design standards - florida department of … · blasting zone r y g lane ends left lane ends right...

83
FOR DESIGN, CONSTRUCTION, MAINTENANCE AND UTILITY OPERATIONS ON THE STATE HIGHWAY SYSTEM TOPIC NO 625 010 003 DESIGN STANDARDS 2010 Tallahassee, Florida 32399-0450 605 Suwannee Street Mail Station 32 Approved For Use On Federal Aid Projects Roadway Design Office State of Florida, Department Of Transportation For Martin Knopp, Division Administrator

Upload: nguyenhanh

Post on 04-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • FOR DESIGN, CONSTRUCTION, MAINTENANCE AND UTILITY

    OPERATIONS ON THE STATE HIGHWAY SYSTEM

    TOPIC NO 625 010 003

    DESIGN STANDARDS

    2010

    Tallahassee, Florida 32399-0450

    605 Suwannee StreetMail Station 32

    Approved For Use On Federal Aid Projects

    Roadway Design OfficeState of Florida, Department Of Transportation

    For Martin Knopp, Division Administrator

  • 544

    18100-18305

  • THIS SHEET INTENDED TO BE BLANK

  • RebeccaTypewritten Text

    RebeccaTypewritten Text

  • W

    X

    A

    c. c.

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 1 of 13

    Last

  • Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 2 of 13

    Last

  • ROAD

    WORK

    AHEAD

    ONE LANE

    ROAD

    AHEAD

    BE

    PREPARED

    TO STOP

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 3 of 13

    Last

  • Name / Initials Date

    APPROVED BY

    DRAWN BY CHECKED BY

    CHECKED BY

    FHWA APPROVALXXX

    XXX

    XXX

    Name / Initials

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    Date DESCRIPTION

    Added:

    Changed:

    Deleted:

    REVISION LOG

    DESIGNED BY

    Name / Initials

    XXX

    DEVELOPMENT CHECKLIST

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    Original Release DateDate

    XX/XX/XX

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 4 of 13

    Last

    CONTROL THROUGH WORK ZONES

    GENERAL INFORMATION FOR TRAFFIC

  • DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 5 of 13

    Last

  • DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 6 of 13

    Last

    Speeding fines

    doubled

    when workers

    present

    500 FT

    work

    500 FT

    ROADROAD

    WORK

  • panelStyle:CONSTRUCTION SIGN.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18panelSizes:panelStandard:1levels:GSCOLORFILL|GSBWFILL|GSOUTLINE

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 7 of 13

    Last

  • ROAD WORK

    END

    FOLLOW ME

    PILOT CAR

    DETOUR

    END

    DETOUR

    DETOUR DETOUR

    DETOUR DETOUR

    DO

    NOT

    PASS

    KEEP

    LEFT

    PASS

    WITH

    CARE

    MERGE

    LEFT

    LANE ENDS

    NARROW

    BRIDGE

    M.P.H.

    XX

    KEEP

    LEFT

    KEEP

    RIGHT

    SPEED

    LIMIT

    XX

    TRUCKS

    USE

    CENTER

    LANE

    KEEP

    RIGHT

    LITTER

    PICK UP

    AHEADPEDESTRIAN

    WALKWAY

    SIDEWALK

    CLOSED

    PEDESTRIAN

    WALKWAY

    YIELD

    NEXT X MILES

    ROAD WORK

    TRUCKS

    ENTERING

    HIGHWAY

    AHEAD

    CLOSED

    SIDEWALK CLOSED

    CROSS HERE

    SIDEWALK CLOSED

    CROSS HERE

    BUSINESS

    ENTRANCE

    TRUCKS

    TURNING

    LEFT

    000 FT

    MERGE

    RIGHT ON

    ARROW

    FLASHING

    EXIT

    SIDEWALK CLOSED

    USE OTHER SIDE

    ROAD

    NARROWS

    Name / Initials Date

    APPROVED BY

    DRAWN BY CHECKED BY

    CHECKED BY

    FHWA APPROVALXXX

    XXX

    XXX

    Name / Initials

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    Date DESCRIPTION

    Added:

    Changed:

    Deleted:

    REVISION LOG

    DESIGNED BY

    Name / Initials

    XXX

    DEVELOPMENT CHECKLIST

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    Original Release DateDate

    XX/XX/XX

    ROUGH

    ROAD

    LOOSE

    GRAVEL

    TURN OFF

    2-WAY RADIO

    AND

    CELL PHONE

    GROOVED

    PAVEMENT

    AHEAD

    STATE

    PRISONERS

    WORKING

    LIGHTED

    ZONE

    AHEAD

    WORK

    BRIDGE

    ONE LANE BUMP DIP PAVEMENT

    ENDS

    SOFT

    SHOULDER

    GKO

    TRUCK

    CROSSING

    LOW

    SHOULDERSHOULDER

    DROP OFF

    UNEVEN

    LANES

    Slow Down

    My Daddy

    Works Here

    Slow Down

    My

    Works Here

    Mommy

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    SPEED

    LIMIT

    XX

    W20-7X

    OPEN

    EXIT

    CROSSWALK

    PEDESTRIAN ROAD

    CLOSED

    MERGE

    RIGHT

    LANE ENDS

    RR12-6"

