detail project report (dpr) -...
TRANSCRIPT
Gujarat State Watershed Management Agency
Detail Project Report
Project Name – IWMP-14
Project Identity – Jasvantgadh Project 2011-12
Project Implementing Agency
District Watershed Development Unit (DWDU) Sabarkantha
Table of Content
Chapter 1 Project Background………………………………………………………………………………………………………………3
1.1. Project Background………………………………………………………………………………………………………….4
Table no.1: Basic project information……………………………………………………………………………………...5
1.2 Geographical Area of the Project………………………………………………………………………………………………6
1.3 Project Area of the IWMP-14 Idar Cluster……………………………………………………………………………………7
Table no.2: Weight age of the project……………………………………………………………………………………….9
1.4 Need of Watershed Development Program……………………………………………………………………………………11
Table No. 2 Criteria and weight age for selection of watershed…………………………………………………………………...11
Table no.3: Watershed information…………………………………………………………………………………………12
1.5 Area proposed to be treated…………………………………………………………………………………………………….13
Table no.4: Developmental programmers running in the project area……………………………………………………………14
Table no. 5: Previous Watershed programmes in the project area………………………………………………………..14
Chapter- 2 Project Implementation Agency………………………………………………………………………………………………..15
2.1 Project Implementing Agency…………………………………………………………………………………………………………...16
2.2 District Watershed Development Unit, Sabarkantha………………………………………………………………………………….17
2.3 Programmes / Projects running in the district…………………………………………………………………………………………17
Table no. 6: PIA………………………………………………………………………………………………………………………18
Table no. 7: Staff at PIA level………………………………………………………………………………………………………..19
Table No. 7.1 Staff at Cluster Level………………………………………………………………………………………………...20
2.4 SWOT analysis of the DWDU…………………………………………………………………………………………………………....21
Chapter: 3 Basic Information of Project Area……………………………………………………………………………………………..22
3.1 Basic Information of Project Area…………………………………………………………………………………………….23
3.2 Land use pattern………………………………………………………………………………………………………………..24
Table no. 8: Land use pattern………………………………………………………………………………………………………..25
3.3 Soil and topography………………………………………………………………………………………………………………...........26
Table no. 9: Soil type and topography……………………………………………………………………………………………….27
Table no. 10: Flood and drought condition………………………………………………………………………………………….28
3.4 Edaphic Factors………………………………………………………………………………………………………………………….28
Table no. 11.1: Soil Erosion…………………………………………………………………………………………………………….29
Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress)…………………………………………………………………………...30
Table no. 11.3: Water logging Conditions…………………………………………………………………………………………...30
Table no. 12: Climatic conditions…………………………………………………………………………………………………….31
Table no. 13: Physiographic and relief……………………………………………………………………………………………….31
3.5 Land and Agriculture………………………………………………………………………………………………………………….....32
Table no. 14: Land ownership details……………………………………………………………………….………………………..33
Table no. 15: Agriculture…………………………………………………………………………………….………………………..33
Table no. 16: Irrigation…………………………………………………………………………………….……………………….…..34
Table no. 17: Crop details………………………………………………………………………………….…………………..……….35
Table no. 18: Livestock…………………………………………………………………………………….…………………...………36
Table no. 19: Drinking water…………………………………………………………………………….………………...………….37
Table no. 20: Details of Common Property Resources………………………………………………….……………………………38
Table no. 21: Demographic information……………………………………………………………….…………..………………….39
Table no. 22: Literacy rate…………………………………………………………………………….……….………………………40
Table no. 23: Migration details……………………………………………………………………….…….………………………….41
Table no. 24: Poverty ………………………………………………………………………………..…………………………………42
Table no. 25: Village infrastructure……………………………………………………………………………………………………43
3.6 Infrastructure Facilities……………………………………………………………………………………………………………….…...44
Table no. 26: Facilities / HH assets…………………………………………………………………………………………….………45
Table no. 27: Income……………………………………………………………………………………………………………………46
Table no.28: Dependence on Forest/CPR……………………………………………………………………………………………...47
Table no. 29: Livelihood pattern (Occupational distribution)………………………………………………………………………..48
3.7 Comparative data of the crop productivity of the area: project area vs. District vs. State vs. Country vs. World………………….49
3.8 The IWMP-14 project has low productivity because of the following reasons…………………………………………………………50
Chapter 4 Watershed Activity………………………………………………………………………………………………………………....51
4.1 Watershed Activities………………………………………………………………………………………………………………………..52
4.2 Scientific Planning………………………………………………………………………………………………………………………....53
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects………………………………………………………...54
Table no.31: Details of PRA Activities conducted in the project area……………………………………………………...………..55
4.3 Institution building……………………………………………………………………………………………………………….………..56
4.4 Self Help Group……………………………………………………………………………………………………………………….…...56
Table no. 33: SHG detail………………………………………………………………………………………………………………57
4.5 User Group (UG) …………………………………………………………………………………………………………………….……58
Table no. 34: UG detail………………………………………………………………………………………………………….……..60
4.6 Entry Point activity (EPA)………………………………………………………………………………………………………………...62
Tableno.35: Entry point activities (EPA) (All financial figures in lakh Rs.)………………………………………………………….63
4.7 Watershed Development Works………………………………………………………………………………………………………….66
Table no.36: Details of ridge line treatment / land based activities in watershed work……………………………………………..67
Table no.37: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)………………..68
Table no.38: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)……69
Table no.39: Details of activities related to livelihood, production system and micro-enterprises………………………………….70
Table no. 40: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas …………………………………..72
Table no. 41: Linkages developed at village level………………………………………………………………………………………74
Table no.42: Details of activities connected with vegetative cover in watershed works…………………………………………….75
Table no.43: Details of activities in the CPRs in the project areas……………………………………………………………………..79
4.8 Capacity Building …………………………………………………………………………………………………………………………..80
Table no. 44: Capacity Building Institution……………………………………………………………………………………………...81
Table no. 45: Capacity Building plan……………………………………………………………………………………………………82
Table no.46: Information, Education and Communication Activities………………………………………………………………...83
Chapter 5 Budgeting…………………………………………………………………………………………………………………………….83
5.1 Budget………………………………………………………………………………………………………………………………………...84
Table no. 47: Budget at a glance for the project………………………………………………………………………………….............85
Table no. 48: Village wise- component wise budget available under IWMP………………………………………………………...…85
Table no. 49: Village wise gap in funds requirement……………………………………………………………………………….......86
Table no.50: Details of Convergence of IWMP with other Schemes……………………………………………………………............87
Table no. 51: Public-Private Partnership in the IWMP projects………………………………………………………………………87
Chapter-6 Expected Outcome…………………………………………………………………………………………………………………..88
6.1 Employment……………………………………………………………………………………………………………………………….....89
Table no. 52: Employment in Project area……………………………………………………………………………………………..90
Table no. 53: Seasonal migration from Project area…………………………………………………………………………………...91
Table no. 54: Average ground water table depth in the project areas (in meters)…………………………………………………...91
Table no. 55: Status of Drinking water………………………………………………………………………………………………….92
Table no. 56: Crop area and yield in the project area………………………………………………………………………………….93
Table no. 57: Area under horticulture…………………………………………………………………………………………………94
Table no. 58: Forest/vegetative cover………………………………………………………………………………………….………95
Table no. 59: Details of livestock in the project areas………………………………………………………………………………...96
Table no. 60: Backward-Forward linkages……………………………………………………………………………………………97
Chapter -7 Quality And Sustainability Issues………………………………………………………………………………………………….98
7.1 Plans for Monitoring and Evaluation……………………………………………………………………………………………….……....99
7.2 Plans for Project management……………………………………………………………………………………………………….……..100
7.3 Watershed Development Fund……………………………………………………………………………………………………….……..101
7.4 User Charges………………………………………………………………………………………………………………………….……...102
7.5 Logical Frame Works……………………………………………………………………………………………………………………….103
MAPS……………………………………………………………………………………………………………………………………………..104
Chapter 1
Project Background
1.1 Project Background
Jasvantgadh Project (IWMP-14) project is located in Idar Taluka, Sabarkantha District of Gujarat state. The project is a cluster of
seven micro watershed 5F2D6c3f, 5F2D6dlf 5F2D6dlg 5F2D6dle, 5F2D6c2g, 5F2D6c2h, 5F2D6c2e with as their respective
codes. The total project area of the watershed is about 5096.9 Ha, which proposed to be treated 4689.70ha under Integrated
Watershed Management Programme (IWMP).The watershed falls under the government designated flat area. It is located very
near to the Taluka place Idar Town in Sabarkantha.
Table no.1: Basic project information
Sr
No.
Name of
the
Project
Villages Gram
Panchayats
Tal
uka
Distr
ict
Area of the
project
Area
proposed
to be
treated
Cost in
Lakhs PIA
Name Census code
1
IWMP-
14
(Jasvantg
adh
Project)
Barvav 050040036540000 Barvav
Idar
Sab
ark
anth
a
460.70 434.00 52.08
DW
DU
Sab
ark
anth
a 2 Budheli 050040036740000 Budheli 577.70 432.40 51.89
3 Khaski 050040036830000 Khaski 329.30 254.70 30.56
4 Jasvantgad
h 050040036510000 Jasvantgadh 1620.40 1579.80 189.58
5 Masal 050040036730000 Masal 655.00 640.10 76.81
6 Ratanpur 050040036530000 Ratanpur 693.30 637.60 76.51
7 Umedgadh 050040036840000 Umedgadh 760.50 651.10 78.13
Total 5096.90 4629.70 555.56
1.2 Geographical Area of the Project
1.3 Project Area of the IWMP-14 Idar Cluster
1.4 Need of Watershed Development Program
Watershed Development Programme is selected on the basis of thirteen parameter namely Poverty Index, Percentage of SC/ST.
Actual wages, Percentage of small and marginal farmer, Ground water status, Moisture Index, Area under rain fed agriculture, Drinking
water situation in the area, Percentage of the degraded land, Productivity potential of the land, Continuity of another watershed that has
already development/treated, Cluster approach for plain or for hilly terrain, Based on these thirteen parameter a composite ranking was been
given to Jashwantgarh Watershed project as given in table no. 3
The total number of families under BPL is 478 (as per form filled by talati mantri), which is 20.44 per cent of the total households of
the village. Hence a score of 5 is allotted. The percentage of schedule castes in the village is about 45.15 percent to the total population;
hence a score of 10 is allotted. Rain fed agriculture forms the primary occupation of the village due to the fact that ground water is saline and
hence unfit for usage. More than 60 cent of the farmers are small and marginal by nature and the actual wages earned by the labour is less
than the minimum wages hence a composite rank of 5 and 5 are allotted respectively.
Since the rainfall received is erratic and irregular, the moisture index is low and the area is classified under DPAP block. Drinking
water is problematic in the village. The soil is very permeable and production of the land can be significantly enriched with the availability
of timely irrigation. Jasvatgardh watershed falls in continuity with other watersheds namely Barvav, Budheli, Khaski, Jasvantgadh, Masal,
Ratanpur, Umedgadh . Cluster approach was followed taking into consideration nine micro-watersheds covering a total area of 5096.90 Ha.
All the parameters taken together give a cumulative score of 82 to the watershed (reference Table 2.1 below
Table no.2: Weight age of the project
Project
name Project type Weight age
IWMP Flat Area I II III IV V VI VII VIII IX X XI XII XIII
IWMP-
14 Jasvantgadh
Project 5 10 5 5 2 10 5 5 5 5 10 15 0
Table No. 2.1 Criteria and weight age for selection of watershed
Sr.
No. Criteria
Maximum
score Ranges & scores
i Poverty index (% of poor to
population) 7.5
Above 80 % (10) 80 to 50 % (7.5) 50 to 20 % (5) Below
20 %
(2.5)
ii % of SC/ ST population 5
More than 40 % (10) 20 to 40 % (5) Less than 20 % (3)
iii Actual wages
0
Actual wages are
significantly lower than
minimum wages (5)
Actual wages are equal to or
higher than minimum
wages (0)
iv % of small and marginal
farmers 5
More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)
v Ground water status 3 Over exploited (5) Critical (3) Sub critical (2) Safe (0)
vi Moisture index/
DPAP/ DDP Block 10
-66.7 & below (15)
DDP Block
-33.3 to -66.6 (10)
DPAP Block
0 to -33.2 (0)
Non DPAP/ DDP
Block
vii Area under rain-fed agriculture
15
More than 90 % (15) 80 to 90 % (10) 70 to 80% (5) Above
70 %
(Reject)
viii Drinking water
7.5
No source (10) Problematic village (7.5) Partially covered
(5)
Fully
covered
(0)
ix Degraded land 10
High – above 20 % (15) Medium – 10 to 20 % (10) Low- less than 10
% of TGA (5)
x Productivity potential of the
land
15
Lands with low production
& where productivity can
be significantly enhanced
with reasonable efforts
(15)
Lands with moderate
production & where
productivity can be
enhanced with reasonable
efforts (10)
Lands with high
production & where
productivity can be
marginally
enhanced with
reasonable efforts
(5)
xi Contiguity to another
watershed that has already 5
Contiguous to previously
treated watershed &
Contiguity within the micro
watersheds in the project but
Neither contiguous
to previously
been developed/ treated contiguity within the
micro watersheds in the
project (10)
non contiguous to
previously treated watershed
(5)
treated watershed
nor contiguity
within the micro
watersheds in the
project
xii Cluster approach in the plains
(more than one contiguous
micro-watersheds in the
project)
15
Above 6 micro-watersheds
in cluster (15)
4 to 6 micro watersheds in
cluster (10)
2 to 4 micro
watersheds in
cluster (5)
xiii Cluster approach in the hills
(more than one contiguous
micro-watersheds in the
project)
15
Above 5 micro-watersheds
in cluster (15)
3 to 5 micro watersheds in
cluster (10)
2 to 3 micro
watersheds in
cluster (5)
Total 113 150 90 41 2.5
Table no.3: Watershed information
Sr.No Name of the
project
No. of watersheds to be
treated Watershed code
Watershed
regime/type/order
1
IWMP-14
Jashwantgard
Project
Barvav 1 5F2D6c3f Micro Watershed
2 Budheli 1 5F2D6dlf Micro Watershed
3 Khaski 1 5F2D6dlg Micro Watershed
4 Jasvantgadh 1 5F2D6dle Micro Watershed
5 Masal 1 5F2D6c2g Micro Watershed
6 Ratanpur 1 5F2D6c2h Micro Watershed
7 Umedgadh 1 5F2D6c2e Micro Watershed
Table no.4: Developmental programmers running in the project area
Si. No
Name of the
programmes/scheme Sponsoring agency
Objectives of the
programmes/scheme
Year of
commencement
Villages
covered
Estimated
number of
beneficiaries
Barvav
1 Irrigation Govt. of Gujarat. Irrigation water 1995
Barvav
7
2 MGNREGA Rural Development Dept. Employment 2006-2012 25
3 WASMO Govt. of Gujarat Drinking water facility 2008 1
4 SGSY Rural Development Dept. Financial Inclusion 2008-2010 1
5 TSC Rural Development Dept. Toilet Facility 2009-2010 29
Budheli
1 IAY Rural Development Dept. House Facility 1995
Budheli
2
2 SGSY Rural Development Dept Employment 1995 8
3 TSC Rural Development Dept Toilet Facility 2005 50
4 Irrigation Govt. of Gujarat Irrigation water
(Check dam) 2005
10
5 MGNREGA Rural Development Dept. Employment 2009-10 21
6 WASMO Govt. of Gujarat Drinking water facility 2009-10 1
Khaski
1 IAY Rural Development Dept. House Facility 1995
Khaski
2
2 SGSY Rural Development Dept. Employment 1995 5
3 WASMO Govt. of Gujarat Drinking water facility 2003 1
4 Irrigation Govt. of Gujarat
Irrigation water (Check
dam) 2003-04 13
5 MGNREGA Rural Development Dep. Employment 2005 38
TSC Rural Development Dep. Toilet Facility 2005 40
Jasvantgadh
1 MGNREGA Rural Development Dep. Employment 2005
Jasvantgadh
40
2 Irrigation Govt. of Gujarat
Irrigation water (Check
dam) 2005 18
3 TSC Rural Development Dep. Toilet Facility 2005-2012 358
4 WASMO Govt. of Gujarat Drinking water facility 2008-2011 2
5 IAY Rural Development Dept. House Facility 2008-2012 40
6 SGSY Rural Development Dept. Employment 2008-2012 30
Masal
1 WASMO Govt. of Gujarat Drinking water facility 2005-2006
Masal
3
2 Irrigation Govt. of Gujarat
Irrigation water (Check
dam) 2005-2006 4
3 IAY Rural Development Dept. House Facility 2007-2008 8
4 MGNREGA Rural Development Dept. Employment 2008-2010 21
5 SGSY Rural Development Dept. Employment 2010-2011 5
6 TSC Rural Development Dep. Toilet Facility 2010-11 44
Ratanpur
1 IAY Rural Development Dept. House Facility 1995
Ratanpur
9
2 SGSY Rural Development Dep. Employment 1995 4
3 Irrigation Govt. of Gujarat Irrigation water 1996-1997 22
4 TSC Rural Development Dep. Toilet Facility 2005 9
5 MGNREGA Rural Development Dep. Employment 2005 48
6 WASMO Govt. of Gujarat Drinking water facility 2009 4
Umedgadh
1 IAY Rural Development Dep House Facility 1995
Umedgadh
40
2 SGSY Rural Development Dep. Employment 1995 12
3 Irrigation Govt. of Gujarat
Irrigation
water(Checkdam) 2005 8
4 TSC Rural Development Dep. Toilet Facility 2005 148
5 MGNREGA Rural Development Dep. Employment 2009 23
6 WASMO Govt. of Gujarat Drinking water facility 2010-2011 3
(Source: GP & Talati)
Table no. 5: Previous Watershed programmes in the project area:
Sr.
