"""""" e I\fNlE.'Wa) M TO DEaDf CONCEPT; -- - "'''' '"""NO.<lOOOlS>

E <SIGNA~NAUE>

@80 ~~"::-===~d"",,",D <SIGNAlURE OVER NAME. <SIGNATURE OVER NAME. <SIGNATURE OVER NAME. <SlGNATtRE OVER NAME>

E <CONSUL TANTIS> •••••••• ,~UE><AEOICW.LOFACEltI> QtI~f,~UIJelllO"~ OIEl',I'Vo-..GANDUESllJIICl/1IICN AIIIllST....,.~~'t.-. R~DflECTOI'I.........

EI I I I I I I I I 17.00 I 17.0055.00 56.00 71.50 71.50 53.00 52.00 52.00 52.00 52.00

L 549.00

Conceptual Design Plan prepared by the Consultant and approved by the Regional Office

PJIOJECTIoIAUEANDLOC'AnoN: '""""""""'" PREPARED; """"'"_. _.

"'''' '""'NO.•-~~--DEPARTIIENT OF PUBLIC WORKS AND HIlJHWAYS -'WNAME'

(SEE COVER SHEET) (SEE CCNER SHEET) (SEE COVER SHEET)

@8<REGIOl'W.OFFCENo>"""'"'" <SIGNATURE OVER NAME> <SlGNAlURE OVER NAME> <NAME> <NAME> <NAME>.......,. IIEOIONI\LDIR£ClOfI ~ORr\I>IIIJREAllIJl"CIl:.lIU\l ~~RR \IMlUI5HA1I:lMYKM>

M~ """""~- ~~ M~ M~ - ""'""'-----95.00 52.50 52.50 55.00 52.00 52.00 52.00 52.00 52.00 17.00 17.00

549.00

Conceptual Design Plan prepared by the Regional Office, checked and approved at the Central Office

PREPARED: PROJECTNAMEAHOt.OCATtON: ...•.- e ,- RIMIiWEl)ASlOOESlGN~; """"'""'" •...... "'''' ,"""NO.<tOGOIS>

(SEE COVER SHEET) (SEE COVER SHEET) (SEE C<NER SHEET)

@8REf'\,A1LI::OI'nE~..-mo. ••••.•~Ol'....-uc'llflDltaMD~ <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>~OR'MtDPtlBiIIGlt All5I$T~r .•tn'FOfl ~~ ...<CONSUlTANTfS> > -.•.••.... DIItI',~ANlDElICiINcv.-.. 1HEF.~DESlGNOI\/I!IION> REGIIOIW.DI*:CTlJR..- ....•....... ....•.•.~...... ""'""'-......,.. ....-...""'"

50.00 I 50.00 I 45.00 I 45.00 I 53.00 I 45.33 I 45.33 I 45.33 I 45.33 I 45.33 45.34 I 17.00 I 17.00

549.00

Conceptual Design Plan prepared by the Consultant, checked and recommended by the Regional Office and approved at the Central Office

L- 15mm from ed e of the o er9 P P

f thd15

oI')

:5

Page 60: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r-- mm romegeo e poper

I Annex"F - 3" I

PROJ£CTNAMENIlJLl'JCfIJ1QN: SliE1:TCCWTENf$: _0 ""....., ............., - "'''' '-NO.•~~--~~DeP~ OF PUBUCWORKI AND HICIHWA'R <.~~ •••••••• (SEE COYER SHEET) (SEE COVER stEET) (SEE COVER SHEET)

@e<\JPMOCLUSTER> --- <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>"""'"""" ctEf'.~~DIVJ8lON>o I'IlWeUfDIRECTCR ~ANlSECRElN'rr~ I.NlERSECRETARVFOR.. "'"E''''''''''''''' .....,a.us_ m>HCN.•••••••• """ •.... """"'"

95.00 I 52.50 I 52.50 I 55.00 52.00 52.00 52.00 52.00 52.00 17.00 17.00

549.00....,

Conceptual Design Plan prepared by UPMO, checked and approved at the Central Officea.0Q..,0.,co., .•."""" PftOJECTIWoIE1MOLOCATlON: """- tit """"'" ~AS'JODI!SlGNOONCI!PT; ,,~ I-- "'''' '-NO.

<LOOOlS>E (SEE COVER stEEl) (SEE COVER SHEET) (SEE CCNER SHEET)

@ee IllY'I..eI..J::OFTHE~

"""""",. ~-o.."""'::_AND""'" <SIGNATURE OVER NAME> c$IGNATURE OVER NAME> <SIGNATURE OVER NAME> -<~,.~"""" MISIT~.ynf'lJR ~.Q",~E <CONSULTANTlS> ....,""""'" F'I'Itl.ECTUOIWIGl'R atlEF.~==~ "::~""""""""

1».11!'~SERV1:E8 Illt.TF ~8ElMC1!S

EI I I50.00 50.00 45.00 45.00 53.00 45.33 45.33 45.33 45.33 45.33 45.34 17.00 17.00

L 549.00

Conceptual Design Plan prepared by the Consultant, checked and recommended by UPMO and approved at the Central Office

PRO.E'CTNAMEf1H)lOCA11l:iN: 8HEETCONTENTS:_.

"""""" ..-me -- - "'''' ....,NO.•-~-~DEP~ Of PUBLK: WORKS ANO HIGHWAYS ~~r'E> (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

@eBUREAU OF DeSIGN<CONCERr.ED1lMSION> """"" <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>

~AO::) DlWE. PORT AAEA,1oWIIlA

~r.g>ctIEF.~~~ ~ ••••,~!Jf~ l\&IIIGA""RCllliTNn'l'l;R ~IMI'fOR~~ ~~ ~~-........ - """""' ........

99.00 74.00 74.00 60.00 52.00 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00

Conceptual Design Plan prepared by the Bureau of Design

.......... , PROJECTNJ.UEH«)L0C4TICtI' '""'''''''''''' ..-... -- _.""'" .-NO

<LOoolS> •~~~--<SlGNA~NAUE> DEPARTIIeNT OF PUllUCWORKS AND HIGHWAY'S

@e4lEBIOroW.OFfJCEIfD.>....."'" <lllS111ICTE~NG OFfiCE> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME><CONT~TORJS> <SIG"H,WW'UE>

GttEF.~INBIUA)a:wJM-';IJ;JN A551iT_IDli!I'lI'\,.'~ER [ETJU;TII~

56.00 I 56.00 I 74.00 I 74.00 I 99.00 I 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00

Conceptual Design Plan prepared by the Contractor and approved by the District Engineering Office(for Design and Build Projects)

L- 15mm from edge of the poper

f thd15

o'"

Page 61: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r-- mm om e ge 0 e poper

I Annex"F - 4" I

........, ~IUMEAMDl.OCo\11ON: """""""'"' e ""'""'" """"""'" - "''''' ....".,.<LOGO/S>

<SIGN.\~R ••••••.•

@e-- ~~~~~" <SIGNAlURE OVER NAME> <SIGNAlURE OVER NAME> <SIGNAlURE OVER NAME> <SIGNATURE OVER NAME><CONTRACTOR/S> .umrr:TlNOtlE~OFf'lC£> Q'W',f'l.AllrNHGNlDDESIiIJj~ CI'E'.I'lJ\NIIlNJAlllPDIlSlGN~ DlJflnCI~ IlE(lIONN..~CfDIII- - --

66.00 I 66.00 71.50 I 11.50 I 53.00 52.00 52.00 52.00 52.00 I 17.00 I 17.00

549.00

a;Co Conceptual Design Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office0Co

(for Design and Build Projects).,0.,01., _ .

