departmental update: infrastructure/street maintenance...

10
Departmental Update: Infrastructure/Street Maintenance Program August 8, 2018 Public Works Commission

Upload: others

Post on 10-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

Departmental Update: Infrastructure/Street

Maintenance Program

August 8, 2018

Public Works Commission

Page 2: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

Street Maintenance BureauStreet Maintenance Section

• Street Maintenance is responsible for preventive maintenance & emergency repairs of: – 100+ centerline miles of street pavement, striping,

markings

– 150 miles of sidewalks, curbs, gutters

– 40 centerline miles of alleys

– 18,200+ traffic signs

Page 3: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

Street Maintenance BureauSignals and Street Lighting Section

• Signals and Street Lighting is responsible for maintenance and preventive & emergency repairs of:– 100+ signal controlled intersections – 5,500+ street lights– 1,200+ public right-of-way electrical outlets– 600+ CCTV video detection cameras

Page 4: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

FY 17-18 Achievements and Productivity

Street Maintenance Section• Curb Repaired 2,761 ft.• Curb Painted 23,091 ft.• Sidewalks Repaired 260• Sidewalks Replaced 172 • Potholes Repaired 1,208• Pavements Patched 107• Signs Replaced 608• Street Markings Painted 243

Page 5: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

FY 17-18 Achievements and Productivity

Signals and Street Lighting Section• Traffic Signals Repaired 327• Street Lights Repaired 1,136• Utility Locations Marked 1,046• CCTVs Maintained 223• CCTVs Repaired/Relocated 54• METRO Related Responses 286• Traffic Signals Reprogrammed 95• Traffic Signal LEDs Replaced 440

Page 6: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

Street Transformation Enhancement Program

STEP• Street-by-street approach to enhancing, repairing and

transforming outdated infrastructure in order to provide a higher level of service to residents and businesses.

• Project targets will include:Street Markings

Traffic SignalsStreet Lights

PavementSidewalks

Signs

Page 7: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

STEP Example 1: Rodeo Drive

7

Page 8: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

STEPBenefits of STEP Implementation

• Residents and business owners will see tangible improvements on their street and throughout their neighborhood.

• Increasing work efficiency and productivity.

• Reduce liability risk due to deficient infrastructure.

• Creating cost savings/economies-of-scale.

Page 9: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

STEPAdditional STEP Enhancements

Coordinated with Other PW Divisions:

• Tree trimming/pruning

• Re-painting water valve lids and fire hydrants

• Replacing “Do Not Dump” markers on catch basins

• Repairing catch basin screens and inserts

• Incorporating STEP into street re-paving projects

Page 10: Departmental Update: Infrastructure/Street Maintenance Programbeverlyhills.org/cbhfiles/storage/files/... · 2018-08-09 · Benefits of STEP Implementation •Residents and business

Improving our City one STEP at a time!