( 108 ) Contractor No. of Corrections Executive Engineer DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET The scope of work includes providing approved make pump and allied equipment for the scheme as per requirement of the Department. The essential design features and detailed specification of each and every item is as under. VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide water lubricated Vertical Turbine Pump matching to the specified requirement of the Department as enclosed in statement no. 1, H-Q curve of the offered pump for mono operation and multiple pump operation should be plotted on the system head curve attached with the tender paper. Approved Makes Kirloskar / Jyoti / Worthington / M&P / FBM Essential Design Features Vertical Turbine Pump offered shall satisfy the following basic design features. - The pump shall be conforming to IS-1710 (1989) or its latest version. - It shall have a rising head characteristic. - The impeller adjustment shall be such that the impellers run free in any installed condition in spite of the extension of line shaft, caused by hydraulic down thrust, and weight of shafting and impellers. - It shall be designed for non-overloading characteristic for prime mover. - It shall be designed to run with closed sluice valve condition without overloading the prime mover. General Specification The contactor shall submit his technical offer in standard prescribed form and performance data required by the Department as enclosed separately. The pump shall have stable characteristic performance over the entire head range mentioned. The pump shall be designed for the BEST EFFICIENCY at duty point. The total head mentioned is inclusive of all losses in the entire length of pipeline starting from discharge flange and velocity head required at discharge point. The losses in the column pipe and discharge head etc. shall be assessed by the tenderer and included in the design head of the bowl. The offer of lower efficiency pump than that required by the Department will not be considered. Similarly no efficiency loading will be considered for higher efficiency. The material of construction for pump should be as specified by the Department.

Upload: others

Post on 17-Mar-2020

72 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 108 )

Contractor No. of Corrections Executive Engineer

DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET The scope of work includes providing approved make pump and allied equipment for the scheme as per requirement of the Department. The essential design features and detailed specification of each and every item is as under. VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide water lubricated Vertical Turbine Pump matching to the specified requirement of the Department as enclosed in statement no. 1, H-Q curve of the offered pump for mono operation and multiple pump operation should be plotted on the system head curve attached with the tender paper. Approved Makes Kirloskar / Jyoti / Worthington / M&P / FBM Essential Design Features Vertical Turbine Pump offered shall satisfy the following basic design features. - The pump shall be conforming to IS-1710 (1989) or its latest version. - It shall have a rising head characteristic. - The impeller adjustment shall be such that the impellers run free in any installed condition in

spite of the extension of line shaft, caused by hydraulic down thrust, and weight of shafting and impellers.

- It shall be designed for non-overloading characteristic for prime mover. - It shall be designed to run with closed sluice valve condition without overloading the prime

mover. General Specification The contactor shall submit his technical offer in standard prescribed form and performance data required by the Department as enclosed separately. The pump shall have stable characteristic performance over the entire head range mentioned. The pump shall be designed for the BEST EFFICIENCY at duty point. The total head mentioned is inclusive of all losses in the entire length of pipeline starting from discharge flange and velocity head required at discharge point. The losses in the column pipe and discharge head etc. shall be assessed by the tenderer and included in the design head of the bowl. The offer of lower efficiency pump than that required by the Department will not be considered. Similarly no efficiency loading will be considered for higher efficiency. The material of construction for pump should be as specified by the Department.

Page 2: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 109 )

Contractor No. of Corrections Executive Engineer

The dimensions of column pipe, impeller shaft, line shaft, etc. should not be less than that mentioned by the Department as specified requirement. The complete pump set including pump, column pipe, line shaft and discharge case should be supplied of approved makes only. The complete pump set should be offered for inspection at the time of third party inspection in manufacturer's works prior to dispatch. Suction Bell Mouth and Suction Strainer Suitable size C.I. bell mouth and suction strainer shall be supplied by the contractor with each pump. Strainer should have net area of opening equal to at least three times the suction pipe area. Bowl Assembly The casting of bowl shall be free from blowholes and other defects. The pump bowl / bowls shall be flanged with machine matching faces. The bowls shall be capable of withstanding a hydrostatic pressure equal to twice the pressure at rated capacity or 1.5 times the shut-off head whichever is greater. The bowls may be equipped with replaceable seal rings on suction side of enclosed impeller. Water passage shall be smooth and the bowls may contain bush to serve as bearings for the impeller shaft. The bowl assembly shall bear manufacturer's name-plate giving details as per IS-1710. Impellers The impeller may be of enclosed or semi-enclosed type and shall be properly dynamically balanced on balancing equipment. The test results of the same should be offered for inspection during factory test. The impellers shall be properly machined with water passage hand finished. Enclosed impellers or bowls shall be equipped with seal rings on their hubs. Seal rings shall be provided either with impeller or in the bowl. Impeller Shaft The impeller shaft shall be of STAINLESS STEEL having surface finish of 0.75 micron Ra Max at fixing sizes. The design of shaft shall also take into consideration the critical speed of the shaft, which shall be removed, from the actual working speed by atleast 10% on either side. The impeller shaft shall be guided by bearings provided in each bowl or above and below the impeller shaft assembly. Extra long bearings shall be provided for suction and discharge bowls. The butting faces of the shaft shall be machined square to the axis and the shaft ends shall be chamfered on the edges.

Page 3: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 110 )

Contractor No. of Corrections Executive Engineer

Column Pipes The column pipe shall be manufactured from tubes conforming to IS-1978/1971 heavy series. The standard length of column pipes shall be 1.5 M and its jointing shall be flanged type. The total suspended column pipe with bowl assembly shall be 15 M. For calculating the setting lengths the required levels are given in the detailed statement. Accordingly the column pipe and line shaft shall be installed. The setting dimensions shall be got approved before supply. Make up piece, if required, for pump shall be provided to have exacted setting length. Line Shafts and Couplings The line shaft shall be solid circular section prepared from stainless steel SS 410 of required length. The shaft surface finish, tolerance limit and critical speed criteria for design should be as per impeller shaft. The line shaft shall be furnished with interchangeable sections. To ensure correct alignment of the shaft they shall be straight within 0.125 mm for 3 M lengths. Maximum permissible error in the axial alignment of thread axis and shaft axis is 0.05 mm in 150 mm. Steel coupling shall be designed with minimum right hand threads depending on the direction of rotation of the pump to tighten during the pump in-operation. Line Shaft and Line Shaft Bearings The line shaft section shall be provided with a non corrosive-wearing surface particularly at the location of each guide bearing. The line shaft bearing shall be designed to be lubricated by the water being pumped and shall be placed in bearing holders held in position at the joint of the column. Separate G.I. water tank with required piping for water lubrication should be provided if column length is more than 9 M. Discharge Head Discharge head shall be fabricated from CI / MS. It shall be incorporated in full diameter elbow mounting flange for motor with suitable tapping for pressure gauge. The discharge head shall be of robust construction and shall be designed to support entire static and dynamic load of pump assembly, water column and motor. The discharge head shall have an arrow indicating direction of rotation of pump. The discharge head shall bear a name-plate with following information - Name of Manufacturer Discharge Cum / Hr. Serial Number Head Metres Type / Size Pump Input KW Speed Maximum Input KW

Page 4: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 111 )

Contractor No. of Corrections Executive Engineer

The discharge head may have a stuffing box with renewable bushing. The location shall be easily accessible. The lantern ring and gland follower shall be split type. It shall incorporate suitable arrangement to collect gland leakage and lead to sump with suitable piping. The discharge head should have suitable size valve arrangement for air release. Base Frame The pump is to be erected as per general layout drawing approved by the Department. The pump is to be erected on provided RCC beam / ISMB as directed by the Engineer. Suitable size ISMB base frame is to be provided to erect both pump and motor and rigidly bolted to main beam, RCC foundation block of suitable size be casted for erection of pump as pump foundation block. The cost of main base frame and RCC foundation is included in this item. The pump and motor shall be installed on base frame, designed for rigidity and suitable to accommodate pump set, suitable machined sole plate. The pump is to be erected as per general layout drawing shown. The pump is to be erected on provided RCC beam / ISMB as directed by Engineer. Suitable size ISMB base frame is to be provided and rigidly bolted to main beams. M.S. sole plate shall be provided under the discharge head of minimum 25 mm thickness with arrangement for precise vertical and horizontal alignment. The main frame shall be levelled and firmly bolted to RCC beam and shall have ground top. The sole plate shall be matched to this ground top by blue matching process to have atleast 60% contact area. The base plate shall be constructed from steel channels as recommended by manufacturer. Pre-lubrication Tanks The pre-lubrication tanks of suitable capacity with inlet and outlet piping shall be provided with each pump including all specials, gate valves and sundry material. Same shall be supplied from the manufacturer along with the pumps. Tools The contractor should supply all special tools required such as M.S. clamp for bowl assembly, line shaft and TT spanner for erection of pump with each pump. Factory Inspection and Test The pump shall be inspected and tested by third party approved by M.J.P. in presence of Department's Representative. The scope of inspection includes hydrostatic test of bowl assembly, column assembly, discharge head, performance test, strip inspection, reviewing material test certificate, impeller balancing test certificates, etc. The testing shall be done as per stipulation in IS-9137 code for acceptance test for class-C pump. It is contractor's responsibility to organise this inspection and shall bear all expenses inclusive of inspection fees, etc.

Page 5: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 112 )

Contractor No. of Corrections Executive Engineer

Contact Limit Common header pipe upto duckfoot bend outside pump house and its connection to rising main. Specifications and Requirements of Department (Statement No. 1) 1 Type of Pump required Vertical Turbine Pump 2 Pumps opeation 2 3 Standby pump 1 4 Duty discharge of each pump 20 LPS 5 Duty head required 126 M 6 Speed 1460 7 Column pipe size required (not less than) 150 mm 8 Type of column pipe Flanged 9 Line shaft size (not less than) 43 mm 10 Total suspension length of column assembly 16 M 11 Pump’s operating range 94 – 139 M 12 Pump’s shut off head (not less than) 145 M 13 Pump’s bowl efficiency (not less t han) 80% 14 Pump’s field efficiency expected (not less than) 75% 15 Number of stages (not more than) As per Mfg. Design 16 Delivery valve size required (not less than) 150 mm 17 Common header pipe size (not less than) 300 mm 18 Minimum HP required 50 HP 19 Sluice valve and non return valve size 150 mm 20 Pumps base frame ISMC of adequate size 21 Sole plate 25 mm MATERIAL OF CONSTRUCTION FOR PUMP

A) CASING, BOWLS & BELL MOUTH C.I. IS-210 F.C. 200 B) DISCHARGE HEAD M.S. FABRICATED / C.I. C) IMPELLER BRONZE AS PER IS-318 GR.II D) IMPELLER SHAFT STAINLESS STEEL AISI 410 E) LINE SHAFT SS 410 F) COLUMN PIPE E.R.W. HEAVY DUTY G) WEARING RINGS BRONZE AS PER IS-318 GR.II H) SUCTION & DISCHARGE CASE BEARING BRONZE AS PER IS-318 GR.II I) NUT-BOLTS CARBON STEEL J) GASKET SEAL AND PACKING AS PER IS-5120 / 1988

Page 6: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 113 )

Contractor No. of Corrections Executive Engineer

TENDERER MUST SUBMIT HIS OFFER ALONGWITH SPECIFICATION SHEET DULY FILLED CONSIDERING ABOVE REQUIREMENTS. Detail information to be supplied by the tenderer regarding V.T. Pump offered against this tender as per IS-1710. In absence of following information, the tender is likely to be REJECTED. 1. Make of pump and its code designation 2. Method of lubrication 3. Lubrication (automatic / manual / other type) 4. Outside diameter of bowl mm 5. Discharge at duty point Cum/hr 6. Effective head at duty point M 7. Number of stages Nos. 8. Bowl assembly head M 9. Speed RPM 10. Pump input at duty point KW 11. Maximum pump input KW 12. Pump efficiency at duty point % 13. Details of column assembly a) Length of column assembly M b) Column pipe size mm dia. c) Pieces of 1.5 M length mm dia. d) Adjustment piece length M e) Flanged or screwed type f) Shaft enclosing tube size mm dia g) Impeller shaft size mm dia h) Line shaft size mm dia i) Model of discharge head j) Size of discharge outlet mm dia k) Distance of centre line of discharge branch mm below the motor floor Additional information to be furnished with the supply A) PERFORMANCE CURVE OF THE PUMP B) CERTIFIED DRAWINGS GIVING LEADING DIMENSIONS C) WEIGHT OF PUMP

Page 7: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 114 )

Contractor No. of Corrections Executive Engineer

MOTOR ( Vertical Solid Shaft ) (Item No. 2) Approved Makes Kirloskar / Jyoti The scope of the work includes providing approved make, vertical soilid shaft squirrel cage induction motor, conforming to IS 325-1970, suitable to operate on 415 Volts ± 10%, 3 Phase, 50 Hz, AC supply. The synchronous speed of the motor should be 1500 RPM. The insulation grade of the motor should be 'B'. The motor should be screen protected and drip-proof type. Motor should have suitable terminal box to accommodate incoming cable from starter. Motor shall be suitable to operate on ± 10% voltage variation, and ± 10% frequency variation and ± 3% voltage and frequency variation. Thrust bearing shall be suitable and of adequate capacity to carry the weight of all rotating parts and the hydraulic down thrust. Non-reversing ratchet or similar mechanism should be provided to the motor to prevent reverse rotation. Continuous maximum rating of the motor shall be at least 20% above the maximum power absorbed by the pump under any operating point within stipulated head range of the pump or at least 10% above the power required at shut-off, whichever is higher. However the motor should not be less than that mentioned in schedule 'B'. All technical details, leaflets for the motor offered should be given along with tender only. Manufacturer's test certificate shall be furnished along the supply of motor. Factory Inspection and Test The motor shall be inspected and tested by third party approved by MJP in presence of Department's representative. The scope of inspection includes : - Review of raw material test certificates and quality control procedures. - Routine test. - Type test for one number random motor for 300 HP and above, including vibration and noise

level test. C.I. D/F SLUICE VALVE – 150 mm dia PN-1.6 Rating (Item No. 3) Approved Makes Durga / Gavane Patil / IVI / IVC / Kirloskar / Mayur The specification under this section covers the design, performance, manufacture and construction features, delivery, erection and testing, etc. of sluice valve. All jointing material for erection of valves is to be provided by contractor with no extra cost. The valve shall be double flanged water works pattern inside screw with non-rising spindle. The valve shall have suitable size hand wheel with arrow marked for OPEN and CLOSE. The valve shall be

Page 8: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 115 )

Contractor No. of Corrections Executive Engineer

conforming to specifications as per IS 780 or IS 2906 as applicable according to size of valve. The valve should be without bypass arrangement. Necessary cement concrete support block for supporting the valves shall be provided as per direction of Engineer-in-charge. (The cost of supporting block is payable as per actual against RCC/PCC foundation work.) The valves shall be painted with two coats of best quality anticorrosive black paint after erection work. Testing The valve shall be subjected to test at manufacturer's works for seat and body test at the pressure stipulated in IS for respective PN Rating. Manufacturer's test certificate shall be submitted along with supply. C.I. D/F REFLUX VALVE – 150 mm dia PN-1.6 Rating (Item No. 4) Approved Makes Durga / Gavane Patil / IVI / IVC / Kirloskar / Mayur The specification under this section covers the design, performance and construction features, delivery, erection and testing, etc. complete. Providing erecting double flanged reflux valve, single door, water works quality conforming to IS-5312, with gunmetal seat and jointing to pipe work including all hardware and packing The non-return valve without bypass arrangement shall be provided as per description given below. The valve shall be free-action quick opening, non-slam closer and low heat loss characteristics and single door type. Necessary supports of cement concrete block for supporting the valve shall be provided as per direction of Engineer-in-charge. (The cost of supporting block is payable as per actual against RCC/PCC foundation work.) Valves shall be painted with two coats of best quality anticorrosive black paint after erection work Testing The valves shall be tested at manufacturer's works for seat and body test pressure as given in IS for respective PN-Rating.

Page 9: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 116 )

Contractor No. of Corrections Executive Engineer

KINETIC DOUBLE BALL AIR VALVE – 80 mm dia PN-1.6 Rating (Item No. 5) Approved Makes IVI / IVC / Kirloskar / Mayur The contractor shall have to provide and erect in position as per direction of Engineer-in-charge Kinetic Double Orifice Air Valve with an isolating sluice valve mounted in horizontal position operated with wheel gear. The specials required for erection of Kinetic Air Valve should be supplied by the contractor. The valve should be painted with two coats of best quality anticorrosive black paint. M.S. D/F PIPING (Item No. 7) The contractor should prepare layout drawing of pumping machinery as per actual site condition. The pumping machinery layout drawing with detail dimensions of suction piping, delivery piping, common manifold piping upto contract limit should be got approved from Department before starting the work. The contractor has to supply M.S. D/F pipes and specials such as Taper, 90 degree bends, duckfoot bend, Radial tee, distance pieces of various length, blank flanges, etc., as per approved drawing. M.S. D/F specials shall be of mild steel conforming to IS and fabricated to transit flow without disturbing streamlined condition, to gradual and smooth change of direction and or velocity, as the case may be and to offer neat and aesthetic appearance. The thickness of pipe shell and flange should be got approved from Department prior to fabrication. The flanges should be drilled as per IS-1538/1967 Part 4-1976. The Contractor shall provide all jointing material such as rubber packing, nut bolts, washers, white lead, etc. required for jointing pipes and specials. Necessary cement concrete block should be provided for pipe support. The necessary hydraulic testing of pipe and special's joints for structural rigidity and water-tightness with all conditions of pumping shall be given. The quantity mentioned in the tender is tentative and may vary as per site condition. Weighment of pipes and specials will be the entire responsibility of the contractor before erection. The weight of C.I. pipes and specials should not be less than that mentioned in respective IS. However, no extra payment will be made for excess weight The complete piping work including valves, etc. should be painted with two coats of anticorrosive paint after complete erection and testing work. Payment will be made as per actual weight basis. For calculating the weight for payment on rate per Kg. basis, following parameters will be applicable. - Weight of pipe and special shall be based on finished / fabricated component. Wastage will not

be paid for. - Thickness shall be average thickness of pipe supplied. - No deduction for bolt holes in flange will be made. - Nut bolts will not be considered for weight calculation. - Specific weight for MS pipes and specials assumed as 7850 Kg / Cum.

Page 10: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 117 )

Contractor No. of Corrections Executive Engineer

M.S. Flanges Heavy duty flanges should be used wherever required. The flange holes drilled should match the adjoining valves or C.I. specials. Flange screw fitted to drop pipe should be welded to G.I. pipe before erection work. Cost of all jointing material such as rubber sheet, nut bolts is included in this item. PLAIN CEMENT CONCRETE FOUNDATION (Item No. 8) Providing casting (including curing) cement concrete block in 1:2:4 proportion for the purpose of foundation for panel, thrust block support, anchor blocks for valves, piping, etc. including required excavation, form work, etc. has to be provided by the contractor. All necessary material like cement, stone metal, sand, etc. required for completing the job shall have to be provided by the contractor. Blocks should have good finishing with plastering, etc. complete. Payment will be made on cum basis. HAND OPERATED CRANE (3 MT, 8 M Span) (Item No. 9) Approved Makes For Crane - Hercules / Anupam / Samco Chain Pulley Block and Monorail Trolley - Indef / Moris / Elephant / Speed The design of gantry arrangement should be got approved from Engineer-in-charge prior to fabrication and supply. Providing and erecting suitable capacity overhead gantry crane, hand operated, with geared train with wheel and hand chain to travel smoothly on rails or square bars of suitable size fixed / grouted on corbel beam already provided. Details of Gantry Arrangement required Working load - 3 MT Lift - 6 M Cross travel span - 8 M Lengths / Diameter of pump house - 8 M dia Gantry type - Circular / Rectangular Distance between corbel and bottom of roof - 1.5 M Providing and erecting monorail geared travelling trolley hand operated with necessary cross girders, gears and hand wheel with chain to travel along the span with necessary stoppers at the end of the pump house ( in case of rectangular gantry crane). Providing and fixing triple spur gear chain pulley block with swiveling hook with chain of suitable size in double length and lifting range of 6 M.

Page 11: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 118 )

Contractor No. of Corrections Executive Engineer

The contractor shall provide manually operated lifting equipment consisting of a single girder travelling trolley and chain pulley block complete with below rail or square bar i.e. square plates of size minimum 200 x 200 mm and 12 mm thick, rigidly welded to rail and fixed on corbel beam with bolts at every 1 M interval. The crane shall generally conform to IS-3177. The crane shall consist of end carriages and the bridge unit bolted together on site during erection. The crane shall be of the single girder travelling type and shall have a geared trolley. The end carriages shall run on rail, the end carriage wheels shall be machined and shall be of the double flange. The end carriage shall incorporate gearing arrangement driven by a common shaft extending the full length of the single girder, for motion of the gantry crane. The travelling trolley shall have four wheel geared type. The trolley shall r un on the lower flange of the gantry beam with two wheels on either side of the gantry web. The trolley wheel shall be single flanged with threads machined to match the flange of the gantry beam. A gearing arrangement shall be incorporated in the trolley to affect the traverse motion and shall be operated by means of chain extending to within 600 M of the operating floor. The trolley shall also incorporate a hook of robust designed for fixing the chain pulley block. The operating chain for cross traverse motion of gantry shall be suitably positioned to enable the operator to move the unit easily without dragging the operating chain over the control panels or other equipment. All gears shall be machined cut and of a robust design. Suitable ball or roller bearing shall be employed on all motions. The chain pulley block shall be spur gear type. The chain pulley block shall generally conform to IS-3882. The chain pulley block shall consist of load chain wheel, hand chain wheel. The hand chain for hoisting shall be handed well clear to the hook. The hand chain wheel shall be provided with roller type guarding to prevent slip off the chain. Gearing arrangement shall be totally enclosed with proper lubrication arrangement for bearing and pinions. Gears shall conform to IS-4460. The brake shall be of automatic screw and friction disc type and shall offer no resistance during hoisting. The assembly shall be such that the load could be sustained automatically at any position of the lift on release of the manual hoisting effort. The hook shall swivel and operate on ball and roller bearing and shall be generally conforming to IS-3815. Track stopper shall be provided at the end of track rail to prevent the end carriages from over running the end of track (in case of longitudinal travel). Suitable stoppers shall also be provided to prevent over travel of travelling trolley.

Page 12: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 119 )

Contractor No. of Corrections Executive Engineer

Following lifts shall be considered for supply of load and hand operated chains. Chain pulley block - load and operating chain - 3 MT Traverse trolley - travel operating chain - 3 MT Factory Test The crane shall be tested for 1.25 times the working capacity in all three motion and deflection at manufacturer's work in presence of Third Party Inspector and Departmental Engineer. PRESSURE GAUGE (Item No. 10) Approved Makes Fiebig / Uday / H. Guru Contractor has to provide and install required pressure gauges as per items mentioned in Schedule 'B'. Providing and fixing 150 mm dia Borden pressure gauge with inline siphon tube and pulsation damper, one number for each pump and one number on common header, is included in this item. Contractor should provide suitable tapped holes at appropriate places for fixing these pressure gauges. The pressure gauges should be of approved make only. SUB-STATION POLE STRUCTURE (Size 7.5 M x 7.5 M) (Item No. 11) The item includes designing, providing, erecting and commissioning SUB-STATION STEEL STRUCTURE to fulfill following requirements - 1. Four pole structure to receive 22 kV power from M.S.E.B. 2. To accommodate lightening arrestor, A.B. Switch, D.O. Fuse set. 3. And distribute power to provided Transformer. The layout drawing of the sub-station pole structure, sub-station fencing, earthing system, transformer location cable laying, etc. should be submitted to Department to verify fulfillment of Department's specified requirements and subsequently get approved from concerned Electrical Inspector. The sub-station comprises of following major items - a) Pole Structure and Cross Arm Contractor has to provide and erect the four pole structure to accommodate 22 KV lightening

arrestor 1 set, gang operated AB switch and DO fuse set - 1 no. The sub-station structure work comprises of following :

1) RSJ pole of ISHB 150 size each of length 11 M 4 Nos. 2) Cross arm of ICMC 100 x 50 mm of required length As required 3) G.I. Stay wire 7/8 SWG 4 Nos. The payment for the steel work provided and erected will be payable on Kg. basis.

Page 13: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 120 )

Contractor No. of Corrections Executive Engineer

The foundation in PCC will be payable as per actual for erection of pole and stay wire as per item of PCC/ RCC foundation work in schedule 'B'. The item is inclusive of excavation work.

b) Providing, erecting 22 KV Lightening Arrestor 1 Set (Thyrite type with required disc and pin insulators) Approved Makes Elpro / Atlas c) Gang Operated A.B. Switch 1 Set Tilting type with operating handle and drop pipe, etc. complete. d) Outdoor type Dropout Fuse Unit 1 Set Approved Makes for (b), (c) and (d) Pactil / Kiran / Atlas / Southern Switchgear / Universal Switchgear The cost of required 22 KV grade porcelain type disc insulators, pin insulators, 6 SWG solid

copper conductor for all overhead connections with extra thick alkathene covering pipe anticlimbing devices to all vertical poles, MS clamps, ancillary material, hardware and nut bolts is deemed to have been included in the rate of lightening arrestor, AB switch and DO fuse. No extra payment will be payable against supply of these material.

All electrical equipment shall be double earthed with suitable size G.I. earth lead as per I.E. rule

and IS-3043/66. All earth electrodes shall be interconnected by G.I. strip of suitable size through a common circular ring.

The MS structure should be painted with one coat of red lead and two coats of silver paint. e) Sub-station Civil Work and Fencing Sections As per approval layout drawing of substation, contractor has to develop the plot for sub-station

to accommodate required pole structure and transformer plinth with adequate margin all around. However, the sub-station area should not be less than 81 sqm.

f) Providing proper size C.C. Foundation block for transformer and Kiosk Metering box as per

approved drawing is to be carried out by the contractor. The cost of C.C. foundation required will be payable extra as per actual against the item of PCC/ RCC foundation in the sub-clause of Schedule 'B'.

g) The sub-station area should be provided proper fencing by M.S. fabricated section having size

2.45 M x 1.2 M width, (total fencing sections required as per estimate is 25 nos. and payment will be given as per actual supply) made of 50 x 50 x 6 mm angle duly erected in C.C. foundation, section of frame fitted with flat iron 25 x 6 mm and chain link jali 50 x 50 mm size of 3.26 mm dia / 10 SWG G.I. hard wire. The work of providing, erecting 50 x 50 x 6 mm angle corner support is included in this item. The fencing wall height about 60 cm ( 200 mm below

Page 14: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 121 )

Contractor No. of Corrections Executive Engineer

existing Gland, 400 mm above ) shall be constructed in 1:2:4 C.C. with R.C.C. raft below. (The payment for RCC plinth wall will be payable extra as per actual against the item of RCC/ PCC foundation work in the sub-clause of Schedule 'B'.

h) Sub-station Gate

The double leafed hinged door, each 1.5 M in width and 1.85 M height, using 25 mm dia "B" class GI Pipe, 45 x 45 x 5 mm cross support and chain link jali as mentioned above with flat iron covering all around. The Channel iron size 100 x 50 mm, 2.5 M length for side support of gate duly erected in C.C. foundation gate should be provided with head latches and locking arrangement. The C.C. foundation for gate support and fencing pole is included in this item, and same will not be paid extra.

i) Complete fencing work including gate should be painted with one coat of red-oxide and two

coats of aluminum paint. j) Sub-station Area Development The sub-station area should be levelled and compacted properly. Providing and spreading stone

metal 25 mm size of 100 mm layer above the compacted sub-station area is to be completed after completion of earthing work. Sub-station plot shall be raised 200 mm above the GL by earth filling.

k) Miscellaneous Equipment and Tools As per I.E. rule, following material is required for sub-station. The same should be supplied by

the contractor, the cost of the same is included in the estimated cost. 1) Operating rod for D.O. fuse at 6 M height - 1 No. 2) M.S. fabricated stand for 4 nos. buckets - 1 No. 3) Round bottom buckets (13 lit. capacity) duly painted - 4 Nos. by two coats of red paint. 4) Printed instruction chart duly framed - 1 No. 5) Pair of hand gloves - 2 Pairs 6) Standard first-aid box with all required standard - 1 No. contents 7) Standard size danger board duly fixed - 4 Nos. 8) Fire extinguishers (capacity 5 kg.) - 2 Nos. Repairs to D.P. Structure at W.T.P.

Page 15: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 122 )

Contractor No. of Corrections Executive Engineer

Replacing of lighting arrestor, disc insulator, pin insulator, AB switch, as per requirement at the time of erection of Pumping Machinery. POWER TRANSFORMER (Item No. 12) Approved Makes Kirloskar / Pactil / Bharat Bijlee / Crompton / BHEL / Western / EMCO / Transdelta / Vivekanand The scope of work includes supplying, erecting approved make transformer and giving test and trial, etc. complete. The transformer should be of following rating - 1) HT Voltage / LT Voltage 22000 / 433 Volts 2) KVA Rating 160 KVA 3) Nature of Cooling ONAN 4) Type of Winding DY-II 5) HV Tapping ( Off load tap changer ) -12.5 To +2.5 % ( In steps of 2.5% ) 6) Termination System For HT Termination Bushing For LT Cable End Box The transformers should be provided with following standard equipments - 1) Off load tap changing switch 2) Oil conservator with filling hole with cap and plain oil level gauge 3) Silica gel dehydrating breather 4) Oil drain valve 5) 100 mm dia thermometer with thermometer pocket 6) Oil filter valves 7) Two earthing terminals 8) Diagram and rating plate 9) First filling of oil with dielectric strength of 50 kV NO BREAK 10) Lifting eyes / hooks 11) Four bi-directional plain rollers 12) Air vent 13) Explosion vent.

Page 16: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 123 )

Contractor No. of Corrections Executive Engineer

The transformer should be suitable for 3 phase, 50 cycles per sec. AC system, oil immersed winding, outdoor type transformer with copper winding connected Delta on HV side and star on LT side, with additional neutral brought out. No load rating 22000/433 volts continuously rated for full load and temperature rise not exceeding 45 degree C by thermometer in oil and 50 degree C by the resistance in the winding above ambient temperature of 45 degree C, after continuous run at full load rating complete with following standard fittings. The terminal arrangement, bushing with lugs on HV side & cable end box on LV side complete with certificate from manufacturer and completely erected on R.C.C. plinth as per approved drawing. The channel guide & stoppers should be provided as required as per IS-1886. The plinth shall be constructed in C.C. raft foundation. The cost of raft foundation and C.C. plinth is included in the estimated cost. The transformer shall be conforming to IS-2026 / 1902. The test report of filled oil should be submitted along with the transformer The drawing of sub-station shall be submitted to Department and Electrical Inspector for approval immediately after getting the work order. Routine test of transformer as per IS should be carried out and test report should be submitted to this office. Third Party Inspection The transformer shall be inspected by the third party inspector approved by the MJP. 22 KV HT CUBICAL METER (KIOSK) (Item No. 13) The HT metering cubical shall be of proper size and as per detailed specifications approved by MSED Co. It shall consist of bus bar, CTs, HT meter and all other necessary accessories, etc. The plinth for erection of KIOSK shall be made as per direction of MSED Co. and approved drawing. The cost of same is included in this item. The HT meter shall be got tested from MSED Co. from the contractor's cost. No other charges will be paid for the same. The indoor and outdoor jointing kit shall be made as per direction of Engineer-in-charge and under the supervision of MSED Co. L.T. PANEL BOARD (Item No. 15) L.T. Panel shall be skeleton / Box type for indoor operation, floor mounted type to receive power and distribute as per requirement to related equipment with proper protection, metering system and indication as per I.E.rule. L.T. panel board should be fabricated from MS sheet 16 SWG and angle 50 x 50 x 6 mm with ICMC base channel. The panel shall be given one coat of red-oxide and two coats of gray enamel paint. The general requirement of the system is represented in the single line diagram attached. The panel shall consist of following equipments.

Page 17: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 124 )

Contractor No. of Corrections Executive Engineer

Panel Board Quantity

1. MCCB 50 KA 300 Amp 1 No.

2. MCCB 50 KA 200 Amp 4 Nos.

3. MCCB 20 KA 150 Amp 3 Nos.

4. MCCB (Lighting) – 10 KA 100 Amp 1 No.

5. Voltmeter 144 x 144 0-500 V 1 No.

6. Ammeter 144 x 144 0-500 V 4 Nos.

7. C.T.S. 100/5 12 Nos.

8. S.S. 5 Nos.

9. Hour Meter 3 Nos.

10. Energy Meter 4 Nos.

11. Indicating Lamps 1 Set

12. Bus Bar Chamber 3.5 RM

13. Fabrication 14 SWG CRCA Suitable size

14. Rubber matting 4 Sqm.

The switchboard shall be completely factory wired ready for connecting the equipment. All internal wiring of the panel is to be carried out by PVC insulated PVC sheathed copper cable of adequate capacity. Incoming and out going cable entries shall be enclosed in metal clad, dust and vermin proof enclosure. The drawings of panel board with all electrical equipments shall be got approved and tested at manufacturer from the Executive Engineer (Mech.). Rubber matting 6 mm thick, total 4 Sqm should be provided with each panel and starter. Moulded Case Circuit Breakers Approved Makes L&T / ABB / Siemens / Control & Switchgear / Alstom / Andruw Yule / Havells / NGEF / SEIL MCCB provided should have adequate rating, triple pole 440 VOLTS / 3 phase / 50 Hz. with neutral link overload trips having overload. Bus Bar Bus bar shall be of Aluminium with continuous amperage rating as per mention in above table separately for each panel and temperature rise should not exceed 55°C over ambient temp of 48°C. The bus bar shall be capable of withstanding the electro- mechanical forces due to short circuit. The bus bar shall have separate special screwed cover with ventilation louvers. The bus bars shall be PVC insulated with colour codes.

Page 18: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 125 )

Contractor No. of Corrections Executive Engineer

The bus bars shall be provided with suitable size insulators on internal angle frames structure to top bottom with required hardware material. Rotary Switch Approved Makes L&T / Siemens / Kaycee / Thakoor Indicating Lamps The indicating lamp shall be of filament bulb type, oil and dust proof and suitably colored. The connection should be done with copper wire with suitable slip fuse links. Voltmeter and Ammeter Approved Makes AE / IMP / NSDA These meters shall be of accuracy of class 1 as per IS 1248. Meter sizes should not be less than 144 x 144 mm square and flush type. The meter range shall be 125% higher than maximum expected reading. For ammeter suitable rating CTs should be provided. These meters should be provided with suitable selector switch, rotary type so as to facilitate the reading of three phases. CAPACITOR (Item No. 14) Approved Makes Voltas / Crompton / Usha / Madhav / Universal / Malde / Jaivic / Hicco / Khatav Junkar / Prabodhan Contractor has to design and provide prolypoplene type capacitor suitable for operation at 440 Volt / 3 phase / 50 Hz of approved make. The capacitors should be as per IS-13585-1994 / IEC 60831 The prolypoplene capacitor should be designed for Temp. 10 to 50 degree centigrade Rated voltage 440 volt AC Frequency and phase 50 Hz / 3 ph Insulation level 2.5 kV Voltage tolerance 1.1 x Vo Current tolerance 1.3 Io Impregnant Non-PCB, Non toxic, Non hazardous Guaranteed losses Not more than 1.5 W / kVAR Prolypoplene capacitor should be manufactured by using one layer of tissue paper and one layer of plain polypropylene film between two electrode of plain aluminium foil (soft annealed 99.3% above purity) and have extended foil design to ensure low watt losses.

Page 19: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 126 )

Contractor No. of Corrections Executive Engineer

Mixed di-electric capacitor shall be designed to withstand electro-dynamic and thermal stresses caused by transient over current during switching. The capacitor shall conform to IS-2834. The capacitors are to be installed of suitable capacity or 2 units of 30 KVAR capacitors and 60 KVAR are to be installed with outgoing terminals of the starter, through HRC fuses of 50 A rating as approved by the Engineer-in-charge. Single units are to be connected to panels through spare MCCBs provided in the panel. The capacitors are to be installed on the MS fabricated stand with required earthing etc. completed as per IE rule. The capacitors are to be installed outside the starter with proper size MS fabricated stand. The cost of PVC coated copper cord of suitable rating required for installation of the capacitor is deemed to have been included in the cost of the capacitor. Each capacitor unit is to get tested from MSEDC authority before installation and test report of the same should be submitted to the Dept. for record. The fees for testing of capacitor shall be borne by contractor. FULLY AUTOMATIC AUTO TRANSFORMER STARTER (With Air Break Contactor) (Item No. 16) Approved Makes SELL / L &T / SIEMENS / BHARTIA CUTTLER HAMMER / KILBURN / TELE MECH / ANDREW YULE / HAVELLS The scope of work includes designing, providing and giving test and trial of locally manufactured fully automatic auto transformer starter with approved make power contactors. Fully automatic auto transformer starter shall be housed in totally enclosed sheet metal clad, vermin and dust-proof cubical box, suitable for floor / plinth mounted for indoor operation. The panel shall be fabricated from MS sheet SWG 14, with hinged door at front. Limit switch shall be provided to trip the motor in the event of opening of door. The panel framework shall have ICMC-100 base channels. The size of the cubical box shall be sufficient for ease in maintenance work and proper ventilation. However, the size of the cubical should not be less than 1.5 x 0.9 X 0.5 M. Atleast two numbers of ventilating louvers shall be provided on side walls at top to exit the hot air; and one number louver at bottom to allow fresh air inlet. The panel shall be painted with one coat of primer and two coats of enamel paint of approved shade. Bus bar, copper strips, copper leads shall be designed for twice the full load current. The potential wiring shall be carried out in 1.5 sq.mm copper cables and CT circuitry wiring shall be carried in 2.5 sq.mm copper cables. The Auto transformer starter shall incorporate following equipments - • Triple pole AC3 rating power contactor 1 No. with required number of NO & NC

Page 20: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 127 )

Contractor No. of Corrections Executive Engineer

MAIN CONTACTOR ( 200 Amp Rating ) • AUXILLARY CONTACTOR ( 70 Amp rating ) 2 Nos. • Oil immersed, copper wound Auto transformer 1 No. with tappings, 50%, 65%, 80% with first fill of best quality transformer oil • CT operated bimetallic overload relay 1 No. • ON & OFF pneumatic timer ( 0.05 to 30 Sec ) 1 No. • ON delay pneumatic timer ( 0.05 to 30 Sec ) 1 No. • ON / OFF Push buttons 2 Nos. • HRC control fuses 2 Nos. • Suitable rating Ammeter with metering CTS & Selector switch 1 No. • Thermostat for oil temperature 1 No. • Hour meter 1 No. • Door limit switch ( 1 NO + 1 NC ) 1 No. • Current sensing single phasing preventor with CTS 1 No. • No volt release 1 No. • Indicating lamps, Motor ON, OFF, TRIP 3 Nos. ( Protection CTs 10 P3 / 10 VA ) Auto Transformer Fully automatic auto transformer shall be 3 Phase, oil cooled type, suitable for motor starting duty, core type, copper wound of high grade silicon lamination with 'B' class insulation. The auto transformer shall be suitable for operation on 45° ambient temperature with tapping at 60%, 70% and 80% and have 95% regulation when fully loaded. The lowest tapping at auto transformer shall be in compliance with driven equipment torque requirement. It shall be suitable for 6 operations per hour, all six starts being uniformly distributed over an hour with equal period in between. The auto transformer shall conform to IS-1822. The auto transformer starter shall be wired up as per corondorfer connection to avoid open circuit transition, providing for a smooth change over from tap to line voltage. The main contactor shall be of suitable rating. Adequately rated thermal overload relays operated through suitable CT shall be provided. The CT operated base mounted single-phase preventor shall be provided. The starter shall be complete with

Page 21: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 128 )

Contractor No. of Corrections Executive Engineer

necessary adjustable timer, auxiliary contactor, other accessories, wiring, etc. to make a composite unit. The master timer set shall be provided to cut off supply to auto transformer in case the change over timer fails to operate. Power Contactor Approved Makes SELL / L &T / SIEMENS / BHARTIA CUTTLER HAMMER / KILBURN / TELE MECH / ANDREW YULE / HAVELLS The contactors in starter shall have 3 main poles with a minimum of 2 NOs + 2 NCs, auxiliary contacts, with one spare NO and NC. The contact shall be made of anti weld Silver Cadmium Oxide and contact system shall be designed with minimum bounce to ensure long contact life. The contactor shall be sufficiently rated for severity operating condition for use in motor circuit. The coil shall be molded in hard resin suitable for continuous operation. The contactor shall be suitable for making and breaking at 0.35 power factor and stalled current of associated motor which shall be assumed and times full load current of corresponding motor. All contactors employed shall conform to IS-2959. Single Phasing Preventor Approved Makes L&T / Siemens / EE / Minilec The single-phase preventor in the starter shall be provided for each panel and it shall be current operated negative sequence with necessary CTs. The indicating lamp shall be of filament bulb type of 160-Volt rating with series of resistance for different voltage. The timer shall have 2 NOs + 2 NCs auxiliary contacts. The timer shall be capable of the thermal effect of switching and should have very close accuracy. The timer shall be capable for operating on 240 Volts AC supply in the voltage range of 80% to 110% and frequency range 95% to 105%. Factory Inspection and Test The starter shall be inspected and tested by third party approved by M.J.P. in presence of Department's representative and shall be arranged by the contractor with his own cost. The scope of inspection includes - - Review of raw material test certificate and quality control procedure

- High voltage test

- Insulation resistance test

- Control circuit operation check

- Fault simulation for testing protection relays except short circuit and earth fault.

Page 22: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 129 )

Contractor No. of Corrections Executive Engineer

- Temp. rise test for bus bars at rated motor full load current for one hour. Site Testing 1. Insulation resistance check.

2. Control circuit operation check.

3. Test to demonstrate reduction in starting current.

Guarantee Performance The starter should be almost maintenance free and should not produce any harmonics. The tenderer should give guarantee of performance of at least 1 year from the date of commissioning. MULTICORE CABLE (Item No. 17) Approved Makes Tropodor / Asian / Gloster / Universal / (For 22 kV XLPE armoured aluminium cable) Tropodor / Finolex / Asian / Gloster / Incab / Universal / Polycab / Prime CAB / Vishal / Plaza (For 1.1 kV armoured aluminium cable) Finolex / Perfect / Calama (PVC submersible copper cable) PVC Armoured Multicore Cable Supplying and erecting XLPE armoured cable 22000 / 1100 Volt grade, XLPE / PVC and of approved make, as per following type, having solid / stranded aluminium core with 6 mm thick 25 mm width MS spacer with GI saddles screwed with continuous 14 SWG GI earth wire / 6 Sq.mm. aluminium earth wire complete, erected on wall with 25 x 3 mm MS clamps. Schedule of cable required is as under : Cable required for Size of cable Qty. MSEDCL to transformer 22 KV XLPE HT 3 core x 95 sqmm 75 M Transformer to panel XLPE 3½ core x 185 sqmm 100 M Panel to starter to motor XLPE 3½ core x 70 sqmm 75 M Indoor cable joint kit 22 KV 2 Nos. Outdoor cable joint kit 22 KV 2 Nos. Contractor has to provide 22 KV XLPE cable for MSEDC power connection from point of supply to transformer if required. The cost of work for providing, erecting and giving test and trial of 22 KV XLPE cable is inclusive of required termination joints of reputed make. Cable shall be laid in trenches in ground outside pump house and in duct while passing through wall. Every cable shall nearly run vertically or horizontally or parallel to the adjacent wall, beam or column. The cable shall be terminated in mechanical gland, which shall be suitable to provide adequate support by locking on armoured and additional earth continuity. Suitable compression type lugs shall be used for

Page 23: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 130 )

Contractor No. of Corrections Executive Engineer

cable termination. Cable routing drawing, trench drawing should be got approved from the Department prior to cable laying. The point of Entry and Exit of the cable from pump house shall be sealed from outside with an approved asbestos compound which shall be followed by a weak mortar. Submersible cable is to be laid in the ground through required size PVC enclosing pipe. The cost of cable jointing kit required for submersible cable is deemed to have been included in the rate of submersible cable. Cable routing and laying shall be such that sharp bends are avoided. Loop and extra length shall be provided in each cable run and located suitably. Single core cable should be laid in trefoil formation. Cables running parallel should be spaced 150 mm clear distance. Radius of cable bend should not be less than 20 D, where D is overall diameter of cable. Cable route marker and metallic tags bearing cable reference should be provided as per instructions of Engineer-in-Charge. The depth of cable trench shall not be less than 750 mm measured from finished ground level. 75 mm sand layer shall be provided in excavated trench at bottom and on this sand layer cable should be laid. After laying cable in the trench, 75 mm sand layer shall be provided to cover the cable which shall further be covered by burnt brick on both sides and precast slab on top. The trench shall then be backfilled and finished to ground level. EARTHING (Item No. 18) The item includes providing earthing to H.T. / L.T. electrical equipment in pump house / sub-station. The earthing system shall be carried out in accordance with the layout drawing approved from the Department and the Electrical Inspector. The earthing shall be designed with galvanised cast iron earth plate of size 60 x 60 cm. 6 mm thick, or with 40 mm Dia GI pipe buried in specifically prepared earth pit, upto 1.5 M below ground level. The earth pit should be refilled with 40 Kg charcoal and salt. A separate 19 mm Dia GI pipe with funnel wire mesh for watering should be provided. Necessary length of double GI earth wire of 6 SWG bolted with lug to the plate and covered in 12 mm Dia GI pipe, 2.5 M long. 6 SWG earth wire should be used for minor LT load. However, for higher HP Installation, GI strip should be used. Minimum number of earth electrodes required is as mentioned in schedule 'B' or should be provided as per Electrical Inspector's approval without any extra cost. G.I. strip of 8 M length is included in the rate of earth electrode. Any quantity required additional will be paid on weight base as mentioned in Schedule 'B'. The earth electrodes shall be buried in specifically prepared earth pit and refilled with layers of charcoal / coal and salt. Cement concrete or brick masonry chamber with CI covers should be provided to each electrode. The size of chamber should not be less than 30 cm x 30 cm x 25 cm deep ( clear opening ), as per paragraph 7.3 of IS-3043. All electrical equipment shall be double earthed with suitable size GI / Aluminum earth lead as per I.E. rule and IS-3043 / 1966. All earth electrodes shall be inter-connected by GI strip of suitable size through a common circular ring.

Page 24: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 131 )

Contractor No. of Corrections Executive Engineer

The earth resistance should not exceed the limit prescribed in IS / I.E. rule. IRON WORK (Item No. 19) The iron work includes providing erecting the square bar with base plate for overhead crane including cuffing, welding, drilling, etc. and complete erection in position with necessary material hardware, etc. duly painted with one coat of red oxide and two coats of enamel paint to match with the associated equipment. Mode of Payment The payment will be made on Kg basis as per standard weight of plate, bar angle used for fabrication work. The nut, bolts and any sundry material will not be considered for weight calculation. ELECTRIFICATION (Item No. 20) The scope of work includes providing installing and commissioning all electrical wiring and fixtures for internal and external electrification of pump house. The main fixtures and items included in the estimated cost are as mentioned below. Contractor has to provide and install all electrical equipments required to fulfill following requirement. Internal Electrification Point wiring in PVC conduit with 2 x 1.5 sq.mm PVC 5 Points to PVC COPPER conductor 1 x 40-Watt Box type fluorescent fitting Energy efficient T.S. type with copper chock 4 Nos. Plain pendent type bulb holder with bulb 2 Nos. Flush type shockproof 6 pin plug socket with 15 Amp. switch 2 Nos. External Electrification Streetlight weatherproof fluorescent fitting energy efficient tube set 2 Nos. with 1 x 40 W fitting Point wiring for light / fan / bell with ISI marked 2 x 1.5 sq.mm. 100 Volt grade PVC insulated PVC sheathed COPPER wire in Rigid PVC conduit heavy gauge 20 mm Dia with PVC accessories, with ISI marked switch / bell push 6 Amp. porcelain base flush type erected on polished double teak wood folded screwed board with top of either teak wood or plywood pasted with sunmica and with ISI marked ceiling rose / batten holder / slanting holder erected on double teak wood block with brass screws. There should be separate circuits for internal and external electrification fixtures. External fittings will be operated by 15 Amp. ANCHOR type D.P. switch.

Page 25: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 132 )

Contractor No. of Corrections Executive Engineer

Bulk head fitting should be with fine finished cast aluminium enamel painted body with 20 mm conduit entry and clear glass / prismatic glass with guard and complete watertight hinged with locking screw, suitable porcelain holder to house metal filament lamp upto 100 watt erected in position on polished double T.W. block / on 20 mm dia H.G. conduit 30 cm in length, suitably grouted on wall. Patti type fluorescent fitting of approved make. 1 x 4' = 40 Watt white stove enameled made of MS sheet 0.8 mm thick white on the reflector side and gray on other side complete with 40 Watt. Polyester heavy duty COPPER wound ballast, lock type tube holder, starter with holder and condenser duly wired up for use on 230 V. AC supply erected if required on varnished T.W. block / PVC block with flexible wire twin core 24 / 0.2 mm and with necessary material with one fluorescent tube light 40 W complete. Street Light Weatherproof Fluorescent Fitting with Bracket approved make 1 x 4' = 40 W approved make weatherproof street light fluorescent fitting with side entry/top/entry suitable for single 4'-40W fluorescent tube 250 V AC supply single phase 50 cycles with clear / corrugated plastic cover complete with polyester heavy duty copper wound ballast, capacitor, starter, starter holder and lock type tube holders duly wired with single tube 4'-40W and reflector tray made of CRCA sheet steel of thickness 10 mm and canopy made of aluminium sheet of thickness 1.25 mm erected with flexible wire twin core 24/ 0.20 mm on pole / on wall on provided bracket in position with one fluorescent tubelight 4'-40 watts. The item also includes providing erecting of street light bracket of 25 mm dia. 'B' class G.I. pipe 1.2 M in length duly grouted in wall with 50 x 3 mm M.S. flat etc. complete. TOOLS & TACKLES (Item No. 21) This item includes the supply of following tools and tackles of reputed make for maintenance of V.T. pump as per below given list and hand over to Engineer-in-charge. 1. Ring Spanner 4 Nos. 2. Fix Spanner 4 Nos. 3. Screw Driver 6 x 300 4 Nos. 4. Screw Driver 8 x 200 4 Nos. 5. Screw Driver 5 x 200 4 Nos. 6. Screw Driver 5 x 300 4 Nos. 7. Tool Box 4 Nos. 8. Bearing Puller 8" 1 No. 9. Bearing Puller 10" 1 No. 10. Bearing Puller 12" 1 No. 11. Hydraulic Crimping Machine 1 No. 12. Hand Operated Crimping Machine 1 No. 13. Megger 1 No. 14. Earth Tester 1 No. 15. Tong Tester 2 Nos. 16. Steel Level 2 Nos. 17. Allen Head Crome (Allen Key) 2 Nos. 18. Tubler Box Spanner Set 2 Nos. 19. Cutting Plier KDPE Coated 4 Nos.

Page 26: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 133 )

Contractor No. of Corrections Executive Engineer

COMMISSIONING, TEST AND TRIAL OF THE PUMPING MACHINERY (Item No. 22) This item includes testing of complete installation including charges of required operating staff, supervision, sundry material and lubricants required. Testing period will be one week after commissioning the installation. The original time limit of 4 MONTHS is for providing, erecting and commissioning of all the items covered. The time mentioned in the item "Operation & Maintenance" of 3 months is over and above the original time limit. Contractor has to run the installed and tested pumping machinery for further three months. Contractor has to provide and engage operational staff for all the pumping stations such as electrician, operator (qualified as per IE Rule), valveman, watchman, etc. as per requirement to run the pumps round the clock. Contractor has to maintain the log book for daily record of the pumping hours and quantity of water lifted and daily record of power factor failures of MSEDC power supply, etc. as per direction of Engineer-in-charge. The Department will make only electricity and water available for test and trial free of cost. During operation period, any defect observed, the contractor has to rectify the same immediately free of cost. Guarantee period of 12 months will be treated after satisfactory test and trial (one week after commissioning test) completed. The Department may issue final certificate after satisfactory test and trial.

Page 27: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 134 )

Contractor No. of Corrections Executive Engineer

GENERAL DESCRIPTION OF WORKS

1.1 Location of Works

__________________________________________________ 1.2 Climatic Conditions

The climate is normal. Rainfall is about _____ mm. Rainfall spread over months from June to October. Ambient temperature is ___oC

1.3 Storage

The contractor shall construct a covered store as required at the site. Necessary adequate area as approved by the Engineer-in-charge shall be made available free of cost.

The contractor shall be responsible for clearing the site, levelling, including filling and cutting as necessary atleast 0.5 M above HFL, compacting, construction of storeshed, safe and proper storage and requisite precautions to prevent deterioration of all equipments including heating, wherever necessary to maintain temperature of electrical equipments to safe level to prevent damage due to moisture. The contractor shall bear entire cost of construction and storage.

1.4 Electricity and Water The contractor shall arrange for temporary electricity and water supply at the site, from available

facilities at both pumping stations at his cost and pay charges as fixed by the Department. 1.5 Power Supply Site Voltages It is intended to provide 22 KV Express Feeder from M.S.E.B. It is proposed to provide 1 No. 22

KV, 1.433 KV, 100 KVA (existing) power transformers for power supply at stage pumping for raw water pumps.

Voltage and Frequency Variations Anticipated voltage and frequency variation are as under Voltage variation ±10% Frequency variation ±3% Combined Voltage and Frequency variation ±10%

Page 28: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 135 )

Contractor No. of Corrections Executive Engineer

1.6 Scope of Contract

i) The scope of contract includes designing, providing, erecting, testing, commissioning, operating and maintenance during guarantee period of the vertical turbine pumps with all allied electrical and mechanical works as per limit shown in layout.

ii) The total work is of turnkey nature.

iii) The job includes loading, unloading, transportation, its insurance delivery at site, storing

with due care (to prevent corrosion and deterioration from the moisture and dust), guarding, erection, allied civil works, performance test, operation, maintenance, etc.

iv) The scope of contract shall include all equipments in Schedule 'B' and in addition to

equipments listed in Schedule 'B', the whole which are described or implied by the tender documents, or as per direction of Engineer-in-charge.

The matters ommitted and not specified in the documents, but which may be inferred to be obviously necessary for intended service shall be deemed to have been included in the contract at no extra cost and shall be obligatory and this point shall be carefully noted by the contractor.\

1.7 Tender Drawings

The tender drawings attached to tender documents are indicative and supplement to the specifications to provide adequate information to the tenderer to enable him to design the equipment, layout and arrangement and submit the offer.

1.8 Tender Drawings and Data

Drawings and data as uner shall be submitted by the tenderer alongwith his offer - i) Layout showing dimensions, spacing and levels of equipments in pump house and switch

yard. ii) Sectional drawing of all major equipments illustrating general arrangement, components,

mounting arrangement dimensions.

iii) Cable layout and general arrangement of cable, ducts, trench, racks and tier formations. iv) Single line diagrams for power, measurements and protections.

v) Description of major equipments including technical aspects and sutiability.

Page 29: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 136 )

Contractor No. of Corrections Executive Engineer

vi) Relevant literature, catalogue, etc.

vii) Write up elucidating technical proposal. viii) Any other drawings and/or information to elaborate the offer.

ix) Comments on suitable general arrangements of civil works and hydraulic design of sump

from aspects of vortex-free operation. 1.9 Important Documentations It is obligatory for the tenderer to examine the pump supporting arrangements of civil structure

and suitability of submergence in the sump/well vis-a-vis the setting of pumps and submit documentations as under -

i) Weight of pumps including bowl assembly, columns discharge head, coupling, motor

stool and thrust bearings and other components. ii) Weight of motor

iii) Maximum dynamic load imposed on the pump supporting structure with justification and

reference to IS and/or authoritative publications with extracts of relevant portions duly signed by the tenderer for ynamic factor and other applicable parameters, criterial consideration for working out dynamic load.

iv) Compatibility of NPSH required with NPSH available under conditions of low water

level, for solo operation and parallel operation of pumps from 2 nos. substantiated by NPSHR curve for pumps and calculations of NPSH available with reference level of eye of impeller.

v) Characteristic curves of the bowl assembly and pump showing relationship between

discharge and head, power required and efficiency (bowl performance curves and pump performance curves shall be drawn on same graph and shown in separate legends for easy identification head losses in strainer suction bell mouth, column pipes and discharge/head, and power losses in line shaft and thrust bearing shall be considered for characteristic curves of pump).

vi) Pump (not bowl) performance curve for solo and parallel operation from 1 no. to 3 nos.

showing relationship between discharge and head superimposed on system head curves for getting an idea of immediate and ultimate stage discharge. Tender is liable for rejection if the obligatory documentation are not submitted.

vii) Points load on corbel due to crane and heaviest equipment handled with full justification.

Page 30: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 137 )

Contractor No. of Corrections Executive Engineer

1.10 Drawings and Data to be furnished by Successful Tenderer Successful tenderer shall submit to the Engineer as stated hereunder within 2 weeks of award of

contract.

i) Modified layout, if necessary. ii) Detailed drawings, detailing equuipment mounting details, foundations, fastening and

bolts, floor cutouts, cable runs with position and arrangements of duct, trenches, racks, trays, wall fixing electrical panel arrangement and civil works in wall floor, etc.

iii) Wiring diagrams, all circuit diagrams.

iv) Working drawings for erection.

v) Any other drawings required by Engineer successful tenderer shall also submit data

necessary for reception and installation of equipments. 1.11 Test Certificates and Manuals

The successful tenderer shall submit test certificates for various components as called for in the specification. If necessary and required by the Engineer, certificates for materials of construction equipments shall be furnished.

The successful tenderer shall also submit instruction manuals in duplicate covering operation,

maintenance and repairs of all equipments including wiring diagrams and charts in duplicates for periodical maintenance of equipements. Five copies of such literature manuals and wiring diagrams, etc. shall be submitted to the Engineer-in-charge.

1.12 Additional Equipments and Features

The tenderer may quote for additional equipment which he considers necessary for efficient working of the system with detailed justification.

1.13 Additional Tools and Spares

The tenderer is requested to list out additional tools and service equipments required and prices therefor, cost of these additional spares and tools will, however, not be considered for evaluation. However, if ordered by the Engineer, it shall be binding on successful tenderer to supply additional spares and tools at quoted prices.