    ROAD

    500 FT

    WORK

    ROAD

    1000 FT

    WORK

    ROAD

    1500 FT

    WORK

    ROAD

    MILE12

    WORK

    ROAD

    1 MILE

    WORK

    ROAD

    AHEAD

    WORK DETOUR

    AHEAD

    DETOUR

    500 FT

    DETOUR

    1000 FT

    DETOUR

    1500 FT

    DETOUR

    MILE1

    2

    TWO LANES

    CLOSED

    AHEAD

    LEFT

    LEFT LANE

    CLOSED

    CLOSED

    RIGHT LANE

    CLOSED

    CENTER LANE FLAGGER

    500

    FEET

    WORKERS SHOULDERWORK

    RIGHT

    SHOULDER

    CLOSED

    END

    BLASTING

    ZONE

    R

    Y

    G

    LANE

    ENDS

    LEFT

    LANE

    ENDS

    RIGHT

    ROAD

    CLOSED

    ONE LANE

    ROAD

    SURVEY

    CREW

    UTILITY

    WORK

    AHEAD

    BLASTING

    ZONE

    1000 FT

    STAY

    LANE

    lN YOUR

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 8 of 13

    Last

  • Name / Initials Date

    APPROVED BY

    DRAWN BY CHECKED BY

    CHECKED BY

    FHWA APPROVALXXX

    XXX

    XXX

    Name / Initials

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    Date DESCRIPTION

    Added:

    Changed:

    Deleted:

    REVISION LOG

    DESIGNED BY

    Name / Initials

    XXX

    DEVELOPMENT CHECKLIST

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    Original Release DateDate

    XX/XX/XX

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    OrOr CAUTION

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 9 of 13

    Last

  • Name / Initials Date

    APPROVED BY

    DRAWN BY CHECKED BY

    CHECKED BY

    FHWA APPROVALXXX

    XXX

    XXX

    Name / Initials

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    Date DESCRIPTION

    Added:

    Changed:

    Deleted:

    REVISION LOG

    DESIGNED BY

    Name / Initials

    XXX

    DEVELOPMENT CHECKLIST

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    Original Release DateDate

    XX/XX/XX

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/07 10 of 13

    Last

  • Name / Initials Date

    APPROVED BY

    DRAWN BY CHECKED BY

    CHECKED BY

    FHWA APPROVALXXX

    XXX

    XXX

    Name / Initials

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    Date DESCRIPTION

    Added:

    Changed:

    Deleted:

    REVISION LOG

    DESIGNED BY

    Name / Initials

    XXX

    DEVELOPMENT CHECKLIST

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    Original Release DateDate

    XX/XX/XX

    BUSINESS

    ENTRANCE

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 11 of 13

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 12 of 13

    Last

  • DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    600

    07/01/09 13 of 13

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    601

    07/01/05 1 of 1

    Last

  • ROAD WORK

    END

    ROAD WORK

    END

    ROAD

    WORK

    AHEAD

    ROAD

    WORK

    AHEAD

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    *

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    602

    07/01/07 1 of 1

    Last

  • ROAD

    WORK

    AHEAD

    ONE LANE

    ROAD

    AHEAD

    ROAD WORK

    END

    ROAD WORK

    END

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    ROAD

    WORK

    AHEAD

    ONE LANE

    ROAD

    AHEAD

    BE

    PREPARED

    TO STOP

    BE

    PREPARED

    TO STOP

    SPEEDING FINESDOUBLED

    WHEN WORKERS

    PRESENT

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    603

    07/01/09 1 of 2

    Last

  • ROAD WORK

    END

    ROAD WORK

    END

    BE

    PREPARED

    TO STOP

    BE

    PREPARED

    TO STOP

    ROAD

    WORK

    AHEADONE LANE

    ROAD

    AHEAD

    STOP

    ONE LANE

    ROAD

    AHEAD

    ROAD

    WORK

    AHEAD

    ROAD WORK

    END

    ROAD WORK

    END

    BE

    PREPARED

    TO STOP

    ROAD

    WORK

    AHEAD

    ONE LANE

    ROAD

    AHEAD

    ONE LANE

    ROAD

    AHEAD

    ROAD

    WORK

    AHEAD

    D

    HERE ON

    STOP

    RED

    STOP SLOW

    SLOW

    BE

    PREPARED

    TO STOP

    SPEEDING FINESDOUBLED

    WHEN WORKERS

    PRESENT

    C

    SPEEDING FINESDOUBLED

    WHEN WORKERS

    PRESENT

    C

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    603

    07/01/09 2 of 2

    Last

  • KEEP

    RIGHT

    KEEP

    RIGHT

    KEEP

    RIGHT

    KEEP

    RIGHT

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    STOP

    STOP

    END

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD WORK

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    12/26/06 XXXAdded:

    Changed: "Symbols"-The Type I or Type II Barricade symbol. The text "Steady Burning" was

    replaced with "Flashing."