I'RQlI!CT!<lI\loEANDL.ClC.'TION IllEETCONl'E!NT&: tit ........, -- """""" "''''' ......".,.<LOGOIS>

E <SIGNA~V NAU&

@ee P:I!!PUIUC0l' 1'HE PHIJ'PWE$

"""'"'" p..un-.n OF..-.: •••• AoNO••••• <SIGNAlURE OVER NAME> <SIGNA lURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>E <CONTRACTORIS> -"""" •... Ct'IEF,~IUGDESilt8l1ClJCN g; •••.•~AJrIC~tN'MCIN A8EJ1T~I'E(lII[JfW.~IUH ~DIIECfO'l

~~M'" - -- - --EI I I I 17.00 I 17.0055.00 66.00 71.50 11.50 53.00 52.00 52.00 52.00 52.00

L 549.00

Conceptual Design Plan prepared by the Contractor and approved by the Regional Office(for Design and Build Projects)

.."""",. !'ROJ£CTNoWE~l..OCATION ...•..- tit CHECKED: ~ """""""',"""'- "''''' ...•.. '"

<I.OGOIS>< > (SEE COVER SHEET) (SEE COVER SHEET) (SEE CCNER SHEET)

@e~ICOFntEl'HU'I'IfE$.-mo, Of !"talC Wl:IllCIAMJ •••••• <SIGNATURE OVER NAME> <SIGNATURE OVER NAME,. <SIGNA~~:QfINAME>I)MU;rOl'l~CWDa8ON .....,.~~~""f'OW ~?R,,,,,,<CONTRACT~

< > -"""' •... [;t1U',P\.ANIIINOo\JDDEllIGNIW&:lN QoIEF.~DE!lKlNDNlI!ION>- - - ............... """""'''''''''''' TEt't/NOri, SE!WCES

50.00 50.00 45.00 I 45.00 I 53.00 I 45.33 I 45.33 I 45.33 I 45.33 45.33 45.34 17.00 17.00

549.00

Conceptual Design Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office(for Design and Build Projects)

.."""'" PROJIECT*ME1III£JlOCA~' ....,- e '''''''''" ..,.",. .""""""'" ~ "''''' ....,"'.<lOGOl5>(SEE COVER SHEET) (SEE COV'ER SHEET)(SEE COVER StEEn

@e""","",' _~~~Y""'A <SIGNATURE OVER NAME> <SIGNATURE OYER NAME:> <SIGNATURE OVER NAME>~1l1R"'OI'lJliSQN Mi8IIJT~.un'RM ~r...~<CO~ORIS> """ ........ PROJECTIMfIIWEH Oftf.~UI.1ll!:IIQN~ ,,=1~......... - ""~ 8lJflIEMIlN'DBlIlliN """"'" ....••. """"""' ..""""

50.00 50.00 45.00 45.00 53.00 I 45.33 I 45.33 I 45.33 I 45.33 I 45.33 45.34 17.00 17.00

549.00

Conceptual Design Plan prepared by the Contractor, checked and recommended by the concerned UPMO Cluster and approved at the Central Office(for Design and Build Projects)

L- 15mm from edge of the paper

f thdfr15

oI')

Page 62: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm om e ge 0 e poper

I Annex"G - 1" I

PAClJECTNAMEAIC)lOCll'OON: !lHEETCONl1::NTS, """"', ....•..... ......"", """""""" -, ""'" """'NO.•~~--~DEPAwn.NTOF PU8UC WORKS AND HIGHWAYS ~~> @e~omcr'*"~<OISTRICTENGIEERING OffICE> """""",, <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>- T > ENQIoIS:RI ctlEF.f'LAN4IN1jAMJIJI35IliN8EClIJN ASWJTANTOI5l1l:lCT~ER DBTRICT INOWEBl~~

99.00 I 74.00 I 74.00 I 60.00 I 52.00 I 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00~•• Detailed Engineering Design Plan prepared and approved by the District Engineering OfficeQ.

"Q.

0

-- f'ftOdECTNo\I.E.NelOCA'f1ON: liN!ETCONl'Bf'J$: ~ .. --..n, """""'" ""'" ....,NO.<LOGOIS> •~~---<SIGNA.T~NA"& DePARl1IIeNT Of PUBUCWOItK8 AND HIGHWAYS

@e«EGll)W.OFFICENov

"*""" <llISTFIlCTENGtlEERlNGOffICE> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <StGNA.TURE OVER NAME><CONSUl. TNolTIS> .......... ~F, f'1.JI.II'QoKiNolOmBl3Wl£ClION AmIIITNfTIlETRlCTEMl»EER CII!I-m!l:TENQIlt£I;.I(-

56.00 I 5ll.00 I 74.00 I 74.00 I 99.00 I 52.00 I 52.00 52.00 I 17.00 I 17.00

L 549.00

Detailed Engineering Design Plan prepared by the Consultant and approved by the District Engineering Office

PROJECTNAUEANO~1IOIot """""""'" PR:EPAREO; ......"", ...-., -- ""A'M'" ""'" ••••• NO.•~~-~DEPARTIIENT OF PUBLIC WORKS AND HIGHWAYS

@e..•••...."""'"<llIS1RICTENGIEERlNG OfFICE> <StGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>.......... ~Il ctIU'.Pl.AfNNlJNmDE8lJlN~ CMEf",~AND_UIIIlIalIf DllinllCf~ 1tOIOtW.~"'UIf

95.00 60.00 60.00 52.00 52.00 52.00 52.00 52.00 17.00 17.00

549.00

Detailed Engineering Design Plan prepared by the District Engineering Office and approved by the concerned Regional Office

-, PItOIECT 'WEAHO LOCUDl 8HEE1'CONl'ENT8: e ........" ..........,.."""""'" "" .. ••••• NO.

<LOGO1$><SIGNA~NAUE>

AI!PIJl!lLlCOl'ntE~ @e"""'""" liIP.unwsn::.-:O::'AIlO ••••••. Yl <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME><CONSUl TANTIS> <S""'~UE> <f:lI8'I"RI:'Tt~OfFlCE' CHI&, PlJUrHNa AND DEIlIiIN liI:CllCtI OEF.Pl.AlNNGAND~1M8JN DllJJRICTENGNEER REGK»W.OR;:[;T(JR-~ .......••. ~~ ~~ ~~ ~~

55.00 55.00 71.50 71.50 53.00 52.00 52.00 I 52.00 52.00 17.00 17.00

549.00

Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the District Engineering Office and approved by the concerned Regional Office

L-- 15mm from ed e of the o er9 P P

f thdfr15

EoJ::EEoI')

••:S

••'"..,••

Page 63: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm romegeo e poper

I Annex "G - 2" I

PROJECTIWEN«ltOCATDt: !lHi:ETCOIfI1!:IITS: 0•• ",,, ........., ..wm;o· -- - ""'" ,"""NO.•--~--DePARTIII!!NT Of PUBLIC WORKS AND HIOIIWAYI ~1Ir> @e<REGIOIW.OFFICENo.> _.<SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>- CMEF,~DDEBQNlJECT1CNl> CHIEI',P\ANNlHQANOCIB:JN~ AS5l8T1WTflBJKltW.ClRECTOlt REGIlltW-DlRECTOft<SIGNA~NAME>

99.00 I 74.00 I 74.00 60.00 52.00 52.00 52.00 52.00 17.00 17.00

549.00~"0- Detailed Engineering Design Plan prepared and approved by the Regional Office00-

"0

"0>

"_.

