Design Development Groves Middle School Port Neches Middle School Port Neches – Groves High School November 13, 2007 GROVES MS PORT NECHES MS PORT NECHES – GROVES HS

Upload: others

Post on 24-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Design DevelopmentGroves Middle School

Port Neches Middle SchoolPort Neches – Groves High School

November 13, 2007GROVES MS

PORT NECHES MS

PORT NECHES – GROVES HS

Page 2: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PROJECT TEAMPort Neches – Groves ISDDr. Lani Randall SuperintendentMarc Keith PN-G HS PrincipalKen Cummings Groves MS PrincipalKyle Hooper Port Neches MS PrincipalDr. Mary Jane Moore Secondary Curr. Coordinator Frank Wilson Director of Maintenance

SHW Group Gary Blanton Managing PrincipalJennifer Henrikson Principal in ChargeBill Wadley Lead Designer – HS & StadiumDan Whalen Lead Designer - PNMSAshad Satchu Lead Designer - GMSJ. Luis Del Valle Project Manager

ConsultantsDBR Engineering Consultants MEP EngineersBrooks & Sparks Civil EngineersMillunzi & Associates Food Service Consultant

Program ManagerLANWalton Program Manager

Page 3: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

• Completed Onsite Design though DD• Great involvement and input from PN-G staff

– Board of Trustees– Administrators– Teachers– Code authorities & municipalities

• Looking for approval for DD• Next step will be to continue to develop the contract

documents– Drawings– Specifications

Design Progress Status

Page 4: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

Project Schedule

• All projects remain on schedule!

Weeks Months

May June July August September October November December JanFebMaAp MaJunJul AugSe Oc No De JanFebMaAp MaJunJul Aug Ap MaJunJul Aug<---- ---- S U M M E R -------------->

Groves MSPort Neches MS

ProgrammingSchematic Design Development

Design DevelopmentContract Documents

4 Week Proposal PeriodEvaluation

Construction Period

PNG HS + Athletics

ProgrammingSchematic Design Development

Design DevelopmentContract Documents

4 Week Proposal PeriodEvaluation

Construction Period

2008 2009 20102007

Page 5: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

SITE PLAN

Groves Middle School

VISITOR PARKING

STAFF PARKING

WILSON

VAN BU

REN

Page 6: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

FLOOR PLAN

Groves Middle School6TH GRADE

7TH GRADE8TH GRADEGYMS

LIBRARY DINING

FINE ARTS

CATE

ADMIN

Page 7: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

TYPICAL CLASSROOM

Groves Middle School

Page 8: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

TYPICAL CLASSROOM

Groves Middle School

Page 9: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

SHARED PALETTE – MATERIALS AND COLORS

All Schools

Page 10: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PALETTE – MATERIALS AND COLORS

Groves Middle School

Page 11: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – FRONT ENTRY

Groves Middle School

Page 12: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – FRONT ENTRY

Groves Middle School

Page 13: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – FROM WILSON

Groves Middle School

Page 14: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – LIBRARY

Groves Middle School

Page 15: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – SCIENCE COURTYARDS

Groves Middle School

Page 16: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – “MAIN STREET”

Groves Middle School

GLUE-LAM WOOD TRUSSES

CONCRETE

SUNFLOWER SEED BOARD

BRICK

CERAMIC TILE

METAL ACCENT

STEEL COLUMN

Page 17: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – “MAIN STREET”

Groves Middle School

GLUE-LAM WOOD TRUSSES

PAINTED DRYWALL

CONCRETE MASONRY

METAL WAINSCOTING

CERAMIC TILE

WOOD

Page 18: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

THROUGH SECTION – MAIN STREET

Groves Middle SchoolWINDOWS

CONCRETE MASONRY

BRICK

DISPLAY CASEMETAL ACCENT

SUNFLOWER SEED BOARDCLERESTORY WINDOWS

GLUE-LAM WOOD TRUSSES

DISPLAY CASEMETAL ACCENT

CONCRETE MASONRYCLERESTORY WINDOWS

GLUE-LAM WOOD TRUSSES

DISPLAY CASE

METAL ACCENT

WOOD BEAD-BOARDCLERESTORY WINDOWSGLUE-LAM WOOD TRUSSES

GRAPHICCONCRETE MASONRY

GLAZED MASONRY

Page 19: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

– Project appears to remain on budget!