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    604

    07/01/09 1 of 1

    Last

  • ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    605

    07/01/09 1 of 1

    Last

    Name / Initials Date

    APPROVED BY

    DRAWN BY CHECKED BY

    CHECKED BY

    FHWA APPROVALXXX

    XXX

    XXX

    Name / Initials

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    Date DESCRIPTION

    Added:

    Changed: note 8 to be the same as note 5 on Index 616 per email from Cheryl Adams

    Deleted:

    Added: Duration Notes per email from Cheryl Adams dated 9-22-08

    REVISION LOG

    DESIGNED BY

    Name / Initials

    RJK

    RJK

    DEVELOPMENT CHECKLIST

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    Original Release DateDate

    07/01/08

    9/23/08

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    606

    07/01/09 1 of 4

    Last

  • ONE LANE

    ROAD

    1000 FT

    ONE LANE

    ROAD

    1000 FT

    R

    Y

    G

    R

    Y

    G

    ONE LANE

    ROAD

    1000 FT

    R

    Y

    G

    ONE LANE

    ROAD

    1000 FT

    R

    Y

    G

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    SPEEDING FINES

    PRESENT

    DOUBLED

    WHEN WORKERS

    SPEEDING FINES

    PRESENT

    DOUBLED

    WHEN WORKERS

    SPEEDING FINES

    PRESENT

    DOUBLED

    WHEN WORKERS

    SPEEDING FINES

    PRESENT

    DOUBLED

    WHEN WORKERS

    KEEP

    LEFT

    KEEP

    RIGHT

    KEEP

    RIGHT

    KEEP

    LEFT

    KEEP

    LEFT

    KEEP

    RIGHT

    KEEP

    RIGHT

    KEEP

    LEFT

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Work Area

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    606

    07/01/09 2 of 4

    Last

  • ONE LANE

    ROAD

    1000 FT

    ONE LANE

    ROAD

    1000 FT

    R

    Y

    G

    R

    Y

    G

    ONE LANE

    ROAD

    1000 FT

    ONE LANE

    ROAD

    1000 FT

    R

    Y

    G

    R

    Y

    G

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    KEEP

    LEFT

    KEEP

    RIGHT

    KEEP

    RIGHT

    KEEP

    LEFT

    KEEP

    RIGHT

    KEEP

    LEFT

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    10

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    606

    07/01/09 3 of 4

    Last

  • ROAD

    AHEAD

    WORK EQUIPMENT

    CROSSING

    AHEAD

    R

    Y

    G

    ROAD

    AHEAD

    WORKEQUIPMENT

    CROSSING

    AHEAD

    R

    Y

    G

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    606

    07/01/05 4 of 4

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    ROAD

    AHEAD

    WORK

    SHOULDER

    WORKONE LANE

    ROAD

    ROAD

    AHEAD

    WORK SLOW TRAFFIC

    AHEADor

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    607

    07/01/09 1 of 1

    Last

    X

    W

    A

  • ROAD

    CLOSED

    ROAD

    CLOSED

    ROAD

    1 MILE

    WORK

    ROAD

    1 MILE

    WORK

    ROAD WORK

    END

    ROAD WORK

    END

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    ROAD

    WORK

    ROAD

    WORK

    1500 FT

    ROAD

    WORK

    ROAD

    WORK

    1500 FT

    SPEEDING FINES

    DOUBLED

    PRESENT

    WHEN WORKERS

    SPEEDING FINES

    DOUBLED

    PRESENT

    WHEN WORKERS

    1000 FT

    1000 FT

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    608

    07/01/09 1 of 1

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    611

    07/01/05 1 of 1

    Last

  • ROAD WORK

    END

    ROAD

    WORK

    AHEAD

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    612

    07/01/07 1 of 1

    Last

  • ROAD WORK

    END

    ROAD

    AHEAD

    WORK RIGHT LANE

    CLOSED

    AHEAD

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    613

    07/01/09 1 of 2

    Last

  • ROAD

    1 MILE

    WORK

    ROAD

    MILE1

    2

    WORK

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD

    1 MILE

    WORK

    ROAD

    MILE1

    2

    WORK

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    UNEVEN

    LANES

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    **

    **

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    613

    07/01/05 2 of 2

    Last

  • 1

    2

    CLOSED

    MILE

    RIGHT LANE

    ROAD

    1 MILE

    WORK

    SPEED

    LIMIT

    XXROAD WORK

    END

    SPEED

    LIMIT

    XX

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    SPEED

    LIMIT

    XX

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEED

    LIMIT

    XX

    500

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    614

    07/01/07 1 of 2

    Last

  • 1

    2

    TRUCKS

    USE

    CENTER

    LANE

    CLOSED

    MILE

    RIGHT LANE

    500

    FEET

    ROAD

    1 MILE

    WORKSPEED

    LIMIT

    XX

    ROAD WORK

    END SPEED

    LIMIT

    XX

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    614

    07/01/09 2 of 2

    Last

  • LEFT LANE

    CLOSED

    AHEAD

    CLOSED

    AHEAD

    RIGHT LANE

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials DateEND

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD WORK

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    615

