Design of closed loop borehole systems - (Part 2) Hydraulics Robin Curtis – GeoScience / GSHPA 18 th June 2020 Ground Source Heat Pump Association Webinar Series 2020

Upload: others

Post on 07-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Design of closed loop borehole systems - (Part 2)

Hydraulics

Robin Curtis – GeoScience / GSHPA

18th June 2020

Ground Source Heat Pump Association Webinar Series 2020

Page 2: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Objectives ?

- To raise awareness of the issue

- Illustrate the impact on performance

- Show basic GSHP hydraulic design approach

- Audience

Page 3: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

(Closed loop) Ground source “hydraulics” - the issue

The forgotten bit….

Why does this matter ?

..protect the technology

Page 4: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

CL GSHP Design

ffBuilding thermal loads

Ground parametersAvailable space Heat pumpFlow rate /max min EWT

Total borehole lengthSpacing

Code - for say 20To 50 years

Hydraulics

Costing

Drilling conditions

Contract terms

Page 5: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

from GSHP Rogues Gallery >

Page 6: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Why ? - Do the numbers…

50kW heat pumpCOP ? ~4Electrical input = 50/4 = 12.5 kW

Pump power 11kW !!Effective COP = 50/(12.5+11) = 2.12 !!

(that’s the first bit of bad news)

Page 7: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

The real bad news?

There’s nothing anyone can do about it.

Page 8: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Simple example -(of getting it wrong)

12 kW heat pump

Flow rate = 0.6 l/s

Told manufacturer = 3 x 60 metre boreholes in 32mm

Pressure drop per hole = ~15kPa (Re ~ 3200)

Pump selection = ~ Wilo 30/7

Page 9: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Simple example -(of getting it wrong)12 kW heat pump

Clever driller - decides on 1 hole.

180m of 40mm !!

Pressure drop now: ~120kPa (Re ~ 8000)

Pump size - off the graph > Parasitic power = huge!

Page 10: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Other warning signs

“We only use 40mm U-tubes…….”

“GSHP boreholes are always 100m deep……”

Page 11: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

-10.00%

-9.00%

-8.00%

-7.00%

-6.00%

-5.00%

-4.00%

-3.00%

-2.00%

-1.00%

0.00%

3.00

3.05

3.10

3.15

3.20

3.25

3.30

3.35

3.40

3.45

3.50

1 2 3 4 5 6 7 8 9 10

Red

uctio

n in

SPF

%)

SPF

Pump power as % of compressor power

Effect of ground loop circulation pump on SPF

% reduction in SPF Reduced SPF

Page 12: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Where / how of ground loop heat transfer

Page 13: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Laminar flow in pipe

Ground

Ground

Pipe Wall

Pipe Wall

Boundary layer

Boundary layer

Ground Ground

GroundGround

= Heat flow

Page 14: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Non-Laminar flow in pipe

Ground

Ground

Pipe Wall

Pipe Wall

Boundary layer

Boundary layer

Ground Ground

GroundGround

= Heat flow

Page 15: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Reynold’s number

Re = ρVD / µ

ρ = densityV=fluid velocityD=hydraulic diameterµ =dynamic viscosity

(dimensionless - NO units !)

Laminar < 2000Turbulent > 4000

Page 16: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

(illustrative only – do not use !

Page 17: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

So > Increase Reynolds No:

Heat transfer improves

but……

Pump power also goes up

Page 18: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Designer’s hydraulic balancing act:

Maximise heat extraction/rejection

Minimise (circulation) pump power

Page 19: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

7

Page 20: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Design Target

Ground loop circulating pump power< 2.5 - 3 %

of heat pump thermal output.(from MIS 3005)

(Prefer a few % of compressor electrical power : <5% )

Page 21: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Hydraulics -Pressure dropcomponents:

1) Active element(s)2) Headers3) Heat pump4) + contingency/fittings

Page 22: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Heat pump

Ground sideheat exchanger Php

Ground loopcirculating pump

Header pipeworkPh

Active elements(boreholes)Pa

Ground loop hydraulic components

Ground sideheat exchanger Php

Ground loopcirculating pump

Header pipeworkPh

Active elements(Slinkies)Pac

Heat pump

Ground sideheat exchanger Php

Ground loopcirculating pump

Header pipeworkPh

Active elements(horizontal loops)Pac

Page 23: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Hydraulics -“fixed” parameters

u minimum Heat Pump flow rate u minimum freeze protection limitu Pressure drop in heat pump – (beware !)

