Design & Construction
Project Update
September 28, 2016
Jim Moran School of Entrepreneurship
Jim Moran Institute
Jim Moran School of Entrepreneurship
Jim Moran Institute
EOAS (Earth, Ocean & Atmospheric Sciences)
EOAS (Earth, Ocean & Atmospheric Sciences)
EOAS (Earth, Ocean & Atmospheric Sciences)
EOAS (Earth, Ocean & Atmospheric Sciences)
EOAS (Earth, Ocean & Atmospheric Sciences)
EOAS (Earth, Ocean & Atmospheric Sciences)
College of Engineering
College of Engineering
University Housing Replacement
University Housing Replacement Phase 2
University Housing Replacement Phase 2
University Housing Replacement Phase 2
University Housing Replacement Phase 2
University Housing Replacement Phase 2
University Housing Replacement-Food
Services Phase 2
Doak Campbell Stadium Improvements
Doak Campbell Stadium Improvements
Nov 2015
Doak Campbell Stadium Improvements
Sept. 2016
Doak Campbell Stadium Improvements
Doak Campbell Stadium Improvements
Doak Campbell Stadium Improvements
Doak Campbell Stadium Improvements
Interdisciplinary Research &
Commercialization Building (IRCB)
Interdisciplinary Research &
Commercialization Building (IRCB)
Interdisciplinary Research &
Commercialization Building (IRCB)
Interdisciplinary Research &
Commercialization Building (IRCB)
Ringling Campus –Glass Pavilion
Ringling Campus –Glass Pavilion
Ringling Campus –Glass Pavilion
Ringling Campus –Glass Pavilion
Ringling Campus –Glass Pavilion
Ringling Campus –Glass Pavilion
Ringling Campus –Glass Pavilion
FSU Sustainable Design
LEED Certifications Mike Long Track Facility (silver)
College of Education (silver)
Life Science Teaching & Research (certified)
Materials Research Building (certified)
Student Success – Phase II (gold)
Conference Center (silver)
Ruby Diamond Auditorium (gold)
Johnston Renovation (gold)
FSU Law/Advocacy Center (silver)
Tibbals Learning Center Phase 2 (silver)
Traditions Hall (certified)
Johnston Annex/HSF House (in progress)
AME (Aeropropulsion Mechatronics & Energy Building)
Wellness Center
University Housing Replacement Phase 1 (buildings 1 & 2) and Phase 2 (buildings 3 & 4) (in progress)
Earth Ocean Atmospheric Sciences Building (EOAS) (in progress)
Interdisciplinary Research and Commercialization Building (IRCB) (in progress)
Minor Projects
https://www.facilities.fsu.edu/depts/designCo
nstr/Documents/MinorProjectsList.pdf
•Click on the link “Minor Projects" on the Right under Project Information
•Minor Project list is published every Monday
• We currently have 150 active minor projects
• Total value of current minor projects is $50 MIL
• We now utilize a new project management system
called CPPM
Human Resources Training Center
Haskins Walkway Improvements
Strozier Library Improvements
Third Floor before renovation
Strozier Library Improvements
Third Floor after renovation
Strozier Library Improvements
Fourth & Fifth Floor after renovation
Dirac - Dittmer Plaza
Before
After
Dirac - Dittmer Plaza
Thagard Plaza Improvements
Thagard Plaza Improvements
Challenger Center - Classroom
Copeland Street Pedestrian
Improvements
Before
After
Jennie Murphree Window
ReplacementBefore
After
Kellum Hall Demolition
Before
After
MK Wing Expansion – Mag Lab
Collins Spectrograph Magnet
Law School ADA Restrooms
Before
After
Bellamy Atrium
Existing First & Second Floor
Keen 7th Floor – Seminar Room
Keen 7th Floor – Seminar Room
UCC Lobby Improvements
Stone Building Re-roof
Civic Center – Concourse
Restrooms
Civic Center - Marquee
Civic Center – Men’s Basketball
Locker Rooms
Civic Center – Women’s
Basketball Locker Rooms
Civic Center – Men’s Basketball
Locker Rooms
Civic Center – ROI
BSU/African American Study
Center
BSU/African American Study
Center
Planning and Space Management
• Arena District
• College of Business
• Student Union
• NW Campus Housing Study
College of Business
College of Business
NW Campus Housing Study
Major and Minor Project List Update
https://www.facilities.fsu.edu/depts/
designConstr/showProjectInfo.php
•Click on the link “Summary Sheet” for Major Projects or “Minor
Projects" on the Right under Project Information
•Updated bi-monthly; Minor Project list is published every Monday
Next Quarterly Update will be scheduled
In early Spring 2017