No
.
Projec
t
name
Year
started
Name
of
villages
No. of
micro
watersh
ed
Watersh
ed codes
Area
under
treatment
Fundin
g source
Nodal
agency PIA
Total
cost
Expenditure
incurred up
to start of
IWMP
%
financial
completion
% physical
completion
1
Not
any
Project
- - - - - - - - - - - -
Chapter- 2
Project Implementation Agency
2.1 Project Implementing Agency
The Project Implementing Agency (PIA) is being selected by an appropriate mechanism by State Level Nodal Agency (SLNL). PIAs would be
responsible for implementation of watershed project. These PIAs may include relevant line departments, autonomous organizations under State /
Central, Governments, Government Institutes / Research bodies, Intermediate Panchayats, Voluntary Organization (VOs) The PIA of Jasvantgadh
watershed Project (IMWP) is District watershed development Unit (DWDU) Sabarkantha.
2.2 District Watershed Development Unit, Sabarkantha
The organization and its objectives:
The District Watershed Development Unit (DWDU), Sabarkantha is a district level nodal agency and was established on 1St
April 2008 to oversee for
then smooth implementation of watershed projects in the district. The District Development Officer (DDO) is the chairman of the DWDU. The DWDU
have dedicated and experience staffs comprising one project Manager (deputation from Gujarat Forest Department) a technical expert (on contract basis)
and multidisciplinary team of agriculture expert, community mobilization expert, computer operator, civil engineer, MIS coordinator, system analyst,
surveyor, and accountant are recruited. The DWDU Sabarkantha staffs are sitting with the District Rural Development Agency (DRDA) at Bahumali
Building, C-block, Ground Floor, Himatnagar-Sabarkantha. The objective of the DWDU Sabarkantha are supervising, planning, implementing,
documenting and promoting watershed development projects and related development activities in the district. Moreover, the DWDU Sabarkantha will
work as a PIA for some IWMP projects.
2.3 Programmes / Projects running in the district
At present 21 IWMP projects have been sanctioned by Government of India for the Sabarkantha district. The Entry Point Activities of first 12 IWMP
projects has almost completed and work phase work has been started in all the project of the 2009-10 & 2010-11 projects. In 2009-10 projects 4 project
being PIA were Forest Dept. (IWMP 1, 2, 3&6) and in 2 projects DWDU (IWMP 4&5) were PIA respectively. In 2010-11 we have other six project
were sanctioned for district Sabarkantha in which Forest Dept. as PIA for the 2 projects (IWMP-8 & 9) and DWDU-self is as PIA for the 4 projects
(IWMP-7,10,11 & 12). Apart from the running 12 IWMP projects, total 135 pre-Hariyali & Hariyali projects (DPAP & IWDP) has been sanctioned and
out of that 30 projects are completed and 110 projects are still running in the district. The DWDU Sabarkantha is also monitoring a central government
sponsored scheme on “Artificial Recharge of Groundwater through Dugwells” in the district.
Table no. 6: PIA:
Sr No. Name of project Details of PIA
1 IWMP-14 project
(i) Type of organization District Level Nodal Agency
(ii) Name of organization DWDU, Sabarkantha
(iii) Designation & Address Project Manager, DWDU, Sabarkantha
(iv) Telephone (02772)241666
(v) Fax (02772)242636
(vi) E-mail [email protected]
Table no. 7: Staff at PIA level:
Sr. No. Name Age Sex Designation Qualification Experience Job assigned Monthly
remuneration
1 Shri B.B Patel 54 Male Project
Director B.Sc (Physics) 24 years
Project Management 560000.00
2 Prashant Dhanula 26 Male Technical
Expert
MBA in
Marketing 1.6 years
Project Management 25000.00
3 Sidharth Singh
Bisen 29 Male
Technical
Expert
MBA in Rural
Mgmt 2.6 years
Project Management 25000.00
4 Malava Bhavsar 21 Male MDT( Eng) Civil Eng. 7 months SMC development 15000.00
5 Sunil Patel 22 MDT (Agri) M.R.S 8 months Agriculture 9000.00
Development
6 Hiral Patel 28 Female MDT (CM) B.R.S 8 years Community
Mobilization 12000.00
7 Sweety Patel 32 Female MDT (CM) M.S.W 8Years Community
Mobilization 12000.00
8 Hidayat Menon 27 Male MDT (MIS) B.E( IT) 3 years Project Data
Management 15000.00
9 Nayan Patel 23 Male System Analyst MCA 6 months System Management 8000.00
10 Deepak Patel 28 Male MDT Account M.Com 5.8 yeas Manage the District
Account 15000.00
11 Disha Prajapati 28 Female Data Entry
Operator PGDCA 1 year Operator 6000.00
12 Bhaveshchand
Ravat 25 Male Office Assistant B.A 5 months Office Assistant 3500.00
13 Manhor Sinh 36 Male Peon 10th
Pass 6 years Peon 4500.00
Table No. 7.1 Staff at Cluster Level
Sr.
No. Name Age Sex Designation Qualification Experience Job assigned
Monthly
remuneration
1 Prashant Dhanula 26 Male
Technical
Expert
MBA in
Marketing 1.6 years Project
Management 25000.00
2 Sheth Naziya .M 26 F WDT ENG.
Diploma In
Civil Eng. 4.7years 05/11/2011 12000
3 Patel Dipak .S 29 M WDT AGR B.R.S./M.S.W 2 Years 05/11/2011 8000
4 Parmar Hasumatiben
.H 36 F WDT. CO B.R.S./M.A 7 Years 5/11/2011 8000
2.4 SWOT analysis of the DWDU:
Strength
1. Well establishment of PRIs for social audits Independent District Level Nodal Agency (DWDU). With Dedicated competent and experienced
personnel.
2. Separate State Level Nodal Agency (Gujarat State Watershed Management Agency) for Planning and fund Dispersion.
3. Use multidisciplinary teams and with more holistic approaches using modern technology like GIS & Remote Sensing (RS).
4. Strong linkages with national and state level Institutions, State Agricultural Universities, North Gujarat University KVKs and NGOs for capacity
building and technical guidance.
5. District level monitoring, coordination & co-operating Committee (DLCCC).
6. Extensive grassroots coverage at district- and village-level with project office in cluster level and village office at village level.
7. Amalgamation of Various technological, academic and social institutions for programme support.
8. Participatory planning involving more grassroots contact. Bottom-up approaches ensures effective grassroots and community participation.
9. Allocation of financial resources to the community hence planning and Implementation by community with a Project Implementation Agency
for technical and Logistical support.
10. Programme is more flexible and is adjusted to changing needs and environmental factors for making a sustainable and measurable outcome
Weakness:
1. Lack of technical knowledge in new Personnel.
2. Permanent Office Building is lacking
3. High staff turnover since there is no permanent staff.
4. Inadequate budgets as majority of area is rain-fed and highly scarce natural resources.
5. Numerous but uncoordinated developmental interventions resulting from secluded and untenable output.
6. Duplication and repetition of projects without measuring output and gap analysis.
7. Community participation suffers due to conflicts, counterproductive thinking and Lack of leadership for effective community mobilisation.
Opportunities:
1. Cooperation between the public and private sectors.
2. Improved collaboration and efficiency through departmental convergence.
3. Greatly improved understanding of community needs through participatory planning and implementation would show greater accountability and
impact of work.
4. Small independent decision-making units like village Watershed committee, SHG federation will facilitate quick decision-making and greater
flexibility in programme implementation.
5. Awareness generation among the illiterates through IEC activities by usage of new ICT activities.
6. Usage of new technologies of watershed modelling and GPS for monitoring the watershed activities.
Threats:
1.Lack of Sustainable agriculture development
2.Delay of releasing project fund from the higher authority.
3.The outcome of the project is heavily dependent on monsoon making it vulnerable.
4.Unfavourable socio-economic environment threatens operations and survival of the project.
5.Contribution and cooperation from local peoples were reduced due non timely payments
6.Low and erratic rainfall in the project area.
7.Low literacy rate in the project area.
Chapter: 3
Basic Information of Project Area
3.1 Basic Information of Project Area
Jasvantgadh watershed is located in the Idar taluka of Sabarkantha district which about 45 km from district headquarters. The project area is
characterized by high temperature and low rainfall. The proposed watershed has a land area of 4629.70 ha will be treated. The Jasvantgadh
watershed project is characterized by low land and heavy runoff of soil with varying slopes. The soil and underground water is highly saline
which results in acute shortage of drinking water at lean period.
3.2 Land use pattern:
The net geographical area of Jasvantgadh watershed is about 5096.90 ha out of which 4167.60 ha is Agriculture land area which is about
81.76% of land under is agriculture which is completely rain-fed mainly a Kharif crop and 30 to 40% of Rabi crop were taken. About 851.4ha
of the total land are classified under wasteland of which 53.88% is cultivable and rest is uncultivable 46.11%. Total agricultural lands were classified
under watershed area.
Table no. 8: Land use pattern:
Sr. No. Names of
villages
Geographical
Area of the
village
Forest Area Land under
agricultural use Rain fed area
Perm-anent
pastures
Wasteland
Cultivable Non-
cultivable
1 Barvav 460.70 0 360.90 360.90 0 73.1 26.7
2 Budheli 577.70 0 357.30 357.30 0 75.1 145.3
3 Khaski 329.30 0 228.0 228.0 0 23.4 0
4 Jasvantgadh 1620.40 0 1416.60 1416.60 0 163.2 40.6
5 Masal 655.00 0 596.30 596.30 0 43.8 14.9
6 Ratanpur 693.30 0 589.0 589.0 0 48.6 55.7
7 Umedgadh 760.50 0 619.50 619.50 0 31.6 109.4
TOTAL 5096.90 0 4167.60 4167.60 0 458.80 392.60
3.3 Soil and topography:
Jasvantgadh Watershed Project falls under North West Gujarat Agro Climatic Zone. The soil is mainly loam and Sandy loam. The soil is light
brown to Dark greyish or black in surface colour. The depth of soil is moderate to deep about 30 to 65 cm. The predominant texture of soil is loamy,
sand, silt and clay. The soil fertility is poor with moderate nitrogen, phosphorus and potash. By large soils are well drained with moderate water holding
capacity. There has a considerable reduce application of farm yard manure and use of the chemical fertilizer which resulting in reduction in moisture retention
capacity and porosity in the soils. Due to low organic carbon, lack of water conservation measures at the field and at the community level has led to the
acceleration of environmental degradation. The increasing dependency on external input has increased the vulnerability of agriculture such that even small
stresses and fluctuations in the environment lead to instability and threatens farming livelihoods. The soil falls in Aridsol and Inseptisols order, topography
of the area is flat.
Table no. 9: Soil type and topography:
Sr.
No.
Name of the Agro-climatic zone
covers project area Area in ha
Names of the villages
Major soil types Topography
a)Type b) Area in ha
1 North Gujarat (N:G)
460.70 Barvav Black Cotton soil,
Morrum 434.00
Flat Land
577.70 Budheli Black Cotton soil,
Morrum 432.40 Flat Land
329.30 Khaski Black Cotton soil,
Morrum 254.70 Flat Land
1620.40 Jasvantgadh Black Cotton soil,
Morrum 1579.80 Flat Land
655.00 Masal Black Cotton soil,
Morrum 640.10 Flat Land
693.30 Ratanpur Black Cotton soil,
Morrum 637.60 Flat Land
760.50 Umedgadh Black Cotton soil,
Morrum 651.10 Flat Land
5096.90
4629.70
Table no. 10: Flood and drought condition:
Sr. No Village Flood (Incidence) Drought (Incidence)
1 Barvav
No Flood/Drought Condition
2 Budheli
3 Khaski
4 Jasvantgadh
5 Masal
6 Ratanpur
7 Umedgadh
3.4 Edaphic Factors
Table no. 11.1: Soil Erosion
Cause Type of erosion Area affected (ha) Run off
(mm/ year)
Average soil loss (Tonnes/ ha/
year)
Water erosion
A Sheet
1763.4 1162 2-3 B Rill
C Gully
Sub-Total
Total 1763.4 1162 2-3
Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress)
Name of the Village Survey Number Soil pH Type of Salinity
(Inherent/Ingress)
Barvav - 7.5 TO 8.0 Inherent
Budheli - 7.5 TO 8.0 Inherent
Khaski - 7.5 TO 8.0 Inherent
Jasvantgadh - 7.5 TO 8.0 Inherent
Masal - 7.5 TO 8.0 Inherent
Ratanpur - 7.5 TO 8.0 Inherent
Umedgadh - 7.5 TO 8.0 Inherent
Table no. 11.3: Water logging Conditions
Name of the Village Survey Number Reasons
Barvav Nil
Due to Black cotton Soil water logging
condition occurred after heavy rain.
