Northbound traffic. Southbound traffic. Description. Plans call for the construction of temporary bridge pilings erected adjacent to each of the existing bridge’s four piers in the lake. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Description](https://reader036.vdocuments.net/reader036/viewer/2022062521/568166d0550346895ddadfe1/html5/thumbnails/1.jpg)
Description
Northbound trafficSouthbound traffic
![Page 2: Description](https://reader036.vdocuments.net/reader036/viewer/2022062521/568166d0550346895ddadfe1/html5/thumbnails/2.jpg)
Plans call for the construction of temporary bridge pilings erected adjacent to each of the existing bridge’s four piers in the lake.
![Page 3: Description](https://reader036.vdocuments.net/reader036/viewer/2022062521/568166d0550346895ddadfe1/html5/thumbnails/3.jpg)
Crews would then construct a new bridge on top of the temporary piers. Once that work is finished, the existing bridge would be demolished and the new bridge would be slid laterally onto the existing piers.
![Page 4: Description](https://reader036.vdocuments.net/reader036/viewer/2022062521/568166d0550346895ddadfe1/html5/thumbnails/4.jpg)
The existing bridge piers have undergone extensive examination in recent months. It has been determined they remain well preserved by the lake water and are in good condition. Use of the existing piers will provide a cost savings.
![Page 5: Description](https://reader036.vdocuments.net/reader036/viewer/2022062521/568166d0550346895ddadfe1/html5/thumbnails/5.jpg)