PAQlEC'tNAAiENflJ!,.OCATJCItI: Sl£ETCONY~ It - -- _. .•"'" ....".,.<tOOO/S>

E <SIGNA~~RNAME>

@e0 ~~~..:::=-~ <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNA 1\JRE OVER NAME> <SIGNATURE OVER NAME>

E <CONSUL TANTIS><SIG",~&

<AEGDW.CJI'RCE ~. ~,PI.NHIfONlDDEtIlQN&a:11ON CIOI1f,R.ANMI«lANDOOSlQIII~ ABlnTNfT~~I~ REI;llOIoIf<L.Dll'ECTOR- ~~ ~~ ~~ ~=E55.00 56.00 71.SO 71.50 53.00 52.00 52.00 52.00 52.00 I 17.00 I 17.00

L 549.00

Detailed Engineering Design Plan prepared by the Consultant and approved by the Regional Office

PAOJECTNAMElMllOCAl1ON: IlI£eTCCNTENrS: ...•.....••. """"'" ...,"""""'" """""'" "''''' ....,"'.•-~~--DePART'IIeNT OF PUBLIC WORKS AND HIGIHWAY1I <"""""WNAME> (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

@e<REGlOtW. OFFK:E No,> SUlIIo!lTTI!o: <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>-. CHEF.cCONCI!RNEDOEaQN~ 1lEGDrW.~0P: DIIleCTORIV.~Cf'~ ASSIBTMfl'I;IB;IIETNfI'f'afI UNDERSECAETARY' fOlIl> BlJAEAUOFOEEN ~~ ~~ ~~ ""'"""""""'" ~~ """""' ...."""95.00 52.SO 52.50 55.00 52.00 52.00 52.00 52.00 52.00 17.00 17.00

549.00

Detailed Engineering Design Plan prepared by the Regional Office and approved at the Central Office

"'''''''''' "'AOJECTPWoCEAt«>LOC#\TlON" '""""'"""'" It CHEC*ED:"""""" ..""""""" ~ "''''' '"""'"<lOGO/S>

< > (SEE COVER St£ET) (SEE COVER SHEET) (SEE COlER SHEET)

@e"""""". lO'.,.....,~...::c~.•...•<SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <StGNATURE OVER NAME::-UI'II:~'Qlf1SOt"DIliIIlGIt """~~"'" ~m.."",<CON~TIS> < > ~OFflCENlIo.~ cttEI',~NWJ_DII'&:JN QtEf, <OONCaMW DUIQN IWIlICN> ~~CllJll'l

"""""'" ~ ........,~"""" ~w ~~-""""'" I~= """""".....,..SO.OO SO.OO 45.00 45.00 53.00 45.33 45.33 45.33 45.33 45.33 46.34 17.00 17.00

549.00

Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the Regional Office and approved at theCentral Office

L- 1 mm from ed e 09 f the paper

f thd15

5

o'"

"

Page 64: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r-- mm romegeo e paper

I Annex"G - 3" I

PIlOSECT/IlAWi:~lOQ\ltON: &£ET CCNTEKTS: ..•....• .......", - -, "' ... -StlERNO.•~~---DePARTlImn' OF PUBLIC WORKS AND tDfWAYI <81GNA:MIM hWoIE" (SEE COVER SHEET) (SEE Co.tER SHEET) (SEE COVER SHEET)

@8<UPMOClUSTER> """'"'"' <SIGNATURE OVER NAME> <SIGNA lURE OVER NAME> <NAME> <NAME> <NAME>........... PftOJECTDIlECroR ~Q'I"'.alRe'AUDFDe8IUN .-.sl!II5TANTIIECIl:ETNn'FCil \NJIiRlll:CftlTARY ~OR> ~, I!UREAUOFDESIGN ~~ ....""""", ~~ ~~ -.......,.. ""'"''''''''''''''''

95.00 I 52.50 52.SO I 55.00 I 52.00 I 52.00 I 52.00 I 52.00 I 52.00 I 11.00 I 11.00

549.00~"0. Detailed Engineering Design Plan prepared by the concerned UPMO Cluster and approved at the Central Office"0.

"0

"'"" ....•....•• "fk>JECT,.,.ANOlOCATlON ....,"""""" It CHfCllED: """"'" ..- •..•... "' ... ....,•..<1..00015>

E (SEE COVER StEEl) (SEE COVER SHEET) (SEE COlER SHEET)

@8e """"",,, ~~..:.;e.:::=~ <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>

E <CONSUlTANTIS:> ..••.""""" I'ftO.E:CTw.NJI.GDl a.IEF·.~.....-..c:n..EDDE:IAOH~ ~~ ~~0I"0B;lIQI\I ~~RM ~=.......... ~~ ....•...~......E

I I I I I I I I I I I 11.00 I 11.0050.00 SO.OO 45.00 45.00 53.00 45.33 45.33 45.33 45.33 45.33 45.34

L 549.00

Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the concerned UPMO Cluster and approved at the Central Office

PROJECT NAUENCI LDCATDt 8tEElCONTEHT'S' PflEl'AAED: - """""'" - _. "' ... ........•~~---DEPARTMENT OF PUBUC WORKS AND tlQlfWAYS ~~> (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

@8BUREAU Of DESIGN<CONCERt.EDIlIVISIOO> """"". <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>

~AClODfWE. PORTJJlEA,IWaA~~>

CIfioF.~uoeBlONlll'tI16IIJJP ~IUMIV,~UI'~ _l_'~'AIn'~~ ~:::.c":"""""~ ..•.. Mn -""""" Mn

99.00 14.00 14.00 60.00 52.00 52.00 52.00 52.00 11.00 11.00

549.00

Detailed Engineering Design Plan prepared by the Bureau of Design

I'\IlEPARED: l'ftOJECt,....t.EANDlOCATION: StEeT COh"TEHJS:_ .

""""""'" - "' ... ....."'.<lOGOlS> •~~--<SIGNA~NAUE> DEPARllIENT Of PUBUC WORK8 AND HIGHWAYS

@84tEQlCHIJ.OFfJC£No.>

•••••mo <DIS1RICTENGINEERINGOFFICE> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNA TlRE OVER NAME><CONTRACTOR/&- <SIG~UE> ..••..•••. CIIEl',f'LAN'INOANDDlCtiKiNIif;CIIJN ~lNfTDI5IR1C1ENQlN15eR OIITRICllNGHllII:~~ - ~n

56.00 58.00 14.00 14.00 99.00 52.00 52.00 52.00 11.00 11.00

549.00

Detailed Engineering Design Plan prepared by the Contractor and approved by the District Engineering Office(for Design and Build Projects)

L- 15mm from ed e of the er9 pop

f thd15

:5

o,..,

Page 65: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm romegeo e paper

I Annex"G - 4" I

_ .I'llO..IECTJ<lAWNfDlOCATlON· ......- e ......... --. """""", '"''''' ".""0.

<LOOOIS>-~WOWlE>

@8- ~"::'=:=--T1 <SIGNAlURE OVER NAME> <SIGNA lURE OVER NAME> <SIGNA lURE OVER NAME> <SIGNATURE OVER NAME>---•..<CONTRACTORIS> <S~E> ~lNON!afNGOf'f1C£>o cnIt".~NfDCtiR;;JrltM:l1DN OIif.I'\AIIIIlNGANDIlIi8iftDVllACN lJRITKICTENGIIEER REGIONN.lMECTDR- .••..••.. .-55.00 I 66.00 71.50 71.50 53.00 52.00 I 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00

•...,Q. Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office0Q.

(for Design and Build Projects).,0.,'"., ........", Pl'lOJECTIVIMENfDlOCo\T1ON SHEeTCONTaITS: e .•..•..•. - """""'" "''''' ....,.•.

<LOGOIS>E <SJGHA~W NAME>

@8e - ~"':":~ __ Yl <SlGNAruRE OVER NAME> <SIGNAlURE OVER NAME> <SlGNAlURE OVER NAME> <SIGNATURE OVER NAME>

E <CONTRACTORIs> cIl£GiICN,O,I. OFRCE "v O4I>F,,,,,,,*-NmDE8lQNSECTICN Ctl£F,Pl.ANNNIlAM:IIl£SlOltDVl8:lN A881T~~~~ ~~.••..••.. --EI I I 17.00 I 17.0055.00 66.00 71.50 71.50 53.00 52.00 52.00 52.00 52.00

L 549.00

Detailed Engineering Design Plan prepared by the Contractor and approved by the Regional Office(for Design and Build Projects)

_ .PRO.lECTJWE/>MIJl.OCATlQN ...,""""'" e """"'" ....-. - """"'" "''''' ....,"'.

<LooOlS>(SEE COVER StEET) (SEE COVER SHEET) (SEE co.tER SHEET)

@8-, l!I'MT1&t~~~.-.m <SIGNATURE OVER NAME> <SIG~TURE OIER NAME> ~~~NAME>~crOR~ClfOEBIOfI """li!l&•••.",,,, ~"'"<CONTRACTORIS> _"""'No> CHEF.~_~D\I"" CHEF,~Doe!l1GHOMlIION>.••..••.. -- ••••_ ~Of'DSlIIlilN """'"" ......... """"""' ..""'"