u Non-laminar – (transition zone) Re >2100

Page 24: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Antifreeze issues(another Webinar !)

uViscosity > low at low temperatures uConcentration for minimum freeze

protection

Page 25: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Hydraulics -the variables

u Borehole/loop lengths vs numberu Pipe diameter u Borehole pipe configuration (eg 1U / 2U)u Header arrangements

Page 26: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Heat pump thermal output H

Note B

Initial estimate of allowed pressure drop for complete ground loop circuit (kPa)

Circulating pump efficiency ?Normal~30%

High~50%

Permitted Pressure

Drop80kPa(PPD)

Permitted Pressure

Drop130kPa(PPD) Look up heat pump pressure

drop (kPa) = Php

Use appropriate "Active Element" graph to compute

pressure drop in one parallel active element (kPa) = Pa

Use appropriate hydraulic sizing graph(s) to compute pressure drop in header

pipes (kPa) = Ph

PD = 1.15*(Php+Ph+Pa)

is PD < PPD ?

Change no of active elements and lengths or change pipe diameter(s) orchange antifreeze

Go to pump manufacturer's pump selection.

Check pump electric input power < 2.5% of heat pump

thermal output H

Use higher

efficiency pump

Note A

Note C

Note D

Note E

Note F

Note G

Note H

Closed loop GSHP Hydraulic Sizing Flow Chart

Page 27: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Look up Heat pump Groundside flow rate F (litres/sec)

Select antifreeze

Note J

Note K

From ground loop sizing:Number of (parallel) active elements = N

Total Pipe length of EACH active element = L (metres)

Select appropriate Acive Element chart for type of pipe, antifreeze, and freeze protection level

Compute flow rate in each Active Element Fa = F / N (litres/sec)

On chart, locate flow rate Fa (horizontal axis)

Select required feeze protection level T (°C)

Does flow rate intersect desired pipe diameter ? (In turbulent zone)

Change pipe

diameter

Select proposed active element pipe outer diameter and pipe type

Change no of active

elements

Changeantifreeze

Read pressure drop (kPa) per metre of pipe on vertical axis = dP (kPa/m)

NO

Pressure drop for active element Pac = L x dP

NO

Flow chart to compute Active Element Pressure Drop

Note L

Note N

Note O

Note P

Note Q

Note R

Note S

Note T

Note M

Is Pac <( PPD - Ph)?

Go to calculateHeader Pressure Drop

Page 28: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Flow Rate (l/s)

Pres

sure

Dro

p (k

Pa/m

of P

ipe)

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

0.50

0.55

0.60

0.65

0.70

0.75

0.80

0.85

0.90

0.95

1.00

1.05

1.10

1.15

1.20

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6

Lam

inar

Flo

w Z

one

SDR11 Active Element - Ethylene Glycol (-10°C)

Page 29: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Look up Heat pump Groundside flow rate F (litres/sec)

Select antifreeze

Note A

Note K

Decide of no pairs of header pipes NHLength of header run LH (metres)

Select appropriate hydraulic chart for type of pipe, antifreeze, and freeze protection level

Compute flow rate in each pair of headers FH = F / NH (litres/sec)

On chart, locate flow rate FH (horizontal axis)

Select required feeze protection level T (C)

Does flow rate interesect desired pipe diameter ?