Budheli Nil
Khaski Nil
Jasvantgadh Nil
Masal Nil
Ratanpur Nil
Umedgadh Nil
Table no. 12: Climatic conditions:
Name of
project
Average rainfall- last 5 years Average temperature
Year mm Summer Winter
IWMP-14
(Jasvantgadh)
Max Min Max Min
2008 487 43 25 33 24
2009 589 43 24 34 22
2010 678 45 27 35 26
2011 691 44 24 34 21
2012 710 44 24 36 24
Jashwantgard watershed project area totally depended on the rainfall. In this area rainfall is good for kharif and early rabi crops. The average rainfall of
this area is about 631 mm (from past five year data) with a highest intensity of 710 mm. Area faces continual crop failure that comes on whenever there is a
shortfall in the total quantum of rain. However, even more serious are the gaps in rain even in years when the total rainfall is considered normal. These gaps at crucial
periods in the crop growth cycle can prove fatal for the crop. However, through careful water harvesting, in-situ moisture conservation and a drought-proofing
strategy of dry land agriculture, these gaps can easily be plugged and the crops saved.
Table no. 13: Physiographic and relief
Project name Elevation (MSL) Slope range (%) Major streams
IWMP-14 Jasvantgadh 194 m 0-5 % Debhol Stream
3.5 Land and Agriculture
The average land holding is about2 to 3 ha, the main crops under agriculture are cotton, maize jowar castor, wheat, funnel and fodder grass.
Farmers take up rain-fed castor if the rains are good and being gone for the maize cropping in winter season. But when low rain fall occurs then there is
lack of surface water source for sufficient base for irrigation as well as for drinking purpose in summer season. The average land holding is about 2 to 3
ha mostly rain-fed in nature. Lack of irrigation source forces the majority of the farmers to migrate to ensure their livelihood. This affects directly the
demographic profile of the village. The major crops cultivated by the farmers are Cotton, castor, wheat, gram and cumin. Sorghum is primarily grown
for fodder purpose only. Cotton is the main cash crop in this region. It is grown in alternate year with available irrigation facility. It is also grown
without irrigation in some areas but the yield varies thereafter. Some of the farmers take up rain-fed castor crop if rainfall is good. The land conservation
measures such as earthen bunds and farm bunds in the area will help them to take up a rabi crop of mustard or cumin in the residual moisture.
Table no. 14: Land ownership details
Sr.
No. Village
Total owned land (ha) HHs giving land on
lease
HHs taking
land on lease Gen OBC SC ST
1 Barvav 167 138 50
- 0 0
2 Budheli 90 152 18
- 0 0
3 Khaski 16 100 10
- 0 0
4 Jasvantgadh 432 134 311
- 0 0
5 Masal 210 41 64
- 0 0
6 Ratanpur 440 82 128
- 0 0
7 Umedgadh 390 50 139
- 0 0
1745 697 720
Table no. 15: Agriculture
Sr. No. Village Net sown area (ha)
One time Two times Three times
1 Barvav 345 140
-
2 Budheli 400 140
-
3 Khaski 210 80
-
4 Jasvantgadh 1300 800
-
5 Masal 595 180
-
6 Ratanpur 590 200
-
7 Umedgadh 615 270
-
Total 4055 1810
-
Table no. 16: Irrigation
Sr.
no Village
Source 1 : Canal Source 2 : Check dam / Pond Source 3 : Well
Availability
months Net area
Gross
area
Availability
months
Net area
(ha)
Gross
area (ha)
Availability
months
Net area
(ha)
Gross
area (ha)
1 Barvav - - - - - - 8 0 40
2 Budheli - - - - - - 7 0 80
3 Khaski - - - - - - 7 0 80
4 Jasvantgadh - - - - - - 8 0 80
5 Masal - - - - - - 7 0 67
6 Ratanpur - - - - - - 7 0 78
7 Umedgadh - - - - - - 8 0 66
Total 0 0 0 0 0 0 0 491
Table no. 17: Crop details:
Sr.
No. Village Kharif (Monsoon)
Crop 1(Cotton ) Crop 2 (Jowar) Crop 3 (Maize)
Area (Ha) Production (Kg.) Productivity
(qt/ha)
Area
(Ha)
Production
(Kg.)
Productivity
(qt/ha)
Area
(Ha)
Production
(Kg.)
Productivity
(qt/ha)
1 Barvav 190 155800 8.2 61 40260 6.6 - - -
2 Budheli 200 149000 7.45 25 13500 5.4 - - -
3 Khaski 155 131285 8.47 20 9400 4.7 - - -
4 Jasvantgadh 835 618735 7.41 90 52200 5.8 70 80500 11.5
5 Masal 400 256000 6.4 37 26270 7.1 10 9800 9.8
6 Ratanpur 360 219600 6.1 100 55000 5.5 - 0
7 Umedgadh 330 211200 6.4 80 44800 5.6 55 46200 8.4
Total 2470 1780870 7.21 431 241360 5.6 135 56700 4.2
Sr.
No. Village Rabi (Winter)
Crop 1(Wheat) Crop 2 (Castor) Crop 3 (Vegetables)
Area
(Ha)
Production
(Kg.)
Productivity
(qt/ha)
Area
(Ha)
Production
(Kg.)
Productivity
(qt/ha)
Area
(Ha)
Production
(Kg.)
Productivity
(qt/ha)
1 Barvav 60 50400 8.40 70 23800 3.4 0 0 0
2 Budheli 75 55500 7.40 150 61500 4.1 0 0 0
3 Khaski 45 36450 8.10 35 10850 3.1 0 0 0
4 Jasvantgadh 430 318200 7.40 325 138125 4.25 0 0 0
5 Masal 70 37800 5.40 80 34000 4.25 0 0 0
6 Ratanpur 70 45150 6.45 130 54600 4.2 0 0 0
7 Umedgadh 120 78600 6.55 150 48750 3.25 0 0 0
Total 870 617700 7.10 940 357200 3.8 0 0 0
Sr.
No Village Zaid (Summer)
Crop 1 Crop 2 Crop 3
Area Production Productivity Area Production Productivity Area Production Productivity
1 Barvav 0 - - - - - - - -
2 Budheli 0 - - - - - - - -
3 Khaski 0 - - - - - - - -
4 Jasvantgadh 0 - - - - - - - -
5 Masal 0 - - - - - - - -
6 Ratanpur 0 - - - - - - - -
7 Umedgadh 0 - - - - - - - -
Table no. 18: Livestock
Sr.
No. Village Buffalo Cow
Total Milk
(Buffalo+
Cow)
Goat Sheep Bullock Hen Others
Nos. Milk/lit/
(Day) Nos.
Milk/lit
(Day)
Milk/liter
(day) No
Milk/day
(lit)
1 Barvav 142 710 176 1056 1766 9 22.5 0 22 0 0
2 Budheli 176 880 34 204 1084 0 0 0 29 0 0
3 Khaski 131 655 22 132 787 11 27.5 0 30 0 0
4 Jasvantgadh 2004 10020 994 5964 15984 0 0 0 298 0 0
5 Masal 146 730 156 936 1666 0 0 0 82 0 0
6 Ratanpur 544 2720 271 1626 4346 0 0 0 138 0 0
7 Umedgadh 194 970 106 636 1606 55 137.5 0 60 0 0
Total 3337 16685 1759 10554 27239 75 187.5 0 1417 0 0
Table no. 19: Drinking water
Sr.
No. Village Ground water table (mt) Source of drinking water
Availability in
months Quality
1 Barvav 40 Open Wells, Bore 8 Potable
2 Budheli 40 Open Wells, Bore 7 Potable
3 Khaski 40 Open Wells Bore 7 Potable
4 Jasvantgadh 40 Open Wells Bore 8 Potable
5 Masal 40 Open Wells Bore 7 Potable
6 Ratanpur 40 Open Wells Bore 7 Potable
7 Umedgadh 40 Open Wells Bore 8 Potable
Table no. 20: Details of Common Property Resources
Sr.
No.
Names of
project
CPR
Particulars
Total Area (ha)
Area owned/ In possession of Area available for treatment (ha)
Pvt. persons
Govt.
(specify
deptt.)
PRI
Any other
(Pl.
Specify)
Pvt.
persons
Govt.
(specify
deptt.)
PRI Any other
(Pl. Specify)
1. IWMP-14
Jasvantgadh
Wasteland/ degraded land -- 317.40 - - - - -- -
Pastures - 95.42 - - - - -- -
Orchards - - - - - - -- -
Village Woodlot - - - - - - -- -
Forest - - - - - - -- -
Village Ponds/ Tanks - 10.90 - - - - -- -
Community Buildings - 29.35 - - - - -- -
Weekly Markets - - - - - - -- -
Permanent markets - - - - - - -- -
Temples/ Places of worship - 0.31 - - - - -- -
Others (Pl. specify) - 31.23 - - - - -- -
Table no. 21: Demographic information
Sr.
No. Village Population SC ST
Total Male Female Total Male Female % Total Male Female %
1 Barvav 793 409 384 230 120 110 22.20 4 2 2 0.39
2 Budheli 785 424 361 80 50 30 6.4 0 0 0 0
3 Khaski 610 339 271 48 25 23 4.0 0 0 0 0
4 Jasvantgadh 3432 1782 1650 1360 700 660 37.24 24 14 10 0.66
5 Masal 1010 517 493 286 150 136 22.43 0 0 0 0
6 Ratanpur 1665 894 771 545 270 275 26.70 0 0 0 0
7 Umedgadh 1826 998 828 615 323 292 27.35 04 2 2 0.18
Total 10121 5363 4758 3164 1638 1526 146.32 32 18 14 1.23
Table no. 22: Literacy rate
Sr. No. Village Literacy Literacy % above
age 14
Literacy % below
age 14 Total % Male % Female %
1 Barvav 793 70.80 531 51.25 505 48.74 58.29 31.51
2 Budheli 785 65.75 702 56.16 548 43.84 47.14 47.11
3 Khaski 610 55.00 684 57.00 516 43.00 42.91 49.56
4 Jasvantgadh 3432 78.25 1833 50.19 1819 49.81 55.21 41.25
5 Masal 1010 78.62 710 55.69 565 44.31 47.14 49.12
6 Ratanpur 1665 71.53 192 9.41 949 46.50 47.12 55.17
7 Umedgadh 1826 62.41 1131 50.31 1117 49.69 51.41 37.58
Total 10121 70.14 5783 57.14 6019 59.47 48.42 43.45
Table no. 23: Migration details
Sr.
No. Village
Total
population
Migration Migration by months
Main reason
for migration
Income
during
migration /
month
Total Male Female Up to 3
months
3-6
months
More than
6 months
1 Barvav 793 0 0 0 0 0 0 0 0
2 Budheli 785 0 0 0 0 0 0 0 0
3 Khaski 610 0 0 0 0 0 0 0 0
4 Jasvantgadh 3432 0 0 0 0 0 0 0 0
5 Masal 1010 0 0 0 0 0 0 0 0
6 Ratanpur 1665 0 0 0 0 0 0 0 0
7 Umedgadh 1826 0 0 0 0 0 0 0 0
Total 10121 0 0 0 0 0 0 0 0
Table no. 24: Poverty
Sr. no Village Total Household BPL % of BPL
HH
Total Land less
HH
% of land less
HH 0-16 16-20 Total
1 Barvav 170 1 11 12 7.06 34 20.00
2 Budheli 176 2 21 23 13.07 4 2.27
3 Khaski 143 1 5 6 4.20 10 6.99
4 Jasvantgadh 720 39 180 219 30.42 78 10.83
5 Masal 270 10 28 38 14.07 31 11.48
6 Ratanpur 400 35 105 140 35.00 66 16.50
7 Umedgadh 460 2 38 40 8.70 111 24.13
Total 2339 90 388 478 20.44 334 14.28
Table no. 25: Village infrastructure
Sr
.
N
o.
Village
Pucc
a
road
to
the
villa
ge
(Y/N
)
Schools
College
s
(Numbe
r)
Post
Office
(Distanc
e)
Banks
(Numbe
r)
Distan
ce
from
nearest
market
yard
Milk
collecti
on
centre
(Numbe
r)
Milk
cooperati
ve
(Number
)
Other
cooperati
ves / CBIs
(Number)
Any
other
instituti
on
LP UP HS
1 Barvav Y Y Y N N 0 0 7 1 0 0 0
2 Budheli Y Y Y N N 0 0 14 1 0 0 0
3 Khaski Y Y N N N 0 0 12 1 0 0 0
4 Jasvantga
dh Y Y Y Y N 0 1 16 1 0 0 0
5 Masal Y Y Y N N 0 0 10 1 0 0 0
6 Ratanpur Y Y Y Y N 0 0 11 1
7 Umedgad
h Y Y Y Y N 0 0 12 1
Total 0 0 33 1 0 0 0
3.6 Infrastructure Facilities: All villages of the watershed area where well connected to the C.C road with Idar taluka. All villages have electricity.
Villages have lower primary school and health centre. For middle and higher secondary education, the students have to go at Jasvanthgard, Umedhgardh
and Ratanpur villages of and for college they to Idar, Himmatnagar and Vadali talukas, which is about 30-35 kilometres away on an average from the
almost all the villages this particular cluster. Agriculture and animal husbandry is main source of their income and apart from these their income
depends on labouring and some of from services. recruit
Table no. 26: Facilities / HH assets
Sr.