50.00 I 50.00 I 45.00 I 45.00 I 53.00 45.33 45.33 45.33 45.33 45.33 45.34 I 17.00 I 17.00

549.00

Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office(for Design and Build Projects)

PREPAAEO ; PROJeCT NI\ME AI«) lOCATION ....,- It "'''''''' .........""""""'" """"'" "''''' ....,NO.

<LOGOIS>(SEE COVER St£ETJ (SEE COVER SHEET) (SEE COVERSHEET)

@8- ~~~..::::~. <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>~CIUR'B;Of"LJaIlGJf Aa!IIn'~"'"POIt ~<CONT~ORfS> > ",,",CWSlOR> PRWfCTM/roIW3£A OEI'.~DE:IIUN~ PfiQJ~clIllJa<l,;UJR "'".••..••.. - ~UOf'DEIiIllN

Mm .....,""""" """'"" ......... reCtltllQtlL_R\/ICeSi

50.00 I 50.00 I 45.00 45.00 I 53.00 45.33 45.33 45.33 45.33 45.33 45.34 I 17.00 I 17.00

549.00

Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the concemed UPMO Cluster and approved at the Central Office(for Design and Build Projects)

Luuu .... 15mm from edge of the paper

f thd15

:5

o'"

Page 66: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm romegeo e paper

I Annex"H _1" I

........... PlK)JECTNAMEANOlOCAT1ON ......""""'" e '"""'" ......, - """"""",. - ••• on BHEl'TNO,

<LOOO/S>

<SIGNATURE OVER NAME> ~~~'='""",,,\'l <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNAllRE OVER NAME> @8.cCONTRACTQRIS> """""' ......•.. ---,., I'flCIJE:T9IIJNER ~,4IP'I.DIIiNlINQss;naM>- QIlil'.PI.AJONiAMJCESIl,OI\I~"JUll A861SToWTDII51Rl!;l£MJIEI:II' DIBTRlCTfNGN:tJIGlRl:T EHONERtfGOOU;>-- m~

50.00 50.00 51.00 I 51.00 63.00 52.00 52.00 52.00 52.00 52.00 17.00 17.00

549.00

"-II)Q. "As-Staked" Plan prepared by the Contractor and approved by the District Engineering Office"Q.

II)

0II)0>II) - PflOJECTJWilI!foNOLOCl\.T1c.t SlEET CONfEHT$: e _. - - - ••• on .-r...

<LOoolS>E <51~~

@8e <SIGNATURE OVER NAME> ~~~..::::s .•.••YI ~[): <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAUE> <SIGNA TIRE OVER NAME><CONTRACTClR./S> """""' .....••• ---,., t»ftI',~MDDEllIt;WDM&ION DRiTFlfCTB«lIEER A&IlnANTRliGlONl'.l.~ REGICNIIII.~CTlJRE <IlO1RlCI'......-.o""'"

E """"",. m~ m~ m~ m~

50.00 50.00 50.00 50.00 63.00 54.00 52.00 52.00 52.00 52.00 17.00 17.00

L 549.00

"As-Staked" Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office

........... PROJECTNAMENI:lLC\CATlON' ..••.."""""" e - ......., - """""""" - ••• on ..••.....<LOoolS>

<SIGNA lURE OVER NAME> lI9A~~~~'l'1 <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNAllRE OVER NAME> @8<CONTRACTORIS> F'ftOJlft;TIMNAQSt ~OFACf:No.~ PRO.IfCTeNC»E£JI O'a,".--"-lrjfNi~l __ ~tIla'.~NrlDUl:3lGJllIt:(;llDN .v.llIlf'NofllC1:U1UM11t.~l~ IIRi1IDNI\LDII£CTIlK- -- .~ M~ m~

50.00 50.00 51.00 51.00 I 63.00 52.00 52.00 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00

"As-Staked" Plan prepared by the Contractor and approved by the Regional Office

..•.""" I>ROJECTNMlEN«)l.OCATlOtit ..••.."""""" e """"", """"'" - •....... ""on .-r...<LOOOIS>

~~ME> (SEE COVER StEEl) (SEE COVER SHEET) (SEE CCN'ER SHEET)

@8<SIGNATURE OVER NAME> lEI'.urr:....~~~_'l'1 """""", <SIGNA.TURE OVER NAME> <SIGNATURE OVER WJ.tE>OIIlB;TOR'MbOl'DalIGJII AIlIIIT~oIJ«RJR ~"'"<CONTRACTORIS> """""' .....••• _OFFICE ••••

>DWEf',<:oNCElINEDDESICIN~ ~~ECTali...•..... ••.•••••0"••'•• """""'''''''''"' """"""' .......

50.00 50.00 I 45.00 I 45.00 63.00 I 45.33 I 45.33 45.33 I 45.33 45.33 45.34 17.00 17.00

549.00

"As-Staked" Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office

L- 15mm from ed e of the " er9 P P

f thd15

oI"l

Page 67: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm om e ge 0 e paper

I Annex "H - 2" I

.........,. l>ltOJfCT~I>WJI.ocATlON ...,"""""" tit -, ......... ............, 1-<-<- "'''' ...,NO.<LOOOIS>

~_r' (SEE COVER StEEl) (SEE COVER SHEET) (SEE COlfER SHEET)

@e<SlGW,TURE OVER NAME> ~~~..::::s.......,........• , <$IGMI\TURE OVER NAME> <SIGNATURE OIlER NAME>~~OfDEBOlf l\AIIT~oUffKlll ~ ..""<~ORJS> """""- .....,""""'" ~&.IfME> t:HI:f. <alNCERNED DElIIUN DWBCN> I'I'l:O.£t;lUltct:f,;I~

M~ - M.......,•..•.... .....,""""'" ." """"""""""'" fl!ctMO\L 8f:lMCflS

50.00 50.00 I 45.00 I 45.00 I 53.00 45.33 I 45.33 45.33 I 45.33 45.33 J 46.34 17.00 17.00

549.00

~Q.

"As-Staked" Plan prepared by the Contractor, checked by the concerned UPMO Cluster and approved at the Central Office0Q.

Q)

aQ)coQ) ..••..•... ~AN08U8IofTTED: e 0'''''''' """"'" -- """",", ,",",He.<LOGOIS> <LOGOIS>E

(SEE COVER SHEET) •••• COlIER 8HE£T) (SEE CO'v'ER SHEET) e~<S~n.tRE OVERNAME> <StGNA.llJRE OVER NAME> -.-.-" ~~~.:::aMllilHWAYI <SfGNAruRE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAJ.tE>. <NAY,> -> ...•"".E <~~ """""'- <CONSUl TANT/S> l'lflO.IECT"""'OER ....,"""""

DIlT!' 1lUREAlJ00OE&lGfrol .....,a ..•..•.." ...•••.•. .~ 1M" .~ M"-""""'" _.'""""'"EJ J J I J J L40.00 44.00 40.00 44.00 47.00 63.00 44.00 44.00 44.00 44.00 44.00 44.00 17.00

L 549.00

HAs-Staked"Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by theConsultant, checked and recommended by UPMO, and approved at the Central Office

L- 15mm from ed e of the a er9 P P

:S

oI')

15 fr d f th

Page 68: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r-- mm romegeo e poper

I Annex "1- 1· I

...•......•. Pfk).JfCTNIIUE'IlNDLOCATlOf.I ~"""""'" tit ".,.,.., --- ...-.. -- - "ro •• •••m'o,<l000lS>

<SIGNATURE OVER NAME> ~~~~" <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> @e<CONTRACTOIlJS> """'"'- ......"....-.. ...... PROJIECTENGIN!EII CIWF.~SIiC1tDN>' CItIlII'f'l,NNNGI'Hl~HC11CN ASIlI5TANTml>I1QI;Ta«ON;lOR Dliffll!;T~- - _.~= M= M= ~= ~=

50.00 50.00 51.00 51.00 53,00 52.00 52.00 52.00 I 52.00 I 52.00 I 17.00 I 17,00

549.00~"c. Revised Plan prepared by the Contractor and approved by the District Engineering Office0c.

