CHMI | Q4 2020 As the energy sector is undergoing significant changes, Engie, a major energy supplier, must digitalize its services. To face that challenge, the company initiated an innovative projec t: the smart cabin solution. Validation of the technical documentation and the high level process design and of identification the next steps, Definition of the services that could be provided to clients (first alerting and then predictive maintenance). To minimize the delay in the development & commercialization of the solution, Edge first analysed the maturity of the project. Then our consultants supported Engie on the following points: In order to confirm the viability of the smart cabin solution, Edge audited the current process and identified the main blocking points. Then, Edge mapped out a strategy to accelerate the solution development, finalize the solution design and all individual components. Edge subsequently defined the full customer life cycle and target delivery to build the smart cabin services and created a detailed business case. Edge built processes related to the alerts from sensors and to predictive maintenance. Beyond planning, Edge also followed up weekly on the design and implementation project team to make sure that the project was advancing at the planned pace. At the end of the project, the MVP was created and is now present on several sites. The services delivery process were designed as well as the sales presentation to start the commercialization. Creating a structured approach to develop the smart cabin project. Developing the smart cabin solution. Following the implementation of the recommended processes. Evaluating Edge's impact. www.edge.consulting Define Design Implement Measure

Upload: others

Post on 06-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design Define - Edge Consulting · 2020. 3. 13. · Evaluating Edge's impact. Define Design Im ple m ent M easure. Title: Smart Program Author: Clara Besnard Keywords: DADr7ZPpFJA,BADlQ9KdvuA

CHMI | Q4 2020

As the energy sectoris undergoingsignificant changes,Engie, a majorenergy supplier,must digitalize itsservices. To face thatchallenge, thecompany initiatedan innovative project: the smart cabinsolution.

Validation of the technicaldocumentation and the high levelprocess design and  of  identificationthe next steps,Definition of the services that could beprovided to clients (first alerting andthen predictive maintenance).

To minimize the delay in the development &commercialization of the solution, Edgefirst  analysed the maturity of the project.Then our consultants supported Engie onthe following points:

In order to confirm the viability of the smartcabin solution, Edge audited the currentprocess and identified the main blockingpoints. Then, Edge mapped out a strategyto accelerate the solution development,finalize the solution design and allindividual components. Edge subsequentlydefined the full customer life cycle andtarget delivery to build the smart cabinservices and created a detailed businesscase.

Edge built processes related to the alertsfrom sensors and to predictivemaintenance. Beyond planning, Edge alsofollowed up weekly on the design andimplementation project team to make surethat the project was advancing at theplanned pace.

At the end of the project, the MVP wascreated and is now present on several sites.The services delivery process were designedas well as the sales presentation to start thecommercialization.

Creating a structured approach to developthe smart cabin project.

Developing the smart cabin solution.

Following the implementation of therecommended processes.

Evaluating Edge's impact.