    07/01/09 1 of 1

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    616

    07/01/09 1 of 3

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    RIGHT LANE

    CLOSED

    AHEAD

    ROAD WORK

    END

    ROAD

    AHEAD

    WORKPRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    MUST

    RIGHT LANE

    TURN RIGHT

    STOP

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    THRU

    TRAFFIC

    MERGE

    LEFT

    *

    *

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    616

    07/01/09 2 of 3

    Last

  • CLOSED

    AHEAD

    ROAD

    CLOSED

    ROAD WORK

    END

    ONE WAY

    ONE WAY

    ROAD

    AHEAD

    WORKPRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    MUST

    LEFT LANE

    TURN LEFT ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    LEFT LANE

    CLOSED

    AHEAD

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    LEFT LANE

    Taper Tangent

    25 50

    25 50

    Taper Tangent

    25

    3030 to 45

    25 50

    50

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX MTP Added:

    Changed: Rotated Road Closed sign.

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials DateCLOSEDROAD

    *

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    616

    07/01/09 3 of 3

    Last

  • CLOSED

    AHEAD

    CENTER LANEROAD

    AHEAD

    WORK

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    END

    ROAD WORK

    **

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    617

    07/01/09 1 of 1

    Last

  • CLOSED

    AHEAD

    RIGHT

    CLOSED

    AHEAD

    RIGHT

    TWO LANES

    TWO LANES

    ROAD

    AHEAD

    WORK ROAD WORK

    END

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    STOP STOP

    STOP

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    618

    07/01/09 1 of 1

    Last

  • RIGHT LANE

    CLOSED

    LEFT LANE

    CLOSED

    RIGHT LANE

    CLOSED

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    ROAD

    AHEAD

    WORK

    SHOULDER

    WORK

    AWA W

    LEFT LANE

    CLOSED

    WS

    S W

    AW

    AW

    A

    A

    A

    A

    X

    W

    A

    WS

    S W

    AW

    AW

    A

    A

    A

    A

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    619

    07/01/05 1 of 1

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    620

    07/01/09 1 of 2

    Last

  • CLOSED

    1500 FT

    RIGHT LANE

    CLOSED

    1000 FT

    RIGHT LANE

    DO

    NOT

    PASS

    DO

    NOT

    PASS

    DO

    NOT

    PASS

    DO

    NOT

    PASS

    KEEP

    RIGHT

    KEEP

    RIGHT

    DO

    NOT

    PASS

    KEEP

    RIGHT

    DO

    NOT

    PASS

    LEFT LANE

    CLOSED

    1500 FT

    LEFT LANE

    CLOSED

    1000 FTROAD WORK

    END

    ROAD

    1 MILE

    WORK

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD

    1 MILE

    WORK

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD WORK

    END

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XXSPEEDLIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEEDING FINES

    DOUBLED

    PRESENT

    WHEN WORKERS

    SPEEDING FINES

    DOUBLED

    PRESENT

    WHEN WORKERS

    ROAD

    WORK

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEED

    LIMIT

    XX

    ROAD

    MILE1

    2

    WORK

    MILE1

    2

    SPEED

    LIMIT

    XX

    L L(T)

    1: 20

    1: 201: 2

    0

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    620

    07/01/09 2 of 2

    Last

  • CLOSED

    1500 FT

    RIGHT LANE

    CLOSED

    1000 FT

    RIGHT LANEDO

    NOT

    PASS

    DO

    NOT

    PASS

    LEFT LANE

    CLOSED

    1500 FT

    LEFT LANE

    CLOSED

    1000 FT

    KEEP

    RIGHT

    ROAD

    CLOSED

    ROAD

    1 MILE

    WORK

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD

    1 MILE

    WORK

    ROAD

    MILE1

    2

    WORK

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    ROAD

    MILE1

    2

    WORK

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    621

    07/01/09 1 of 1

    Last

  • CLOSED

    AHEAD

    RIGHT LANE

    CLOSED

    AHEAD

    RIGHT LANE

    LEFT LANE

    CLOSED

    AHEAD

    LEFT LANE

    CLOSED

    AHEAD

    ROAD WORK

    ENDROAD

    AHEAD

    WORK

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    SPEEDING FINES

    DOUBLED

    PRESENT

    WHEN WORKERSSPEEDING FINES

    DOUBLED

    PRESENT

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    SPEEDING FINES

    DOUBLED

    PRESENT

    WHEN WORKERS

    STOP

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    622

    07/01/09 1 of 1

    Last

  • BE

    PREPARED

    TO STOP

    Work Area

    Work Area

    Lane Identification + Direction of Traffic

    Work Zone Sign

    A B C

    DISTANCE BETWEEN SIGNS

    500

    200

    350

    500

    200

    350

    500

    Speed

    (mph)

    350

    20040 or less

    45

    50 or greater

    25

    20030

    35 250

    30540

    45 360

    42550

    55 495

    57060

    65 645

    155

    Dist.Speed

    (mph)

    BUFFER SPACE

    CONDITIONS

    SYMBOLSSpacing (ft.)