"0

"0>PftS'Il."l!D; PROJECTNo'lMEHlDl.OCAllON: eHl!ETOONTENI"a: tit CHrQCED: ......., - -......... -, "'oo. ~"',

<LOGo.'S>E @ee <SIGNATURE OVER NAME> ~~~ ...." <SIGNATURE OVER NAME> <SlGNA1\JRE OVER NAME> <SIGNA 1\JRE OVER NAME> <SIGNA 1\JRE OVER NAME> <SIGNATURE OVER NAME>

E <CONTRACTORIS> """'"'''''''''''' ..",.,,- ...... """""- Cttti',<IIIII"t£Il9mN~ CHl:f,~J\M)DElifQHIIIOC11ON ••••• TI\HT~P«JIEER llImU::TINQ~- - ....•..•.. ~= M= ~= ~= ~=EI I I I 17,00 I 17,0050.00 50.00 51,00 51,00 53.00 52.00 52.00 52.00 52.00 52.00

L 549.00

Revised Plan prepared by the Contractor, concurred by the Design Consultant and approved by the District Engineering Office

...•......•. ~JW.lI;/<MOLOCAT\OfrI; S><HT"""","" tit '''''''''' """""" """"""'" -, "ro •• ~"',<l000lS>

.........:,,~OFll<E1'tU'HE$<SI~_'lt""'" @e<SIGNATURE OVER NAME> OI'I'l.IaI:WQMSANI) ••••••. - <SlGNA1\JRE OVER NAME> <SIGNA 1\JRE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>

<CONTRACTORIS> PROJECT w.HN3ER ..•...•.•.••- Ctfit",I'lAJININli'NrlD~1lMSlON IJI5IItK;T~ MiIRI1NlT~~IUK Rt.liIUtW.llMt.~'lJK<DlOlRlCT_ ••••••....•..•..50.00 I 50.00 I 50.00 I 50.00 I 53.00 I 54.00 I 52.00 I 52,00 I 52.00 I 52.00 I 17.00 I 17,00

549.00

Revised Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office

"IlOJtCTNMlEANOl.ClCATlON' ~"""""'" It ""'-, ...•.... -, .....-.. _ . ",oo. ~ •..<LOOOIS>

<SIGNATURE OVER NAME> •• ~~"':":~N8ttIlA'l1 <SIGNATURE OVER NAME> <SIGNA1\JRE OVER NAME> <SIGNATURE OVER NAME> <SlGNA1\JRE OVER NAME> <SIGNATURE OVER NAME> @e<CONTRACTORIS> PROJECTIAANAGSl<IlBlIJlrW.OFFlCEItiI.•.

PROJECTENONBI ~. <IlIII"LeIIENT samtlN> ctIEf·~MDDalGN5ECJIIJN tllimlCTENlJIrIi:ER IlEOICltW.IlMECTOFl~ EJrQ&IlNGOf'f'P.>- ....•..•..50.00 50.00 51,00 51,00 53.00 52.00 I 52.00 52.00 52.00 52.00 17.00 17.00

549.00

Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked by the District Engineering Office and approved by the concerned Regional Office

L- 15mm from ed e 01 the a er9 P P

1 thd15

o'"

:5

Page 69: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm ro g 0 e p p r

I Annex "I - 2" I

PJIOJECTNAMEANOtoCATlt:»l MOT"""""" e """,",. ......., _ . _. .......... ",on ....,'"<LOllOIS>

<SIGNATURE OVER NAME> p.....n..n.~..:uc~ESloI&lMAn <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> @e<CONl1lACTORIS> PAO.eCTMANAGER ••••••••• 0fftCE••• I'ftO,JfCTENONDl CH&, •••• PIJiMEHl'JrIGDMlIfl,1N> ~.P\AMDlGN&lI*IIiilt~ ASIISTANTf£QOfrW.DlftEII;fCR REGIOIW..DllECTCIt- - ......... - --50.00 I 50.00 I 51.00 I 51.00 I 53.00 52.00 52.00 52.00 52.00 52.00 I 17.00 I 17.00

549.00~'" Revised Plan prepared by the Contractor and approved by the Regional Officea."Q.

'"0

'"'"" PIIOPARED', I'IlOJECTNoIIMEN-IDtoCATlflIlI: 8H!ETCONT1!NfS: e """"'" ......., ...- - - ""on ...,'"<LOllOIS>E

@e2 <SIGNATURE OVER NAME> ~~~~HllJ"'Yl <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>E <CONTRACTORIS> "',,,,,,,"',, ...•.. <flEGOW.QFfICENo.> "'"""',.- ~,~CWIIiICN> cteF.f'I.}I,~NfDtJUIGIIlatYIBICN ASBIITANTflUlIDIW..llI'CCJ'CR REOIClIMl.DlRECTlJIiI-- M_ M_ -- --E

I I I I I 17.00 I 17.0050.00 50.00 51.00 51.00 53.00 52.00 52.00 52.00 52.00 52.00

L 549JlO

Revised Plan prepared by the Contractor, concurred by the Design Consultant and approved by the Regional Office

•..•..- PROJECTNlIIMEAHOLCJO:ATtCItI: SHEETCON1ENTS: e O£m>, ........ ,."""""""" -- "'''' ••• ro".

<l0ll0lS>~~> (SEE COVER stEET] (SEE COYER SHEET) (SEE COolER SHEET)

@e<SIGNATURE OVER NAME> *"","-,~~...;::::s_YlSIJlIIjf'f1'B): <SIGNATURE OVER NAME> ~IGNATURE OVER NAME>llIft!CTOR~ut"CI:BUI'I A861S'~"H'f'OIIiI ~"'"<CONTRACTORIS> PAOJECT~ """""""""' •.. >

CNl!F..••••••••••.•••""'uDl<_~ 1'ftQ.I;C'~IUl'l- .......... ................ M_ """'" """"'" 1_- """"""', ..,,""50.00 50.00 45.00 I 45.00 I 53.00 I 45.33 I 45.33 45.33 45.33 45.33 45.34 17.00 17.00

549.00

Revised Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office

f'RfPAR!D; PlIO.ECT NME NolOLOCATION' ...,- It O£m>, -- """"""'" ~ "'''' ...,.•..<l0ll0lS>

~~ME> (SEE COVER StEET) (SEE COVER SHEET) (SEE. C<>JER SHEET)

@e<SIGNATURE OVER NAME> ~~...:;e...;::::s.••.•Kr. """""", <SIGNATURE CM:R NAME:o- <SIGNA~~NAME>~MtCftlB!llClN ASIlISTSR'rM«R;lIIl ~rfR,"",<CQNTRACTORIS> PMO.ECT UANAQER _0fftCE •••

>CHIEF,<OONCB'lNEDDl!i1llVH1JIVBDt,P.••.•..... na." 8I.IlENJOFOE6IElN -- ..- TI!CHNCAlBeIi'llk:a; TECtfMlOl,L llElMa!8

50.00 50.00 45.00 45.00 53.00 45.33 I 45.33 I 45.33 I 45.33 I 45.33 I 45.34 I 17.00 I 17.00

549.00

Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked and recommended by the Regional Office and approved at the Central Office

L-- 1 f m f the o er

:5

"

o'"

15 f m ed e f th 0 e

5mm ro edge 0 p p

Page 70: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r-- mm romegeo e poper

I Annex "I - 3" I

........." PAOJttTNMII;ANDLOCAnOt.l; ....,.- tit """",,, ...•.••""""'""'" ........ "'''' ....,."',

<toOOIS>••••••••• /f'ME> (SEE COVER St£ET) (SEE COVER SHEET) (SEE COVER SHEET)

@e<SIGNATURE OVER NAME> ~~~.::::slQlllAn....""" <SIG~TURE CNERNAME> <SIGNA~~ NAME>~crtlR~OFDB!IGN ASSST~Mn'FOR ~FOM<CONTRACTORIS> Pl'IO.ET~ .-J""",,,," ctIEF.~Dl:IllQNDMIIlCN>- ~ .......... )0 nt.TI' 1II.JAP,lJ0f'0ESIlilN

~D ~ ~D ••••••••• """"'" •••..••• lECtIIflOI\l.SlIMCEB

50.00 50.00 45.00 45.00 53.00 I 45.33 45.33 45.33 45.33 I 45.33 I 45.34 I 17.00 I 17.00

549.00~0. Revised Plan prepared by the Contractor, checked and recommended by the concerned UPMO Cluster and approved at the Central Office0.