GMS Scope/BudgetGROVES MIDDLE SCHOOL

Cost Summary SFSite Work 129,067 $35 $4,509,305 $30 $3,911,044 $26 $3,357,970New Exterior Spaces & Canopies 6,425 $35 224,875 $30 192,750 $25 160,625Subtotal 135,492 4,734,180 4,103,794 3,518,595

New Interior Spaces 137,280 $131 $18,051,358 $126 $17,364,958 $121 $16,678,559

Renovated Interior Spaces 8,120 $125 $1,015,000 $120 $974,400 $115 $933,800

TOTAL BASE PROJECT $23,800,538 $22,443,152 $21,130,954

Budget $21,907,596 $21,907,596 $21,907,596Delta $1,892,942 $535,556 ($776,642)

8.64% 2.44% -3.55%

Demolition Cost 75,595 $5 $377,975 $4 $302,380 $3 $226,785

TOTAL BASE PROJECT + DEMOLITION $24,178,513 $22,745,532 $21,357,739

Budget $22,409,736 $22,409,736 $22,409,736Delta $1,768,777 $335,796 ($1,051,997)

7.89% 1.50% -4.69%

Design Development - Estimate of Probable Cost

Best CaseWorst Case Most Likely

Page 20: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

Port Neches Middle School

CENTRAL

ME

RR

IMA

N

LLAN

O

MAGNOLIA

Page 21: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

Port Neches Middle SchoolSTAFF

PARKING

VISITOR PARKING

CENTRAL

ME

RR

IMA

N

LLAN

O

Page 22: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

FLOOR PLAN

Port Neches Middle School

8TH GRADE

7TH GRADE

6TH GRADE

GYMSLI

BRAR

Y

DINING

FINE ARTS

CATE

ADMIN

Page 23: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – FRONT

Port Neches Middle School

Page 24: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – LIBRARY

Port Neches Middle School

Page 25: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – FINE ARTS

Port Neches Middle School

Page 26: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – SCIENCE COURTYARD

Port Neches Middle School

Page 27: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – FROM MERRIMAN

Port Neches Middle School

Page 28: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PALETTE – MATERIALS AND COLORS

Port Neches Middle School

Page 29: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – MAIN STREET

Port Neches Middle School

GLUE-LAM WOOD TRUSSES

PAINTED DRYWALL

CONCRETE MASONRY

WOOD SHIPLAP

CERAMIC TILE

Page 30: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – MAIN STREET

Port Neches Middle School

GLUE-LAM WOOD TRUSSES

PAINTED DRYWALL

CONCRETE MASONRY

WOOD SHIPLAP

CERAMIC TILE

Page 31: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

THROUGH SECTION – MAIN STREET

Port Neches Middle School

METALWOOD SHIPLAP

MASONRY

GLUE-LAM WOOD TRUSSES

WOOD CHAIR RAILLAMINATE WAINSCOTING

WOOD TRIM

PAINTED DRYWALL

WOOD CHAIR RAILLAMINATE WAINSCOTING

WOOD TRIM

PAINTED DRYWALL

METALWOOD SHIPLAP

CONCRETE MASONRY

PAINTED DRYWALLCONCRETE BLOCK

PAINTED DRYWALLACOUSTICAL PANELS

STEEL STRUCTURE

Page 32: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

Port Neches Middle School

Page 33: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

Port Neches Middle School

Page 34: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

– Project appears to remain on budget!

PNMS Scope/BudgetPORT NECHES MIDDLE SCHOOL

Cost Summary SFSite Work 111,175 $38 $4,261,325 $33 $3,712,660 $29 $3,199,450New Exterior Spaces & Canopies 3,590 $35 125,650 $30 107,700 $25 89,750Subtotal 114,765 4,386,975 3,820,360 3,289,200

New Interior Spaces 131,980 $131 $17,223,540 $126 $16,563,640 $121 $15,903,740

Renovated Interior Spaces 0 $0 $0 $0

TOTAL BASE PROJECT $21,610,515 $20,384,000 $19,192,940

Budget $20,717,827 $20,717,827 $20,717,827Delta $892,688 ($333,827) ($1,524,887)

4.31% -1.61% -7.36%

Demolition Cost 84,815 $5 $424,075 $4 $339,260 $3 $254,445

TOTAL BASE PROJECT + DEMOLITION $22,034,590 $20,723,260 $19,447,385

Budget $21,185,454 $21,185,454 $21,185,454Delta $849,136 ($462,194) ($1,738,069)

4.01% -2.18% -8.20%

Best CaseWorst Case Most Likely

Design Development - Estimate of Probable Cost

Page 35: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

EXISTING SITE PLAN

Port Neches – Groves High School

Page 36: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

Port Neches – Groves High School

MERRIMAN

NEW PARKING & BAND

PRACTICE FIELD

NEW PARKING

PARK ST.