No. Village
HHs with
electricity
HHs with
safety
latrines
HHs with phones HHs with vehicle HHs
with TV
set
HHs with
cooking
gas
HHs
with
Drinking
water
HHs
with
fridge Land line Mobile 2-wheeler 4-wheeler
1 Barvav 170 150 25 201 80 5 148 100 170 85
2 Budheli 176 147 10 180 45 6 128 85 176 38
3 Khaski 143 85 5 98 36 3 65 35 143 25
4 Jasvantgadh 720 500 352 955 455 45 546 403 720 585
5 Masal 270 240 50 341 190 22 215 138 270 232
6 Ratanpur 400 325 70 412 270 32 290 226 400 247
7 Umedgadh 460 298 82 498 325 28 320 215 460 250
Total 2339 1745 594 2685 1401 141 1712 215 2339 1462
Table no. 27: Income
Sr. No. Village Agriculture Animal husbandry Agri.+AH Casual
labour
Others
(services &
business)
Total
1 Barvav 4922000 128000 125450 237000 954300 6366750
2 Budheli 1083200 356000 245200 210000 88600 1983000
3 Khaski 2637000 560000 1189500 102000 148000 4636500
4 Jasvantgadh 3240000 5106000 2445500 3829000 835300 15455800
5 Masal 2858000 1924000 1472400 673000 314000 7241400
6 Ratanpur 1042700 316000 1484000 1275000 562900 4680600
7 Umedgadh 4544000 1184000 2915000 2872100 522250 12037350
Total 20326900 9574000 9877050 9198100 3425350 52401400
Table no.28: Dependence on Forest/CPR
Sr.
No. Village
Benefit type 1 Benefit type 2 Benefit type 2 Total
income % sells Income % sells Income % sells Income
1 Barvav 0 0 0 0 0 0 0
2 Budheli 0 0 0 0 0 0 0
3 Khaski 0 0 0 0 0 0 0
4 Jasvantgadh 0 0 0 0 0 0 0
5 Masal 0 0 0 0 0 0 0
6 Ratanpur 0 0 0 0 0 0 0
7 Umedgadh 0 0 0 0 0 0 0
Table no. 29: Livelihood pattern (Occupational distribution)
Sr.
No. Village
Total
workforce Agriculture
Animal
husbandry
(AH)
Agriculture
+ AH
Casual
labour Services Handicraft Others
1 Barvav 170 69 13 24 34 18 5 7
2 Budheli 176 106 11 26 4 15 8 6
3 Khaski 143 84 19 11 10 11 6 2
4 Jasvantgadh 720 364 48 64 78 89 28 49
5 Masal 270 122 9 20 31 58 16 14
6 Ratanpur 400 168 21 41 66 56 21 27
7 Umedgadh 460 198 32 29 92 49 24 36
Total 2339 1111 153 215 315 296 108 141
3.7 Comparative data of the crop productivity of the area: project area vs. District vs. State vs. Country
“The term productivity in general means the total output per unit of factor input. For example land productivity means output per hectare of
land. Productivity can be calculated as dividing the total output of a particular crop by the total cultivated area under that crop.”
Data are made available by the Baseline survey, Handbook of Agriculture, ICAR publication 2006 (For Gujarat and India), and Final district
plan (DAP) of Dept. of Agriculture (SK). The results indicate that the cluster villages have comparatively lower productivity compared to Gujarat.. The
productivity is low not only because that the land is unproductive or the farmer’s lack the skills to manage their crop but also due lack to of source of
irrigation, salty water and scarcity of rain.
The IWMP-14 villages come under Semi-arid zone. So farmers grow crop according to the rainfall. If they get good rainfall they generally grow
high value crops like Cotton, Castor, and Groundnut etc. In case of low rainfall they go for Pulses, and pearl millet. So we can say that monsoon decides
cropping patterns of the villages.
3.8 The IWMP-14 project has low productivity because of the following reasons
i) Full dependence on monsoon:
Water is essential input in agriculture. Due to the absence of proper irrigation facility,100% of the total cultivated area depends on the
uncertain monsoon. Therefore, the suceess or failure of the monsoon determines the success or failure of agriculture production.The
rainfall is unreliable due to two factors: untimely and inadequate rainfall.
ii) Low use of fertilizer per unit cropped area:
Farmers do not use sufficient fertilizer due to lack of water, scarcity of fertilizer in market and insufficient money for fertilizer. Many a
times they don’t get fertilizer at the right time.
iii) Traditional farming methods:
This also leads to low productivity. There is a lot of ignorance about the use of new farming methods and technologies such as multiple
cropping. They don’t use FYM and other input in a proper way; that is why they don’t get 100% output. So these factors contribute to
low productivity.
iv) Lack of adequate farm machinery:
Even today a large number of farmers in some villages use wooden ploughs and bullocks. They don’t have adequate machinery like seed
drill. So, old machineries take more time in tillage practices.
v) Lack of finances for farmers:
Most of the farmers are marginal or small farmers in the villages. They do not have enough money to buy good quality seeds, machinery
and other inputs.
vi) Lack of good quality seeds and fertilizers:
Good quality seed, fertilizer and pesticide are important factor in agriculture productivity. The use of good quality leads to higher land
productivity. In Jasvantgadh Project, there are mainly two limitations in the use of fertilizer. First these fertilizers are most useful in
irrigated condition. But in Jasvantgadh Project 80 per cent of land depend on rainfall. Second is mostly farmers use nitrogenous fertilizers
especially urea. This has resulted in disproportionate use of fertilizer depleting the quality of land.
vii) Lack of other facilities such as storage and marketing:
10-15% of agriculture product damage after harvesting due to scarcity of proper storage and proper market for sale. So they sell it to local
traders at the low prices. Farmers mainly face two problems in which first is proper means of transportation and roads and second
problem is farmers don’t have proper storage facilities.
Chapter 4
Watershed Activity
4.1 Watershed Activities
Watershed management as a strategy has been adopted by Government of India especially in the rain-fed regions of semi-arid tropics. These
regions are characterized by low and undependable rain, low soil fertility, poor infrastructure development, low literacy and high incidence of migration.
Several studies have identified that there is a dire need of a systematic and scientific approach to deal with watershed development. The common
guidelines generate a fresh and flexible framework for the next generation watershed development.
4.2 Scientific Planning
i) Cluster Approach
This envisages a broader vision of Geo-hydrological unit which involves treating a cluster of micro-watershed. The Jashvantgadh Project
consists of seven micro watersheds 5F2D6c3f, 5F2D6dlf 5F2D6dlg 5F2D6dle, 5F2D6c2g, 5F2D6c2h, 5F2D6c2e with
their respective codes.
ii) Base line Survey
To access the impact of any watershed development programme a detailed baseline survey has to be conducted. This acts a benchmark
for any intervention during and post implementation of any development programme. A detailed baseline survey was undertaken which
involved household census survey, Bio-physical survey and Village level data collection from Talati –cum mantri. Household census
survey includes a detailed questionnaire which was been filled by visiting each and every household in the village. This gave in the
details of the demographic profile of the village, the literacy percentage, SC/ST population, number of BPL household, cattle population,
and net consumption rate in the village, average milk production of the cattle and various schemes running and their benefits
Bio-physical survey was undertaken to identify various natural resources available in the village. It included the soil typology, wells in
the area, crop taken in the field, Cropping pattern, fertilizer used and various sources of irrigation in the field.
iii) Participatory Rural Appraisal (PRA)
The past experience of watershed has given tremendous input to focus on creating accountability of the stakeholders towards the
programme. This has created an emphasis to include all the stakeholder communities and their local and Indigenous Technological
Knowledge (ITK) while planning for any activity. Participatory approach provides a new path for planning, implementing, and
monitoring and post- withdrawal activities with a complete accountability of the stakeholders. Various PRA techniques like resource
mapping, social mapping, and season calendars were used to understand the physical and social orientation of the village in general and
watershed in specific. These tools put the villagers in ease than the complicated questionnaires. Various tools like Matrix ranking, Venn
diagram were used to identify various local vegetations (apt for of forestation), Fodders crops, various institutions and their significance
in the life of the farmers.
iv) Use of GIS and Remote sensing for planning
Use of various high science tools has been promoted at various stages of watershed development.
a) Prioritization
Geographical Information System (GIS) has been used for prioritization process. Various layer maps were created like Geo-
morphological, Soil, BPL Population, SC/ST population, Ground water Status, Drinking water situation Slope percent. These were all
given proper weight age according to the DoLR specification. This helped in prioritization of various watershed areas.
b) Planning
An action plan matrix was formulated by State Level Nodal Agency (SLNA) taking into account various features like the slope percent,
soil Depth, Soil Texture, Soil erosion in the area for wasteland, forest land and agricultural land. Global positioning System (GPS) was
used to identify each and every water conservation structures available in the project area. This was used to create a map. Contour Map of
vertical interval of 1 meter at a scale of 1:8000 was used for identifying various locations for soil and water conservation structures.
c) Hydrological modelling
Hydrology modelling technique was used for locating drainage, stream length, flow direction, sink and Flow accumulation. This model
verlaid over cadastral map to calculate the catchment area of each structures like the check dam etc. This has helped to remove the human
error which generally occurs while calculating the catchment area of a check dam.
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects
Sr.
No. Scientific criteria/ inputs used Whether scientific criteria was used
(A) Planning
1 Cluster approach Yes
2 Whether technical back-stopping for the project has been arranged? If yes, mention the name of the Institute No
3 Baseline survey Yes
4 Hydro-geological Survey Yes
5 Contour mapping Yes
6 Participatory Net Planning (PNP) Yes
7 Remote sensing data-especially soil/ crop/ run-off cover Yes
8 Ridge to Valley treatment Yes
9 Online IT connectivity between Yes
10 Project and DRDA cell/ZP Yes
11 DRDA and SLNA Yes
12 SLNA and DoLR Yes
(B)Availability of GIS layers
1 Cadastral map Yes
2 Village boundaries Yes
3 Drainage Yes
4 Soil (Soil nutrient status) Yes
5 Land use Yes
6 Ground water status Yes
7 Watershed boundaries Yes
8 Activity Yes
9 Crop simulation models# Yes
10 Integrated coupled analyzer/ near infrared visible spectroscopy/ medium spectroscopy for high speed soil
nutrient analysis
Yes
11 Normalized difference vegetation index (NDVI)# Yes
12 Weather Station Yes
(B) Inputs Yes
1 Bio-pesticides No
2 Organic manures No
3 Vermi compost No
4 Bio-fertilizer No
5 Water saving devices No
6 Mechanized tools/ implements No
7 Bio-fencing No
8 Nutrient budgeting No
9 Automatic water level recorders & sediment samplers No
10 Any other (please specify) No
Table no.31: Details of PRA Activities conducted in the project area
Sr. No. Name of the PRA
Activity / FGD
Date Number of people
present
Lessons learnt / Understanding of the problem/situation
1 Social map 07-04-2012 Barvav-102 Make aware about geographical land.
2 Drainage map Make aware about Drainage of villages. Too much of soil
erosion in monsoon.
3 Daily activity chart Mostly all women are engaged with animals, and man was
engaged with farming and labour work.
4 Seasonal chart Majority of farming work related of cereals & cash crop.
1 Social map 11-04-2012 Budheli-78 Make aware about geographical land. Having two peta para.
2 Drainage map Make aware about Drainage of villages.
3 Daily activity chart Mostly all women are engaged with animals, and man was
engaged with farming and labour work.
4 Seasonal chart Majority of farming work related of cash crop , Vegetables
& fruits.
1 Social map 16-4-2012 Khaski-93 Make aware about geographical land that there are three other
peta para in revenue village.
2 Drainage map Make aware about Drainage of villages. Too much of soil
erosion in monsoon.
3 Daily activity chart Mostly all women are engaged with animals, and man was
engaged with farming and labour work.
4 Seasonal chart Majority of farming work related of cereals & cash crop.
1 Social map 20-4-2012 Jasvantgadh -72 Make aware about geographical land.
2 Drainage map Make aware about Drainage of villages. Too much of soil
erosion in monsoon.
3 Daily activity chart Mostly all women are engaged with animals, and man was
engaged with farming and labour work.
4 Seasonal chart Majority of farming work related of cereals & cash crop.
1 Social map 17-04-2012 Masal -104 Make aware about geographical land.
2 Drainage map Make aware about Drainage of villages. Too much of soil
erosion in monsoon.
3 Daily activity chart Mostly all women are engaged with animals, and man was
engaged with farming and labour work.
4 Seasonal chart Majority of farming work related of cereals & cash crop.
1 Social map 10-4-2012 Ratanpur -79 Make aware about geographical land.
2 Drainage map Make aware about Drainage of villages. Too much of soil
erosion in monsoon.
3 Daily activity chart Mostly all women are engaged with animals, and man was
engaged with farming and labour work.
4 Seasonal chart Majority of farming work related of cereals & cash crop.
1 Social map 18-04-2012 Umedgadh -104 Make aware about geographical land.
2 Drainage map Make aware about Drainage of villages. Too much of soil
erosion in monsoon.
3 Daily activity chart Mostly all women are engaged with animals, and man was
engaged with farming and labour work.
4 Seasonal chart Majority of farming work related of cereals & cash crop.
Problem Analysis Tree
Poor Life Style Migration
LOW SOCIO-ECONOMIC
STATUS
Low Income Unemployment Local self Governance not dynamic or inclusive
Low Agricultural
Production
Low Market Price of
the Product
Low Literacy
Status
Less Orientation for
self employment
Local Leadership
not sufficiently
developed
Lack of common
interest to support
and strength the
local governance
Poor
Cropping
pattern
Less Fertile Soil
Soil Erosion
Natural Misfortunes Lack of
irrigation
Facilities
Less
availability of
water
Lack of
resource for
irrigation
Lack of appropriate
market linkage
Lack of co-
operation
between farmers
Presence of
middle man
Lack of
Entrepreneurial
skill
Lack of
Information
and training
Low representation
of Weakest in real
term
Lack of Grass
root Peoples
Organisation
Objective Tree
Improvement in life style Less Migration/Comfort Migration
Improvement in socio-economic status
Increase in Individual income Generate the Opportunity of self
employment
e
Presence of dynamic local self governance
Increase in
Agricultural
Productivity
Good Market price of
the product Less Orientation for
self employment
Well established
Local Leadership
Increase common
interest to support
and strength the
local governance
Improved
Agricultural
Practices
Wadi
Development
Programme
Availability of water
and resources for
irrigation
Water resource
Management,
watershed
development
Elimination of
Middleman and
Increase the Co-
operation between
farmers
Capacity Building
and Awareness
programme and
formation of PO’s
Capacity Building
and skill
improvement
programme
Setup
Microenterpris
e
Facilitate milk
production as
an income
generating
activity
Increase the
representation of
weakest in real term
Presence of
people’s
Organisation
Training
and
Awareness
4.3 Institution building
i) Watershed Committee (WC)
It is a committee that is constituted by Gram Sabha to implement the watershed project with technical support of WDT in the village. This
committee is registered under society Registration Act 1860. The Gram Sabha of the village selects the chairman of the watershed committee with the
secretary who will be a paid functionary. A watershed Committee was formed accordingly in all the village .The watershed has divided into 7 villages
namely Barvav (434.0 ha), Budheli (432.40 ha),Khaski (254.70 ha), Jasvantgadh (1579.80 ha) , Masal (640.10 ha) Ratanpur (637.60) Umedgadh (651.10)
so separate watershed committees was formed in the project. Capacity building training to the watershed committee is given by WDT. The watershed
committee has a pivotal role to play during and after the project implementation period.
Table no. 32: Watershed Committee details
Sr.
No.