0

-- PItOJECTtMME/VVlOCATIOH, stEETCQN'lENT8; tit ","""", -, """"""'" .......", ""'" ..•.."'.<LOGOIS>

~~ME> (SEE COVER SfoEET) (SEE COVER SHEET) (SEE COlfER SHEET)

@e<SIGNATURE OVER NAME> ~~~.::::s .••••." ..•...... <SIGNATURE CNER NAME> <SIGNATURE OVER NM4E>~t:TUR~OFDS5ION ASI!AST~"-R'(RlR ~~~<CONTRACTORJS> l'ftOJECTMANAOER .-J""",,,," CHEJ',~DElIICNl:WII9lON> ",:,::,;r:~ ....",..... ••••.••• 8IJIIIElWOFDEI8IQM ~ ~D ~D """""" •••••••• """""' ..""'"

50.00 I 50.00 45.00 45.00 I 53.00 I 45.33 I 45.33 I 45.33 I 45.33 I 45.33 I 45.34 I 17.00 I 17.00

L 549.00

Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked and recommended by the concerned UPMO Cluster and approved at the Central Office

......""" FEVEW'EiD AND Sl.IIllr..-JTEO , tit D£a<m """'""" ~ """""" ..•..""<LOGOIS> <tooo/s>

_ COlIERllI<EE'T) (SEE COlIER SHEET) (SEE COVER SHEET) e<S~TURE OVERNAUE•. <SIGHA. lURE OVER NAME>i ~t;t;T CONTENT;

lII'~":":~~ttlIIMA <SIGNATURE OVER NAME> <SIGNA. T\JRE OYER IIWl£> <SIGNA TIJRE OIlER NM,4E> ~.~> ~>~> ~ •• ~><CONTRACTQRIS> PROJeCT~ <CONSU~ANT'S> FftOJECTw.tWER ....., CWS1ER> ~" -....•...... """"' .."""" ~UI'WIOCl.USTl!fl.> -""'''''''''''' """""""""'"

40.00 I 44.00 I 40.00 I 44.00 I 47.00 I 53.00 I 44.00 I 44.00 I 44.00 I 44.00 I 44.00 44.00 I 17.00

549.00

Revised Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by theConsultant, checked and recommended by UPMO, and approved at the Central Office

L- 15mm from ed e of the o er9 P P

.,o.,:5

.,'""0.,EoJ:EEo'"

15 d f th

Page 71: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm romegeo e paper

I Annex"J _1" I

..•.....•• PI'tOJECT"""""NIOI.OC:II"TIClN 9HEElc:otm:NTS: e """"'" - ~. """""" """" ....,...<LOGOIS>

<SIGNATURE OVER NAME> ~,.,=:::;e::e.:::::a••••Yl <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> @8<CONTRACTOR/$> """""- ---- PAOJECTENON£R CI'W.~11ICil5lCl'lJNl> AS9IITAN1Ol3"TR1CTE~ DIlITR£TiNOlllHIt<tllS'I1lCTlOlOIEEANloma;:~.- MW ......... MW Mtt Mtt Mtt

55.00 52.00 73.50 73.50 53.00 52.00 52.00 I 52.00 52.00 17.00 17.00

549.00~••Q. "As-Built" Plan prepared by the Contractor and approved by the District Engineering Office0Q.

••0

••'" -- PllOJEC'TfrWoIE,\N01..OCA1'lOH; ....,.~ It ""' •..... -- - """"",,, """" ....,..•.<LOOOIS>

E @8e <SIGNATURE OVER NAME> ~:~""Yl <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>

E <CONTRACTORIS> """"" ......••• <OOTRICTENGf&IlItGOFR::E" I'RlJECTENl3INEER D'IEF.~JJNG8ECQl.lN> """"" ...••.•. ASSlBTANTfIE(lIOIoW.~lUJ( REQIDtW..~crgf- ..•..•.•. .~ - ~~E

I I I I I I I I I 17.00 I 17.0050.00 50.00 51.00 51.00 53.00 52.00 52.00 52.00 52.00 52.00

L 549.00

"As-Built" Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concernedRegional Office

.....•.• PRO.ECl' NAUE /\NO U)(;A:11ON """- It '""""'" - """"""'" """""" "''''' ....,00.<LOGOIS>

<SlGNA.TURE OVER NAME> ~~~.:::::a~", <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> @8<C~~ORIS> PRO.ECT wtWJEft """"""""',." PftWECTellill'El<fl cttI:F_~'N:lIll'lBlON" A5S151Hf1lt1:U1ONN,l;IIHH;llJW IIEQIJNN.[Mt.CHJH.........Mtt Mtt

55.00 52.00 73.50 73.50 53.00 52.00 52.00 52.00 52.00 17.00 17.00

549.00

"As-Built" Plan prepared by the Contractor and approved by the Regional Office

"""""'. PROJECTNlilMEANOI.OCATIOJ.l" ••••",a."•••• It ""' ..... -- ....,.,.,..,." """"",,, "''''' ....,""<LOGOIS>(SEE COVER $toIEET) (SEE COVER SHEET)

@8<SIGNATURE OVER NAME> lJEI'AlmIEIff~...:1~ttelflIrA'fl <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME><CONTRACTORIS:> """""- """""'''''''',." """"" ...•.... ctIl&',.cIMPLEIENllNOlJtIBCN> R£GllCltW.DIlECT'QR A8lI8TNIT~TNn'I'I;JfI ~_ ••••.•• FOR..•..•.•. RE~0fI£M1'IClNIlI -"""'''''''

50.00 I SO.OO I 51.00 I 51.00 I 53.00 I 52.00 I 52.00 I 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00

'As-Bui"" Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office

L- 15mm from edge of the paper

f thd15

o'"

Page 72: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

r- mm romegeo e paper

I Annex"J - 2" I

--- PllO.§CTNMlf:ANDI.OCATICItol SHliETCONTEHB: e ........ ..-..,. ~ -, ",on """'NO.<LOOOIS>(SEE COVER SHEET) (SEE COVER SHEET)

@e<SIGNATURE OVER NAME> ~~...:..c~ .....•"tl <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME><CONTRACTORJS> -..a_ .....,•.••.... """"" ...•.... ~T __

PIKlJI!CTt8II:CTCIt A8lIIlITIMT a:ao:l,1oftY RlR ~I"""'FOR- - ......... ~n ~n ~n ......,""""" - ,,"">C•••••.•••• ~~ ....••..•."""50.00 50.00 51.00 51.00 53.00 52.00 52.00 52.00 I 52.00 I 52.00 I 17.00 I 17.00

549.00...I>a. "As-Builf' Plan prepared by the Contractor, checked by the concerned UPMO Cluster and approved at the Central Office0a.I>

0

I>

'"I> ....,.•... 1E\lElNs) NIOaIIWCJTI!D: fit """'" ........ ..........." -'" ",on """''''.<LOOOIS> <LOGOIS.E (sa: COVER SHEET) (E£ rovER SHEET)

@ee <StGNAnJRE OVER NAME' <SaGNAruRE OVER NALfE>,~ lIIlWmIENr~~.:;:::s""A <StGNATURE OVER NAME> <SIGNA.11JRE OVER NAME> <SlGNt.TURE OVER NAME> ...•"". ...•"" .