    (ft.)

    BE

    PREPARED

    TO STOP

    ROAD

    WORK

    AHEAD

    ROAD

    WORK

    AHEAD

    Sign

    GENERAL NOTES

    Median Work Area

    BE

    PREPARED

    TO STOP

    BE

    PREPARED

    TO STOP

    ROAD

    WORK

    AHEAD

    ROAD

    WORK

    AHEAD

    TWO-LANE, TWO-WAY

    MULTILANE

    Traffic Control Officer

    A B C

    Buffer

    Space

    Buffer

    Space C B A

    A B CBuffer

    Space

    Buffer

    Space C BA

    Flagger

    1. This Index does not apply to limited access facilities.

    2. When a side road intersects the highway within the TTC zone,

    additional TTC devices shall be placed in accordance with

    applicable TCZ Indexes.

    3. Traffic volume or complexity of the roadway may dictate additional

    devices, signs, flagmen and/or a traffic control officer.

    4. The buffer space may be omitted if there are no sight

    obstructions to vehicles approaching the Flagger/Officer

    for distance equal to the buffer space.

    5. The BE PREPARED TO STOP sign may be omitted if all

    of the following conditions are met:

    a) Speed limit is 45 mph or less.

    b) No sight obstructions to vehicles approaching the

    Flagger/Officer for a distance equal to the buffer space.

    c) Vehicles in the work area have high-intensity, rotating,

    flashing, oscillating, or strobe lights operating.

    6. On undivided highways the median sign as shown are to be omitted.

    7. For general TCZ requirements and additional information

    refer to FDOT Index No. 600.

    PLANNED CLOSURE NOT

    EXCEEDING 5 MINUTES.