Page 31: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 138 )

Contractor No. of Corrections Executive Engineer

SCHEDULE 'C' - TO BE FILLED BY THE CONTRACTOR

1 - RAW WATER PUMPS

1. Pump type 2. Manufacture and his type designation 3. Standard to which manufactured 4. Design capacity (lps) 5. Design head (M) 6. Number of stages 7. Speed (rpm) 8. Pump efficiency 9. Power absorbed by pump (kw) 10. Type of impeller (enclosed) 11. Diameter of impeller (mm) 12. Minimum submergence required measured from bottom floor level (mm) 13. Delivery branch size (mm) (Full Elbow) 14. Type of bearing 15. Bearing make and manufacturer no. 16. Life of bearing (hours) 17. Capacit of bearing (bgf) 18. a) Hydraulic thrust at normal head

b) Hydraulic thrust at shut-off c) Weight or rotating element d) Total design thrust

i) Normal head ii) Shut off

Page 32: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 139 )

Contractor No. of Corrections Executive Engineer

19. Bearing cooling arrangement 20. Type and make of shaft bearing with maximum span 22. Whether pump is suitable for starting against a closed Sluice Valve (Yes / No) 23. Weight of pump (kg) including column assembly

and bowl assembly 24. Materials for

a) Casting sealing rings b) Impeller c) Bell mouth d) Strainer e) Line shaft f) Pump shaft g) Shaft sleeves h) Line shaft coupling i) Coupings j) Sole plate k) Pump column l) Bolts, nuts and washers m) Line shaft coupling

25. Area of opening in stainer 26. Column pipe dia (mm) and thickness 27. Line shaft dia (mm) 28. Bowl assembly size (mm) 29. Bowl assembly length

Page 33: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 140 )

Contractor No. of Corrections Executive Engineer

2 - GUARANTEE - V.T. PUMP SET

1. Rated discharge (q) (lps) 2. Rated head (M) 3. Water horse power (KW) Q x H _____ 102 4. Pump efficiency at rated head and discharge

a) Bowl efficiency (%) b) Pump efficiency (%)

5. Input to pump (KW) 6. Loss in line shaft bearing (KW) 7. Loss in thrust bearing (KW) 8. Motor efficiency at rated condition (%) 9. Overall efficiency of pump and motor set

at rated condition (%) 10. Input to motor (%) 11. Specific power consumption (KW) 12. NPSH required (M)

Page 34: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 141 )

Contractor No. of Corrections Executive Engineer

3 - UHS TYPE ELECTRIC MOTORS FOR PUMPS 1. i) Make and type ii) Reference standard 2. Type of frame and size 3. Degree of protection 4. Rotor shaft hollow 5. Rated output KW / HP 6. Rated voltage and range

7. No. of phases and frequency ( 3 ph. 50 Hz.) 8. Duty class (Continuous) 9. Full load speed 10. Starting current in % of full load current 11. Full load current 12. Starting torque in % of full load torque 13. Breakdown torque in % of full load torque 14. Pull up torque in % of full load torque 15. Starting time

a) With load b) Without load

16. Locked rotor withstand time a) Under hot condition (Sec.) b) Under cold condition (Sec.) 17. Starter thermal time constant

Page 35: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 142 )

Contractor No. of Corrections Executive Engineer

18. No load current 19. Locked rotor withstand time at

minimum permissible starting voltage (Sec.) 20. Locked rotor withstand time at 110% voltage (Sec.) 21. Maximum permissible running time with full load at minimum allowable voltage (Min.) 22. Method of Starting 23. Power Factor a) At Full Load b) At ¾ Load c) At ½ Load d) At ¼ Load 24. Efficiency Factor a) At Full Load b) At ¾ Load c) At ½ Load d) At ¼ Load 25. Insulation

a) Class of insulation b) Material and treatmetn c) Tropical and fungicidal treatment

26. Maximum allowable temperature rise over an ambient of 40oC 27. Starter winding

a) Connection b) Type and no. of terminals brought out c) Resistance per phase in ohms at 20 oC d) No. of embedded temperature detector per phase

28. Direction of rotation reviewed from driving end

Page 36: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 143 )

Contractor No. of Corrections Executive Engineer

29. Bearing

a) Driving end b) Non-driving end c) Recommended lubricant

i) Type ii) Non-driving end (Lit.)

d) Anticipated bearing life 30. Location of terminal box viewed from driving end 31. Cable gland size 32. GD² of motor 33. Critical speed 34. Total weight of the motor

a) Weight of starter b) Weight of rotor

Page 37: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 144 )

Contractor No. of Corrections Executive Engineer

4 - AUTO TRANSFORMER STARTER

1. Make 2. No. of tapping and percentage 3. Rated voltage 4. Rate, rating and duty class of main contractor 5. Make, rating and duty class of auxilliary contractor 6. Coil voltage 7. Type, make and range 8. Applicable standard 9. No. of auxilliary contacts a) Normally open

b) Normally closed 10. Current rating of auxilliary contacts

a) Make and carry ( A ) b) Break ( A )

11. Thermal overload relay

a) Setting range b) No. of contacts 12. Ammeter

a) Make b) Type

c) Applicable standard d) Accuracy class e) Current coil rating f) Current burden g) Case size h) Angle of deflection

Page 38: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 145 )

Contractor No. of Corrections Executive Engineer

13. Contact rating

a) At 100 V DC b) At 240 V AC

14. Indicating lamps

a) Make b) Type

c) Voltage d) Series resistor value

15. Current transformers

i) Protective CT's

a) Make b) Type designation

c) Applicable standard d) Ratio

e) Applications f) No. of cores

g) Output h) Accuracy class and accuracy limit factor

i) Knee point voltage j) Secondary resistance

k) Existing current at 1/2 knee point voltage l) Class of insulation

ii) Measuring CT's

a) Make b) Type designation c) Applicable standard d) Ratio

e) Applications f) No. of cores

g) Output h) Accuracy class and accuracy limit factor

i) Instrument safety factor j) Class of insulation

Page 39: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 146 )

Contractor No. of Corrections Executive Engineer

16. Wiring

a) Voltage b) Conductor material

c) Insulation d) Size of conductor

e) Maximum current rating f) Colour code used

g) Type of terminals h) Size of terminals

Page 40: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 147 )

Contractor No. of Corrections Executive Engineer

5 - L.T. PANEL BOARD

(A) Panel 1. Manufactured by 2. Manufacturer's type designation 3. Board designation 4. Whether single front or double front opening 5. No. of sets of switch gear bus bars 6. Short time (1 sec.) withstand rating 7. Memetary withstand rating 8. Clearance

a) Between phases b) Between live parts and earth

9. One minute power frequency withstand voltage for power circuits 10. Thickness of sheet steel / insulating barrier 11. Structural section details for panel frame work 12. Overall dimensions (width x depth x height)

a) Incoming cubical / circuit breaker cubical b) Feeder cubical

13. Total weight of panel board 14. Shipping dimensions and weight of largest packages

Page 41: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 148 )

Contractor No. of Corrections Executive Engineer

(B) Bus Bars 1. Material 2. Size 3. Type of insulation 4. Minimum clearance

a) Between phase b) Phase to nearest earthed part

5. Continuous current rating 6. Temperature rise over the specific ambient temperature 7. Bus bar cross section 8. Details of bus bar segregation (C) Isolating Switches 1. Make 2. Type 3. No. of poles 4. Rated voltage (V) 5. Rated continuous current (A) (D) Fuses 1. Make 2. Type 3. Standard applicable 4. Rated voltage (V) 5. Rated current (A)

Page 42: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 149 )

Contractor No. of Corrections Executive Engineer

6. Minimum fusing current at the ambient temperature specified (A)

7. Capacity of duty 8. Rupturing capacity (KA) (prospective current) (E) M.C.C.B. 1. Make 2. Type 3. Rated voltage 4. Rated current 5. Type of duty 6. Making capacity (peak value) KV (F) Current Transformers 1. Make 2 Type 3. Applicable standard 4. Burden 5. Ratio 6. Over current factors 7. Class of insulation 8. Maximum temperature rise of winding over

specified ambient temperature

Page 43: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 150 )

Contractor No. of Corrections Executive Engineer

6 - CAPACITOR

1. Manufacture 2. Reference specification 3. Type 4. Rated capacity 5. Rated continuous voltage 6. Rated frequency 7. Rated line current 8. Method of internal connection 9. Maximum operating temperature 10. Type of discharge service 11. Mounting details of capacitor bank

a) Structural section b) Dimensions

(width x depth x height)

Page 44: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 151 )

Contractor No. of Corrections Executive Engineer

7 - CAST IRON SLUICE VALVE

1. Manufactured by 2. Type 3. Standard to which manufactured 4. Class 5. Size 6. Material body 7. Screwed rod 8. Seating 9. Maximum torque required while opening 10. Working pressure (kg/cm²) 11. Test pressure

a) Body (kg/cm²) b) Seating (kg/cm²)

Page 45: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 152 )

Contractor No. of Corrections Executive Engineer

8 - CAST IRON NON-RETURN VALVE ( PN-1 )

1. Manufactured by 2. Type 3. Standard to which manufactured 4. Class 5. Size 6. Material body 7. Screwed rod 8. Seating 9. Maximum torque required while opening 10. Working pressure (kg/cm²) 11. Test pressure

c) Body (kg/cm²) d) Seating (kg/cm²)

Page 46: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 153 )

Contractor No. of Corrections Executive Engineer

9 - KINETIC AIR VALVE

1. Manufactured by 2. Type 3. Size 4. Single / Double ball 5. Standard to which manufactured 6. Material

a) Body b) Ball c) Seat

7. Working pressure (kg/cm²) 8. Test pressure

e) Body (kg/cm²) f) Seating (kg/cm²)

Page 47: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 154 )

Contractor No. of Corrections Executive Engineer

10 - M.S. PIPES AND SPECIALS

1. Manufactured by 2. Standard to which manufactured 3. Reference to I.S. 4. Material of nut bolts 5. Material of gas joints used in jointing 6. Working pressure (kg/cm²) 7. Test pressure (kg/cm²)

Page 48: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 155 )

Contractor No. of Corrections Executive Engineer

11 - POWER TRANSFORMER 1. Make and type 2. Reference standard 3. KVA rating 4. High voltage KV 5. Low voltage 6. Frequency 7. Cooling method 8. Connection H.V. side 9. Connection L.V. side 10. Power frequency withstand voltage a) High voltage b) Low voltage 11. Impulse Withstand Voltage a) High Voltage b) Low Voltage 12. Tapping a) Type b) Steps and range of each step c) Position 13. Voltage relationship 14. Neutral terminal for earthing is provided or not. 15. Earthing type 16. Maximum temperature rise of oil by temperature

Page 49: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 156 )

Contractor No. of Corrections Executive Engineer

17. Temperature rise of the windings measured by resistance method 18. Normal continuous ratings under site conditions 19. Normal ratio of transformation 20. Percentage magnetizing curent expressed for the high voltage 21. Fixed losses at normal ratio 22. Fixed load losses at normal ratio and and at 75°C 23. Efficiency at normal ratio and and at 75°C a) Full Load b) ¾ Load c) ½ Load d) ¼ Load 24. Regulations at 75°C at unity P.C. expressed as a percentage of normal voltage at a) Full Load b) ¾ Load c) ½ Load d) ¼ Load 25. Regulations at 75°C at 0.8 lagging power factor expressed as a percentage of normal voltage at a) Full Load b) ¾ Load c) ½ Load d) ¼ Load 26. Impedance voltage at normal ratio and at 75oC

expressed as a percentage of normal voltage 27. Type of transformer (core or shell) 28. Operating flux density

Page 50: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 157 )

Contractor No. of Corrections Executive Engineer

29. Type of windings

a) High voltage winding b) Low voltage winding

30. Winding material

c) High voltage winding d) Low voltage winding

31. Insulation of

a) High voltage winding b) Core bore bolt c) Core bolts and washers d) End plate e) Core laminations f) Low voltage winding

32. Total quantity of insulating oil required for 3 phase

transformer including conserver and cooling system 33. Thickness of transformer tank

a) Sides b) Bottom

34. Dimensions of transformers a) Height over bushing b) Overall length c) Overall breadth 35. Noise level 36. Weight of core and winding 37. Total weight of the transformer 38. Type of high voltage bushing insulator 39. Weight of high voltage bushing insulator 40. Total creepage distance in air for HV bushing

Page 51: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 158 )

Contractor No. of Corrections Executive Engineer

41. Quantity of oil in one high voltage bushing 42. Dry withstand value of high voltage bushing 43. Wet withstand value of high voltage bushing 44. Impulse withstand value of high voltage bushing 45. No. of dehydrating agents

Page 52: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 159 )

Contractor No. of Corrections Executive Engineer

12 - CABLES

1. Manufactured by 2. Type 3. Class / Grade 4. Size 5. Standard which manufactured 6. Material for conductor 7. Material for insulation and grade 8. Material for armouring 9. Material for PVC covering

Page 53: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 160 )

Contractor No. of Corrections Executive Engineer

13 - LIFTING ARRANGEMENTS

Circular Overhead Gantry and Square Overhead Gantry 1. Manufactured by 2. Type 3. Brand name 4. Standard which manufactured 5. Rated capacity 6. Suitable to mounting on main beam size 7. No. of track wheel and dia. 8. Trolley traverse operating chain height Chain Pully Block 1. Manufactured by 2. Type 3. Brand name 4. Standard which manufactured 5. Capacity 6. Hosting lifts 7. Hand chain operating height 8. Testing

Page 54: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 161 )

Contractor No. of Corrections Executive Engineer

DETAILED SPECIFICATIONS FOR SUBMERSIBLE PUMPSET The items quoted by the Contractor in Schedule 'B' are to be executed as per detailed specifications below mentioned and cost of all materials, labour, transport to site, watch and ward and all sundry costs to run and commission required for this work is included in rate quoted for items in Schedule 'B'. Submersible Motor Pumpset (with mechanical seal) (Item No. 1) Giving discharge of as specified in Schedule 'B'. The pump shall be 200 mm dia and also cover the head range from 75% to 110% of the head specified. The shut-off head shall not be less than 115% of the head specified. The pump shall be of minimum size of 150 mm and shall have bronze impeller (impeller of polypropylene shall not be accepted), stainless steel shaft, minimum number of stages, streamlined non-return valve, brass strainer, etc. complete. The efficiency of pump shall be maximum at duty point. The pump shall conform to IS 8034/1976. The submersible motor shall be wet/water filled, fitted with stainless/tensile steel shaft, seal cap, expansion chamber, thrust bearing, etc. suitable to operate on 360 volts to 440 volts 3 ph., 50 hz. A.C. supply. The HP of motor shall be such that it shall have 20% reserve margin over and above the maximum power required in the specified head range. The pump and motor shall be coupled directly. The motor pump set shall be suitable for vertical and horizontal installation. The pump shall be provided with flanged outlet connection for 80 mm size and above. The pump set shall be installed on tube well / bore well / open well of ____ Mtr. dia. in vertical / horizontal position. Two nos. of M.S. heavy duty clamps of suitable size shall be provided for erection. The pumps shall be erected on square frames of suitable size 1 M x 0.5 M fabricated from ISMC 75 for pumps upto 10 HP and from ISMC 100 for pumps above 10 HP. The frames shall be supplied by the Contractor. The design of square frame shall be such that the pumping unit and flanged joints of drop pipes shall pass through it very easily. The square frame shall be fixed on the main girder by nuts and bolts with J/U bolts. In case of horizontal installations, the submersible motor pumps shall be installed horizontally at the bottom of well on the M. S. fabricated resting stool prepared out of heavy duty M.S. channel / angles, etc. The resting stool shall be properly designed for clamping the pump motor unit in such a fashion that the pump set shall be inclined by about 15 degrees from rear end of motor towards the delivery end of pump. The Contractor shall fabricate and provide the necessary M.S. bend of suitable angle to match outlet of pump to the vertical drop pipe for delivery connection. While designing the resting stool, the minimum submergence required for pump in horizontal position and the maximum silt accumulated in the well shall be considered. Best quality 6 mm size wire rope shall be provided and fixed to the pumpset and stool with 'U' clamps. The streamlined non-return valve of pump shall be fixed in vertical position with vertical delivery pipe near the pump. The length of resting stool shall not be less than the total length of square frame. M.S. clamps and stool shall be given three coats of black anti-corrosive paint. The design, size and material shall be got approved from the Engineer-in-charge before fabrication.

Page 55: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 162 )

Contractor No. of Corrections Executive Engineer

In both cases of installation, pump set shall be lowered down upto bottom of well failing which payment will not be made. The pumpset above 30 HP shall be got inspected by third party approved by MJP, inspection fees shall be paid by the Contractor. The third party inspection report shall be furnished along with the supply. Makes approved - As per MJP approved list. Sluice Valve (Item No. 2) The item includes providing, erecting, jointing with jointing material and commissioning CI double flanged sluice valve of dia. specified in Schedule 'B', of PN-1 rating for duty head below 100 M and PN 1.6 rating for head from 100 M to 160 M. The valve shall conform IS 780. The valve shall be provided with a concrete block for support. Each valve shall be provided with a CI operating wheel. Approved makes - As per schedule attached / mentioned in Schedule 'B'. Reflux Valve (Item No. 3) The item includes providing, erecting, jointing with jointing material and commissioning CI double flanged reflux valve of dia. specified in Schedule 'B', of PN-1 rating for duty head below 100 M and PN 1.6 rating for head from 100 M to 160 M. The valve shall conform IS 5312 (part-I). The valves shall be provided with a concrete block for support. In case of centrifugal pumpset, the valves shall be provided with by-pass arrangements. Approved makes - As per schedule attached / mentioned in Schedule 'B'. Kinetic Air Valve (Item No. 4a) The air valve shall be single ball, large orifice of size specified in Schedule 'B' and shall be erected near. The outside vertical bend on common delivery. A tee of size delivery size x delivery size x 50 mm shall be provided for fixing the air valve. The item of tee shall be paid in the item of CI/MS specials. This item includes the cost of jointing material, nut bolts, etc. Approved makes - As per schedule attached / mentioned in Schedule 'B'. Pressure Gauge (Item No. 4b) The pressure gauge shall be 100 mm dia circular dial with range mentioned in Schedule 'B'. It shall be provided with 'U' tube and 3 way cock arrangement. The gauge shall be installed on the first M.S. bend above the frame of individual pump sets. A 3/8" size socket shall be welded on both bends with a hole tapped on bend for the gauge. On installations, with side switch room, pressure gauge common for both pump sets shall be installed in switch room with a tap on common delivery on rising main with 15 mm dia medium duty GI pipe and specials. In this case, 3/8" sockets will be kept plugged.

Page 56: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 163 )

Contractor No. of Corrections Executive Engineer

Approved makes - As per schedule attached / mentioned in Schedule 'B'. 15 mm G.I. Pipe This item includes providing, laying, jointing 15 mm dia medium duty GI pipe for pressure gauge connection from rising main. The item includes saddle pieces for tap connection, required GI specials, etc. complete. The GI pipe shall be laid from rising main upto inside the switch room. The pipe shall be laid atleast 0.75 M below ground level. Pipe on wall shall be fixed with necessary clamps. The quantity is tentative. Payment will be made on actually laid quantity on metre basis. Approved makes - As per schedule attached. G.I. Pipes (Item No. 5) The G.I. pipe shall be of dia specified in Schedule 'B' medium duty class, provided for pump delivery in maximum 3 M length pieces. The size pipe shall be so selected that the velocity of water shall not exceed 2 M/s. G.I. enlarger, if required, shall be welded to a nipple to avoid slipping down, through the threads. G.I. pipes upto 150 mm dia shall have heavy duty couplings for connection. Above 150 mm dia, only flanged jointing shall be used. The item includes cost of all jointing materials, labour, threading of pipes, etc. nut bolts, rubber packing, white paste, etc. The length in Schedule 'B' is tentative, payment will be made for actual laid length on metre basis. Approved makes - As per schedule attached. CI / MS Specials (Item No. 6) The item includes providing, erecting, jointing with jointing material and commissioning CI / MS flanged pieces and specials hydraulically tested to withstand twice the duty head of pump or 1.5 times the pump's shut-off head, whichever is more. Rubber jointing 1/8" thickness with nut bolts shall be used. The specials shall be supplied as per layout drawing, got approved from Engineer - in - charge or as directed by him at the time actual erection work. M.S./ CI specials, pipes and valves shall be given two coats of black anti-corrosive black paint. The work also includes the dismantling and reconstructing the portion of slab / wall for taking out delivery piping. M.S. flanges of 10 mm thickness shall be used for all MS specials and pipes. CC supports shall be provided at each 1.5 M interval. Size of pipes and specials on suction shall be so selected that velocity of water in suction shall not exceed 2 M/s. Size of pipes and specials on delivery shall be so selected that velocity of water in delivery pipe shall not exceed 2.5 M/s. The weight in Schedule 'B' in tentative. Payment will be made on weight basis for weight of specials and pipes actually erected. Weight of nut bolts, etc. The basis for weights shall be as per relevant ISS with permissible tolerance on weight.

Page 57: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 164 )

Contractor No. of Corrections Executive Engineer

Walkway This item includes providing and anchoring MS grill work over the two main pump girders on the open well, provided for installation of submersible pumpsets. As a standard practice, the girders will be placed at 1 mtr. center to center. The pump adjoining space of 1 M x 1 M on either side of the pump shall be covered with chequered plate of adequate thickness. The MS grill work shall be fabricated from 40 x 40 x 6 mm angle frames of 1 M x 1 M size with vertical MS flats of 25 x 6 mm size properly welded to the angle frames. The spacing between the two adjoining flats shall not exceed 50 mm. The grill work shall be given two coats of red oxide and fixed to main girders by nut bolts. A railing shall be provided for the walkway on both sides and rear end. Railing shall be of GI pipes light duty of 25 mm dia. in two rows and shall be fixed in position to MS angle posts of size 65 x 65 x 6 mm mtr. in height, located at a distance of 1 M c/c. The railing and posts shall be provided with two coats of enamel paint. The angle posts shall be firmly anchored to main girders by providing a base plate duty bolted to girders. MS Ladder In case of open well, a MS ladder shall be provided to give access to pump - floor. The ladder shall comprise of 65 x 6 mm MS angle placed at 45 cm apart with 16 mm dia. MS bars in double rows at steps at 20 cm center to center. The ladder shall be given two coats of red oxide and two coats of enamel paint. The length in Schedule 'B' is tentative. Payment will be made on actual length of ladder provided on meter basis. Panel Board (Item No. 7) The panel board shall be cubical type, fabricated from M.S. angle of 50 x 50 x 6 mm and 16 SWG M.S. sheet. It shall be closed from backside and shall have hinged shutter at front side. All the switches shall be fitted in a decent manner with sufficient space. The panel board shall be given one coat of primer and two coats of steel gray colour. The panel board shall consist of the equipment mentioned in Schedule 'B' neatly installed on a slotted angle frame fixed at the rear panel board.

Page 58: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 165 )

Contractor No. of Corrections Executive Engineer

Values of A, B, C and D are as per table given below

HP of each set Minimum Values in Amps of Equipments A

(Incoming) B

(Individual) C

(Capacitor) D

(Ammeter)

Upto 75 HP 63 32 32 30

8 to 15 HP 100 63 32 30

16 to 20 HP 100 MCCB 63 MCCB 32 MCCB 60

21 to 30 HP 200 100 63 60

31 to 50 HP 300 200 100 100 All the wiring of the panel board shall be of copper conductor, PVC insulated wire only. It shall be carried out through PVC flexible conduit with PVC glands and nuts on each side. The wiring inside the box shall be in engineering manner with PVC tapping at required length. Necessary extra looping length for cables and wire shall be provided. For single pump set full size panel board is not required, half size panel board with one main switch, one starter switch, one starter capacitor with one switch and other equipments shall be provided. Approved makes - As per schedule attached. Incoming 3½ Core Cable The item includes providing, laying, electrically jointing and commissioning 3½ core of size mentioned in Schedule 'B', aluminium conductor, PVC insulated, PVC sheathed, armoured cable to be laid from kit-kats in the corresponding item to panel board incoming switch, cable shall be laid as per IE rules. The length in Schedule 'B' is tentative, payment will be made on actually laid length on metre basis. Approved makes - As per schedule attached / mentioned in Schedule 'B'. 3 Core Cable The item includes providing, laying, electrically connecting 3 core, PVC insulated, of size mentioned in Schedule 'B' from starters in panel board to individual motors. For submersible pumpset, cable shall be flat, copper conductor, waterproof. The cable size depending on its required length shall be selected from the table enclosed. For all motors except - submersible, the cable shall be PVC sheathed, armoured, aluminium conductor of specified size. Cable shall be provided with extra loop of 5 M. The cables shall be laid through PVC pipes separately for each pump with required fittings. Cable shall be laid minimum 0.5 M below ground level.

Page 59: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 166 )

Contractor No. of Corrections Executive Engineer

The length is tentative, payment will be made on actually laid length on metre basis. Approved makes - As per schedule attached / mentioned in Schedule 'B'. Earthing (Item No. 9) Necessary plate type double earthing as per IS 3043 and I.E. rules shall be provided with 6 SWG G.I. wire firmly bolted to panel board and G.I. earth plate, buried 1.5 M below ground level with required charcoal, salt, etc. complete. Earthing wires shall pass through 15 mm dia G.I. pipe of 1.5 M length above G.L. outside the switch room fixed on wall with clamps. A separate 15 mm dia. G.I. pipe shall be provided for watering approximately 0.3 M above ground level. The earthing shall be connected at two points on each electrical equipment. Lifting Arrangement (Item No. 10) The item includes providing, erecting and commissioning following arrangement for hoisting of pumpsets. 1. For submersible pumpsets on open well Four ISMB 150 girders, each 3 Mtr. long shall be provided and fixed on main pump supporting

RSJS in vertical position. The anchoring shall be done by a MS plate, square in shape, welded to vertical position. The anchoring shall be done by a MS plate, square in shape, welded to vertical posts and nut-bolted to main RSJS. Two cross ISMB 150 girders shall be placed and anchored with MS base plates and nut bolts over top of the vertical girders, perpendicular to the plane of main RSJS. The length of these cross arms shall be 1.2 M each. One additional ISMB 150 of approx. 3.25 M length shall be placed on the welded cross RSJS centrally in the same plane of pumps below. A tentative drawing of this arrangement is enclosed for reference.

A 2 tonne capacity CD block, triple spar gear and 5 M lifting chair shall be provided with a wire

rope hook around the single cross RSJS for hanging the CD block. Note : Only in case of pumpsets to be installed in staggered positions, a circular RCC continuous

corbel shall be provided which will carry monorail travelling crane (for circular well/sump). For rectangular sump or pump house, continuous RCC corbels along the longitudinal walls shall be provided over which rails of monorail travelling crane shall be erected.

Approved makes : As per schedule attached.

Page 60: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 167 )

Contractor No. of Corrections Executive Engineer

Servo Controlled Automatic Voltage Stabilizer (Item No. 11) Providing, erecting Servo Controlled Automatic Voltage Stabilizer suitable for output voltage of 415 volt +1%, 3 Ph, 50 Hz. With copper wound transformer (air/oil cooled) as mentioned below. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%. The stabilizer should be constructed in cubical box, with bi-directional wheels for easy handling, necessary monitors and user’s controls on front panel such as indication, alarm, voltmeter and selector switch for measuring input andoutput voltage, auto/manual selector switch, raise/low push buttons, etc. Suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. All three phases shall be independently monitored and corrected. The Servo Controlled Automatic Voltage suitable for input 220 to 460 volts and output 415 to 460 volts with protections and indications shall be incorporated over/under voltage single phasing cut off contactor, with electronic output sensing unit, etc. complete with third party inspection. Tools (Item No. 12) The Contractor should supply the following tools.

1. Double ended spanner set ( 6 mm to 32 mm ) 1 Set

2. Ring spanner set ( 6 mm to 32 mm ) 1 Set

3. Hammer 1 Kg. 1 No.

4. Screw driver 150 mm / 300 mm 1 No. each

5. Insulated plier 200 mm 1 No.

6. Plier 250 mm 1 No.

7. Pipe wench 300 mm 1 No.

8. Pipe wench 600 mm 1 No.

9. Hacksaw frame with blade 300 mm 1 Set

10. Half round smooth file 1 No.

11. Test lamp kit 1 Kit

12. Electricians tester 1 No. Electrification (Item No. 13) The item includes electrification to the switch house. The wiring shall be done in copper conductor 1.5 sqmm. wire PVC insulated wire only. PVC conduit of flat of suitable size shall be used for encasing. Following electrical fittings shall be provided.

Page 61: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 168 )

Contractor No. of Corrections Executive Engineer

1. Fluorescent tube fitting, box type 1 x 4 W complete. Energy efficient T.S. type

4 Nos.

2. Bulk head fitting with 60 W CFL bulb

2 Nos. outside the room

3. Bulb 60 W CFL with holder inside the room

1 No.

4. Plug point with switch 15/5 Amp 5 pin 1 No. Separate wooden board with sunmica with 16 Amp. kit-kat switches of piano type and fuse shall be provided for fittings. External Electrification – As per Raw Water Sub-work Test and Trial (Item No. 14) The Contractor shall arrange with all tools and equipments for a satisfactory field testing, after a period of continuous running for one month for both pump sets and equipments for a satisfactory field testing, after a period of continuous running for one month for both pumpsets and equipments. Running trial for 200 hours for each pumpset shall be arranged at the convenience of MJP, availability of water and electricity and the requirement of the village. In this trial run period, if any abnormality is observed by the Engineer, the same shall be rectified by the Contractor. The Contractor shall be responsible for the satisfactory performance of the equipments supplied and installed by him for a period of 12 months from the date of satisfactory test, trial and performance. Any failure or defects noticed during or after performance test shall be attended by Contractor within 15 days' notice period, failing which the MJP shall have right to carry out rectification at the cost and risk of Contractor. The discharge test shall be given by the Contractor after commissioning of pump sets for which no extra payment will be made. The necessary equipments for discharge test shall be made available by the Contractor. The test shall be carried out in the presence of Junior Engineer (M), Deputy Engineer (M) and test reports duly signed by the Deputy Engineer (M) and the Contractor shall be furnished to MJP. The Contractor shall furnish electrical installation, completion cum test report in M.S.E.B. prescribed form for getting electrical connection.

Page 62: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 169 )

Contractor No. of Corrections Executive Engineer

GUIDELINES TO THE CONTRACTOR AND HIS OBLIGATORY CONDITIONS 1. The Contractor shall be a licensed electrical contractor and registered with MJP. 2. No R.R. shall be accepted. Any damages or wharfage will be Contractor's responsibility and

liability. 3. a) 80% payment will be released on receipt of material on site in good condition with

manufacturer's test certificate and other documents required by Engineer. b) 10% payment on satisfactory installation of all the equipments. c) 10% payment on satisfactory testing for a period of at least one month after

commissioning and satisfactory test recorded. In case, the sump is not ready and Contractor is directed to give delivery at MJP's godown, he

shall be entitled to 80% payment of material against Manufacturer's Test Certificate. The place of delivery is MJP's choice. No payment, however, be further paid for further carting of material at site of work.

4. 100 hours running trial for each pump will be taken and pump will be run for a period of one

month under exclusive supervision of Contractor. In case, the pump does not give discharge indicated, it shall have to be replaced. No reduced payment should be asked for and will not be paid.

5. M.S.E.B. connection is to be obtained by MJP. However, cash memo of capacitor test report of

capacitor and complete installation is the responsibility of the agency. 6. As per Indian Electricity Rules, double earthing is necessary and this is a part and parcel of

tender. 7. Preference will be given to a costly and higher category pump, if MJP feels it to be of superior

quality. 8. The characteristic curves, chart and other technical documents shall be attached with the tender;

otherwise the tender will be rejected. 9. Any tax variation and duty variation under statute will be allowed and the date of receipt of

tender will be taken as base. The Contractor shall have to produce necessary documents in case there is any statutory increase.

Page 63: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 170 )

Contractor No. of Corrections Executive Engineer

10. The tender must accompany pump characteristics, failing which the tender is likely to be rejected.

11. The Contractor should see the site prior to tendering. If not, it shall be so presumed for all

practical purposes. 12. Danger board is required to be fixed as per Indian Electricity Rules. No extra payment shall be

effected. 13. Contractor should clearly mention what lubricants are to be used. 14. The agreement is governed by Indian Contract Law and under no circumstances Sales Tax or 'D'

or 'AF' form be issued. 15. Payment for the item for providing pumpset will not be released unless supply is accompanied

with test report and guarantee card of the manufacturer. 16. Guarantee period for the motor pump set and all allied equipments should be 12 months after

giving satisfactory trial run and recorded. 17. The schedule for the details of submersible pump set and other equipment must filled by the

Contractor; otherwise the tender will be considered incomplete and will not be accepted.

Page 64: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 171 )

Contractor No. of Corrections Executive Engineer

GUARANTEED PERFORMANCE AND TECHNICAL SPECIFICATIONS OF SUBMERSIBLE PUMP SETS AND OTHER EQUIPMENTS TO BE FILLED BY THE CONTRACTOR

SCHEDULE

Sr. No. Description Type, Make and Other Details to be filled by the Contractor

1. Submersible Pump Set / Vertical Turbine / Centrifugal Make Type, reference standard No. of stages Efficiency at duty points Shut-off head Head range Construction of material of impeller Maximum power required at specified head range as per characteristic curve 2. Sluice Valve Size Type, reference standard Make Rating 3. Non-return Valve Size Type, reference standard Make Rating

Page 65: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 172 )

Contractor No. of Corrections Executive Engineer

Sr. No. Description Type, Make and Other Details to be filled by the Contractor 4. Air Valve Size Make Rating 5. Cubical panel board Whether wall mounting/floor mounting Incoming Change-over Outgoing a) ICTP switches/change-over switches/ OCTS/ACB Make Capacity Fuse rating b) DOL/Star-Delta/AT Starter Type Make Capacity Contractor rating c) S.P.P./W.L.G. Make Type d) Voltmeter Make Range

Page 66: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 173 )

Contractor No. of Corrections Executive Engineer

Sr. No. Description Type, Make and Other Details to be filled by the Contractor e) Ammeter Make Range f) Capacitor Make KVAR 6. Earthing Size of G.I. wire Type of earth Electrode and size 7. Pressure Gauge Size Type Make 8. Submersible Cable Size, reference standard Make 9. G.I. Pipe Size Grade/Class Make

Page 67: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 174 )

Contractor No. of Corrections Executive Engineer

Sr. No. Description Type, Make and Other Details to be filled by the Contractor 10. C.I./M.S. Specials Size Make Thickness 11. CP Block Make Rating 12. Travelling Crane Make Rating Size of giver offered

Page 68: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 175 )

Contractor No. of Corrections Executive Engineer

1. Approved Makes for Panel Board Accessories

a) D.O.L. L & T / Siemens / Crompton / Bharatiya Cutler Hammer

b) Star-Delta L & T / Siemens / Crompton / Bharatiya Cutler Hammer / MEI

c) Manually Operated ATS MEI / Kilburn / JMP

d) Fully Automatic ATS (Oil immersed contactor)

MEI / JMP

e) Fully Automatic ATS (Air break contactor)

MEI / Kilburn / JMP

f) Contactor for assembled ATS L & T / Siemens / Crompton / Bharatiya Cutler Hammer / Andrew Yule / Crompton

g) Gentle / soft start starter (upto 200 HP only)

RMS

2. Switches

a) Rotary Thakoor / Kaycee / CPL / L & T / Siemens

b) Iron Clad Stanley / Ashok / KEW

c) Metal Clad CPL / L & T / H. Elecon / Ashok / Standard

3. HRC Fuses L & T / English Electric / Siemens / Standard

4. Oil Circuit Breaker MEI / Easun / Kilburn / Southern Switchgear

5. Moulded Case Circuit Breaker L & T / Crompton / Voltas / ABB / EE

Page 69: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 176 )

Contractor No. of Corrections Executive Engineer

6. Air Circuit Breaker

a) Upto 1000 A L & T / EE / ABB / Voltas

b) Above 1000 A L & T

7. Vacuum Circuit Breaker

GEC / Crompton / MEI / Andrew Yule / BHEL

8. Vacuum Contactors GEC / Jyoti / BHEL

9. Earth Leakage Circuit Breaker Reputed makes to be decided at local level

10. Water Level Guard and Single Phasing Preventor

Reputed makes to be decided at local level

11. a) Motor Protection Relay for H.T. Motor

EE / ABB / MEI

b) Overcurrent and Earthfault EE / ABB

Page 70: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 56 )

Contractor No. of Corrections Executive Engineer

DETAILED SPECIFICATIONS FOR UNCONVENTIONAL WATER TREATMENT PLANT

Unitwise Obligatory Data for Hydraulic Design

Plant flow rates

Capacity 3.50 MLD (Million Litres per Day)

Capable for 20% overloading

Rate of flow 1,56,250 lit./hour All process units shall be designed for normal rate of flow. All open channels, inlet and outlet openings, ports closed conduits and piping shall be designed for 20% hydraulic overloading. Aeration Fountain

Capacity 3.50 MLD

Rate of Flow 1,56,250 lit./hour

No. of Units 1, One

Minimum floor area required 0.015 Sqm/cum/hr.

Minimum Rise of Cascade 0.15 M

Minimum Tread of Cascade 0.40 M (3.0 MLD and above)

No. of Cascades 3, Three

Central Shaft (RCC) ID : 0.60 M (3.0 MLD and above)

Minimum depth of water in collection launder

(peripheral)

0.3 M

Minimum width of launder 0.60 M

Free board in launder 0.30 M

Width of peripheral walkway 1.00 M

Dia. of inlet pipe (raw water main) 0.40 M In case the central shaft (vertical) is to be provided in CI/MS pipe, the velocity in pipe shall not be more than 0.6 M/Sec. with a bell-mouth opening at top. A duck foot bend shall be provided at bottom over a proper foundation block to facilitate its connection with raw water main.

Page 71: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 57 )

Contractor No. of Corrections Executive Engineer

Stilling Chamber and Mixing Weirs

A) Stilling Chamber

Capacity 3.50 MLD

Rate of Flow 1,56,250 lit./hour

Inlet From Aeration Fountain (Under flow baffle)

Detention time 1 Minute (3.0 MLD and above)

Direction of flow Horizontal

Width of chamber Min. 0.60 M

Side water depth Min. 0.60 M

Free board 0.30 M

B) Rapid Mix Weir

Length of weir 0.40 M to 0.60 M

Type of weir Rectangular, sharp crested with graduations

Free board over weir Min. 0.40 M

Velocity gradient for rapid mixing 800 to 1000 l/sec.

Detention time (downstream side of weir) 2 to 5 Sec. A baffle wall of 0.10 M to 0.15 M height to be constructed at the distance of 0.60 M to 1.0 M from weir on the downstream side, across the width of mixing channel for achieving the said detention time in the mixing basin.

C) Mixing Channel

Capacity 3.50 MLD

Rate of Flow 1,56,250 lit./hour

No. of units 1, One

Velocity 0.6 M / sec.

Detention Time 10 to 40 sec.

Mixing promotion Vent tiles fixed in staggered fashion

Width of channel 0.80 M (3.0 MLD and above)

Length of channel As per design

Depth of water Max. 0.20 M

Free board 0.30 M

Page 72: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 58 )

Contractor No. of Corrections Executive Engineer

Mechanical Flocculation Tank

Capacity 3.50 MLD

Rate of flow 1,56,250 lit./hour

No. of Units 2, Two (3.0 MLD and above)

Detention time Min. 30 minutes

Side water depth Min. 3.5 M

Free board 0.50 M

Velocity gradient to be achieved 30 to 60 lit./Sec.

Value (GT) 10,000 to 1,00,000

Minimum electrical motor rating 1.0 KW

Paddle tip velocity Less than 0.60 M/Sec.

Speed of agitator (with provision for three

different speeds)

4 to 6 rpm

Cross sectional area of blades 10 to 20% of cross sectional area of tank The design of mechanical agitator shall generally conform to the guidelines of CPHEEO manual (Edition 1991). Acrylic pedals should be fitted in order to avoid rusting.

Velocity at inlet port Less than 0.30 M/Sec.

Velocity under outlet baffle Less than 0.05 M/Sec. Invert of bottom slab of mixing channel shall be at the same RL or more than FSL of flocculator. Invert of bottom slab of flocculator shall be minimum 0.5 M below the top of hopper in tube settling tank. Tube Settling Tanks

Capacity 3.50 MLD

Rate of Flow 1,56,250 lit./hour

No. of units 4, Four (3.0 MLD and above)

Surface loading (on tubes area of tank) Max. 4,750 litres/sqm/hr (0.50 to 2.50 MLD)

Max. 5,000 litres/sqm/hr (3.0 MLD and above)

Detention time of tank Min. 35 minutes

Page 73: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 59 )

Contractor No. of Corrections Executive Engineer

Side water depth Min. 3.0 M (above hopper top)

Free board 0.50 M

No. of hoppers 1 No. per unit (0.50 MLD to 1.25 MLD)

2 Nos. per unit (above 1.25 MLD)

Min. slope of hopper 50º to horizontal plane

Min. hopper depth 1.50 M

Inlet (from flocculation tank) 200 mm O.D. rigid PVC pipes, perforated,

min. nos. = 2, Two per unit

Velocity through inlet pipes Not more than 0.25 M/Sec. (for the normal flow

rate)

Dia. of perforations Less than 0.10 M/Sec.

Depth of water below modules Min. 1.50 M

Height of modules Min. 0.50 M

Depth of water above modules Max. 1.0 M

Size of tube 50 mm x 50 mm, square conduit or any other

shaped tubes like circular, cheveron, hexagonal,

etc. having prooven performance.

Material of tubes Rigid PVC

Length of individual tube 0.60 M

Angle of inclination of tube 60º to horizontal plane

Settled water collection pipe 200 mm dia rigid PVC, perforated

Spacing of pipes Max. 1.0 M c/c

Depth of water in pipes Less than half the radius of pipes

Collection orifices 40/50 mm dia holes

Weir loading Less than 300 Cum/RM/Day The difference between FSL of tube settling tank and filter bed shall be minimum 0.30 M. Note : Design, fabricate and construct tube settlers with square or any other shaped tubes, like circular,

cheveron, hexagonal, etc. having prooven performance.

Page 74: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 60 )

Contractor No. of Corrections Executive Engineer

Rapid Sand Gravity Filter Beds

Capacity 3.50 MLD

Rate of flow 1,56,250 lit./hour

No. of beds 2, Two (independent operation) each bed having

two section with side gutter

(3.0 MLD and above)

Rate of filtration Max. 5,000 litres/sqm./hr.

Depth of water Minimum 3.65 M

Free board 0.50 M

Type of filter control Constant rate filtration with split flow weir

without mechanical control devices.

Minimum available head loss 2.0 M

Depth of supporting gravel 0.60 M, graded 2 mm to 50 mm

Depth of filter sand 0.75 M, E.S. 0.55 to 0.60 mm U.C. 1.5 to 1.7

Depth of water over sand 2.30 M

Equal flow distribution to filter beds Split flow weir boxes at inlet to filter bed when

no. of beds is more than one.

Length of split flow weir 0.6 M

Height of split flow weir (over chamber bottom) 0.50 M Invert of bottom slab of filter inlet channel and split flow weir box shall be same. Lip RL of weir shall be 0.05 M below the FSL of bed. The inlet pipe to filter bed (from the split flow weir box) shall be extended upto the top of wash water disposal gutter. Lip RL of outlet weir (outlet chamber of filter bed) shall be 0.15 M above top of the sand media in filter bed.

Width of inlet channel to filter 0.6 M

Velocity through channel 0.4 to 0.6 M/sec

Filter port velocities For sizing of pipe / valves

Page 75: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 61 )

Contractor No. of Corrections Executive Engineer

Filter inlet 0.6 to 1.0 M/sec

(Minimum size 200 mm x 200 mm)

Filter outlet 1.0 to 1.2 M/sec

(Minimum size 150 mm dia)

Wash water inlet and disposal 2.5 to 3.0 M/sec

Type of backwash Duel wash. Sectional backwash methodology.

Rate of backwash 600 lit/sqm/min.

Duration of backwash Minimum 10 min.

Capacity of wash water tank Net capacity for 1 bed + 10 cum

Filter under drain system Mild steel pipe manifold and 'V' shaped M.S.

wired laterals of latest design

Area of perforations to laterals 0.3 to 0.35% of bed area The design of filter under drain shall generally conform to the guidelines of CPHEEO manual, Edition 1991.

Minimum size of cross troughs in filter 0.30 M x 0.30 M

Lateral travel of wash water Maximum 1.0 M

Width of side disposal gutter 0.60 M

Depth of side disposal gutter To be extended upto filter bottom The minimum free fall from outlet weir of filter to second compartment of outlet chamber shall not less than 0.15 M. The velocity in P.W. pipe to sump shall not be more than 1.0 M/sec for the designed capacity. Chemical House Building

Area requirement on ground floor 25 to 35 sqm (0.50 MLD to 2.50 MLD)

35 to 50 sqm (3.0 MLD and above) (Exact requirement of area shall be as per the tender drawings.)

Page 76: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 62 )

Contractor No. of Corrections Executive Engineer

Area function Store room, TCL tank, outlet chamber pipe

gallery for filter control.

Chlorinator room (sanitary block – independent)

Clear head room Minimum 3.50 M (For plant capacity above and including 3.0 MLD, separate pipe gallery with minimum width of 3.50 M shall be provided. The valves shall be operated from the upper level walkway by means of extended spindle and head stock. The pipe gallery shall be covered with minimum head room over upper level walkway as 3.50 M.)

Area requirement on first floor 15 to 20 sqm (0.50 MLD to 2.50 MLD)

35 to 50 sqm (3.0 MLD and above)

Area function To house alum tanks, office, and laboratory and

pre-chlorination.

Clear head room 3.50 M

Location of structure Adjacent to filter beds.

Type of structure RCC framed structure with BB masonry walls.

Architectural features Porch, canopies, suitable treatment to front

elevation. Staircase for access to the first floor

shall be provided outside the building. Elevation

should be got approved before final designing.

Bleaching Powder Dosing Tank

No. of tanks 2, Two (Pre-chlorination : 1)

(Post-chlorination : 1)

Capacity 350 litres each (3.0 MLD and above)

Rating of tank 8 hours

Chlorine dose 3 mg/lit (ppm)

Available chlorine 25%

Strength of solution 5%

Agitator Manually operated Post-chlorination

Manually operated Pre-chlorination

Page 77: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 63 )

Contractor No. of Corrections Executive Engineer

Alum Solution Tanks

No. of tanks 2, Two

Capacity 750 litres min. (0.50 MLD to 1.25 MLD)

1,000 litres min. (1.50 MLD to 2.50 MLD)

1,500 litres min. (3.0 MLD and above)

Rating of each tank 12 hours

Maximum dose 50 mg/lit.

Strength of solution 5%

Agitator Electrically operated stirrer (min. 0.5 KW motor),

S.S. 318 shaft and blades

Constant head dosing tank Manually controlled, 1 no., common to both tanks

Piping and valves Rigid PVC or polypropylene

Laboratory equipments As per detailed specifications

Weighing/handling equipments As per detailed specifications

Sanitary Block Sanitary block should be separate B.B. masonry

structure with RCC slab. It should consist of –

1) Toilet – 1 (0.90 x 1.20) with septic tank

2) Urinals – 2

3) Wash basin – 1 no.

Total size – 1.50 x 3.50 M

Page 78: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 64 )

Contractor No. of Corrections Executive Engineer

Wash Water Tank and Backwash Pumps

Location Over first floor of chemical house building.

Capacity Net capacity for washing of 1 bed for 10 min.

duration + 10 cum for utility.

Shape Square, circular, rectangular Inlet, outlet and overflow piping to be provided with drain arrangement. Wash water pump will be installed in pure water pump house.

Effective head of wash water tanks required over

filter bottom

Minimum 8.5 M

Capacity of wash water pump 25,000 to 30,000 lit./hr.

No. of backwash pumps 2 ( 1 working + 1 standby )

Minimum rating of motor 3.0 KW Actual head to be provided for wash water tank = effective head required + head required to overcome frictional head losses through filter control piping, valves and wash water inlet pipeline to filter.

Bypass Arrangements As per detailed specifications

Sludge/Waste Water Disposal As per detailed specifications.

Electrification As per detailed specifications.

Trial Run As per detailed specifications. Obligatory Levels of WTP 1. GL 49.53 M 2. Aeration Fountain Lip 54.30 M 3. LSL of Pure Water Sump 45.53 M 4. F.S.L. 49.53 M

Page 79: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 65 )

Contractor No. of Corrections Executive Engineer

Battery Limit of Works a) Inlet side Upto 5.0 M horizontal distance from the centre of

Aeration Fountain b) Outlet side Pure water pipe from filter control room to Pure

water Sump ( Maximum 20.0 M ) c) Drainage Upto 15.0 M from the final drain chamber

( RCC NP-2, 400 mm dia ) Notes : 1. The hydraulic gradient shown on flow diagram shall be strictly observed. In no case the losses

provided shall be reduced. 2. The Department has suggested the layout of the plant which enclosed with the tender document.

However, the successful tenderer may propose a different layout keeping in mind the essence of purpose and specifications of the work. However, this shall be subject to the approval by the Engineer-in-charge of the works or the approval authority.

3. The successful tenderer on award of the work shall submit the hydraulic design along with the

calculations for hydraulic losses and general arrangement drawings of the water treatment plant to the Executive Engineer-in-charge of the works. The general arrangement drawings shall include the hydraulic flow diagram, layout plans, key plan, plans of the structure at various levels and sectional elevations showing various hydraulic and structural levels. The contractor shall engage the services of an experienced and reputed designer for the correct interpretation of data and for submission of the efficient design.

After getting approval to these drawings only then he shall proceed ahead with structural design

of the plant. The contractor shall also submit the front elevation and side elevation of the plant. The plant

shall aesthetically look good and if necessary elevation treatment may be given to beautify the structure.

4. The successful tenderer shall be ultimately responsible for the stability and soundness of the

various structures. He shall also be completely responsible for the quality of treated water and the efficiency of the unit processes. The criteria for quality of treated water is mentioned elsewhere in the tender.

Page 80: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 66 )

Contractor No. of Corrections Executive Engineer

Desired Performance of the Water Treatment Plant The treated water shall conform to the following requirements : Physical and Chemical Quality 1. The filtered water shall be clear in appearance with the turbidity less than 2 NTU on the

Nephelometric turbidimeter. 2. The filtered water shall be free from colour with maximum limit of 10 on the platinum cobalt

scale. 3. The turbidity of settled water shall be preferably 15 NTU with maximum limit upto 20 NTU. 4. The continuous filter run shall not be less than 20-24 hours with a loss of head not exceeding 2.0

M at the designed flow rate. 5. The duration of filter backwash shall not exceed 10 min. with water on the bed at close of

backwash having turbidity less than 20-30 NTU. 6. The wash water consumption shall not exceed 2% to 3% of the quantity of the treated water as

calculated for the duration of one year. 7. At the commencement of filter run after backwash, the initial head loss shall not exceed 0 M to

0.30 M. 8. The pH valve of filtered water shall be between 6.5 to 8.5. Bacteriological Quality 9. In a Standard Plate Count test, the filtrate shall not contain 100 total colonies per cubic cm. at 37

degrees centigrade after 24 hours incubation of agar agent. 10. In 90% of the samples examined throughout any year, coliform bacterial shall not be detected or

the MPN index of coliform micro-organisms shall be less than 1.0. None of the samples should have an MPN index of coliform bacteria in excess of 10. An MPN index of 8-10 should not occur in two consecutive samples. ( Per 100 ml of sample ).

Page 81: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 67 )

Contractor No. of Corrections Executive Engineer

Specifications for Unconventional Water Treatment Plant These specifications shall be applicable to the Unconventional Water Treatment Plants having capacity from 0.50 MLD to 5.0 MLD. The plant shall be simple in every aspect from construction upto maintenance. The plant shall be compact in nature. Various hydraulic and process units and ancillary structures shall integrate and merge with each other to produce an aesthetically pleasing effect. The top priority shall be given to operational and maintenance convenience while making layout of the plant. The use of mechanical equipments in the process shall be minimum and wherever essential only. And finally the overall engineering and execution efforts shall ultimately ensure a high quality, safe potable drinking water from the treatment plant. The hydraulic and process design of the plant shall be in accordance with the various parameters given in the obligatory data and the detailed specifications. The structural design of various civil components shall be as per the design criteria enclosed in the appendices. The main units of the plant shall be as follows : 1. Aeration Fountain 2. Stilling Chamber / Mixing Weir / Mixing Channel 3. Mechanical Flocculation Tank 4. Tube Settling Tank with hopper bottom 5. Rapid Sand Gravity Filter Bed 6. Wash Water Tank 7. Chemical House / Control Room 8. Pure Water Sump and Pump House Aeration Fountain This shall be of cascade type and shall be designed as per the obligatory data. The central shaft shall be in RCC of minimum dia. as specified in the obligatory data. The raw water main shall be connected to the central shaft at the bottom minimum 0.60 M below ground level. The raw water main shall be connected to the RCC shaft by providing a crippling flange in a puddle pipe. In case the central shaft is of CI/MS pipe, then the maximum velocity through it shall not be more than 0.60 M. A duck foot bend shall be provided at the bottom over a foundation block and a bell mouth opening at the top.

Page 82: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 68 )

Contractor No. of Corrections Executive Engineer

There shall be minimum three nos. of cascades with rise of each cascade as 0.15 M. The tread of each cascade shall not be less than specified in the obligatory data. The cascades shall be covered with aesthetic patterns made out of glazed tiles. The edges of the cascades shall be preferably rounded. A peripheral collection launder shall be provided around the cascades. The depth of water in collection launder shall not be less than 0.30 M and free board shall be 0.30 M. The width of the launder shall be minimum 0.60 M. A RCC walkway of width 1.0 M shall be provided cantilevered to the collection launder on the outer side. The walkway shall be provided with railings. The walkway of the aeration fountain shall be accessible from other units of the plant. Stilling Chamber and Mixing Channel Stilling Chamber The size of Stilling Chamber shall be as per the design criteria mentioned in the obligatory data. The function of this unit is to receive raw water from aeration fountain and to dampen the turbulence before passing the water over the measuring weir. Sometimes the chamber is designed to arrest heavier particles like sand and grit. The Stilling Chamber shall be in a form of channel with horizontal flow. This channel shall start from the aeration fountain and terminate at the mixing weir. The minimum width of the chamber / channel shall be 0.6 M. The water depth in channel shall be minimum 0.60 M. The channel / chamber shall be designed to give detention time of 1 to 2 minutes to the designed flow rate. An under flow baffle shall be constructed at the inlet of the chamber about 1.0 M from the collection launder of aeration fountain. The velocity through opening below the baffle shall be less than 0.10 M/sec. The baffle shall be a part of turbulence dampening arrangement as the flow has to be passed over the measuring cum mixing weir. The free board provided in the Stilling Chamber shall be minimum 0.30 M. The channel shall be covered with precast slabs as an access to the aeration fountain. A drain pipe of size 100 mm dia with a sluice valve shall be provided to the chamber / channel. Measuring cum Mixing Weir The outlet arrangement to the Stilling Chamber shall comprise of a rectangular sharp-crested weir. The clear width of weir shall be specified in the obligatory data. The weir frame shall have height of minimum 500 mm. The frame of the weir shall consist of S.S. 318 grade steel of either flats or angles of minimum thickness 5 mm. The weir plate shall consist of 50 mm x 30 mm brass plate which shall be chamfered to 2 mm thickness for the height of 25 mm. The water shall be discharged over the chamfered edge of the weir plate. The weir plate shall be fixed to the S.S. frame by means of anti-corrosive nut-bolts or rivets. The frame shall be fixed to the bottom as well side concrete by means of suitable holdfast arrangement.

Page 83: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 69 )

Contractor No. of Corrections Executive Engineer

A graduated scale shall be fixed over the weir frame so as to measure the discharge. The graduations shall be at the interval of 10 mm. The tenderer shall provide a chart showing the raw water discharge in litres/hour against every 10 mm rise of water over the lip of weir. This shall also be got confirmed by Time v/s Volume Method during commissioning of the plant. The scale shall be adequate to indicate water depth upto 25% overloading over the designed discharge of the plant. Apart from the measuring scale, a simple float operated rate of flow indicator shall be provided over the stilling chamber. The equipment may be of dial type or linear scale type calibrated to read the discharge directly in litres/hour. Rapid Mix Arrangement The above mentioned weir also shall act as a hydraulic rapid (flash) mix device. The lip of the weir shall be minimum 500 mm above the invert of the bottom slab of the channel. This is essential so as to have a minimum free fall of 400 mm on the downstream side of the weir. The free fall of 400 mm to 500 mm on the downstream side of weir shall ensure velocity gradient of 800 to 1000 litres/sec. A mixing basin of 2 to 5 seconds detention time shall be provided on the downstream side of weir at the beginning of mixing channel. A baffle wall with 100 mm to 150 mm height shall be constructed at a distance of 0.75 M to 1.0 M from the mixing weir to give the desired detention time. The turbulence generated due to free fall and confinement of the same in the mixing basin shall be pre-requisite for proper and instantaneous mixing of alum solution with raw water. The alum solution feeder pipe (coagulant diffuser) shall be located at a distance of 100 mm from the weir plate on the downstream side of the weir at an elevation 300 mm above the invert of the weir. It shall consist of a 160 mm O.D. rigid PVC pipe fixed across the width of the mixing channel. The pipe shall be provided with uniformly spaced holes of 4 mm dia at the bottom, through which the alum solution shall fall into the channel. Two slots of size 150 mm x 100 mm shall be cut at the top of the pipe to clean it periodically. The pipe shall be plugged at two ends and shall be supported over the wooden brackets. The brackets shall be fixed on the side walls of the channel. During commissioning, it shall be ensured that the alum solution is fed to the raw water uniformly across the width of the channel. Mixing Channel The mixing channel shall be cantilevered to the wall of the plant. The channel shall extend upto the inlet of flocculation tank. It shall have minimum width specified in the obligatory data and freeboard of 0.3 M. Nominal slope shall be provided to the channel towards the discharge side so that the water doesn't remain stagnant over the channel bed. The mixing promotion arrangement in the channel shall comprise of kadappa tiles embedded in the bottom slab of the channel in vertical position. The height of the tiles shall be 300 mm above the invert of the bottom. The tiles shall be properly anchored in the bottom slab and then shall be filled with concrete slurry. The tiles shall be arranged in a staggered fashion along the length of the channel to achieve maximum mixing by sacrificing a very small head.