E <CONTRACTORIS> l'ROJECTWoWlI38'I <CONSUlTANT/$> -..a_ .....,cws_- ~n ~n .......... ~n ~~ ~n ....,""""'" non: VPMO OPERAlION$ lAIOOPEMTJ:Ml

EI I I I I I I 17.00 I 17.0040.00 44.00 40.00 44.00 74.00 53.00 44.00 44.00 44.00 44.00 44.00

L 549.00

"As-Built" Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by theConsultant, checked ~nd recommended by UPMO, and approved at the Central Office

L- 15mm from ed e of the a er9 P P

o...,

15 d f th

Page 73: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

FOR CONCEPTUAL PLAN FOR DESIGN AND BUILD PROJECTS

NOTE:

THE ABOVE DATA ARE FOR REFERENCE ONLY. THE PROCURING ENTITY DOES NOTGUARANTEE THAT THESE DATA ARE FULLY CORRECT, UP-Te-DATE, AND APPLICABLETO THE PROJECT AT HAND. THE CONTRACTOR IS RESPONSIBLE FOR THE ACCURACYAND APPLICABILITY OF ALL DATA, INCLUDING THE ABOVE, THAT IT WILL USE IN ITSDESIGN \ ~UILD PROPOSAL AND SERVICES.

L-------\--------~-~----~-------__J-USE 1.25 mm FONT SIZE

r

IAnnex "K - 1"1

Page 74: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

IAnnex "K - 2"1

LIABILITY WAIVERTO BE SIGNED BY THE DESIGN

CONSUL TANT/S FOR DETAILED ENGINEERINGDESIGN PLANS

NOTE: fI

THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THESTRUCTURAL DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TOFAULTY AND/OR INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THECHANGES MAD WITHOUT THE CONFORMITY OF THE CONSULTANTS.

PURSUANT TO ITEM 5 OF ANNEX 'A' OF THE REVISED IMPLEMENTING RULESAND REGULATION OF RA. 9184, THE APPROVAL BY THE AUTHORIZEDGOVERNMENT OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGNSUNDERTAKEN BY CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OFTHE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND DESIGNSNOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVINGOFFICIALS.

iI

I

rJ

~OO~ I------------------------------1USE 1.25 mm FONT SIZE

ele~gi~!I~

PROJECT MANAGER<Consultantls>

I

I~-------

Page 75: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

IAnnex "K - 3"1

LIABILITY WAIVER FORDETAILED ENGINEERING DESIGN PLAN PREPARED

BY DESIGN AND BUILD CONTRACTOR

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURALDEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/ORINADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADEWITHOUT THE CONFORMITY OF THE CONTRACTOR.

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FORTHE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THEPERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL ORCONFIRMATION BY THE PROCURING ENTITY.

PROJECT MANAGER<Contractor/s>\

\ ~~ I-------------------~-----_1'--- USE 1.25 mm FONT SIZE

I

~

Page 76: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

LIABILITY WAIVERTO BE SIGNED BY THE CONSTRUCTION SUPERVISION

CONSUL TANT/SFOR "AS-STAKED" AND "AS-BUILT" PLANS

NOTE:

PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULESAND REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISIONCONSULTANT SHALL BE RESPONSIBLE FOR VERIFICATION AND CHECKINGOF QUANTITIES AND QUALITIES OF WORK ACCOMPLISHED BY THECONTRACTOR AS AGAINST THE APPROVED PLANS, SPECIFICATIONS ANDPROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLYRESPONSIBI,.E FOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TOPOOR QUALITY OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOREXCEPT FOR THOSE FAILURE DUE TO FAULTY DESIGN AS PER APPROVEDDETAILED ENGINEERING DESIGN PLAN. THE APPROVAL BY THE AUTHORIZEDGOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR "AS-BUILT" PLANSUNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION CONSULTANTNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THETECHNICAL INTEGRITY OF THE SAID PLANS NOR TRANSFER ANY PART OFTHAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

IAnnex "K - 4"1

PROJECT MANAGER<Consultanl/s>

1--~OO~ I-------~~~--~--------.~~_._._--~---I

USE 1.25 mm FONT SIZE

Page 77: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

LIABILITY WAIVER FORREVISED PLANS CONCURRED BY OED CONSULTANTS

NOTE:

PURSUANT TO ITEM 7 OF DPWH DEPARTMENT ORDER NO. 50. SERIES 2002. THEDETAILED ENGINEERING DESIGN CONSULTANT ISSUE THIS NON-OBJECTION TO VARYTO THE RECOMMENDATION OF THE IMPLEMENTING OFFICE. INCORPORATING MAJORCHANGES IN THE ORIGINAL DESIGN DURING THE PROJECT IMPLEMENTATIONPROVIDED. HOWEVER. THAT THIS ISSUANCE WILL NOT RELIEVE THE ENTITY WHICHDESIGNED THF CHANGES OF ITS RESPONSIBILITY FOR SUCH.

CONCURRED BY:

PROJECT MANAGER<OED Consullantls>

75.00mm

USE 1.25mmFONTS/ZE

;-rII

I~I81~I

IAnnex UK - 5"'

Page 78: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

LIABILITY WAIVER FORREVISED PLANS CONCURRED BY OED CONSULTANTS WITH

CONSTRUCTION SUPERVISION CONSULTANTS

IAnnex "K - 6" I

PURSUANT TO ITEM 7 OF DPWH DEPARTMENT ORDER NO. SO, SERIES 2002, THEDETAILED ENGINEERING DESIGN CONSULTANT ISSUE THIS NON-oBJECTION TO VARYTO THE RECOMMENDATION OF THE CONSTRUCTION SUPERVISION CONSULTANT,INCORPORATING MAJOR CHANGES IN THE ORIGINAL DESIGN DURING THE PROJECTIMPLEMENTATION PROVIDED. HOWEVER, THAT THIS ISSUANCE WILL NOT RELIEVETHE ENTITY WHICH DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH.

NOTE:

CONCURRED BY:

PROJECT MANAGER<OED Consullantls>

L \ 75.00mm----~--\-----~---_.USE 1.25 mm FONT SIZE

TIIIIIl~

eleigi~IIIir

IIr

I

i-J--------------1

Page 79: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

R=28.0mmR=25.Omm

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.> ~<DISTRICT ENGINEERING OFFICE>

<ADDRESS>

. For al/ plans approved by the District Engineering Office

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<REGIONAL OFFICE No.><ADDRESS>

For all plans approved by the Regional Office

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

<UPMO CLUSTER><ADDRESS>

For all plans approved by UPMO

IAnnex"L -1" I

(Style = AliaI )

H=6.4Omm Text HeIgI1t. 6.4llmm

(Style = Arlal Bclld )

H=9.00mm Text HeigIlt. 9.00mm

(Style - Arlal )

H=7.8Omm Text~'7.8lImm

(Style - Arlal )

H=6.4Omm TextHeigllt.6.4Omm

(Style. Arlal )

H-6.4Omm TextHeIght=6.4Omm

(StyIe.ArlaIBclld )

H-9.00mm TeortHelght.9.00mm

(SIyIe=AliaI )

H=7.8Omm TextHelght=7.8Omm

(SIyIe-AliaI )

H-6.4Omm TextHeIght.6.4Omm

(StyIe-AliaI )

H-6.4Omm Text H.,;ght = 6.4llmm

(StyIe=AliaIBclld )

H=9.0Omm Text HeigIlt = 9.00mm

(Style, Arlal )

H=7.8Omm TextHeight=7.BOmm

(Style. AliaI )

H=6.4Omm Text HeIght. 6.4Omm

Page 80: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

BUREAU OF DESIGNMANILA

For all plans approved by the Bureau of Design

C.Y. <YEAR> PROJECTREVISED PLAN FOR

<NAME OF PROJECT><SECTION>

<LOCATION>

<STATION LIMITS>

<NET LENGTH>

<ROAD SECTION / BRIDGE ID>For all plans implemented and approved by DPWH

IAnnex "L - 2" I

(styIo>ArIaI )