Names of WCs Date of
Registrat
ion as a
Society
(dd/mm/
yyyy)
Designat
ion
M/
F
S
C
S
T
S
F
MF LF Land-
less
U
G
SH
G
GP Any
othe
r
Education
al
qualificati
on
Function/s
assigned#
Barvav
1 Patel Bhikhabhai
Jivabhai
President M √ 7 Pass
2 Patel Kesubhai
Kodarbhai
Secretary M √ S.Y.BA
3 Thakor Ramjibhai
Mohanbhai
Member M √ 8 Pass
4 Prajapati Ramesbhai
Maganbhai
Member M √ √ 8 Pass
5 Vankar Murabhai
Kodarbhai
Member M √ 5 Pass
6 Patel Kokilaben
Prakasbhai
Member F √ M.A.Bed
7 Parmar Hansaben
Prakasbhai
Member F √ 10 Pass
8 Parmar Damyantiben
Jayantibhai
Member F √ 10 Pass
9 Thakor Kokilaben
Vinodkumar
Member F √ 5 Pass
10 Sheth Naziya Mohmad
Aarif
WDT
Engg.
F √ Civil Eng.
11 Dhanula Prasantbhai
Dhurjibhai
Nodal
Officer
M √ M.B.A.
Budheli
1 Thakarda Kuvarji
Sankarji
President M √ 10 Pass
2 Rathod Rajendrasingh
Girdarsingh
Secretary M √ √ B.A.
3 Rathod Jayendrasingh
Karansingh
Member M √ √ MSC Bed
4 Chenva Jayantibhai
Lallubhai
Member M √ 12 Pass
5 Patel Bhikhabhai
Shivabhai
Member M √ √ M.A.Bed
6 Patel Bhanuprasad
Dhurabhai
Member M √ 12 Pass
7 Thakarda Sajjanben
Karaji
Member F √ -
8 Rathod Dhirajsingh
Parbatsingh
Member M √ √ 6 Pass
9 Thakarda Geetaben
Ramesji
Member F √ 7 Pass
10 Sheth Naziya Mohmad
Aarif
WDT
Engg.
F √ Civil Eng.
11 Dhanula Prashantbhai
Dhurjibhai
Nodal
Officer
M √ MBA
Khaski
1 Parmar Vikramsingh
Ratansingh
President √ √ MBBS
2 Makvana Babuji
Vaghaji
Secretary √ √ 9 Pass
3 Parmar Balaji Somaji Member √ √ 10 Pass
4 Chavda Madansingh
Ranjitsingh
Member √ √ B.A. Bed
5 Makvana Sangitaben
Kuvarji
Member √ √ 3 Pass
6 Makvana Hiraben
Isvarji
Member √ √ Nil
7 Parmar Ramanji
Ratnaji
Member √ √ 6 Pass
8 Chenva Becharbhai
Sedhabhai
Member √ √ 7 Pass
9 Makvana Isvarbhai
Devchandbhai
Member √ √ 9 Pass
10 Makvana Babuji Sadaji Member √ √ B. Com.
11 Sheth Naziya Mohmad
Aarif
WDT
Engg.
√ Civil Eng.
12 Dhanula Prashantbhai
Dhurjibhai
Nodal
Officer
√ MBA
Jasvantgadh
2 Patel KAntibhai
Pitambarbhai
President M √ √ H.S.C.
2 Vankar Rakeshbhai
Lalabhai
Secretary M √ √ B.A
3 Parmar Jagdishbhai
Lallubhai
Members M √ √ H.S.C.
4 Chavada Babusinh
Gobarsinh
Members M √ √ 10 Pass
5 Prajapati Navnitbhai
Motibhai
Members M √ √ H.S.C.
6 Thakor Kamleshbhai
Jagaji
Members M √ √ 9 Pass
7 Raval Gitaben
Sureshbhai
Members F √ √ H.S.C.
8 Pandya Vijyaben
Bharatbhai
Members F √ √ 11 Pass
9 Patel Chandrikaben
Mulajibhai
Members F √ √ 9 Pass
10 Sheth Naziya Mohmad
Aarif
WDT
Engg.
F √ Civil Eng.
11 Dhanula Prashantbhai
d
Nodal
Officer
M √ MBA
Masal
1 Ramlavat
Dharamvirsinh
Raguvirsih
President M √ √ S.Y.B.com
2 Patel Haribhai
Becharbhai
Secretary M √ √ BVSC&AH
3 Patel Babubhai Member M √ √ Msc
Jethbhai geologist
4 Patel Mukeshbhai
Haribhai
Member M √ √ S.Y.B.A
5 Thakarda Jitubhai
Punjabhai
Member M √ √ 8 PASS
6 Parmar Narsihbhai
Dhurabhai
Member M √ √ 7 PASS
7 Mansuri Yunusbhai
Sulemanbhai
Member M √ √ 9 PASS
8 Chenva Indiraben
Davabhai
Member F √ √ 8 PASS
9 Prajapati Jasodaben
Ranchodbhai
Member F √ √ 7 PASS
10 Vankar Pravinaben
Bhanubhai
WDT
Engg.
M √ √ 9 Pass
11 Sheth Naziya Mohmad
Aarif
WDT
Engg.
F √ √ Civil Engg.
12 Dhanula Prashantbhai
d
Nodal
Officer
M √ √ M.B.A.
Ratanpur
1 Patel Babubhai
Sankarbhai
President M √ √ S.S.C.
2 PatelRamanbhai
Bhikhabhai
Secretary M √ √ S.S.C.
3 PatelNandubhai
Dahyabhai
Member M √ √ B.A.
4 SutharNarayanbhai
Dahyabhai
Member M √ √ Civil Engg.
5 Thakarda Prabhaji
Mohanji
Member F √ √ 8 Pass
6 Vankar khanabhai
Arkhabhai
Member F √ √ B.A.
7 Patel Lilaben
Narayanbhai
Member F √ √ 5 pass
8 Parmar Niruben
Mukeshbhai
Member F √ √ 12 pass
9 Panchal Gitaben
Girishbhai
Member M √ √ 10 pass
10 Sheth Naziya
Mohmad Aarif
WDT M √ √ Civil Engg.
11 Dhanula
Prasantbhai
Dhurajibhai
Nodal
Officer
M √ √ M.B.A.
12 Dhanula Prashantbhai
d
Nodal
Officer
M √ √ M.B.A.
Umedgadh
Patel Girishbhai
Davabhai President
M √ √ S.S.C.
Rathod Kiritsingh
Raguvirsingh Secretary
M √ √ S.S.C.
Patel Girishbhai
Ramabhai
Member M √ √ B.A.
Patel Premilaben
Vipulkumar
Member M √ √ Civil Engg.
Parmar Mukeshkumar
Kuberbhai
Member M √ √ 8 Pass
Prajapati Ramilaben
Nareshbhai
Member F √ √ B.A.
Vankar Hirabhai
Khemabhai
Member F √ √ 5 pass
Raval Kanubhai
Ramabhai
Member F √ √ 12 pass
Dave Pannaben
Dipakbhai
Member M √ √ 10 pass
Sheth Naziya WDT
Engg.
F √ √ Civil Engg.
Mohmad Aarif
DhanulaPrasantbhai
Dhurajibhai
Nodal
Officer
M √ √ MBA
4.4 Self Help Group
Self Help Groups are motivated, small homogenous groups organized together through credit and thrift activities. Self help group initiative
especially for women help uplift their livelihood. Generally self help groups include landless and poor women.
Before formation of the SHGs, during PRA activities, Focussed Group Discussions (FGDs) were held with the women, which came up with the
following observations:
a) Lack of proper credit facilities due to low intervention of formal financial credit institution.
b) Excessive exploitation of weaker section by money lenders
c) Lack of attitude for saving among poor people
d) Lack of knowledge on credit and thrift activity and banking.
With a detailed discussion with some of the local NGOs working in the area like Seva, Khadi Gram Udyog Sewa Trust, it was planned to have
some capacity building training regarding SHG activities. It was also proposed to have some livelihood activities which will promote women
empowerment.
Table no. 33: SHG detail
Sr. No. Name of village
Total no. of registered SHGs No. of members No. of SC/ST in each
category
No. of BPL in each
category
With
only
Men
With only
Women
With
both Total Categories M F Total M F Total M F Total
1 Barvav 2 2 4
(i) Landless 10 10 20 10 10 20 2 10 12
(ii) SF 0 10 10 0 10 10 0 3 3
(iii) MF 11 0 11 11 0 11 1 0 1
(iv) LF 0 0 0 0 0 0 0 0 0
Total 2 2 4
21 20 41 21 20 41 3 13 16
2 Budheli 1 1 0 2
(i) Landless 0 0 0 0 0 0 0 0 0
(ii) SF 10 10 20 10 10 20 0 0 0
(iii) MF 0 0 0 0 0 0 0 0 0
(iv) LF 0 0 0 0 0 0 0 0 0
Total 1 1 0 2
10 10 20 10 10 20 0 0 0
3 Khaski 0 2 1 3
(i) Landless 0 10 10 0 10 10 0 0 0
(ii) SF 10 0 10 10 0 10 0 0 0
(iii) MF 0 0 0 0 0 0 0 0 0
(iv) LF 11 0 11 11 0 11 0 0 0
Total 0 2 1 3
21 10 31 21 10 31 0 0 0
4 Jasvantgadh 4 8 1 13
(i) Landless 20 20 40 20 20 40 16 5 21
(ii) SF 20 30 50 20 30 50 7 8 15
(iii) MF 0 20 20 0 20 20 0 5 5
(iv) LF 0 20 20 0 20 20 0 0 0
Total 4 8 1 13
40 90 130 40 90 130
23 18 41
5 Masal 2 2 0 4
(i) Landless 10 10 20 10 10 20 3 5 8
(ii) SF 10 0 10 10 0 10 4 0 4
(iii) MF 0 15 15 0 15 15 0 3 3
(iv) LF 0 0 0 0 0 0 0 0 0
Total 0 5 0 5
20 25 45 20 25 25 7 8 7
6
Ratanpur
1 5 0 6
(i) Landless 0 20 20 0 20 0 0 5 5
(ii) SF 0 10 10 0 10 0 0 0 0
(iii) MF 0 11 11 0 11 11 0 0 0
(iv) LF 10 10 20 10 10 20 0 0 0
Total
10 51 61 10 51 31 0 5 5
7 Umedgadh
1 4 0 5
(i) Landless 0 20 20 0 20 20 0 5 5
(ii) SF 10 10 20 10 10 20 4 0 4
(iii) MF 0 0 0 0 0 0 0 0 0
(iv) LF 0 10 10 0 10 10 0 0 0
10 40 50 10 40 50 4 5 9
4.5 User Group (UG) User Groups are normally formed to manage an activity or asset created under the program on a long term basis. The user group
collects user charges from their members, oversee the works and manage the benefits. It was decided that each group would formulate certain internal
rules and have a feeling of ownership with community spirit.
Table no. 34: UG detail
Sr.
No. Name of village
Total no. of Ugs No. of members No. of SC/ST in each
category
No. of BPL in each
category
Men Women Both Total Categories M F Total M F Total M F Total
1 Barvav 3 0 3 6
(i) Landless 0 0 0 0 0 0 0 0 0
(ii) SF 17 3 20 0 0 0 0 0 0
(iii) MF 11 0 11 0 0 0 0 0 0
(iv) LF 3 0 03 0 0 0 0 0 0
Total 3 0 3 6 31 3 3 4 0 0 0 0 0 0
2 Budheli 3 0 4 7
(i) Landless 0 0 0 0 0 0 0 0 0
(ii) SF 21 1 22 0 0 0 0 0 0
(iii) MF 15 4 19 0 0 0 0 0 0
(iv) LF 0 0 0 0 0 0 0 0 0
Total 3 0 4 7 36 5 41 0 0 0 0 0 0
3 Khaski 5 0 0 5
(i) Landless 0 0 0 0 00 0 0 0 0
(ii) SF 1 0 1 0 0 0 0 0 0
(iii) MF 16 0 16 0 0 0 0 0 0
(iv) LF 0 0 0 0 0 0 0 0 0
Total 5 0 0 5 17 0 17 0 0 0 0 0 0
4 Jasvantgadh 8 0 13 21 (i) Landless 0 0 0 0 0 0 0 0 0
(ii) SF 45 5 50 0 0 0 0 0 0
(iii) MF 67 13 80 0 3 3 0 3 3
(iv) LF 22 7 29 0 1 1 1 2 3
Total 8 0 13 21 134 25 159 0 4 4 1 5 6
5 Masal 4 0 2 6
(i) Landless 0 0 0 0 0 0 0 0 0
(ii) SF 15 4 19 0 0 0 0 0 0
(iii) MF 23 2 25 2 0 2 2 0 2
(iv) LF 0 0 0 0 0 0 0 0 0
Total 4 0 2 6 38 6 44 2 0 2 2 0 2
6
Ratanpur
8 0 4 12
(i) Landless 0 0 0 0 0 0 0 0 0
(ii) SF 21 0 21 2 0 0 2 0 2
(iii) MF 34 3 37 0 0 0 0 0 0
(iv) LF 18 2 20 0 0 0 0 0 0
Total 8 0 4 12 73 5 78 0 2 2 2 0 2
7
Umedgadh 3 0 10 13 (i) Landless 0 0 0 0 0 0 0 0 0
(ii) SF 20 4 24 6 0 6 6 0 6
(iii) MF 47 7 54 6 0 6 6 0 6
(iv) LF 10 0 10 0 0 0 0 0 0
Total 77 11 88 12 0 12 12 0 12
4.6 Entry Point activity (EPA)
EPA activities are taken up under watershed projects to build a rapport with the
village community at the beginning of the project; generally, certain important works
which are in urgent demand of the local community are taken up. A group Discussion
was conducted with watershed Development Committee regarding the EPA activity,
it was conveyed to the WC that an amount of Rs. 22.22 Lakhs was allotted for EPA
activity, which was 4 per cent of total allocated budget. The villagers discussed
various activities which they felt is important but after a brief discussion it was
conveyed to them that only those activities can be taken, which revive the common
natural resources. It was also taken into priority that there should be an instrument of
convergence which will result in sustainability of activities.
EPA Identification
Tableno.35: Entry point activities (EPA) (All financial figures in lakh Rs.) Sr.
No. Names of Villages Amount earmarked for EPA
Entry Point Activities
planned in Unit Estimated cost
Expected
outcome
1 Barvav
RO Plant for Drinking water Connection Tank 1 No. 1.33
Protection Wall 1 Nos. 0.74
Sub Total 2.08
2 Budheli
Drinking water of PVC Pipe Line 1 No. 1.69
Single Side Stand Post 1 No. 0.38
Sub Total 2.07
3 Khaski
Protection Wall 1 No.
0.68
RCC Bottom Tank 1 No.
0.53
Repairing works for Bottom tank 1 No. 0.06
Sub Total 1.28
4 Jasvantgadh
Over Head Water Tank 1 No. 5.06
Under Ground Sump 1 No.