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    625

    07/01/09 1 of 1

    Last

    TEMPORARY ROAD CLOSURE

    5 MINUTES OR LESS

  • ROAD

    WORK

    ROAD WORK

    END

    AHEAD

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD

    WORK

    AHEAD

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    628

    07/01/09 1 of 1

    Last

    X

    W

    A

    WAWA W AW A

  • CLOSED

    MILE

    RIGHT LANE

    LEFT LANE

    CLOSED

    1000 FT

    LEFT LANE

    CLOSED

    MILE

    CLOSED

    1000 FT

    RIGHT LANE

    1

    2

    1

    2

    TRUCKS

    TURNING

    LEFT

    000 FT

    MERGE

    RIGHT ON

    FLASHING

    ARROW

    TRUCKS

    TURNING

    LEFT

    000 FT

    MERGE

    RIGHT ON

    FLASHING

    ARROW TRUCKS

    ENTERING

    HIGHWAY

    TRUCKS

    ENTERING

    HIGHWAY

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    X

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    630

    07/01/09 1 of 2

    Last

  • CLOSED

    1000 FT

    RIGHT LANE

    CLOSED

    MILE

    RIGHT LANE

    LEFT LANE

    CLOSED

    MILE

    LEFT LANE

    CLOSED

    1000 FT

    1

    2

    1

    2

    TRUCKS

    TURNING

    LEFT

    000 FT

    MERGE

    RIGHT ON

    FLASHING

    ARROW

    TRUCKS

    TURNING

    LEFT

    000 FT

    MERGE

    RIGHT ON

    FLASHING

    ARROW

    TRUCKS

    ENTERING

    HIGHWAY

    TRUCKS

    ENTERING

    HIGHWAY

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    CONDITION A

    CONDITION B

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    630

    07/01/09 2 of 2

    Last

  • TRUCKS

    ENTERING

    HIGHWAY

    TRUCKS

    ENTERING

    HIGHWAY

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    631

    07/01/07 1 of 2

    Last

  • MERGE

    RIGHT

    LANE ENDS

    TRUCKS

    ENTERING

    HIGHWAY

    STAY

    IN YOUR

    LANE

    MERGE

    RIGHT

    LANE ENDS

    AW

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    AW

    AW

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    631

    07/01/09 2 of 2

    Last

  • DO

    STOP

    ON

    TRACKS

    NOT

    ROAD WORK

    END

    ROAD WORK

    END

    ROAD

    WORK

    AHEAD

    ONE LANE

    ROAD

    AHEAD PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    ROAD

    WORK

    AHEAD

    ONE LANE

    ROAD

    AHEAD

    BE

    PREPARED

    TO STOP

    BE

    PREPARED

    TO STOP

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    635

    07/01/09 1 of 1

    Last

  • SPEED

    LIMIT

    XX

    ROAD WORK

    END

    ROAD

    1 MILE

    WORKSPEED

    LIMIT

    XX

    ROAD

    1500 FT

    WORK

    ROAD

    1000 Feet

    WORK

    NEXT X MILES

    ROAD WORK

    ROAD WORK

    END

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    ROAD

    1 MILE

    WORK

    SPEED

    LIMIT

    XX

    NEXT X MILES

    ROAD WORK

    NEXT X MILES

    ROAD WORK

    ROAD WORK

    END

    ROAD WORK

    END

    NEXT X MILES

    ROAD WORK

    SPEED

    LIMIT

    XX

    ROAD

    1 MILE

    WORK

    ROAD

    1500 FT

    WORK

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    ROAD

    1 MILE

    WORK

    ROAD

    1500 FT

    WORK

    ROAD

    1000 Feet

    WORK

    ROAD

    1500 FT

    WORK

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    640

    07/01/09 1 of 2

    Last

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

  • ROAD

    CLOSED ROAD

    CLOSED

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    ROAD

    1 MILE

    WORK

    NEXT X MILES

    ROAD WORK

    ROAD WORK

    END

    NEXT X MILES

    ROAD WORK

    ROAD WORK

    END

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    ROAD

    1 MILE

    WORK

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    640

    07/01/09 2 of 2

    Last

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    ROAD

    WORK

    1500FT

    ROAD

    WORK

    1000FT

    ROAD

    WORK

    1500FT

    1000FT

    WORK

    ROAD

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

  • ROAD

    AHEAD

    WORK

    NEXT X MILES

    ROAD WORK

    ROAD

    AHEAD

    WORK

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    NEXT X MILES

    ROAD WORK

    ROAD

    AHEAD

    WORK

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    KEEP

    LEFT

    ROAD

    AHEAD

    WORK

    STOP

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    641

    07/01/09 1 of 3

    Last

  • ROAD

    AHEAD

    WORK

    ROAD WORK

    END

    NEXT X MILES

    ROAD WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    NEXT X MILES

    ROAD WORK

    ROAD

    AHEAD

    WORK

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    PRESENT

    WHEN WORKERS

    DOUBLED

    SPEEDING FINES

    STOP

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    641

    07/01/09 2 of 3

    Last

    STOP

  • NEXT X MILES

    ROAD WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORK

    ROAD WORK

    END

    ROAD

    AHEAD

    WORK

    ROAD

    AHEAD

    WORKNEXT X MILES

    ROAD WORK

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    KEEP

    LEFT

    STOP

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    641

    07/01/09 3 of 3

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    642

    07/01/09 1 of 1

    Last

  • ROAD

    CLOSED

    ROAD

    CLOSED

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    ROAD WORK

    END

    ROAD

    1 MILE

    WORK

    ROAD

    MILE1

    2

    WORK

    ROAD

    1500 FT

    WORKNEXT X MILES

    ROAD WORK

    NEXT X MILES

    ROAD WORK

    ROAD

    1500 FT

    WORK

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XXROAD WORK

    END

    ROAD

    1 MILE

    WORK

    ROAD

    MILE1

    2

    WORK

    ROAD WORK

    END

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XXROAD

    MILE1

    2

    WORK

    ROAD

    1 MILE

    WORKNEXT X MILES

    ROAD WORK

    ROAD WORK

    END

    SPEED

    LIMIT

    XX

    ROAD

    1 MILE

    WORK

    ROAD

    MILE1

    2

    WORK

    SPEED

    LIMIT

    XX

    NEXT X MILES

    ROAD WORK

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    ROAD

    1500 FT

    WORK

    ROAD

    1500 FT

    WORK

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    R

    LEGEND

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    650

    07/01/09 1 of 2

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    650

    07/01/05 2 of 2

    Last

  • SPEED

    LIMIT

    XX

    ROAD WORK

    END

    ROAD

    1 MILE

    WORK

    NEXT X MILES

    ROAD WORK

    NEXT X MILES

    ROAD WORK

    SPEED

    LIMIT

    XX

    ROAD

    1 MILE

    WORK

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    SPEED

    LIMIT

    XX

    SPEED

    LIMIT

    XX

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    651

    07/01/09 1 of 2

    Last

    ROAD WORK

    END

    ROAD

    WORK

    1000 FT

    ROAD

    WORK

    1500FT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    ROAD

    WORK

    1500 FT

    ROAD

    WORK

    1000 FT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

  • ROAD WORK

    END

    ROAD WORK

    END

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    651

    07/01/09 2 of 2

    Last

  • Name / Initials Date

    APPROVED BY

    DRAWN BY CHECKED BY

    CHECKED BY

    FHWA APPROVALXXX

    XXX

    XXX

    Name / Initials

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    Date DESCRIPTION

    Added:

    Changed:

    Deleted:

    REVISION LOG

    DESIGNED BY

    Name / Initials

    XXX

    DEVELOPMENT CHECKLIST

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    Original Release DateDate

    XX/XX/XX

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    655

    07/01/09 1 of 3

    Last

  • Name / Initials Date

    APPROVED BY

    DRAWN BY CHECKED BY

    CHECKED BY

    FHWA APPROVALXXX

    XXX

    XXX

    Name / Initials

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    XXX

    Date DESCRIPTION

    Added:

    Changed:

    Deleted:

    REVISION LOG

    DESIGNED BY

    Name / Initials

    XXX

    DEVELOPMENT CHECKLIST

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    Original Release DateDate

    XX/XX/XX

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    655

    07/01/09 2 of 3

    Last

  • Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    655

    07/01/09 3 of 3

    Last

  • STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    DATE UTILITY ACCOMMODATION MANUAL REVISIONS

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    660

    07/01/09 1 of 1

    Last

    PEDESTRIAN

    WALKWAY

    PEDESTRIAN

    WALKWAY

    SIDEWALK CLOSEDAHEAD

    CROSS HERE

    SIDEWALK

    CLOSED

    SIDEWALK

    CLOSED

    SIDEWALK CLOSEDAHEAD

    CROSS HERE

    SIDEWALK CLOSEDAHEAD

    CROSS HERE

    SIDEWALK CLOSED

    CROSS HERE

    SIDEWALK CLOSED

    USE OTHER SIDE

    SIDEWALK CLOSED

    USE OTHER SIDE

    SIDEWALK CLOSED

    CROSS HERE

    PEDESTRAIN

    CROSSWALK

    PEDESTRAIN

    CROSSWALK

  • /-/-/ /-/-/ /-/-/

    TRUCKS

    ENTERING

    HIGHWAY

    x x x x x x xx x x

    TRUCKS

    ENTERING

    HIGHWAY

    STANDARD INDEX NO. XXXXX, SHEET X OF X

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX XXX

    XXX

    XX/XX/XX XXX Added:

    Changed:

    Deleted:

    APPROVED BY

    DESIGNED BY

    DRAWN BY

    FHWA APPROVAL

    CHECKED BY

    CHECKED BY

    DEVELOPMENT CHECKLIST

    Original Release Date

    REVISION LOG

    Name / InitialsDate

    Name / Initials Date Name / Initials Date

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    665

    07/01/00 1 of 1

    Last

  • SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    AWA

    PLAZA

    WORK

    1000 FT

    PLAZA

    WORK

    500 FT

    AWA

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    PLAZA

    WORK

    1000 FT

    PLAZA

    WORK

    500 FT

    AWA

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    667

    07/01/09 1 of 6

    Last

  • Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    667

    07/01/09 2 of 6

    Last

    MESSAGE 1: MESSAGE 2: SUNPASS

    LANES

    CLOSED

    USE

    CASH

    LANES

    AWA

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    PLAZA

    WORK

    1000 FT

    PLAZA

    WORK

    500 FT

    AWA

    LANE

    CLOSED

    1/2 MILE

    PLAZA

    WORK

    1 MILE

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    LEFT LANE

    CLOSED

    1000 FT

    AWA

  • AWA

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    667

    07/01/09 3 of 6

    Last

    CLOSED CLOSED

    RIGHT LANE RIGHT LANE

    WORK

    1 MILE1

    2MILE 1000 FT

    PLAZA SPEEDING FINESDOUBLED

    WHEN WORKERS

    PRESENT

    AWA

  • AWA

    LEFT LANE

    CLOSED

    1/2 MILE

    LEFT LANE

    CLOSED

    1000 FT

    PLAZA

    WORK

    1 MILE

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    M

    M

    M/ETC

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    667

    07/01/09 4 of 6

    Last

    AWA

    M

    M

    M/ETC

    AWA

    LEFT LANE

    CLOSED

    1/2 MILE

    LEFT LANE

    CLOSED

    1000 FT

    PLAZA

    WORK

    1 MILE

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

  • LEFT LANE

    CLOSED

    AHEAD

    CLOSED

    CENTER LANE

    AHEAD

    AWA

    AWA

    PLAZA

    WORK

    AHEAD

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    PLAZA

    WORK

    AHEAD

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    PRESENT

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    667

    07/01/09 5 of 6

    Last

    AWA

  • PLAZA

    WORK

    AHEAD

    AWA

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    667

    07/01/09 6 of 6

    Last

    PLAZA

    WORK

    AHEAD

    AWA

  • ROAD WORK

    ENDSPEEDLIMIT

    PRESENT

    SPEEDING FINES

    DOUBLED

    WHEN WORKERS

    ROAD

    1 MILE

    WORKCLOSED

    RIGHT LANE

    1/2 MILE xx

    Sheet No.

    Index No.