H=6.4Omm Text HeIght> 6.4Omm

(Style - ArIaI Bold )

H=9.00mm Text~'9.00nvn

(Style - Ariel )

H=7.8Omm Text.=r.8Omm

(SIyIo-Arial )

H=6.4Omm Texl~t>6.4llmm

H=6.4Omm

H=6.4Omm

H-8.0Omm

H=6.0Omm

70.00

(SCyIe=Arial )I H=3.Omm T""t Heigh!= 3.00•••

SUBMITTED:72.00

(styIo = ArioI Bold )

H-4.4Omm TextHeight=4.40mm

RECOMMENDED:96.50 72.00

(styIo- Ariel )

H-3.00mm Text ~h!> 3.00mm

APPROVED:96.50 72.00

H-2.5Omm

(styIo Arial )TexIH.-=2.50mm

70.00

<SIGNATURE>

<NAME>CHIEF, PLANNING AND DESIGN SECTION

DATE

<SIGNATURE>

<NAME>ASSISTANT DISTRICT ENGINEER

Spacing sample for plans with three signatories on cover sheet

DATE

<SIGNATURE>

<NAME>DISTRICT ENGINEER

Page 81: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

IAnnex "L - 3" I

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:52.40 72.00 52.40

I <SIGNATURE> I I <SIGNATURE> <SIGNATURE> <SIGNATURE>

<NAME> <NAME> <NAME> <NAME>PROJECT MANAGER CHIEF, <IMPlEMENTING DIVISION> ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

<CONTRACTOR NAME>DATE DATE DATE DATE

. Spacing sample for plans with four signatories on cover sheet

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>

<NAME>CHIEF, <IMPlEMENTING SECTION>

PREPARED:31A5

I72.00

<SIGNATURE> ISUBMITTED:

31.45

I <SIGNATURE>

RECOMMENDED:

<SIGNATURE>

<NAME>DISTRICT ENGINEER

<SIGNATURE>

<NAME>ASSISTANT REGIONAL DIRECTOR

APPROVED:

<SIGNATURE>

<NAME>REGIONAL DIRECTOR

DATE DATE DATE DATE DATE

PREPARED: SUBMITTED:

Spacing sample for plans with five signatories on cover sheet

RECOMMENDED: APPROVED:

<NAME>PROJECT MANAGER

<CONSRUCTION SUPERVISION CONSULTANT>o..TE DATE

15.(]()

1

DATE

72.00

<SIGNATURE>

<NAME>PROJECT MANAGER

<CONTRACTOR NAME>

15.00

I I <SIGNATURE> <SIGNATURE>

<NAME>PROJECT DIRECTOR

<UPMO CLUSTER>

<SIGNATURE>

<NAME>DIRECTOR IV, BUREAU OF DESIGN

DATE

<SIGNATURE>

<NAME>ASSISTANT SECRETARY FOR

TECHNICAL SERVICESDATE

<SIGNATURE>

<NAME>UNDERSECRETARY FORTECHNICAL SERVICES

DATE

Spacing sample for plans with six signatories on cover sheet

Page 82: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the paper

Ii;a."a.

":5'0

"'""0

"E~EEIt)

H-2.Mrnm (,.._ArilIfBold)H-l.5Omm (•••• """)

IAnnex "L - 4" I

H-1.<lIlmm ("",--0~:~=~=:=)9l*i)

DANILO L. BALlSIQtQ'-li~'t&DlYIIIION.B.O.D.

60.00

50.00

50.00

H-1.5Omm (..".. MO)H-2.00l'lll'll (••••• MO ••• )H-1.'7Drnm (StylI; -AriIl~"hfor~"'~"bojlM~OIIcII, UPMOau.a.nar""-d~H-2.5Qnvn (Style - MIl NImlllI,o.ng. "<OtS1RlCT £NGINeERNlOFF!CE>" '"*' 4*:GJONAL OfFICE NO>. Uf't,I) <CLUSTER> at BUREAU OF OE:SlGN lICCOllIInlt klwl*:t\dlIce ~ \he ~_ )

H-1.5Onvn (Slyt&t•.ArW)

95.00

REPI&IC OF ne: I'l«.PF'teARTMENT OF PI&JC WORKS AND HtBHWAYS

••••••••. """10.><IlISTRlCT ENGINEERINGOFACE>.....•••.

Eo~

•.."a."a.

":5'0

".gI-"

E

t52.00

EDWIN C. MATANGUIHANQJ.C.·MiBIllT"'NT~TOIt,"""""' ...•..

H_2.5Ilmm (_.""" ••••••H-1.llQmm (_._)

."""52.00

(SEE COVER SHEET)

LEA N. DELFINADO. CESO IVlJIIMt;l;lUNIV.~IWllf"~

•••. 2.00mm (Stolte .,..)

•••• 2.SOmm (St)oItI"'AritfBc:td)H-I.!lOnm (••"'._)

52.00(SEE COVER SHEET)

GlLBERTO S. REYESAAaTANT SliCfllITARY

FOR l£aNCAL 8SMCES

H-2.00mm (_._)

H-2.5Ilmm (_.""" ••• )H-1.&omm (St,.• '"MIl).-

(•••.-0 H-l.5Ilmm

(~"AriII~ H-2.00mmRoclua of Clrcte - 7.00mm

~acIu. of CIrde - 7.00mm(s.lSytnboI,Slv\e-ArIlIIB<*I) H-2..OOmm(SetSMetNo.,~"ArirlI) H-2,OOmm

52.00

(SEE COVER SHEET)

E~~~~~~OIOPeRATIOIrflj;NmT'ECHNI::;.O.l saMCES

52.00

(_ •••••• H-2.00mm

{~-...w~ H-2.5Omm(_ •••••• H-l.ljllmm(_.~ H-l.!lOnm

<_.-0 H-1.51lmm

15mm from edge of the paper

Page 83: DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE …€¦ · b. Profile c. Cross-sections (roads) d. Cross-sections (river/channel) To further improve the quality and for clearer

15mm from edge of the poper

IAnnex "L - 5" I

<CONTRACTOR/S>-2.00mm (••••• ·-Wll-1.5Omm C•••• ·_)

40.00 44.00 <l000lS>

Eo.l:

~••0-o0-.,:5'0.,'"-0.,

C•••• ·-Wll(•••.·..,.l...,.)Hoot .5Cmm

(•.........,)

44.00

H-UIOmm (~·MII}

H-1.8Ornm (~ •.•••• )

•••• 2.00mmH-U50rnm

(SEE COVER SHEET)

(SEE CCVER SHEET)

<__ -ArlIIBaltI H-2.00mmRodkd of CIrcle - 7.00mrn

Rodlut of C!rcIe - 7.ODmrn(&8lSynCdSlylecMll8ot:l) H-2.00m",

(Set8NMltHo.,&ytt"'AIifII) H-2.00mm

44.00

C..".·""') ••••'.lIOmm

(_ ••••• ~ •••• 2.0QmmC..,..·....,) •••.,._(..,...""'! •••.,.O<lmm<..,.. . ....,) ••..U'Cmm

44.00

H-2.00rnm (SI)4t•.•••.••BotJ)H-l.5Omm (••••• _)-1 "NIIlII

<SGNA.TUFtE OVER NAME:>-

44.0044.00

H_1.5Omm (__ c ArllIIHImIw, 0I'IIll:w. hforpoteds '*"-~ bytltRllgloNfOfllo&.. UPMOo.-.OI eu..uGf~H-1.70rTwn (St)IlI. MalNlnow,o..o."<DISTRICT ENGlNEEflINGOffICE>o" _ <REGIQNIf.L OFfCE NO.:>-, l$If#;)<ClLlSTER» lit BUREAU Of oesaJN ~ IIDwhiCtl f:IlIU ~ "PfOtIclplen

<SIGNATURE OVER NAME> c:~TIJRE OVER NAME:>-

53.00

74.00

44.00~••Q.oQ.

••:5'0

~••Q.oQ.

••:5-o••'"-0••

t!I

Eo.l:

EEo,..,

15mm from edge of the paper