SEPTEMBER 5 - 7, 2018
DESIGN OF HELICAL PILES FOR LIMITED ACCESS TRANSMISSION LINE
![Page 2: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/2.jpg)
SEPTEMBER 5 - 7, 2018
BACKGROUND
• July 5th, 2016 A STORM EVENT COLLAPSED APPROX. 10 MILES OF PARALLEL 345 KV TRANSMISSION LINES NEAR ROGERS, MN.
• NORTH LINE WAS RECONSTRUCTED WOOD COMPLETE.
• XCEL HIGHLIGHTED 10 STRUCTURES OF CONCERN DUE TO ACCESS AND FOUNDATION REQUIREMENTS TO BE DESIGN STEEL COMPLETE
![Page 3: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/3.jpg)
SEPTEMBER 5 - 7, 2018
SITE CONDITIONS
• VERY SOFT CLAY OVER FIRM.
• WATER TABLE AT OR NEAR THE SURFACE.
• ABNORMAL RAINFALL FLOODED THE LOCATIONS OF FOUNDATION INSTALL.
• SOME LOCATIONS WERE COVERED BY 5 FEET OF WATER
• ONLY ACCESSABLE BY FLOATING MATS.
![Page 4: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/4.jpg)
SEPTEMBER 5 - 7, 2018
TYPICAL SOIL PROFILE
![Page 5: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/5.jpg)
SEPTEMBER 5 - 7, 2018
REASONS FOR STEEL STRUCTURES
• FOUNDATION FOR WOOD POLE – EXPENSIVE– TIME CONSUMING– BANDING OF THREE
DRIVEN WOOD PILES– REQUIRED LARGE
EQUIPMENT– ACCESS CONCERNS
![Page 6: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/6.jpg)
SEPTEMBER 5 - 7, 2018
REASONS FOR STEEL STRUCTURES
• ADVANTAGES OF SMALL DIAMETER HELICAL PILES– SMALL EQUIPMENT– TORQUE TO
CAPACITY RATIO– FIELD MODIFIABLE– MODULAR
SECTIONS
![Page 7: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/7.jpg)
SEPTEMBER 5 - 7, 2018
FOUNDATION DESIGN
• HPS INFORMED XCEL OF NEW GRILLAGE SYSTEM• XCEL SUPPLIED HPS WITH STRUCTURAL LOADS FOR STEEL
H-FRAMES AND DESIGN GEOTECHNICAL INFORMATION.• FOUR DIFFERENT TOWERS WOULD BE DESIGNED FOR.• EXPEDITED CONSTRUCTION REQUIREMENTS DUE TO
STORM DAMAGE.
![Page 8: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/8.jpg)
SEPTEMBER 5 - 7, 2018
HELICAL PILE DESIGN
• 4-PILE HSS 3.5” SCH. 80 HELICAL PILES WITH HELICAL CONFIGURATION OF 10/12/14/14. PILE DEPTH 20 TO 30 FEET.
• REQUIRED WORKING CAPACITIES OF HELICAL PILES WERE DERIVED FROM ENSOFT, Inc GROUP® SOFTWARE.
![Page 9: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/9.jpg)
SEPTEMBER 5 - 7, 2018
ENSOFT, INC GROUP® PLOTS
*ASSUMING FIXED HEAD CONDITION
![Page 10: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/10.jpg)
SEPTEMBER 5 - 7, 2018
HELICAP® HELICAL CAPACITY DESIGN SOFTWARE
![Page 11: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/11.jpg)
SEPTEMBER 5 - 7, 2018
GRILLAGE DESIGN
![Page 12: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/12.jpg)
SEPTEMBER 5 - 7, 2018
GROUTED CONNECTION
• CREATES A FIXED HEAD GRILLAGE CONNECTION.
• 3” TO 4” OF LOCATION TOLERANCE.
• NO WELDING OR BOLTING• CLAMP INSTALLED BY
TORQUING BOLTS OR HYDRAULIC MEANS
![Page 13: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/13.jpg)
SEPTEMBER 5 - 7, 2018
STRUCTURAL DESIGN
• MEMBER SIZING WAS CONDUCTED USING HAND CALCULATIONS.
• FINITE ELEMENT ANALYSIS SOFTWARE WAS ALSO USED FOR MEMBER CAPACITIES AND WELD SIZES
ANSYS ® FINITE ELEMENT SOFTWARE
![Page 14: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/14.jpg)
SEPTEMBER 5 - 7, 2018
INSTALLATION• INSTALLATION BEGAN ON OCTOBER 3, 2016
![Page 15: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/15.jpg)
SEPTEMBER 5 - 7, 2018
CUTTING TO ELEVATION
![Page 16: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/16.jpg)
SEPTEMBER 5 - 7, 2018
INSTALL CLAMP AND SPACER FIXTURE
![Page 17: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/17.jpg)
SEPTEMBER 5 - 7, 2018
GROUTING VOID
![Page 18: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/18.jpg)
SEPTEMBER 5 - 7, 2018
WASHERS AND THREADBAR
![Page 19: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/19.jpg)
SEPTEMBER 5 - 7, 2018
FINISHED CONNECTION
![Page 20: DESIGN OF HELICAL PILES FOR LIMITED ACCESS …](https://reader031.vdocuments.net/reader031/viewer/2022012016/615ac99545cd282e6955e07c/html5/thumbnails/20.jpg)
SEPTEMBER 5 - 7, 2018
INSTALLATION SUMMARY
• PRODUCTION RATE– 1 TOWER PER CREW PER DAY.– 2 FOUNDATIONS PER TOWER– INSTALLATON DEPTH 20 TO 30 FEET
• 10 TO 15 MINUTES PER PILE TO INSTALL
– GROUT REQUIRED 7 DAYS TO CURE.