    2010 FDOT Design StandardsRevision

    670

    07/01/09 1 of 1

    Last

    CoverCover sheet 1 of 4Cover sheet 2 of 4Cover sheet 3 of 4Cover sheet 4 of 4

    Table of Contents sheet 1 of 3Table of Contents sheet 2 of 3Table of Contents sheet 3 of 3

    RevisionsRevisions sheet 1 of 5Revisions Sheet 2 of 5Revisions Sheet 3 of 5Revisions Sheet 4 of 5Revisions Sheet 5 of 5

    Traffic Control Through Work Zones600-General Information for Traffic Control Through Work Zones sheet 1 of 13600-General Information for Traffic Control Through Work Zones sheet 2 of 13600-General Information for Traffic Control Through Work Zones sheet 3 of 13600-General Information for Traffic Control Through Work Zones sheet 4 of 13600-General Information for Traffic Control Through Work Zones sheet 5 of 13600-General Information for Traffic Control Through Work Zones sheet 6 of 13600-General Information for Traffic Control Through Work Zones sheet 7 of 13600-General Information for Traffic Control Through Work Zones sheet 8 of 13600-General Information for Traffic Control Through Work Zones sheet 9 of 13600-General Information for Traffic Control Through Work Zones sheet 10 of 13600-General Information for Traffic Control Through Work Zones sheet 11 of 13600-General Information for Traffic Control Through Work Zones sheet 12 of 13600-General Information for Traffic Control Through Work Zones sheet 13 of 13

    601-Two-Lane Two-Way, Work Outside Shoulder602-Two-Lane Two-Way, Work On Shoulder603-Two-Lane Two-Way, Work Within the Travel Way sheet 1 of 2603-Two-Lane Two-Way, Work Within the Travel Way sheet 2 of 2

    604-Two-Lane Two-Way, Work In Intersection605-Two-Lane Two-Way, Work Near Intersection606-Two-Lane Two Way, Work Within the Travel Way Signal Control sheet 1 of 4606-Two-Lane Two Way, Work Within the Travel Way Signal Control sheet 2 of 4606-Two-Lane Two Way, Work Within the Travel Way Signal Control sheet 3 of 4606-Two-Lane Two Way, Work Within the Travel Way Signal Control sheet 4 of 4

    607-Two-Lane Two-Way, Movile Operations Work On Shoulder, Work Within the Travel Way608-Two-Lane Two-Way, Temporary Diversion Connection611-Multilane, Work Outside Shoulder612-Multilane, Work On Shoulder613-Multilane, Work Within the Travel Way Median or Outside Lane sheet 1 of 2613-Multilane, Work Within the Travel Way Median or Outside Lane sheet 2 of 2

    614-Multilane, Work Within the Travel Way Center Lane sheet 1 of 2614-Multilane, Work Within the Travel Way Center Lane sheet 2 of 2

    615-Multilane, Work In Intersection616-Multilane, Work Near Intersection Median or Outside Lane sheet 1 of 3616-Multilane, Work Near Intersection Median or Outside Lane sheet 2 of 3616-Multilane, Work Near Intersection Median or Outside Lane sheet 3 of 3

    617-Multilane, Work Near Intersection Center Lane618-Multilane, Work Near Intersection Two Lanes Closed- 45 MPH or Less619-Multilane, Mobile Operations Work On Shoulder, Work Within the Travel Way620-Multilane Divided, Temporary Diversion Connection sheet 1 of 2620-Multilane Divided, Temporary Diversion Connection sheet 2 of 2

    621-Multilane Undivided, Temporary Diversion Connection622-Multilane, Work Near Intersection Temporary Diversion Connection- 35MPH or Less625-Temporary Road Closure 5 Minutes or Less628-Two-Way Left Turn Lane Closure630-Crossover For Paving Train Operations, Rural sheet 1 of 2630-Crossover For Paving Train Operations, Rural sheet 2 of 2

    631-Temporary Crossover sheet 1 of 2631-Temporary Crossover sheet 2 of 2

    635-Work in Vicinity of Railroad Crossing640-Converting Two Lanes to Four Lanes Divided, Rural sheet 1 of 2640-Converting Two Lanes to Four Lanes Divided, Rural sheet 2 of 2

    641-Converting Two Lanes to Four Lanes Divided, Urban sheet 1 of 3641-Converting Two Lanes to Four Lanes Divided, Urban sheet 2 of 3641-Converting Two Lanes to Four Lanes Divided, Urban sheet 3 of 3

    642-Transitions for Temporary Concrete Barrier Wall on Freeway Facilities650-Two-Lane Two-Way, Rural Structure Replacement sheet 1 of 2650-Two-Lane Two-Way, Rural Structure Replacement sheet 2 of 2

    651-Multilane Divided, Maintenance and Construction sheet 1 of 2651-Multilane Divided, Maintenance and Construction sheet 2 of 2

    655-Traffic Pacing sheet 1 of 3655-Traffic Pacing sheet 2 of 3655-Traffic Pacing sheet 3 of 3

    660-Pedestrian Control for Closure of Sidewalks665-Limited Access Temporary Opening667-Toll Plaza Traffic Control Standards sheet 1 of 6667-Toll Plaza Traffic Control Standards sheet 2 of 6667-Toll Plaza Traffic Control Standards sheet 3 of 6667-Toll Plaza Traffic Control Standards sheet 4 of 6667-Toll Plaza Traffic Control Standards sheet 5 of 6667-Toll Plaza Traffic Control Standards sheet 6 of 6

    670-Motorist Awareness System