Page 84: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 70 )

Contractor No. of Corrections Executive Engineer

If there is a necessity of lime addition or pre-chlorination, then the same shall be done in the stilling chamber. The feeder pipe with a diffuser head shall be located before the baffle wall at the inlet to the chamber. The stilling chamber and the mixing channel shall be accessible from the other units of the plants and from the chemical house for the maintenance and observation purpose. It is essential to note that the rapid dispersal of mix of alum solution shall take place in the mixing basin, immediately on the downstream side of mixing weir. Mixing channel is essentially provided to ensure the completion of the reaction. The mixing channel in itself is not a rapid mix device. Inlet Channel to Flocculator The mixing channel shall discharge the coagulated water into the inlet channel of flocculation tanks. The invert of the bottom slab of inlet channel shall be always 0.3 M below that of mixing channel. This shall be achieved by providing a step at the end of the mixing channel. The inlet openings to the flocculation tank shall be designed as submerged ports. Adequate care shall be taken so that the FSL of flocculation tank is not above the invert of the bottom slab of mixing channel to ensure that flooding of the channel does not occur. Mechanical Flocculation Tank General Description The size of this tank shall be as per the design criteria mentioned in the obligatory data. The shape of the tank shall be square in the plan. It shall have one common wall with the tube settling tank and shall be of the same width. The depth of the water in tank shall be minimum 3.5 M with freeboard of 0.5 M. The bottom of the tank shall be atleast 0.5 M below the top of the hopper of the tube settling tank. There shall be a drain channel at the centre of the tank through which periodical draining of the sludge shall be possible. There shall be a minimum slope of 1 : 10 to the bottom slab from side walls towards the drain channel. The drain channel (pit) shall have minimum width and depth of 0.2 M. A 100 mm dia drain pipe with a cast iron sluice valve shall be provided to the drain channel. Inlet Arrangement The inlet to the flocculation tank shall comprise of a square opening of adequate size with limiting velocity of 0.3 M/sec. The openings shall be designed as submerged inlet. The location of the inlet to the tank shall be at the centre. The inlet opening may be provided with a acrylic sluice gate if the inlet channel is designed as the part of flow bypass arrangement. Outlet Arrangement The outlet to the tank shall comprise of adequate size / nos. of openings for flocculated water distribution pipes extending into the tube settling tank. The design criteria shall be as per the obligatory data. The outlet openings shall be located diagonally opposite to the inlet of the tank. The invert of the outlet pipes shall be at the top of the hoppers of the tube settling tank. A RCC baffle wall shall be provided on the outlet side protecting the outlet openings to ensure that short-circuiting of the flow does not occur through the tank. The baffle wall shall be closed at the top with a sloping slab. The bottom of

Page 85: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 71 )

Contractor No. of Corrections Executive Engineer

the wall shall be minimum 300 mm above the bottom of the tank. The wall shall be located 500 mm away from the outlet openings. The wall shall be designed in such a way that the flocculated water enters from the bottom opening to enter into the outlet pipes. The velocity through this horizontal slit opening shall be less than 0.1 M/sec. The flocculated water shall enter smoothly into the outlet pipes without transferring any eddies or circular motion of the water generated due to the mechanical agitator. Drive Mechanism and Agitator The drive mechanism for electrically driven agitator shall mounted on the RCC walkway provided at the top of the tank. The walkway shall have minimum width of 1.2 M and shall be provided with railings on both the sides. The electrical motor, gear box and pulleys assembly shall be mounted on a base frame of ISMC 100 channel sections. The base frame shall be anchored to the RCC walkway / platform properly. The drive mechanism and motor shall be protected with a light weight, easily removable fibre weather shed. The electrical motor shall be minimum 1 KW rating. The flocculator shall be designed to impart velocity gradient of 30 to 60 litres/sec. It shall have flexibility of operating atleast three different speeds by providing a tapered pulley or three different sets of pulleys with drive belts. The tangential velocity at the tip of the arm shall not be more than 0.6 M/sec. The speed of the agitator shall be between 4 to 6 RPM. The top of the blades of the agitator shall be 150 mm below the FSL. The height of the blades shall not extend more than 1.25 M from the bottom of the tank. Apart from these particular details the design of the agitator shall be generally conforming to the guidelines of the CPHEEO Manual (Edition 1991). The shaft of the agitator shall be of minimum dia 80 mm. (MS). The blades shall be acrylic with minimum thickness 12 mm. All the MS parts shall be painted with two coats of red oxide and anti-corrosive epoxy paint. The agitator preferably shall have four arms with two sets of shorter lengths (Swastika shaped in plan) for efficient slow mixing process. The shaft and blades assembly shall be preferably supported over the thrust bearing the walkway level. The walkway / platform supporting the machinery shall be accessible from other units of the plant. The design of the agitator and the outlet arrangement of the tank shall ensure that easily settleable flow is formed in the tank and it is efficiently transferred to the tube settling tank without fragmentation or appreciable deposition in the flocculation tank. The rung ladder or rungs shall be provided on the vertical wall of the tank for access upto the bottom. Tube Settling Tank General Description The size of this tank/tanks shall be as per the design criteria mentioned in the obligatory data. Normally the size of an individual hopper shall not exceed 3.75 M x 3.75 M as plan area at top. If the plan area requirement exceeds 14.0 Sqm then it shall be advisable to adopt a rectangular tank with two hoppers at the bottom. In some cases rectangular hoppers with maximum length to width ratio 1:33:1 should be adopted. It is essential to understand that while deciding the shape and size of the tank, the flocculation tank which has a common wall with tube settling tank shall be taken into consideration.

Page 86: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 72 )

Contractor No. of Corrections Executive Engineer

The side water depth ( swd ), above the hopper shall be minimum 3.0 M with 0.5 M as free board. The hopper or hoppers which shall be provided below the swd, shall have minimum slope of 50 degrees to the horizontal. In case of rectangular hoppers no individual wall shall have slope less than 45 degrees. The hopper shall have a sludge pit at the bottom of size 0.3 M x 0. 3 M x 0.2 M height. Drainage Arrangement Each hopper shall be provided with a individual drain pipe and valve. The drain pipe shall be of 150 mm dia. cast iron. The drain pipe from hopper shall be laid horizontally from the bottom of the hopper for gravity disposal of sludge. However, it is essential to ensure that the natural drain with adequate depth is available near the site through which the further disposal of sludge is possible under gravity head. Hydrostatic washout disposal not allowed. The pipe shall be provided with a cast iron sluice valve. Outside the vertical wall of the tank. The valve shall be located at a distance minimum 300 mm from the vertical wall in a drain chamber. Valve keys with extended stems shall be provided for operating the valves from the ground level. Inlet Arrangement The inlet to the tube settling tank shall comprise of 200 mm OD Rigid PVC (4 Kg/cm2) perforated pipes. These pipes are provided to distribute the flocculated water uniformly below the tube zone. The pipes shall be laid along the length of the tank, from common wall with flocculator upto the other end of the tube settling tank. The velocity of water in these floc distribution pipes shall not exceed 0.25 M/sec for the designed flow rate. The minimum number of pipes shall be two and maximum upto four. The pipes shall be laid at a centre to centre (c/c) distance not exceeding 1.5 M and not less than 0.60 M. The inlet side of the pipe shall rest in the opening provided in the common wall with the flocculation tank. It shall be properly grouted in the vertical wall. The dead end of the pipe shall rest on a concrete corbel and shall be properly anchored to the same. The pipes shall be laid at the hopper top or at about 100 mm above the hopper. For distribution of the water, perforations or holes of size 40 to 50 mm dia shall be drilled on the bottom half of the pipe. These holes shall be provided in the two rows - 120 degrees apart and shall be uniformly spaced. The velocity through an individual hole shall not exceed 0.10 M/sec in any case. The spacing of holes in a single row shall not be less than 150 mm c/c and shall not be more than 300 mm c/c. In addition to this, the drain holes of size 50 mm dia shall be provided to each pipe at the bottom with c/c spacing as 300 mm. At the top of the pipe, air vents of size 6 mm shall be provided at the spacing of 300 to 500 mm c/c. It is essential that the pipe is properly fixed or anchored at the hopper top.

Page 87: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 73 )

Contractor No. of Corrections Executive Engineer

Support for Modules The beams or corbels supporting the tube modules shall be provided atleast 1.5 M above top of the hopper. The modules are simply supported at the two ends over the corbels which shall be provided along the length of the wall. The corbels shall be 100 mm in width to provide sufficient bearing to the end of the modules. The top of both the corbels shall be in one level and shall have a smooth finish. The corbels shall be designed for self load of modules and reasonable live load of the maintenance staff (during erection and maintenance the people are required to stand on the modules). Tube Modules The tube modules shall be manufactured out of 50 + 2 mm x 50 + 2 mm ( ID ) square or any other shaped tubes like circular, chevron, horizontal, etc. rigid PVC pipes / tubes having proven performance. The average wall thickness of the pipes shall not be less than 1.0 mm. The material for the tubes shall be virgin rigid PVC granules. The pipes shall be carbon black in colour to prevent the growth of algae. The material shall be as per the IS specifications. This individual tube in a module shall have length of 600 mm. The tubes shall be cut in such a fashion that when pasted at a 60 degree inclination, the top and bottom surfaces of the modules shall present a smooth and uniform surface. The modules shall be manufactured by pasting the tubes to each other with a high grade cement solvent. One individual module may comprise of five or seven layers, alternate layers shall have tubes in opposite direction to achieve a good physical bond. In no case an individual tube shall have inclination less than 60 + 1 degrees to the horizontal. The ends of the modules shall be plugged with tube pieces to prevent short-circuiting of water. Any individual module shall have strength to withstand the weight of 60 kg. (one person) at the midspan when the module is supported at the two ends over the depth axis. The maximum span of modules shall not be more than 3.50 M. The modules shall be fabricated in the dry environment only. The modules shall be stored in a shed / godown having cement sheet roofing. The modules shall not be exposed to the extreme climatic conditions. The modules during transportation, storage and erection shall be handled on the depth axis only. During the installation of the modules in the tank, no gap shall be left in between the modules. Any small gap between the modules may lead to potential short-circuiting of the flow. The two individual modules shall not be pasted to each other during installation. For access to the bottom of the tank (hoppers) two adjoining modules shall be provided with MS bar lifting hook / rings for easy lifting and removal of the same. Settled Water Collection The settled water collection arrangements shall comprise of uniformly spaced perforated pipes or MS reinforced FRP troughs. The collection pipes shall be of 200 mm OD rigid PVC pipes (6 Kg/sqcm). The pipes shall always be provided along the length of short span of the walls. They shall be provided with collection orifices of 40 mm to 50 mm dia in two rows diametrically opposite to each other in a horizontal plane. The spacing of orifices shall not be less than 150 mm c/c and not more than 250 mm c/c in each row. In case of FRP troughs, the section of the troughs shall not be less than 150 mm x 200 mm height. One end of the pipe shall be plugged and fixed over a supporting corbel. The discharging end of the pipe shall be embedded in the vertical wall through the opening. The pipes or troughs shall not deflect + 5

Page 88: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 74 )

Contractor No. of Corrections Executive Engineer

mm, at the mid span under the hydraulic loading. The inverts of collection orifices of the pipes shall be perfectly in one level after installation and erection of the pipes. The entire collection system shall be designed, fabricated and installed in such a way that any individual pipe collects settled water uniformly along its length. The other criteria is all the pipes shall collect and discharge roughly equal amount of water. For plant capacities from 0.50 MLD to 1.25 MLD, the settled water may be discharged to the filter beds directly. However, the collection pipes shall be extended over and upto the top of filter gutter. For plant capacities including and above 1.50 MLD, the settled water may be discharged into a RCC collection channel which shall be located outside the tank. When the number of tube settling units are more than one, the collection channel shall be provided on the common wall of both the units. There shall be a clear distance of 300 mm from top of the modules to the soffit of the channel. The width of the channel shall not be less than 0.50 M. The tube settling tank shall be provided access in the form of walkways from other units. The rugs shall be provided in the tank for access to the modules and the bottom hoppers. The collection channel shall be covered with precast slabs with railings provided on both the sides. Rapid Sand Filter Beds General Description The size of filter bed / beds shall be as per the design criteria mentioned in the obligatory data. The filter bed shall be designed and operated on the principle of 'Constant Rate Filtration with Split Flow Weirs' and shall conform to the guidelines as per CPHEEO Manual (Edition 1991). The filter beds shall be 'open to sky'. Only the portion of pipe gallery shall be covered with a roof slab. The configuration of filter beds shall be as per the plant capacity as specified in the obligatory data. For plant capacities from 1.50 MLD upto 2.50 MLD, two independently working beds are essential. Each bed shall comprise of one section and a side gutter. For plant capacities including and above 3 MLD, two independently working beds are essential. Each bed shall comprise of two sections separated by the central wash water disposal gutter. The width of side wash water disposal gutter shall be 0.6 M. The height shall extend from bottom slab of the filter upto 0.1 M. above the level of weir edges of the cross troughs. In no case the gutter shall have an overhang above the filter media. For primary collection of wash water, cross troughs shall be employed. The cross troughs shall discharge the wash water to the side gutter from where it shall be connected to the drainage system. For horizontal portion of all trough and walls in bed, glazed tiles should be fixed in order to easy cleaning operation.

Page 89: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 75 )

Contractor No. of Corrections Executive Engineer

The outlet chamber to the filter bed shall have a rectangular sharp crested weir of similar to that like mixing weir in the stilling chamber. The lip of the weir shall be 0.15 M. above the top of sand media. The depth of water over sand media shall not be less than 2.30 M. The minimum free board shall be 0.50M. Filter Inlet Arrangement Where two or more beds are desired, split flow weirs shall be essential. The weir shall be housed in RCC weir box at the inlet to the filter. The weir may be constructed in RCC and shall have a sharp edge. The weir shall discharge the water into outlet compartment of the box, from where it shall be introduced into filter bed by a vertical pipe of suitable size. The inlet pipe shall extend upto the top of side gutter. The location of weir box shall be directly above the side disposal gutter. The lip RL of weir shall be 0.05 M below the FSL of filter bed. Filter Operation and Control At the start of the filtration cycle, the bed will operate at a low water level. The outlet valve to the filter shall be completely open, hence there will be no control on the outlet side. As the bed will get clogged, the head loss will start building up in terms of water head over the bed. As a result, the water level in the bed will start rising. At end of the filter run the water level shall reach the split flow weir and the filter will be due for cleaning / backwashing. As the outlet weir of the filter bed is provided over the sand top, the accidental dewatering of bed is not possible and hence the filter shall never run dry. This type of filter control is known as constant rate type filtration without any mechanical control devices. The split flow weirs are provided to distribute water equally if more than one bed is provided. The CPHEEO manual, Edition 1991 may be referred to for the additional details [page no. 225, clause 7.6.8.1(a)]. Filter Media The depth of filter sand shall be 0.75 M. The effective size of sand ( E.S. ) shall be 0.55 mm to 0.60 mm. The uniformity coefficient of sand ( U.C.) shall be 1.5 to 1.7. The sand shall be free of fines, dust and foreign materials. The filter sand shall be of quartzite variety and shall satisfy following conditions : a) Sand shall be hard and resistant quartz or quartzite. b) Ignition loss shall not exceed 0.7% by weight. c) Soluble fraction in HCl ( 40 % ) shall not exceed by 50 % by weight. d) Specific gravity shall be 2.55 to 2.65. e) Wearing loss shall not exceed 3%. Preferred sources of filter media : Godhra, Bhandara, Belgaum. The sand shall be supported by graded gravel. The gravel shall be as far as possible rounded. Angular gravel or cut pieces shall be avoided.

Page 90: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 76 )

Contractor No. of Corrections Executive Engineer

The gravel size and grading shall be as follows :

Sr. No.

Size ( in mm ) Depth ( in mm )

1. 2 to 6 100 - topmost layer.

2. 6 to 12 100

3. 12 to 25 200

4. 25 to 60 200 - bottom layer. During commissioning of the filter bed, the fines from the sand shall be scrapped by giving successive backwashes to the media. A rough cast sand plaster shall be provided to the side walls of filter in contact with the media. Filter Underdrain System The filter underdrain shall be of manifold-lateral type. The manifold pipe shall be of adequate size with 8 mm wall thickness. The manifold pipe shall be placed inside manifold pit of size 400 mm x 300 mm height. The pipe shall be provided with two coats of red oxide paint and two coats of anti-corrosive bitumastic paint before placing it into the pit. It shall be fixed in the position by grouting it with thin concrete slurry. The laterals shall be provided on both the sides of manifold pipe. The laterals shall be of preferably 50 mm / 63 mm O.D. rigid PVC pipe ( 10 Kg / cm2 ). One end of the lateral shall be plugged with a rigid PVC end cap. The other end shall be connected to the rigid PVC threaded adapter. The threaded adapter in turn shall be fitted to the heavy duty G.I. elbow. The G.I. elbows shall be welded at desired spacing on both sides. The size of the perforations for lateral shall be preferably 6 mm. to 8 mm. dia. The total area of the perforations shall be 0.30% to 0.35% of the bed area. Apart from these details, the design shall generally conform to the guidelines mentioned in the CPHEEO Manual ( Edition 1991 ). The invert of the laterals shall be minimum 25 mm above the invert of the bottom slab of the filter bed. An air vent pipe of 15 mm dia. (G.I.) shall be extended above the FSL of filter bed from the manifold pipe. Due care shall be taken regarding the line and level of laterals while fabricating, fixing and laying of manifold pipe. One no. of overflow pipe sleeve with bend ( 200 mm dia.) shall be provided at the FSL of the filter as per the design. The filter underdrain consisting of manifold and lateral shall be provided for each section of the bed separately.

Page 91: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 77 )

Contractor No. of Corrections Executive Engineer

Air Blowers and Piping Air blower of reputed make 2 nos. (1 working + 1 standby) shall be installed with 100 mm dia M.S. piping with necessary sluice valves for operation. Wash Water Collection and Disposal The filter backwash shall be sectional backwash only. Each section of the bed shall be backwashed independently. The filter shall be backwashed with air wash followed by hard wash. The wash water shall be collected by cross troughs and shall be disposed off to the side wash water disposal gutter. Normally, two nos. of uniformly spaced cross troughs shall be sufficient for the small beds. The size of cross troughs shall preferably be 0.3 M. x 0.35 M. height. The weirs of all cross troughs shall be perfectly in one level. The distance between the top of the sand upto weir of the cross trough shall be about 0.6 M. to 0.65 M. The bottom slab of the troughs shall not be provided any slope in the direction of discharge. The wash water shall be disposed off to the plant drainage system through a cast iron sluice valve. The disposal valve shall be provided outside the filter bed in a separate drain chamber. The entire filtration system and backwash arrangement shall be designed and provided in such a efficient way that backwash water consumption (calculated over a period of twelve calendar months) shall not exceed 2 to 3% of treated raw water quantity. Filter Ports, Pipings and Pipe Gallery Normally, the filter bed shall have one inlet port, one filtered water outlet per section, one wash water inlet port per section and one wash water disposal port per bed. A drain of 100 mm dia. with a sluice valve shall be provided to drain the filter completely. The inlet to the filter shall be provided with a mild steel sluice gate. All other ports shall be provided with cast iron sluice valves. The filter ports and isolating or controlling gates / valves shall be designed as per the velocity norms given in the obligatory data. It shall be advisable to do the plinth filling and flooring of filter control room after laying and jointing of pipelines. The filter control piping, located in the pipe gallery shall be of either cast iron or mild steel (8 mm thick), double flanged piping. The mild steel piping shall be provided with two coats of red oxide and two coats of anti-corrosive epoxy paint. The pipe gallery shall be provided with suitable drainage arrangement. The control valves shall be cast iron sluice valves only. The width of pipe gallery shall be minimum 2.5 M. The outlet chamber to filter shall be provided with white glazed tiles in the second compartment only. The chamber shall be covered with removable glazed shutters fixed to either wooded or mild steel frame with or without hinges. An electric bulb of 60 Watts shall be provided in the second compartment of the chamber at suitable location. For plant capacities from 0.50 MLD to 2.50 MLD, the operation of the control valves shall be from ground floor of chemical house cum control room only. For this purpose, the pipe gallery shall be

Page 92: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 78 )

Contractor No. of Corrections Executive Engineer

covered with M.S. grills. The grills shall be placed at the plinth level of the floor. The arrangement shall be provided to extend the spindles above the M.S. grill platform, from where the valves shall be operated with head stock. The pure water from outlet chamber shall be conveyed to the pure water sump by pipe. For plant capacities including and above 3.0 MLD, the arrangement shall be made to operate the valves from the upper level walkway. For this purpose filter control piping and valves shall be housed in a separate structure. The filtered water shall be conveyed from outlet chambers to the pure water channel. The roof slab of filtered water channel shall act as a lower level walkway and minimum width shall be 1.0 M. The total width of pipe gallery including the lower level walkway shall not be less than 3.5 M. The filter control valves shall be operated from the upper level walkway by providing them with extended spindle and headstocks. The width of upper level walkway shall not be less than 2.25 M. The pipe gallery including the lower level walkway shall be covered with the roof slab. The height of the roof slab above upper level walkway shall be minimum 3.50 M. Access shall be provided to the upper level walkway from the chemical house. A MS ladder shall also be provided from lower level walkway to the upper level walkway. Access shall be provided from the upper level walkway to the filter beds. The width of walkway provided for the filter bed shall not be less than 1.0 M. The pipe gallery shall be provided with windows and doors of adequate ventilation. Head Loss Indicator There shall not be any rate of flow indicator or loss of head manometer gauge as they are redundant in this type of filter. A simple water level indicator with float shall be provided to read the water depth in the filter bed, which will indicate the head loss in the bed. In addition to this a graduated scale of 2.5 M. Length shall be fixed on the side wall of filter bed itself for indicating the head loss. The 2.5 M mark on the scale shall correspond with the lip of split flow weir with 'zero' on the scale at the bottom. The scale shall be chrome plated or of S.S. 318 grade steel. The graduations shall be at the interval of 50 mm and shall be visible from the walkway level. Chemical House Building The chemical house cum administrative building shall be a multipurpose structure, consisting of : a) Ground Floor Housing chemical store, chlorination arrangement, air blowers. b) First Floor Housing chemical mixing and dosing tanks, laboratory and office space. The building shall be RCC framed structure with 0.23 M. thick B.B. masonry side / partition walls. The clear height of the floors shall not be less than 3.50 M. The plinth of ground floor shall be preferably 0.50 M above the ground floor. The doors / window openings shall be about 20% of the floor area. Front door should be 1.20 x 2.10 M with good aesthetic view approved by EIC. The doors shall be of CC TW and windows shall be of

Page 93: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 79 )

Contractor No. of Corrections Executive Engineer

aluminium sliding sections fully glazed. The floor shall be of good quality ceramic tiles 18" x 18". The building shall be provided with adequate architectural features to make the entire structure aesthetically pleasing, which include a porch and canopies over door and windows. Access to the first floor shall be in the form of a RCC staircase. Access to the wash tank shall be M.S. ladder with hand railing. a) Ground Floor The ground floor shall have a carpet area as mentioned in the obligatory data. The minimum

head rood shall be 3.5 M. It shall be house chemical store, chlorination arrangement, backwash water pumps and a small panel board.

Chlorination Arrangement One no. of bleaching powder solution dosing tank of capacity mentioned in the obligatory data with rigid PVC piping and valves shall be provided near the filter outlet chamber for gravity dosing. The solution shall be added directly into the second compartment of the filter outlet chamber. The size of piping and valves shall be minimum 40 mm in diameter. A hand operated agitator shall be provided to stir the solution intermittently. The agitator blades and shaft shall be of S.S. 318 grade material. The tank shall be either RCC or BB masonry. The location of the tank shall be as near to the filter outlet chamber as possible. The tank shall be provided with connections of P.W. inlet, outlet and drain. A weighing balance / scale - 500 kg. capacity shall be provided in the store room for weighing alum and bleaching powder. A wash basin shall be provided on the ground floor along with service water connections. The toilet block provided as an independent unit shall have one WC unit, two urinal and one wash basin with a mirror. A small septic tank of adequate size shall be provided for the toilet block. b) First Floor The carpet area of the chemical house cum laboratory shall be as per the obligatory data. The

access to the treatment units shall be provided from the first floor in the form of walkway. The walkways interconnecting all the units shall be arranged and provided so that the operator has access to all the units from the first floor. Wherever required, the channels shall be covered with precast slabs to use as walkways. All walkways shall be of 1.0 M width and shall be provided with hard railing, consisting of two rows of G.I. pipes of 25 mm dia. The height of the vertical posts shall be 1.0 M. and shall be of M.S. angle section 50 x 50 x 6 mm size. The railings and posts shall be duly painted with red oxide and enamel paint.

Alum Tanks Two nos. of alum tanks of effective capacity mentioned in the obligatory data shall be provided in the chemical house to feed the alum solution to raw water by gravity. The size of the tanks shall be square in plan. A dissolving tray compartment of size 0.3 M x 0.3 M shall be provided along the length of the tank to place alum blocks. The dissolving tray shall have adequate number of perforations of 25 mm dia. in the bottom slab. The arrangement shall be done to spray the water along the length of the tray over the alum lumps by means of a perforated pipe. The service water connection shall be given to this pipe,

Page 94: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 80 )

Contractor No. of Corrections Executive Engineer

with a 25 mm dia. G.M. gate valve. A suitable walkway / platform shall be provided on one side of the tank for convenience of operation. The width of the walkway shall be 0.6 M. and shall be guarded with hand railing. A mild steel ladder shall be provided to approach the walkway from floor level. An electrically operated mechanical stirrer shall be provided to each tank to keep the solution of uniform strength. The electrical motor shall not be less than 0.5 KW rating. The drive mechanism shall be mounted on the ISMC 100 sections, which shall be supported on side walls of the tanks at the top. The speed of the agitator shall be 100 to 150 RPM. The shaft and blades of the agitator shall be of S.S. 304 grade material. The shaft of the agitator shall extend upto half of the height of the tank. The outlet piping and drains shall be of rigid PVC pipes and shall be of 40 mm dia. Each tank shall be provided with one no. of 40 mm dia. rigid PVC or Polypropylene 'Y' type valve or diaphragm type valve on the outlet side. Each tank shall be provided with an overflow and drain arrangement of 40 mm dia. rigid PVC pipes. Constant Head Dosing Tanks A manually operated constant head dosing tank of 25-50 litres capacity shall be provided to feed the alum solution at uniform rate to the mixing channel. The tank shall be rectangular in shape. It shall be provided in BB masonry or shall be of anti-corrosive material like PVC or FRP. A 15º 'V' notch cut into an acrylic/ plastic sheet shall be provided as a partition wall for measurement of flow. The notch shall be calibrated for consumption of 1000 litres of solution in one shift of 8 hours. Maximum strength of solution shall be 5%. The inlet to this constant dosing tank shall be common outlet header pipe from alum tanks. From constant dosing tank, the solution shall be conveyed to raw water in the mixing channel by a 40 mm dia. rigid PVC pipe. This pipe shall introduce the alum solution into the alum feeder pipe described earlier in the 'Stilling Chamber'. A platform of size 0.75 M x 1.5 M in kadappa stone shall be provided in the chemical house for the laboratory instruments. A wash basin shall be provided with 15 mm dia. service water connections, etc. Proper draining arrangement shall be provided for the waste water. An opening of size 0.8 M x 0.8 M shall be provided in the first floor slab to lift alum and bleaching powder sacks from the ground floor. A manually operated chain pulley of 500 kg. capacity shall be employed for the purpose. List of Laboratory Equipments

1. Turbidity rod 1 No. 2. Photoelectric turbidimeter with known standard samples

(Nephelometer - Systronics type) 1 No.

3. Residual chlorine comparator (upto 5 ppm dose) 1 No. 4. Comparator for pH testing 1 No. 5. Glassware and chemicals - 6 nos. of beakers of 500 ml each included 1 Set 6. Table of size 1.5 x 0.75 M 1 No.

Page 95: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 81 )

Contractor No. of Corrections Executive Engineer

7. Chairs 2 Nos. 8. Plastic buckets 3 Nos. 9. Steel cupboard of size 0.90 x 1.20 M 2 Nos.

The chemical house shall be provided with a service door on the side of mixing channel. The room shall be provided with proper ventilation arrangements. Railings shall be provided to safeguard the open terrace (if available on the first floor after construction of the chemical house). Though the pre-chlorination requirement vary from plant to plant and source to source, a tank of adequate capacity shall be provided on the first floor of chemical house to feed the bleaching powder solution by gravity to the stilling chamber. The inlet, outlet and drain arrangement shall be provided for the same, so that if the need arose, intermittent pre-chlorination shall be possible. The tank shall be provided with a manually operated stirrer. The tank may be provided in BB masonry or RCC. Wash Water Tank and Pumps A wash water tank of capacity mentioned in the obligatory data shall be provided above the plant (over first floor) of chemical house. Adequate free board shall be provided from the FSL upto the roof slab. The staging height of the tank shall be as per the design criteria mentioned in the obligatory data. The inlet, outlet and overflow shall be in C.I. or M.S. double flanged pipes only. The access to the tank shall be in the form of M.S. ladders or spiral staircase. If provided above the first floor, then the tank shall have walkways at least of two sides. A float operated water level indicator shall be provided for measurement of water level in the tank. M.S. ladders with hand railing shall be provided for access from roof slab to the bottom of the tank. Two nos. of manholes with covers and adequate no. of ventilators shall be provided over the roof slab of the tank. the overflow from tank may be connected to the stilling chamber of the plant. One number of lightening conductor as per the relevant I.S. specifications shall be provided to the wash water tank. Wash Water Pump Sets Two nos. of electrically driven monoblock pumpsets (one working and one standby) with a minimum 2.0 KW power rating of approved make shall be provided to fill the wash water tank. The capacity of the pump shall be minimum 30,000 litres per hour. The total head shall be 15 to 20 M. It shall include for valves, suction piping, non-return valves, isolation valves and common delivery pipe of adequate size. A local panel board shall be provided with starters, switches, etc. near the pump sets. The location of pump sets may be provided in the pure water pump house.

Page 96: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 82 )

Contractor No. of Corrections Executive Engineer

By-pass Arrangement The following by-pass arrangements shall be incorporated in the plant.

1. Raw water to filter beds, bypassing flocculator and tube settling tank.

2. Settled water to pure water sump by-passing filter beds. The bypass arrangement may be in the form of RCC channels with acrylic gates or in C.I. / M.S. piping of adequate sizes. The pure water pipe from the treatment plant upto the sump shall be either cast iron or concrete class P-1 only. Sludge Drainage and Disposal Sludge drain chambers of minimum size 1.0 x 1.0 M and with the required depth shall be provided for all individual drain outlets from various units of the plant. The top of the drain chambers shall be at least 0.25 M above the G.L. The invert level of the chambers shall be at least 300 mm below the drain valves. Rungs shall be provided for access inside the chambers. The chambers shall be covered at the top with easily removable precast RCC slab. The BB masonry shall be 0.23 M thick. The bottom slab of the chambers shall be of 0.15 M ( M-100 grade ) concrete with a benching of M-150 grade. The inside surfaces of chambers shall be finished smooth with cement plaster in CM 1:3. Interconnecting piping of 200 mm dia and 400 mm dia NP-2 class shall be provided upto the final drain chamber as per the design requirements. The pipes shall be jointed with cement mortar 1:2. The pipes below 200 mm dia shall not be used in the system. The entire design and layout of the sludge and waste water shall be done in such a way so as to avoid backflooding of the chambers / pipe gallery. All units from the stilling chamber upto the pure water sump shall be provided with draining arrangement as described in the specifications. The wash water from filter beds shall be disposed off to the common collection chambers by means of 400 mm dia RCC NP-2 pipe. Further disposal from this chamber shall also be of the same dia. pipe. The drainage from other units like flocculator, tube settler and pipe gallery shall be of 200 mm dia RCC NP-2 pipes. Electrification Illumination Requirement For internal illumination, one CFL bulb (40 W) and one ceiling fan shall be provided for 20 sqm. of enclosed area of the structure. In the chemical house, additional 2 plug points shall be provided on the ground floor as well on the first floor. For external illumination, four light points with encased CFL (outdoor type) at four corners of the building shall be provided. Two additional CFL shall be provided for illuminating the tube settling tanks when these are proposed as separate structures. It shall include supply and fixing and testing of approved quality of wires, switches, etc. complete.

Page 97: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 83 )

Contractor No. of Corrections Executive Engineer

A common control panel shall be provided for mechanical flocculator, alum tanks, agitators and wash water pumpsets. The panel board shall be located at a suitable place on the ground floor of chemical house considering the operational convenience. The panel board shall consist of main switches of adequate capacity with HRC fuses, DOL star-delta starters and single phase preventors. In addition to this, a voltmeter and ammeter shall be provided with phase indicator lights. The recommended makes for the materials and equipments including electrical motors, cables, etc. shall be as per the enclosed appendices. The power shall be made available to the Contractor at the control room / chemical house building. Trial Run The trial run shall be for a period of twelve months. This shall preferably in the monsoon or when the raw water turbidity will be above the average. The Contractor shall provide a skilled plant operator / supervisors and labours for this duration for satisfactory running of the plant. The Contractor's staff shall train the operator / staff nominated by the Engineer-in-charge during this period. The Contractor shall run the plant as per requirement and as per instructions during this period and shall maintain a log book to ascertain the quality and quantity of treated water, consumption of power and chemicals. Any shortcomings in the quality of raw water shall be made good by undertaking appropriate corrective measures. Housekeeping of plant shall be contractor’s responsibility. The raw water, power and chemicals shall be supplied by the MJP during the period of trial run. Payment The payment for trial run of WTP as well as whole scheme is included in trial run sub-work and no separate payment will be made for WTP. Note : The drawings enclosed herewith shall be part of the Detailed Specifications and shall be for general guidance to the tenderer.

Page 98: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 84 )

Contractor No. of Corrections Executive Engineer

2. Criteria for Design of Water Treatment Plant 2.1 The structural design of water containing water tank shall conform to the following standards

specifications and codes of practice of ISI.

IS : 456 Code of practice for plain and reinforced concrete (latest edition)

IS : 875 Code of practice for structural safety of building, loading standards (latest edition)

IS : 3370

Part I To IV

Code of practice for concrete structures for storage of liquids (latest edition)

IS : 1893 Criteria for earth quake resistant design of structures

(latest edition)

IS : 13928 Ductile detailing of RCC structures

2.1.1 General Hydraulic design of various components shall be as per capacity of the container of the tank shall

be the volume of the water it can store between the designed full supply level and the lowest supply level.

2.1.2 Free board is the indication of space provided above full supply level and shall be measured at a

vertical distance above FSL upto soffit of beam supporting the roofs slab/ dome or the top wall for a open water retaining structure. It shall be normally 30 cm, unless permitted otherwise.

2.1.3 Height of staging shall be the vertical difference between lowest supply level and the average

ground level at the site of tank. 2.1.4 The walls of container shall be designed for free board full condition. 2.1.4.1 The tank foundation and other members of the structure shall also be designed for free board full

condition. 2.1.5 Parts of the tank in contact with stored water and enclosing water vapour above FSL shall be in

concrete M-300 or even in richer grade. 2.1.6 The supporting structure shall be designed in M-300 grade or in richer grade if specified. 2.1.7 The allowable bearing pressure or the safe bearing capacities are indicated Bill of Quantities. The tenderer is, however, advised to verify actual strata before tendering and designing the

structure and offer suitable design with full justification.

Page 99: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 85 )

Contractor No. of Corrections Executive Engineer

2.1.8 Notwithstanding anything mentioned above if directed by the Engineer-in-Charge, the contractor

shall carry out actual strata exploration as mentioned in para 0.2 of IS 1892-1979 through a Govt. laboratory and adopt bearing capacity so arrived for the design.

2.1.9 The factor of safety shall be adopted as per clause 6.1 (a) of IS-6403-1971. 2.1.10 If the foundation consists of individual column footing, clear distance between edges of footing

shall be not less than width of footing. 2.1.11 The foundation should be checked for negative pressure on soil due to combined direct and

bending stresses. Negative pressure shall not be allowed on the foundation soil. 2.1.12 For special type of foundations, like pile foundation under reamed pile foundation, etc. decision

of the owner/ Engineer-in-Charge shall be final and binding on the designer. 2.1.13 Classification of soil and characteristics of soil relevant to SBC and ABB shall be as per the soil

investigation reports of Government institution / Government approved investigators. 2.1.14 For the design of foundations of the solid raft type, the ' Plate Theory ' shall be adopted. 2.1.15 In normal circumstances minimum 100 mm thick plain cement concrete with 100 mm projection

all round in grade M-150 with coarse aggregate as metal shall be provided as levelling course unless specified otherwise. Where injurious soils or aggressive water are anticipated the levelling course shall be of grade not weaker than M-150 and if necessary sulphate resisting or other special cement shall be used and the thickness of the levelling course shall be kept not less than 150 mm. The ground level within the foundation area of the structure shall be consolidated properly with a suitable slope to drain out rain water outside the foundation zone.

2.1.16 In the vicinity of lines, collieries and blasting sites or areas which may be subjected to blast or

shock, the tanks shall be designed for dynamic forces adopted to shock. 2.1.17 Member of tower which are primarily subjected to dynamic stress shall be checked for ductility

of the members at joint. 2.1.18 For wash water tank/ water containers at the base of the tower (i.e. ground level), all columns

shall be tied together just above foundation level by a structural member such as a brace or a tie ring beam. Internal braces shall be provided for staging having columns more than 6 at each brace level. Braces shall be invariably provided at G.L. The centre to centre distance between braces shall not exceed 4.5 M.

2.1.19 Column may be assumed as fixed at the top of footing.

Page 100: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 86 )

Contractor No. of Corrections Executive Engineer

2.1.20 Following shall be the minimum thickness of various members of the tank container :

Roof Slab 120 mm

Bottom Slab 200 mm

Roof Dome 80 mm

Vertical wall of container 200 mm

Inclined wall or shell 200 mm

Shuttering on both sides 200 mm

i) Slope with the horizontal more than 30 deg. 200 mm

ii) Slope with the horizontal less than 30 deg. 200 mm 2.2 Loads 2.2.1 For all RCC and PCC components unit weight of concrete shall be taken as 25,000 N/cum and

24,000 N/cum respectively. 2.2.2 Water load and snow load shall be taken as per IS 875-1964 or its latest revision. 2.2.3 Live load on gallery all round the elevated tank shall be considered as 3,000 N/Sqm. 2.2.4 No live load may assumed, while designing the staging ( or tower ) and foundation, for seismic

loads and wind loads, in tank empty condition. 2.2.5 Wind load as per Fig. 1A i.e. Basic Maximum Wind pressure map of India including winds of

short duration as in squalls as per IS 875-1964 code of practice for structural safety of buildings. Loading standards or its latest revision shall be considered. Reduction factor as per note 3 of Clause 4.4.2 shall not be applied to water towers.

2.2.6 Seismic forces on the tower shall be as per IS 1893-1975 or its latest revision. Wind and seismic

forces shall not be assumed to act simultaneously. 2.3 Increase in Permissible Stresses 2.3.1 Where stresses due to wind or earthquake temperature and shrink effects are combined with

those due to dead, live and impact loads on the stresses specified in tables 19, 22 and 23 of IS 456-2000 may be increased upto a limit of 33 1/33.

Page 101: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 87 )

Contractor No. of Corrections Executive Engineer

2.4 Design 2.4.1 Shape of the structure shall be the most economical as directed by Engineer-in-Charge and shall

be selected depending upon site conditions. 2.4.2 Design shall be based on the worst possible combination of various loads, moments, shears,

resultant stresses in the tank for the following cases. i) Tank full ii) Tank empty Tank full means depth of water inside the container upto full height of the container including

free board. 2.4.3 Design shall be based on accepted bases and methods of design as well as the provision of IS

3370, IS 456, IS 1343. Code of practice of pre-stressed concrete IS 2210. Latest version of ISS shall be referred.

However, methods, based on experimental investigation as mentioned in para 18.2.3 in IS 456-

2000 shall not be entertained. 2.4.4 The parts of the structure neither in contact with the liquid on any face nor enclosing the space

above the liquid as in the case of staging of a tower on working stress method in accordance with the requirement of IS 456-2000. Staging should be further checked for ultimate load conditions to ensure the desired margin of safety as per Annex B-4.3 of IS 456-2000.

2.4.5 Design of members other than those excluded by Clause 2.4.4 above ( i.e. roof, walls, floor, etc.

of the container ) shall be based on consideration of adequate resistance to cracking as well as adequate strength. Calculation of stresses shall be as per para 3.3.2 of IS 3370 ( Part II ) or its latest revision.

2.5 Permissible Stress in Concrete For Resistance to Cracking For calculations relating to the resistance of members to cracking the permissible stresses in

tension ( direct and due to bending ) the shear shall conform to the values specified in Table I of IS 3370 ( Part II ). "The permissible tensile stresses due to bending apply to the face of the member in contact with the liquid". In members less than 225 mm thick and in contact with the liquid on one side, these permissible stress in bending apply also to the face remote from liquid.

2.5.1 For Strength Calculations For strength calculations, the permissible concrete stress shall be in accordance with Annex B-2

of IS 456-2000 where the calculated shear stress in concrete alone exceeds the permissible value reinforcement acting in Conjunction with diagonal compression in the compression in the concrete shall be provided to take the whole of the shear.

The maximum reinforcement shall conform to Clause.

Page 102: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 88 )

Contractor No. of Corrections Executive Engineer

a) 26.5.1.1 b) and 26.5.1.2 of IS 456-2000. 2.5.2 The permissible compressive stress ( direct ) in shells ( i.e. Top dome, conical wall and bottom

dome ) shall be reduced by 43% for 10 cm thick shells. For thickness more than 30 cm the compressive stress shall be reduced by 15% and for intermediate thickness i.e. 10 cm to 30 cm linear interpolation shall be done.

2.6 Permissible Stresses in Steel 2.6.1 For strength calculations ( Concrete assume to be cracked ) the permissible stresses in

reinforcement shall be as per Table 2 of 3370 (Part II) (its latest revision). For tor steel, the stress shall be as per IS 1786-1979 cold worked steel high strength deformed bars for concrete reinforcement or its latest revision.

2.6.2 The modular ratio ' m ' for different concrete mix shall be as under :

Grade of Concrete Modular Ratio ' M ' M : 150 19 M : 200 13 M : 250 11 M : 300

2.6.3 The analysis of staging of the tank shall be done by using any established method such as portal

frame method, etc. The staging shall be analysed for combination of dead loads, live loads and wind or seismic loads. The effect of continuity of beams at the junctions shall be properly accounted and column reaction worked out for different combination of loading axial forces, shear forces, bending moments and torsion shall be calculated in the members.

2.6.4 Modules of elasticity of concrete Ec shall be taken as 5000√fck where fck is the characteristic

cube strength of concrete in N/Sq.mm. as per clause 6.2.3.1 of IS 456-2000. 2.6.5 Columns shall be checked for tensile stress for both the conditions mentioned in para above, in

combination with axial tension and bending due to wind and seismic loads and shall be checked for maximum tensile stress arrived.

2.6.6 Stability of the structure shall be checked as per provisions of clause 20 of IS 456-2000. 2.7 Age Factor Age factor for increasing strength shall not considered for the design.

Page 103: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 89 )

Contractor No. of Corrections Executive Engineer

Unconventional WTP (Capacity 3.5 MLD)

Percentage breakup of payment

Sr. No. Particulars % 1. Design Approval 2% 2. Aeration Fountain 3% 3. Mix. Channel and Stilling Chamber 2% 4. Mechanical Flocculator 2% 5. Tube Settler 3% 6. Filter Beds 5% 7. Filter Gallery and P/W Channel 4% 8. Chemical House 5% 9. Alum and TCL Tank 2% 10. Wash Water Tank 5% 11. Pure Water Sump 6% 12. Pure Water Pump House 5% 13. Sanitary Block 2% 14. Drainage Arrangement 2% 15. Internal Roads and Site Cleaning 2% 16. Flooring, Tiling and Plastering 4% 17. Electrification and Plumbing 2% 18. Painting and Railing 5% 19. Doors and Windows 2% 20. Gas Chlorinator 3% 21. Air Blower 3% 22. Wash Water Pump 3% 23. Filter Media 7% 24. Manifold, Piping and Valves 7% 25. Flocculator, Agitators, H.L. Indicators 3% 26. Tube Modules 2% 27. Lab. Equipments and Furniture 2% 28. Watertightness Test 5% 29. Trial Run 2%

Total 100%

Note : Item No. 2 to 12 include only RCC and BB masonry work

Page 104: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 90 )

Contractor No. of Corrections Executive Engineer

SPECIFICATIONS FOR CIVIL ENGINEERING WORKS C. E. S. 1 General The following specification shall be applicable to all the Civil Engineering works under

this contract. Items which are not covered under the following description shall be carried out as per relevant specification in ISS or Book of Standard Specifications 1972 (Government of Maharashtra Publication ) and as mentioned in the proceeding pages.

C. E. S. 2 Materials

1) All the materials shall be of best and standard type as laid down in PWD hand book volume I and II.

2) Red Book of Public works Department, IS specifications and shall have to be

approved by the Engineer-in-Charge. 3) Labour All skilled and unskilled labour, supervisors, site engineers, etc. shall be provided

as directed by the Engineer-in-Charge. C. E. S. 3 General Requirements

1) PCC Course All structures shall be provided with 10 cms this leveling course of PCC M-100

proceeding the floor slabs or foundation slabs. This course shall have an offset of 15 cms on all sides and it shall rest on strata of appropriate bearing capacity as per design.

2) Refilling of Excavated Stuff Sides of the structures below GL shall be refilled wherever necessary with

selected murum from the excavated stuff duly watered and rammed in 15 cms layers.

3) Plinth Fillings The plinth shall be filled up with hard murum in 15 cms layers duly watered and

rammed properly.

Page 105: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 91 )

Contractor No. of Corrections Executive Engineer

4) Super Structure The walls shall be in second class TM brick masonry in CM 1:6 in a framed

structure, unless otherwise specifically mentioned panel wall shall be 23 cms. thick while partition wall shall be 12 cms thick.

5) Plaster All the faces of structure shall be provided with 20 mm thick cement plaster with

neeru finish. External surface shall be in CM 1:4 while internal in CM 1:5. All water retaining faces shall however be in cement plaster in CM 1:3.

6) Flooring All floors of building except chemical store and chlorine rooms shall be provided

with thick glazed tiles flooring of approved quality and shade and for chemical store and chemical house, marble mosaic tiles flooring of approved quality and shade. Risers, traders, of all RCC stair cases shall also be provided with mosaic or chequered tiles. Tiles shall be laid on 12 cms thick PCC in M-100 grade for ground floor. At upper floor it may directly laid on RCC slabs skirting of mosaic tiles of one tile height for all in side faces of walls of the building.

7) Doors and Windows All building shall be provided with adequate numbers of doors and windows and

ventilators as under.

a) The total shutter area of al external doors, windows, ventilators shall not be less than 20% of the carpet area of structure. All external doors shall be provided with CC ramps steps for access inside or exit outside the buildings.

b) All the external and internal windows, ventilators and doors except the

central main door of the filter house shall be of aluminium sliding and as per IS specification. External door shall have a fan light of 45 cms height. Width of the main door shall not be less than 1.2 meter and that of others shall not be less than 0.90 M.

c) The doors shall be half aluminium paneled and half glazed windows and

ventilator shall be fully glazed. The glass fitted shall not weigh less than 3305 gram/sqm.

d) All fastenings and fixtures shall be strong and of heavy oxidised brass.

Proper locking arrangement shall be provided for each unit.

Page 106: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 92 )

Contractor No. of Corrections Executive Engineer

e) All exterior doors, windows, ventilators shall be provided with 75 cms wide RCC chajja in a box type or any other suitable architectural form.

f) All window sills shall consist of approved polished green marble stone of

25 mm thick. g) The central main external teak wood door of the chemical house shall be

fully paneled and having shutter thickness not less than 40 mm and shall be of decorative type. The size and type should be provided suitably as would prove to be a decorative feature. This door shall have a beautiful RCC canopy. This door shall be provided with best quality of three coats of French polish of approved shade.

h) All steels doors, windows and ventilators shall be painted with 2 coats of

synthetic enamel paint of approved colour and shade as per standard specifications.

i) All windows and ventilators shall be provided with MS grill of approved

design from the Engineer-in-Charge.

8) Colour Snowcem Painting and Distempering

a) All internal plastered and finished faces of the walls, columns, etc. shall be given three coats of oil bound distemper of approved quality and shade. The ceiling shall be given 3 coats of white cement paint.

b) All external plastered and finished faces of wall columns, etc. shall be

given 2 coats of cement paint of approved shade. The finish of exterior face shall give an aesthetic appearance to the buildings.

c) The colour scheme shall be got approved from the Engineer-in-Charge.

9) PVC / AC rain water pipe lines shall be provided to all the building of required diameters and lengths so as to carry rain water to the side drains of the approach roads.

Page 107: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 93 )

Contractor No. of Corrections Executive Engineer

DETAILS OF RESPECTIVE ISS AND APPROVED MAKES FOR MATERIAL TO BE USED FOR EXECUTION OF WATER SUPPLY SCHEMES

LATEST VERSION OF ISS SHALL BE REFERRED

Sr. No.

Material ISS No. Approved Make

1. Cement 26(a) Approved manufacturers

2. Tor Steel 1786 (Fe 415) Approved manufacturers

3. MS Round Bar 432 (Part I & II)/

1982

Approved manufacturers

4. CI Pipes 1536/1989 Firms on Rate Contract of DGS&D / MJP

5. GI Pipes For pipes

554/1975

Manufacturers holding valid BIS

Licence.

MJP approved.

For thread

1239/1990

6. PVC Pipes and PVC

Specials

IS 4985/1988 S.S.I. Units registered with Government

of Maharashtra and holding valid BIS

licence approved by MJP

7. Sluice Valves

50 to 300 mm 780/1984 Makes approved by MJP.

Above 300 mm 2906/1984

GNK Catalogue

Makes approved by MJP.

Page 108: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 94 )

Contractor No. of Corrections Executive Engineer

Sr. No.

Material ISS No. Approved Make

8. Air Valves Firms approved by

MJP under letter

no. MWSSB/1091/

33/Store/ 5284

dated 17.7.1992

Makes approved by MJP.

9. CI Specials for CI pipes 1538/1960 Manufacturers approved by MJP.

CI Specials for AC pipes 5531/1969 Manufacturers approved by MJP.

10. Tyton rubber rings 5382/1985

12820/1989

Approved Manufacturers.

11. Reflux Valves IS-5312 (Part I)

1984

Approved Manufacturers.

MJP approved.

12.

Jiffy Mech. Joints 13282/1992 Manufacturers approved by MJP.

Notes : 1. In case of cement and steel, Contractor shall submit manufacturer's test certificate. However,

samples of the materials supplied by the Contractor will be tested by the MJP from Government Engineering College/Recognised Institutes.

2. All types of pipes i.e. C.I./D.I./P.V.C./A.C./P.S.C./M.S./G.I. etc. shall be tested by SGS or

RITES before despatches from Manufacturer's places at Contractor's cost. 3. The Contractor shall purchase PVC pipes, CID joints at RC rates from any RC holder SSI unit of

his choice through MSSIDC only.

Page 109: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 95 )

Contractor No. of Corrections Executive Engineer

REFERENCE OF TECHNICAL SPECIFICATIONS Sr. No.

Short Description of Tender Items

Specifications reference from book of Standard Specification of Govt. of

Maharashtra ( Red Book )

1. Excavation in all sorts of material Sp. No. B-1 on Page No. 24 to 28, Spn. IDS-1.

2. Plain Cement Concrete Sp. No. B-6 on Page No. 33 to 38 of Volume I

and Bd-EP No. 287 to 291 of Volume II Spn. GS-1 to GS-11.

3. Masonry Work (Stone Masonry) Sp.No. B-9, Page No.55 to 60 of Volume I and BH and Page of Volume II Spn. GS-12.

4. Murum Bedding Sp. No. Bd, A.P. No. 262 to 265 of Volume VI, IDS-6, GS-22.

5. M.S. Reinforcement Grade II or Tor Steel (Fe 415)

Stresses as per IS-456-1976 and Sp. No. B-10, Spn. GS-3.

6. CC 1:2:4 proportion of 1:1½:3 proportion for RCC work.

Page No. 62 to 65 of Vol. I, IS 3370 Part I and Part-II, Sp. No. Bd-F-P No. 297 to 309 and ISA 456-1976. Spn. GS-1 to GS-11

7. B.B. Masonry Work Sp. No. 88 (b), Page No. 42, Volume I, Spn. GS-13.

8. Dewatering. Sp. No. BR-4 Page No. 103 to 104.

9.

Cement Plasters Sp. No. B-11, Page No. 60 to 66, Spn. GS-15.

10. Whitewash and Colour Washing Sp. No. BD-P-1, Page No. 411 to 412, Spn. GS-18.

11. Oil Bound Distemper, etc. Sp. No. BD-P ii P.S.P. No. 431, 414, Spn. GS-18.

12. T.W. Doors and Windows As per Sp. No. B and C 7, Page No. 418 and Sp. Bd-1-4 Page No. 479, Spn. GS-14.

Page 110: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 96 )

Contractor No. of Corrections Executive Engineer

Sr. No.

Short Description of Tender Items

Specifications reference from book of Standard Specification of Govt. of

Maharashtra ( Red Book )

13. Structural Steel Sp. No. Bd-C-6, Page No. 277, Spn. GS-21.

14. Rough Shahabad Stone Flooring Sp. No. Bd-M-1, Page No. 379, Spn. GS-16.

15. Lowering, Laying and Jointing of all types

of Pipes. As per Departmental Specifications, IDS-7, IDS-8, IDS-9.

Erecting flanged pipes, etc. Spn. IDS-12.

16. Road Surface Boxes As per type design and Departmental Specifications Spn. IDS-16.

17. B.B. Masonry Chamber As per type design and Departmental Specifications Spn. IDS-11.

18. Fixing of Valves, Air Valves, etc. As per type design and Departmental Specifications Spn. IDS-10.

19. Constructing Standpost As per type design and Departmental Specifications Spn. IDS-13.

20. Refilling As per type design and Departmental Specifications Spn. IDS-2A.

21. Storage Reservoirs. Spn. IDS-17.

22. Fixing of Inlet, Outlet, Overflow and Washout.

As per Departmental Drawing, Designs and Specifications.

23. Lightning Conductor As per ISS and IS rules Spn. IDS-17.

24.

M.S. Ladder Sp. No. Bd-V-19, Page No.559 Spn. GS-19, IDS-3.

25.

G.I. Pipe Hand Railing with RCC bars

Sp. No. BR-51 (a), Page No. 136 and 139, Spn. GS-20.

26. Providing, lowering, laying Slotted Pipe Gallery.

Spn. IDS-2.

Page 111: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 97 )

Contractor No. of Corrections Executive Engineer

Sr. No.

Short Description of Tender Items

Specifications reference from book of Standard Specification of Govt. of

Maharashtra ( Red Book )

27.

Providing and fixing weep holes

Spn. IDS-4.

28. Dapuri type steps Spn. IDS-5.

29. Providing and fixing CI MH frame and cover.

Spn. IDS-15.

30. Plastering Spn. GS-15.

31. IPS flooring Spn. GS-16

32. Rubble filling Spn. GS-23.

33. Maintaining of Scheme Spn. GS-24.

Note : Specifications mentioned above are for reference only. Other relevant specifications shall be

referred.

Page 112: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 98 )

Contractor No. of Corrections Executive Engineer

nmB©n bmB©ZÀ`m joÌr` ObXm~ MmMUr ~Ôb _m{hVr

H$moUË`mhr àH$maÀ`m nmB©n bmB©ZMo H$m_ Pmë`mda Vo H$m_ JwUdÎmmnyU© Pmbo Amho d àË`jmV `oUmè`m OmñVrV OmñV ObXm~mg

dmnabobo nmB©ßg {Q>Hy$Z amhVmV qH$dm Zmhr ømMr ImÌr H$ê$Z KoÊ`mgmR>r Ë`m nmB©n bmB©ZMr joÌr` ObXm~ MmMUr KoUo Amdí`H$ Amho. Aer

MmMUr KoVmZm ObXm~ {H$Vr Agmdm øm ~Ôb ̂ maV gaH$maÀ`m ""dm°Q>a gßbm` A°ÝS> Q´>rQ>_|Q> _°Ý`wAb'' ({Vgar Amd¥Îmr - _mM© 1991) _Ü`o

_mJ©Xe©Z AgyZ doJdoJiçm àH$maÀ`m nmB©n g§~§YrMo g§X^© n[aÀN>oX Imbrb à_mUo AmhoV :

1. E_. Eg. nmB©n n[aÀN>oX 6.5.2 Zwgma n[aÀN>oX 6.4.4.2 à_mUo

2. S>ŠQ>mB©b Am`Z© nmB©n n[aÀN>oX 6.5.2 Zwgma n[aÀN>oX 6.4.4.2 à_mUo

3. H$m±H«$sQ> nmB©n n[aÀN>oX 6.8.3 Zwgma n[aÀN>oX 6.4.4.2 à_mUo

4. {àñQ´>oñS> nmB©n n[aÀN>oX 6.9.3 Zwgma n[aÀN>oX 6.4.4.2 à_mUo

5. nr. ìhr. gr. nmB©n n[aÀN>oX 6.10.5 Zwgma n[aÀN>oX 6.4.4.2 à_mUo

6. H$mñQ> Am`Z© nmB©n n[aÀN>oX 6.4.4 Zwgma n[aÀN>oX 6.4.4.2 à_mUo

Aem arVrZo darb ghm àH$maÀ`m nmB©ngmR>r n[aÀN>oX 6.4.4.2 Zwgma ObXm~ Yamd`mMm Amho. gXa n[aÀN>oXmZwgma Imbrb (A), (~), (H$) d (S>) n¡H$s Omo Xm~ _hÎm_ Agob Ë`m Xm~mbm joÌr` ObXm~ MmMUr ¿`md`mMr Amho. A) _hÎm_ Am°naoqQ>J àoeaÀ`m XrS>nQ>. ~) _hÎm_ ñQ>°{Q>H$ àoeaÀ`m XrS>nQ>. H$) _hÎm_ Am°naoqQ>J àoea d gO© àoea øm§À`m ~oaOoEdT>o. S>) _hÎm_ ñQ>°{Q>H$ àoea d gO© àoea øm§À`m ~oaOoEdT>o.

VgoM nmB©nbmB©ZMm Šbmg R>a{dVmZm BVa AQ>t~amo~aM darb MmMUr ObXm~mMm {dMma hmoUohr Amdí`H$ Amho Ago ñnï> H$aÊ`m§V

Ambo Amho.

Page 113: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 99 )

Contractor No. of Corrections Executive Engineer

FIELD TEST PRESSURES FOR PIPELINE

After laying and jointing any pipe line, the pipe line must be pressure tested to ensure that pipes and joints are strong enough to withstand the maximum pressure likely to be developed under working condition. In this respect G.O.I. Manual on Water Supply and Treatment, (IIIrd Edition March, 1991) describes the field test pressures to be imposed on pipe lines. In this respect, for different types of pipes, concerned paras from this manual are as follows : Sr. No.

Type of Pipe Para No. Remarks

1. M.S. pipes Para 6.5.2 As per para 6.4.4.2 2. Ductile Iron pipes Para 6.5.2 As per para 6.4.4.2 3. Concrete pipes Para 6.8.3 As per para 6.4.4.2 4. Pre-stressed pipes Para 6.9.3 As per para 6.4.4.2 5. PVC pipes Para 6.10.5 As per para 6.4.4.2 6. CI pipes Para 6.4.4.2 As per para 6.4.4.2 Thus, for above 6 types of pipes, field test pressure is as per para 6.4.4.2. As per this paragraph., the field test pressure to be imposed should be not less than the maximum of the following : a) 1.5 times the maximum sustained operating pressure. b) 1.5 times the maximum static pressure in the pipe line. c) Sum of maximum sustained operating pressure and the maximum surge pressure d) Sum of maximum pipe line static pressure and the maximum surge pressure, subject to a

maximum equal to the work test pressure for any pipe fittings incorporated. Here, it is to be noted specifically that, while determining the class of pipe, along with other conditions, aspect of above field hydraulic test pressure should also be considered. Para 6.7.1 of the Manual refers to A.C. pipes lines and there is no specific mention about field hydraulic test pressure and it is not clear whether it should be as per para 6.4.4.2 or not. Hence there were doubts in the minds of some field officers about field hydraulic test pressure of A.C. pipe line. It is also seen that the idea of operating pressure and working pressure is also not very clear in the field. Hence these points are clarified as under :

Page 114: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 100 )

Contractor No. of Corrections Executive Engineer

About working pressure it is clarified that working / operating pressure is the maximum sustained internal pressure, excluding the one coming in abnormal conditions such as surge (water hammer), to which the pipe line may be subjected to, when in use. When we consider A.C. pipe lines as Gravity Mains, then maximum internal pressure occurs when water in tank is at the F.S.L. (fully supply level or full tank level) and the Sluice Valve, located at lowest level in the section under consideration, is in closed position. In such case, the static head i.e. the difference between the F.S.L. of source and lowest invert level of pipe line in that section, is the maximum head in that section. Thus, here, as far as test pressure and class of pipe is concerned, maximum operating pressure is the static pressure. When we refer to I.S. 6530 / 1972, the field hydraulic test pressure for A.C. pipe line should be 1.5 times the operating pressure and as explained above, considering the definition of operating pressure, A.C. pipe Gravity Main should be tested for 1.5 times the operating pressure i.e. for 1.5 times the static pressure. In other words, this is the condition given in G.O.I. Manual para 6.4.4.2 for gravity mains. For deciding the class of A.C. Gravity Main, maximum static pressure shall not exceed 50% of pressure defining class of pipe (Ref.- App. 6.4). All the field tests should be carried out for the pressure as clarified above only. Since we are not using A.C. pressure pipes for large / long Rising Mains, no mention of A.C. pipe Rising Mains is made above.