2.50
Sub Total 7.56
5 Masal
Single Side Stand Post 1 No. 0.43
Drinking water of PVC Pipe Line 1 No.
0.42
Protection Wall 1 No. 2.21
Sub Total 3.06
6 Ratanpur Protection Wall 1 No. 3.06
Sub Total 3.06
7 Umedgadh Protection Wall 1 No. 3.12
Sub Total 3.12
Grand Total 14 No. 22.22
4.7 Watershed Development Works:
Watershed development works are to be done during second phase of watershed project. A multi-tier ridge to valley sequence approach should
be approached towards implementation of watershed development projects. A net budget of 56 percent is allotted for this work. As the average slope of
the watershed is nearly 1-3 percentages, proper ridge to valley approach is not applicable for this watershed. The main constrains in this watershed is
soil erosion, salinity of soil, lack of water harvesting mechanism, drainage of low lying areas and lack of vegetation.
The main treatments in this pasture and non arable land are Earthen Bund with waste weir for discharge of excess water, percolation tank and
village ponds. This generally includes water conservation or surface water storage structures. In arable and personal land the main treatment is planned
for soil erosion. The main treatments are farm bunds, injection well, field outlet and border plantation. Being highly labour intensive, will involve more
of manual labour; so, funds from Mahatma National Rural Employment Guarantee Scheme (MNREGS) can be taken.
Following structures are been proposed in these areas
Ridge Area Treatment
Main objective of ridge area treatment is to Slowing down the velocity of runoff, checking soil erosion and improving local soil moisture profile.
a) Drainage Line Treatment
Main objective of drainage line treatment is to reducing soil erosion, trapping silt which slows the rate of siltation in water harvesting structures
in the lower reaches of the watershed, creating a hydraulic head locally which enhances infiltration of surface runoff into the groundwater
system; and increasing the duration of flow in the drainage line.
b) Land Development
Main objective of land development is to reducing soil erosion by slow down of the runoff, to maintain the soil moisture and to make soil fertile
by different types of treatments.
c) Afforestation/Agro-Forestry/Plantation:
Emphasis is placed on maximizing the use of available land and resources with high yield tree species. Trees can either be of similar species or mixed
in a manner that will result in a stand or forest. Depending on the climate, geographical layout of the area and the soil conditions, trees that have the
greatest growth potential are selected like Neem, Ardusa Mango, Babul and Tamarind
d) Farm Outlet:
Farm outlets are constructed on agricultural land with the aim of arresting soil erosion and improving the soil moisture profile. Ideally, bunds on farms
should be made on the contour line. But this creates several problems for farmers. Contour bunds divide the field into irregular sections. In such a
situation, it becomes inconvenient to manoeuvre bullocks for operations such as ploughing and line-sowing.
Table no.36: Details of ridge line treatment / land based activities in watershed works
Sr.
No.
Village
name
Name of
structures
Type of treatment Type of land Target
(i) (ii) (iii) (i) (ii)
Commun
ity
(iii)
Others
(pl.
specify
)
No. of
units
(No./
cu.m./
rmt/
Ha)
Estimated cost (Rs. in lakh) Expecte
d
month
& year
of
complet
ion
(mm/yy
yy)
Ridge
area
(R)
Drainage
line
Land
dev.
(L)
Private
(D) M W O T
1 Barvav Deepening
Pond
D 2No. 0 3.20 - 3.20
New Pond D 1No. 3.00 2.00 5.00
Check Dem
Decelting
C 5No. 0 1.11
1.11
Land Leveling L 37Ha
0 1.92 - 1.92
Check Dam D 2No. 4.80 3.20 8.00
Waste Wier D 1 No. 0.84 0.56
- 1.40
Total 8.64 11.99 20.63
2 Budheli De-
siltingCheck
Dam
D 7No. 0 2.62 - 2.62
De-silting
Pond
D 1No. 0 1.60 1.60
New Pond D 1No. 3.30 2.20 5.50
Recharging
bore Well
R 2 No. 0.6 0.4 1.00
Land
Levelling
L 77Ha 0 4.00 - 4.00
Protection
Wall
C 4 No. 1.82 1.21 - 3.03
Total 5.72 12.03 17.75
3 Khaski Check Dam
De-silting
D 5 No. 0 1.67 - 1.67
Land
Levelling
L 15Ha. 0 0.38 0.38
Pond
Deepening
D 03 0 4.64 4.64
Total 6.69 6.69
4 Jasvantgadh Protection Wall C 2No. 1.34 0.90 - 2.24
Stone Pitching D 2028
Sqmt.
4.25 2.84 - 7.09
Waste Wier D 2 No. 1.80 1.20 3.00
Check Dem
Decelting
D 14 No. 0 5.80 5.80
New Pond D 1 No. 3.30 2.20 5.50
Deepening
Pond
D 4 No. 0 6.40 6.40
Recharging
Bore Well
R 9 No. 4.32 2.88 7.20
Check Wall L 16 No. 7.89 5.26 13.15
Check Dam L 4 No. 9.60 6.40 16.00
Land Levelling L 173 Ha 0 8.996 8.996
Total 32.50 42.88 75.38
5 Masal Di-silting
Check Dams
D 4 No. 0 1.61 - 1.61 2014-
15
Deepening
Pond
D 4 No. 0 6.29 6.29 2013-
14,201
5-16
New Pond D 1 No. 3.00 2.00 5.00 2015-
16
Protection
Wall
C 2 No. 2.27 1.52 3.79 2015-
16
Land
Levelling
L 120
Ha.
0 6.24 - 6.24 2014-
15
Total 5.27 17.66 22.93
6 Ratanpur New Pond L P 2 No. 6.00 4.00 10.00
De-silting
Check dam L P
11
No.
0 3.74 3.74
Deepening
Pond L C 4 No. 0 6.40 6.40
Recharging
Bore Well C
2 No. 0.72 0.48 1.20
Check Wall 5 No. 2.50 1.67 4.17
Land
Levelling 24Ha 0 1.25 3.12
Total 9.22 17.54 26.76
7 Uemedgadh De-silting
Check Dam L P
8 No. 0 3.50 -
3.50
West-weir L P 2 No. 1.13 0.76 - 1.89
Protection
Wall L C 2 No. 3.39 2.26 - 5.65
Land
Levelling C 73 Ha 0 3.80 - 3.80
New Pond 2 No. 6.00 4.00 - 10.00
Deepening
Pond 2 No. 0 3.20 - 8.00
Repairing
Check dam 2 No. 1.09 0.72 - 1.81
11.61 18.24 29.85
(M – Materials, W- wages, O- others, T – Total)
Activities related to Surface water resources in the project areas
Check dams:
Check dams are constructed across small streams having gentle slope, the selected should have sufficient thickness of permeable bed or weathered
formation to facilitate recharge of stored water within short span of time. The surface water stored in these structures is mostly confined to stream course
and the height is normally less than 2m and excess water is allowed to flow over the wall in order to avoid scouring from excess runoff water cushions
are provided at downstream side. To harness the maximum run off in the stream series of such check dams are to be constructed to have recharge on
regional scale in project villages.
Pond:
Natural or a man-made water body which usually serves the population of a village as well as agriculture fields like ponds greatly vary in size depending
upon the rainfall. These have only a few meters of length and width and are built across the flow path of natural drainage channels. Surplus water from
one pond spills over to a lower pond. In some cases a series of ponds are built on one single stream. Each pond caters to the irrigation needs of one farm
and also augments ground water recharge.
Waste weirs:
These are constructed for giving a safe passage to the excess runoff from the field and also store some amount of water in the field. The water stored in
these structures is mostly confined in field and height is normally less than 1 mt. and excess water is allowed to flow over the wall.
Cause cum Check dam:
Cause cum dams was constructed for saving soil, water and it will be used as way to movement of vehicle. Such structures are usually made for the
convenience of connecting community area field also conserved water.
Table no.37: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
Sr.
No. Village name Type of structures
Proposed target
Augmentation/ repair of existing
structures Construction of new structures Total target
No.
Area to be
irrigated
(ha)
Storage
capacity
Estimate
d cost No.
Area to be
irrigated
(ha)
Storage
capacity
Estimat
ed cost
Area to be
irrigated
(ha)
Storage
capacity
Estimated
cost
1 Barvav Pond Deepening 2 2 ha 170000 8.00 - - - - 2 ha 170000 8.00
New Pond - - - - 1 1 ha 90000 5.00 1 ha 90000 5.00
Total 2 2 ha 170000 8.00 1 1 ha 90000 5.00 3 ha 260000 13.00
2 Budheli Pond Deepening 1 2 ha 170000 4.00 2 ha 170000 4.00
New Pond - - - - 1 1ha 90000 5.00 1ha 90000 5.00
Total 1 2 ha 170000 4.00 1 1 ha 90000 5.00 3 ha 260000 9.00
3 Khaski Pond Deepening 1 1 ha 90000 4.00 1 10ha - - 10ha - -
Total 1 1 ha 90000 4.00 - - - - 1 ha 90000 4.00
4 Jasvantgadh Pond deepening 4 4 ha 340000 16.00 - - - - 4 ha 340000 16.00
New Pond - - - - 1 1 ha 90000 5.50 1 ha 90000 5.50
Total 4 4 ha 340000 16.00 1 1 ha 90000 5.50 5 ha 430000 21.50
5 Masal Pond deepening 4 4 ha 340000 15.73 - - - - 4 ha 340000 15.73
New Pond - - - - 1 1 ha 90000 5.00 1 ha 90000 5.00
Total 5 4 ha 340000 15.73 1 1 ha 90000 5.00 5 ha 430000 20.73
6 Ratanpur Pond deepening 4 4 ha 340000 16.00 - - - - 4 ha 340000 16.00
New Pond - - - - 2 2 ha 170000 10.00 2 ha 170000 10.00
Total 4 4 ha 340000 16.00 2 2 ha 170000 10.00 6 ha 510000 26.00
7 Umedgadh Pond deepening 2 2 ha 170000 8.00 - - - - 2 ha 170000 8.00
New Pond - - - - 2 2 ha 170000 10.00 2 ha 170000 10.00
Total 2 2 ha 170000 8.00 2 2 ha 170000 10.00 4 ha 340000 18.00
Table no.38: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)
Sr.
No.
Name of
Villages Type of structures
Proposed target
Augmentation/ repair of existing
recharging structures
Construction of new recharging
structures Total target
No. Area to be
irrigated (ha)
Estimated
cost No.
Area to be
irrigated (ha)
Estimated
cost
Area to be
irrigated (ha)
Estimated
cost
1 Barvav
RRWHS - - - - - - - -
Water Storage Tank (Gulabpura - - - - - - - -
Recharge bore well in village pond
- - - - - - - -
Total - - - - - - - -
2 Budheli Recharge Bore well in Village pond 2 4 ha 1.00 - - - 4 ha 1.00
Total - - - 16 - 8.00 - 8.00
3 Khaski Recharge Bore well in Village pond - - - - - - - -
Total - - - - - - - -
4 Jasvantga
dh Recharge Bore well in Village pond 9 36 ha 7.20 - - - 36 ha 7.20
Total 9 36 ha 7.20 - - - 36 ha 7.20
5 Masal Recharge Bore well in Village
pond - - - - - - - -
Total - - - - - - - - -
6 Ratanpur Recharge Bore well in Village
pond 2 4 ha 1.20 - - - 4 ha 1.20
Total 2 4 ha 1.20 - - - 4 ha 1.20
7 Umedgadh Recharge Bore well in Village
pond - - - - - - - -
Total - - - - - - - -
Table no.39: Details of activities related to livelihood, production system and micro-enterprises
S.
No. Name of village Name of activity
Type of land Executing
agency Target
(i) Private (ii)
Community
(iii)
Others
(pl.
specify)
(i) UG
(ii)SHG
(iii) Others (pl.
specify)
Estimated
cost
(Rs. in
lakh)
Expected
month &
year of
completion
(mm/yyyy)
Agriculture Based - - -
1 Barvav
Drip Irrigation - - - SHG 2.16
Vermi Compost - - - SHG 1.80
Low cost Greenhouse - - -- SHG 4.80
Horticulture - - - Individual 0.01
Animal Husbandry - - -
Animal camp - - - Common 1.00
Minor Activity - - -
Vegetable Trolley - - - Individual 0.13
Total - - -
9.90
2 Budheli
Agriculture Based - - -
Drip Irrigation -- - - Individual 5.52
Vermi Compost - - - SHG 1.80
Agro- Forestry Based - - -
Agro Processing Based - - -
Tomato & Chilli Grading Packing - - - SHG 1.00
Animal Husbandry - - -
Cattle Camp - - - Common 1.50
Minor Activity - - -
Culberry Implements - - - Individual 0.04
Total - - - 9.86
3 Khaski Agriculture Based - - -
Vermi compost - - - SHG 1.80
Kitchen Garden - - - Individual 0.14
Drip irrigation - - - SHG 2.64
Animal Husbandry - - -
Cattle Camp - - - Common 0.60
Minor Activity - - -
Cotton Plugging Machine SHG 0.50
Handicraft - - - Individual 0.13
Total - - - 5.81
4 Jasvantgadh
Agriculture Based - - --
Vermi Compost -- - - SHG 3.60
Low cost Net house - - - SHG
4.80
Drip Irrigation - - -
Individual
/SHG 18.24
Floriculture - - - Individual
0.20
Agro- Processing Based - - -
Agro Centre - - - SHG 3.00
Vermi Collection Centre - - - SHG 2.40
Animal Husbandry -
Cattle camp - - - Comman 2.00
Minor Activity - - - SHG 1.90
Papad Udyog SHG 0.28
Cotton Plugging machine SHG 1.50
Total - - - 36.02
5 Masal
Agriculture Based - - -
Drip Irrigation - - - Individual 5.52
Low cost Net house - - - SHG 3.84
Vermi Compost - - - SHG 1.80
Animal Husbandry - - -
Cattle camp - - - common 2.00
Minor Activity - - -
Cotton plugging machine SHG 0.50
Flour mill - - -- SHG 0.80
Vegetable -- - - Individual 0.13
Total - - - 14.59
6 Ratanpur
Agriculture Based
Drip Irrigation SHG/ Individual 10.56
Vermi compost SHG 1.80
Horticulture Individual 0.05
Animal Husbandry
Cattle camp COMMAN 1.50
Minor Activity
Cotton plugging machine SHG 0.50
Vegetable Trolley Individual 0.13
TOTAL 14.59
7 Umedgadh
Agriculture Based
Vermi Compost SHG 1.80
Low cost Net house SHG 2.40
Drip Irrigation SHG/I ndividual 4.80
Floriculture - Individual 0.20
Horticulture Individual 0.02
Agro- Processing Based
Agro Centre SHG 4.00
Animal Husbandry
Cattle camp Comman 1.50
Minor Activity
Vegetable Trolley Individual 0.13
TOTAL l 14.85
Table no. 40: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
Sr. No. Names of Major activities of the SHGs
Villages
Name of activity
No. of
SHGs
involved
Average annual income
from activity per SHG
1 Barvav Vermi compost, Drip Irrigation, Low Cost Net house
4
20000
2 Budheli Vermi Compost, Tomato Chilli grading packaging 2
15000
3 Khaski Vermi compost ,Drip Irrigation ,Cotton plugging machine 3 12000
4 Jasvantgadh ,Vermi Compost, Drip Irrigation ,Cotton plugging machine, Low cost
net house, Agro centre, Papad udyog
13 30000
5 Masal
Vermi compost ,Cotton plugging machine, Low Cost Net house,
Flour mill
4
15000
6 Ratanpur Vermi compost ,Drip Irrigation ,Cotton plugging machine 6
20000
7 Umedgadh Vermi Compost, Drip Irrigation ,,Low cost net house, Agro centre, 5
20000
37
Table no. 41: Linkages developed at village level
Sr. No. Village Name of activity Forward/Backward linkage Linkage with Outcome
1 Barvav Vermi compost GLPC Individual farmer, Fertilizer
cooperative
Increase in income and
introduce organic farming
for better soil healths
2 Budheli
Agro Processing Farmer cooperatives
Village Level individual
farmers, agri input
companies
Reduction in food
wastage and increase in
income
Vermi compost GLPC Individual farmer, Fertilizer
cooperative
Increase in income and
introduce organic farming
for better soil healths
3 Khaski Vermi compost GLPC Individual farmer, Fertilizer
cooperative
Increase in income and
introduce organic farming
for better soil healths
Agro Processing Farmer cooperatives
Village Level individual
farmers, agri input
companies
Reduction in food
wastage and increase in
income
4 Jasvantgadh
Agro Processing Farmer cooperatives
Village Level individual
farmers, agri input
companies
Reduction in food
wastage and increase in
income
Vermi compost GLPC Individual farmer, Fertilizer
cooperative
Increase in income and
introduce organic farming
for better soil health’s
Agro Center Agro produce market,
Village for agri inputs
Village level individual
farmers, agri input
companies
Quality input at lower
price
5 Masal Vermi compost GLPC Individual farmer, Fertilizer
cooperative
Increase in income and
introduce organic farming
for better soil health’s
Masal Agro Processing Farmer cooperatives
Village Level individual
farmers, agri input
companies
Reduction in food
wastage and increase in
income
6 Ratanpur
Agro Processing Farmer cooperatives
Village Level individual
farmers, agri input
companies
Reduction in food
wastage and increase in
income
Vermi compost GLPC Individual farmer, Fertilizer
cooperative
Increase in income and
introduce organic farming
for better soil health’s
7 Umedgadh
Agro Center Agro produce market,
Village for agri inputs
Village level individual
farmers, agri input
companies
Quality input at lower
price
Vermi compost GLPC Individual farmer, Fertilizer
cooperative
Increase in income and
introduce organic farming
for better soil health’s
Table no.42: Details of activities connected with vegetative cover in watershed works
Sr.
