design philosophy for transformer pit

4
Home Vertical Vessel/Tower Horizontal Vessel Tube & Shell Exchanger Rotating Equipment Storage Tank on Ring Beam Equipment on Skid Pipe Rack Transformer Pit Anchor Bolt Stack Foundation Help & More Help Feed Back About me Site Link Design Philosophy for Transformer Pit Design Philosophy for Transformer Pit Design Philosophy for Transformer Pit Design Philosophy for Transformer Pit In this page I will talk about how to detemine the size of o il containment for transformer. Following is a typical picture of a transformer and its foundation with oil containment. Now, you will follow the below steps t o determine the foundation and size of spilled oil containment. Step-1 : Review of Transformer drawing (Vendor Equipment Drawing) You need to review transformer drawings from foundation design point of view and check whether you have all the following information: Transformer Erection weight (D e ) Transformer Operating weight (D o ) Plan dimension of Transformer base Height of transformer and location of oil tank Total volume of oil in the oil tank Transformer Center of Gravity location in empty condition and operating condition for Seismic load calculation and application Anchor bolt detail (size, location, projection, etc..) and transformer supporting details Step-2 : Verification of foundation location, elevation and external fitti ngs loads You need to review Plot plan, Equipment location drawings and 3 -D Models and check whether you have all the following information: Verify the area available for foundation and containment. Verify transformer Foundation and containment location and Elevation Electrical and Instrument duct banks Bus duct support and foundation detail, on and around the transformer pit Locations of underground pipes Location of fire hose and sprinkler around the transformer Locations and extent of fire wall and construction type of fire wall Verify the location and extent of new/existing foundations not shown in 3D model or plot plan. Step-3 : Soil / Geotechnical information: Following Geotechnical information are required to start the foundation and spilled oil containment: Soil allowable Bearing pressure or pile capacity (Tension, compression and Lateral force capacity) Soil density Active soil pressure co-efficient of soil Earthquake soil pressure co-efficient Ground water table location Frost depth (for winter snow) Step-4 : Transformer Pedestal sizing criteria: Transformer pedestal shall be sized according to the following criteria: Face-to-face pedestal size shall be the larger of the following: Civil Design Help http://www.civildesignhelp.info/trp.html 1 of 4 2/6/2014 4:08 PM

Upload: thiha-kyaw

Post on 17-Oct-2015

63 views

Category:

Documents


7 download

DESCRIPTION

Civil Design

TRANSCRIPT

  • HomeVertical Vessel/Tower

    Horizontal VesselTube & Shell Exchanger

    Rotating EquipmentStorage Tank on Ring

    BeamEquipment on Skid

    Pipe RackTransformer Pit

    Anchor BoltStack FoundationHelp & More Help

    Feed BackAbout meSite Link

    Design Philosophy for Transformer Pit Design Philosophy for Transformer Pit Design Philosophy for Transformer Pit Design Philosophy for Transformer Pit

    In this page I will talk about how to detemine the size of oil containment for transformer. Following is a typicalpicture of a transformer and its foundation with oil containment.

    Now, you will follow the below steps to determine the foundation and size of spilled oil containment.

    Step-1 : Review of Transformer drawing (Vendor Equipment Drawing)

    You need to review transformer drawings from foundation design point of view and check whether you haveall the following information:

    Transformer Erection weight (De)

    Transformer Operating weight (Do)

    Plan dimension of Transformer baseHeight of transformer and location of oil tankTotal volume of oil in the oil tankTransformer Center of Gravity location in empty condition and operating condition for Seismic loadcalculation and applicationAnchor bolt detail (size, location, projection, etc..) and transformer supporting details

    Step-2 : Verification of foundation location, elevation and external fittings loadsYou need to review Plot plan, Equipment location drawings and 3 -D Models and check whether you have all the following information:

    Verify the area available for foundation and containment.Verify transformer Foundation and containment location and Elevation Electrical and Instrument duct banks Bus duct support and foundation detail, on and around the transformerpit Locations of underground pipes Location of fire hose and sprinkler around the transformer Locations and extent of fire wall and construction type of fire wall Verify the location and extent of new/existing foundations not shown in 3D model or plot plan.

    Step-3 : Soil / Geotechnical information:

    Following Geotechnical information are required to start the foundation and spilled oil containment:

    Soil allowable Bearing pressure or pile capacity (Tension, compression and Lateral force capacity)Soil densityActive soil pressure co-efficient of soilEarthquake soil pressure co-efficientGround water table locationFrost depth (for winter snow)

    Step-4 : Transformer Pedestal sizing criteria:

    Transformer pedestal shall be sized according to the following criteria:

    Face-to-face pedestal size shall be the larger of the following:

    Civil Design Help http://www.civildesignhelp.info/trp.html

    1 of 4 2/6/2014 4:08 PM

  • (a) Bolt c/c distance + 175mm

    (b) Bolt c/c distance + 8 x bolt diameters

    (c) Bolt c/c distance + sleeve diameter + 150mm

    (d) Size of base frame + 200mm

    (e) Bolt c/c distance + 2 x (minimum bolt edge distance)

    It is desirable to make the pedestal deep enough to contain the anchor bolts and keep them out of the mat.