Page 115: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 101 )

Contractor No. of Corrections Executive Engineer

MODEL FORM OF BANK GUARANTEE BOND 1. This deed of Guarantee is made on the __________________________ by ___________

_________________________ having his head office at _______________________________ (hereinafter called the 'said Contractor(s)') from the demand under the terms and conditions of Agreement dated _____________ made between ___________________________________ and ____________________________ for ___________________________________ (hereinafter called 'the Agreement') of additional security deposit for the due fulfilment by the said Contractors of the terms and conditions contained in the said Agreement on production of a Bank Guarantee for Rs. ______________ (Rs. _____________________________________________ only). We, ____________________________ (hereinafter referred to as 'the Bank') at the request of _______________________________________ (Contractor) do hereby undertake to pay to the Maharashtra Jeevan Pradhikaran hereinafter referred to as MJP, an amount no exceeding Rs. _______________________________ against any loss or damage caused to or suffered by the suffered by the MJP by reasons of any breach by the said Contractor of any of the terms and conditions contained in the said Agreement.

2. We, _____________________________________ (indicate the name of bank) do hereby

undertake to pay the amount due and payable under this guarantee without any demur, merely on a demand from the MJP stating that the amount claimed is due by way of loss or damage caused to or would be caused to or suffered by the MJP by reason of breach by the said Contractor(s) of any of the terms and conditions contained in the said Agreement or any reason of the Contract(s) failure to perform the said agreement. Any such demand made on the bank shall be conclusive as regards the amount due and payable under this guarantee shall be restricted to an amount not exceeding Rs. _____________.

3. We undertake to pay to the MJP any money so demanded notwithstanding any dispute or dispute

raised by the Contractor(s)/Supplier(s) in any suit or proceeding pending before any court or tribunal relating thereto our liability under this present being absolute and unequivocal. The payment so made by us under this bond shall be valid discharge of our liability for payment thereunder and the Contractor(s)/Supplier(s) shall have no claim against us for making such payment.

4. We, ____________________________ (indicate the name of Bank) further agree that the

guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said Agreement and that it shall continue to be forcible till all the dues of the MJP under or by virtue of the said Agreement have been fully paid and its claims satisfied or discharged or till _______________________ of MJP certifies that terms and conditions of the said Agreement have been fully and properly carried out by the said Contractor(s) and accordingly discharges this guarantee. Unless a demand or claim under this guarantee is made on us in writing on or before the ______________, we shall be discharged from all liability under this guarantee thereafter.

Page 116: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 102 )

Contractor No. of Corrections Executive Engineer

5. We, ____________________________ (indicate the name of Bank) further agree with the MJP that the MJP shall have the fullest liberty without or our consent and without affecting in any manner our obligations hereunder to vary any of the terms and conditions of the said Agreement or to extend time of performance by the said Contractor from time to time or postpone for any time or from time to time any of the powers exercisable by the MJP against the said Contractor(s), and to forth or enforce any of the terms and conditions relating to the said Agreement, and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said Contractor(s) or for any forbearance, act or commission on the part of the MJP or any indulgence by the MJP to the said Contractor(s), and to forth and enforce any of the terms and conditions relating to the said Agreement, and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said Contractor(s) or for any forbearance, act or commission on the part of the MJP or any indulgence by the MJP to the said Contractor or by any such matter or thing whatever which under the law relating to surety would, but for this provision, have effect of so relieving us.

6. The guarantee will not be discharged due to the change in the constitution of the Bank or the

change in constitution of the Contractor/Suppliers. 7. We, ______________________________ (indicate the name of Bank) lastly undertake not to

revoke this guarantee during its currency except with the previous consent of the MJP in writing. Dated the _______________________ day of __________ 20 ____.

for _______________________ (indicate the name of Bank)

Page 117: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 103 )

Contractor No. of Corrections Executive Engineer

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 1. Name of Work : Ranjangaon Water Supply Scheme, Taluka - Shirur, District - Pune. RCC INSPECTION WELL, HEAD UP WALL & CONNECTING PIPES, JACK

WELL, RAW WATER PUMPING MACHINERY AT HEAD WORKS, PUMP HOUSE, RAW WATER PUMPING MACHINERY, RAW & PURE WATER RISING MAIN, UNCONVENTIONAL WTP, RCC ESR / MBR, GSR, PURE WATER PUMPING MACHINERY, GRAVITY MAIN, DISTRIBUTION SYSTEM, MISCELLANEOUS WORKS, TRIAL RUN, ETC.

DECLARATION

I hereby declare that I have made myself thoroughly conversant with the local conditions regarding all

materials such as stones, murum, sand availability of water etc. and labour, on which I have based my

rates for this work. The specifications and requirements of lead for this work have been carefully

studied and understood by me before submitting the tender. I undertake to use only the best materials,

to be approved by the Executive Engineer in charge of the work or his duly authorised representative,

before starting the work and also to abide by his decision.

I hereby undertake to pay the labours engaged on the work as per Minimum Wages Act, 1984 applicable

to the zone concerned.

Contractor's Signature

Page 118: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 104 )

Contractor No. of Corrections Executive Engineer

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 1. Name of Work : Ranjangaon Water Supply Scheme, Taluka - Shirur, District - Pune. RCC INSPECTION WELL, HEAD UP WALL & CONNECTING PIPES, JACK

WELL, RAW WATER PUMPING MACHINERY AT HEAD WORKS, PUMP HOUSE, RAW WATER PUMPING MACHINERY, RAW & PURE WATER RISING MAIN, UNCONVENTIONAL WTP, RCC ESR / MBR, GSR, PURE WATER PUMPING MACHINERY, GRAVITY MAIN, DISTRIBUTION SYSTEM, MISCELLANEOUS WORKS, TRIAL RUN, ETC.

UNDERTAKING FOR GUARANTEE

I / WE GUARANTEE THAT 1. I / We will replace, repair and adjust free of all charges, to the employer, any part of the work

which fails to comply with the specifications or amendment to such specifications as referred to in our specifications attached to tender, fair wear and tear excepted until the completion and for a period of 12 months from the date of Acceptance Certificate issued under Article 20 of General Conditions of Contract.

2. All the work will be reliable. 3. All the work will be of a type which has been proved in service, to be suitable for the duty

required by the specifications and will be manufactured and tested in accordance with the appropriate standard specifications approved by the Engineer-in-charge.

4. I / We accept and abide by the clause relating to quality and guarantee of work.

Contractor's Signature

Page 119: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 105 )

Contractor No. of Corrections Executive Engineer

J«m_rU nmUrnwadR>m H$m`©H«$_m§VJ©V JwUdÎmm {Z`§ÌU

àñVmdZm

amÁ`mVrb J«m_rU ̂ mJmV AmVmn`ªV am~{dÊ`mV Amboë`m nmUrnwadR>m H$m`©H«$_m§Mo qghmdbmoH$Z H$ê$Z Ë`mV H$m` ÌwQ>r AmhoV VgoM gXa

H$m`©H«$_ amÁ`mV A{YH$ à^mdrnUo am~{dÊ`mgmR>r H$moUË`m Cnm``moOZm H$aUo Amdí`H$ Amho ̀ mMm gImob Aä`mg H$ê$Z {nÊ`mÀ`m nmÊ`mMm

AmamIS>m V`ma H$ê$Z emgZmg gmXa H$aÊ`m~m~V _§{Ì_§S>imMr EH$ Cng{_Vr AmñWm{nV H$aÊ`mV Ambobr hmoVr. gXa _§{Ì_§S>i Cng{_VrZo

J«m_rU nmUrnwadR>m H$m`©H«$_mg§~§Yr Amnbm Ahdmb emgZmg gmXa Ho$bm AgyZ Ë`mVrb J«m_rU nmUrnwadR>m `moOZm§À`m hñVm§VaUmg§~§Yr

{e\$magtZm _§{Ì_§S>imZo _mÝ`Vm {Xbr Amho. Ë`m AZwf§JmZo, J«m_rU nmUrnwadR>m ̀ moOZm§À`m hñVm§VaUmÀ`m g§X^m©V AmXoe {ZJ©{_V H$aÊ`mV ̀ oV

AmhoV.

emgZ {ZU©`

J«m_rU nmUrnwadR>m H$m`©H«$_mMo H$m_ JwUdÎmmnyU© hmoÊ`mÀ`m Ñï>rZo ̀ moOZm A§_b~OmdUr_Ü`o gwédmVrnmgyZM Ë`mV ñWm{ZH$ OZVoMm /

ñWm{ZH$ ñdamÁ` g§ñWm§Mm gh^mJ Va Amdí`H$ AmhoM {edm` `moOZoÀ`m A§_b~OmdUrÀ`m gÜ`mÀ`m nÕVr_Ü`o H$mhr _hÎdmMo ~Xbhr

AJË`mMo AmhoV. Ë`mÑï>rZo J«m_rU nmUrnwadR>m H$m`©H«$_mÀ`m A§_b~OmdUr_Ü`o ̀ mnwT>rb Imbrb ~m~tMr nyV©Vm ~§YZH$maH$ H$aÊ`mV ̀ oV Amho.

1. ñWm{ZH$ ñVa `moOZog àemgH$s` _mÝ`Vm XoÊ`mnydu emgZmZo {d{hV Ho$boë`m gd© {ZH$fm§Mo nmbZ hmoV Amho qH$dm Zmhr Vo nS>VmiyZ

nmhÊ`mgmR>r emgZmÀ`m J«m_{dH$mg d Obg§YmaU {d^mJmZo emgZ n[anÌH$ H«$. J«mnmnw 1093 / grAma-613 / 39(A), {XZm§H$

18/8/1993 AÝd`o {Oëhm n[afXm§gmR>r {d{hV Ho$boë`m MoH${bñQ>À`m AmYmamda `moOZog àemgH$s` _mÝ`Vm XoÊ`mgmR>r {dMma

H$aÊ`mnydu {Oëhmn[afXm§À`m _w»` H$m`©H$mar A{YH$mè`m§Zr ̀ moOZoMr nS>VmiUr H$amdr d emgZmÀ`m {ZH$fmZwgma ̀ moOZog àemgH$s`

_mÝ`Vm XoUo Amdí`H$ Amho Ago à_m{UV H$amdo. MoH${bñQ> d _w»` H$m`©H$mar A{YH$mè`m§Mo à_mUnÌ `moOZog àemgH$s` _mÝ`Vm

XoUmè`m àm{YH$mè`m§H$S>o Z MwH$Vm gmXa H$aÊ`mV ̀ mdo.

2. AZoH$ àH$aUr H$m_m§Mo VwH$S>o nmS>ë`m_wio H$m_mÀ`m JwUdÎmoZwgma Xwîn[aUm_ Amë`mMo {XgyZ Ambo Amho. g~~ ̀ mnwT>o J«m_rU nmUrnwadR>m

`moOZm am~{dUmè`m ̀ §ÌUm§Zr H$moUË`mhr n[apñWVrV emgZmÀ`m nadmZJr{edm` H$moUË`mhr H$m_mMo VwH$S>o nmSy> Z`oV.

3. gÜ`m J«m_rU nmUrnwadR>m ̀ moOZoMr H$m_o Omhra {Z{dXm H$mTy>Z R>oHo$Xmam§_m\©$V am~{dÊ`mV ̀ oVmV. gXa R>oHo$XmamMr emgZmÀ`m gmd©O{ZH$

~m§YH$m_ {d^mJm§VJ©V gj_ àm{YH$mè`m§H$S>o `mo½` Ë`m dJuH$aUmV Zm|XUr Pmbobr Amho d gXa R>oHo$Xmamg gmd©O{ZH$ ~m§YH$m_

{d^mJmH$Sy>Z H$miçm `mXrV Q>mH$Ê`mV Ambo Zmhr `m ~m~r {Z{dXm _§Oya H$aVmZm R>oHo$XmamZo ^aboë`m Xam§~amo~a àm_w»`mZo nm{hë`m

OmVmV. ̀ m àH$aUr Ago {XgyZ Ambo Amho H$s, gmd©O{ZH$ ~m§YH$m_ {d^mJmH$S>o Zm|XUr Pmboë`m AZoH$ R>oHo$Xmam§Zm J«m_rU nmUrnwadR>m

`moOZm am~{dÊ`mMm AZw^d ZgVmo. J«m_rU nmUrnwadR>m `moOZm§Mr H$m_o {d{eï> Vm§{ÌH$ ñdê$nmMr Agë`mZo AZw^d Zgboë`m

R>oHo$Xmam§H$Sy>Z Aem `moOZm§Mr H$m_o hmVmibr Joë`mg gXa H$m_m§À`m JwUdÎmoda AZoH$ {R>H$mUr {dnarV n[aUm_ Pmë`mMo {XgyZ Ambo

Amho.

Page 120: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 106 )

Contractor No. of Corrections Executive Engineer

`mMm {dMma H$ê$Z emgZ Ago AmXo{eV H$arV Amho H$s, _hmamï´> OrdZ àm{YH$aU _§S>imZo VmËH$mi gmd©O{ZH$ ~m§YH$m_ {d^mJmÀ`m

gj_ A{YH$mè`mH$S>o Zm|XUrH¥$V R>oHo$Xmam§n¡H$s J«m_rU nmUrnwadR>m `moOZm§Mr H$m_o am~{dÊ`mg Vm§{ÌH$ kmZ d AZw^dmÀ`m Ñï>rZo gj_

R>oHo$Xmam§Zr ñdV§Ì[aË`m Zm|XUr H$amdr d Aem nÕVrZo Zm|XUr Ho$boë`m R>oHo$Xmam§Mr Zmdo gd© {Oëhmn[afXm§Zm H$idmdr. R>oHo$Xmam§Mr Zm|XUr

H$aÊ`mgmR>r _hmamï´> OrdZ àm{YH$aU _§S>imZo gÜ`m emgZmÀ`m gmd©O{ZH$ ~m§YH$m_ {d^mJm_m\©$V Adb§{~br OmUmar H$m`©nÕVr

AZwgamdr. {XZm§H$ 1/4/1995 nmgyZ J«m_rU nmUrnwadR>m `moOZm§Mr H$m_o hmVmiÊ`mgmR>r \$º$ _hmamï´> OrdZ àm{YH$aU _§S>imH$S>o

Zm|XUr Pmboë`m R>oHo$Xmam§MmM {dMma H$aÊ`mV `mdm. _§S>imH$S>o Zm|XUr Z Pmboë`m R>oHo$Xmamg {XZm§H$ 1/4/1995 Z§Va ZdrZ H$m_o

H$moUË`mhr n[apñWVrV XoÊ`mV ̀ oD$ Z`oV. darbà_mUo Zm|XUrH¥$V R>oHo$Xmam§Zr ̀ moOZoMr H$m_o Ano{jV JwUdÎmoZwgma d {d{hV H$mbmdYrV g_mYmZH$maH$ Z Ho$ë`mg gXa R>oHo$Xmam§g

H$miçm `mXrV Q>mH$Ê`mMo A{YH$ma _hmamï´> OrdZ àm{YH$aU _§S>imA§VJ©V gj_ Zm|XUr àm{YH$mè`m§H$S>o amhVrb. _mÌ EImÚm

R>oHo$Xmam§g H$miçm ̀ mXrV Q>mH$Ê`mg§~§Yr {Oëhm n[afXoÀ`m _w»` H$m`©H$mar A{YH$mar ̀ m§Zr Ho$boë`m {e\$magr gXa gj_ àm{YH$mè`mda

~§YZH$maH$ amhVrb.

4. _§Oya AmamIS>çmà_mUo `moOZm am~{dVmZm H$m`m©Ýd`Z `§ÌUm ({Oëhm n[afX, _hmamï´> OrdZ àm{YH$aU _§S>i) `m§Zr EH$m nmUrnwadR>m

`moOZoÀ`m H$m_mgmR>r EH$mM R>oHo$XmamMr {Z`wº$s H$amdr d R>oHo$Xmam§g H$m_m§Mm R>oH$m gm{hË` gm_wJ«rgh XoÊ`mV ̀ mdm. ñWm{ZH$ joÌmVrb

`moOZm§Zr H$m_o EH$mM R>oHo$XmamH$Sy>Z nma nmS>Ê`mg§~§Yr ho AmXoe {Oëhm n[afX ̀ m§Zm _hmamï´> {Oëhm n[afX d n§Mm`V g{_Vr A{Y{Z`_

1991 À`m H$b_ 261(A) AÝd`o XoÊ`mV ̀ oV AgyZ Vo Ë`m§À`mda ~§YZH$maH$ AmhoV.

5. gmd©O{ZH$ Cn`moJr àH$ënm§Mr H$m_o nyU© Pmë`mZ§Va {d{hV H$mbmdYrn`ªV XoI^mbrÀ`m doir AmT>iyZ `oUmè`m ~m§YH$m_mVrb Xmof d

gm{hË`mVrb Xmof ñdV: IMm©Zo Xwê$ñV H$ê$Z XoÊ`mMr O~m~Xmar H§$ÌmQ> nÕVrZo nyU© H$ê$Z XoUmè`m H§$ÌmQ>Xmam§da ~§YZH$maH$ amhrb Aer

AQ> {Z{dXoV KmbÊ`m~m~V {S>\o$ŠQ> {b`m{~{bQ>rMo A{Y{Z`_ gmd©O{ZH$ ~m§YH$m_ {d^mJmZo emgZ {ZU©` H«$. grEQ>r 1087/grAma-

94/{~pëS>¨J-2 {XZm§H$ 14/6/1989 AÝd`o {ZJ©{_V Ho$bo AmhoV. hm {ZU©` _hmamï´> OrdZ àm{YH$aU _§S>i d {Oëhm n[afXo_m\©$V

`mnwT>o H$m`m©pÝdV hmoUmè`m gmd©O{ZH$ Cn`moJr J«m_rU nmUrnwadR>m ̀ moOZm§À`m H§$ÌmQ>r H$m_m§Zm VmËH$mi à^mdmZo bmJy H$aÊ`mV ̀ oV Amho.

J«m_rU nmUrnwadR>m `moOZm§À`m {d{eï> H$m_m§gmR>r {S>\o$ŠQ> {b`m{~{bQ>rMo H$mbmdYr gmo~VÀ`m ghnÌ (A) _Ü`o Xe©{dë`mà_mUo

AgVrb, gXa H$mbmdYr g§~§{YV H$m_mMr MmMUr nyU© hmoD$Z {Z`{_V dmna gwê$ Pmboë`m {XdgmnmgyZ bmJy amhVrb. {S>\o$ŠQ>

{b`m{~{bQ>rÀ`m H$mbmdYrV X¡Z§{XZ XoI^mb d gm_mÝ` Xwê$ñVrMo H$m_ H$aUo AWdm Ë`m§Mm IM© gmogUo ho H$m_ H§$ÌmQ>XmamÀ`m

H$jm~mhoarb H$m_ amhrb. na§Vw Ë`m H$mbmdYrV ~m§YH$m_mVrb Xmof d gm{hË`mVrb Xmof AmT>iyZ Amë`mg H§$ÌmQ>XmamZo ñdIMm©Zo Xwê$ñV

H$ê$Z XoUo H§$ÌmQ>Xmamda ~§YZH$maH$ amhrb. `mgmR>r H§$ÌmQ>mÀ`m {Z`_mà_mUo Ë`m§À`mda H$m`©dmhr hmoD$ eHo$b d Ë`mgmR>r AZm_V

aH$_oMm H$mhr A§e amIyZ R>odÊ`mV ̀ mdm.

6. J«m_rU nmUrnwadR>m ̀ moOZoMr H$m_o nma nmS>Ê`m~m~V ̀ mnwT>o H$m`m©Ýd`Z AmamIS>m V`ma H$aÊ`mV ̀ mdm. ̀ moOZm§À`m CX²^dmMo H$m_ àW_

Z H$aVm BVa Cnm§Jm§Mr H$m_o AmYr Ho$ë`mda d Z§Va CX²^dmda nwaogo Mm§Jbo nmUr Z bmJë`mg BVa Cnm§Jm§darb IM© dm`m OmÊ`mMr

eŠ`Vm AgVo. ̀ mgmR>r àM{bV AmXoemZwgma ̀ moOZoÀ`m CX²^dmMo H$m_ gd©àW_ H$aÊ`mV ̀ mdo, CX²^dmV nmUr bmJVmM Vo {nÊ`m`mo½`

Amho qH$dm Zmhr `m~m~V Amamo½` à`moJemioH$Sy>Z MmMUr KoÊ`mV `mdr. Vo {nÊ`m`mo½` Amho Ago à`moJemioZo à_m{UV Ho$ë`mg

CX²^dmMo H$m_ nwT>o Mmby H$amdo. VXZ§Va CX²^dmbm àH$pënV bmoH$g§»`og nwaob BVHo$ nmUr CnbãY Pmë`mg ̂ yOb gd}jU d {dH$mg

`§ÌUoZo à_m{UV Ho$ë`mZ§Va ̀ moOZoÀ`m Cnm§JmMr H$m_o Imbr {ZX}{eboë`m H«$_mZo H$aÊ`mV ̀ mdr.

Page 121: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 107 )

Contractor No. of Corrections Executive Engineer

A) CƒñVa / ̂ yñVa Q>mŠ`m§Mr H$m_o,

~) CÕaU dm{hZr / Jwê$Ëd dm{hZrMr H$m_o d n§nJ¥h d n§qnJ _{eZar ~g{dUo, Q>mŠ`m§Mr H$m_o 80% nyU© Pmë`mda

CÕaUdm{hZr/ Jwê$Ëddm{hZrMr H$m_o hmVr ¿`mdrV.

H$) {dVaU ì`dñWm

S>) Zi H$m|S>miçmMr H$m_o

7. {Oëhm n[afXm§À`m `moOZm§Mr H$m_o JwUdÎmm nyU© hmoVrb `m Ñï>rZo ñWm{ZH$ ñVamdarb Zi `moOZm§~m~V Vm§{ÌH$ _mJ©Xe©Z, ghmæ` d

VnmgUr H$aÊ`mMo A{YH$ma emgZ AmXoe J«m_{dH$mg {d^mJ H«$. J«mnmnw 1089/grAma-15/39-A, {XZm§H$ 7/4/1990 AÝd`o

_hmamï´> OrdZ àm{YH$aU _§S>im§À`m AYrjH$ A{^`§Ë`m§H$S>o XoÊ`mV Ambobo Amho. Ë`mAZwf§JmZo _hmamï´> OrdZ àm{YH$aU _§S>imÀ`m

AYrjH$ A{^`§Ë`m§Zr Ë`m§À`m A{YH$majoÌmVrb {H$_mZ 12 àJVrnWmdarb qH$dm Ë`m Am{W©H$ dfm©V nyU© Pmboë`m ñWm{ZH$ ñVamdarb

Zi `moOZm§Mr Xa_hm VnmgUr H$amdr. AYrjH$ A{^`§Ë`m§Zr VnmgUrA§Vr Ho$boë`m gyMZm§Mo AZwnmbZ H$Q>mjmZo H$aÊ`mV `oB©b Ago

_w»` H$m`©H$mar A{YH$mar, {Oëhm n[afX ̀ m§Zr nhmdo.

8. àM{bV {Z`_mZwgma ñWm{ZH$ ñVa Zi nmUrnwadR>m ̀ moOZm {Oëhm n[afXo_m\©$V H$m`m©pÝdV H$ê$Z KoÊ`mV ̀ oVmV. Oa {Oëhm n[afXm gXa

`moOZm H$_©Mmar dJm©A^mdr dm AÝ` H$maUm§_wio H$m`m©pÝdV H$aÊ`mg Ag_W© AgVrb d gXa H$m_o _hmamï´> OrdZ àm{YH$aU

`§ÌUo_m\©$V H$ê$Z KoÊ`m~m~V Oa {Oëhm n[afXm§Zr {dZ§Vr Ho$br Agob Va gXa H$m_o H$m`m©Ýd`ZmgmR>r g§~§{YV _hmamï´> OrdZ àm{YH$aU

~m§YH$m_ {d^mJmH$S>o {Oëhm gwgy{ÌH$aU d g§{Z`§ÌU g{_VrÀ`m {e\$magrZo Am{U emgZmÀ`m _§OwarZo {Oëhm n[afXoH$S>rb Amdí`H$

Ë`m AZwXmZmgh dJ© H$aVm ̀ oVrb.

9. _hmamï´> OrdZ àm{YH$aU _§S>imÀ`m AYrjH$ A{^`§Ë`m§Zr {Oëhm n[afXm§À`m bKwnmQ>~§Ymao {d^mJmÀ`m H$m`©H$mar A{^`§Ë`m§À`m

ñWm{ZH$ joÌmVrb J«m_rU nmUrnwadR>m `moOZm§À`m H$m_m~m~V {Oëhm n[afXoÀ`m _w»` H$m`©H$mar A{YH$mè`mH$S>o doimodoir A{^àm`

nmR>dmdoV. g§~§{YV H$m`©H$mar A{^`§Ë`m§Mo JmonZr` A{^boI {b{hVmZm _w»` H$m`©H$mar A{YH$mè`m§Zr gXa A{^àm`m§Mr XIb ¿`mdr.

10. {OëhçmVrb àË`oH$ nyU© Pmboë`m ñWm{ZH$ / amÁ`ñVa Zi `moOZogmR>r EH$ ñdV§Ì {hñQ´>r erQ> gmo~V OmoS>boë`m ghnÌ (~) À`m

Z_wÝ`mV R>odÊ`mV ̀ mdr d Ë`mV Imbrb ~m~tMr Zm|X KoÊ`mV ̀ mdr. A) `moOZoMr R>iH$ d¡{eï>ço

~) `moOZoÀ`m àË`oH$ Xwê$ñVrMm Am{W©H$ d Cnm§J{Zhm` Vnerb

H$) Xadfu dm{f©H$ VnmgUr Pmë`mZ§Va ̀ moOZoÀ`m H$m_{Jar{df`r Zm|Xr

àË`oH$ dfu Zi nmUrnwadR>m `moOZm§Mr dm{f©H$ VnmgUr emgZ n[anÌH$, J«m_{dH$mg d Ob{Z:gmaU {d^mJ H«$_m§H$ J«mnmnw 1093/grAma-831/39-A, {XZm§H$ 11/1/1994 _Yrb gyMZm§à_mUo H$ê$Z Ë`mV Z_yX Ho$ë`mà_mUo Ë`m§À`m H$m_{Jar{df`r ̀ mo½` Ë`m Zm|Xr ̀ moOZoÀ`m {hñQ´>r erQ>_Ü`o H$aÊ`mV `mì`mV. Á`m `moOZm§Mr H$m_{Jar g_mYmZH$maH$ Zmhr Ë`m§Mr Vm§{ÌH$ boIm narjm _w»` H$m`©H$mar A{YH$mar, {Oëhm n[afX, AYrjH$ A{^`§Vm, bKwnmQ>~§Ymao (ñWm{ZH$ ñVa) d AYrjH$ A{^`§Vm, _hmamï´> OrdZ àm{YH$aU ~m§YH$m_ _§S>i ̀ m§Zr H$amdr d Ë`m§Zr {Xboë`m A{^àm`mÀ`m AmYmamda nwT>rb H$m`©dmhr H$aÊ`mV `mdr. darbà_mUo gd© nyU© Pmboë`m `moOZm§Mr dm{f©H$ VnmgUr d Amdí`H$VoZwgma Vm§{ÌH$ boImnarjm H$aÊ`mMr nÕV gwê$ Ho$ë`mg H$m_mÀ`m JwUdÎmoda {ZpíMVM Mm§Jbm n[aUm_ hmoB©b Aer Anojm Amho.

Page 122: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 1 )

Contractor No. of Corrections Executive Engineer

GENERAL CONDITIONS 1. Unless otherwise specifically provided for either in tender items or in specifications or in the

schedule of supply of materials, all items in the tender are inclusive of cost of all materials required for the execution of the items and these, as, are proposed to be supplied by the Pradhikaran as per respective schedule shall be provided of the approved type and make by the Contractor.

2. All the materials used in the work shall be of best quality and any materials rejected shall be

removed from the site within 24 hours. 3. All other rules regarding Workmen's Compensation, etc. shall be binding on the Contractor. 4. All items to be executed in the course of the work have to be executed by the Contractor as

specification in the P.W.D. Hand-books, the books of standard specifications, published by the Public Works Board of Government of Maharashtra, relevant I.S. specifications, latest editions, and practice in vogue, at the rates as per rules of the MJP and conditions of agreement in this respect. The Contractor shall be responsible and liable to pay for damage to public property caused by him. He should keep the accounts of such materials in suitable look which would be available for inspection to the Engineer-in- charge. The Contractor shall be responsible for proper handling and safe custody of all material delivered by him for use on work. The material including pipes shall be procured by the Contractor as per requirement of work and no excess material shall be procured. Only used material shall be paid to the Contractor.

5. For all accident on the contracted works the Contractor shall be responsible to pay the

compensation to the sufferer or his legal dependents as per the Legal Compensation Act in force. 6. The Contractor shall engage an authorised agent or an experienced qualified supervisor for the

work capable of managing and guiding the work on his behalf. He shall take such orders as may be given to him by the Engineer-in-charge from time to time and shall be responsible to carry them out promptly.

7. A work order book shall be maintained at the works site. The Contractor shall sign the orders

given by the Engineer-in-charge and Sub-Divisional Officer and shall carry them promptly. After completion of the work, the work order book shall be surrendered to the MJP.

8. Quantities given in the tender are approximate and are liable for variation. Rate quoted in tender

for excavation of pipelines is average rate for all types of strata. The Contractor shall have no claim for compensation on account of any variation in the quantities and also for any variation in the depth for trenches shown in the drawings.

Page 123: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 2 )

Contractor No. of Corrections Executive Engineer

9. The Contractor shall at his own expenses make all necessary provisions for housing, water supply and sanitary arrangements for his employees and for the work under tender shall pay direct to the authorities concerned all taxes and other charges. The Contractor shall also comply with all requirements of the Health Board in regard to anti-malaria.

10. All items occurring in the work and as found necessary in actual execution shall be carried out in

workmanship like manner as per specifications given in P.W.D. Hand Book and as per the current specifications prevalent in MJP Circle, as per orders of the Engineer-in-charge; as stated above.

11. It must be clearly understood that the conditions of the contract and specifications are intended

to be rigidly enforce and no relaxation on the ground of conditions prevailing is to be allowed. 12. The Contractor will be entirely responsible for breach of laws of local bodies, Government, etc.

while using private or public conveyance procuring and stacking materials. Employment of labour etc. and he will meet out all expense in this contract without any claim whatsoever on the MJP and the MJP shall not take any responsibility on this account.

13. Before entering any property, plot, land, premises or areas, etc., the Contractor shall make his

own independent investigation through the Collector or Inspector of Land Records, etc. on his own about the ownership of the plot, etc. and he will be liable for action for act of encroachment, trespass, etc. committed by him or his labour or for the steps taken by the party concerned.

14. The Contractor shall have to clear the site of work before the commencement of work and after

the completion of the work without any extra cost. The Contractor shall construct at his cost a temporary shed of about 20 sq.mt. as per specification, carpet area for use as office for inspection of the work by the officers and for discussing the details of work, writing work order, etc. Necessary furniture such as chairs, tables, wooden box, etc. will be constructed and provided for within fifteen days from the date of receipt of work order. It will be maintained properly till the work is completed. The shed and furniture will be allowed to be taken back by the Contractor after the work is completed. The MJP shall not pay any rent, charges for the shed, etc. and no MJP's materials will be issued by the MJP for this shed.

15. A jeepable service road, wherever necessary shall be provided and maintained by the Contractor

at his cost till the completion of the work. 16. The Contractor shall arrange for final lineout of works at his own cost and under supervision of

responsible representatives of the MJP. 17. All cement concrete shall be machine mixed and machine vibrated unless otherwise instructed by

the Executive Engineer. 18. The Contractor shall furnish a list of machinery in his possession which he proposes to use on

the work.

Page 124: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 3 )

Contractor No. of Corrections Executive Engineer

19. The Contractor shall follow the instructions in general under notes for guidance of page I and II of the P.W.D. Hand Book Volume I.

20. Labour Regulation The Contractor will have to abide by the provisions made under the Contract Labour

(Regulations and Abolition) Act 1970 and Rules made thereunder by Government of Maharashtra. License shall have to be produced prior to starting of work.

Page 125: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 4 )

Contractor No. of Corrections Executive Engineer

1. General Note 1.1 Design Criteria, Structural and General 1.1.1 The contractor shall quote his offer in Schedule 'B' for the complete work of constructing Head

Works, Unconventional Water Treatment Plant, RCC ESR / MBR to be carried out as per his own design based on the data furnished in this document.

He shall tender the rates in Schedule 'B' for construction of complete unconventional water

treatment plant including commissioning, trial run, water tightness test, etc. complete.

The work shall be carried out as per the relevant ISS (latest edition), "Red Book" published by PWD department of Govt. of Maharashtra and practice in vogue in MJP.

The structures shall be designed for seismic forces as per the recent declaration of zones

wherever necessary.

1.1.2 The work of providing and constructing Head Works, Unconventional Water Treatment Plant, RCC ESR / MBR, wash water drainage arrangement, including providing, designing, constructing, giving water tightness test, trial run shall be carried out as per relevant ISS, standard specification. (Red book published by PWD of Government of Maharashtra and practice in vogue in MJP).

The Contractor shall submit the name, qualifications and experience of Design Engineer who has

prepared detailed RCC calculations or will prepare design and drawings on acceptance of the tender. The authorised representative of the designer will have to inspect and certify the works at foundation and every beam level.

1.1.3 The design engineer has to prepare and submit a note on design methodology and construction

and drawing in two copies through the Contractor.

The note should indicate general description and salient features of the design covering the following points :

1) Capacity, general layout size of structures.

2) Shape and type of wash water tank.

3) Staging height of tank indicating various levels.

4) Safe bearing capacity assumed in the design or safe bearing capacity of strata based on

actual investigation report of laboratory and type of foundation provided with proper justification.

5) Maximum and minimum sub-soil water level.

6) Site plan showing location of WTP, ESR, Sump.

7) Line diagram showing dimensional, sectional elevation with important levels.

8) Design parameters proposed to be adopted for detail design.

Page 126: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 5 )

Contractor No. of Corrections Executive Engineer

1.1.4 This note on design will be subjected to thorough check by the Engineer-in-charge of the owner and the tender will be accepted and work order issued by the competent authority only after verification that the design to be offered will fulfill the requirements of the design as per tender specifications.

1.1.5 After acceptance of tender, the contractor will have to submit three copies of detailed design and

drawing of the structure within 30 days of acceptance of the tender. 1.1.6 The Design Engineer will be required to attend the office of Engineer-in-Charge for preliminary

discussion for scrutiny remarks, etc. whenever required with all reference data, books, IS specifications, etc. at his own cost.

1.1.7 It will be binding on the Design Engineer of contractor to clarify, modify, redesign and prepare

drawings after compliance of scrutiny remarks by the owner or his representative such as an Engineering College within 15 days of communication of remarks.

1.1.8 On approval of the design, contractor shall supply, free of cost, eight sets of design and drawing

duly bound for use of the owner. The contractor shall also furnish the steel along with programme of execution for completion of work within the time limit stipulated in the tender.

1.1.9 Security Deposit of the tenderer shall be forfeited if he fails to modify his design as per scrutiny

remarks within specified time after levy of compensations as per tender agreement. 1.1.10 Even though the design and drawing submitted by the contractor are approved by the owner /

Engineer-in-Charge, the contractor will not be relieved of his contractual obligations to hand over the structure in sound condition, duly tested.

In case of any damage, failure either during construction testing or after commissioning, whether

due to faulty design or defective construction all repairs or reconstruction of the structure shall have to be carried out by the contractor, entirely at his risk and cost.

No claim for such repairs reconstruction shall be entertained. 1.2 Common Conditions 1.2.1 The contractor at his own cost shall provide necessary housing accommodation and the sanitary

arrangement for his staff and labour and shall pay direct to the authorities concerned all rates, taxes, royalties and other charges. The contractor shall also comply with the requirement of the Health Department as regards anti-malaria measures, etc.

1.2.2 A work order book shall be maintained on site of work and the orders given by the Engineer-in-

Charge shall be signed and carried out by the contractor. The contractor shall construct a temporary shed of about 20 Sqm. for use as office for inspection

of works within 30 days of work order. The contractor shall be the property of the contractor.

Page 127: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 6 )

Contractor No. of Corrections Executive Engineer

1.2.3 Water required for the execution of work and for the water tightness test of the reservoir shall be supplied by the contractor at his own cost in the manner satisfactory to the Engineer-in-Charges of work.

1.2.4 All materials to be used shall conform to the relevant specifications as per the latest version of

Indian Standards, unless otherwise stated in the detailed specifications of items of work. 1.2.5 Wherever a reference to any IS appears in specifications it shall be taken to mean as a reference

to the latest versions of the standard. 1.2.6 The work under this contract includes the supply of material at site of work or store as specified

including railway freight, loading, carting, unloading, stacking as directed, insurance, local taxes, etc.

1.2.7 The contractor shall be responsible for observing the laws rules and regulations under the "Minor

Mineral Act" and such other laws and rules prescribed by the Government from time to time. 1.2.8 The hydraulic test of water retaining structure shall have to be given by the contractor without

any extra cost. The filling of the reservoir WTP or any other water retaining structure shall be carried out gradually at the rate not exceeding 30 cm rise in water level per hour and shall not exceed 2.0 M in 24 hours and total period of 72 hours. Records of leakages starting at different level of water in the reservoir, if any, shall be kept. The reservoir once filled shall be allowed to remain filled for seven days before any readings drop in water level are recorded. The level of the water shall be recorded again at subsequent intervals of 24 hours over a period of seven days. The total drop in surface level over a period of seven days shall be taken as an indication of the water tightness of the reservoir, which for all practical purposes shall not exceed 40 mm.

If the structure does not satisfy the condition of test and the daily drop in water level is

increasing the period of test may be extended for a period of seven days and if the specified limit is then reached the structure may be considered as satisfactory. 10% payment shall be withheld till satisfactory test is given.

1.2.9 If even after extending the period of test, the drop is more than permissible, the contractor should

empty the reservoir, rectify the defects in tank by the re-plastering wherever necessary, applying water proofing paint, etc. and give the water tightness test till the drop in level is within permissible limit. This shall be repeated at the cost of the contractor without claiming extra cost.

Any delay in giving water tightness test will invite penal action under relevant clauses of the

tender agreement. 1.2.10 The contractor shall provide cement plaster to the external faces of the structure in CM (1:4) 12

mm thick.

Page 128: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 7 )

Contractor No. of Corrections Executive Engineer

SPECIAL CONDITIONS OF CONTRACT Payment against Excess Quantities of Various Items 1. Before making payment of excess quantities as per rules, the concerned Executive Engineer

should get himself satisfied regarding genuineness of the claim and he should also exercise a compulsory check of minimum 5% of measurements for a particular item. Responsibility of informing the excess beyond quantities as per Schedule 'B' of the tender for approval to Superintending Engineer and also for correctness of claims to be submitted in future shall rest with the Junior Engineer, Auditor and Divisional Accountant also. While submitting the proposal for approval, concerned authorities should consider the exact position of the revised estimates, if necessary due to this excess.

2. For executing any quantity, the excess over the quantity specified in the tender, the Contractor

should be authorised by the Executive Engineer in writing. 3. While asking the Contractor to execute such excess quantity, the concerned Executive Engineer

should inform the Contractor in writing specifically that the payment in excess of quantities specified in the tender will be made only after following concerned prescribed rules.

General 1. The quoted rate shall be total rate for the completed item of work as per the specifications, and

shall be inclusive of all incidental charges such as lifts, leads for materials, water for construction etc. The rates for excavation are inclusive of the fine edge of excavated pit beyond foundations.

2. The tenderer must obtain on his own responsibility and his own expenses all the information

which may be necessary for the purpose of making a tender and for entering into a contract and must consider and satisfy himself with all local conditions, sites and quarries, means of accesses, the nature of rock, material to be met with in all execution and all materials pertaining to work.

3. Specifications of item stipulated for other sub-works shall be made applicable, where relevant. Outline of Works 1. The work will be on the lines of plans attached to the tender documents. The plans are, however,

liable to be changed and strata as shown there is approximate. 2. The items of work and their approximate quantities are given in Schedule-B of the tender.

Page 129: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 8 )

Contractor No. of Corrections Executive Engineer

Unit 1. The rates quoted for each item for units mentioned in Schedule-B against each item. Site Conditions 1. It shall be presumed that the Contractor has satisfied himself as to the nature and location of the

works, general and local conditions, particularly those bearing on transport handling, storage of materials, availability of labour, weather conditions and has estimated the cost and quoted his rates accordingly. MJP will bear no responsibility for lack of such acquaintance with site conditions and consequences thereof.

2. Set of tender documents as and conditions (upto a maximum of three sets) at the discretion of the

Executive Engineer, will be supplied to the Contractor after acceptance of tender. 3. Contractor should take detailed information of underground pipe, cables, gas pipeline, OFC, etc.

before starting the excavation work. Responsibility of any damage of pipeline and claims thereafter is only with contractor. No separate claim will be entertained for these damages.

Extras, Omissions and Discrepancies In all cases of the omissions, doubts or discrepancies in the dimensions in the drawing and items of works, reference shall be made to the Executive Engineer, whose elucidation and elaboration shall be considered final. Supply of Material by the Contractor 1. The Contractor should supply all material mentioned in Schedule 'B'. This shall be conforming to

relevant ISS. CI/ DI/ PVC/ AC/ PSC/ MS/ GI pipes and CID joints will be accepted only after due inspection of SGS or RITES. The charges for the same shall be borne by the Contractor. Items such as valves, specials, etc. shall be as per relevant ISS. Third party inspection shall not be insisted.

2. Other material such as cement, tor steel, etc. shall be conforming to relevant ISS. Testing

charges for cement, tor steel shall be borne by the Contractor. L and T cement shall preferably used for water retaining structures.

3. 85% of procurement price will be paid to the Contractor on receipt of pipes, valves, etc. with due

inspection.. 4. The Contractor shall provide at the site of work satisfactory storage for not less than one month's

average consumption of works and shall keep the cement stored in a manner that will satisfy the Executive Engineer. The arrangement of storage and utilisation of cement in the order of its arrival at the stores and the Contractor shall maintain satisfactory records, which would have any time show the dates of receipt and proposed utilisation of cement lying in the storage.

Page 130: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 9 )

Contractor No. of Corrections Executive Engineer

5. The Executive Engineer-in-charge shall at all the times have access to the stores and size, method of storage records, and security provided by the Contractor. The Contractor shall comply with instructions that will be given by Executive Engineer, in this behalf.

The Contractor shall further at all times satisfy the Executive Engineer on demand by production

of books, of submission of returns in proforma as directed, other proofs, that, the cement supplied is being used for the purpose for which it is supplied and the Contractor shall at all times keep his records up-to-date and available to the Executive Engineer.

6. The responsibility of possession and the transactions of material issued to contractor as per

Schedule A is with the contractor. He should sign the USR indicating the list of material issued to him, after confirming the quantity.

7. Price Variation Clause (Escalation) Price variation clause is not applicable for this tender. 8. A copy of all the bills and payment given to the contractor will be given to Ranjangaon Gram

Panchayat Water Supply and Sanitation Committee. The querries and points raised about the quality and quantity must be satisfied by the contractor along with Department.

Page 131: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 10 )

Contractor No. of Corrections Executive Engineer

ACQUAINTANCE WITH SITE CONDITIONS AND WORK CONDITIONS 1. The Contractor shall study the site conditions, general conditions and data included in the tender

papers and get it verified from actual inspection of the site etc. before submitting the tender. In case of doubts about any items or data included in this tender or otherwise, it shall be got clarified by applying in writing to the Executive Engineer, 15 days in advance before date of submission of the tender. Once the tender is submitted, it shall be considered that the Contractor has verified and made himself conversant with all the details as required for quoting the rates and completing the work as per tender conditions and specifications.

2. Contractor shall not sell or otherwise dispose off or remove except for the purpose of this

contract, the rubble, stone metal, sand or other material which may be obtained from any excavation, made for the purpose of the contract. All such materials shall be MJP's property and shall be disposed off in the manner and at place as may be directed by the Engineer-in-charge. Contractor may with the permission of the Engineer-in-charge in writing and when directed by him, use any of the materials free of cost.

3. Other unforeseen items to be done in the course of work will have to be done by the Contractor

as per specifications in P.W.D. Hand Book Volume I and II and will be paid at mutually agreed rates, ISS and standard practice in vogue.

Extra charge of claims in respect of extra work shall not be allowed unless the work to which

they relate are in the spirit and meaning of the specifications or unless such works are ordered in writing by the Engineer-in-charge and claimed for in the specified manner before the work is taken in hand.

Materials 4. The Contractor shall make his own arrangements for obtaining rubble, khandki, headers, metal,

sand, murum, etc. from MJP or private quarry. Applications of the Contractor for reasonable area of Government land required for this purpose can be recommended to Revenue Authorities without any guarantee of making the land for quarry available.

All the materials involved in the construction shall be of best quality and specifications and shall

be got approved from the Engineer-in-charge before use. If necessary, materials shall be got tested from the Laboratory at his cost. Samples requiring approval shall be submitted by the Contractor to the Engineer-in-charge in good time before the use of each material. The samples shall be properly marked to show the name of the materials place.

5. The Contractor shall provide all labour, skilled as well as unskilled, pegs lime, strings, site-rails

(wooden as well as steel, etc.) as and when required as per approved design and make available such other materials for surveying, lining out, setting out, checking of work, taking measurements, testing of hydraulic and other structures, without any payment by the MJP to him. He will also provide proper approach and access to all his works and stores without any extra cost over his tendered rates for the items to be inspected.

Page 132: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 11 )

Contractor No. of Corrections Executive Engineer

6. Rates quoted include clearance of site (prior to commencement of work and its closure) in all respects and hold good for work under all conditions of sites, moisture, weather, etc.

7. Failure to comply with any of the above instructions will result in the MJP's doing the needful at

the risk and cost of the Contractor. These conditions are for all items and as such no extra payment shall be made for observing these conditions.

8. The Contractor shall make his own arrangements for quarrying of rubble, stone, murum, sand,

lime, metal etc. 9. Overburden in a quarry will have to be removed by the Contractor at his own cost. 10. Unless a separate item is provided in Schedule 'B' minor dewatering of foundations in excavation

and during the construction of foundation masonry if required shall be done by the Contractor without claiming extra cost.

11. Masonry shall be kept wet for atleast 15 days and concrete work shall be kept wet for atleast 21

days commencing from the date of its final laying in position. In case during execution curing is found inadequate, it will be carried out by MJP's and the cost thereof shall be recovered from the Contractor. The Contractor shall make his own arrangements for getting water at site at his own cost.

12. The proportions of cement concrete specified in the Schedule 'B' are nominal and are only an

indication of approximate proportion of cement, fine aggregate and coarse aggregate which may have to be altered suitably at site to obtain the desired strength and workability. However quantity of cement shall not be less than the standard nominal mix criteria.

In case of major items of concrete for RCC works the Contractor shall prepare test blocks as per

IS Specifications for testing its tensile and compressive strength at his own cost. These blocks will be tested in any of the Government Test Laboratories at the cost of the Contractor. The number of test blocks, frequency etc. shall be as per ISS 456/1978 (Cl.14) and acceptance criteria of concrete shall be as per clause 15 of ISS 456-1978.

13. Damage by Floods or Accident The Contractor shall take all precautions against damage by floods and from accidents. No

compensation will be allowed to the Contractor for his plant, material and work etc. lost or damaged by floods or from other causes. The Contractor shall be liable to make good any part of material which is in charge of the Contractor and which is lost or damaged by floods or from any other cause. If the work executed is damaged, trenches filled due to any reason, Contractor shall have to make it good at his cost only.

Page 133: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 12 )

Contractor No. of Corrections Executive Engineer

14. Testing of Structure In the case of work which creates reasonable doubts about the quality of workmanship or of

materials used in the construction, the Superintending Engineer may order the Contractor to satisfy the MJP by carrying out a suitable load test or test of the structure or parts thereof, in the manner as prescribed in Clause-16.5 on Page No. 45, The Indian Standard Code of Practice for, plain and reinforced concrete for general building construction or as may be approved by him, in regard to the sufficiency of the strength as designed and in the event of any deficiency being noticed as a result of the test, the Contractor shall carry out necessary strengthening or dismantling as may be directed by the Superintending Engineer.

The load test and strengthening or dismantling whenever directed shall be carried out by the

Contractor entirely at his risk and cost and to the entire satisfaction of Engineer-in-charge or his authorised agent and till then the work shall not be considered to have been completed. No payment for dismantled work shall be made.

15. Supply of Rate Analysis in case of Extra Items In case of the EIRL the Contractor shall supply Rate Analysis based on labour and material in

case he is called upon to do so. 16. Water required for Construction The Contractor has to make his own arrangements at his cost for water required for

construction, testing, filling, structures, etc. either from local bodies or from elsewhere, by paying the charges directly and arranging tankers, etc. as per necessity. No claim for extra payment on account of non-availability of water nearby, or extra lead for bringing water shall be entertained. All required piping arrangements and pumping if required for water shall be made by the Contractor at his cost. If Contractor fails to pay the water charges to local bodies or private parties these shall be recovered by the MJP from his bills. In case MJP's water supply is available, a connection at a suitable place may be sanctioned but, all further arrangements of pumping if required, piping, etc. shall be done by the Contractor at his cost, and water charges in such a case, shall be paid by the Contractor at the rates as decided by the Executive Engineer, which shall be final and binding on the Contractor.

Whenever Schedule 'B' provides for any dewatering item, payment shall be admissible under that

item, but apart from that item, no extra claims for dewatering required for executing various tender items, and for executing such items in wet condition shall be entertained as all these expenses are deemed to be included in the dewatering item.

17. Leads and Lifts Unless otherwise specifically mentioned in the tender item, the tendered rate for all items in

tender shall cover all lifts and leads encountered for the execution of the work as directed and no extra claims for additional lifts and leads shall be entertained.

Page 134: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 13 )

Contractor No. of Corrections Executive Engineer

18. Unless otherwise specifically provided for in the tender or a separate item is provided in Schedule 'B', all the sides of excavated trenches after the work is completed or in progress are to be filled by the Contractor to the original ground level from excavated stuff at no extra cost to the MJP.

19. Unless otherwise specifically mentioned in tender items, the net dimensions of RCC or CC

Members actually cast are only admissible for payment under RCC or plain CC items. No increase in dimensions due to plastering or finishing shall be admissible for payment under RCC or plain CC items.

20. Cement that will be supplied by the Contractor shall be in Jute/PVC bags. 21. No claims for any desilting of trenches, foundation, etc. filled due to floods, untimely rains, or

any other reasons whatsoever shall be entertained and Contractor shall have to do this desilting operation together with dewatering operations entirely at his cost.

22. Electricity supply required for construction of work/labour camp, etc. shall be arranged by the

Contractor at his own cost. 23. The no. of various specials should be brought on the site only after the prior approval of

Engineer-in-charge and its payment will be released as per actual consumption on site. In order to avoid the surplus balance of specials, with Department; contractor shall be paid

specials on weight basis, brought by him on the site. Only consumed specials shall be considered for payment and other will have to be returned to contractor.

Page 135: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 14 )

Contractor No. of Corrections Executive Engineer

3. Technical Specifications General 3.1 The tender is inclusive of necessary excavation in all types of soft and hard strata, lean concrete

below foundation, foundation concrete, RCC footings, container tank covered with RCC roof slab/dome, with RCC ventilator in the roof RCC stair case, or MS ladder, lightning conductor, GI pipe railing, fixing of pipe assembly, valves, construction of BB masonry chambers, providing and laying RCC pipe line for drain, cement plaster for tank from inside with waterproofing material neat furnishing. Cement based paint from outside, painting capacity, name of scheme, etc. on body wall concrete as per detailed specifications for all units of WTP, sump, pump house, etc. complete.

3.2 Clearing of Site Before starting the work the site shall be cleared of all shrubs, grass and other vegetation

including large and small bushes, all stumps, removal of roots, cutting and disposal of small trees upto 300 mm growth, etc. ( the growth shall be measured at a height of 1.5 meters above G.L. ). The site to be cleared shall consist of the entire area required to be cut down to accommodate the reservoir. The contractor shall make themselves familiar with the local rules and regulations pertaining to land clearance, special requirements of forest areas, wherever applicable, and the work shall be carried out in strict accordance therewith.

3.3 Excavation The side slopes of the cutting shall generally have the following slopes for stability : a) 1 : 1 slope for excavation in early, murum, boulders, etc. b) 1 : ½ slope for excavation in hard murum. c) No slope will be allowed for soft and hard rock. If however, the strata met with can sustain safety, steeper slopes than those mentioned above,

such steeper slopes may be permitted with the prior written permission of the Engineer-in-Charge of the work.

3.4 Dewatering or Pumping If pumping or dewatering of water is required to be done at any time during excavation, the

contractor shall arrange for such draining by excavating channels, pumping or otherwise and shall maintain such arrangements to the satisfaction of the Engineer-in-Charge for such a period as may be required. The discharge of the dewatering pumps shall be conveyed to drains and shall not be allowed to be spread in the vicinity of the work site. All cost for such arrangements including pumping shall be borne by the contractor and no extra payment shall be admissible for such operation.

Page 136: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 15 )

Contractor No. of Corrections Executive Engineer

3.5 Shoring Open cuttings shall be suitably shored, sheeted and braced, if required by the Engineer or by site

conditions or to meet local laws, for protecting life, property adjoining work site. Adequate shoring and strutting shall be provided by the contractors at their own cost, warped or

deformed timber shall not be used. The shoring shall project at least 150 mm above ground level and shall extend to a suitable depth below the bottom. Wherever necessary the planks or struts shall be driven by compressed air pile drivers. The planks shall be fixed close enough to avoid any running in of sand or earth through the joints. The shoring materials shall not be of sizes less than those specified below, unless steel sheet piling is used or unless approved by the Engineer in writing.

a) Planks 5 cm thick.

b) Walling pieces 10 cm x 20 cm

c) Struts 15 cm x 20 cm For walling pieces round timber shall not be allowed. In a vertical plane, there shall be at least

three struts or more as directed by the Engineer. They shall rest on walling pieces. The spacing of the struts shall be as per the requirement. At the bottom, extra struts shall have to be provided if ordered by the Engineer-in-Charge.

3.5.1 The excavated material shall be transported by the contractors and stacked at suitable places as

directed by the Engineer-in-Charge. The stacks shall be made out side the area of excavation and shall not endanger the work in any way and shall avoid the obstruction to footpaths, road-drive ways, hydrants, access to the properties and work sites. Cutter shall be kept clear. Natural water courses shall not be obstructed.

Separate stacks shall be formed for : a) rubble considered suitable for masonry work or road work.

b) rubble of inferior quality and boulders.

c) Soft rock, earth murum.

d) rod spoils upto 150 mm size.

Page 137: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 16 )

Contractor No. of Corrections Executive Engineer

GENERAL SPECIFICATIONS GS 1 Sand and Metal Sand and coarse aggregate (metal) shall be stored separately on site on hard ground so as to keep

them free from foreign materials such as soil, clay, glass, etc. In case of machine crushed metal separate depot shall be prepared for different sizes of metal and suitable proportion to form a dense mix as directed by the MJP shall be taken from these different sizes of metal.

GS 2 Form Work 2.1 The wooden shuttering planks shall be not less than 40 mm thick or such other thickness as may

be allowed by the Executive Engineer for a particular job. The entire form work, whether of steel, plywood or wooden planks, shall be very strongly proposed and braced with sufficiently strong vertical and horizontal members and the entire supporting structure shall be of sufficiently horizontal members and the entire supporting structure shall be sufficiently strong to take up the load of concrete and all stresses it may be subjected to, without any deflection. The Contractor shall be wholly and fully responsible for any defects in the entire form work and its supporting structure.

2.2 The form work shall be very smooth and entirely free from any dust particles direct and its inner

surface shall be oiled for the easy facility of form removal and shall be watertight. GS 3 Reinforcement 3.1 The Contractor has to procure it from open Market at his cost. The bars shall be scrapped

thoroughly for removing any scales, rust, etc. before use in work. Bars that may be found defective in any way shall not be allowed to be used. The reinforcement is to be fabricated and placed in position as per the MJP design to be intimated to the Contractor during execution from time to time. The hooks, laps, anchors, cover, etc. shall be as directed by the MJP. The Contractor has to place in position the reinforcement as directed and to secure it by binding wire to be provided at Contractor's cost. Any additional reinforcement provided by Contractor in addition to MJP's design and directions shall not be measured and paid for.

3.2 To ensure that the minimum cover require for slabs, beams, etc. is provided. Separators of

precast or cast in situ CC block with wires embedded shall be used and shall be tied to the reinforcement with wires. Between 2 or more layers of reinforcement, separators, of 20 mm or 25 mm size bars as directed shall be used duly tied. The separators of M.S. bar piece shall not be admissible for payment. The GI binding wire shall not be admissible for payment.

Page 138: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 17 )

Contractor No. of Corrections Executive Engineer

3.3 When Contractor has to bring steel then it shall be only tested one and Contractor shall produce the manufacturer's rolling mills test certificate without which it shall not be accepted. Further the Contractor shall arrange to get tested any samples from steel brought at site in a laboratory at his cost, and results should be submitted to MJP. Defective steel shall be rejected.

GS 4 Mixing 4.1 Good clean water shall only be used for mixing. Arrangements for bringing such water shall be

done by the Contractor at his cost. The amount of water to be used shall be as directed by the Engineer-in-charge on the basis of correct water cement ratio. The water measuring apparatus shall be provided by the Contractor at his cost.

4.2 For R.C.C. reservoirs and for other works which in the opinion of the Executive Engineer are

important the concrete shall be only machine mixed. The mixing shall be continued for atleast 8 minutes after all materials and water are placed in the drum which shall revolve for 14 to 18 revolutions or as specified by the manufacturers. The mixer for this purpose shall be brought by Contractor at his cost and the MJP does not take any responsibility for supply of MJP's mixer which could be conveniently spared to the Contractor, that will be issued to him on hire on Contractor's request, as per MJP's rules in force from time to time. If as a result of break down of mixer during concreting hand mixing has to be resorted to temporarily. Only such work which is considered absolute essential by the Executive Engineer shall be allowed to be done by hand mixing and the entire operation of hand mixing and precaution thereof shall be taken as will be directed by the Engineer-in-charge. For hand mixing first cement and sand will be dry mixed in required proportions by turning over the mixture for sufficient time till it is of uniform colour. The required quantity of aggregate shall then be added and the mixture again turned over for atleast _____ times. The required quantity of water shall then be added gradually through rose pieces attached to the can until process of turning is in progress and till is of uniform consistency where such hard mixing is allowed as a result of area requirement and no extra payment for this excess cement shall be admissible.