Change pipe

diameter

Select proposed header pipe outer diameter and pipe type

Change no of

headerpairs

Changeantifreeze

Read pressure drop (kPa) per metre of pipe on vertical axis = dP (kPa/m)

NO

Pressure drop for header pair Ph = 2 x L x dP

is Pac+Ph+Php < PPD ? NO

Flow chart to compute Header Pressure Drop

Note L

Note V

Note W

Note X

Note Q

Note R

Note Y

Note Z

Note U

Go to pump manufacturer's pump selection. Check pump electric input power < 2.5% of heat pump thermal output HNote H

Page 30: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Flow Rate (l/s)

Pres

sure

Dro

p (k

Pa/m

of P

ipe)

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

0.50

0.55

0.60

0.65

0.70

0.75

0.80

0.85

0.90

0.95

1.00

1.05

1.10

1.15

1.20

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 4

SDR11 Header Pipework - Ethylene Glycol (-10°C)

Page 31: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Pressure drop calculator

Input - pipe diameter (internal) flow ratepipe lengthviscosity

Output - Reynolds number,Turbulent pressure dropLaminar pressure drop

Page 32: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Simple example

Given: 20kW HP. HP flow rate = 0.95 l/s

Using EED or GLHEPRO or equivalent - get 1st attempt at Borehole depth, number and layout.

6 holes ~ 67m deep ie 400m of hole.

Page 33: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Simple example

6 holes ~ 67m deep ie 400m of hole.(flow rate = 0.16 l/s per hole)

Using PD calculator

3 common pipe sizes - 25mm, 32mm, 40mm:

Re ΔP25 = 2740 36 kPa 32 = 2140 11 kPa40 = 1710 4 kPa

Page 34: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Simple example

Re ΔP

25mm 2740 36 kPa32mm 2140 11 kPa40mm 1711 4 kPa

2nd go –

25mm – 7 holes 57m flow = 0.135 l/s Re = 2346 ΔP = 23 kPa32mm – 6 holes 67m flow = 0.16 l/s Re = 2140 ΔP = 11 kPa40mm – 5 holes 80m flow = 0.24 l/s Re = 2053 ΔP = 6 kPa

Repeat thermal calculations – iterate

Page 35: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Simple example

Component ΔP

Boreholes = ~12kPaHeaders = ~ 25kPa (depends on distance to plant room, and pipe diameter) Total = ~27 kPaAllow say 15% ~30kPa - fittings / manifolds / plant room etc.

(ok < 50kPa)

Add heat pump 10 kPa

For pump - need 40kPa (~ 4m head) at 0.95 l/s

Page 36: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Simple example

Pump selection parameters

Flow rate = 0.95 l/s

Working pressure / head = ~ 40 kPa

Page 37: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

System curve + pump curve

0

5

10

15

20

25

30

35

0 2 4 6 8 10 12Flow rate

Pre

ssu

re d

rop

or

Head

System curvePump curve

Page 38: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Pump sizing

Actual Graphic

Page 39: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…
Page 40: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Don’t blow it on the headers !!

Page 41: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

eg 200m or 300 metre long runs. = Large, costly, pipe installs.

Does the plant room really have to be this far away ?

Remember - we are installing for 50 - 100 years.

Pumps will be running 2000 to 4000 hours per annum - for 50 years +

Once the ground array is installed - it is IRREVERSIBLE !

COP > ENERGY / CARBON / RUNNING COST

Don’t blow it on the headers !

Page 42: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Don’t blow it on the Manifolds

uUse properly designed low pressure drop GSHP manifolds

uNot underfloor heating assemblies!!

Page 43: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…
Page 44: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…
Page 45: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Variable speed pumps

and

high efficiency pumps

Page 46: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Variable speed pumps

Beware new pumps withautomatic speed controlbased on reducing flow as pressureIncreases.

Opposite of what is required for ground loop!

Page 47: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Miracle Nano-Fluids ?

Avoid on ground loops –

(salesmen don’t get it)

Page 48: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

MCS Hydraulics Design Guide materials

https://mcscertified.com/standards-tools-library/

https://mcscertified.com/wp-content/uploads/2019/08/GSHP-Hydraulics-Design-Guide-.pdf

https://mcscertified.com/wp-content/uploads/2019/08/MCS-Hydraulics-Design-Pressure-Drop-Charts-v1.0-1.pdf

Page 49: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

no more of these

please…..

Page 50: Design of closed loop borehole systems -(Part 2€¦ · -Show basic GSHP hydraulic design approach-Audience (Closed loop) Ground source “hydraulics” -the issue The forgotten bit…

Questions…..

and thank youwww.gshp.org.uk