No. Name of village
Name of
structure/ work
Type of treatment Type of land Executing
agency Target
(i)
Ridge
area
(R)
(ii)
Drainage
line
(D)
(iii)
Land
dev.
(L)
(i)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(i) UG
(ii)SHG
(iii) Others
(pl. specify)
Area
(ha)
No. of
plants
Estimated
cost
(Rs. in
lakh)
Expected
month & year
of completion
(mm/ yyyy)
1 Barvav
Afforestation
Fodder bank
Fodder
Horticulture C UG 0.01
Others (pl.
specify) - - - - - - - - - - -
Total - - - - - - - - - - -
2
Budheli
Afforestation - - - - - - - - - - -
Fodder bank - - - - - - - - - - -
- - - - - - - - - - -
3 Khaski Afforestation - - - - - - - - - - -
Total - - - - - - - - - - -
4 Jasvantgadh Afforestation - - - - - - - - - - -
5
Masal
Fodder bank - - - - - - - - - - -
Others (pl.
specify) - - - - - - - - - - -
Afforestation - - - - - - - - - - -
Total - - - - - - - - - - -
6 Ratanpur Afforestation
Horticulture P UG 0.05
7 Umedgadh Horticulture p UG 0.02
Table no.43: Details of activities in the CPRs in the project areas
Sr. No. Name(s) of the
villages CPR particulars Activity proposed
Target
Target area under the activity
(ha) Estimated expenditure (Rs.)
Expected no. of
beneficiaries
1 Barvav
- - - - -
2 Budheli - - - - -
3 Khaski - - - - -
4 Jasvantgadh - - - - -
5 Masal - - - - -
6 Ratanpur - - - - -
7 Umedgadh - - - - -
Capacity Building
Capacity Building is the process of assisting the group or Individual s to identify and address issues and gain the insights, knowledge and experience
needed to solve problems and implement changes. There is a realization in the development sector that there is a need to appraise the success of
development interventions by going beyond the conventional development targets and measures of success to take in to account improvements to human
potential. Capacity Building of stakeholders is also increasingly viewed as an important factor in developmental projects that involved participation of
stakeholders as all levels for effective implementation of projects.
Table no. 44: Capacity Building Institution:
Sr.
No.
Name of the
Training Institute
Full Address with
contact no., website
Type of
Institute#
Area(s) of
specialization$
Accreditation
details
Trainings
Reference
Year
No. of
trainings
assigned
No. of
trainees to
be trained
1
State Institute of
Rural
Development,
Gujarat
Ahmadabad GOG
Training in
Rural
Development
Schemes
Training
Institute 2011-2016 3 150
2
Development
Support Centre
(DSC)
Ahmadabad NGO
Rural
Development
Training
Training
Centre 2012-13 5 98
3
4 ICECD
E-1/14, Sterling
city,Bopal,
Ahemedabad.
(o)+91-79-3732039
Development
centre
Women
Rural & Tribal
areas, Urban
slum, poor &
low-middle
income
centre of
development
programme
2012-2014 3 108
5 Dantiwada Argil. Dantiwada -
Banaskantha University
Training in
modern and
better
agriculture
practices
Agriculture
University 2010-2015 3 150
6 BISAG BISAG-
GADHINAGAR
Space
application
Remote
Sensing GoG 2010-2015 3 6
7 KVK KVK, Khedbramha,
Dist. Sabarkantha GoG
Agriculture
Science GoG 2011-2012 48 224
Table no. 45: Capacity Building plan:
Sr.
No. District Project Project Stakeholders
Total no. of
persons
No. of persons to be
trained
No. of training
programmes Estimated cost
1 Sabarkantha IWMP-14
PIA 2 2 12
28.788
WDTs 3 3 5
Ugs 176 3
SHGs 54 4
WCs 5 10 4
Total 923 245 28 28.788
Table no.46: Information, Education and Communication Activities:
Sr. No. Activity Executing agency Estimated expenditure (Rs.) Outcome
(may quantify, wherever possible)
1 Project Information Board PIA-DWDU 4.00
To make aware people more about
project, its work and their
participation.
2 Wall Slogan PIA-DWDU
3 Pamphlet & Posters PIA-DWDU
Chapter 5
Budgeting
BUDGET
Table no. 47: Budget at a glance for the project
Sr. No. Budget Component % of the Budget Cost Requirement
A Barvav
1 Administrative costs 10 5.21
2 Monitoring 1 0.52
3 Evaluation 1 0.52
4 Entry Point activity 4 2.08
5 Institution and Capacity Building 5 2.61
6 Detailed Project Report 1 0.52
7 Watershed Development Works 56 29.16
8 Livelihood activities for asset less 9 4.69
9 Production systems and micro-enterprises 10 5.21
10 Consolidation phase 3 1.56
TOTAL 100 52.08
B Budheli
1 Administrative costs 10 5.19
2 Monitoring 1 0.52
3 Evaluation 1 0.52
4 Entry Point activity 4 2.07
5 Institution and Capacity Building 5 2.59
6 Detailed Project Report 1 0.52
7 Watershed Development Works 56 29.06
8 Livelihood activities for asset less 9 4.67
9 Production systems and micro-enterprises 10 5.19
10 Consolidation phase 3 1.56
TOTAL 100 51.89
C Khaski
1 Administrative costs 10 3.06
2 Monitoring 1 0.31
3 Evaluation 1 0.31
4 Entry Point activity 4 1.22
5 Institution and Capacity Building 5 1.52
6 Detailed Project Report 1 0.31
7 Watershed Development Works 56 17.11
8 Livelihood activities for asset less 9 2.75
9 Production systems and micro-enterprises 10 3.06
10 Consolidation phase 3 0.91
TOTAL 100 30.56
D Jasvantgadh
1 Administrative costs 10 18.96
2 Monitoring 1 1.89
3 Evaluation 1 1.89
4 Entry Point activity 4 7.58
5 Institution and Capacity Building 5 9.48
6 Detailed Project Report 1 1.90
7 Watershed Development Works 56 106.16
8 Livelihood activities for asset less 9 17.06
9 Production systems and micro-enterprises 10 18.96
10 Consolidation phase 3 5.69
TOTAL 100 189.57
E Masal
1 Administrative costs 10 7.68
2 Monitoring 1 0.77
3 Evaluation 1 0.77
4 Entry Point activity 4 3.07
5 Institution and Capacity Building 5 3.85
6 Detailed Project Report 1 0.77
7 Watershed Development Works 56 43.01
8 Livelihood activities for asset less 9 6.91
9 Production systems and micro-enterprises 10 7.68
10 Consolidation phase 3 2.30
TOTAL 100 76.81
F Ratanpur
1 Administrative costs 10 7.65
2 Monitoring 1 0.77
3 Evaluation 1 0.77
4 Entry Point activity 4 3.06
5 Institution and Capacity Building 5 3.82
6 Detailed Project Report 1 0.77
7 Watershed Development Works 56 42.85
8 Livelihood activities for asset less 9 6.88
9 Production systems and micro-enterprises 10 7.65
10 Consolidation phase 3 2.29
TOTAL 100 76.51
G Umedgadh
1 Administrative costs 10 7.81
2 Monitoring 1 0.78
3 Evaluation 1 0.78
4 Entry Point activity 4 3.12
5 Institution and Capacity Building 5 3.92
6 Detailed Project Report 1 0.78
7 Watershed Development Works 56 43.75
8 Livelihood activities for asset less 9 7.03
9 Production systems and micro-enterprises 10 7.81
10 Consolidation phase 3 2.35
TOTAL 100 78.13
Table no. 48: Village wise- component wise budget available under IWMP
Sr.
no. Village
Administrative
Monitoring
and
Evaluation
EPA Institution
and CB DPR
Watershed
development
Work
Livelihood
for asset-
less
Production
system and
Microenterprises
Consolidation Total
1 Barvav 6.25 2.08 2.61 0.52 29.16 4.69 5.21 1.56 52.08
2 Budheli 6.23 2.07 2.59 0.52 29.06 4.67 5.19 1.56 51.89
3 Khaski 3.68 1.22 1.52 0.31 17.11 2.75 3.06 0.91 30.56
4 Jasvantgadh 22.74 7.58 9.48 1.90 106.16 17.06 18.96 5.69 189.57
5 Masal 9.22 3.07 3.85 0.77 43.01 6.91 7.68 2.30 76.81
6 Ratanpur 9.19 3.06 3.82 0.77 42.85 6.88 7.65 2.29 76.51
7 Umedgadh 9.37 3.12 3.92 0.78 43.75 7.03 7.81 2.35 78.13
Total 66.68 22.20 27.76 5.57 311.10 49.99 55.56 16.65 555.55
Table no. 49: Village wise gap in funds requirement
Sr.
No. Village Total cost requirement
Total funds available under
IWMP Gap in funds requirement
1 Barvav 29.98 29.16 0.82
2 Budheli 30.08 29.08 1.00
3 Khaski 17.73 17.11 0.62
4 Jasvantgadh 107.16 106.16 1.00
Table no.50: Details of Convergence of IWMP with other Schemes
Sr. No. Village Phase/ Type of
work
Activity to be
carried out
Fund made
available to
IWMP due to
convergence
(Rs. in lakh)
Scheme with
which
convergence
took place
Reference no. of
activity/ task/
structure in DPR
Level at which
decision for
convergence
was taken
1 Barvav Work phase New Pond 0.82 MGNREGA
livelihood Drip irrigation 41.80 GGRC - -
2 Budheli
Work phase New Pond 1.00 MGNREGA
livelihood Drip irrigation 12.65 GGRC - -
3 Khaski Work phase
Check dam Di-
silting 0.62 MGNREGA
livelihood Drip irrigation 6.05 GGRC
4
Jasvantgadh
Work phase New Pond 1.00 MGNREGA
livelihood Drip irrigation 41.80 GGRC
5 Masal 44.15 43.01 1.14
6 Ratanpur 43.85 42.85 1.00
7 Umedgadh 45.60 43.75 1.85
Total 318.55 311.12 7.43
5 Masal Work phase
Checkdam
Dicelting 0.64 MGNREGA
livelihood Dripirrigation 12.65 GGRC
6 Ratanpur Work phase
New pond 1.00 MGNREGA
livelihood Dripirrigation 24.20 GGRC
7 Umedgadh Work phase
New pond 1.00 MGNREGA
livelihood Dripirrigation 11.00 GGRC
Table no. 51: Public-Private Partnership in the IWMP projects
S.
No.
Name of
Private Sector
Partner
Agency
Type of agreement signed Financial contribution
Partnership
Interventions
Expected
Outcomes Comments
a)MoU b)Contract c) Any other
(pl. specify) IWMP
Private
sector
1 Not Available - - - -
Chapter-6
EXPECTED OUTCOMES
Employment:
Employment has always been a problem in the village. The principle occupations of the people are agriculture, animal husbandry and casual labour
works. However, agriculture works is more over depends on rainfall so sometimes it suffer due to uneven rainfall in area and they only take single crop
for whole season which keep them engage for only 4-5 months. With uneven rainfall lack of fodder problems comes so animal husbandry is also
indirectly affect. Thus, the people mainly depend upon casual labour, either in the village itself or outside it
Table no. 52: Employment in Project area:
Sr.
NO.