4.3 For works other than mentioned in above para, hand mixing will be allowed and in such cases,

cement to be used shall be as per standard requirement only. 4.4 Normally the standard cement consumption will be as under : M 10 4.20 Bags / Cum 1:3:6

M 15 6.20 Bags / Cum 1:2:4

M 20 6.90 Bags / Cum 1:1½:3

M 25 8.50 Bags / Cum 1:1½:1

M 30 9.20 Bags / Cum Mix Design

For any other mix the cement consumption shall be as decided by the Executive Engineer. The consumption as mentioned above shall be for the gross RCC column actually cast. The cement required for finishing, rendering cement, wash, etc. shall be in addition to above.

Page 139: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 18 )

Contractor No. of Corrections Executive Engineer

GS 5 Concrete Laying 5.1 The forms shall first be lightly moistened before laying concrete. The concrete shall be placed in

position within 20 minutes after adding water to the mix and shall be slowly deposited in its place and not thrown or dumped from a height shall be placed in uniform layers. For vertical walls or water retaining structure water stoppers shall be provided.

5.2 For columns the concrete shall be laid in maximum 1.2 M height at a time. For vertical walls of

reservoir it shall be laid in maximum 0.6 M height only at a time. GS 6 Tamping, Ramming and Consolidating 6.1 For all RCC Reservoirs and other works which are considered by the Executive Engineer to be

important, mechanical vibrators shall invariably be used by the Contractor at his cost. The Contractor shall provide at least 2 vibrators in good working condition, so as to have one as a standby and to prevent interruption in work. The concrete being laid shall be vigorously vibrated during laying and also loaded by bars where vibrator cannot reach so that dense and complete filling is assured. The Contractor shall make his own arrangements for procuring vibrators at his cost and the MJP does not guarantee that they will be supplied on hire.

6.2 For all other works consolidation and tamping shall be manual labour by rodding vigorously by

M.S. bars, throughout for a sufficient time and in such manner as directed by the Engineer-in-charge. Adequate number of labourers shall be set apart specifically for tamping and ramming with relievers.

6.3 The efficiency of tamping and consolidation shall be judged by absence of any air pockets and

absence of honey combing any defective consolidation and tamping shall be entirely on Contractor's risk and costing will have to be entirely pulled down if so directed and redone properly entirely at the cost of the Contractor.

GS 7 Curing 7.1 All RCC work will be watered and kept constantly wet for 23 days after initial set casting by

means of wet gunny bags and ponding as directed by the Engineer-in- charge. This operation shall start immediately after initial set of the concrete. Should the Contractor fail to water the concrete continuously, it will be done immediately at Contractor's cost.

7.2 Removal of Form It shall be generally as under, subject to the written approval and modification by the Engineer-

in-charge.

Page 140: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 19 )

Contractor No. of Corrections Executive Engineer

Column and Beam Sides 3 Days Vertical Walls 6 Days Bottom of Slabs and Domes 10 Days Bottom of Beams 14 Days Bottom of Beams of Span 4.5 M and above 21 Days Bottom of Plain CC 3 Days GS 8 Inspections The work of each category of operation i.e. completion of form work placing reinforcement,

concreting, removal of form, etc. must be got inspected by the Junior Engineer before commencing and succeeding operation in case of RCC elevated reservoir and major RCC jobs. In all cases, however, before the concrete is laid it must be got inspected and approved by the Deputy Engineer to concreting shall be commenced with approval of the Deputy Engineer. In case of RCC reservoirs and other major works concreting must be done in presence of Deputy Engineer himself. In other case, it shall be done in presence of Junior Engineer. In case of failure to comply with above specifications, the work is liable to be pulled down if directed by MJP and redone at full cost of the Contractor. No measurements will be recorded for any work which is done contrary to specifications and no payment thereof shall be admissible.

GS 9 Finish and Quality of Concrete 9.1 The RCC work cast shall be of dense mix, homogenous without any honey combing true in size

alignment and shape. Any defective work shall not be entitled for full tendered rates for payment and if the defects are major no measurements and payment are admissible and Contractor shall have to pull down such defective work and redo at his cost. The decision of the Executive Engineer regarding such defective work and the decision, viz. pulling it down or reducing rates as may be necessary shall be final and binding on the Contractor.

9.2 All RCC work shall be finished as directed by the Executive Engineer. It should be clearly

understood that the finishing is not meant to cover the casting defects but only to give a smooth appearance. In case of RCC reservoirs and other major RCC works Contractor shall not commence finishing unless and until Engineer-in-charge has inspected the casting of concrete after removal of form and has satisfied about its quality failing which it shall be regarded that casting was defective and action deemed fit as per clause (11) 1 above will be taken since finishing has to commence immediately after removal of forms. The forms removal in RCC reservoirs and other major work shall be done in presence of Deputy Engineer.

Page 141: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 20 )

Contractor No. of Corrections Executive Engineer

9.3 Surfaces not in contact with form work and not subject to any plaster shall be finished by a float to present a smooth and uniform appearance. Surfaces which are in contact of form work but for which no plastering is provided as per plan and estimate shall also be finished smooth, and sand faced as directed. Surfaces for which plastering is to be done, as per separate provision of plastering plans and estimates, shall immediately on removal of forms, be roughened for bond by a pointed tamping tool.

9.4 In case, whether would be specified in the tender item or not the finish shall be such as to match

with the rest of the structure to present a harmonious appearance. It shall consist of 3 coats of cement wash, rendering, plastering float finished faced, etc. as per the requirement at site and as directed by the Executive Engineer and Contractor shall have to do it at his own cost. Failure to do proper finishing as directed shall result in payment at reduced rates only to the Contractor and the decision of the Executive Engineer in this respect shall be final and binding on the Contractor.

GS 10 Testing 10.1 All structures meant to hold water shall be tested for watertightness test at Contractor's cost, by

filling them to their desired level. The watertightness test shall be considered satisfactory when the fall in water level after the container is filled to the FSL is not more than 6 mm/24 hours and there is no sweating from outside or bottom whatsoever.

10.2 Contractor has to make his own arrangements for water for testing at his cost and these

arrangements shall be such that immediately after initial setting of plaster, the containers are filled with water. After the satisfactory watertightness test the container shall be kept constantly filled with water at Contractor's cost till the completion of work.

10.3 Till satisfactory watertightness test is given by the Contractor, at his cost, to the satisfaction of

the MJP, only 90% tendered rates shall be admissible for payment for RCC concrete items. 10.4 In case of RCC elevated reservoirs and other major RCC works from batches or concrete mix

actually being laid, testing cubes shall be cast periodically as directed by the MJP, in presence of the Deputy Engineer-in-charge and these cubes shall be got tested after they have attained their full strength, from a suitable testing laboratory. The MJP's representative shall arrange for taking test cubes, sending them to laboratory and obtaining test results, at full cost of Contractor.

The charges of this viz. moulds, labour for casting, materials, conveyance charges to and from

the laboratory including TA of staff members and laboratory test charges, etc. are included in the tender rates and they shall be recovered from Contractor's bills. The ultimate compressive stress as revealed from these tests shall be as per IS.

Page 142: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 21 )

Contractor No. of Corrections Executive Engineer

Cube casting acceptance of concrete will be as specified in IS 456-1964 and relevant ISS. Unacceptable quality concrete shall be demolished and redone without any extra cost by the Contractor.

The Executive Engineer at his discretion consider sub-standard work at a suitable reduced rate,

provided such weak concrete is restricted to such members and in such quantities, which in the opinion of the Executive Engineer will not endanger the safety of the structures. Executive Engineer's decision in such cases shall be final and binding on the Contractor.

GS 11 Measurements 11.1 The measurements shall be the units as mentioned in the Schedule 'B' and break-up schedule. 11.2 Mode of measurements shall be : a) Columns : Height from top of footing to bottom of beams shall be measured as columns. b) Braces for columns shall be measured as net between column faces. c) For straight beams, duly ribs between column top and slab bottom surface shall be

measured to beams and rest in slabs. d) For ring beams the full section of beams from bottom to top shall be measured in beams

and quantities laying outside the full beam section in beams. Slant walls, slabs, etc. as the case may be shall be measured in the respective slant wall, vertical wall, flat slab, etc. as the case may be.

e) Vertical walls shall be measured for net quantity outside columns, beams, slabs. f) No deduction shall be made for reinforcement in RCC work. 11.3 The measurement under RCC works for net dimensions cast as directed without any allowance

for rendering, finishing, etc. GS 12 Doors, Windows CCTW Doors, Windows, Cupboards, etc. 12.1 Sizes shown on drawings are clear openings in masonry and not the shutter's size. These sizes

shown on drawings are, therefore, inclusive of required frame sizes and doors, windows, etc. and shall be manufactured, accordingly. If sizes bigger than shown in drawings are manufactured, as instructed specifically in writing they shall be measured and paid for accordingly.

Page 143: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 22 )

Contractor No. of Corrections Executive Engineer

12.2 The work shall be executed as per the size of frame thickness of shutter type viz. plain planked panelled, glazed, etc. and fixture, etc. as described in tender item. Iron bars for windows and ventilators are to be provided if specifically mentioned in the tender item at Contractor's cost. Specifications in PW standard specifications shall be applicable.

12.3 The design of shutters and quality of wood shall be got approved from the Engineer-in-charge

before manufacture. The CCTW to be used for wood work shall be uniform in substance straight, free from large deed knots, flows flanks. The work shall be done as per specification of P.W.D. hand books latest edition. The joints shall be perfect. The work be done as per Specification Book (Red Book) published by B & C Department.

12.4 Parts of wood embedded in masonry shall be painted with the tar. The frames of doors, windows,

ventilators, etc. shall have proper holdfasts embedded in masonry. 12.5 Whenever iron bar is to be provided as per tender item the rate thereof is included in tender item. The pointing shall be done as prescribed in tender item. No painting, however, shall be permitted

till the wood work is approved by the Engineer-in-charge. 12.6 Any substandard work not conforming to the specifications shall be paid at reduced rates only

and also liable to the outright rejected and Executive Engineer's decision in such cases shall be final and binding on the Contractor.

12.7 The mode of measurement shall be on area units as mentioned in Schedule 'B'. GS 13 Plastering 13.1 12 mm, 20 mm and 25 mm cement plaster either plain or waterproof. The plastering items shall be executed in thickness and cement mortar of proportions as detailed

in respective tender items. Similarly, the plastering shall be either ordinary or waterproof as specified in tender item.

13.2 In case of waterproof plaster, standard and approved waterproofing compounding shall be mixed

in cement mortar in required percentage as directed and then the plaster is applied. Unless and until the watertightness test is given by the Contractor to the satisfaction of the MJP, only part rates shall be paid.

13.3 The finishing shall be either smooth or rough cast as may be directed by the MJP unless

otherwise specifically mentioned in the tender item. 13.4 Neeru finish wherever directed by the MJP shall be done from inside at no extra cost. 13.5 Specification given for this item in Standard Specifications Book (Red Book) published by B

and C Department shall be followed.

Page 144: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 23 )

Contractor No. of Corrections Executive Engineer

13.6 Curing and watering shall be done as directed and plaster shall be in alignment and level. Any sub-standard work is liable to be rejected and shall have to be redone at Contractor's cost. Sand to be used shall be of approved quality only.

13.7 Cost of all scaffolding is included in the tender rate. GS 14 Painting 14.1 The work shall be carried out as per the description of the tender item and as directed by

Engineer-in-charge. It shall be whitewashing, distempering and/or snowcem painting. Shade and make shall be as directed by the MJP and for decorative purpose, MJP may ask for different shades to be provided for different components or different parts of the same component which the Contractor shall have to do within his tendered rate only at no extra cost to the MJP. Cost of priming coat as directed, scaffolding, etc. is included in the tender item. The work shall be executed as per the specifications of P.W.D. Hand Book latest edition and specification for painting in Standard Specification Book (Red Book) published by B and C Department.

GS 15 Providing and Fixing M.S. Ladder Ladder shall be manufactured as per the details provided in the tender item. All the materials and

labour required for executing the item are to be provided by the Contractor at his cost. The ladder shall be properly fixed at site as directed and the bottom and top shall be properly embedded in 1:2:4 CC block as directed at Contractor's cost. In order to have stiffness to the ladder, cross supports or stiffeners at suitable intervals as directed, shall be provided of suitable M.S. flats duly embedded in walls or welded to the ladder. The specifications for this item as given in the Standard Specification Book (Red Book) published by B and C Department shall be followed.

GS 16 GI Hand Railing The item shall be executed as specified in the tender item and as shown on drawing. The vertical

supports shall be properly fixed at base either in masonry or concrete by nuts and bolts duly embedded in the form, right anchorage holes in the vertical support to pass GI piping in it or welding to fix the GI pipes to supports together with MS cleats, etc. are included in this item. The GI piping shall be provided along with required specials, fixtures, fastenings, etc. and GI piping shall be bent in circular or spiral railing pipes and shall be jointed by GI collars or welded as per necessity. The diameter of GI piping, number of rows, size and type to vertical posts together with its centre to centre distance height, etc. shall be as specified in the tender item and in absence thereof as per the MJP's type design in force. The rate shall also include 2 coats of approved shade oil paint. Cost of all the materials which shall be procured by the Contractor, labour involved for executing this item is included in tender item. The measurements and the payment shall be on the basis of lengths in running metres occupied by the completed railing assembly in plan.

Page 145: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 24 )

Contractor No. of Corrections Executive Engineer

GS 17 Providing, Fixing RSJ and Other Structural Steel Works 17.1 This item covers fixing MS/RS girders, MS angle, channels, flats, base plates, gusset plates,

cleat, bracket, etc. and other accessories as per requirement and as directed and fabricating the assembly by cutting, drilling holes, etc. and erecting and fixing item at site with necessary rivetted or welded joints, fixtures with nuts and bolts, etc. wherever necessary, together with their proper fixing and embedding in masonry or slabs of concrete as directed. Structural steel works materials shall be procured by the Contractor from open market at his cost. The item includes 3 coats of oil paint of shade as directed to all structural work.

17.2 All above operations including cost of materials and labour thereof are included in the tender

item. The measurement and payment shall be on the weight basis in the unit as mentioned in Schedule 'B', actually erected at site as directed shall be admissible for payment. RSJ channels, angles, flats, gusset plates, brackets, base plates, cleats, packing pieces actually used as directed shall be admissible for payment but not the rivets, nuts and bolts, etc. The rivetted or welded joints or fixing with nuts are included in the tendered rates. The specification for this item given in Standard Specification (Red Book) published by B and C Department will be followed.

GS 18 Murum Filling, Bedding, etc. 18.1 When tender item provides that murum available from excavation is to be used free of cost,

whatever murum that is available and suitable from excavated stuff shall be used by Contractor, free of cost.

18.2 The murum filling or bedding is to be done in 15 cm to 20 cm thick layers, watered and duly

consolidated by hand rammers as directed. GS 19 Rubble Filling - Providing and Packing Rubble Filling, etc. 19.1 The rubble shall be properly hand packed with murum bindage in 20 cm thick layers as directed.

Unless otherwise specifically mentioned in the tender item of the cost of rubble in included in this item, and if rubble is available from excavation, the same shall be used by the Contractor after getting approved the quality of rubble selected from the excavated stuff by the Engineer-in-charge. This rubble is considered to be issued free of cost for use on the work only.

19.2 This shall be as per specification of P.W.D. (Hand Book) and as directed by Engineer-in-charge.

Only trap stone shall be used other than the specification for this item in Standard Specification Book.

Page 146: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 25 )

Contractor No. of Corrections Executive Engineer

GS 20 Maintaining Rural Water Supply Scheme for 12 (Twelve) Months beyond the trial run for Individual Scheme

20.1 On completion of scheme, the Contractor should commission the scheme to its rated capacity,

including cost of all labour items, attending execution defects noticed, including cost of material and labour for above period till the time the concerned Village Panchayat takes over the scheme whichever is earlier. The period may extend eighteen months if Village Panchayat does not take over the scheme.

20.2 The Contractor should employ necessary staff such as operator, valveman. It should be the

responsibility of the Contractor to see the regular supply is maintained which should be disinfected by TCL / Alum and the Village Panchayat is made aware of day-to-day maintenance. The running charges exclude the cost of TCL / Alum and cost of electrical bills. The defects noticed during this period, arising out of defective workmanship should be attended by the Contractor, without any extra cost.

20.3 The Contractor should maintain necessary log book of pumping and chemical dose etc. up-to-

date. If the Village Panchayat accepts the scheme after 12 months, the joint inspection of the committee members shall be arranged, as decided by the Executive Engineer, and regular handing over note shall be signed by the concerned authorities. The responsibility of the Contractor shall cease only after signing of such documents.

Page 147: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 26 )

Contractor No. of Corrections Executive Engineer

DETAILED SPECIFICATIONS General Following specifications are in amplification OR in addition to the specifications for the respective items given in P.W.D. Hand Book Volume I and II (Latest Edition), Red Book of Government of Maharashtra and shall be strictly adhered to. Relevant ISS shall also be referred. Alignment Alignments and line out for the work is to be given by the MJP's officials and the work shall be carried out as per the MJP's line out and alignment for which Contractor has to provide at his cost all materials such as sight-rails, honing rods, pegnails, chunnam flags, etc. and also the required labour for line outs. The cost of constructing pillars, platforms for temporary bench marks is also to be borne by the Contractor. Excavation in Soft Materials and Hard Materials The classification for all excavation met with shall be in two categories only, as under : Soft Materials Soft material shall include all types of earthy or sandy materials, soils of all types, clay, soft, average hard murum i.e. all kinds of disintegrated rock, shingles, clay, sand, made-up soils, bricks, bats and isolated boulders upto the size of 0.1 cum. The excavation in macadam bound surfaces shall also be classified in soft materials. Hard Materials Hard materials will include boulders of size bigger than 0.1 cum, all types of rock, soft and hard, which can be best removed by blasting. Blasting will not be permitted in inhabited localities or in vicinity of properties, where damage to human life and property will be involved in the opinion of the Executive Engineer and in that case work will have to be done by chiselling and the like methods in the same tendered rates. By the term "SOFT ROCK" is meant rock in masses but of a softer variety, crystalling in structure, which is otherwise like hard rock. It only indicates the degree of softness, but will not include the disintegrated masses of rock, which generally have fractures or cleavages. Soft rock can be removed by a pick but for mass removal blasting has to be done. On hard rock a crow bar or a pick will only rebound removing but in significant quantity. The excavation in asphalt or concrete shall be classified as hard materials.

Page 148: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 27 )

Contractor No. of Corrections Executive Engineer

The excavation shall be taken down to such depths as shown in drawings and/ or as directed and shall be done in extra sections shown in drawings and stipulated in specifications elsewhere herein. Extra excavation done over and above specified for whatever reasons shall not be paid for. The bottom of the foundation pits shall be perfectly levelled before any concrete or masonry is put in and shall be watered and thoroughly rammed. No filling will be allowed for bringing the foundation pit to proper level. The excavation may go down deeper by 3.0 M more to reach proper foundations and arriving certain levels etc. for which necessary payment shall be done. The section of excavation, however, may be increased correspondingly, if necessary, as directed by the Executive Engineer, for such extra depths and such increased section as directed by Executive Engineer, shall be admissible for payment at respective tendered rates. All foundation pits shall be filled on the sides of masonry and concrete by the excavated stuff to the original surface of ground as required, watered and rammed, in 20 cms. thick layers and the tendered rate includes this operation. Excavated material from foundations shall not be placed nearer than 1.2 M from the edges of excavation. In case of excavation in towns and inhabited places, it shall be strongly fenced and lighted during night by red lights in charge of watchman at Contractor's cost. Material should not be dumped on road. Unless otherwise specific lifts and leads are mentioned in the tendered item the tendered rate shall be for all lifts and leads involved in the work. The Contractor shall provide shoring and strutting of approved size and type for normal conditions wherever necessary for excavation in soft materials without extra cost unless otherwise provided for in separate tender item. Excavation carried out in excess of the width specified shall be at Contractor's own risk and shall not be measured. So also the excavation carried out in excess of the required depths shall be made good to the required level by either concrete or masonry of proportion as directed by the Executive Engineer without extra cost. The tendered rate for excavation items shall include lifting and removing the excavated materials for proper disposal in the vicinity as directed by the Engineer-in-charge. Nothing extra shall be paid for removal of masonry concrete structures, or for removal of stumps or roots of trees met with during excavation and for filling of holes or hollow due to removal of roots etc. or existing originally which shall be filled up by earth and will be rammed and levelled. If there is no separate item of dewatering in the tender, the Contractor's tendered rate shall include manual bailing, draining of the trench and the excavation shall be kept free from water, while the work is in progress in a manner as may be directed by the Executive Engineer. When there is a tender item of dewatering then payment shall be admissible under dewatering required for all items in the tender from start till its completion. In either case the excavation item shall be dry as well as in wet condition, unless otherwise separate items exist for wet excavation. In case of pipe trenches, the Engineer-in-charge may reduce the width of trench wherever a hard strata is met with, if he feels adequate and just sufficient to lay the pipeline in order to reduce the hard quantity. In such cases the Contractor will be paid on the actual measurement.

Page 149: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 28 )

Contractor No. of Corrections Executive Engineer

No extra cost will be paid for putting the pipe all along the trenches before laying in the trenches. Average width of excavation trenches that shall be admissible for payment for various diameters of pipelines (excepting PVC pipes) shall be as under : Sr.No. Internal Dia. of Pipe Width of Excavation of Trench Nature of Strata

1. 80 mm and below 0.70 M In soft and hard materials 2. 100 mm 0.75 M In soft and hard materials 3. 150 mm 0.75 M In soft and hard materials 4. 200 mm 0.85 M In soft and hard materials 5. 250 mm 0.85 M In soft and hard materials 6. 300 mm 0.90 M In soft and hard materials 7. 350 mm 0.95 M In soft and hard materials 8. 400 mm 1.10 M In soft and hard materials 9. 450 mm 1.15 M In soft and hard materials 10. 500 mm 1.20 M In soft and hard materials 11. 550 mm 1.25 M In soft and hard materials 12. 600 mm 1.25 M In soft and hard materials 13. 700 mm 1.30 M In soft and hard materials 14. 750 mm 1.40 M In soft and hard materials 15. More than 750 mm O.D. + 0.60 M In soft and hard materials

In case of PVC pipes following trench widths shall be adopted. Sr.No. Outside Dia. of Pipe Width of Excavation of Trench Nature of Strata

1. Upto 110 mm 0.70 M In soft and hard materials 2. 140 mm 0.75 M In soft and hard materials 3. 160 mm 0.75 M In soft and hard materials 4. 180 mm 0.80 M In soft and hard materials 5. 200 mm 0.80 M In soft and hard materials 6. 225 mm 0.80 M In soft and hard materials 7. 250 mm 0.85 M In soft and hard materials 8. 280 mm 0.90 M In soft and hard materials 9. 315 mm 0.90 M In soft and hard materials

Any width excavated more than above shall not be measured and paid for. The Contractor shall carry out extra excavation for collar pits at joints wherever necessary and such extra collar pit excavation shall not be admissible for payment and will not be measured.

Page 150: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 29 )

Contractor No. of Corrections Executive Engineer

During excavation and till the trenches are properly refilled, if any public or private water tap connections, telephone wires, cables etc. are damaged, the Contractor shall reinstate them at his cost. The Contractor shall at his own cost give the satisfactory hydraulic testing which shall include all labour cost of water to feed and while testing, repairs required shall have to be carried out by the Contractor. No extra cost shall be paid. Refilling Trenches of Pipelines In no case the Contractor shall be allowed to refill the trenches in hard excavated portion to be refilled by the boulders or the excavated stuff. This portion of trench shall be refilled by the soft murum or soft strata from excavated stuff from distant place. No extra cost shall be paid. After the pipelines are laid, jointed and tested, the refilling of trenches with excavated stuff shall be done approximately in 20 to 30 cms. higher than road or natural ground level, to allow for sinking afterwards. This refilling shall be done in 15 cms. thick layers, duly watering compacting, each layer. The 15 cms thick layer immediately in contact on or under pipe shall have no stones or chips, but only soil or soft murum selected from the excavated stuff after refilling. If it is sunk below the road level after some time till completion of work, the Contractor shall have to make it good at his cost. Before lowering of all pipes in trenches a layer of murum selected from excavated stuff shall be provided below pipe line for proper grading and to act as cushion, etc. Refilling the Sides of Excavated Trenches of Jackwell and Inspection Well The part of gap between the rubble filling of steining and the sides of excavation shall be refilled with the excavated stuff in layers of 20 cms thickness or as specified in the item working, each layer shall be watered and rammed before the next layer is laid. The boulder filling behind the steining and the refilling shall be done simultaneously if required as directed by Engineer-in-charge. The balance quantity of excavated stuff shall be removed without any extra cost to the MJP and it shall be disposed in such a manner that it does not form an obstruction of the natural water course or the passage to the pump house or to the adjacent land owner. The measurements shall be on the exact section measured upto the original ground level. Dewatering for River Head Works This item includes the entire dewatering operation from start of work till its completion in all respects. In case of percolation wells, abandoned due to less yield, the payment of dewatering shall be in proportion of yield, as per recuperation test.

Page 151: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 30 )

Contractor No. of Corrections Executive Engineer

All Machinery, Piping, Fuel and Lubricating Oils and Electricity Consumption charges, electrical connection charges, etc. required for pumping machinery and together with erecting, labour and running charges are to be borne by the Contractor under this item. The trenches shall be kept free of water during the entire construction and arrangements to dispose off the bailed out water shall be properly made by the Contractor. The job also includes removal of muddy water, muddy paste, etc. If at any time during excavation till its completion, the work is filled with water or debris either due to untimely rains or due to underground springs being struck during excavation, slide slips or due to any cause whatsoever, the Contractor shall have to dewater and remove the debris, filled up material, etc. at his cost and no claims for extra rates shall be entertained. Similarly if the coffer dam is constructed for water diversion and is broken, washed away due to any reason, the Contractor shall make it good at his cost and no claim thereof shall be entertained. If the work is continued for more than one working season, or beyond the stipulated time limit, due to any reason whatsoever, the Contractor has to do all the dewatering and removing and trench clearing operations entirely at his cost. If any accident occurs during dewatering operations or due to coffer dam, etc. on account of any reason whatsoever, the Contractor shall be fully responsible for and shall have to shoulder all responsibility of compensation, etc. at his cost. In short, this item of dewatering covers the materials and labour cost for the entire period of execution from start till completion of work together with all eventualities mentioned above. Till the work is completed, part rates shall be admissible against this item, as decided by Executive Engineer, whose decision shall be final and binding on the Contractor. This item is operative only when dewatering operations are actually required to be done during execution and the payment shall be on the basis of units as mentioned in Schedule 'B'. The dewatering job item is for various units as mentioned in tender item itself. The dewatering sets or other machinery, if taken on hire from the MJP shall be returned by the Contractor after the work is completed in the same condition as was at the time of hire or otherwise the Contractor shall have to pay the repair charges and other charges if any for making it good. Providing and Fixing M.S. Ladders Ladder shall be manufactured as per the details provided in the tender drawing. All the material and labour required for executing the item are to be provided by the Contractor at his cost. The ladder shall be properly fixed at site as directed and the bottom and top shall be properly embedded in masonry or concrete and duly bolted with nuts and bolts and other arrangement as directed. The bottom if resting on ground shall be embedded in 1:2:4 CC block as directed at Contractor's cost.

Page 152: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 31 )

Contractor No. of Corrections Executive Engineer

In order to have stiffness to the ladder cross supports or stiffeners at suitable intervals as directed shall be provided of suitable M.S. plates, duly embedded in walls and welded to ladder. The cost of these stiffeners is to be painted with two coats of anti-corrosive paint of approved shade. The rate includes bending, cutting, scrapping the M.S. plates, bars and welding and jointing thereof. Weep Holes The tender item includes the cost of PVC or AC pipe, with screen together with the labour charges for fixing it in the staining. The diameter of the pipe should be 80 mm and it may be of any class. The pipe should pass through the width of steining completely and it should be placed at slight inclination so as to facilitate the flow of water as shown in the drawing. On the face of the pipe perforated cement concrete cover shall be fixed in cement mortar to serve as screen to prevent sand, other objectionable materials flowing into jackwell and inspection well. M.S./C.I. Dapuri Type Steps The cost of providing and fixing M.S. Dapuri steps is included in tender item. The size of M.S. Bar should be atleast 22 mm diameter and steps manufactured out of these bars shall be properly fixed at 0.30 M c/c distance and at places and in manner as directed. Painting with two coats of anti-corrosive black paint is also included in this item. Murum Bedding The murum to be used shall be of approved quality soft murum to be laid in 15 cms average thickness to the grade as directed by the Engineer-in-charge. The width admissible for payment shall be the same as per excavation trench width admissible under excavation item. The murum bedding shall be provided where there is black cotton soil or hard material below pipes or wherever directed and it shall be well rammed so as not to sink the pipe line. Extra excavation for murum bedding, wherever required as above shall be admissible for payment under excavation tender items. Providing, Lowering, Laying CI/DI Pipes with Tyton Joints Jointing the pipes with rubber gaskets joints. (viz. Tyton Joints) The tender item covers lowering, laying and jointing of CI/DI pipes as well as CI/DI specials, pipe-pieces, etc., as per requirement and as directed by the Sub-Divisional Officer, by Rubber Gasket Joint viz. Tyton Joints. The cost of conveyance of these materials from place of the site of work is also included in the Tender item. Tender rate includes jointing CI/DI pipes with providing rubber gasket joints including laying and jointing CI specials with lead joints. The method of Tyton Joint (i.e. Rubber Gaskets) is as under :

Page 153: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 32 )

Contractor No. of Corrections Executive Engineer

The rubber gasket is inserted in the socket of the pipe which is facilitated by applying a thin film of lubricating oil in such a way that the bulb of gasket is forward at the back and the socket and the groove in the gasket should be firmly fixed in the projecting ring inside the socket. The gasket has to be properly cleaned before inserting and it has to be ensured that it fits evenly around the whole circumference of the socket, removing any bulges which would prevent the entry of spigot end, then a thin film of lubricant should be applied to the gasket, inside surface and outside surfaces of entering spigot end for one inch distance after cleaning it. The pipe to be jointed should be supported centrally by the tackle, so that it is clear of trench bottom. The spigot of the pipe shall be carefully aligned and inserted in the adjoining socket, until it makes contact with the rubber gasket. The spigot shall be forced inside the socket past the gasket (which is thus compressed) until the spigot reaches the end of the socket. The forceful insertion has to be achieved with crowbars, jacks and lowers, etc. as per the details given in the literature of TISCO or any other suitable method as directed. However, before lowering of pipes in trenches a layer of murum bedding from the excavated stuff will have to be provided below the pipeline for proper grading and alignment and also to act as cushion and support to pipe. The murum bedding will be paid under item of refilling as it forms a part of refilling item. Note Above procedure with relevant changes will be applicable for the item of lowering, laying and jointing of A.C., R.C.C. pipes also. Lead required for the work should be brought by the Contractor at his own cost and the quality of the same should be got approved. The quantity of lead required per joint shall be as detailed below : For 80 mm 1.81 kg For 100 mm 2.20 kg For 150 mm 3.47 kg For 200 mm 4.60 kg For 250 mm 6.74 kg For 300 mm 7.33 kg For collar joints measurements will be allowed as two joints. PVC Pipes In case of PVC pipes the above relevant specifications shall apply. The cost of jointing material is included in the item of lowering, laying and jointing of PVC pipes. The pipes and couplers should be cleaned thoroughly. Cement solvent should be applied quickly as it is fast drying. The surface temperature should not be more than 45o C. Assembly jointing should be done till male and female ends of pipe are soft and wet with solvent cement. Excess cement should be removed. Following setting time should be observed for newly jointed pipes.

Page 154: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 33 )

Contractor No. of Corrections Executive Engineer

30 minutes minimum @ 60 to 100o F and above (15 to 40o C) 1 hour minimum @ 40 to 60o F and above (5 to 15o C) 2 hours minimum @ 20 to 40o F and above (-5 to 5o C) 4 hours minimum @ 0 to 20o F and above (-20 to -5o C) Hydraulic Test Suitable section as directed by the Engineer-in-charge shall be taken for such testing from time to time during progress of the work and satisfactory test given for that section. All testing apparatus, gauges, connections, etc. and water required for testing shall be arranged by the Contractor at his cost. The MJP does not undertake any responsibility to supply water for testing, which the Contractor has to arrange from the Municipality or otherwise by paying the required charges directly. The MJP shall have the right to recover such charges from his bills if complaints are received that Contractor has not paid the charges thereof. If there is delay in testing, the Contractor shall refill the trenches for the time being and reopen them at time of testing at his own cost, failure of which shall entitle the MJP to do the refilling and reopening of trenches at the risk and cost of the Contractor. If the trenches are filled due to any reason whatsoever before testing, the Contractor shall have to open them for testing at no extra cost. 1. Satisfactory hydraulic test shall be regarded when the section under test shall withstand the

pressure as specified by the Engineer-in-charge for about 15 minutes without operating the test pump, the test pressure being maintained at the specified figures during that 15 minutes interval.

2. The entire pipe line, specials and all joints in that section appear to be dry. The test pressure

shall be as per circular no. MJP/QCC/322 dated 31/12/1997 vide Appendix IV. During testing if any joints are found leaky they shall be repaired and/or redone by the Contractor at his cost till the test is found satisfactory. Similarly, any pipes, collars, specials, show hair cracks, leaks, etc. during testing, the Contractor shall replace them with sound pipes and specials together with new joints, entirely at his own cost, till a satisfactory test is given. The pipe, specials, etc. which crack during testing will, however, be supplied by the Contractor for replacement free of cost. The hydraulic test shall be given in presence of the Engineer-in-charge. 5% payment of respective sub-work shall be withheld till hydraulic test is given which shall be released only on giving satisfactory test. In addition to this, 20% amount of the item of laying, jointing of pipeline will be withheld for hydraulic testing. Fixing of Sluice Valves, Scour Valves and Air Valves, etc. Unless otherwise specifically mentioned in the tender items the required sluice valves, scour valves, air valves, etc. shall be supplied by the Contractor. The materials supplied shall be flanged as per requirement. The valves are to be carted to the site from supply place, lowered in the trenches and jointed to the pipeline as directed with cost of all jointing materials, such as lead, aloe-rope, rubber packing, nuts and bolts, fire wood, etc. and the labour cost, which included in the tender items. The joints may be either flanged or S & S lead joints depending upon the nature of valves supplied and

Page 155: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 34 )

Contractor No. of Corrections Executive Engineer

Contractor shall have no extra claims for any particular type of joint required to be done. The required number of jointing for fixing these valves is included in the tender item. If there is delay in supply of these materials by the MJP on account of their non-availability, no claims for any compensation shall be entertained. The measurement will be per number of valve and the length for tail pieces will be payable under item of laying and jointing. 90% amount will be paid on its supply and remaining amount will be released on completion of fixing and testing. B.B. Masonry Chamber (Providing and Constructing) The work is to be done in workmanlike manner as per type designs of the MJP and as directed. The cost of extra excavation in all strata which is in addition to the pipeline trench excavation is included in this item, while the excavation covered under pipe line trenches coming in the chamber is admissible for payment separately under the respective tender items of excavation for pipe trenches. Sizes of chambers mentioned in tender item are the internal dimensions of the chamber. The tender item covers 1:3:6 CC bedding 15 cms thick on the well rammed bottom 23 cms thick BB Masonry walls in CM 1:6 cement plaster 12 mm in CM 1:3 from inside and cement pointing 1:2 from outside, 1:2:4 CC either plain or RCC as required 10 mm thick for coping and providing and fixing M.H. frame and cover 1 M x 0.5 M. This is a completed item and any incidentals not mentioned above but are necessary as per type design are deemed to be included in this item. The finished top of the chamber shall be flush with road surface and shall not cause any hindrance to the traffic. The measurements shall be on the basis of completed number of chambers. Erecting, Laying and Fixing in Position CI / MS OR HS Pipes and Specials for Inlet, Washout, Overflow, etc. The item includes erecting, fixing, laying and jointing pipes and specials for inlet, outlet, washout, overflows, etc. as described in tender item. The pipes and the specials of any category are to be erected and joined under ground or above either in horizontal or vertical or inclined direction as per requirements with all leads and lifts involved in the work. The erecting shall be in perfect line and level. Necessary supporting girders, ropes, chain-pulley, etc. if required shall be arranged by the Contractor at his own cost. The item includes cost of all labour and materials for jointing such as lead, nuts and bolts, rubber packing, etc. The materials shall be procured by the Contractor from open market at his own cost. The tendered rate includes both lead and flanged joints depending upon the nature of pipes and specials and no extra claims for any modification, increase or decrease in joints of any category shall be entertained. In case of lead joints the standard lead consumption for lead shall be as per specifications of item of pipe line works. The cost involved in fixing pipes and specials in walls, etc. together with leak proof arrangements thereof required is included in the tendered rate and no extra claims for any provision required shall be entertained.

Page 156: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 35 )

Contractor No. of Corrections Executive Engineer

Satisfactory hydraulic test shall be given by the Contractor at his cost which is included in tender item. During testing if any joints are found leaky they shall be repaired at the Contractor's cost. Pipes if found leaky, cracked, during testing they shall be removed, replaced, refixed and jointed with good pipes and specials. Two coats of anti-corrosive black paint shall be given to the pipes and specials above ground and cost thereof is included in the tender item. The job shall include laying of pipes and specials upto ground, sluice valves for inlet, outlet, washout, overflow, etc. and their interconnection, etc. as required and directed by the Engineer-in-charge. Two Tap Standposts (Providing and Constructing) 1. This is completed job item for precast/cast-in-situ standposts and the work shall be carried out as

per Schedule 'B' item and MJP's type design and drawing and as directed. 2. The item includes the cost of providing precast standpost, excavation in all strata plain or RCC

M-150 (1:2:4) as per site condition, providing and laying GI pipes of 25 mm diameter 7.5 RM and 12 mm diameter and 2.0 M, providing and fixing 100 mm diameter CI pipe 2 RM or 75 mm x 75 mm x 6 mm MS angle, making connection of 25 mm diameter GI pipe with service line, providing and fixing tap 2 Nos. and providing and fixing barbed wire to the standpost when MS angle is fixed instead of CI pipe, etc. All other incidentals required for the completed item as per type drawing are included in this item and no extra payment shall be admissible for any particular item in the completed job.

3. This item also includes required 25 mm diameter GI connection from the nearest distribution

service line upto standpost for a length of 7.5 metres including drilling holes, etc. in service line, providing and fixing ferrules with clamp and specials, providing and fixing 15 mm wheel valve, etc. complete.

4. When good foundation is not available for standpost and if it is specifically mentioned in the

tender item then in that case, cast-in-situ standposts shall be provided as per type design. 5. It will be the responsibility of the Contractor to safeguard the structure from any damage upto

the date of handing over to MJP. 6. The mode of measurement shall be on basis of each number.

Page 157: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 36 )

Contractor No. of Corrections Executive Engineer

Road Box The item includes providing and fixing 225 x 300 mm CI road box including necessary excavation, supporting RCC pipes or BB masonry, etc. complete. The mode of measurement shall be on basis of each number of completed item. Providing and Fixing Manhole Frames and Cover, Cowl Type Ventilators The cost of providing the above item is included in tender item. These are to be properly fixed at place and manner as directed. Painting with two coats of anti-corrosive black paint is also included in this item. If locking arrangements are required they shall be done by the Contractor as directed without any extra cost. Surface Road Boxes with Chamber The road box should be of CI and trapezoidal having a size of 22.5 cm x 30 cm at height. The weight of the road box should not be less than 18 kgs. The road box should have a hinged corner fixed to the body. The Contractor shall produce sample of road box and get it approved and procure the entire number as per approved sample. The item includes necessary excavation, refilling, supporting, RCC pipe (450 mm dia) or BB masonry, etc. complete.

Page 158: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 37 )

Contractor No. of Corrections Executive Engineer

3.7 CI/MS Pipe Assembly of Flanged and S & S Pipes and Specials & Sluice Valves 3.7.1 Detailed drawing showing the pipe assembly with pipes, specials, valves, etc. shall be obtained

from the owner before fixing the pipes, specials, valves vertically and horizontally. The drawing shall also show bye-pass arrangement from incoming main to distribution, as also the draining of overflow and washout.

3.7.2 For duck foot bends plain concrete blocks of adequate size and in M-150 grade shall be provided

by the contractor. These concrete blocks shall rest on firm ground (and not on refilled soil) or on the raft slab and shall have a minimum of 600 mm. The width of the block shall be such that it should have an offset of 150 mm on all sides.

3.7.3 Thrust blocks of adequate size and in M-150 grade shall also be provided wherever required or

as directed by the Engineer-in-Charge. 3.7.4 All the CI / MS flanged pipes, S & S pipes, specials and sluice valves, MH frame and covers as

per requirement will have to be provided by the contractor. Jointing materials shall be provided by the contractor at his own cost and got approved from the Engineer-in-Charge before using. Pig lead, if required, shall be procured by the contractor. Material shall be as per respective ISS. MS or CI pipe inserts with middle flanges for insertion in concrete for inlet, outlet, overflow, etc. shall also be provided by the contractor without claiming extra cost. Material shall be as per respective ISS. MS or CI pipe inserts with crippling flanges for insertion in concrete for inlet, outlet, overflow, etc. shall be provided by the contractor

3.7.5 The pipes before using shall be cleaned properly from inside. The vertical pipes shall be fixed

exactly in pump. The horizontal flanged and / or S & S pipes shall be laid to proper grade and alignment. The flanged pipes and specials and sluice valves shall be jointed by means of nuts and bolts, washers, and 3 mm thick three ply rubber packing with hubbock. The S & S joints shall be made with rubber gasket or pig lead as directed.

The sluice valve shall be fixed on horizontal pipe line for inlet and outlet, washout and bye pass.

The pipes shall have to be cut by the contractor if required without claiming extra cost. The vertical pipes, specials valves shall be painted with three coats of anti-corrosive paint after

jointing and testing. For draining the washout RCC NP2 class pipes and specified in the drawing shall be provided,

laid and jointed by the contractor. This work includes giving satisfactory hydraulic test to the required head of water and all

materials, equipment and labour shall be arranged by the contractor at his own cost. 3.7.6 The horizontal pipes shall have minimum cover of 1.0 M chambers of adequate size and

height/depth as required shall be constructed for sluice valve in brick masonry 225 mm thick in CM 1:6. The foundation concrete shall be 150 mm thickness in C.C. M100. The inside shall be cement plastered in CM 1:3. The outer side shall be pointed in 1:2 PCC coping 100 mm thick

Page 159: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 38 )

Contractor No. of Corrections Executive Engineer

cast in situ in CC M 150 (1:2:4) and including providing and fixing of C.I.M.H. Frame and Cover medium duty of size 0.9 M x 0.5 M as per 25_1726_1997.

4. Water Level Indicator

A water level indicator shall be provided and fixed, reading depth of water in meters upto 10 cm.

The system shall consist of uncorrodable materials and shall be simple and easy to maintain. The water level indicator shall be provided and fixed as approved and directed by Engineer-In-Charge. The indicator shall be full scale to upto 3.0 metres and ratio type above 3.00 metres height. Alternatively manometric gauge or electronic water level indicator can be offered.

5. Access to Roof

Access to the roof and entry to the inside of the tank shall be provided by MS ladder of 45 cm

width at roof level of the tank. The access to roof manhole shall be provided with parapet or GI pipe railing. At ground level or at walk-way level, the access for going up shall be provided with a M.S. door and locking arrangement.

6. G.I. Pipe Railing

G.I. Pipe railing at roof level shall be provided as per details given in para 7.22. 7. Painting

Name of the project and capacity of RCC GSR/ESR shall be painted on the container. 8. At least two C.I. manholes frame and cover with locking arrangement shall be provided

diagonally in opposite directions with ladder for entering into the container for maintenance purpose. The size of manhole frame and cover shall be 900 mm x 450 mm rectangular as per IS 1726-1991.

9. Lightning Arrestor

Lightning arrestor shall be provided at the highest level on the roof of the tank as per IS 2309-

1969. Code of Practice for protection of buildings and allied structures against lightning. Position and height of lightning arrestor shall be such that the whole structure shall be enclosed within cone having it apex at top end of the arrestor and generated by a line inclined at 60 deg. to the vertical. The arrestor shall be suitably earthed.

10. Ventilator

The roof of the tank shall be ventilated by providing cowls or shaft ventilator 1.00 metre x 1.5

metre height with mosquito-proof net for ventilators. The net shall be fixed with proper framing. Ventilation area shall not less than 0.04% of the free water surface when cowl type ventilators are provided.

Page 160: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 39 )

Contractor No. of Corrections Executive Engineer

11. Waterproof Plaster 20 mm thick water proof plaster in CM 1:3 shall be provided on the inner sides of the container

and top of the floor slab of the container using minimum 1 Kg. of water proofing powder per bag of cement or as per manufacturer's specification used for preparing mortar for plastering.

12. M.S. Ladder The contractor shall provide and fix 450 mm wide M.S. ladder for getting inside the tank

fabricated from M.S. flats 65 mm x 12 mm with 2 Nos. of 16 mm dia. double mild steel bars for each step at 300 mm c/c. The ladder shall be fixed by stay of 10 mm x 50 mm flat fixed 3 M c/c.

13. Spiral Staircases The contractor shall provide RCC circular 1.0 M wide spiral case with central circular column

with 1.00 M high parapet in M-150 as per criteria for capacities greater than 2,00,000 litres. M.S. ladders shall be provided for smaller capacity tanks.

14. Jointing Material All necessary jointing materials for pipe assembly. G.I. railing, M.S. ladder, etc. such as nuts,

bolts, rubber packing and any other miscellaneous materials required shall be provided by the contractor at his cost.

15. Colour Wash Snowcem paint of approved shade shall be applied in two coats to whole structure externally. 16. M.S. Door M.S. steel door for stair case entrance shall be provided and fixed as per instructions of engineer

or his representative. 17. 25 mm dia. G.I. pipes railing with two horizontal rows of pipes and posts of RCC 15 cm x 15 cm

at bottom and 10 cm x 10 cm at top or angle iron of size 65 mm x 65 mm x 8 mm and placed at 1.5 M c/c interval including painting two coats and anchorage in c/c., etc. shall be provided at top of tank and at intermediate gallery.

18. Staging 18.1 The supporting staging shall be in the form of columns, braces. Staging on hollow cylindrical

shall not be accepted, unless otherwise specially asked in NIT. If shaft staging is permissible, the following specifications will apply for the shaft portion and specifications of other items remain the same as specified in the foregoing paras.

For load bearing, shaft minimum thickness should be 200 mm. Shaft should be designed as M-200 mix.

Page 161: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 40 )

Contractor No. of Corrections Executive Engineer

18.2 Shaft supporting a water tank must be designed as given under the para "Stresses in Circular supporting Walls" at page 84 of the book "Concrete Water Towers Bunkers Silos and other elevated structures" by Gray and Manning (5th edition), published by Cement and Concrete Association. The vertical load causes direct compression. Under wind load, the wall act as a vertical cantilever of hollow circular section and has to resist bending moment and shearing forces. In addition to main stresses, caused by the wall acting as a hollow circular vertical cantilever, the wind flowing on one face tends to flatten that face, distorting the circle into an oval. Horizontal reinforcement to resist a bending moment M = + 0.035 PD2 producing tension on the inside face and a moment M = - 0.031 PD2 causing tension on the outside face, where P = Unit wind pressure in KN/M and D=c/c diameter of shaft in metres.

The reinforcement arrived as above should be provided on both, inside and outside faces.

However minimum horizontal reinforcement in the shaft shall be 0.3% of the gross concrete area provided. In case of towers in high seismic zones (i.e. Zone - IV and V ) minimum horizontal reinforcement shall be 0.4% of the gross concrete area provided. Minimum vertical reinforcement in the shaft shall be 0.4% of gross concrete area required and it shall be provided equally on both faces of the load bearing shaft.

Shaft shall be checked for combined axial load and bending due to wind or seismic loads and

shall satisfy the provisions of IS 456-2000 in tank full and tank empty conditions. Horizontal construction joints in shaft shall be as minimum as possible. Age factor for increasing strength shall not be considered. Shaft should be checked for tensile stress in worst condition for combination of axial tension on

bending axis due to wind or seismic load for tank full and tank empty conditions. On account to minor inaccuracies in construction of the shaft the allowable direct compressive

stress shall be reduced by multiplying with a factor of 0.85. On account of buckling reduction factor if any shall be multiplied by the factor of 0.85. For the calculation of direct compressive stress the contribution of steel shall be neglected.

For buckling calculations reduced value of modules of elasticity due to creep shall be maximum

0.4 times its value as per IS 456-2000. At the plinth panel 50 mm thick M-150 grade shall be provided. Rectification of Defective Members If it is found that certain members are defective and are found giving acoustical or vibrational

disturbances even though these may be structurally sound, rectification of such members should be done by the contractor free of charge and to the satisfaction of Engineer-In-Charge.

Page 162: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 41 )

Contractor No. of Corrections Executive Engineer

II CRITERIA FOR DESIGN OF R.C.C. GROUND TANK / ESR / MBR 1. The structural design of water tank shall conform to the following standards, specifications and

Codes of Practice of I.S.

IS : 456 Code of Practice for plain and reinforcement concrete (latest edition)

IS : 875 Code of Practice for structural safety of building, loading standards (latest edition).

IS : 3370 Pare I to IV

Code of Practice for concrete structures for storage of liquids (latest edition).

IS : 1893 Criteria for earthquake resistance design of structures (latest edition) Other ISS

2. General Capacity of the container of the tank shall be the volume of the water it can store between the

designed full supply level and the lowest supply level. 2.1 Free Board is the indication of space provided above full supply level and shall be measured at a

vertical distance above F.S.L. upto soffit of beam supporting the roofs slab/dome. Free Board shall be minimum 30 cm below soffit of beam or slab, in case of domed roof, free board may be reduced upto 15 cm.

2.2 The walls of container shall be designed for free board full condition. 2.3 The tank foundation and other members of the structure shall also be designed for free board full

condition. 2.4 Parts of the tank in contact with stored water and enclosing water vapour above F.S.L. shall be in

concrete M-30 or even in richer grade. 2.5 The allowable bearing pressure or safe bearing capacities are indicated in Schedule 'B'. The tenderer is, however, advised to verify actual strata before tendering and designing the

structure and offer suitable design with full justification. 2.6 Not with standing anything mentioned above if directed by the Engineer-in-Charge the

contractor shall carry out actual strata exploration as mentioned in para 0.2 of IS 1892-1979 through a Government laboratory and adopt bearing capacity so arrived for the design.

2.7 The factor of safety shall be adopted as per clause 6.1 (a) of IS-6403-1971.

Page 163: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 42 )

Contractor No. of Corrections Executive Engineer

2.8 If the foundation consists of individual column footing minimum clear distance between centre of column shall be equal to twice the width of footing and clear distance between edges of footing shall be not less than width of footing.

2.9 The foundation should be checked for negative pressure on soil due to combined direct and

bending stresses. Negative pressure shall not be allowed on the foundation soil. 2.10 Classification of soil and characteristics of soil relevant to S.B.C. and A.B.B. shall be as per the

soil investigation reports of Government institution/ Government approved investigators. 2.11 For the design of foundations of the solid raft type, the Plate Theory shall be adopted. 2.12 In normal circumstances, minimum 100 mm. thick plain cement concrete with 100 mm.

projection all around in grade M-100 and M-150 (for ESR) with coarse aggregate as metal shall be provided as levelling course. Where injurious soils or aggressive water are anticipated the levelling course shall be of grade not weaker than M-150 and if necessary sulphate resisting or other special cement shall be used and the thickness of the levelling course shall be kept not less than 150 mm. The ground level within the foundation area of the structure shall be consolidated properly with suitable slope to drain out rain water outside the foundation zone.

2.13 In the vicinity of mines, collieries and blasting sites or areas which may be subjected to blast or

shock, the tank shall be designed for dynamic forces adopted to shock. 2.14 Column may be assumed as fixed at the top of footing. 2.15 Following shall be the minimum thickness of various members of the tank container :

Roof Slab 120 mm. Bottom Slab 200 mm. Roof dome 80 mm. Vertical wall of container 200 mm.

3. Loads 3.1 For all RCC and PCC components unit weight of concrete shall be taken as 25000 N/Cum and

24000 N/Cum respectively. 3.2 Water load and snow load shall be taken as per IS 875-1964 or its latest revision. 3.3 Seismic forces shall be per IS 1893 (its latest revision). 4. Design 4.1 Shape of structure shall be the most economical as directed by Engineer-In-Charge and shall be

selected depending upon site conditions.

Page 164: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 43 )

Contractor No. of Corrections Executive Engineer

4.2 Design shall be based on the worst possible combination of various loads, moments, shears resultant stresses in the tank following cases.

i) Tank Full ii) Tank Empty iii) Uplift pressure if any Tank full means depth of water inside the container is upto full height of the container including

free board. 4.3 Design shall be based on accepted bases and methods of design as well as the provisions of IS

3370, IS 456, IS 1343. Code of Practice for pre-stressed concrete IS 2210. (Latest edition of IS shall be referred).

4.4 Design of members other than those excluded by Clause 5.4 above (i.e. roof, walls, floor, etc. of

the container) shall be based on consideration of adequate resistance to cracking as well as adequate strength. Calculation of stresses shall be as per para 3.3.2 of IS 3370 (Part II) (its latest revision).

5. Permissible Stresses in Concrete for Resistance to Cracking 5.1 For calculations relating to the resistance of members to cracking the permissible stresses in

tension (direct and due to bending) and shear shall conform to the valves specified in Table I of IS 3370 (Part II). "The permissible tensile stresses due to bending apply to the face of the member in contact with the liquid." In members with thickness less than 225 mm. and in contact with the liquid on one side, these permissible stresses in bending apply also to the face remote from liquid.

5.2 For Strength Calculations For strength calculations, the permissible concrete stresses shall be in accordance with Para 44 of

IS 456-2000 where the calculated shear stress in concrete alone exceeds the permissible value reinforcement acting in conjunction with diagonal compression in the concrete shall be provided to take the whole of the shear. The maximum reinforcement shall conform Clauses 26.5.1.1.b and 26.5.1.2 of IS 456-2000.

6. Permissible Stresses in Steel 6.1 For strength calculations (concrete assumed to be cracked) the permissible stresses in

reinforcement shall be as per table 2 of IS 3370 (Part II) (its latest revision). For tor steel, the stress shall be as per IS 1786-1979 for cold worked steel high strength deformed bars for concrete reinforcement or its latest revision.

Page 165: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 44 )

Contractor No. of Corrections Executive Engineer

6.2 The modular ratio 'm' for different concrete mixes shall be as under :

Grade of Concrete Modular ratio 'm' M : 15 19 M : 20 13 M : 25 11 M : 30 9

6.3 Modules of elasticity of concrete Ec shall be taken as Ec = 5000√fck where fck is the

characteristic cube strength of concrete in N/mm2 and Ec is the short term static modulus of elasticity in N/mm2 as per clause 6.2.3.1 of IS 456-2000.

7. Age Factor Age factor for increasing strength shall not be considered for the design. 8. Units : Design should be in Metric units only. 9. Detailing 9.1 Minimum Reinforcement for Water Retaining Members The minimum reinforcement in walls, floors, roofs in each of two directions at right angles shall

have an area of 0.3% of the concrete section in that direction for sections upto 100 mm. thick. For sections of thickness greater than 100 mm. and less than 450 mm. the minimum reinforcement in each of the two directions shall be linearly reduced from 0.3% for 100 mm. thick sections to 0.2% for 450 mm. thick section. For section of thickness greater than 450 mm. minimum reinforcement in each directions shall be kept at 0.2%. In concrete sections of thickness 225 mm. or more, two layers of reinforcing steel shall be placed one over each face of the section to make up the minimum reinforcement specified in this clause.

9.2 The minimum reinforcement specified in 9.1 above may be decreased by 20% in case of high

yield strength deformed bars conforming to IS 1786 or IS 1139 (Latest version of ISS shall be followed.)

9.3 Covers to Reinforcement 9.3.1 Minimum clear cover to reinforcement shall be as per IS 456 and 3370. (Latest version shall be

referred.) 9.3.2 For members of structure in contact with water effective cover shall not be more than 60 mm. for

bars subjected to bending stresses. For bars subjected to pure tension the effective cover shall not be more than 75 mm.

Page 166: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 45 )

Contractor No. of Corrections Executive Engineer

9.4 Spacing of Reinforcement 9.4.1 Spacing of reinforcement shall be as per para 26.3 of IS 456-2000. 9.4.2 Spacing of lateral ties for column shall satisfy the provisions of para 26.5.3.2 'C' of IS 456-2000. 9.4.3 Reinforcing steel which accounts for resisting moments, tension etc. i.e. other than temperature

and shrinkage steel, shall comprise of minimum 8 mm. dia. for ribbed bars and 10 mm. dia. for mild steel bars. For compressive members, the minimum dia. of main reinforcement shall not be less than 12 mm. dia.

9.5 Concrete mix design shall be done for the following requirement. i) Concrete grade M-30 ii) Cement 43 grade ( OPC ) iii) Aggregate 20 mm nominal maximum size iv) Maximum W/C ratio 0.5 v) Minimum cement content 375 kg/cum vi) Degree of workability Medium Slump 50-100 mm vii) Exposure Moderate viii) Degree of supervision Good Notes :

1) Standard cement consumpation for M-30 grade of concrete - 465 kg/cum. 2) Mix design shall be done as per the recommendation in IS-456-2000, IS-10262-1982, IS-383-1970. 3) Contractor should get mix design only from Govt. Polytechnic / Govt. Engg. College /

Reg. Engg. College / Recognised Consultant. 4) Contractor will borne all expenses for design of concrete mix. 5) Design mix should satisfy the acceptance criteria given in IS-456-2000. 6) Contractor should get mix design approved from Engineer-in-charge.

NOTES : 1. In case of dispute regarding interpretation of any of the above clauses, the decision of the owner

or his representative will be final and binding on the designer and contractor. 2. In case of any clause not included in the above criteria, the decision of the owner or his

authorised representative will be final and binding on the designer and contractor.

Page 167: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 46 )

Contractor No. of Corrections Executive Engineer

WATER RETAINING STRUCTURES SUCH AS ESR / MBR / GSR / SUMP, ETC. a) Constructing Storage Reservoirs viz. ESR/MBR/GSR/Sump – Contractor’s Design 1. The reservoir will be a covered RCC container supported on RCC column with individual

footing with intermediate braces, etc. as per drawings. 2. Suitable MS ladders/spiral stair for ESR of capacity 2 lakh litres and above with landing at

regular intervals for approach to the gallery and top slab of ESR shall be provided. RCC cantilever catwalk (gallery) 1.0 metre width GI pipe railing shall be provided at floor level,

preferably at junction of floor slab and vertical walls. Ventilators shall be provided in top slab of ESR. One number or CI Manhole frame and cover (weight 85 kg) shall be provided and fixed in the

roof of tank and at Catwalk way. One M.S. ladder with hand railing shall be provided and fixed for access into the tank through

manhole left in the roof. Ladders shall be provided as per specifications. Water level indicator assembly of approved type shall be provided and installed. Lightening arrestor as per IS specifications and conforming to I.E. Rules shall be provided and

fixed. Vertical and horizontal piping of CI flanged pipes, CI specials of required sizes for inlet, outlet

and overflow arrangements together with suitable sluice valves shall be provided as per drawing. For washout one tee shall be fixed on the outlet pipe with one valve of suitable diameter.