    Step-5 : Transformer spilled oil containment sizing criteria:

    Containment size shall be calculated for worst condition. It is assumed that worst condition will be happened whentotal oil is in the containment + Transformer on fire + Heavy rain fall. So, total containment volume will be, additionof following items:

    Volume of transformer oil (mentioned in the equipment drawing)Transformer on fire: When transformer is on fire (refer IEEE-980 annex-B or NFPA-850 chapter-6 ) all thehose pipe (deluge system) will spray the water on all four sides and top of the transformer. So total volumeof water will be: Water volume = (Total surface area of the transformer (all 4 sides) + top plan area oftransformer) xrate of water flow from hose pipe per unit area x total fire rating time.Rain water: Total volume of rain water shall be calculated for total fire time. So volume of rain water = Rainfall intensity (mm/hr) x Plan area of containment x total fire rating time.

    Generally, you will find that containment area is full of stones (40 mm down). In this case, we consider that 35%void is available to accommodate the above volume of oil and water mix. So, you need to increase the capacity ofthe containment accordingly.

    Step-6 : Anchor Bolt Check:

    Design of anchor bolts shall be based on the following considerations. Corrosion allowance should be consideredwhen required by the project design criteria.

    Tension Check:

    The maximum tension force in the anchor bolts (Tmax

    ) may be calculated according with following formula:

    Tmax

    = M / (Ny x BCD) - (De

    / Do) / Nb

    Where, M = total maximum moment on foundation BCD = Bolt c/c distance Ny = No. of bolt row Nb = no. of anchor bolt

    Use De or D

    o whichever is critical.

    Shear Check:

    When anchor bolts are utilized to resist shear, the unit shear per bolt shall be calculated as follows:

    Vmax

    = V / Nb where, V = total shear force on anchor bolt.

    Frictional resistance to shear between the transformer base plate and the concrete or grouted bearing surface shallbe utilized to resist shears induced by wind or by other static loads. Frictional resistance shall not be employed to

    Civil Design Help http://www.civildesignhelp.info/trp.html

    2 of 4 2/6/2014 4:08 PM

  • resist shear induced by seismic loads. For seismic-induced shear, adequate mechanical means shall be provided toresist horizontal shear, either by means of properly detailed anchor bolt / bolt hole arrangements or through acombination of anchor bolts, shear lugs, or other anchorage devices. The static coefficient of friction between steeland concrete or between steel and cementitious grout shall be considered as 0.4 or specified in project designcriteria.

    Tension Shear Interaction check:

    When anchor bolts are subjected to combined shear and tension loads, the design shall be based on satisfying interaction formula (say Appendix-d of ACI 318).

    Please note that anchor bolt edge distance, spacing and load capacity shall be as per project design criteria.

    Step-7 : Load combinations for foundation sizing / Pile loads and Foundation design:

    You need to create the load combination per your project design criteria. However, I have created this loadcombination based on ACI 318:

    Load combination for Foundation sizing and Pile load calculation (un-factored load calculation):

    LC1: Do

    LC2: (De) + Wind

    LC3: De + Seismic

    LC4: Do + Wind

    LC5: Do + Seismic

    Load combination for Pedestal and containment mat foundation design (factored load calculation):

    LC6: 1.4*(Do)

    LC7: 0.75 [1.4 De] +1.6 Wind

    LC8: 1.2 De +1.0 E

    LC9: 0.75 (1.4 Do ) + 1.6 Wind

    LC10: 1.2 (Do) + 1.0 E

    The weight of the foundation and of the soil on top of the foundation shall be included as dead load in all of theseload combinations.

    Step-8 : Loads on containment wall

    Containment wall shall be designed for following loads and load combinations:

    Active soil pressure on the wallSurcharge load on wall due to live load on soil. You need to discuss with construction about any site cranemovement around the transformer pit.Earthquake load on wall due to soil movement. Use Monobe Okabe Equation for Earthquake loadcalculation.

    Typical foundation and oil containment drawing for a Transformer

    For requirement of firewall refer NFPA-850 chapter-5.

    Now from above steps, you have learnt the following:

    Different types of loads on foundationDifferent criterias for the pedestal sizingMaximum tension and shear force on each anchor boltA sample load combinations.

    To complete the foundation design, your work will be to create following calculation sheets:

    Civil Design Help http://www.civildesignhelp.info/trp.html

    3 of 4 2/6/2014 4:08 PM

  • A calculation sheet for anchor bolt embedment length check (ex: ACI 318 appendix-D).A calculation sheet for foundation sizing (considering soil bearing pressure, Sliding, Buoyancy, uplift offoundation due to frost and overturning) or pile load (tension, compression and shear on each pile)calculation and check with soil consultant for acceptable values.A calculation sheet for foundation, pedestal and containment wall reinforcement calculation per your projectdesign criteria.

    Discussions:

    Question from visitor: Do I need to consider soil passive pressure on transformer wall for sliding check, when the

    transformer pit is in high seismic zone?

    Recommendation from Subhro: It is advisable not to consider any passive pressure on wall for sliding check, when

    pit is in high seismic zone. If it is absolute necessary to consider the passive pressure on wall for sliding check,

    you must consult with geotechnical engineer for recommendations.

    Recommendations courtsey: Soumyabrata Roychowdhury, Civil/Structural Engineer

    I hope this page will be very helpful to you to understand the basic loads for transformer foundation andcontainment pit design

    Copyright 2009. All rights reserved. Please do not print or copy of this page or any part of this page without

    written permission from Subhro Roy.

    Disclaimer: This page is prepared based on experience on Civil Engineering Design. All definitions and most of the

    explanations are taken from different text books and international design codes, which are referenced in the

    contents. Any similarity of the content or part of with any company document is simply a coincidence. Subhro Roy

    is not responsible for that.

    Civil Design Help http://www.civildesignhelp.info/trp.html

    4 of 4 2/6/2014 4:08 PM