Names of
Villages
Wage employment Self employment
No. of man days No. of beneficiaries No. of beneficiaries
SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total
1 Barvav 2412 0 3681 2611 8704 18 0 27 20 65 25 0 120 25 170
2 Budheli 1876 0 4196 2603 8675 14 0 32 19 65 30 0 110 20 160
3 Khaski 1474 0 2101 1532 5107 11 0 15 12 38 25 0 108 22 155
4 Jasvantgadh 10452 0 11697 9493 31642 78 0 87 71 236 22 0 99 25 146
5 Masal 2948 0 6037 3851 12836 22 0 45 29 96 28 0 85 15 128
6 Ratanpur 2546 0 6408 3837 12791 19 0 47 29 95 22 0 98 10 130
7 Umedgadh 3082 0 6060 3918 13060 23 0 46 29 98 25 0 110 20 155
Total 24790 0 40180 27845 92815 185 0 299 209 693 177 0 730 137 1044
Table no. 53: Seasonal migration from Project area
Sr. No. Names of villages No. of persons migrating No. of days per year of migration
Pre-project Expected post project Pre-project Expected post project
1 Barvav 0 0 0 0
2 Budheli 0 0 0 0
3 Khaski 0 0 0 0
4 Jasvantgadh 0 0 0 0
5 Masal 0 0 0 0
6 Ratanpur 0 0 0 0
7 Umedgadh 0 0 0 0
Table no. 54: Average ground water table depth in the project areas (in meters)
Sr. No. Names of Villages Sources Pre-Project level Expected Increase/decrease
(Post- Project)
1 Barvav Open wells 24-160 mt 20-200 mt
Bore wells 30-120 mt 20-280 mt
2 Budheli Open wells 24-160 mt 20-200 mt
Bore wells 30-120 mt 20-280 mt
3 Khaski Open wells 24-160 mt 20-200 mt
Bore wells 30-120 mt 20-280 mt
4 Jasvantgadh Open wells 24-160 mt 20-200 mt
Bore wells 30-120 mt 20-280 mt
5 Masal Open wells 24-160 mt 20-200 mt
Bore wells 30-120 mt 20-280 mt
6 Ratanpur Open wells 24-160 mt 20-200 mt
Bore wells 30-120 mt 20-280 mt
7 Umedgadh Open wells 24-160 mt 20-200 mt
Bore wells 30-120 mt 20-280 mt
Table no. 55: Status of Drinking water
Sr.
No.
Names of
Villages
Availability of drinking water
(no. of months in a year) Quality of drinking water
Comments
Pre-project Expected Post project Pre-project Expected Post-project
1 Barvav 8 12 Potable Potable
2 Budheli 8 12 Potable Potable
3 Khaski 8 12 Potable Potable
4 Jasvantgadh 8 12 Potable Potable
5 Masal 8 12 Potable Potable
6 Ratanpur 8 12 Potable Potable
7 Umedgadh 8 12 Potable Potable
Table no. 56: Crop area and yield in the project area
Sr. No. Name of
village Name of crops
Pre-project Post Project
Area Average Yield (Qtl) per
ha.
Area Average Yield qtl per ha
(ha) (ha)
Kharif
1 Barvav
Cotton 190 35 190 37
Maize - - - -
Juvar 61 25 61 30
Rabi
Wheat 60 50 60 70
Castor 70 24 70 30
Vegetables 10 80 10 90
Kharif
2 Budheli
Cotton 200 35 200 40
Maize - - - -
Juvar 25 25 25 30
Rabi
Wheat 75 40 75 50
Castor 50 25 50 30
Vegetables 15 50 15 60
Kharif
3 Khaski
Cotton 155 32 155 35
Maize - - - -
Juvar 20 22 20 25
Rabi
Wheat 45 45 45 50
Castor 35 20 35 25
Vegetables 05 80 05 85
Kharif
4 Jasvantgadh
Cotton 835 35 835 40
Maize 70 20 70 25
Juvar 90 25 90 35
Rabi
Wheat 430 45 430 50
Castor 325 22 325 25
Vegetables 45 70 45 75
Kharif
5 Masal
Cotton 400 33 400 35
Maize 10 22 10 24
Juvar 37 25 37 27
Rabi
Wheat 70 45 70 48
Castor 80 25 80 27
Vegetables 45 70 45 80
Kharif
6 Ratanpur
Cotton 360 30 360 33
Maize - - - -
Juvar 100 25 100 27
Rabi
Wheat 70 55 70 57
Castor 130 27 130 29
Vegetables 10 50 10 60
7 Umedgadh Cotton 330 27 330 29
Maize 55 20 55 22
Juvar 80 22 80 24
Rabi
Wheat 120 50 120 53
Castor 150 25 150 27
Vegetables 10 52 10 55
Table no. 57: Area under horticulture
Sr. No. Name of Village Existing area under horticulture (ha) Area under horticulture proposed to be covered
through IWMP
1 Barvav 0 0
2 Budheli 0 0
3 Khaski 0 0
4 Jasvantgadh 0 0
5 Masal 0 0
6 Ratanpur 0 0
7 Umedgadh 0 0
Table no. 58: Forest/vegetative cover
Sr. No. Name of Village Existing area under tree cover (ha) Area under tree cover proposed (Ha)
1 Barvav 0 0
2 Budheli 0 0
3 Khaski 0 0
4 Jasvantgadh 0 0
5 Masal 0 0
6 Ratanpur 0 0
7 Umedgadh 0 0
Table no. 59: Details of livestock in the project areas (for fluids please mention in liters, for solids please mention in kgs. and income in Rs.)
S. No. Name of
Village Type of Animal
Pre-Project Expected Post-project Remarks
No. Yield Income No. Yield Income
1 Barvav
Buffalo 142 36000 122400 555 4050 144000
Cow 176 2175 65250 450 2280 68250
Total 318 38175 187650 1005 6330 212250
2 Budheli
Buffalo 176 350 14000 65 455 15600
Cow 34 250 7500 58 355 8800
Total 210 600 21500 123 810 24400
3 Khaski
Buffalo 131 1743 69720 262 1920 70252
Cow 22 525 15750 125 625 16895
Total 153 2268 85470 387 2545 87147
4 Jasvantgadh
Buffalo 1002 4080 163200 200 4150 183200
Cow 497 200 6000 65 300 8000
Total 1499 4280 169200 265 4450 191200
5 Masal
Buffalo 146 702 28080 128 825 30000
Cow 156 280 8400 65 325 8600
Total 302 982 36480 193 1150 38600
6 Ratanpur
Buffalo 544 84 3360 20 125 3800
Cow 271 875 26250 188 900 28250
Total 815 959 29610 208 1025 32050
7 Umedgadh
Buffalo 194 837 33480 85 898 35628
Cow 106 172 5160 55 199 5230
Total 300 1009 38640 140 1097 40858
Table no. 60: Backward-Forward linkages
Sr. No. Project Type of Marketing Facility Pre-project (no.) During the project (no.) Post-project (no.)
1 Iwmp-14
Jasvantgadh
Backward linkages - - -
Seed certification - - -
Seed supply system - - -
Fertilizer supply system - 3 3
Pesticide supply system - 3 3
Credit institutions - 1 2
Water supply - - -
Extension services - 3 3
Nurseries - - -
Tools/machinery suppliers - 1 2
Price Support system - - -
Labour - - -
Any other (please specify) - - -
Forward linkages - - 2
Harvesting/threshing machinery - 1 2
Storage (including cold storage) - - -
Road network - - -
Transport facilities - - -
Markets / Mandis - - -
Agro and other Industries - 1 2
Milk and other collection centres - - - Labour
Any other (please specify)
CHAPTER -7
QUALITY AND SUSTAINABILITY ISSUES
7.1 Plans for Monitoring and Evaluation
A Web-based GIS System is being developed for monitoring and evaluating the project in its planning & implementation phases. The system
would be available on a public domain and can be accessed by all the stakeholders of the project. The system shows the entire state of Gujarat and all of
those areas selected over the next 18 years. Filtering allows the user to zoom onto one particular project. Details related to soil type, Land-use
classification, inhabitation etc., can be obtained village-wise. Furthermore, survey-number wise details related to ownership, irrigation source, yield etc.,
can also be accessed by the users of the system. This system is being used for pooling up the details obtained from the DPR. In other words, the DPR is
made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in
the area, proposed areas for treatment etc., for further treatment and planning. The system would also show the satellite imageries of various years from
the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective
measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project.
Yet another component of the Web-based GIS system is the Mobile based Monitoring & evaluation System, which will help the ground staff
alias WDTs (Watershed Development Team) to transmit information from the ground level to the central server. Also, any higher-up official in charge
of the project can obtain information regarding the project area on their mobile phone by means of an SMS. The system works in the following manner.
The WDT equipped with a GPS instrument marks the latitude-longitude information of various treatment areas during the DPR. The probable sites are
then transferred onto the central server. During the works phase, any progress in the treatment areas is reported to the server by means of an SMS by the
WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent
periods of time.
7.2 Plans for Project management
The Project management of any watershed programme is very important. It mainly depends upon the community organisation and the village
level institutes. In Jashvantgard project, watershed committee and various user groups have been formulated for post project operation and maintenance
of assets created during project period. Major emphasis will be on equity and sustainable benefit of the project even after implementation stage. A
proper link-up will be built during project period with various institutes and capacity building organisation. They will act as a major kingpin during post
implementation for scaling up the successful experience during project.
7.3 Watershed Development Fund
The major source of financial assistance after post implementation period is watershed Development Fund. The contribution of it will comes
mainly fund the following:
7.4 User Charges
Various user groups will be formed in village. These user groups will collect user charges according to the designated rules formed during the
formation of user group. These funds will be transferred to the WDF funds as per these formulated rules. The secretary of watershed committee (WC)
shall maintain all the records.
Logical framework Analysis
Narrative Summary Indicators Source of verification Assumptions
Goal:
Sustainable Development and
conservation of natural resources
with the help of peoples
participation
Increased Agricultural
Production and overall
development increase in
contribution of agricultural
income to the household
income.
Objective 1
Increase soil moisture content
1.1 Less Uncertainty in
Agricultural Production
1.2 Farmers take two crops in a
year
1.1 Discussion with
Villagers/Farmers
1.2 Soil testing
1.3 Physical verification
Repair and
Maintenance and
taking care of
conservation structures
Output
Soil moisture content will
increase
1.1 Clear growth of vegetation
cover
1.2 Certainty in Kharif, Rabi
crop
Discussion with Villagers/
Farmers
Time to time take care
of structures
Activities
1.1 Farm bunding
1.2 Boulder checks
1.3 Gabions
1.1 40500 rmt
1.2 109 rmt
1.3 9 no
1.1 Physical verification
1.2 Records in asset register
1.3 Interferences from GIS maps at
1.1 Money spent on
right time
1.2 Proper scientific
different times
1.4 Measurement Book
methods used
1.3 Workers are ready
1.4 Fields are free from
crops
Objective 2
Increased irrigation potential
2.1 increased irrigated
area
2.2 increase in Land value
2.3 More uncultivable lands to
be brought under agriculture
and new plantation
2.1 Revenue records
2.2 Patwari map
2.3 Maps from GIS
2.1 Judicious use of
water
2.2 Accessibility to
common and forest
lands increased with
removal of
encroachments and
resolution of conflicts
Output
Increased irrigation water
2.1 Increased water table in
wells
2.2 Increase in flow period of
streams
2.1 Physical verification
2.2 Records in asset register
2.3 Interferences from GIS maps
at different times
2.4 Promotion of better irrigation
practices like drip irrigation
2.2 Structures full to its
capacity
2.3 Good amount of
rainfall received
Activities
2.1 Nalla/Gully plug
2.2 Irrigation tank
2.1 15 nos.
2.2 11 nos.
2.1 Physical verification
2.2 Records in asset register
2.1 Good amount of
rainfall
2.2 Size according to
catchment and storage
2.3 Farm ponds
2.4 Repair of old Check dams
2.5 Check dams
2.6 Causeway cum check dam
2.3 130 nos.
2.4 4 no.
2.5 79 nos.
2.6 17
2.3 Interferences from GIS maps
at different times
volume calculation
2.3 No seepage from
structure
Objective 3
To improve Soil Quality
3.1 Agriculture based
livelihood income generation
activities
3.2 Promotion of organic
farming Practices
3.1 Physical verification 3.1 Availability of
waste/mulching
material
Output
Quality of soil improved
3.1 Agriculture production will
increase
3.2 Plantation of fruits and
forest species
3.1 Physical verification
3.2 Market Survey
3.3 Soil testing
3.1 Composting
material used and
refilled according to
farm requirement
3.2 Use it in right time
Activities
3.1 Composition
3.2 Application of farm yard
manure
3.3 Use of FYM enriched with
route Phosphate and Bio-
3.1 Nos. Physical verification 3.1 People ready for
voluntary contribution
for Biogas Structure
3.2 Available of cow
dung at right time
3.3 Proper maintenance
Fertilizers
of structures
Objective 4
To increase fodder availability
4.1 Increase in the proportion
of households having more
security of fodder
4.2 Reduction in drudgery of
fodder
Collection especially women
4.1 Survey(Pre and Post) 4.1 Quality of
management of
common property
resources
4.2 Proper distribution
of seedling and take
care
Output
Increased fodder availability
4.1 Health of live stock
improved
4.2 Expected increase in cattle
population
4.3 promotion of dairy
development among
communities
4.1 Expenditure on seedling from
register
4.2 List of beneficiaries from the
register
4.1 Proper seedling
4.2 Proper care and
maintains
Activities
4.1 Pasture land and grassland will
be developed
4.2 On farm bunds selected local
species and fodder crops
4.1 Physical verification
4.2 Verification on farm bunds
4.1 WC˜s Reports
4.2 Expenditure Register
4.3 Resolution in WC˜s
4.4 Physical verification
4.1 Peoples
participating
4.2 Proper variety
selection
4.3 Social fencing
Objective 5
5.1 Peoples
participation/woman’s socio-
political and economic
empowerment in watershed for
income generation activities
5.1 Women participation
enhanced in decision making of
GVCs
Project to be
implemented and
managed in a
democratic and
participatory way
ensuring equity
Output
5.1 Community Mobilised
5.2 Community Trained
5.3 Better standard of living
5.1 Maintenance of assets and
records by the villagers
themselves.
5.1 Frequent meetings
5.2 Training register
5.3 Increased participation
5.1 Proper training
provided
5.2 No biasness in
villages
Activities
5.1 Formation and strengthening
of village institutions like
women˜s SHG groups/WS/UGs
and WCs through awareness
programmes
5.2 Formation of fodder banks to
increase fodder security and
promote dung development
5.1 Increased awareness
amongst women about village
resources.
5.2 Women participation
enhanced in decision-making
of GVCs.
5.3 Farmers adopt organic
farming practices
5.4 Increased household
5.1 Farmable socio-cultural
conditions at the village
5.2 Checking registers of SHGs
5.3 Checking passbook of groups
5.4 Physical verification of income
generation activities
5.5Posters/banners/meeting
register
5.1 No influence of any
external agency
5.2 Smooth flow of
funds
5.3 Access to
appropriate technology
5.4 Peoples
Participation and
positive perception
5.3 Capacity building of SHG
leaders and accounts
members/farmers/UGs/WCs
through workshop/meetings
5.4 Income generation activities.
5.5 Awareness campaign
income
5.5 improved access to credit to
livelihood purposes.
5.6 Gender sensitization of
UGs and WCs to increase
Inclusiveness of group decision
making
towards the programme
MAPS
--------------------------------------------------------------------------------x--------------------------------------------------------------------------------------