Sluice valves of required size shall be fixed for inlet, outlet and washout. These valves shall be

supplied by the Contractor conforming to relevant ISS and of makes approved by MJP. Required no. of BB masonry chambers of 0.45 x 0.9 M size with manhole frames and covers

shall be provided and constructed at suitable locations for sluice valves. Waterproof cement plaster of CM 1:2 proportion 20 mm thick shall be provided for inside

surface of the tank including roof slab bottom. Outside surface of tank, exposed face of columns, braces, beam, catwalk, bottom portion of slab

and any exposed surface of the tank shall be provided with smooth finish and then three coats of approved shade of Snowcem paint as per colour scheme approved by the MJP shall be rendered.

Letters indicating capacity of tank, name of scheme and year of construction shall be either

embossed or engraved on vertical wall of tank and shall be painted with suitable shade of oil paint in two coats.

Page 168: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 47 )

Contractor No. of Corrections Executive Engineer

On completion of work, hydraulic test or water tightness test shall be given as per standard specifications. Therefore, required water arrangements shall be made by Contractor at his own cost.

3. Since this is lumpsum offer, the interim payments will be made at different stages of works

contract, as per breakup schedule enclosed. Since, this is water retaining structure, Contractor shall give a satisfactory hydraulic test of the

tank. This test shall be considered water tightness test and accepted if the structure appears bone dry from outside after filling with water upto full supply level and the drop in water level is not more than 40 mm in 7 days. For this purpose the water filling arrangements shall be made by the Contractor at his own cost including cost of water pumping arrangements, etc.

If during testing any damage occurs to the structure, it will be the responsibility of the Contractor

to rectify. Until satisfactory water tightness test is given on completion of work, interim payments to be made at different stages of works, upto 90% shall be released on completion of work and remaining 10% after giving required water tightness test.

Materials Required for Construction 1. Sand Metal and Bricks Sand, metal and bricks of best variety and samples of these will have to be got approved prior to

use on work. 2. Cement Cement in jute/PVC bags 43 Grade (weighing 50 kg. each) shall be used for all water retaining

structures. 53 Grade cement shall not be used for WTP, ESRs. Approved Makes – L&T, Birla, Vasavdatta, Coromandal, ACC, JK 3. Reinforcement The steel to be used shall be of grade Fe-250, Fe-450 as per design. The Contractor shall have to

procure the steel from open market. The steel procured by Contractor shall be only tested one and the Contractor shall produce manufacturer's test certificate without which it shall not be accepted. Further the Contractor shall arrange to get tested any sample from steel brought at site by him in Laboratory at his cost and result should be submitted to the MJP. Defective steel brought by Contractor shall be rejected and will not be allowed to be used.

Atleast three samples of each diameter should be tested from every 5 tonnes or part thereof.

Tested lots only will be permitted to be used.

Page 169: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 48 )

Contractor No. of Corrections Executive Engineer

4. Concrete The PCC and RCC work shall be as per IS 456/2000. Concrete mixer shall be used for preparing

concrete. Vibrator shall be used to consolidate concrete while placing in position. Mix design will be allowed only if required for minimum infrastructure like weigh batching plant, needle vibrator and proper form work is provided.

While concreting, representative samples in form of Test Cubes shall be taken by the MJP

Supervisor and shall be tested under his supervision, charges of testing shall be borne by the Contractor and will be recovered from bills payable to him.

5. Water Level Indicator Assembly Mercury water level indicator with 15 mm dia. required GI pipes (medium duty), stop cocks (2

nos.), necessary fixtures suitable for staging height upto 15 M and water depth upto 5 M to represent depth of water in tank, etc. shall be provided and fixed by the Contractor as per direction of MJP. The indicator should be fixed to exterior face of column at about 1.5 M above ground level at site or as per requirement of Engineer-in-charge.

6. Lightening Arrestor Lightening arrestor conforming to IS and Indian Electricity Rules shall be provided. The

lowermost portion of tape for 2 metres above ground level and 2 metres below ground level shall be enclosed by 50 mm GI pipe of 'M' class.

7. Pipe Railing at free end of Walkway Railing shall be of GI pipes 'A' class not less than 25 mm diameter in two rows and shall be fixed

in position to RCC posts or M.S. angle posts of size 65 mm x 65 mm x 6 mm, 1.0 metre in height, located at a maximum distance of 1.5 M C/C. The railing and the posts shall be provided with two coats of oil paint of approved shade.

8. M.S. Ladder One Number of M.S. ladder with hand railing shall be provided and fixed to give access into the

tank through manhole in the roof slab. The ladder shall be comprising of 65 mm x 6 mm M.S. angles placed at 45 cm. apart with 16 mm diameter M.S. bars in double rows as steps at 20 cm c/c. Hand rail shall consist of 25 mm dia G.I. pipe and 40 x 40 x 6 mm MS angle for vent post at 1.5 M c/c.

9. Centering Work Before starting the work of ESR, the Contractor should submit design of centering and its

detailed drawing for approval by MJP. This set of drawings shall be kept at site. This condition shall be applicable for the ESR with Contractor's design.

Page 170: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 49 )

Contractor No. of Corrections Executive Engineer

b) Specification and Design Criteria for RCC ESR/MBR/GSR/Sump with Contractor's own Design

Designing, Providing and Constructing RCC ESRs/MBR 1. General Note 1.1 The Contractor shall quote his offer in Schedule 'B' for the complete work of constructing RCC

ESR to be carried out as per his own design based on given data i.e. he shall tender the offer in Schedule 'B' for construction of elevated tank of required capacity including fixing pipes, specials, valves and providing and fixing, lightning conductor, C.I. manhole frame and cover, water level indicator ventilator, etc. complete with his own design and drawings. The design shall be got checked from the institutes like Engineering College. Remarks shall be complied and scrutiny charges shall be borne by the Contractor.

1.2 The Contractor shall submit the name, qualifications and experience of Design Engineer who has

prepared detailed RCC calculations or how will prepare design and drawings on acceptance of the tender. The authorised representative of the designer will have to inspect and certify the works at foundation level and every beam level.

1.3 The design Engineer has to prepare and submit a note on design methodology and construction

and drawings in two copies through the contractor. The note should indicate general description, and salient features of the design covering the

following points : 1) Capacity 2) Shape and type 3) Staging height of tank indicating various levels

4) Safe bearing capacity assumed in the design of safe bearing capacity of strata based on

actual investigation report of laboratory and type of foundation provided with proper justification.

5) Maximum and minimum subsoil water level. 6) Site plan showing location of ESR. 7) Line diagram showing dimensional and sectional elevation with important levels. 8) Design parameters proposed to be adopted for detailed design.

Page 171: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 50 )

Contractor No. of Corrections Executive Engineer

1.4 This not on design will be subjected to through check by the Engineer-In-Charge of the owner and the tender will be accepted and work order issued by the competent authority only after verification that the design to be offered will fulfill the requirements of the design as per tender specifications.

1.5 After acceptance of tender, the Contractor will have to submit three copies of detailed design and

drawings of the structure within 30 days of acceptance of the tender. 1.6 The Design Engineer will be required to attend the office of Engineer-in-Charge for preliminary

discussion for scrutiny remarks, etc. whenever required with all reference data, books, IS specifications, etc. at his own cost.

1.7 It will be binding on the Design Engineer of contractor to clarify, modify, redesign and prepare

drawing after compliance of scrutiny remarks by the owner or his representative such as an Engineering College, within 15 days of communication of remarks. Even though design will be approved by owner, it will be the entire responsibility of the Design Engineer and the Contractor.

1.8 On approved of the design, contractor shall supply, free of cost, eight sets of design and drawing

duly bound for use of the Owner. The Contractor shall also furnish the details of steel requirement along with programme of execution for completion of work within the time limit stipulated in the tender.

1.9 Security deposit of the tenderer shall be forfeited if he fails to modify his design as per scrutiny

remarks within specified time after levy of compensation as per tender agreement. 1.10 Even though the design and drawing submitted by the Contractor are approved by the

Owner/Engineer-in-Charge, the Contractor will not be relieved of his contractual obligations to hand over the structure in sound condition, duly tested.

1.11 In case of any damage/failure either during construction, testing or after commissioning, whether

due to faulty design or defective construction, all repairs or reconstruction of the structure shall have to be carried out by the contractor, entirely at his risk and cost. No claim for such repairs/reconstruction shall be entertained.

Page 172: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 51 )

Contractor No. of Corrections Executive Engineer

Special Obligatory Conditions of Design for Water Retaining Structure ESR / MBR / GSR / SUMPS - Storage Reservoirs with own design Design Conditions The Contractor can alternatively quote with his own design with following conditions : 1. The design of R.C.C. ESR shall be carried out by a designer having minimum qualification of

Post Graduate in Structural Engineering. He shall sign the design and affix his name and stamp. 2. The design shall be carried out in conformity with following IS code. a) IS 456/2000 b) IS 3370 - Part I and IV c) IS 875-1987 Part I to Part IV d) IS 11682-1985 for RCC staging of overhead tanks. e) IS 1893-1984 with inclusion of seismic zones as per latest circular. f) IS 1786 for cold worked steel high grade deformed bars (Tor steel of Fe-415 grade shall only be used.) g) IS 13920/ 1993 - for ductile detailing, applicable for ESRs under seismic zone III, IV and V. (Recent editions of IS shall be referred.) h) B.S.I. publication S.P. 34 (S and T) 1987. Notes :

1) Recent editions of all above mentioned IS code shall be referred. 2) All the memebrs of container should be designed as 'Uncracked Section' as per IS-3370. 3) Columns should be designed by 'Working Stress Method' as per IS-456. It can be

checked by limit state method. IS-11682-1985 should be followed for design and staging. 4) RCC ESR is to be designed for Seismic Zone III.

3. The free board shall be included in the depth of water for design purposes. 4. Minimum free board shall be 300 mm; measured below bottom of roof beam.

Page 173: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 52 )

Contractor No. of Corrections Executive Engineer

5. Maximum actual water depth shall not exceed 5.0 M. 6. Clear cover for reinforcement shall be provided as below : a) Footing/Raft 50 mm. at bottom and sides 40 mm. at top b) Columns 40 mm. c) Braces, beams, slab (Bottom 25 mm. and roof), vertical wall, gallery. 7. Minimum thickness of container members shall be as below. a) Bottom slab and vertical wall 200 mm. b) Roof slab 120 mm. 8. The design and casting of container members which includes bottom and roof beams. bottom

slab, roof slab, vertical wall and gallery, shall be done in M-30 grade of concrete 9. The staging of ESRs (Columns, braces, footing/Raft) shall be designed in M-25 Grade of

concrete, however, casting shall be done in M-30 grade of concrete. The concrete of grade M-15 shall be used for PCC work.

10. The staging shall be designed for ductile detailing as per IS 13920/1993, wherever applicable. 11. The width of braces shall be maximum of the following in case of Earth Quake Zone III and

above. a) 250 mm. or b) 75% of column side (column diameter in case of circular column) 12. Minimum width of brace – 300 mm. 13. Width to depth ratio in case of braces shall preferably be more than 0.30 14. Increase in permissible stresses in braces, for Earth Quake/ Wind force design, will not be

allowed. 15. The centre to centre distance between braces shall not exceed 4.50 M for ESR/MBR of capacity

less than 5 lakh litres and 6.0 M for ESR/MBR of capacity above 5 lakh litres. At the joints of braces and columns, the links to the column bars shall be tied properly and this shall be thoroughly checked before concreting.

Page 174: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 53 )

Contractor No. of Corrections Executive Engineer

16. Wherever annular raft is provided, the inside and outside width of raft shall be provided in such a way that the centre of gravity of upward reaction shall co-inside with column/raft beam centre.

17. Uplift pressure on the foundation of structure should be considered as per available water table at

site in rainy season However, minimum uplift upto 50% of depth of foundation below ground level should be considered in the designs.

18. 20 mm. thick cement plaster with CM 1:2 proportion with water proof compound shall be

provided to the container from inside (including roof beams and roof slabs/dome, etc.) 19. The shape of container may be circular. Similarly the column shape may also be circular. 20. Minimum size of column (width or diameter) shall not be less than 400 mm. Columns, if

required to be provided inside container, for supporting roof ring beam/ dome/ slab, may be provided as per design requirements, following minimum cover requirements. However the size shall not be less than 200 x 200 mm. (or 200 mm. dia.) Centering should be designed by the contractor . Same should be approved by the Competent authority before construction. Only steel/ plywood centering shall be used. For design having more than 6 columns, provision of internal bracing is obligatory. All columns shall have the same foundation level as far as possible. In any case the foundation level difference between any two columns shall not exceed 1.50. In such case 'Sway Analysis' of the staging shall be done and additional reinforcement or increase in sizes shall be provided if necessary. When safe bearing capacity of foundation is less than 15 T/m2 only raft foundation should be provided.

21. Minimum dia. of main bars in the footing shall be 10 mm. and minimum clear distance between

reinforcing bars shall not be more than 180 mm. 22. Water density shall be taken as 1000 Kg./Cum and live load on gallery shall be considered as

300 Kg./Sqm. Minimum load of water proof treatment on roof slabs be taken as 100 Kg./Sqm. 23. The diameter, weight per metre, tensile strength and minimum elongation properties of steel,

brought by the contractor/supplied by the department, shall be got tested from the approved laboratory before using it. It shall be used only when the test report indicates that the steel is in accordance with the I.S. specifications and design presumptions.

24. i) The inlet, outlet, overflow and bypass piping shall be of cast iron D.F. pipes only. M.S.

pipes will not be allowed.

ii) Spout type overflow arrangement shall not be allowed. Overflow arrangement shall be from top to bottom as a vertical pipe assembly with proper drainage arrangement.

iii) For all duck foot bends for inlet, outlet and overflow arrangements, individual columns

with footings resting at foundation level of ESR, columns/raft shall be provided.

Page 175: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 54 )

Contractor No. of Corrections Executive Engineer

iv) The manhole frame and covers, provided in the roof slab, shall be of cast iron only. Mild steel covers shall not be allowed.

The above four conditions i.e. 24 (i), 24 (ii), 24 (iii), 24 (iv) shall be followed without

substitutes and equals. No M.S. piping and spout type overflow arrangement shall be accepted, even if rebates, etc. are offered.

v) Inlet, outlet, bypass and scour valves with chambers shall be provided. The horizontal

piping for inlet,, outlet, overflow, bypass upto 3 M from outer brace shall be provided and laid without any extra cost.

vi) Lightening conductor, water level indicator, central ventilator and M.S. ladders/RCC

staircase shall be provided as per detailed specifications. 25. The design submitted by the Contractor, shall be got checked from the nearest Government

Engineering College/ Government Polytechnic/ reputed Engineering College/ reputed Consultancy, for which the scrutiny charges shall be borne by the contractor. The delay in checking designs from third party as above shall be treated as the delay on the part of contractor for operation of tender clauses.

26. The Contractors who have already successfully constructed, tested, as per provisions of I.S.

3370, and commissioned minimum three no. of ESRs shall only be allowed to quote for alternative offers for the work on own design basis. The contractors desiring to quote for alternative offer, based on their own design, will be required to submit a certificate to above effect, at the time of pre-qualification. The certificate shall be signed by an officer of rank not below Executive Engineer. The tenders shall be invited, based on the departmental designs only, while those pre-qualified as above, may quote alternative offer. The alternative offer shall be in the form of additional amount/rebate in terms of fixed sum over the main offer. The main offer (Departmental Design based) shall essentially by quoted. The officer accepting the tender shall be competent to decide whether to accept the alternative offer or not. The alternative offer shall be accepted only in cases where it is beneficial to the MJP,.

27. Size of inlet, outlet, overflow, bypass piping and valves including scour valve shall be specified

as per actual requirements and makes of valves shall also be specified as per standard practice. 28. Capacity of the container of the tank shall be the volume of the water it can store between the

designed full supply level and the lowest supply level. 29. Height of staging shall be the vertical difference between lowest supply level and the average

ground level and the site of tank. Note : Above conditions shall also be applicable for design of RCC ESRs of capacity more than 5.0

lakh litres and above except for conditions at Sr. No. 26 and with a change in condition at Sr. No. 9, that the design of staging shall be in M-25 and actual construction shall be in M-30 only.

Page 176: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 55 )

Contractor No. of Corrections Executive Engineer

30. Rectification of Defective Members If it is found that certain members are defective and are found giving acoustical or vibrational

disturbances even though these may be structurally sound, rectification of such members should be done by the contractor free of charge and to the satisfaction of Engineer-In-Charge.

31. Terms of Payment As the tender is lumpsum tender for constructing the tank as a complete unit, the release of

intermediate payment will be on lumpsum basis at the percentages specified below :

1. Design after final approved 2% 2. Excavation of foundation 3% 3. Footing a) Lean Concrete 3% b) RCC footing 6% 4. Column and Brace upto base slab of container 18% 5. Floor slab/dome with ring beam 20% 6. Vertical Wall a) Half height 10% b) Full height 10% 7. Roof slab 7% 8. Plaster and finishing 2% 9. Stair case 2% 10. Erection of inlet, outlet, overflow pipes, specials 4% and valves, railing. 11. Water level indicator, lightening conductor and M.S. ladder 1% 12. Water tightness test 10% 13. Painting and Miscellaneous Works, such as chambers 2% Total 100%

Note : No change in percentage specified above shall accepted.

Page 177: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

SUB-ESTIMATE NO. 9 : Pure Water Rising MainMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

A) MATERIAL27866.00 Kg Item No.1 :- Providing and supplying ISI standard D.I.

specials with sealing rubber gasket of S B R includingall taxes (Central and local), railway freight,insurance, unloading from railway wagon, loading intotruck, transport to departmental stores / sites,unloading, stacking, etc. complete. As per IS- 9523

91.00 Ninty one only Kg 2535806.00

Item No.2 :- Providing and supplying ISI mark CI D/Fsluice valves and butterfly valves of following dia.including all taxes (Central and local), railway freight,inspection charges, unloading from railway wagon,loading into truck, transportation upto departmentalstores, unloading, stacking, etc. complete .( MJPapproved make only )

2.00 Nos 250 mm dia. Reflux Valve PN-1 27957.00 Twenty seven thousand nine hundred fifty seven only

No 55914.00

Estimated Cost of sub work put to Tender : Rs. 9975039/-Estimated Rate ( Rs.) Total amount

according to estimated quantities

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

SCHEDULE ' B ' OF B-1 TENDER

contractor No. of corrections Executive Engineer

Page 178: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount

according to estimated quantities

5.00 Nos 150 mm dia. Sluice valve PN-1 9460.00 Nine thousand four hundred sixty only

No 47300.00

19.00 Nos 50 mm dia. Kinetic Air Valve Flanged type PN-1 10860.00 Ten thousand eight hundred sixty only

No 206340.00

Note - 85% Payment after supply10% Payment after Lowering / laying5% Payment after testing

B) LABOUR

13311.00 Cum Item No.3 :- Excavation for foundation / pipe trenchesin earth soils of all types, sand, gravel and softmurum, hard murum, hard rock of all types byblasting, chisseling etc including removing theexcavated material upto a distance of 50 M andincluding all lifts as below, stacking area spreading asdirected, normal dewatering, preparing the bed forfoundation & excluding backfilling, etc. complete.

355.00 Three hundred fifty five only

Cum 4725405.00

1479.00 Cum Item No.4 :- Providing murum bedding in trencheswith approved murum from excavated materials fromfoundation 15 to 20 cm layers including watering andcompaction etc. complete.

50.00 Fifty only Cum 73950.00

contractor No. of corrections Executive Engineer

Page 179: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount

according to estimated quantities

Item No.5 :- Lowering, laying and jointing with SBRrubber gaskets C.I. / D.I. / K-9 pipes of variousclasses with C.I. / D.I. / M.S. specials of followingdiameters in proper position grade and alignment asdirected by Engineer-in-charge, including conveyanceof materials from stores to site of works, includingcost of jointing material and labour giving hydraulictesting etc. complete. ( Only SBR rubber gasket to beused )

9350.00 Rm 250 mm dia. D.I. K-9 pipes 132.00 One hundred Thirty two only

Rm 1234200.00

2250.00 Rm 200 mm dia. D.I. K-7 pipes 101.00 One hundred One only

Rm 227250.00

Note - 85% Payment after Lowering / laying15% Payment after testing

Item No.6 :- Lowering, laying and jointing in positionfollowing C.I. D/F Sluice valves including cost of alllabour, jointing material, including nut bolts and givingsatisfactory hydraulic testing, etc. complete.

2.00 No 250 mm dia. Sluice valve PN-1 3644.00 Three thousand six hundred fourty four only

No 7288.00

5.00 No 150 mm dia. Sluice valve PN-1 2688.00 Two thousand six hundred eighty eight only

No 13440.00

Note - 85% Payment after Lowering / laying15% Payment after testing

contractor No. of corrections Executive Engineer

Page 180: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount

according to estimated quantities

7.00 Nos Item No.7 :- Providing and constructing B.B. masonryvalve chamber with 15 cm thick 1:3:6 proportion PCCbedding, excluding excavation, B.B. masonry in CM1:5 proportion, 12 mm thick cement plaster in CM 1:4proportion on both sides with providing and fixingprecast RCC frame and cover, etc. complete asdirected by Engineer-in-charge. Size - 90 x 90 cm

7585.00 Seven thousand five hundred eighty five only

No 53095.00

Item No.8 :- Providing and fixing in position air valveshaft including providing and fixing G.I. medium dutyclass pipe or 6mm thick M.S. pipe shaft 2.70 M longover branch flange of air valve tee, providing PCCblock of M-150 concrete, 150 mm thick around the airvalve tee including encasing of vertical shaft in PCCM-150 as shown in type design together withproviding and making flanged joints whereverrequired and fixing air valve over the shaft excludingcost of air valve and branch flanged air valve tee, etc.complete as per type design and as directed byEngineer-in-charge for following dia. of pipe lines.

19.00 Nos 200 to 400 mm dia. Pipe line 5431.00 Five thousand four hundred thirty one only

No 103189.00

contractor No. of corrections Executive Engineer

Page 181: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount

according to estimated quantities

Item No.9 :- Providing and laying in situ, followinggrades of cement concrete of trap / granite / quartzite/ gneiss metal for foundation and bedding includingbailing out water, form work, compacting and curing,etc. complete

19.50 Cum P.C.C. M-150 (1:2:4) 4265.75 Four thousand two hundred sixty five & paise seventy five only

Cum 83182.13

11303.00 Cum Item No.10 :- Refilling the trenches with availableexcavated stuff with soft material first over pipelineand then hard material in 15 cm layers with all leadsand lifts including consolidation, surcharging, etc.complete.

50.00 Fifty only Cum 565150.00

19.00 No Item No.11 :- Providing and fixing in position M.S. airvalve boxes fabricated with 2 mm thick M.S. plate, 30x 30 x 3 mm size M.S. angle frame, If requiredconcreting in M-150 for Fixing the boxes in position,applying 2 coats of oil paint, painting charges, lockingarrangements, etc. complete as directed by Engineer-in-charge.

2291.00 Two thousand two hundred ninty one only

No 43529.00

Total Rs. 9975038.13

Say Rs. 9975039.00

contractor No. of corrections Executive Engineer

Page 182: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Sub Work No.10 : Construction of RCC MBR / ESR'sMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

Item No.1 :- Designing (Aesthetically), and constructing RCC Elevated Service Reservoir of following capacity with RCC staging consisting of columns, internal and external bracings, spaced vertically at not more than 4.5 M center to center,for ESR having capacity upto 500cum and not more than6 M center to center,for ESR having capacity above 500cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compound to the inside face of container, including refilling disposing of surplus excavated stuff within a lead of 50 M,all labour and material charges for lowering, laying,erecting, hoisting and jointing pipe assembly of Inlet, Outlet,Washout, Overflow, Bypass arrangementas per departmental design, providing and fixing accessories such as M.S. ladders CI MH frame cover, water level indicator, lightning conductor, GI

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANAPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

SCHEDULE ' B ' OF B-1 TENDER

Estimated Cost of sub work put to Tender : Rs. 11563148 /-Estimated Rate ( Rs.) Total amount according

to estimated quantities

Contractor No. of corrections Executive Engineer

Page 183: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

pipe railing around RCC walkway and top slab, aswell as providing spiral staircase from ground levelto roof level,MS grill gate of 2m height with lockingarrangement of approved design., B.B. masnarychambers for all valves, ventilating shafts.Providing and applying three coats of snowcempaint to the structure including roof slab,epoxypainting to internal surface and anti-termitetreatment for underground parts of the structure andgiving satisfactory water tightness testas per IScode. The job include painting the name of thescheme and capacity of the reservoir.as perdirection of Engineer incharge.

1.000 No A) RCC MBR of 6,70,,000 Litres capacity atLandevasti - 12 M staging height

3696582.92 Thirty six lakhs ninty six thousands five hundred eighty two & Ps.Ninty two only

No 3696582.92

1.000 No B) RCC ESR of 5,00,000 Litres capacity atRanjangaon Gaothan - 12 M staging height

3057275.00 Thirty lakhs fifty seven thousands two hundred seventy five only

No 3057275.00

1.00 No C) RCC ESR of 1,00,000 Litres capacity at KawaleVihir - 12 M staging height

1179977.47 Eleven lakhs seventy nine thousands nine hundred seventy seven & Ps. fourty Seven only

No 1179977.47

Contractor No. of corrections Executive Engineer

Page 184: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

1.00 No D) RCC ESR of 1,20,000 Litres capacity at GanpatiMandir - 12 M staging height

1301952.67 Thirteen lakhs one thousand nine hundred fifty two & Ps Sixty Seven only

No 1301952.67

Notes1

2

345

67

8

9

10

11

Plain round mild steel bars grade - I confirming to IS 432 part-I or high yield strength deformed bars confiming to IS 1786 or IS 1139 shall be used grade -II mild steel bars will not be allowed.

The design of the structure be in accordance with relevant I S specification ( IS 3370- 1965 or revised AS per M S office L No. TB-1/350/ 391 Dt. 21/03/2011 )The design shall satisfy the stipulations a per IS 1893-1984 and IS 13920 /1993 for sesmic force and 11682/1985 for RCC staging of overhead tanks

For design having more than 6 columns, provision of internal bracing is obligatory. External bracings is also obligatory.Entire structure shall be in M - 300 mix only.

All conditions given in the Member Secretay's Circular No. MJP/ TS-I/ 350 / 1668/ dt 2-8-97 and MJP /S-I / 350/ 2127 dt. 13/7/99 shall be strictly followed and additional cost , if any, due to these conditions is included in the rates mentioned below. 75% part rate shall be payable for reinforcement concrete and plastering items of containers of ESR tilll satisfactory hydraulic tesing for water tightness is given and till that work shall be treated as incomplete.

Irrespective of the type of foundation proposed in the design , one set of bracing be provided at the ground level.There rates include providing MS ladder for ESRs upto 2 Lakh liters capacity and providing spiral staircase for ESR above 2 Lakh litres capacity.

Staging shall have to be designed with stresses of M-250 concrete for ESR. However all RCC construction should be done in M-300

There rates are including the cost of uplift pressure if any and entire dewatering during excution. In case of water logging area where water is stretch at shallow depth, extra provision of dewatering shall be made as per site condition.

Contractor No. of corrections Executive Engineer

Page 185: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

Item No.2 :- Providing at site of work C.I. flangedpipes of following class and dia.meter, including alltaxes (Central & local) insurance, railway freight,unloading from railway wagon, loading into truck,transport to the site of work, loading, unloading,stacking, etc. complete.

140.00 Rm 300 mm dia. C.I. D/F Pipe 6589.00 Six thousands five hundreds eighty nine only

Rm 922460.00

70.00 Rm 250 mm dia. C.I. D/F Pipe 5125.00 Five thousands one hundreds twenty five only

Rm 358750.00

180.00 Rm 200 mm dia. C.I. D/F Pipe 3803.00 Three thousands eight hundreds three only

Rm 684540.00

Note - 85% Payment after supply10% Payment after Lowering / laying5% Payment after testing

Item No.3 :- Providing and supplying at site of workC.I. Sluice Valves of following dia.meter, including alltaxes (Central & local) insurance, railway freight,unloading from railway wagon, loading into truck,transport to the site of work, loading, unloading,stacking, etc. complete. (MJP approved make only)

Contractor No. of corrections Executive Engineer

Page 186: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

1.00 No 300 mm dia. 34903.00 Thirty four thousands nine hundreds three

No 34903.00

1.00 No 250 mm dia. 27697.00 Twenty seven thousands six hundreds ninty seven only

No 27697.00

10.00 Nos 200 mm dia. 17901.00 Seventeen thousands nine hundreds one only

No 179010.00

Note - 85% Payment after supply10% Payment after Lowering / laying5% Payment after testing

2000.00 Kg Item No.4 :- Providing and supplying at site of workC.I. Specials suitable for above said pipes, includingcost of all taxes (Central & local) insurance, railwayfreight, unloading from railway wagon, loading intotruck, transport to the site of work, loading,unloading, stacking, etc. complete.

60.00 Sixty only Kg 120000.00

Total Rs. 11563148.06Say Rs. 11563148.00

Contractor No. of corrections Executive Engineer

Page 187: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Sub-Work No.11 : Pure Water Gravity MainMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

7942.89 Kg Item No.1 :- Providing and supplying ISI standard D.I.specialswith sealing rubber gasket of S B R includingall taxes (Central and local), railway freight, insurance,unloading from railway wagon, loading into truck,transport to departmental stores / sites, unloading,stacking, etc. complete. As per IS- 9523

91.00 Ninty one only Kg 722803.00

Item No.2 :- Providing and supplying ISI mark CI D/Fsluice valves and butterfly valves of following dia.including all taxes (Central and local), railway freight,inspection charges, unloading from railway wagon,loading into truck, transportation upto departmentalstores, unloading, stacking, etc. complete. ( MJPapproved make only )

3.00 Nos 200 mm dia. Sluice valve PN-1 17901.00 Seventeen thousand nine hundred one only

No 53703.00

Estimated Rate ( Rs.) Total amount according to estimated quantities

SCHEDULE ' B ' OF B-1 TENDER

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

Estimated Cost of sub work put to Tender : Rs. 3230061 /-

contractor No. of corrections Executive Engineer

Page 188: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

2.00 Nos 250 mm dia. Sluice valve PN-1 27697.00 Twenty seven thousand six hundred ninty seven only

No 55394.00

3.00 Nos 150 mm dia. Sluice valve PN-1 9460.00 Nine thousand four hundred sixty only

No 28380.00

12.00 Nos 50 mm dia. Kinetic Air Valve Flanged type PN-1 10860.00 Ten thousand eight hundred sixty only

No 130320.00

Note - 85% Payment after supply10% Payment after Lowering / laying5% Payment after testing

B) LABOUR

3815.650 Cum Item No.3 :- Excavation for foundation / pipe trenchesin earth soils of all types, sand, gravel and soft murum,hard murum,hard rock by wedging ,chisselling , bymechanical means etc including trimming &levellingthe bed & removing the excavated material upto adistance of 50 M and lifts as below, stacking areaspreading as directed, normal dewatering, preparingthe bed for foundation & excluding backfilling, etc.complete.

355.00 Three hundred fifty five only

Cum 1354555.75

contractor No. of corrections Executive Engineer

Page 189: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

572.350 Cum Item No.4 :- Providing murum bedding in trencheswith approved murum from excavated materials fromfoundation 15 to 20 cm layers including watering andcompaction etc. complete.

50.00 Fifty only Cum 28617.50

Item No.5 :- Lowering, laying and jointing with SBRrubber gaskets C.I. / D.I. / K-9 pipes of various classeswith C.I. / D.I. / M.S. specials of following diameters inproper position grade and alignment as directed byEngineer-in-charge, including conveyance of materialsfrom stores to site of works, including cost of jointingmaterial and labour giving hydraulic testing etc.complete.

1702.00 Rm 250 mm dia. D.I. K-7 pipes 132.00 One hundred Thirty two only

Rm 224664.00

2787.00 Rm 200 mm dia. D.I. K-7 pipes 101.00 One hundred One only

Rm 281487.00

Note - 85% Payment after Lowering / laying15% Payment after testing

Item No.6 :- Lowering, laying and jointing in positionfollowing C.I. D/F Sluice valves including cost of alllabour, jointing material, including nut bolts and givingsatisfactory hydraulic testing, etc. complete.

contractor No. of corrections Executive Engineer

Page 190: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

3.000 Nos 200 mm dia. Sluice valve PN-1 2796.00 Two thousand seven hundred ninty six only

No 8388.00

2.000 Nos 250 mm dia. Sluice valve PN-1 3644.00 Three thousand six hundred fourty four only

No 7288.00

3.000 Nos 150 mm dia. Sluice valve PN-1 2688.00 Two thousand six hundred eighty eight only

No 8064.00

Note - 85% Payment after Lowering / laying15% Payment after testing

Item No.7 :- Providing and fixing in position air valveshaft including providing and fixing G.I. medium dutyclass pipe or 6mm thick M.S. pipe shaft 2.70 M longover branch flange of air valve tee, providing PCCblock of M-150 concrete, 150 mm thick around the airvalve tee including encasing of vertical shaft in PCC M-150 as shown in type design together with providingand making flanged joints wherever required and fixingair valve over the shaft excluding cost of air valve andbranch flanged air valve tee, etc. complete as per typedesign and as directed by Engineer-in-charge forfollowing dia. of pipe lines.

contractor No. of corrections Executive Engineer

Page 191: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

12.000 Nos 200 to 400 mm dia. Pipe line 5431.00 Five thousand four hundred thirty one only

No 65172.00

5.000 Nos Item No.8 :- Providing and constructing B.B. masonryvalve chamber with 15 cm thick 1:3:6 proportion PCCbedding, excluding excavation, B.B. masonry in CM1:5 proportion, 12 mm thick cement plaster in CM 1:4proportion on both sides with providing and fixingprecast RCC frame and cover, etc. complete asdirected by Engineer-in-charge. Size - 90 x 90 cm

7585.00 Seven thousand five hundred Eighty five only

No 37925.00

Item No.9 :- Providing and laying in situ, followinggrades of cement concrete of trap / granite / quartzite /gneiss metal for foundation and bedding includingbailing out water, form work, compacting and curing,etc. complete

10.000 Cum P.C.C. M-150 (1:2:4) 4265.75 Four thousand two hundred sixty five & paise seventy five only

Cum 42657.50

3063.000 Cum Item No.10 :- Refilling the trenches with availableexcavated stuff with soft material first over pipelineand then hard material in 15 cm layers with all leadsand lifts including consolidation, surcharging, etc.complete.

50.00 Fifty only Cum 153150.00

contractor No. of corrections Executive Engineer

Page 192: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

12.000 Nos Item No.11 :- Providing and fixing in position M.S. airvalve boxes fabricated with 2 mm thick M.S. plate, 30x 30 x 3 mm size M.S. angle frame, If requiredconcreting in M-150 for Fixing the boxes in position,applying 2 coats of oil paint, painting charges, lockingarrangements, etc. complete as directed by Engineer-in-charge.

2291.00 Two thousand two hundred ninty one only

No 27492.00

Total cost 3230060.75Say Rs. 3230061.00

contractor No. of corrections Executive Engineer

Page 193: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

SUB-ESTIMATE NO.12 : Distribution SystemMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

A) MATERIAL11583.42 Kg Item No.1 :- Providing and supplying ISI standard

D.I. specials with sealing rubber gasket of S B Rincluding all taxes (Central and local), railwayfreight, insurance, unloading from railway wagon,loading into truck, transport to departmental stores/ sites, unloading, stacking, etc. complete. As perIS- 9523

91.00 Ninty one only Kg 1054091.00

28131.35 Kg 1 a ) CI Specials 60.00 Sixty only Kg 1687881.00Item No.2 :- Providing and supplying ISI mark CID/F sluice valves and butterfly valves of followingdia. including all taxes (Central and local), railwayfreight, inspection charges, unloading from railwaywagon, loading into truck, transportation uptodepartmental stores, unloading, stacking, etc.complete. ( MJP approved make only )

2.000 Nos 200 mm dia. Sluice valve PN-1 17901.00 Seventeen thousand nine hundred one only

No 35802.00

Estimated Rate ( Rs.) Total amount according to

SCHEDULE ' B ' OF B-1 TENDER

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

Estimated Cost of sub work put to Tender : Rs. 22467511 /-

contractor No. of corrections Executive Engineer

Page 194: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

10.000 Nos 150 mm dia. Sluice valve PN-1 9460.00 Nine thousand four hundred sixty only

No 94600.00

12.000 Nos 100 mm dia. Sluice valve PN-1 6307.00 Six thousand three hundred seven only

No 75684.00

30.000 Nos 80 mm dia. Sluice valve PN-1 4737.00 Four thousand seven hundred thirty seven only

No 142110.00

10.000 Nos 80 mm dia. S/V for washout 4737.00 Four thousand seven hundred thirty seven only

No 47370.00

Note - 85% Payment after supply10% Payment after Lowering / laying5% Payment after testing

Item No. 3:-Providing installing and givingsatisfactory field testing of Domestic water meter,horizontal inferential single or multijet type witmagnetic drive and dry dial suitable for ambient 500

C temperature duly sealed against tamperingcomplete with couplings at both ends andconfirming to class B as per IS 779/1994 ( IVRevision ) with ISI mark along with manufacturestest certificate and guarantee certificate, includingcost of all materials and labours

4200.00 No 15 mm dia ( EEC mark with remote reading facilitysingle jet )

1500.00 One thousand five hundred only

No 6300000.00

contractor No. of corrections Executive Engineer

Page 195: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

200.00 No 20 mm dia ( EEC mark with remote reading facilitysingle jet )

1750.00 One thousand seven hundred fifty only

No 350000.00

100.00 No 25 mm dia ( ISI mark as per 779/1994 withoutremote reading facility ) 2000.00 Two thousand only No 200000.00Note - Meters should be purchased as perrequirement & due permission of Engineer-in-charge

B) LABOUR

25261.000 Cum Item No.4 :- Excavation for foundation / pipetrenches in earth soils of all types, sand, graveland soft murum, hard murum, hard rock byblasting or chiseling in all types of strata includingremoving the excavated material up to a distanceof 50 M and lifts as below, stacking areaspreading as directed, normal dewatering,preparing the bed for foundation & excluding

355.00 Three hundred fifty five only

Cum 8967655.00

3789.150 Cum Item No.5 :- Providing murum bedding in trencheswith approved murum from excavated materialsfrom foundation 15 to 20 cm layers includingwatering and compaction etc. complete.

50.00 Fifty only Cum 189457.50

contractor No. of corrections Executive Engineer

Page 196: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

Item No.6 :- Lowering, laying and jointing with SBRrubber gaskets C.I. / D.I. / K-7 pipes of variousclasses with C.I. / D.I. / M.S. specials of followingdiameters in proper position grade and alignmentas directed by Engineer-in-charge, includingconveyance of materials from stores to site ofworks, including cost of jointing material and labourgiving hydraulic testing etc. complete. (Only SBRrubber gasket to be used )

70.00 Rm 200 mm dia. D.I. K-7 pipes 101.00 One hundred One only

Rm 7070.00

2865.00 Rm 150 mm dia. D.I. K-7 pipes 80.00 Eighty only Rm 229200.00

8320.00 Rm 100 mm dia. D.I. K-7 pipes 60.00 Sixty only Rm 499200.00

22035.00 Rm 80 mm C.I. "LA" Class Pipes 50.00 Fifty only Rm 1101750.00Note - 85% Payment after Lowering / laying

15% Payment after testing

Item No.7 :- Lowering, laying and jointing inposition following C.I. D/F Sluice valves includingcost of all labour, jointing material, including nutbolts and giving satisfactory hydraulic testing, etc.complete.

2.000 Nos 200 mm dia. Sluice valve PN-1 2796.00 Two thousand seven hundred ninty six only

No 5592.00

contractor No. of corrections Executive Engineer

Page 197: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

10.000 Nos 150 mm dia. Sluice valve PN-1 2688.00 Two thousand six hundred eighty eight only

No 26880.00

12.000 Nos 100 mm dia. Sluice valve PN-1 1710.00 One thousand seven hundred ten only

No 20520.00

30.000 Nos 80 mm dia. Sluice valve PN-1 1309.00 One thousand three hundred nine only

No 39270.00

10.000 Nos 80 mm dia. S/V for washout 1309.00 One thousand three hundred nine only

No 13090.00

Note - 85% Payment after Lowering / laying15% Payment after testing

Item No.8 :- Providing and fixing C.I. road boxincluding loading, unloading and carting to site ofwork including all necessary excavation in all typesof strata and fixing in murum packing, etc.complete.

42.000 Nos 225 mm x 300 mm (40 Kgs) 2142.00 Two thousand one hundred fourty two only

No 89964.00

contractor No. of corrections Executive Engineer

Page 198: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

Item No.9 :- Providing and constructing B.B.masonry valve chamber with 15 cm thick 1:3:6proportion PCC bedding, excluding excavation,B.B. masonry in CM 1:5 proportion, 12 mm thickcement plaster in CM 1:4 proportion on both sideswith providing and fixing precast RCC frame andcover, etc. complete as directed by Engineer-in-charge.

20.000 Nos Size - 0.90 x 0.45 M 5828.00 Five thousand eight hundred twenty eight only

No 116560.00

2.000 Nos Size - 0.90 x 0.90 M 7585.00 Seven thousand five hundred eighty five only

No 15170.00

Item No.10 :- Providing and laying in situ, followinggrades of cement concrete of trap / granite /quartzite / gneiss metal for foundation and beddingincluding bailing out water, form work, compactingand curing, etc. complete

7.000 Cum P.C.C. M-150 (1:2:4) 4265.75 Four thousand two hundred sixty five & paise seventy five only

Cum 29860.25

contractor No. of corrections Executive Engineer

Page 199: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

10.00 Nos Item No.11 :- Providing and constructing two tapsstandpost as per type design with excavation in allstrata, 15 cm thick PCC 1:3:6 bedding 20 mm thickPCC 1:2:4 concrete for platform of 1.75 M dia. withside curb and bucket rest, 80 mm dia. heavy dutyG.I. pipe central post duly filled therein with C.C.1:2:4, 5 M long, 20 mm dia. G.I. medium duty pipefrom point of tapping to standpost, additional 20mm dia. G.I. pipe fixed vertically upto 15 mm dia.self closing water taps, one brass ferrule, etc.complete together with all labour and materialcharges as per drawing and as directed byEngineer-in-charge when good foundation isavailable. Rate includes draining arrangement byexcavating open gutters., etc. complete.

6700.00 Six thousand seven hundred only

Cum 67000.00

21234.674 Cum Item No.12 :- Refilling the trenches with availableexcavated stuff with soft material first over pipelineand then hard material in 15 cm layers with allleads and lifts including consolidation, surcharging,etc. complete.

50.00 Fifty only Cum 1061733.70

Total Rs. 22467510.45

Say Rs. 22467511.00

contractor No. of corrections Executive Engineer

Page 200: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Sub- Work No.13 : Miscellaneous WorksMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

500.00 Rm Item No. 1 - Providing &erecting chain linkfencing of size 50x50 mm thick MS anglesfixed at 1.7 M c/c …. etc comp

1348.00 One thousand three hundred & fourty eight only

Rm 674000.00

5.00 Nos Item No.2 : Providing and fixing MS gate 2.50M wide for compound with 40 mm dia. G.I.pipe of approved design with grill workincluding side pillars in RCC M-150 of size 25cm x 40 cm x 2.50 M height and its foundationincluding 12 mm thick cement plaster in CM1:3 with snowcem paint two coats, etc.complete.

23000.00 Twenty three thousand only

No 115000.00

Estimated Rate ( Rs.) Total amount according to estimated quantities

SCHEDULE ' B ' OF B-1 TENDER

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

Estimated Cost of sub work put to Tender : Rs. 2127860 /-

Contractor No. of corrections Executive Engineer

Page 201: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

5.00 Nos Item No.3 : Providing and fixing MS wicketgate 1.00 M wide for compound with 40 mmdia. G.I. pipe of approved design with grillwork including side pillars in RCC M-150 ofsize 25 cm x 40 cm x 2.50 M height and itsfoundation including 12 mm thick cementplaster in CM 1:3 with snowcem paint twocoats, etc. complete.

14000.00 Fourteen thousand only No 70000.00

Item No 4 : Full bore electro magnetic flowmeter-- Manufacturing, supplying &commissioning Electro Magnetic Flow meter-(EMF) for Raw /Pure Water with accuracy + / -.5 % of measured value & protection as pergiven specifications for size 100 mm - 1000mm including sensor , transmitter surgearrestor , cable duct separate PVC of 25 mmdia for 25 m sensor transmitter ,surgearrestors, flow mrter, including the pipecutting, levelling & installation of flow meters inthe pipe lines with neccessary tool tackles ,cranes etc as maybe required at site & basedon technical specificationsFor Raw Water

1 Nos 200 mm 198780.00 One lakh ninty eight thousand seven hundred eighty only

Nos 198780.00

For Pure Water

Contractor No. of corrections Executive Engineer

Page 202: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

1 Nos 300 mm 254298.00 Two lakh fifty four thousand two hundred ninty eight only

Nos 254298.00

1 Nos 250 mm 219441.00 Two lakh ninteen thousand four hundred fouty one only

Nos 219441.00

3 Nos 200 mm 198780.00 One lakh ninty eight thousand seven hundred eighty only

Nos 596340.00

Total Rs. 2127859.00Say Rs. 2127860.00

Contractor No. of corrections Executive Engineer

Page 203: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Sub Work No .14 : O & M of the schemeMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

Item No.1 :- Commisioning, running and maintainingthe scheme to quantites, rated capacity, includingmanning necessary personnel such as operator,valveman, etc. as per requirements of the scheme andwho should also administer chemical dose for a periodof 12 months after completion one month of trial runperiod, together with training of personnel spared byMJP / Local Body and handing over the scheme toLocal Body after completion of the above period asdirected by Engineer-in-charge.( Required chemicals to be supplied by Departmentfree of cost and electricity bill will also be paid by theDepartment.

13.00 Months For single village (One +Twelve Months) 22000.00 Twenty two thousand only

Month 286000.00

Total Rs. 286000.00

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

Estimated Cost of sub work put to Tender : Rs. 286000 /-Estimated Rate ( Rs.) Total amount

according to estimated quantities

SCHEDULE ' B ' OF B-1 TENDER

contractor No. of corrections Executive Engineer

Page 204: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

SUB-WORK NO.1 : Construction of Intake WellMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

Item No.1 :- Excavation in general in softmaterial such as all types of soils, soft murum,hard murum and boulders of size less than 0.10cum, etc. in wet / dry condition for head works onnalla / river, Jack well, pump house, etc. for lift assteated below and lead of 150 M, includingbarricading, guarding and disposing off surplusexcavated stuff within a radius of 0.50 km asdirected, etc. complete, excluding back filling

22.050 Cum Lift 0.00 to 1.50 M 295.00 Two hundred ninty five only

Cum 6504.75

Note- Add Rs. 16/- per every 1.50M extra lift

Estimated Rate ( Rs.) Total amount according to estimated quantities

Estimated Cost of sub work put to Tender : Rs. 437295 /-

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

SCHEDULE ' B ' OF B-1 TENDER

Contractor No. of corrections Executive Engineer

Page 205: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.2 :- Excavation in general in hardmaterial such as soft rock, hard rock, etc. byblasting / chiselling in wet / dry condition for headworks on nalla / river, Jack well, pump house,etc. for lift as steated below and lead of 150 M,including barricading, guarding and disposing offsurplus excavated stuff within a radius of 0.50 kmas directed, etc. complete, excluding back filling

7.250 Cum Lift 0.00 to 1.50 M 625.00 Six hundred twenty five only

Cum 4531.25

21.772 Cum Lift 1.50 to 3.00 M 641.00 Six hundred fourty one only

Cum 13955.852

21.772 Cum Lift 3.00 to 4.50 M 657.00 Six hundred fifty seven only

Cum 14304.204

4.350 Cum Lift 4.50 to 6.00 M 673.00 Six hundred seventy three only

Cum 2927.55

Note- Add Rs. 16/- per every 1.50M extra liftItem No.3 :- Providing and laying in situ, following grades of cement concrete of trap / granite /quartzite / gneiss metal for foundation andbedding including dewatering, form work,compacting and curing, etc. complete

Contractor No. of corrections Executive Engineer

Page 206: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

2.000 Cum P.C.C. M-150 (1:2:4) 4265.75 Four thousand two hundred sixty five & paise seventy five only

Cum 8531.5

Item No.4 :- Providing and casting in situ CC M-300 (1:1:2) of trap / granite / quartzite / gneissmetal of approved quality for RCC works as perdetailed drawings and designs or as directedincluding dewatering, centering, form work,compaction, finishing the formed surfaces withCM 1:3 of sufficient minimum thickness to give asmooth and even surface wherever necessaryand roughening if special finish is to be providedand curing, etc. complete (excluding MSreinforcement).

a) RCC Raft Footing (M-300)

2.512 Cum Lift 0.00 to 5.00 M 5702.80 Five thousand seven hundred two & paise eighty only

Cum 14325.4336

b) RCC Vertical Wall (M-300)11.059 Cum Lift 0.00 to 5.00 M 7632.80 Seven thousand six

hundred thirty two &paise eighty only

Cum 84411.1352

c) RCC Slab (M-300)

1.040 Cum Lift 0.00 to 5.00 M 7632.80 Seven thousand six hundred thirty two & paise eighty only

Cum 7938.112

Contractor No. of corrections Executive Engineer

Page 207: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.5 :- Providing and fixing in position torsteel bar reinforcement of various diameters forRCC pipes, caps, footings, foundations, slabs,beams, columns, canopies, staircases, newels,chajjas, lintels, pardies, copings, fins, arches, etc.as per detailed designs, drawings and schedulesincluding cutting, bending, hooking the bars,binding with wires of 1.6 mm to 1.22 mm (about16 to 18 gauge) or tack welding and supportingas required, etc. complete (including cost ofbinding wire).

1.150 M.T. Lift 0.00 to 5.00 M 49700.00 Fourty nine thousand seven hundred only

M. T. 57155.00

5.000 Rm Item No.6 :- Providing and fixing M.S. ladder of50 cm wide with 75 mm x 10 mm thick MS flatsas stringers with 16 mm dia. MS twin round barsin double row at 30 cm centre to centre andapplying 3 coats of anti corrosive paint, etc.complete, including pipes, specials, painting,cutting, welding, fixing etc. complete.

1200.00 One thousand Two hundred only

Rm 6000.00

45.000 Cum Item No.7 :- Refilling the trenches with availableexcavated stuff with soft material first overpipeline and then hard material in 15 cm layerswith all leads and lifts including consolidation,surcharging, etc. complete.

50.00 Fifty only Cum 2250.00

Contractor No. of corrections Executive Engineer

Page 208: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Job Lump sum

Item No.8 :- Dewatering including diversion ofstreams, etc. as may be necessary for foundationand other parts of work during excavation and tillits completion in all respects, etc. complete.

58410.00 Fifty eight thousand four hundred ten only

Lump sum

58410.00

312.500 Cum Item No.9 :- Providing and constructing cofferdam in river basin of required section as perdepartmental / contractirs own design includingexcavation filling empty cement bags with soiletc. and placing in position on both sides. fixinghorizontal and vertical ballies with binding wireson both sides as necessary. fixing G.I. sheets inthe central B.C. soil earthing portion, ramming,compacting for satisfactory complection of workincluding dismentling coffer dam after completionof works, etc. complete, as directed by theEngineer-in-charge (For Intake well andConnecting pipes)

420.00 Four hundred twenty only

Cum 131250.00

1.000 No Item No.10 :- Providing, hosting, fixing in positionC.I. manhole frame & cover of best qualities ofsize 90 x 60 cm size in dome / roof slab withlocking arrangement, painting in two coats of anti-corrosive paint, etc. complete as directed.

2300.00 Two thousand three hundred only

No 2300.00

Contractor No. of corrections Executive Engineer

Page 209: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

1.000 No Item No.11 :- Providing, hosting and fixing 'J'type 100 mm dia. C.I. cowl type ventilatorsincluding applying two coats of anti-corrosivepaint, etc. complete as directed. (Weight not lessthan 35 kgs)

1500.00 One thousand Five Hundred only.

No 1500.00

300.000 Kgs Item No.12 :- Providing and fixing 300 mm dia.rose piece of fabricated mesh for intake well,providing and three coats of anti-corrosive paint,etc. complete as directed.

70.00 seventy only Kg 21000.00

Total 437294.79Say Rs. 437295.00

Contractor No. of corrections Executive Engineer

Page 210: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

SUB-WORK NO.2 : Connecting Pipe (450 mm PSC Pipes)Memorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

Item No.1 :- Excavation in general in softmaterial such as all types of soils, softmurum, hard murum and boulders of sizeless than 0.10 cum, etc. in wet / drycondition for head works on nalla / river,Jack well, pump house, etc. for lift assteated below and lead of 150 M, includingbarricading, guarding and disposing offsurplus excavated stuff within a radius of0.50 km as directed, etc. complete,excluding back filling

225.000 Cum Lift 0.00 to 1.50 M 295.00 Two hundred ninty five only

Cum 66375.00

Estimated Rate ( Rs.) Total amount according to estimated quantities

Estimated Cost of sub work put to Tender : Rs. 1608102 /-

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 1Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEME

TALUKA - SHIRUR, DISTRICT - PUNE

SCHEDULE ' B ' OF B-1 TENDER

Contractor No of corrections Executive Engineer

Page 211: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

Item No.2 :- Excavation in general in hardmaterial such as soft rock, hard rock, etc. byblasting / chiselling in wet / dry condition forhead works on nalla / river, Jack well, pumphouse, etc. for lift as steated below and leadof 150 M, including barricading, guardingand disposing off surplus excavated stuffwithin a radius of 0.50 km as directed, etc.complete, excluding back filling.

78.750 Cum Lift 0.00 to 1.50 M 625.00 Six hundred twenty five only

Cum 49218.75

213.750 Cum Lift 1.50 to 3.00 M 641.00 Six hundred fourty one only

Cum 137013.75

137.062 Cum Lift 3.00 to 4.50 M 657.00 Six hundred fifty seven only

Cum 90049.73

84.375 Cum Lift 4.50 to 6.00 M 673.00 Six hundred seventy three only

Cum 56784.38

73.125 Cum Lift 6.00 to 7.50 M 689.00 Six hundred eighty nine only

Cum 50383.13

Contractor No of corrections Executive Engineer

Page 212: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

13.500 Cum Item No.3 :- Filling plinth and foundationsetc. for murum bedding below pipe line fromexcavated materials, including consolidation,surcharging, etc. complete.

50.00 Fifty only Cum 675.00

Item No.4 :- Providing and supplying ISImark PSC pipes pipe for following class anddiameter including all taxes (Central andlocal), insurance, railway wagon, loading intotruck, transport to departmental store,unloading, stacking etc. complete.

60.00 Rm 450 mm dia. PSC 8 Kg/cm2 pipe 3391.00 Three thousand three hundred ninty one only

Rm 203460.00

Note - 85% Payment after supply10% Payment after Lowering / laying5% Payment after testing

Item No.5 :- Lowering, laying and jointingPSC pipes for following class and diameterin proper position, grade and alignment asdirected including conveyance from stores tosite of work, cost of jointing materials, rubberrings, labour, hydraulic testing, etc.complete.

60.00 Rm 450 dia. PSC pipes 163.00 One hundred sixty three only

Rm 9780.00

Contractor No of corrections Executive Engineer

Page 213: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

Note - 85% Payment after Lowering / laying15% Payment after testing

1640.625 Cum Item No.6 :- Providing and constructingcoffer dam in river basin of required sectionas per departmental / contractirs own designincluding excavation filling empty cementbags with soil etc. and placing in position onboth sides. fixing horizontal and verticalballies with binding wires on both sides asnecessary. fixing G.I. sheets in the centralB.C. soil earthing portion, ramming,compacting for satisfactory complection ofwork including dismentling coffer dam aftercompletion of works, etc. complete, asdirected by the Engineer-in-charge (ForIntake well and Connecting pipes)

420.00 Four hundred Twenty only

Cum 689062.50

Job Lump sum

Item No.7 :- Dewatering including diversionof streams, etc. as may be necessary forfoundation and other parts of work duringexcavation and till its completion in allrespects, etc. complete.

210600.00 Two Lakh ten thousand six hundred only

Lump sum

210600.00

Note - 75% Payment for Excavation25% Payment for laying

Contractor No of corrections Executive Engineer

Page 214: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

894.000 Cum Item No.8 :- Refilling the trenches withavailable excavated stuff with soft materialfirst over pipeline and then hard material in15 cm layers with all leads and lifts includingconsolidation, surcharging, etc. complete.

50.00 Fifty only Cum 44700.00

1608102.23Say 1608102.00

Contractor No of corrections Executive Engineer

Page 215: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

SUB-WORK NO.3 : RCC JACKWELL & PUMP HOUSEMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

Item No.1 :- Excavation in general in softmaterial such as all types of soils, softmurum, hard murum and boulders of sizeless than 0.10 cum, etc. in wet / dry condition for head works on nalla / river, Jack well,pump house, etc. for lift as steated belowand lead of 150 M, including barricading,guarding and disposing off surplusexcavated stuff within a radius of 0.50 km asdirected, etc. complete, excluding back filling

106.269 Cum Lift 0.00 to 1.50 M 295.00 Two hundred ninty five only

Cum 31349.36

Note- Add Rs.16/- for every additional lift of 1.50 m

Estimated Rate ( Rs.) Total amount according to

estimated quantities

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

SCHEDULE ' B ' OF B-1 TENDER

Estimated Cost of sub work put to Tender : Rs. 2694276 /-

contractor No. of corrections Executive Engineer

Page 216: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantitiesItem No.2 :- Excavation in general in hardmaterial such as soft rock, hard rock, etc. byblasting / chiselling in wet / dry condition forhead works on nalla / river, Jack well, pumphouse, etc. for lift as steated below and leadof 150 M, including barricading, guardingand disposing off surplus excavated stuffwithin a radius of 0.50 km as directed, etc.complete, excluding back filling

0.000 Cum Lift 0.00 to 1.50 M 625.00 Six hundred twenty five only

Cum 0.00

75.360 Cum Lift 1.50 to 3.00 M 641.00 Six hundred fourty one only

Cum 48305.76

75.360 Cum Lift 3.00 to 4.50 M 657.00 Six hundred fifty seven only

Cum 49511.52

75.360 Cum Lift 4.50 to 6.00 M 673.00 Six hundred seventy three only

Cum 50717.28

75.360 Cum Lift 6.00 to 7.50 M 689.00 Six hundred eighty nine only

Cum 51923.04

75.360 Cum Lift 7.50 to 9.00 M 705.00 Seven hundred five only

Cum 53128.80

75.360 Cum Lift 9.00 to 10.50 M 721.00 Seven hundred twenty one only

Cum 54334.56

contractor No. of corrections Executive Engineer

Page 217: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantities

75.360 Cum Lift 10.50 to 12.00 M 737.00 Seven hundred thirty seven only

Cum 55540.32

Note- Add Rs.16/- for every additional lift of 1.50 m

Item No.3 :- Providing and laying in situ,following grades of cement concrete of trap /granite / quartzite / gneiss metal forfoundation and bedding includingdewatering, form work, compacting andcuring, etc. complete

5.024 Cum P.C.C. M-150 (1:2:4) 4265.75 Four thousand two hundred sixty five & paise seventy five only

Cum 21431.13

Item No.4 :- Providing and casting in situ CCM-300 of trap / granite / quartzite / gneissmetal of approved quality for RCC works asper detailed drawings and designs or asdirected including dewatering, centering,form work, compaction, finishing the formedsurfaces with CM 1:3 of sufficient minimumthickness to give a smooth and even surfacewherever necessary and roughening ifspecial finish is to be provided and curing,etc. complete (excluding MS reinforcement).

contractor No. of corrections Executive Engineer

Page 218: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantitiesa) RCC Raft Foundation (M-300)

13.602 Cum Lift 10.00 to 15.00 M 5702.80 Five thousand seven hundred two & paise eighty only

Cum 77569.49

b) RCC Vertical Wall (M-300)

59.384 Cum Lift 00.00 to 05.00 M 7632.80 Seven thousand six hundred thirty two &paise eighty only

Cum 453266.20

31.830 Cum Lift 05.00 to 10.00 M 8396.08 Eight thousand three hundred ninty six only & paise eight only

Cum 267247.23

9.501 Cum Lift 10.00 to 15.00 M 9235.69 Nine thousand two hundred thirty five &paise sixty nine only

Cum 87748.29

c) RCC Slab (M-300)0.300 Cum Lift 00.00 to 05.00 M 7632.80 Seven thousand six

hundred thirty two & paise eighty only

Cum 2289.84

8.409 Cum Lift 05.00 to 10.00 M 8396.08 Eight thousand three hundred ninty six & paise eight only

Cum 70602.64

5.270 Cum Lift 10.00 to 15.00 M 9235.69 Nine thousand two hundred thirty five & paise sixty nine only

Cum 48672.09

contractor No. of corrections Executive Engineer

Page 219: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantitiesd) RCC Beams (M-300)

0.000 Cum Lift 00.00 to 05.00 M 7082.80 Seven thousand eighty two & paise eighty only

Cum

7.083 Cum Lift 05.00 to 10.00 M 7791.08Seven thousand seven hundred ninty one & paise eight only

Cum 55184.22

1.739 Cum Lift 10.00 to 15.00 M 8570.20 Eight thousand five hundred seveny & paise twenty only

Cum 14903.58

e) RCC Chajjas (M-300)0.000 Cum Lift 00.00 to 05.00 M 7732.80 Seven thousand

seven hundred thirty two & paise eighty only

Cum 0.00

0.366 Cum Lift 05.00 to 10.00 M 8506.08 Eight thousand five hundred six & paise eight only

Cum 3113.23

f) RCC Columns (M-300)

2.506 Cum Lift 0.00 to 5.00 M 7182.80 Seven thousand one hundred eighty two & paise eighty only

Cum 18000.10

contractor No. of corrections Executive Engineer

Page 220: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantities0.653 Cum Lift 10.00 to 15.00 M 7901.08 Seven thousand nine

hundred one & paise eight only

Cum 5159.41

Item No.5 :- Providing and fixing in positiontor steel bar reinforcement of variousdiameters for RCC pipes, caps, footings,foundations, slabs, beams, columns,canopies, staircases, newels, chajjas, lintels,pardies, copings, fins, arches, etc. as perdetailed designs, drawings and schedulesincluding cutting, bending, hooking the bars,binding with wires of 1.6 mm to 1.22 mm(about 16 to 18 gauge) or tack welding andsupporting as required, etc. complete(including cost of binding wire).