SITE PLAN

Page 37: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PN-G Stadium Renovations

HOME SEATS

VISITOR SEATS

EX

ST.

FIE

LD H

OU

SE

EXISTING COSMETOLOGY BUILDING TO BE REMOVED IN STADIUM PHASE

EXISTING HVAC CLASSROOM TO BE REMOVED IN STADIUM PHASE

CATE BUILDING TO BE REMOVED IN HIGH SCHOOL PHASE II

Page 38: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

FIRST FLOOR PLAN

Port Neches – Groves High School

10TH

GR

AD

E

9TH GRADE

GYMS

GYMS

FINE ARTS

ART

DINING

LIBRARY

ADMIN

CATE

CA

TE

CATE

COUNS.

Page 39: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

SECOND FLOOR PLAN

Port Neches – Groves High School

11TH

GR

AD

E

9THG

RA

DE

12TH

GR

AD

E

Page 40: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

TYPICAL CLASSROOM

Port Neches – Groves High School

Page 41: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

TYPICAL SCIENCE CLASSROOM

Port Neches – Groves High School

Page 42: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PALETTE – MATERIALS AND COLORS

Port Neches – Groves High School

Page 43: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

OVERALL PERSPECTIVE

Port Neches – Groves High School

Page 44: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – AUDITORIUM ENTRY

Port Neches – Groves High School

Page 45: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE - GYMS

Port Neches – Groves High School

Page 46: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

PERSPECTIVE – ACADEMIC WING

Port Neches – Groves High School

Page 47: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

INTERIOR SKETCH

Port Neches – Groves High School

Page 48: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

INTERIOR SKETCH

Port Neches – Groves High School

Page 49: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

INTERIOR SKETCH

Port Neches – Groves High School

Page 50: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

EXTERIOR ELEVATION

Port Neches – Groves High School

Page 51: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

Port Neches – Groves High School

EXISTING CONDITIONS

NEW HALLWAYSINTERIOR ELEVATION

Page 52: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

EXISTING BUILDING - CEILING WORK

Port Neches – Groves High School

Page 53: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

INTERIOR ELEVATIONS

Port Neches – Groves High School

GLUE-LAM WOOD TRUSSES

WOOD SOUND WALL

PAINTED DRYWALL

GLAZED MASONRY

Page 54: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

INTERIOR ELEVATIONS

Port Neches – Groves High School

GLUE-LAM WOOD TRUSSES

PRESSED GALVANIZED METAL

PAINTED DRYWALL

TEXTURED CONCRETE MASONRY

Page 55: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

INTERIOR ELEVATIONS

Port Neches – Groves High School

Page 56: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

High School Scope/Budget

– Project appears to remain on budget!

PORT NECHES-GROVES HIGH SCHOOL

Cost Summary SFSite Work 296,424 $24 $7,113,910 $20 $5,992,928 $17 $5,128,790New Exterior Spaces & Canopies 3,947,475 3,576,250 3,205,025Subtotal 296,424 11,061,385 9,569,178 8,333,815

New Interior Spaces 174,260 $129 $22,435,225 $124 $21,563,925 $119 $20,692,625

Renovated Interior Spaces 21,920 $148 $3,250,100 $143 $3,140,500 $138 $3,030,900

TOTAL BASE PROJECT $36,746,710 $34,273,603 $32,057,340

Budget $35,495,460 $35,495,460 $35,495,460Delta $1,251,250 ($1,221,857) ($3,438,120)

3.53% -3.44% -9.69%

Demolition Cost 153,960 $5 $769,800 $4 $615,840 $3 $461,880

TOTAL BASE PROJECT + DEMOLITION $37,516,510 $34,889,443 $32,519,220

Budget $35,495,460 $35,495,460 $35,495,460Delta $2,021,050 ($606,017) ($2,976,240)

5.69% -1.71% -8.38%

Best CaseWorst Case Most Likely

Design Development - Estimate of Probable Cost

Page 57: Design Development...Nov 13, 2007  · GLUE-LAM WOOD TRUSSES CONCRETE MASONRY DISPLAY CASE METAL ACCENT WOOD BEAD-BOARD CLERESTORY WINDOWS GLUE-LAM WOOD TRUSSES GRAPHIC CONCRETE MASONRY

Port Neches – Groves Independent School DistrictGMS, PNMS, PNGHS Design Development

• Looking for approval for DD• Next step will be to continue to develop the contract

documents– Drawings– Specifications

• PN-G continues to be a pleasure to work with• We appreciate your continued involvement and passion• Thank you!