4.700 M.T. Lift 0.00 to 5.00 M 49700.00 Fourty nine thousand seven hundred only

M. T. 233590.00

4.000 M.T. Lift 5.00 to 10.00 M 52185.00 Fifty two thousand one hundred eighty five only

M.T. 208740.00

2.500 M.T. Lift 10.00 to 15.00 M 54794.25 Fifty four thousand seven hundred ninty four & paise twenty five only

M.T. 136985.63

contractor No. of corrections Executive Engineer

Page 221: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantities23.500 Rm Item No.6 :- Providing and fixing GI pipe

railing having 1 M height consisting of 50 x50 x 6 mm thick MS angles as vertical at1.50 M c/c and additional posts at everycorner with 3 rows of 25 mm dia. GI pipes ofmedium class verity as horizontal andpainting 3 coats of anticorrosive oil paint ofapproved colour and shade including cost ofall labour, material, transporting, bent tocurved shapes etc. complete.

800.00 Eight hundred only Rm 18800.00

1.060 M.T. Item No.7 :- Providing structural steel work insingle stanchions composed of RSJ channelfor gantary and floor level supportingarrangements, etc. with caps bases, mildsteel plates, angles, brackets, cleats, gussetplates, anchor bolts, etc. as per detaileddesign, drawings as directed includingcutting, fabricating, hosting, erecting, fixingin position, making rivetted / bolted / weldedconnections and one coat of anticorrosivepaint, and over it two coats of oil paintetc.omplete

54817.00 Fifty four thousand eight hundred seventeen only

M.T. 58106.02

contractor No. of corrections Executive Engineer

Page 222: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantities6.000 Sqm Item No.8 :- Providing and fixing MS

chequerred plate flooring of 8 mm thicknesssupported on MS angles (25 x 25 x 8 mmsize) including weding, spot welding &cutting and fabricating the plates to therequired square or rounding shape, makingholes in the plate, including providing andapplying 3 coats of anticorrosive paint, andover it two coats of oil paint etc. complete asdirected by Engineer-in-charge.

3900.00 Three thousand nine hundred only

Sqm 23400.00

Job Lump sum

Item No.9 :- Dewatering including diversionof streams, etc. as may be necessary forfoundation and other parts of work duringexcavation and till its completion in allrespects, etc. complete.

175220.00 One lakh seventy five thousand two hundred twenty only

Lump sum

175220.00

Note - 75% Payment for Excavation25% Payment for construction

contractor No. of corrections Executive Engineer

Page 223: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantities20.000 Rm Item No.10 :- Providing and fixing M.S.

ladder of 50 cm wide with 75 mm x 10 mmthick MS flats as stringers with 16 mm dia.MS twin round bars in double row at 30 cmcentre to centre and applying 3 coats of anticorrosive paint, etc. complete, includingpipes, specials, painting, cutting, welding,fixing etc. complete.

1200.00 One thousand two hundred only

Rm 24000.00

208.000 Cum Item No.11 :- Refilling the trenches withavailable excavated stuff with soft materialfirst over pipeline and then hard material in15 cm layers with all leads and lifts includingconsolidation, surcharging, etc. complete.

50.00 Fifty only Cum 10400.00

Item No.12 :- Providing, lowering, laying andfixing 300 mm dia. Sluice valve withnecessary extension rod, clamps, fixtures,head stock, 30 cm dia. Wheel, including costof all taxes, transportation, loading,unloading, stacking, etc. complete. (withoutby-pass) MJP approved make only

1.000 No a) 300 mm dia. Sluice Valve 38663.00 Thirty eight thousand six hundred sixty three only

No 38663.00

Note - 85% Payment after supply10% Payment after Lowering / laying5% Payment after testing

contractor No. of corrections Executive Engineer

Page 224: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantities1.000 Job b) Providing & fixing extension rod and head

stock arrangement40398.00 Fourty thousand three

hundred ninty eight only

Job 40398.00

191.250 Cum Item No.13 :- Providing and constructingcoffer dam in river basin of required sectionas per departmental / contractirs own designincluding excavation filling empty cementbags with soil etc. and placing in position onboth sides. fixing horizontal and verticalballies with binding wires on both sides asnecessary. fixing G.I. sheets in the centralB.C. soil earthing portion, ramming,compacting for satisfactory complection ofwork including dismentling coffer dam aftercompletion of works, etc. complete, asdirected by the Engineer-in-charge (ForIntake well and Connecting pipes)

420.00 Four Hundred twenty only

Cum 80325.00

14.238 Cum Item No.14 :- Providing and constructing 2ndclass B.B. masonry with conventional IS typebricks in cement mortar 1:6 insuperstructure, including racking out jointswhere plastering is to be done & scaffolding,curing , etc. complete.

2616.00 Two thousand six hundred sixteen only

Cum 37246.61

contractor No. of corrections Executive Engineer

Page 225: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantitiesItem No.15 :- Providing internal / externalplaster 20 mm thick in two coats in c.m. 1:3without neeru finish to concrete or bricksurface in all position, including scaffoldingand curing, etc. complete.

132.154 Sqm a) Inside Plaster 174.15 One hundred seventy four & paise fifteen only

Sqm 23014.62

124.423 Sqm b)) Outside Sand Faced Plaster 247.00 Two hundred fourty seven only

Sqm 30732.48

3.240 Sqm Item No.16 :- Providing and fixing steelwindows of various sizes as per detaileddrawings without hot zinc coating, withoutventilators including fabrication / glazing withplain / obscured glass panes of approvedtype, quality & fitness and fastening withoutteakwood boxing and architrares finishingwith oil painting, etc. complete.

2340.00 Two thousand three hundred fourty only

Sqm 7581.60

contractor No. of corrections Executive Engineer

Page 226: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantities5.250 Sqm Item No.17 :- Providing and fixing rolling

shutter fabricated from steel laths ofminimum thickness 0.90 mm with lock plateof 3.15 mm thickness reinforced with 35 x 35x 5 mm angle section fitted with sliding boltsand handles for both sides, deep M.S.channel section of depth and thickness notless than 65 mm and 3.15 mm respectivelywith hold fast arrangements, M.S. Bracketplate 300 x 300 x 3.15 mm minimum sizeand shape with square bar suspension shaftof minimum 32 mm diametre, hood cover ofM.S. sheet not less than 0.90 mm thicknessand of any size at top and safety devicesincluding without mechanical gear operationarrangement consisting of worm gear wheelsand worms of high grade cast iron or mildsteel and one coat of red lead primer, etc.complete

2095.00 Two thousand ninty five only

Sqm 10998.75

132.154 Sqm Item No.18 :- Providing and applyingwashable oil bound distemper of approvedcolour & shade to old / new surfaces in 3coats, including scaffolding, preparing thesurface, etc. complete.

23.10 Twenty three & paise ten only

Sqm 3052.76

contractor No. of corrections Executive Engineer

Page 227: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

estimated quantities124.423 Sqm Item No.19 :- Providing and applying 3 coats

of waterproof cement paint of approvedmanufacturer & approved colour to plasteredsurfaces, including scaffolding, if necessarycleaning and preparing the surface, wateringfor 2 days, etc. complete.

29.00 Twenty nine only Sqm 3608.27

1.000 No Item No.20 :- Providing and fixing in positioncopper lightening conductor, includingcopper rod of 20 mm dia. Upper terminal1.50 M long with a knob at the end withconical spike at top, copper tape conductor20 x 3 mm size, copper earth plate of 3 mmthick and 0.81 sqm in area, clamps at 1 Mcentre to centre including necessaryexcavation, laying and fixing the conductor,providing and fixing 40 mm G.I. pipe upto 3M height from ground and 0.50 M belowground including making all connections,filling the earthing pit with charcoal, salt, etc.and refilling and watering, etc. complete asper specifications laid in relevant IS codes.asper , etc. complete. (without by-pass)

9415.00 Nine thousand four hundred fifteen only

No 9415.00

Total 2694275.78Say Rs. 2694276.00

contractor No. of corrections Executive Engineer

Page 228: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

SUB-ESTIMATE NO. 4: CONSTRUCTION OF APPROACH BRIDGEMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

Item No.1 :- Excavation in general in soft materialsuch as all types of soils, soft murum, hard murumand boulders of size less than 0.10 cum, etc. in wet/ dry condition for head works on nalla / river, Jackwell, pump house, etc. for lift as steated below andlead of 150 M, including barricading, guarding anddisposing off surplus excavated stuff within a radiusof 0.50 km as directed, etc. complete, excludingback filling

120.000 Cum Lift 0.00 to 1.50 M 295.00 Two hundred ninty five only

Cum 35400.00

Estimated Cost of sub work put to Tender : Rs. 1930922 /-Estimated Rate ( Rs.) Total amount according

to estimated quantities

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

SCHEDULE ' B ' OF B-1 TENDER

Contractor No. of Corrections Executive Engineer

Page 229: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.2 :- Excavation in general in hard materialsuch as soft rock, hard rock, etc. by blasting /chiselling in wet / dry condition for head works onnalla / river, Jack well, pump house, etc. for lift assteated below and lead of 150 M, includingbarricading, guarding and disposing off surplusexcavated stuff within a radius of 0.50 km asdirected, etc. complete, excluding back filling

33.750 Cum Lift 0.00 to 1.50 M 625.00 Six hundred twenty five only

Cum 21093.75

33.750 Cum Lift 1.50 to 3.00 M 641.00 Six hundred fourty one only

Cum 21633.75

Item No.3 :- Providing and laying in situ, followinggrades of cement concrete of trap / granite /quartzite / gneiss metal for foundation and beddingincluding dewatering, form work, compacting andcuring, etc. complete

10.125 Cum P.C.C. M-150 (1:2:4) 4265.75 Four thousand two hundred sixty five & paise seventy five only

Cum 43190.72

Contractor No. of Corrections Executive Engineer

Page 230: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.4 :- Providing and casting in situ CC M-300of trap / granite / quartzite / gneiss metal ofapproved quality for RCC works as per detaileddrawings and designs or as directed includingdewatering, centering, form work, compaction,finishing the formed surfaces with CM 1:3 ofsufficient minimum thickness to give a smooth andeven surface wherever necessary and roughening ifspecial finish is to be provided and curing, etc.complete (excluding MS reinforcement).

RCC Raft Foundation (M-300)15.510 Cum Lift 0.00 to 5.00 M 5702.80 Five thousand seven

hundred two only & paise eighty only

Cum 88450.43

Item No.5 :- Providing and casting in situ CC M-300of trap / granite / quartzite / gneiss metal ofapproved quality for RCC works as per detaileddrawings and designs or as directed includingdewatering, centering, form work, compaction,finishing the formed surfaces with CM 1:3 ofsufficient minimum thickness to give a smooth andeven surface wherever necessary and roughening ifspecial finish is to be provided and curing, etc.complete (excluding MS reinforcement).

Contractor No. of Corrections Executive Engineer

Page 231: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

RCC Columns (M-300)15.525 Cum Lift 0.00 to 5.00 M 7182.80 Seven thousand one

hundred eighty two & paise eighty only

Cum 111512.97

Item No.6 :- Providing and casting in situ CC M-300of trap / granite / quartzite / gneiss metal ofapproved quality for RCC works as per detaileddrawings and designs or as directed includingdewatering, centering, form work, compaction,finishing the formed surfaces with CM 1:3 ofsufficient minimum thickness to give a smooth andeven surface wherever necessary and roughening ifspecial finish is to be provided and curing, etc.complete (excluding MS reinforcement).

RCC Beams (M-300)27.189 Cum Lift 0.00 to 5.00 M 7082.80 Seven thousand

eighty two & paise eighty only

Cum 192574.25

20.392 Cum Lift 5.00 to 10.00 M 7791.08 Seven thousand seven hundred ninty one & paise eight only

Cum 158875.70

Contractor No. of Corrections Executive Engineer

Page 232: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.7 :- Providing and casting in situ CC M-300of trap / granite / quartzite / gneiss metal ofapproved quality for RCC works as per detaileddrawings and designs or as directed includingdewatering, centering, form work, compaction,finishing the formed surfaces with CM 1:3 ofsufficient minimum thickness to give a smooth andeven surface wherever necessary and roughening ifspecial finish is to be provided and curing, etc.complete (excluding MS reinforcement).

RCC Slab (M-300)

31.500 Cum Lift 5.00 to 10.00 M 7632.80 Seven thousand six hundred thirty two & paise eighty only

Cum 240433.20

Item No.8 :- Providing and fixing in position tor steelbar reinforcement of various diameters for RCCpipes, caps, footings, foundations, slabs, beams,columns, canopies, staircases, newels, chajjas,lintels, pardies, copings, fins, arches, etc. as perdetailed designs, drawings and schedules includingcutting, bending, hooking the bars, binding withwires of 1.6 mm to 1.22 mm (about 16 to 18 gauge)or tack welding and supporting as required, etc.complete (including cost of binding wire).

Contractor No. of Corrections Executive Engineer

Page 233: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

4.580 M.T. Lift 0.00 to 5.00 M 49700.00 Fourty nine thousand seven hundred only

M.T. 227626.00

4.080 M.T. Lift 5.00 to 10.00 M 52185.00 Fifty two thousand one hundred eighty five only

M.T. 212914.80

100.000 Rm Item No.9 :- Providing and fixing GI pipe railinghaving 1 M height consisting of 50 x 50 x 6 mmthick MS angles as vertical at 1.50 M c/c andadditional posts at every corner with 3 rows of 25mm dia. GI pipes of medium class verity ashorizontal and painting 3 coats of anticorrosive oilpaint of approved colour and shade including cost of all labour, material, transporting, bent to curvedshapes etc. complete.

800.00 Eight hundred only Rmt 80000.00

131.000 Cum Item No.10 :- Refilling the trenches with availableexcavated stuff with soft material first over pipelineand then hard material in 15 cm layers with all leadsand lifts including consolidation, surcharging, etc.complete.

50.00 Fifty only Cum 6550.00

780.000 Cum Item No.11 :- Providing and filling embankment forapproach road with contractors murum for beddingin 15 to 20 cm thick cm layers including wateringand compaction, etc. complete.

525.00 Five hundred twenty five only

Cum 409500.00

Contractor No. of Corrections Executive Engineer

Page 234: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

366.760 Sqm Item No.12 :- Providing dry rubble stone pitching 23cm thick, etc. complete.

140.00 One hundred fourty only

Sqm 51346.40

42.000 Cum Item No.13 :- Providing dry trap / granite / quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thicklayers including hand packing and compacting, etc.complete.

710.00 Seven hundred ten only

Cum 29820.00

Total 1930921.97Say Rs 1930922.00

Contractor No. of Corrections Executive Engineer

Page 235: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

SUB-WORK NO.5 : Raw Water Pumping MachineryMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

2.000 No Item No.1 :- Providing, erecting and giving satisfactory test and trial of submersible pump set of 200 mm dia with water proof winding etc., capable of discharging 43 LPS. against a total head of 21 mtr from all causes. when pump set running at 2900 RPM. The pump shall be with stainless steel shaft & special bronze impeller . The motor suitable to working on 415 volts , 3 phase, 50 HZ, AC supply with water lubricated bearing to with stand entire hydraulic thrust & mechanical seal. The erection shalll be in Engg manner & as directed by Engineer-in- charge etc.complete as per detailed specifications. 20 BHP

72590.00 Seventy two thousand Five hundred ninty only

No 145180.00

2.000 No Item No. 2: .Providing, erecting and givingsatisfactory test and trial of Cast Iron Sluice Valveof following size and rating as per detailedspecifications. 200 mm dia PN 1.0 rating

20697.00 Twenty thousand six hundred ninty seven only

No 41394.00

Estimated Cost of sub work put to Tender : Rs. 770133 /-Estimated Rate ( Rs.) Total amount

according to

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

SCHEDULE ' B ' OF B-1 TENDER

contractor No. of corrections Executive Engineer

Page 236: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

2.00 Nos Item No. 3 : Providing, erecting and giving satisfactory test and trial of Cast Iron Reflux Valve of following size and rating as per detailed specifications. 200 mm dia PN 1.0 rating

19179.00 Nineteen thousand one hundred Seventy nine only

Rm 38358.00

2.000 Nos Item No. 4 a: .Providing, erecting and givingsatisfactory test and trial of Double Orifice KineticAir Valve with Isolating Sluice Valve in horizontalposition of following size and rating as per detailedspecifications. 80 mm dia PN 1.0 rating

14514.00 One lakh twenty thousand fivehundred only

No 29028.00

2 Nos Item No. 4b : Providing, erecting and commissionging of Pressure guage witrh syphon tube and cock arrangement etc. complete as per detailed specifications 150 mm dia

675.00 Six hundred seventy five only

No 1350.00

30.00 Rm Item No. 5 : Providing lowering layig & jointing of GI pipe Medium duty B class 150 mm dia etc.complete as per detailed specifications

1290.00 One Thousand Two hundred Ninty only

Rm 38700.00

750.00 Kg Item No. 6 : Providing fabricating erectingv and commissioning of MS flanged pipes & Specials reducerrs enlargere etc. as per required as per detailed specifications

62.00 Sixty two only Kg 46500.00

contractor No. of corrections Executive Engineer

Page 237: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

1 No Item No.7 :- Designing providing erecting and commissioning of LT Distribution panel board box type floor mounting comprising of incoming feeder, outgoing distribution feeders switches , star delta starter, RYB induction lamps, volt meter Ammeter, CTS, controll wiring etc. complete as per detailed specifications

96927.00 Ninty Six Thousand Nine Hundred Twenty Seven only

No 96927.00

Item No.8 :- Providing laying jointing and testing XLPE/ PVC insulated armoured cable ISI mark 1100 V grade with standard or solid conductor as per below details as per detailed specifications

150 Rm a :- Submersible copper conductor 3 core 4 Sqmm cable

136.00 One Hundred Thiry six only

Rm 20400.00

50 Rm b :- Alluminium 3.5 core 50 sqmm cable from Main panel to LT Distribution panel

476.00 Four Hundred Seventy six only

Rm 23800.00

4 Nos Item No.9:- Providing erecting and commissioning of earthing with required GI earth plate and charcole salt etc. complete.

1575.00 One thousand Five hundred Seventy five only

Rm 6300.00

1.00 Nos Item No.10:- Providing erecting and commissioning of chain pully block 2 tonne capacity with travellling trolly etc.

30350.00 Thirty thousand three hundred fifty only

No 30350.00

contractor No. of corrections Executive Engineer

Page 238: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to

1 Nos Item No.11 :-Providing erecting and commisssioning of servo controlled automatic voltage stabilizer 30KVA capacity as per detailed specifications etc.

207846.00 Two Lakh Seven thousand Eight Hundred Fourty six only

No 207846.00

Input - 220 to 460 voltoutput - 415 to + - % volt

1 lot Item No.12 :- Providing of tools and tackle as per detailed specifications

21000.00 Twenty one thousand only

lot 21000.00

1.00 Job Item No.13 :- Providing and electrification workinside and outside of pump house as per detailedspecifications

18000.00 Eighteen thousand only

Job 18000.00

1.00 Job Item No.14 :- Giving satisfactory test and trial ofelectrical / mechanic all above equipment etc.complete as per detailed specifications

5000.00 Five thousand only Job 5000.00

Total 770133.00Say Rs. 770133.00

contractor No. of corrections Executive Engineer

Page 239: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Memorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

274.72527 Kg Item No.1:- Providing and supplying ISI standardD.I. / C.I. flanged / S & S specials including alltaxes (Central and local), railway freight,insurance, unloading from railway wagon, loadinginto truck, transport to departmental stores / sites,unloading, stacking, etc. complete.

91.00 Ninty one only Job 25000.00

Item No.2 :- Providing and supplying ISI mark CID/F sluice valves and butterfly valves of followingdia. including all taxes (Central and local), railwayfreight, inspection charges, unloading from railwaywagon, loading into truck, transportation uptodepartmental stores, unloading, stacking, etc.complete .( MJP approved make only )

1.000 No 150 mm dia. Sluice valve PN 1.0 9460.00 Nine thousand four hundred sixty only

9460.00

Estimated Cost of sub work put to Tender : Rs. 361375 /-Estimated Rate ( Rs.) Total amount

according to estimated quantities

SUB-WORK NO.6 : Raw Water Rising Main

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

SCHEDULE ' B ' OF B-1 TENDER

Contractor No. of corrections Executive Engineer

Page 240: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

1.000 No 50 mm dia. Kinetic Air Valve Flanged type PN -1.0

10860.00 Ten thousand eight hundred sixty only

No 10860.00

Note - 85% Payment after supply10% Payment after Lowering / laying5% Payment after testing

497.250 Cum Item No.3 :- Excavation for foundation / pipetrenches in earth soils of all types, sand, graveland soft murum, hard murum, hard rock of alltypes by mechanical means , wedging &chisseling including removing the excavatedmaterial upto a distance of 50 M and aii lifts ,stacking , spreading as directed, normaldewatering, preparing the bed for foundation &excluding backfilling, etc. complete.

355.00 Three hundred fifty five only

176523.75

57.375 Cum Item No.4 :- Providing murum bedding in trencheswith approved murum from excavated materialsfrom foundation 15 to 20 cm layers includingwatering and compaction etc. complete.

50.00 Fifty only Cum 2868.75

Contractor No. of corrections Executive Engineer

Page 241: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.5 :- Lowering, laying and jointing withSBR rubber gaskets C.I. / D.I. / K-9 pipes ofvarious classes with C.I. / D.I. / M.S. specials offollowing diameters in proper position grade andalignment as directed by Engineer-in-charge,including conveyance of materials from stores tosite of works, including cost of jointing materialand , labour giving hydraulic testing etc.complete ( Only SBR rubber gasket to be used )

450.000 Rm 250 mm dia. D.I. K-9 & k-7 pipes 132.00 One hundred Thirty two only

59400.00

Note - 85% Payment after Lowering / laying15% Payment after testing

Item No.6 :- Lowering, laying and jointing inposition following C.I. D/F Sluice valves includingcost of all labour, jointing material, including nutbolts and giving satisfactory hydraulic testing, etc.complete.

1.000 No 150 mm dia. Sluice valve PN 1.0 2688.00 Two thousand six hundred eighty eight only

2688.00

Note - 85% Payment after Lowering / laying15% Payment after testing

Contractor No. of corrections Executive Engineer

Page 242: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

1.000 Nos Item No.7 :- Providing and constructing B.B.masonry valve chamber with 15 cm thick 1:3:6proportion PCC bedding, excluding excavation,B.B. masonry in CM 1:5 proportion, 12 mm thickcement plaster in CM 1:4 proportion on both sideswith providing and fixing precast RCC frame andcover, etc. complete as directed by Engineer-in-charge. Size - 90 x 45 cm

5828.00 Five thousand eight hundred twenty eight only

No 5828.00

Item No.8 :- Providing and fixing in position airvalve shaft including providing and fixing G.I.medium duty class pipe or 6mm thick M.S. pipeshaft 2.70 M long over branch flange of air valvetee, providing PCC block of M-150 concrete, 150mm thick around the air valve tee includingencasing of vertical shaft in PCC M-150 as shownin type design together with providing and makingflanged joints wherever required and fixing airvalve over the shaft excluding cost of air valveand branch flanged air valve tee, etc. complete asper type design and as directed by Engineer-in-charge for following dia. of pipe lines.

1.000 Nos 200 to 400 mm dia. Pipe line 5431.00 Five thousand four hundred thirty one only

No 5431.00

Item No.9 :- Providing and laying in situ, followinggrades of cement concrete of trap / granite /quartzite / gneiss metal for foundation andbedding including bailing out water, form work,compacting and curing, etc. complete

Contractor No. of corrections Executive Engineer

Page 243: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

9.500 Cum P.C.C. M-150 (1:2:4) 4265.75 Four thousand two hundred sixty five & paise seventy five only

Cum 40524.63

410.000 Cum Item No.10 :- Refilling the trenches with availableexcavated stuff with soft material first overpipeline and then hard material in 15 cm layerswith all leads and lifts including consolidation,surcharging, etc. complete.

50.00 Fifty only Cum 20500.00

1.000 No Item No.11 :- Providing and fixing in position M.S.air valve boxes fabricated with 2 mm thick M.S.plate, 30 x 30 x 3 mm size M.S. angle frame, Ifrequired concreting in M-150 for Fixing the boxesin position, applying 2 coats of oil paint, paintingcharges, locking arrangements, etc. complete asdirected by Engineer-in-charge.

2291.00 Two thousand two hundred ninty one only

No 2291.00

Total Rs. 361375.13Say Rs. 361375.00

Contractor No. of corrections Executive Engineer

Page 244: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Sub -Work No.7 : Water Treatment Plant (Capacity 3.50 MLD)UnconventionalMemorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

Item No.1 :- Designing (aesthetically), providingand constructing high rate Unconventional WaterTreatment Plant i.e. Simplified Water TreatmentPlant consisting of Civil, Mechanical andElectrical works, including cost of providing andsupplying, epoxy paint to inside surface of waterretaining structures in contact with chlorine andproviding anti-termite treatment to entirestructure below ground level, mechanical andelectrical components of various sub-works asgiven below, including necessary hydraulictesting, structural testing and trial run for threemonths, etc. complete as directed by Engineer-in-charge ( turn-key job works ) 1) Aeration fountain2) Inlet arrangements3) Mixing channel with ventury flume and flowmeasuring arrangement4) Inlet channel

Estimated Rate ( Rs.) Total amount according to estimated quantities

SCHEDULE ' B ' OF B-1 TENDER

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

Estimated Cost of sub work put to Tender : Rs. 8864840 /-

Contractor No. of corrctions Executive Engineer

Page 245: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

5) Flocculator - Conforming to I.S. 7208-1974 (Type-c)with detention period of 30 minutes

6) Tube settlers - Designing, fabricating andconstructing Tube Settlers with square or any othershaped tube like Circular, Cheveron, Hexagonal etc.having proven performance.

7) Rapid sand gravity filters 8) Filter house9) Chemical house10) Alum tanks - Two Nos. with mixing, carrying anddosing arrangements with piping.11) Gravity feed gas chlorinator with 100% standby.

12) TCL solution tank with mixing, carrying and dosingarrangement with piping13) Bye-pass arrangement14) External and internal electrification15) Laboratory equipments16) Wash water tanks of capacity equal to 2% ofdesigned quantity of filtered water in a day (+) 10%17) Wash water pumps with 100% standby18) Air blowers capable of delivering 600 LPM persquare metre of free air of filter area at 0.4 Kg/sqcm atthe under drains ( 100% standby )

19) Pure water sump of capacity equal to one hourpumping capacity.20) Pure water pump house over the sump / by theside of sump.21) Drainage arrangements

Contractor No. of corrctions Executive Engineer

Page 246: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in wordsEstimated Rate ( Rs.) Total amount according

to estimated quantities

22) Alum store23) Sanitary block with necessary water supply anddrainage arrangements and internal WBM roads.

24) These rates are applicable for seismic zones 2, 3and 4.25) Rates given below are inclusive of uplift pressureif any and dewatering during the entire work.

26) All RCC structures shall be constructed in M-30

27) Unconventional Treatment Plants less than 1.00MLD capacity shall not be constructed.

1.00 No WTP of 3.50 MLD Capacity 8864837.00 Eighty Eight lakh sixty four thousand eight hundred thirty seven only

No 8864837.00

Note 1 Lead charges for Sand & Gravel for distance of60 Km & 30 km. respectively are considered inabove rates.

Total Rs 8864837.00

2 Contractor should submit the preliminary architectural drawing of WTP and only after approval of the same, detailed structural & hydraulic drawing should be prepared

Say Rs. 8864840.00

3 Bearing capacity for WTP structure is 20 MT/ Sqm.4 Obligatory levels of WTP are as per drawing

attached in the tender

Contractor No. of corrctions Executive Engineer

Page 247: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Memorandum showing the items of work to be carried out by the Contractor.

Quantity Unit Particulars PerRate Rate in words

3 Nos. Item No.1 - V.T.Pump.50 HPx 3 Nos Providing, erecting and giving satisfactory test and trial suitable to run in parellel operation having bronze impeller, S.S.shafts and suitable to match required duty conditions and specified requirements water lubricated vertical turbine pumpsets as per detailed specifications with total suspended column assembly of 16 mtrs. Water lubricated V.T.pump suitable for Discharge 20 lps, 126 M total head, RPM 1450 (as per Market rate )

325000.00 Three lakh twenty five thousand only

each 975000.00

Estimated Rate ( Rs.) Total amount according to estimated quantities

Sub Work No 8.:- Pure Water Pumping Machinery & Allied Equipments

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

SCHEDULE ' B ' OF B-1 TENDER

Estimated Cost of sub work put to Tender : Rs. 3764512 /-

contractor No. of corrections Executive Engineer

Page 248: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No 2 - VHS Motor Providing, erecting and giving satisfactory test and trial of squirrel cage induction motor of the following type suitable for operation at 415 V + / 10%, 3 Ph, 50 Hz, AC supply having "F" class insulation, temperature rise limited to class-B with continuous duty conforming to IS 325 and as per detailed specifications. Vertical hollow shaft motor (screen protected drip proof type) Rating 37kw /50 Hp, 1500 RPM syn.speed

3 Nos. Item No.3 :CI D/F Sluice Valve. Providing, erecting and giving satisfactory test and trial of CI D/F sluice valve of following size and rating as per detailed specifications.

175025.00 One lakh seventy five thousand twenty five only

each 525075.00

3 Nos. 150 mm dia PN1.6 rating 13700.00 Thirteen thousand seven hundred only

each 41100.00

Item No.4 : CI D/F Reflux Valve Providing, erecting and giving satisfactory test and trial of CI D/F reflux valve of following size and rating as per detailed specifications.

3 Nos. 150 mm dia PN1.6 rating 13261.00 Thirteen thousand two hundred sixty one only

39783.00

contractor No. of corrections Executive Engineer

Page 249: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.5 : Kinetic Air Valve. Providing, erecting and giving satisfactory test and trial of double orifice kinetic air valve of following size and rating as per detailed specifications.

1 No 80 mm dia PN1.6 rating. 17174.00 Seveenteen thousand one hundred seventy four only

each 17174.00

Item No.7 : MS DF/CI DF Piping Providing, lowering, laying, jointing and testing MS DF/CI DF piping as per detailed specifications and approval layout of pumping machinery and of size as per required.and as per detailed specifications

800 Kg MS DF Pipes & Specials. 62.00 Sixty two only Kg 49600.00Item No. 8 : Concrete Foundation. Providing CC foundation in 1:2:4 ratio as per detailed specifications.

2 Cum CC foundation 1:2:4 3140.00 Three thousand one hundred fourty only

Cum 6280.00

Item No.9 : Hand operated Crane.1 No. Providing, erecting & giving satisfactory test

and trial of hand operated crane of 3 MT capacity with circular gantry with trolley with 6 M lift, 8 Mtr. span as per detailed specifications.

228314.00 Two lakh twenty eight thousand three hudreds fourteen only

each 228314.00

contractor No. of corrections Executive Engineer

Page 250: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.10 : Pressure Gauges. Providing, erecting & testing pressure gauge/ combination gauge with required syphon tube, valve GI pipes and specials as per detailed specifications.

4 Nos. Pressure gauge 150 mm dia. 675.00 Six hundred seventy five only

each 2700.00

Item No.11 : 22 KV TransformerSub-station.

1 Job. Providing, erecting & giving satisfactory test and trial of sub-station structure with AB switch, DO fuse set and all allied equipments with required civil work, fencing etc. complete as per detailed specifications etc.

225000.00 Two lakh twenty five thousand only

Lump 225000.00

Item No.12 : 160 KVA Transformer.1 No. Providing, erecting and giving satisfactory

test and trial of plinth mounted outdoor type copper wound transformer of following rating with all standard fixtures as per detailed specifications.

295327.00 Two lakh Ninty five thousand three hundred twenty seven only

No 295327.00

22 KV/433 Volts, (160 KVA)1 No. Item No.13 : Kiosk HT Meter

Supplying & erecting of Kiosk 22 KV HT metering cubical with HT meter etc. as per detailed specifications.

207629.00 Two lakh seven thousand six hundred twenty nine only

No 207629.00

contractor No. of corrections Executive Engineer

Page 251: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.14 : Mixed Electric Capacitor.60 KVAR Supplying and erecting bank of mixed di-

electric capacitors with standard capacities on angle iron or channel frame etc. as per detailed specifications separately for both the motors.as per detailed specifications.

621.00 Six hundred twenty one only

KVAR 37260.00

Item No.15 : LT Panel.Providing, erecting and giving satisfactory test and trial of LT panel comprising of specified breakers, bus-bar, switches, indicating instruments, capacitors etc. as per detailed specifications.

1 No. Main Cubical Control Panel Board. 285000.00 Two lakh eighty five thousand only

each 285000.00

Item No.16 : Motor Starter.3 Nos. Providing, erecting and giving satisfactory

test and trial of fully automatic autotransformer starter for 60 HP motor as per detailed specifications.

117637.00 One lakh seventeen thousand six hundred thirty seven only

each 352911.00

Air break contactor type assembled etc.Item No.17 : Cable.Providing, lowering, laying, jointing & testing PVC insulated armoured cable, ISI mark, 1100 V grade with stranded or solid conductor as per detailed specifications.

75 RM a) 22 KV XLPE H.T. Armoured Aluminium 3 Core 95 sqmm PVC cable

2066.00 Two thousand sixty six only

RM 154950.00

contractor No. of corrections Executive Engineer

Page 252: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

100 RM b) Aluminimum 3 1/2 Core, 185 sqmm PVC (11 KV) Transformer to Panel

1211.00 One thousand two hundred eleven only

RM 121100.00

75 RM c) Aluminimum 3 1/2 Core, 70 sqmm PVC Panel to ATS Starter to Motor.

564.00 Five Hundred sixty four only

RM 42300.00

2 Nos. d) Indoor Cable jointing kit. 12224.00 Twelve thousand two hundred twenty four only

each 24448.00

2 Nos. e) Outdoor HT Cable jointing kit. 19291.00 Ninteen thousand two hundred ninty one only

each 38582.00

Item No.18 : Earthing.Providing, erecting & giving satisfactory test & trial of pipe type/Plate type earth electrode with required chamber, GI earth strip as per detailed specifications.

15 Nos. Pipe type earth electrodes, with chambers. 1575.00 Fifteen hundred seventy five only

each 23625.00

1 Job. Providing, lowering, laying GI earth strip of required size from jackwell to Bridge starting point from transformer to bridge starting point.

10000.00 Ten thousand only Lump 10000.00

contractor No. of corrections Executive Engineer

Page 253: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Quantity Unit Particulars PerRate Rate in words

Estimated Rate ( Rs.) Total amount according to estimated quantities

Item No.19 : Iron Work.Providing, fabricating Iron work of ISMB, ANGLES, CHEQURRED PLATES, for base frame, panel stand, square bar for crane, or all other similar works including cutting, bending, welding and painting as per detailed specifications.

600 Kg Iron Work 52.26 Fifty two &paise twenty six only

Kg 31354.20

Item No.20 : Internal & External Electrification.

1 Job. Providing, erecting & giving satisfactory test & trial of internal & external electrification work for pump house including all fixtures and wiring as per detailed specifications.

10000.00 Ten thousand only Lump 10000.00

Item No.21 : Tools & Tackles.1 Set Providing tools of standard make as per

detailed specifications.10000.00 Ten thousand only each 10000.00

Item No.22 : Commissioning, Test & Trial.

1 Job. of above equipments as per detail specifications

10000.00 Ten thousand only Lump 10000.00

Total Rs. 3764512.20Say Rs. 3764512.00

contractor No. of corrections Executive Engineer

Page 254: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(6)

CONDITIONS OF CONTRACT

Clause 1 (Modification as per the G.R.P.W.D. No. CAT-1087 /CR-94/ Bldg.2 dated 14.6.1989)

The person / persons whose tender may be accepted (hereinafter called the Contractor, which expression shall unless excluded by or repugnant to the context include his heirs, executors, administrators and assigns) shall (A) within ten days (which may be extended by the Superintending Engineer concerned upto 15 days if the Superintending Engineer thinks fit to do so) of the receipt by him of the notification of the acceptance of his tender deposit with the Executive Engineer in cash or Government securities endorsed to the Executive Engineer (if deposited for more than 12 months) of sum sufficient which will make-up the full security deposit specified in the tender or (B) (permit MJP at the time of making any payment to him for work done under the contract to deduct such sum as will amount to 4 percent of all moneys so payable such deductions to be held by MJP by way of security deposit). Provided always that in the event of the Contractor depositing a lumpsum by way of security deposit as contemplated at (A) above, then and in such case, if the sum so deposited shall not amount to 2 percent of the total estimated cost of the work, it shall be lawful for MJP at the time of making any payment to the Contractor for work done under the contract to make-up the full amount 2 percent by deducting sufficient sum from every such payment as last aforesaid until the full amount of the security deposit is made-up. All compensation or other sums of money payable by the Contractor to MJP under terms of this contract may be deducted from or paid by the sale of sufficient part of his security deposit or from the interest arising therefrom, or from any sums which may be due or may become due by MJP to the Contractor under any other contract or transaction of any nature on any account whatsoever and in the event of his security deposit being reduced by reason of any such deduction or sale as aforesaid, the Contractor shall within ten days thereafter, make good in cash or Government securities endorsed as aforesaid any sum or sums which may have been deducted from or raised by sale of his security deposit or any part thereof. The security deposit referred to, when paid in cash may at the cost of the depositor, be converted into interest bearing securities provided that the depositor has expressly desired this in writing.

If the amount of the security deposit to be paid in a lumpsum within the period specified at (A) above is not paid the tender/contract already accepted shall be considered as cancelled and legal steps taken against the Contractor for recovery of the amounts. The amount of security deposit lodged by a Contractor shall be refunded along with the payment of the final bill, if the date upto which the Contractor has agreed to maintain the work in good order is over. If such date is not over, only 90% amount of security deposit shall be refunded along with the payment of the final bill. The amount of security deposit retained by the MJP shall be released after expiry of period upto which the Contractor has agreed to maintain the work in good order is over. In the event of the Contractor failing or neglecting to complete rectification work within the period upto which the Contractor has agreed to maintain the work in good order, then subject to provision of Clauses 17 and 20 thereof the amount of security deposit retained by MJP shall be adjusted towards the excess cost incurred by the MJP on rectification work.

Clause 2 The time allowed for carrying out the work as entered in the tender shall be strictly observed by the Contractor and shall be reckoned from the date on which the order to commence work is given to the Contractor. The work shall throughout the stipulated period of the contract be proceeded with all due diligence (time being deemed to be the essence of the contract on the part of the Contractor) and the Contractor shall pay as compensation an amount equal to one percent or such smaller amount as the Superintending Engineer (whose decision in writing shall be final) may decide, of the amount of the estimated cost of the whole work as shown by the tenderer for everyday that the work remains uncommenced or unfinished after the proper dates. And further to ensure good progress during execution of the work, the Contractor shall be bound, in all cases in which the time allowed for any work exceeds one month to complete.

¼ of the work in ¼ of the time ½ of the work in ½ of the time ¾ of the work in ¾ of the time

Note : The quantity of the work to be done within a particular time to be specified above shall be fixed and inserted in the blank space kept for the purpose by Officer competent to accept the contracts after taking into consideration the circumstances of each case.

Contractor No. of Corrections Executive Engineer

Page 255: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(7)

The following proportion will usually be found suitable :-

In ¼, ½, ¾ of the time.

Reasonable progress of earth work 1/6, ½, ¾ of the total value of the work to be done.

Reasonable progress of masonry work 1/10, 1/10, 8/10 of the total value of the work to be done.

In the event of the Contractor failing to comply with these conditions he shall be liable to pay as compensation an amount equal to one percent or such smaller amount as Superintending Engineer (whose decision in writing shall be final) may decide of the said estimated cost of the whole work for everyday that the due quantity of work remains incomplete provided always that the total amount of compensation to be paid under the provisions of this clause shall not exceed 10 percent of the estimated cost of the work as shown in the tender. Superintending Engineer should be the final authority in this respect, irrespective of the fact that tender is accepted by Chief Engineer / Additional Chief Engineer / Superintending Engineer / Executive Engineer or Assistant Engineer / Deputy Engineer.

Clause 3 In any case in which under any clause of this contract the Contractor shall have rendered himself liable to pay compensation amounting to the whole of his security deposit (whether paid in one sum or deducted by instalments) or in the case of abandonment of the work owing to serious illness or death of the Contractor or any other clauses, the Executive Engineer, on behalf of the MJP shall have power to adopt any of the following courses, as he may deem best suited to the interest of the MJP.

Action when whole of security deposit is forfeited.

a) To rescind the contract (for which rescission notice in writing to the Contractor under the hand of Executive Engineer shall be conclusive evidence) and in that case the security deposit of the Contractor shall stand forefeited and be absolutely at the disposal of the MJP.

b) To carry out the work or any part of the work departmentally debiting the Contractor with the cost of the work, expenditure incurred on tools, plant and charges on additional supervisory staff including the cost of work-charged establishment employed for getting unexecuted part of the work completed and crediting him with the value of the work done departmentally in all respects in the same manner and at the same rates as if it has been carried out by the Contractor under the terms of his contract. The certificate of the Executive Engineer as to the cost and other allied expenses so incurred and as to the value of the work so done departmentally shall be final and conclusive against the Contractor.

c) The order that the work of the Contractor be measured up and to take such part thereof as shall be unexecuted, out of his hands and to give it to another contractor to complete, in which case all expenses incurred on advertisement for fixing a new contracting agency, additional supervisory staff including the cost of work-charged establishment and the cost of the work executed by the new contract agency will be debited to other contractors and the value of the work done or executed through the new contractor shall be credited to the Contractor in all respects and in the same manner and at the same rates as if it had been carried out by the Contractor under the terms of his contract. The certificate of the Executive Engineer as to all the costs of the work and other expenses incurred as aforesaid for getting the unexecuted work done by the new contractor and as to the value of the work so done shall be final and conclusive against the Contractor.

In case the contract shall be rescinded under clause (a) above, the Contractor shall not be entitled to recover or be paid, any sum for any work therefore actually performed by him under this contract unless and until the Executive Engineer shall have certified in writing the performance of such work and the amount payable to him in respect thereof and he shall only be entitled to be paid the amount so certified.

Contractor No. of Corrections Executive Engineer

Page 256: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(8)

In the event of either of the courses referred to in clause (b) or (c) being adopted and the cost of work executed departmentally or through a new contractor and other allied expenses exceeding the value of such work credited to the Contractor, the amount of excess shall be deducted from any money due to the Contractor by MJP under the contract or otherwise howsoever or from his security deposit or the sale proceeds thereof provided, however that the Contractor shall have no claim against MJP even if the certified value of the work done, allied expenses, provided always that whichever of the three courses mentioned in clauses (a), (b) or (c) is adopted by the Executive Engineer, the Contractor shall have no claim to compensation for any loss sustained by him by reason of not having purchased, or procured any materials, or entered into any engagements or made any advances on account of, or with a view to the execution of the work or the performance of the contract.

Clause 4 If the progress of any particular portion of the work is unsatisfactory, the Executive Engineer shall notwithstanding that the general progress of the work is in accordance with the conditions mentioned in clause 2, be entitled to take action under clause 3 (b) after giving the Contractor 10 days' notice in writing. The Contractor will have no claim for compensation, for any loss sustained by him owing to such action.

Action when the progress of any particular portion of the work is unsatisfactory.

Clause 5 In any case in which any of the powers conferred upon the Executive Engineer by clauses 3 and 4 hereof shall have become exercisable and the same shall not have been exercised, the non-exercise thereof shall not constitute a waiving of any of the conditions hereof and such powers shall notwithstanding be exercisable in the event of any future case of default by the Contractor for which under any clauses hereof he is declared liable to pay compensation amounting to the whole of his security deposit and the liability of the Contractor of past and future compensation shall remain unaffected. In the event of the Executive Engineer taking action under sub-clause (a) or (c) of clause 3, he may, if he so desires, take possession of all or any tools and plant, materials and stores, in or upon the work or the site thereof or belonging to the Contractor or procured by him and intended to be used for the execution of the work or any part thereof, paying or allowing for the same in account at the contract rates, or in the case of contract rates not being applicable at current market rates, to be certified by the Executive Engineer whose giving notice in writing to the Contractor or his clerk of the work, foreman or other authorised agent require him to remove such tools, plant, materials, or stores from the premises within a time to be specified in such notice and in the event of the Contractor failing to comply with any such requisition, the Executive Engineer may remove them at the Contractor's expense or sell them by auction or private sale on account of the Contractor at his risk in all respects, and the certificate of the Executive Engineer as to the expense of any such removal and the amount of the proceeds and expense of any such sale shall be final and conclusive against the Contractor.

Power to take possession of or sell Contractor's plant.

Clause 6 If the Contractor shall desire an extension of the time for completion of work on the ground of his having been unavoidably hindered in its execution or on any other grounds, he shall apply in writing to the Executive Engineer before the expiration of the period stipulated in the tender or before the expiration of 30 days from the date on which he was hindered as aforesaid or on which the cause for asking for extension occurred, whichever is earlier and the Executive Engineer or in the opinion of Superintending Engineer or Chief Engineer as the case may be, if in his opinion, there were reasonable grounds for granting an extension, grant such extension as he thinks necessary or proper, the decision of the Executive Engineer in this matter shall be final.

Extension of time.

Clause 7 On the completion of the work, the Contractor shall be furnished with a certificate by the Executive Engineer (hereinafter called the Engineer-in-charge) of such completion, but no such certificate shall be given nor shall the work be considered to be complete until the Contractor shall have removed from the premises on which the work shall have been executed, all scaffolding, surplus materials and rubbish and

Final Certificate.

Contractor No. of Corrections Executive Engineer

Page 257: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(9)

shall have cleaned off, the dirt from all wood-work, doors, windows, walls, floor or other parts of any building in or upon which the work has been executed, or of which he may have had possession for the Engineer-in-charge or where the measurements have been taken by his subordinates until they have received approval of the Engineer-in-charge, the said measurements being binding and conclusive against the Contractor. If the Contractor fails to comply with requirements of this clause as to the removal of scaffolding, surplus materials and rubbish and cleaning of dirt on or before the date fixed for the completion of the work, the Engineer-in-charge may at the expense of the Contractor, remove such scaffolding, surplus materials and rubbish and dispose off the same as he thinks fit and clean off such dirt as aforesaid and the Contractor shall forthwith pay the amount of all expenses so incurred, but shall have not claim in respect of any such scaffolding or surplus materials as aforesaid except for any sum actually realised by the sale thereof.

Clause 8 No payment shall be made for any work, estimated to cost less than Rupees One Thousand till the whole of work shall have been completed and a certificate of completion given. But in the case of works estimated to cost more than Rupees One Thousand, the Contractor shall, on submitting a monthly bill therefor, be entitled to receive proportionate to the part of the work then approved and passed by the Engineer-in-charge, whose certificate of such approval and passing of the sum so payable shall be final and conclusive against the Contractor. All such intermediate payments only and not as payments for work actually done and completed, and shall not preclude the Engineer-in-charge from requiring any bad, unsound, imperfect or unskillful work to be removed or taken away and reconstructed or re-erected not shall any such payment be considered as an admission of the due performance of the contract or any part thereof in any respect or the accruing of any claim nor shall it conclude, determine or affect in any other way the powers of the Engineer-in-charge as to the final settlement and adjustment of the accounts or otherwise, or in any way vary of affect the contract. The final bill shall be submitted by the Contractor within one month of the date fixed for the completion of the work, otherwise the Engineer-in-charge's certificate of the measurements and of the total amount payable for the work shall be final and binding on all parties.

Payment on intermediate certificate to be regarded as advance.

Clause 9 The rates for several items of work estimated to cost more than Rs. 1,000/- agreed to within shall be valid only when the items concerned are accepted as having been completed fully in accordance with the sanctioned specification. In cases where the items of work are not accepted as so completed the Engineer-in-charge may make payment on account of such items at such reduced rates as he may consider reasonable in the preparation of final or on-account bills.

Payment at reduced rates on account of items of work not accepted as completed, to be at the discretion of the Engineer-in-charge.

Clause 10 A bill shall be submitted by the Contractor in each month on or before the date fixed by the Engineer-in-charge for all works executed in the previous month and the Engineer-in-charge shall take or cause to be taken the requisite measurements for the purpose of having the same verified and the claim, so far as it is admissible, shall be adjusted, if possible, within ten days from the presentation of the bill. If the Contractor does not submit the bill within the time fixed as aforesaid, the Engineer-in-charge may depute a subordinate to measure up the said work in the presence of the Contractor or his duly authorised agent whose counter signature to the measurement list shall be sufficient warrant and the Engineer-in-charge may prepare a bill from such list which shall be binding on the Contractor in all respects.

Bills to be submitted monthly.

Clause 11 The Contractor shall submit all bills on the printed forms to be had on application at the office of the Engineer-in-charge. The charges to be made in the bills shall always be entered at the rates specified in the tender or in the case of any extra work ordered in pursuance of these conditions and not mentioned or provided for in the tender, at the rates hereinafter provided for such work.

Bills to be on printed forms.

Contractor No. of Corrections Executive Engineer

Page 258: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(10)

Clause 12 If the specification or estimate of the work provides for the use of any special description of materials to be supplied from the stores of the MJP or if it is required that the Contractor shall use certain stores to be provided by the Engineer-in-charge (such material and stores and the prices to be charged therefor as hereinafter mentioned being so far as practicable for the convenience of the Contractor but not so as in any way to control the meaning or effect of this contract specified in the schedule or memorandum hereto annexed) the Contractor shall be supplied with such materials and stores, as may be required from time to time to be used by him for the purposes of contract only and the value of full quantity of the material and stores, so supplied shall be set off or deducted from any sums then due, or thereafter to become due to the Contractor under the contract or otherwise or from the security deposit, or the proceeds of sale thereof if the security deposit is held in Government securities, the same or a sufficient portion thereof shall in that case be sold for the purpose. All materials supplied to the Contractor shall remain the absolute property of the MJP and shall on no account be removed from the site of the work, and shall at all times be open for inspection by the Engineer-in-charge. Any such materials unused and in perfectly good condition at the time of completion or determination of the contract shall be returned to the MJP stores if the Engineer-in-charge so requires by a notice in writing given under his hand, but the Contractor shall not be entitled to return any such materials except with such consent and he shall have no claim for compensation on account of any such material supplied to him as aforesaid but remaining unused by him or for any wastage or damage thereto.

Stores supplied by MJP.

Clause 12 (A) All stores of control material such as cement, steel, etc. to be supplied by the MJP to the Contractor should be kept by the Contractor under lock and key and will be accessible for inspection by the Executive Engineer or his agent at all times.

Clause 13 The Contractor shall execute the whole and every part of the work in the most substantial and workmanlike manner, and both as regards materials and every other respect in strict accordance with specifications. As per norms of the MJP, after ascertaining the recuperation test of the percolation well and potability of water, the work of percolation well shall be continued and completed. The further sub-works shall be taken up as under :

Works to be executed in accordance with specif-ications, drawings, orders, etc.

1. ESR, GSR

2. Gravity Main, Rising Main, Switch House, Installation of Pumping Machinery after 80% work of storage tank is completed.

3. Distribution System

4. Standposts

The Contractor shall also conform exactly, fully and faithfully to the designs, drawings and instructions in writing relating to the work signed by the Engineer-in-charge and lodged in his office and to which the Contractor shall be entitled to receive three sets of contract drawings and working drawings as well as one certified copy of the accepted tender along with the work order free of cost. Further copies of the contract drawings and working drawings if required by him shall be supplied at the rate of Rs. 10/- per set of contract drawing and Re. 1/- per working drawing except where otherwise specified.

C

lause 14

The Engineer-in-charge shall have poser to make any alterations in or additions to the original specifications, drawings, designs and instructions that may appear to him to be necessary or advisable during the progress of the work, and the contractor shall be bound to carry out the work in accordance with any instructions in this connection which may be given to him in writing signed by the Engineer-in-charge and such alteration shall not invalidate the contract, and any additional work which the Contractor may be directed to do in the manner above specified as part of the work shall be carried out by the Contractor on the same conditions in all respects on which he agreed to do the main work, and at the same rates as are specified in the tender for the main work. And if the additional and altered work includes any class of work for which no rate is specified in this contract, then such class of work shall be carried out at the rates entered in the Schedule of Rates of the Division or at rates mutually agreed upon between the Engineer-in-charge and the Contractor, whichever are lower.

Alterations in specifications and designs not to invalidate contracts. Rates for work not entered in estimate or Schedule of Rates of the District.

Contractor No. of Corrections Executive Engineer

Page 259: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(11)

If the additional or altered work for which no rate is entered in the Schedule of Rates of the Division, is ordered to be carried out before the rates are agreed upon then the Contractor shall within seven days of the date of receipt by him of the order to carry out the work, inform the Engineer-in-charge of the rate which is his intention to charge for such class of work and if the Engineer-in-charge does not agree to this rate, he shall by notice in writing be at liberty to cancel this order to carry out such class of work and arrange to carry it out in such manner as he may consider advisable provided always that if the Contractor shall commence work or incur any expenditure in regard thereto before the rates shall have been determined as lastly hereinbefore mentioned, then in such case he shall only be entitled to be paid in respect of the work carried out or expenditure incurred by him prior to the date of the determination of the rate as aforesaid according to such rate or rates as shall be fixed by the Engineer-in-charge. In the event of a dispute, the decision of the Superintending Engineer of the Circle will be final.

Where, however, the work is to be executed according to the designs, drawings and specifications recommended by the Contractor and accepted by the Competent Authority, the alterations above referred to shall be within the scope of such designs, drawings and specifications appended to the tenders.

The time limit for the completion of the work shall be extended in the proportion that the increase in its cost occasioned by alterations or additions bears to the cost of the original contract work, and the certificate of the Engineer-in-charge as to such proportion shall be conclusive.

Clause 15

1. If at any time after the execution of the contract documents the Engineer-in-charge shall for any reason whatsoever (other than default on the part of the Contractor for which the MJP is entitled to rescind the contract) desire that the whole or any part of the work specified in the tender should be suspended for any period or that the whole or part of the work should not be carried out, at all he shall give to the Contractor a notice in writing of such desire and upon the receipt of such notice the Contractor shall forthwith suspend or stop the work wholly or in part as required, after having due regard to the appropriate stage at which the work should be stopped or suspended so as not to cause any damage or injury to the work or any part of it could be or could have been safely stopped or suspended shall be final and conclusive against the Contractor. The Contractor shall have no claim to any payment of compensation whatsoever by reason of or in pursuance of any notice as aforesaid, on account of any suspension, stoppage or curtailment except to the extent specified hereinafter.

No claim to any payment or compensation for alteration or restriction of work.

2. Where the total suspension of work ordered as aforesaid continued for a continuous period exceeding 90 days, the Contractor shall be at liberty to withdraw from the contractual obligations under the contract so far as it pertains to the unexecuted part of the work by giving a 10 days' prior notice in writing to the Engineer, within 30 days of the expiry of the said period of 90 days, of such intention and requiring the Engineer to record the final measurements of the work already done and to pay final bill. Upon giving such notice the Contractor shall be deemed to have been discharged from his obligation to complete the remaining unexecuted work under his contract. On receipt of such notice the Engineer shall proceed to complete the measurement and make such payment as may be finally due to the Contractor within a period of 90 days from the receipt of such notice in respect of the work already done by the Contractor. Such payment shall not in any manner prejudice the right of the Contractor to any further compensation under the remaining provisions of this clause.

3. Where the Engineer required the Contractor to suspend the work for a period in excess of 30 days at any time or 60 days in the aggregate the Contractor shall be entitled to apply to the Engineer within 30 days of the resumption of work after such suspension for payment of compensation to the extent of pecuniary loss suffered by him in respect of working machinery rendered idle on the site or on the account of his having had to pay the salary or wages of labour engaged by him during the said period of suspension, provided always that the Contractor shall not be entitled to any claim in respect of any such working machinery, salary or wages for the first 30 days whether consecutive or in aggregate or such suspension or in respect of any suspension whatsoever occasioned by unsatisfactory work or other default on his part. The decision of the Engineer in this regard shall be final and conclusive against the Contractor.

Contractor No. of Corrections Executive Engineer

Page 260: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(12)

4. In the event of -

i) ii)

Any total stoppage of work on notice from the Engineer under sub-clause (1) in that behalf, Withdrawal by the Contractor from the contractual obligation to complete the remaining unexecuted work under sub-clause (2) on account of continued suspension of work for a period exceeding 90 days.

No claim to compensation on account of loss due to delay in supply of materials by MJP.

iii) Curtailment in the quantity of item or items originally tendered on account of any alteration, omission or substitutions in the specifications, drawings, designs, or instructions under clause 15 (1) where such curtailment exceeds 25% in quantity and the value of the quantity curtailed beyond 25% at the rates for the item specified in the tender is more than Rs. 5,000/-

It shall be open to the Contractor within 90 days from the service of (i) the notice of stoppage of work or (ii) the notice of withdrawal from the contractual obligations under the contract on account of the continued suspension of work or (iii) notice under clause 15 (1) resulting in such curtailment, to produce to the Engineer satisfactory documentary evidence that he had purchased or agreed to purchase material for use in the contracted work, before receipt by him of the notice of stoppage, suspension or curtailment and require the MJP to take over on payment such material at the rates determined by the Engineer, provided, however, that such rates shall in no case exceed the rates at which the same was acquired by the Contractor. The MJP shall thereafter take over the material so offered, provided the quantities offered, are not in excess of the requirements of the unexecuted work as specified in the accepted tender and are of quality and specifications approved by the Engineer.

Clause 15 (A) The Contractor shall not be entitled to claim any compensation from MJP for the loss suffered by him on account of delay by MJP in the supply of materials entered in Schedule ' A ' where such delay is caused by

No claim to compensation on account of loss due to delay in supply of material by MJP.

i) Difficulties relating to the supply of railway wagons.

ii) Force meajure.

iii) Act of God.

iv) Act of enemies of the State or any other reasonable cause beyond the control of MJP.

In the case of such delay in the supply of materials, MJP shall grant such extension of time for the completion of the works as shall appear to the Executive Engineer to be reasonable in accordance with the circumstances of the case. The decision of the Executive Engineer as to the extension of time shall be accepted as final by the Contractor.

Clause 16 Under no circumstances whatsoever shall the Contractor be entitled to any compensation from MJP on any account unless the Contractor shall have submitted claim in writing to the Engineer-in-charge within one month of the case of such claim occuring.

Time limit for unforeseen claims.

Clause 17 If at any time the security deposit or any part of thereof is refunded to the Contractor it shall appear to the Engineer-in-charge or his subordinate in-charge of the work that any work has been executed with unsound, imperfect or unskilled workmanship or with materials of inferior quality, or that any materials or articles provided by him for the execution of the work are unsound or of a quality inferior to that contracted for, or are otherwise not in accordance with the contract, it shall be lawful for the Engineer-in-charge to intimate this fact in writing to the Contractor and then notwithstanding the fact that the work, materials or articles complained of may have been inadvertently passed, certified and paid for, the

Action and compensation payable in case of bad work.

Contractor No. of Corrections Executive Engineer

Page 261: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(13)

Contractor shall be bound forthwith to rectify, or remove and reconstruct the work so specified in whole or in part, as the case may require or if so required shall remove the materials or articles so specified and provided other proper and suitable materials or articles at his own charge and cost and in the event of his failing to do so within a period to be specified by the Engineer-in-charge in the written intimation aforesaid, the Contractor shall be liable to pay compensation at the rate of one percent on the amount of the estimate for everyday not exceeding 10 days during which the failure so continues and in the event of any such failure the Engineer-in-charge may rectify or remove and re-execute the work or remove, and replace the materials or articles complained of as the case may be at the risk and expense in all respects of the Contractor. Should the Engineer-in-charge consider that any such inferior work or materials as prescribed above may be accepted or made use of, it shall be within his discretion to accept the same at such reduced rates as he may fix therefor.

Clause 18 All works under or in course of execution or executed in pursuance of the contract shall at all times be open to inspection and supervision of the Engineer-in-charge and his subordinates and the Contractor shall at all times during the usual working hours, and at all other times at which reasonable notice of the intention of the Engineer-in-charge and his subordinates to visit the works shall have been given to the Contractor, either himself be present to receive orders and instructions or have a responsible agent duly accredited in writing present for that purpose. Orders given to the Contractors duly authorised agent shall be considered to have the same force and effect as if they had been given to the Contractor himself.

Work to be open to inspection. Contractor or responsible agent to be present.

Clause 19 The Contractor shall give not less than five days' notice in writing to the Engineer-in-charge or his subordinate in-charge of the work before covering up or otherwise placing beyond the reach of measurement any work in order that the same may be measured and correct dimensions thereof taken before the same is so covered up or placed beyond the reach of measurement and shall not cover up or place beyond the reach of measurement any work without the consent in writing of the Engineer-in-charge or his subordinate in-charge of the work, and if any work shall be covered up or placed beyond the reach of measurement, without such notice having been given or consent obtained the same shall be uncovered at the Contractor's expense, and in default thereof no payment or allowance shall be made for such work or for the materials with which the same was executed.

Notice to be given before work is covered.

Clause 20 If during the period as listed below, from the date of completion as certified by the Engineer-in-charge pursuant to clause 7 of the contract or for the period as mentioned below after commissioning the work whichever is earlier in the opinion of the Executive Engineer the said work is defective in any manner whatsoever the Contractor shall forthwith on receipt of notice in that behalf from the Executive Engineer, duly commence execution and completely carry out at his cost in every respect all the work that may be necessary for rectifying and setting right the defects specified therein including dismantling and reconstruction of unsafe portion strictly in accordance with and in the manner prescribed and under the supervision of the Executive Engineer. In the event of the Contractor failing or neglecting to commence execution of the said rectification work within the period prescribed therefor in the said notice and / or to complete the same as aforesaid as required by the same notice, the Executive Engineer may get the same executed and carried out departmentally or by any other agency at the risk, on account and at the cost of the Contractor. The Contractor shall forthwith on demand pay to the MJP the amount of such cost, charges and expenses sustained or incurred by the MJP of which the certificate of the Executive Engineer shall be final and binding on the Contractor. Such costs, charges and expenses shall be deemed to be arrears of and revenue and in the event of the Contractor failing or neglecting to pay the same on demand as aforesaid without prejudice to any other rights and remedies of the MJP, the same may be recovered from the Contractor as arrears of land revenue. The MJP shall also be entitled to deduct the same from any amount which may then be payable or which may thereafter become payable by the MJP to the Contractor either in respect of the said work or any other work whatsoever or from the amount of security deposit retained by the Maharashtra Jeevan Pradhikaran.

Contractor liable for damage done and for imperfections

Contractor No. of Corrections Executive Engineer

Page 262: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(14)

During defect liability period, the work of daily maintenance and general repairs and expenses thereon would be out of scope of the tender. However, if any defects in the subwork or in the material are found, the same will be rectified by the Contractor at his cost and will be binding on him, failing to which legal action would be taken as per tender clauses. Ten percent amount will be withheld from the security deposit depending upon the nature of work, till the defect liability period is over.

I) Head Works

a) River headworks including those at storage dams, infilteration galleries, trench galleries, bank pitching, intake works, connecting pipe, approach bridges, etc.

Five years

b) Anicuts or wires, earthen/masonry dams and ancillary works.

Five years

c) Nalla/canal headworks inclusive of infilteration wells, connecting pipes, production and percolation wells, etc.

Three years

d) Tube wells, bore wells, etc.

Three years

e) Repairs to the works at (a) to (d) above

One year

II) Pumping Machinery

a) Pumping machinery and other allied mechanical, electrical installations (excluding those provided in the treatment plant contract), surge arrestors, water hammer control devices, chlorinators (excluding those provided in the treatment plant contract)

One year

b) Repairs to the works at (a) above

Six months

III) Treatment Plants

a) Water treatment plant and sewage treatment plant based on Contractor's design

Five years

b) Water treatment plant and sewage treatment plant based on Departmental design

Three years

c) Repairs to the treatment plant at (a) and (b) above

Two years

IV)

ESR/GSR/BPT, Sump and Pump House, etc.

a) Based on Contractor's own design

Five years

b) Based on Departmental design

Three years

c) Special repairs to ESR/GSR/BPT

Two years

d) Ordinary repairs to ESR/GSR/BPT, Sump and Pump House, etc.

One year

Contractor No. of Corrections Executive Engineer

Page 263: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(15)

V) Pipe Lines

a) Pumping mains, gravity mains, leading mains, including intercepting outfall sewer in case of sewerage schemes.

Two years

b) Distribution system, lateral, branch sewers of sewerage system, etc.

One year

c) Repairs to the pipeline under the works at (a) and (b) above

Two years

Two instructions contained in the Govt. of Maharashtra (Public Works Department) Resolution dated 14th June 1989 shall henceforth be applicable to all the works for which defect liability period have been specified as above.

Clause 21 The Contractor shall supply at his own cost all material (except such special materials, if any, as may, in accordance with the contract, be supplied from the MJP stores), plant, tools, appliances, implements, ladders, cordages, tackles, scaffolding and temporary works requisite or proper for the proper execution of the work, in the original, altered or substituted form and whether included in the specification or other documents forming part of the contract or referred to in these conditions or not and which may be necessary for the purpose of satisfying or complying with the requirements of the Engineer-in-charge as to any matter as to which under these conditions he is entitled to be satisfied, or which he is entitled to require together with the carriage therefor to and from the work. The Contractor shall also supply without charge the requisite number of persons with the means and materials necessary for the purpose of setting out works and counting, weighing and assisting in the measurement or examination at any time and from time to time of the work or the materials. Failing this the same may be provided by the Engineer-in-charge at the expense of the Contractor and expenses may be deducted from any money due to the Contractor under the contract or from his security deposit or the proceeds of sale thereof, or a sufficient portion thereof. The Contractor shall provide all necessary fencing and lights required to protect the public from accident and shall also be bound to bear the expenses of defence of every suit, action or other legal proceedings at law that may be brought by any person for injury sustained owing to neglect of the above precautions, and to pay any damages and costs which may be awarded in any such suit action or proceedings to any such person, or which may with consent of the Contractor be paid for compromising any claim by any such person. List of machinery in Contractor's possession and which he proposes to use on the work should be submitted along with the tender.

Contractor to supply plant, ladders, scaf-foldings, etc. and is liable for damages arising from non-provisions of light, fencing, etc.

Clause 21 (A) The Contractor shall provide suitable scaffolds and working platforms, gangways and stairways and shall comply with the following regulations in connection therewith.

a) Suitable scaffolds shall be provided for workmen for all works that cannot be safely done from a ladder or by other means.

b) A scaffold shall not be constructed, taken down or substantially altered except :-

i) under the supervision of a competent and responsible person; and

ii) as far as possible by competent workers possessing adequate experience in this kind of work;

Contractor No. of Corrections Executive Engineer

Page 264: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(16) c) All scaffolds and appliances connected therewith and ladders shall -

i) be of sound material;

ii) be of adequate strength having regard to the loads and strains to which they will be subjected; and

iii) be maintained in proper condition.

d) Scaffolds shall be so constructed that no part thereof can be displaced in consequence of normal use.

e) Scaffolds shall not be over-loaded and so far as practicable the load shall be evenly distributed.

f) Before installing lifting gear on scaffolds special precautions shall be taken to ensure the strength and stability of the scaffolds.

g) Scaffolds shall be periodically inspected by a competent person.

h) Before allowing a scaffold to be used by his workmen the Contractor shall whether the scaffold has been erected by his workmen or not, take steps to ensure that it complies fully with the regulations herein specified.

i) Working platform, gangway, stairways shall -

i) be so constructed that no part thereof can sag unduly or unequally;

ii) be so constructed and maintained, having regard to the prevailing conditions as to reduce as far as practicable risks of persons tripping or slipping; and

iii) be kept free from any unnecessary obstruction.

j) In the case of working platform, gangways, working places and stairways at a height exceeding 3 metres (to be specified),

i) every working platform and every gangway shall be closely boarded unless other adequate measures are taken to ensure safety;

ii) every working platform and gangway shall have adequate width; and

iii) every working platform, gangway, working place and stairway shall be suitably fenced.

k) Every opening in the floor of a building or in a working platform shall except for the time and to the extent required to allow the excess of persons or the transport or shifting of material be provided with suitable means to prevent the fall of persons or material.

l) When persons are employed on a roof where there is a danger of falling from a height exceeding 3 metres (to be specified) suitable precautions shall be taken to prevent the fall of persons or materials.

m) Suitable precautions shall be taken to prevent persons being struck by articles which might fall from scaffolds or other working places.

n) Safe means of access shall be provided to all working platforms and other working places.

o) The Contractor will have to make payments to labourers as per Minimum Wages Act.

Clause 21 (B) The Contractor shall comply with the following regulations as regards the Hoisting Appliances to be used by him.

Contractor No. of Corrections Executive Engineer

Page 265: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(17)

a) Hoisting machines and tackles, including their attachments, anchorages and supports shall

i) be of good mechanical construction, sound material and adequate strength and free from patent defect; and

ii) be kept in good repair and in good working order.

b) Every rope used in hoisting or lowering materials or as a means of suspension shall be of suitable quality and adequate strength and free from patent defect.

c) Hoisting machines and tackles shall be examined and adequately tested after erection on the site and before use and be re-examined in position at intervals to be prescribed by the MJP.

d) Every chain, ring, hook, shackle, swivel and pulley block used in hoisting or lowering materials or as a means of suspension shall be periodically examined.

e) Every crane driver or hoisting appliance operator shall be properly qualified.

f) No person who is below the age of 18 years shall be in control of any hoisting machine, including any scaffold which give signals to the operator.

g) In case of every hoisting machine and every chain, ring, hook, shackle, swivel and pulley block used in hoisting or lowering or as a means of suspension, the safe working load shall be ascertained by adequate means.

h) Every hoisting machine and all gear referred to in proceeding regulation shall be plainly marked with the safe working load.

i) In case of hoisting machine having a variable safe working load each safe working load and the conditions under which it is applicable shall be clearly indicated.

j) No part of any hoisting machine or any gear referred to in regulation (g) above shall be loaded beyond the safe working load except for the purpose of testing.

k) Motors, gearing, transmissions, electric wiring and other dangerous parts of hoisting appliances shall be provided with efficient safeguards.

l) Hoisting appliances shall be provided with such means as will reduce to minimum and the risk of the accidental descent of the load.

m) Adequate precaution shall be taken to reduce to a minimum the risk of any part of a suspended load becoming accidentally displaced.

Clause 22 The Contractor shall not set fire to any standing juggle, trees, brushwood or grass without a written permission from the Executive Engineer.

Measure for prevention of fire.

When such permission is given and also in all cases when destroying, cut or dig up trees, brushwood, grass, etc. by fire, the Contractor shall take necessary measures to prevent such fire spreading to or otherwise damaging surrounding property.

The Contractor shall make his own arrangements for drinking water for the labour employed by him.

Contractor No. of Corrections Executive Engineer

Page 266: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(18)

Clause 23 Compensation for all damages done intentionally or unintentionally by Contractor's labour whether in or beyond the limits of the MJP property including any damage caused by the spreading of fire mentioned in clause 22 shall be estimated by the Engineer-in-charge or such other officer as he may appoint and the estimate of the Engineer-in-charge subject to the decision of the Superintending Engineer on appeal shall be final and the Contractor shall be bound to pay the amount of the assessed compensation on demand, failing which the same will be recovered from the Contractor as damage in the manner prescribed in clause 1 or deducted by the Engineer-in-charge from any sums that may be due or become due from MJP to Contractor under this contract or otherwise.

Liability of Contractor for any damage done in or outside work area.

Clause 24 The employment of female labourers on works in neighbourhood of soldiers' barracks should be avoided as far as possible.

Employment of female labour.

Clause 25 No work shall be done on Sunday without the sanction in writing of the Engineer-in-charge.

Work on Sunday.

Clause 26 The contract shall not be assigned or sublet without the written approval of the Engineer-in-charge. And if the Contractor shall assign or sublet his contract, or attempt to do so, or become insolvent or commence any proceedings to get himself adjudicated and insolvent or make any composition with his creditors, or attempt so to do or if bribe, gratuity, gift, loan, perquisite, reward of advantage, pecuniary or otherwise shall either directly or indirectly be given, promised or offered by the Contractor or any of his servants or agents to any public officer of person in the employment of MJP in any way relating to his office or employment, or if any such officer or person shall become in any way directly or indirectly interested in the contract, the Engineer-in-charge may thereupon by notice in writing rescind the contract, and the security deposit of the Contractor shall thereupon stand forfeited and be absolutely at the disposal of MJP, and the same consequences shall ensure as if the contract had been rescind under clause 3 thereof and in addition the Contractor shall not be entitled to recover or be paid for any work therefor actually performed under the contract.

Contract may be rescinded and security deposit forfeited for subletting it without approval or for bribing a Public Officer or if Contractor becomes insolvent.

Clause 27 All sums payable by a Contractor by way of compensation under any of these conditions shall be considered as a reasonable compensation to be applied to the use of MJP without reference to the actual loss or damage sustained, and whether any damage has or has not been sustained.

Sum payable by way of compensation to be considered as reasonable compensation without reference to actual loss.

Clause 28 In the case of tender by partners, any change in the constitution of a firm shall be forthwith notified by the Contractor to the Engineer-in-charge for his information.

Changes in the constitution of the firm to be notified.

Clause 29 All works to be executed under the contract shall be executed under the direction and subject to the approval in all respects of the Superintending Engineer of the Circle, for the time being, who shall be entitled to direct at what point or points and in what manner they are to be commenced and from time to time carried out.

Directions and control of the Superintending Engineer.

Contractor No. of Corrections Executive Engineer

Page 267: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(19)

Clause 30.1 Except where otherwise specified in the contract and subject to the powers delegated to him by MJP under the code, rules then in the force, the decision of the Superintending Engineer of the Circle for the time being shall be final, conclusive and binding on all parties of the contract upon all questions relating to the meaning of the specifications, designs, drawings and instruction hereinbefore mentioned and as to the quality of workmanship, or materials used on the work, or as to any other question, claim, right, matter or thing whatsoever, in any way arising out of or relating to the contract, designs, drawings, specifications, estimates, instructions, orders, or these conditions, or otherwise concerning the works, or the execution, or failure to execute the same, whether arising during the progress of work, or after the completion or abandonment thereof.

Clause 30.2 The Contractor may within thirty days of receipt by him of any order passed by the Superintending Engineer of the Circle as aforesaid appeal against it to the Chief Engineer, concerned with the contract work or project provided that -

i) the accepted value of the contract exceeds Rs. 10 lakhs (Rupees Ten Lakhs).

ii) amount of claim is not less than Rs. 1.00 lakh (Rupees One Lakh).

Clause 30.3 If the Contractor is not satisfied with the order passed by the Chief Engineer as aforesaid, the Contractor, may within thirty days of receipt by him of any such order appeal against it to the Member Secretary, Maharashtra Jeevan Pradhikaran, who, if convinced that prima - facie the Contractor's claim rejected by Superintending Engineer / Chief Engineer is not frivolous and that there is some substance in the claim of the Contractor as would merit a detailed examination and decision by the MJP shall put up to the MJP for suitable decision.

Clause 31 The Contractor shall obtain from MJP's stores all stores and articles of European and American manufacture which may be required for the work, or any part thereof or in making up any articles required therefor or in connection therewith unless he has obtained permission in writing from the Engineer-in-charge to obtain such stores and articles elsewhere. The value of stores and articles as may be supplied to the Contractor will be debited in his account at the rates shown in the Schedule ' A ' attached to the contract and if they are not entered in the said Schedule, they shall be debited to him at cost price which for the purpose of this contract shall include the cost of carriage and all other expenses whatsoever, which shall have been incurred in obtaining delivery of the same at the stores aforesaid.

Stores of European or American manufacture to be obtained from the MJP.

Clause 32 When the estimate on which a tender is made includes lumpsums in respect of parts of the work, the Contractor shall be entitled to payment in respect of the items of work involved or the part of the work in question at the same rates as are payable under this contract for each items, or if the part of the work in question is not in the opinion of the Engineer-in-charge capable of measurement, the Engineer-in-charge may at his discretion pay the lumpsum amount entered in the estimate and the certificate in writing of the Engineer-in-charge shall be final and conclusive against the Contractor with regard to any sum or sums payable to him under the provisions of this clause.

Lumpsums in estimates.

Clause 33 In the case of any class of work for which there is no such specification as is mentioned in Rule 1 of Form B - 1, such work shall be carried out in accordance with the Divisional specifications, and in the event of there being no Divisional specifications, the work shall be carried out in all respect in accordance with all instructions and requirements of the Engineer-in-charge.

Action where no specifications.

Contractor No. of Corrections Executive Engineer

Page 268: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(20)

Clause 34 The expression 'Work' or 'Works' where used in these conditions, shall unless there be something in the subject or context repugnant to such construction, be construed to mean the work or works contracted to be executed under or in virtue of the contract, whether temporary or permanent and whether original, altered, substituted or additional.

Definition of work.

Clause 35 The percentage referred to in the tender shall be deducted from / added to the gross amount of the bill before deducting the value of any stock issued.

Contractor's percentage whether applied to net or gross amount of bill.

Clause 36 All quarry fees, royalties and ground rent for stacking materials, if any, should be paid by Contractor.

Refund of quarry fees and royalties.

Clause 37 The Contractor shall be responsible for and shall pay any compensation to his workmen payable under the Workmen's Compensation Act, 1923 (VIII of 1923), (hereinafter called the said Act) for injuries caused to the workmen. If such compensation is payable / paid by the MJP as principal under sub-section (1) of Section 12 of the said Act on behalf of the Contractor, it shall be recoverable by the MJP from the Contractor under sub-section (2) of the said section. Such compensation shall be recovered in the manner laid down in clause 1 above.

Compensation under Workmen's Compensation Act.

Clause 37 (A) The Contractor shall be responsible for and shall pay the expenses of providing medical aid to any workman who may suffer a bodily injury as a result of an accident. If such expenses are incurred by MJP, the same shall be recoverable from the Contractor forthwith and be deducted without prejudice to any other remedy of the MJP from any amount due or that may become due to the Contractor.

Clause 37 (B) The Contractor shall provide all necessary personal safety equipment and first-aid apparatus available for the use of the persons employed on the site and shall maintain the same in condition suitable for immediate use at any time and shall comply with the following regulations in connection therewith.

a) The workers shall be required to use the equipments so provided by the Contractor and the Contractor shall take adequate steps to ensure proper use of the equipment by those concerned.

b) When work is carried on in proximity to any place where there is a risk of drowning, all necessary equipment shall be provided and kept ready for use and all necessary steps shall be taken for the prompt rescue of any person in danger.

c) Adequate provision shall be made for prompt first-aid treatment of all injuries likely to be sustained during the course of the work.

Clause 37 (C) The Contractor shall duly comply with the provisions of the ' The Apprentices Act, 1961 ' (LII of 1961), the rules made thereunder and the orders that may be issued from time to time under the said Act and the said Rules and on his failure or neglect to do so he shall be subjected to all the liabilities and penalties provided by said Act and said Rules.

Contractor No. of Corrections Executive Engineer

Page 269: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(21)

Clause 38

1. Quantities shown in the tender are approximate and no claim shall be entertained for quantities of work executed being either more or less than those entered in the tender or estimate.

Claim for quantities entered in the tender or estimates

2. Quantities in respect of the several items shown in the tender are approximate and no revision in the tendered rate shall be permitted in respect of any of the items so long as, subject to any special provision contained in the specifications prescribing a different percentage of permissible variation in the quantity of the item does not exceed the tender quantity by more than 25 percent and so long as the value of the excess quantity beyond this limit at the rate of the item specified in the tender, is not more than Rs. 5,000/-.

3. The Contractor shall if ordered in writing by the Engineer so to do, also carry out any quantities in excess of the limit mentioned above in sub-clause (i) hereof on the same conditions as and in accordance with the specifications in the tender and the rates (i) derived from the rates entered in Current Schedule of Rates and in the absence of such rates (ii) at the rates prevailing in the market. The said rates being increased or decreased as the case may be by the percentage which the total tendered amount bears to the estimated cost of the works as put to tender based upon the Schedule of Rates applicable to the year in which the tenders were invited (for the purpose of operation of this clause, this cost shall be taken to be Rs. 7,75,72,112/- [ Rupees Seven Crore Seventy Five Lakh Seventy Two Thousand One Hundred Twelve only ].

4. This clause is not applicable to extra items. Claims arising out of reduction in the tendered quantity of any item beyond 25 percent will be governed by the provision of clause 15 only when the amount of such reduction beyond 25 percent at the rate of the item specified in the tender is more than Rs. 5,000/-. This reduction is exclusively the reduction in clause nos. 2,1,4 of work and site conditions.

5. There is no change in the rate if the excess is less than or equal to 25 percent. Also there is no change in the rate if the quantity of work done is more than 25 percent of the tendered quantity. But the value of the excess work at the tendered rates does not exceed Rs. 5,000/-.

6. The quantities to be paid at the tendered rates shall include

a) tendered quantity plus

b) 25% excess of tendered quantity or the excess quantity of the value of Rs. 5,000/- at tendered rate whichever is more.

7. a) Unless authorised by the Executive Engineer-in-charge in writing the Contractor should not execute the excess quantity beyond the quantities specified in the tender.

b) Even after written instructions of the Executive Engineer, whenever the excess quantities beyond those specified in the tender are executed, the payment in excess of the quantities specified in the tender will be made by the Executive Engineer only after getting approval from the appropriate authority viz. Superintending Engineer, if the cost of excess quantity at prevailing DSR is (i) upto Rs. 50,000/- (Rupees Fifty Thousand only) for estimated cost put to tender upto Rs. 10,00,000/- and (ii) upto Rs. 1,00,000/- (Rupees One Lakh only) (considering quantities of all items and not of individual item) when the estimated cost put to tender is more than Rs. 10,00,000/-. The Chief Engineer will be the appropriate authority for the proposals of payments of excess quantities costing upto Rs. 5,00,000/-. Member Secretary of the MJP in consultation with Financial Advisor and Chief Accounts Officer of the MJP will be the authority for approval of proposals for payment of excess quantities costing more than Rs. 5,00,000/-

c) Till the approval from appropriate authority is received the Executive Engineer can make payment as per Circular No. 1949 dated 2/9/1997.

Contractor No. of Corrections Executive Engineer

Page 270: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(22)

Clause 39 The Contractor shall employ any famine, convict or other labour of a particular kind or class if ordered in writing to do so by the Engineer-in-charge.

Employment of famine labour, etc.

Clause 40 No compensation shall be allowed for any delay caused in the starting of the work on account of acquisition of land or, in the case of clearance works, on account of any delay in accordance to sanction of estimates.

Claim for compensation for delay in starting the work.

Clause 41 No compensation shall be allowed for any delay in the execution of the work on account of water, standing in borrow pits or compartments. The rates are inclusive for hard or cracked soil, excavation in mud, sub-soil, water standing in borrow pits and no claim for an extra rate shall be entertained unless otherwise expressly specified.

Claim for compensation for delay in execution of the work.

Clause 42 The Contractor shall not enter upon or commence any portion of work except with written authority and instructions of the Engineer-in-charge or of his subordinate in-charge of the work. Failing such authority the Contractor shall have no claim to ask for measurements of or payment for work.

Entering upon or commencing any portion of work.

Clause 43

i) No Contractor shall employ any person who is under the age of 18 years.

ii) No Contractor shall employ donkeys or other animals with breaching of string or thin rope. The breaching must be at least three inches wide and should be of tape (Newar).

iii) No animal suffering from sores, lameness or emancination or which is immature shall be employed on the work.

iv) The Engineer-in-charge or his agent is authorised to remove from the work, any person or animal found working which does not satisfy these conditions and no responsibility shall be accepted by the MJP for any delay caused in the completion of the work by such removal.

v) The Contractor shall pay fair and reasonable wages to the workmen employed by him, in the contract undertaken by him. In the event of any dispute arising between the Contractor and his workmen on the grounds that the wages paid are not fair and reasonable, the dispute shall be referred without delay to the Executive Engineer who shall decide the same. The decision of the Executive Engineer shall be conclusive and binding on the Contractor but such decision shall not in any way affect the conditions in the contract regarding the payment to be made by the MJP at the sanctioned tender rates.

vi) Contractor shall provide drinking water facilities to the workers. Similar amenities shall be provided to the workers engaged on large work in urban areas.

vii) Contractor to take precautions against accidents which take place on account of labour using loose garments while working near machinery.

Clause 44 Payment to Contractors shall be made by cheque drawn on any treasury within the division convenient to them, provided the amount exceeds Rs. 10/-. Amounts not exceeding Rs. 10/- will be paid in cash.

Method of payment.

Contractor No. of Corrections Executive Engineer

Page 271: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(23) Clause 45 Any Contractor who does not accept these conditions shall not be allowed to tender for work.

Acceptance of conditions compulsory before tendering for work.

Clause 46 If Government declares a site of scarcity or famine to exist in any village situated within 16 kms of the work, the Contractor shall employ upon such parts of the work, as are suitable for unskilled labour, any person certified to him by the Executive Engineer, or by any person to whom the Executive Engineer may have delegated this duty in writing to be in need of relief and shall be bound to pay to such person wages not below the minimum which Government may have fixed in this behalf. Any disputes which may arise in connection with the implementation of this clause shall be decided by the Executive Engineer whose decision shall be final and binding on the Contractor.

Employment of scarcity labour.

Clause 47 The price quoted by the Contractors shall not in any case exceed the control price, if any, fixed by Government or reasonable price which it is permissible for him to charge a private purchaser for the same class and description, the control price or the price permissible under the provisions of Hoarding and Profiteering Prevention Ordinance, 1948 as amended from time to time. If the price quoted exceeds the controlled price or the price permissible under Hoarding and Profiteering Prevention Ordinance, the Contractor will specifically mention this fact in his tender along with the reasons for quoting such higher prices. The purchaser at his discretion will in such case exercise the right of revising the price at any stage so as to conform with the controlled price as permissible under the Hoarding and Profiteering Prevention Ordinance. This discretion will be exercised without prejudice to any other action that may be taken against the Contractor.

Clause 48 In case of materials that may remain surplus with the Contractor from those issued for the work contracted for, the date of ascertainment of the materials being surplus will be taken as the date of sale for the purpose of Sales Tax and the Sales Tax will be recovered on such sale.

Clause 49 The Contractor shall employ atleast 80 percent of the total number of unskilled labour to be employed by him on the said work from out of the persons ordinarily residing in the district in which site of the said work is located. Provided, however, that if the required number of unskilled labour from that district is not available, the Contractor shall in the first instance employ such number of persons as is available and thereafter may with the previous permission in writing of the Executive Engineer-in-charge of the said work, obtain the rest of the requirement of unskilled labour from outside district.

Clause 50 The Contractor shall pay the labourers - skilled and unskilled - according to the wages prescribed by Minimum Wages Act applicable to the area in which the work of the Contractor is located. The Contractor shall comply with the provision of the Apprentices Act, 1961 and the Rules and Orders issued thereunder from time to time, if he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may in his discretion cancel the contract. The Contractor shall also be liable for any pecuniary liability arising on account of any violation by him of the provisions of the Act. The Contractor shall pay the labourers - skilled and unskilled - according to wages prescribed by Minimum Wages Act applicable to the area in which the work lies.

Wages to be paid to the skilled and unskilled labourers engaged by the Contractor.

Contractor No. of Corrections Executive Engineer

Page 272: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(24)

Clause 51 All amounts whatsoever which the Contractor is liable to pay to the MJP in connection with the execution of the work including the amount payable in respect of (i) materials and / or stores supplied / issued hereunder by the MJP to the Contractor (ii) hire charges in respect of heavy plant, machinery and equipment given on hire by the MJP to the Contractor for execution by him of the work and / or which advances have been given by the MJP to the Contractor shall be deemed to be arrears of land revenue and the MJP may without prejudice to any other rights and remedies of the MJP recover the same from the Contractor as arrears of land revenue.

Clause 52 The successful tenders will be required to produce to the satisfaction of the specified concerned authority valid and consequent licence issued in favour of the Contractor under the provisions of the Contract Labour (Regulation and Abolition) Act, 1970 before starting the work. On failure to do so, the acceptance of the tender should be liable to be withdrawn and also earnest money.

The Contractor shall duly comply with all the provisions of the Contract Labour (Regulation and Abolition) Act, 1970 (37 of 1970) and the Maharashtra Contract Labour (Regulation and Abolition) Rules, 1971 as amended from time to time and all other relevant statues and statutory provisions concerning payment of wages particularly to workmen employed by the Contractor and working on the site of the work. In particular the Contractor shall pay wages to each worker employed by him on the site of the work at the rates prescribed under Maharashtra Contract Labour (Regulation and Abolition) Rules, 1971. If the Contractor fails or neglects to pay wages at the said rates or makes short payment and the MJP makes such payment of wages in full or part thereof less paid by the Contractor, as the case may be, the amount so paid by the MJP to such workers shall be deemed to be arrears of land revenue and the MJP shall be entitled to recover the same as such from the Contractor or deduct the same from the amount payable by MJP to the Contract hereunder or from any other amount / s payable to him by MJP.

Clause 53 Where the workers are required to work near machines and are liable to accidents, they should not be allowed to wear loose clothes like dhoti, jhabba, etc.

Clause 54 The Contractor shall comply with the provisions of the Apprentices Act, 1961 and the Rules and Orders issued thereunder from time to time, if he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may in his discretion cancel the contract. The Contractor shall pay the labourers - skilled and unskilled - according to wages prescribed by Minimum Wages Act applicable to the area in which the work lies.

Clause 55 In view of the difficult position regarding the availability of foreign exchange, no foreign exchange be released by the MJP for the purchase of the plant and machinery required for the execution of the work contract.

Clause 56 CANCELLED I. If during the operative period of the contract as defined in condition (i) below, there shall be any

variation in the Consumer Price Index (new series) for Industrial workers for Pune Centre as per the Labour Gazette published by the Commissioner of Labour, Government of Maharashtra and / or in the Wholesale Price Index for all commodities prepared by the Office of Economic Advisor, Ministry of Industry, Government of India or in the price of petrol / oil and lubricants and major construction materials like bitumen, cement, steel, various types of metal pipes, etc. then subject to the other conditions mentioned below, price adjustment on account of (i) labour component, (ii) material component, (iii) petrol, oil and lubricants component, (iv) bitumen component, (v) HYSD and mild steel component, (vi) cement component and (vii) CI and DI pipes component calculated as per the formula hereinafter appearing, shall be made. Apart from these, no other adjustments shall be made to the contract price for any reasons whatsoever. Component percentage as given below are as of the total cost of work put to tender. Total of labour, material and POL components shall be 100 and other components shall be as per actuals.

Price Variation Clause

Contractor No. of Corrections Executive Engineer

Page 273: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(25)

1) Labour component - K1 ( %) 2) Material component - K2 ( %) 3) POL component - K3 ( %) 4) Bitumen component - Actual 5) HYSD & mild steel component - Actual 6) Cement component - Actual Note : If cement, steel, bitumen, CI & DI pipes are supplied on Schedule 'A', then respective

component shall not be considered. Also if particular component is not relevant, same shall be deleted.

CANCELLED

1)

Formula for Labour Component K L - L 1 1 0V1 = 0.85 P [ ___ x ______ ] 100 L0 where, V1 = Amount of Price Variation in Rupees to be allowed for Labour Component. P = Cost of work done during the quarter under consideration minus the cost of cement,

HYSD & mild steel, bitumen, CI & DI pipes calculated at the basic star rates as applicable for the tender, consumed during the quarter under consideration. (These star rates shall be specified here.)

K1 = Percentage of Labour Component as indicated above. L0 = Basic Consumer Price Index for Pune Centre shall be average Consumer Price Index for

the quarter preceding the month in which the last date prescribed for receipt of tender falls.

L1 = Average Consumer Price Index for Pune Centre for quarter under consideration.

Star Rate

2) Formula for Material Component K M - M 2 1 0V2 = 0.85 P [ ___ x _______ ] 100 M0 where, V2 = Amount of Price Variation in Rupees to be allowed for Material Component. P = Cost of work done during the quarter under consideration minus the cost of cement,

HYSD & mild steel, bitumen, CI & DI pipes calculated at the basic star rates as applicable for the tender, consumed during the quarter under consideration. (These star rates shall be specified here.)

K2 = Percentage of Material Component as indicated above. M0 = Basic Consumer Price Index for Pune Centre shall be average Consumer Price Index for

the quarter preceding the month in which the last date prescribed for receipt of tender falls.

M1 = Average Wholesale Price Index during the quarter under consideration.

Star Rate

3) Formula for Petrol, Oil & Lubricant Component K P - P 3 1 0V3 = 0.85 P [ ___ x ______ ] 100 P0 where, V3 = Amount of Price Variation in Rupees to be allowed for POL Component. P = Cost of work done during the quarter under consideration minus the cost of cement,

HYSD & mild steel, bitumen, CI & DI pipes calculated at the basic star rates as applicable for the tender, consumed during the quarter under consideration. (These star rates shall be specified here.)

K3 = Percentage of POL Component as indicated above. P0 = Average Price of H.S.D. at _____ during the quarter preceding the month in which the

last date prescribed for receipt of tender falls. P1 = Average Price of H.S.D. at _____ during the quarter under consideration.

Star Rate

Contractor No. of Corrections Executive Engineer

Page 274: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(26)

4) Formula for Bitumen Component V4 = QB [ B1 - B0 ] V4 = Amount of price variation in Rupees to be allowed for Bitumen Component. QB = Quantity of Bitumen (Grade__) in metric tonnes used in the permanent works and approved enabling works during the quarter under consideration. B1 = Current, average ex-refinery price per metric tonne of Bitumen (Grade__) under

consideration including taxes (octroi, excise, sales tax) during the quarter under consideration.

B0 = Basic rate of Bitumen in Rupees per metric tonne as considered for working out value of P or average ex-refinary price in Rupees per metric tonne including taxes (octroi, excise, sales tax) of Bitumen for the Grade of Bitumen under consideration prevailing quarter preceding the month the last date prescribed for receipt of tender falls, whichever is higher.

CANCELLED

5) Formula for HYSD and Mild Steel Component S0 (SI1 - SI0)V5 = ___________ x T SI0 where, V5 = Amount of price variation in Rupees to be allowed for HYSD & Mild Steel Component. S0 = Basic rate of HYSD / Mild Steel in Rs. per metric tonne as considered for working out

value of P. SI1 = Average Steel Index as per RBI Bulletin during the quarter under consideration. SI0 = Average Steel Index as per RBI Bulletin for the quarter preceding the month in which the

last date prescribed for receipt of tender falls. T = Tonnage of steel used in the permanent works for the quarter under consideration.

6) Formula for Cement Component ) C0 (CI1 - CI0V6 = ___________ x T CI0 where, V6 = Amount of price escalation in Rupees to be allowed for Cement Component. C0 = Basic rate of Cement in Rupees per metric tonne as considered for working out value of

P. CI1 = Average Cement Index published in RBI Bulletin for the quarter under consideration. CI0 = Average Cement Index published in RBI Bulletin for the quarter preceding the month in

which to the last date prescribed for receipt of tender falls. T = Tonnage of Cement used in the permanent works for the quarter under consideration.

7) Formula for CI / DI Pipe Component V7 = Qd [ D1 - D0 ] V7 = Amount of price escalation in Rupees to be allowed for CI / DI Pipe Component. D0 = Pig Iron basic price in Rupees per tonen considered for working out value of P. D1 = Average Pig Iron price in Rupees per tonne during the quarter under consideration

(published by by IISCO). Qd = Tonnage of CI / DI Pipes used in the works during the quarter under consideration.

Contractor No. of Corrections Executive Engineer

Page 275: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(27)

The Following Conditions shall prevail.

CANCELLED

i)

The operative period of the contract shall mean the period commencing from the date of work order issued to the Contractor and ending on the date on which time allowed for the completion of the works specified in the Contract for work expires, taking into consideration the extension of time, if any, for completion of the work granted by the Engineer under the relevant clause of the conditions of Contract in ccases other than those where such extension is necessiated on account of default of the Contractor. The decision of the Engineer as regards the operative period of the contract shall be final and binding on the Contractor. Where any compensation for liquidated damages is levied on the Contractor on account of delay in completion or inadequate progress under the relevant contract provisions, the price adjustment amount for the balance of work from the date of levy of such compensation shall be worked out by pegging the indices L1, M1, C1, P1, B1, SI1, and CI1 to the levels corresponding to the date from which such compensation is levied.

ii)

This Price Variation Clause shall be applicable to all contracts in B-1, B-2 and C forms but shall not apply to piece works. The price variation shall be determined during each quarter as per formula given above in this Clause.

iii)

The Price Variation under this clause shall not be payable for the extra items required to be executed during the completion of the work and also on the excess quantities of items payable under the provisions of Clause 38 / 37 of the Contract Form B-1 / B-2 respectively, since the rates payable for extra items or the extra quantities under Clause 38 / 37 are to be fixed as per the current DSR or as mutually agreed to yearly revision till completion of such work. In other words, when the completion / execution of extra items as well as extra quantities under Clause 38 / 37 of the Contract Form B-1 / B-2 extends beyond the operative date of the then DSR, then rates payable for the same beyond the date shall be revised with reference to the current DSR prevalent at that time on year to year basis or revised in accordance with mutual agreement thereon, as provided for in the contract, whichever is less.

iv)

This clause is operative both ways, i.e., if the Price Variation as calculated above is on the plus side, payment on account of Price Variation shall be allowed to the Contractor and if it is on the negative side, the Government shall be entitled to recover the same from the Contractor and the amount shall be deductible from any amounts due and payable under the Contract.

v)

To the extent that full compensation for any rise or fall in costs to the Contractor is not entirely covered by the provision of this or other clauses in the Contract, the unit rate and prices included in the Contract shall be deemed to include amounts to cover the contingency of such other actual rise or fall in costs.

Contractor No. of Corrections Executive Engineer

Page 276: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

(28) Clause 57 The tendered rates shall be inclusive of all Taxes, Duties, Octroi, Service Tax, Works Contract Tax, as amended from time to time.

Clause 58 - Appointment of Arbitrator Arbitrator will not be appointed. In case of any dispute, the decision given by the Member Secretary (Tech.) will be final. If at all the contractor goes in the court, in the interest of work, the process of getting work done from another contractor will be in continuation.

Clause 59 In case of dispute regarding the provisions of any items precedence to decide the provisions will be as below :

i)

Provisions in Schedule 'B'

ii)

Specifications

iii)

Drawings

Contractor No. of Corrections Executive Engineer

Page 277: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Dia of Total Pipe Inlet Outlet Overflow Bypass Inlet Outlet Overflow Bypass Inlet Outlet Overflow Bypass Inlet Outlet Overflow Bypass

300 20 35 55

250 25 10 20 35 35 35 160

200 20 25 20 10 25 40 10 25 30 10 215

Sluice Valves

300 1 1

250 1 1 1 3

200 1 1 1 1 1 1 1 1 1 1 10

100 1 1 1 1 4

Ranjangaon Water supply scheme - Details of MBR & ESR piping & valves

Gavthan ESR Temple ESR Kavale Vihir ESR M B R

Page 278: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Structure Capacity Location G.L. L.D.L. F.S.L S.B.C. Type of Foundation M.B.R. 670000 Landewadi 116 128 133 20 MT/Sqm Individual

hillock

Gavthan E.S.R. 500000 Behind shopping complex

101 113 117 20 MT/Sqm Individual

Temple E.S.R. 120000 Near Mahaganpati

temple

96 108 111.5 20 MT/Sqm Individual

` Kavle Vihir E.S.R. 100000 Near Kavale

vihir115 127 130 20 MT/Sqm Individual

 Ranjangaon water supply scheme Tal. Shirur

Datasheet For MBR & ESR'S

Page 279: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Rs. In Figures Rs. In Words1 2 3 4 5 6 7

1 250 mm D I K‐9 pipes 9500 Rmt2 250 mm D I K‐7 pipes 2002 Rmt3 200 mm D I K‐9 pipes 2250 Rmt4 200 mm D I K‐7 pipes 2857 Rmt5 150 mm D I K‐7 pipes 2865 Rmt6 100 mm D I K‐7 pipes 8320 Rmt7 80 mm C.I. LA pipes 22035 Rmt

49829

Note :

Contractor Executive Engineer Maharashtra Jeevan PradhikaranDevelopment Divison Pune 1

Schedule showing ( approximately ) the material to supplied from the Department Stores for the work contracted, to be executed and preliminary and ancillary works and the rates at which they are to be charged for

Rate at which the material will be charged to the contractorSr No

Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEMETALUKA - SHIRUR, DISTRICT - PUNE

Providing , constructing Head works, Switch / Pump house , Raw / Pure water Pumping Machinery , Raw / Pure water Rising Main, Gravity Main, WTP, RCC MBR / ESR's, Distribution System , Miscellaneous works, Trial run

SCHEDULE ' A ' OF B-1 TENDER

One rubber ring will be provided with each pipe.

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001

Quantity

Free of costAt Departmental store

at Ranjangaon Tal. Shirur Dist. Pune

Free of cost

The person or firm submitting the tender should see that rates in the above schedule are filled up by the Executive Engineer- in- charge on the issue of the form prior to the submission of the tender

Particulats Unit of Measurement Place of Delivery

contractor No. of corrections Executive Engineer

Page 280: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 1 )

FORM B-1

Percentage Rate Tender and Contract for Works

DEPARTMENT : Maharashtra Jeevan Pradhikaran. CIRCLE : Maharashtra Jeevan Pradhikaran Circle, Pune 411 001. DIVISION : Maharashtra Jeevan Pradhikaran Development Division, Pune 411 001. NAME OF WORK : Ranjangaon Ganapati Village Water Supply Scheme, Tal. Shirur, Dist. Pune. CONSTRUCTION OF HEAD WORKS, APPROACH BRIDGE, RAW & PURE WATER

PUMPING MACHINERY, RAW & PURE WATER RISING MAIN, PURE WATER GRAVITY MAIN, WTP, MBR & ESRs, DISTRIBUTION SYSTEM & MISCELLANEOUS WORKS.

General Rules and Directions for the Guidance of Contractor 1. All the works proposed to be executed by contract shall be notified in a form of invitation to tender pasted on a notice board hung up

in the office of the Executive Engineer and signed by the Executive Engineer. This form will state the works to be carried out as well as the date for submitting and opening tenders, and the time allowed for

carrying out the work, also the amount of earnest money to be deposited with the tender and amount of the security deposit to be deposited by the successful tenderer and the percentage, if any, to be deducted from bills. It will also state whether a refund of quarry fees, royalties, dues and ground rents will be granted. Copies of the specifications, designs and drawings, estimated rates, scheduled rates and any other documents required in connection with the work shall be signed by the Executive Engineer for the purpose of identification and shall also be open for inspection by Contractors at the office of the Executive Engineer during office hours.

Where the works are proposed to be executed according to the specifications recommended to a Contractor and approved by a

competent authority on behalf of the Maharashtra Jeevan Pradhikaran, such specifications with designs and drawings shall form part of the accepted tender.

2. In the event of the tender being submitted by a firm, it must be signed by each partner thereof, and in the event of the absence of any

partner, it shall be signed on his behalf by a person holding a power of attorney authorising him to do so. i) The Contractor shall pay along with the tender the sum of Rs. 3,53,884/- ( Rupees Three Lakh Fifty Three Thousand Eight

Hundred Eighty Four Only ) as and by way of earnest money. The Contractor may pay the said amount by forwarding along with the tender a blank challan for the said amount or call deposit receipt for the like amount in favour of the Executive Engineer. The said amount of earnest money shall not carry any interest whatsoever.

Contractor No. of Corrections Executive Engineer

Page 281: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 2 )

ii) In the event of his tender being accepted, subject to the provisions of sub-clause (iii) below, the said amount of earnest money shall be appropriated towards the amount of security deposit payable by him under conditions of General Conditions of Contract.

iii) If, after submitting the tender, the Contractor withdraws his offer or modifies the same, or if, after the acceptance of his tender,

the Contractor neglects to furnish the balance amount of security deposit without prejudice to any other rights and powers of the MJP hereunder or in law, MJP shall be entitled to forfeit the full amount of the earnest money deposited by him.

iv) In the event of his tender not being accepted, the amount of earnest money deposited by the Contractor shall, unless it is prior

thereto forefeited under the provisions of sub-clause (iii) above, be refunded to him on his passing receipt therefor. 3. Receipts for payments made on account of any work, when executed by a firm, should also be signed by all the partners except

where the Contractors are described in their tender as - firm, in which case the receipt shall be signed in the name of the firm by one of the partners, or by some other person having authority to give effectual receipts for the firm.

4. Any person who submits a tender shall fill up the usual printed form stating at what rate below or above the rates specified in

Schedule 'B' (Memorandum showing items of work to be carried out) he is willing to undertake the work. Only one rate or such percentage on all the estimated rates/scheduled rates shall be named. Tenders which propose any alteration in the work specified in the said form of invitation to tender, or in the time allowed for carrying out the work, or which contain any other conditions of any sort will be liable to rejection. No printed form of tender shall include a tender for more than one work, but if Contractor who wish to tender for two or more works, they shall have the name and the number of work to which they refer written outside the envelope.

5. The Executive Engineer or his duly authorised assistant shall open tenders in the presence of the Contractors who have submitted

their tender or their representatives who may be present at the time and he will enter the amounts of the several tenders in a comparative statement in a suitable form. In the event of a tender being accepted, the Contractor shall, for the purpose of identification, sign copies of the specifications and other documents mentioned in Rule 1. In the event of tender being rejected, the Divisional Officer shall authorise to refund the amount of earnest money deposited to the Contractor making the tender, on his giving a receipt for the return of the money.

6. The officer competent to dispose off the tenders shall have the right of rejecting all or any of the tenders. 7. No receipt for any payment alleged to have been made by a Contractor in regard to any matter relating to this tender or the contract

shall be valid and binding on the MJP unless it signed by the Executive Engineer. 8. The memorandum of work to be tendered for and the Schedule of Materials to be supplied by the MJP and their rates shall be filled

in and completed by the office of the Executive Engineer before the tender form is issued. If a form issued to an intending tenderer has not be been so filled in and completed, he shall request the said office to have this done before he completes and delivers his tender.

9. All works shall be measured net by standard measure and according to the rules and customs of the MJP and without reference to

any local custom.

Contractor No. of Corrections Executive Engineer

Page 282: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 3 )

10. Under no circumstances shall any Contractor be entitled to claim enhanced rates for items in this contract. 11. Every registered Contractor should produce along with his tender, Certificate of Registration as approved Contractor in the

appropriate class and renewal of such registration with date of expiry. 12. All corrections and additions or pasted slips should be initialed. 13. The measurements of work will be taken according to the usual methods in use in the MJP and no proposals to adopt alternative

methods will be accepted. The Executive Engineer's decision as to what is "the usual method in use in the MJP" will be final. 14. A tendering Contractor shall furnish a declaration along with a tender showing all works for which he has already entered into

contract and the value of the work that remains to be executed in each case on the date of submitting the tender. 15. Every Contractor shall furnish along with the tender, information regarding the Income Tax Circle or Ward of the District in which

he is assessed to income tax, the reference to the number of the assessment and the assessment year, and a valid Income Tax Clearance Certificate.

16. In view of the difficult position regarding the availability of foreign exchange, no foreign exchange would be released by the MJP

for the purchase of plant and machinery required for the execution of the work contracted for (GCM / PWD / CFM / 1058 / 62517 OF 26.5.1959).

17. The Contractor will have to construct shed for storing controlled and valuable materials issued to him under Schedule 'A' of the

agreement, at work site, having double locking arrangement. The materials will be taken for use in the presence of the MJP's person. No materials will be allowed to be removed from the site of works.

18. The Contractors shall also give a list of machinery in their possession which they propose to use on the work. 19. Every Contractor shall furnish along with the tender a statement showing pervious experience and technical staff employed by him. 20. Successful tenderer will have to produce to the satisfaction of the accepting authority a valid and current licence issued in his favour

under the provisions of Contract Labour (Regulation and Abolition) Act, 1973 before starting work failing which acceptance of the tender will be liable for withdrawal and earnest money will be forfeited to the MJP.

21. The Contractor shall comply with the provisions of Apprentices Act, 1961 and the rules and order issued thereunder from time to

time. If he fails to do so, his failure will be breach of the contract and the Superintending Engineer, may, in his discretion cancel the contract. The Contractor shall also be liable for any pecuniary liability arising on account of any violation by him of the provisions of the Act.

Contractor No. of Corrections Executive Engineer

Page 283: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 4 )

Tender for Works I / We hereby tender for the execution, for the Maharashtra Jeevan Pradhikaran (hereinbefore and hereinafter referred to as " MJP ") of the work specified in the underwritten memorandum within the time specified in such memorandum at *____% (_____________________________________ percent) [in figures as well as in words ] percent below / above the estimated rates entered in Schedule "B" (memorandum showing items of work to be carried out) and in accordance with all respects with the specifications, designs, drawings and instructions in writing referred to in Rule 1 hereof and in Clause 12 of the annexed conditions of the contract and agree that what materials for the work are provided by the MJP, such materials and the rates to be paid for them shall be as provided in Schedule " A " hereto.

* In figures as well as in words.

MEMORANDUM 1. (a) General Description : Ranjangaon Ganapati Village Water Supply Scheme, Tal.

Shirur, Dist. Pune. CONSTRUCTION OF HEAD WORKS, APPROACH BRIDGE, RAW & PURE WATER PUMPING MACHINERY, RAW & PURE WATER RISING MAIN, PURE WATER GRAVITY MAIN, WTP, MBR & ESRs, DISTRIBUTION SYSTEM & MISCELLANEOUS WORKS.

a) If several sub-works are included, same should be detailed in a separate list.

b) Estimated Cost Rs. 7,07,76,772/- c)

Earnest Money Rs. 3,53,884/- c) The amount of earnest

money to be deposited shall be in accordance with the provisions of paras 206, 207 of the MPW manual.

d) Security Deposit

(i) In the form of TDR, FDR or bank guarantee (ii) To be deducted from the current bills

Rs. Rs.

14,15,600/-

14,15,600/-

d) This deposit shall be in accordance with paras 213, 214 of the MPW manual.

TOTAL Rs. 28,31,200/- e) Percentage, if any, to be deducted from bills so

as to make up the total amount required as security deposit by the time, half the work, as measured by the costs, is done

4 (Four) Percent e) This percentage where no security deposit is taken will vary from 5% to 10% according to the requirement of the case; where security deposit is taken see note to clause 1 of Conditions of Contract.

f) Time allowed for the work from date of written

order to commence 15 (Fifteen) Calendar Months including monsoon

f) Give schedule where necessary showing dates by which the various items are to be completed.

2. I / We agree that the offer shall remain open for acceptance for a minimum period of 120 days from

the date fixed for opening the same and thereafter until it is withdrawn by me / us by notice in writing duly addressed to the authority opening the tenders and sent by registered post A.D. or otherwise delivered at the office of such authority, Bank Challan No. and date or Deposit at Call Receipt No. and date in respect of the sum of * Rs. 3,53,884/- ( Rupees Three Lakh Fifty Three Thousand Eight Hundred Eighty Four Only ) representing the earnest money is herewith forwarded.

Amount to be specified in words and figures.

Contractor No. of Corrections Executive Engineer

Page 284: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

( 5 )

The amount of earnest money shall not bear interest and shall be liable to be forfeited to the MJP

should I / we fail to (i) abide by the stipulations to keep the offer open for the period mentioned above or (ii) sign and complete the contract documents as required by the Engineer and furnish the security deposit specified in item (d) of the memorandum contained in paragraph (1) above within the time limit laid down in clause (1) of the annexed General Conditions of Contract, the amount of earnest money may be adjusted towards the security deposit or refunded to me / us if so desired by me / us in writing unless the same or any part thereof has been forfeited as aforesaid.

3. I/We have secured exemption from payment of earnest money after executing the necessary bond in favour of the MJP, a true copy of which is enclosed herewith should any occasion for forfeiture of earnest money for this work arise due to failure on my / our part to abide by the stipulations to keep the offer open for the period mentioned above or to sign and complete the contract document and furnish the security deposit as specified in item (d) of the memorandum contained in paragraph (1) above within the time limits laid down in clause (1) of the annexed General Conditions of Contract the amount payable by me/us at the option of the Engineer, be recovered out of the amount deposited in lumpsum for securing exemption in so far as the same may extend in terms of the said bond and in the event of the deficiency out of any other moneys which are due or payable to me / us by the MJP under any other contract or transaction of any nature whatsoever or otherwise.

4. Should this tender be accepted I / we agree to abide by and fulfil all the terms and provisions of the Conditions of Contract annexed hereto so far as applicable and in default thereof to forfeit and pay to the MJP the sums of money mentioned in the said conditions.

Name of the bank to be specified.

Receipt No. _______ Dated _______________ from the MJP or Bank _________________________________ at __________________in respect of the sum of Rs. ___________________ is herewith forwarded representing the earnest money (a) the full value of which is to be absolutely forfeited to the MJP should I / we do not deposit in full amount of security deposit specified in the above memorandum in accordance with (d) of clause (1) of the tender for works shall be refunded.

Strike out (a) if no such security deposit is to be taken.

Contractor : Signature of Contractor before submission of tender ________ day of _________ 20___. Address : Witness : Signature of Witness to Contractor's Signature Address : Occupation : The above tender is hereby accepted by me for and on behalf of Maharashtra Jeevan Pradhikaran.

Executive Engineer (or his duly authorised Assistant)

Contractor No. of Corrections Executive Engineer

Page 285: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Sr No. Name of Subwork Amount

1 Intake Well 437295.00

2 Connecting Pipe 1608102.00

3 Jackwell & Pumphouse 2694276.00

4 Approch Bridge 1930922.00

5 Raw water Pumping Machinery 770133.00

6 Raw water Rising Main 361375.00

7 Water Treatment Plant 8864840.00

8 Pure Water Pumping Machinery 3764512.00

MAHARASHTRA JEEVAN PRADHIKARAN DEVELOPMENT DIVISION, PUNE - 411001Name of work - RANJANGAON (GANPATI) WATER SUPPLY SCHEME

SCHEDULE ' B ' OF B-1 TENDER

RECAPITULATION OF COST

TALUKA - SHIRUR, DISTRICT - PUNE

Providing , constructing Head works, Switch / Pump house , Raw / Pure water Pumping Machinery , Raw / Pure water Rising Main, Gravity Main, WTP, RCC MBR / ESR's, Distribution System , Miscellaneous works, O & M of the scheme

contractor No of corrections Executive Engineer

Page 286: DETAILED SPECIFICATIONS FOR VERTICAL TURBINE PUMPSET ...mjp.maharashtra.etenders.in/tpoimages/mjp/tender/Tender27.pdf · VERTICAL TURBINE PUMP (Item No. 1) Contractor has to provide

Sr No. Name of Subwork Amount

9 Pure Water Rising Main 9975039.00

10 M B R & E S R' S 11563148.00

11 Pure Water Gravity Mains 3230061.00

12 Distribution System 22467511.00

13 Misc. Works 2127860.00

14 O & M of the scheme 286000.00

Total Cost Rs. 70081074.00In Words - Seven Crore Eighty One Thousand Seventy Four Only.

I / We hereby quote % ( percent ) below / above cost put to tender.

Notes :

1

2

3

45 The contractor shall carry day to day maintenance & repairs of the scheme to rated capacity for minimum period of 12 months after

The work of distribution will be taken in the hand only after 75 % completion of Head works , Rising mains , WTP & ESR.

All types of pipes & valves will be accepted only after due inspection of through third party such as EIL / SGS India Ltd. / Rites Ltd. Or any other agency approved by MJP . The charges for the same shall be borne by the contractor.Other material such as Cement, Reinforcement, etc. shall be confirming to relevent ISS. Testing charges for cement and steel shall be borne by the contractor.Hydraulic and structrual stability of the contractors own design work lies with the contractor.