DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF September, 2012
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication of NIT
Types of bidding ( single /two bid system )
Last date of receipt
of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of work
Actual date of completion
Remarks/ Reason for delay if
any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
CE(C)I-JP
Dy. CE/C/III-JP
Sr.
No.
T.
No.
Item/
Nature
of work
Mode
of
tender
Date
of
public
-
catio
n
of
NIT
Type of
bidd
ing
(single/
Two bid
system)
Last
date of
receipt
of
tender
Nos of
tenders
receive
d
Nos. &
names of
parties
qualified
after
technical
evaluation
Nos &
names
of
parties
not
qualified
after
technical
evaluati
on
Whether
contract
awarded to
lowest
tenderer/
Evaluated
L1
Contract No.
& date
Name of
contract-or
Value of
contract
Scheduled
date of
completion
of supplies
Actual
date of
start of
work
Actual
date of
completi
on
Reason for delay
if any
1
AF
/BK
I/G
C/J
P/4
R Construction
strengthening and
rebuilding minor
bridges between
Nadbai- Bharatpur
Open
tender
Two bid
system
29.0
4.9
9
15 07 08 Yes CPM/JP/KTT/
CA/16 dated
15.02.2000
M/s Jugendra
Singh & Co.,
Etah.
2.98
crore
04.01.2000 01.06.0
1
31/3/04 Work completed,
case was
investigated by
vigilance final
variation advice is
awaited.
Reminder sent.
2
AF
/BK
I/G
C/
JP
/68
Laying and linking
BG track between
BTE- AH section
Open
tender
24..0
4.0
4 One bid
system
27.0
9.0
4
5 1 4 Yes NWR/S&C/CA
/51 dated
04.01.05
M/s RSV
Construction
Hyderabad
1.83
crore
01.03.05 5.11.04 31.5.05 Work completed.
Final bill Under
technical check
3
AF
/BK
I/G
C/
JP
/69
Laying and linking
BG track between
BTE-AH section
Open
tender
24.0
4.0
4 One bid
system
27.9
.200
4 5 1 4 Yes NWR/S&C/CA
/49
dated24.12.04
M/s Engipress
Rail Link,
Gwalior
1.58
crore
25.02.05 28.10.0
4
30.11.05 Work is in
dispute as money
suit filed by
contractor.
4
AF
/BK
I/G
C/3
6
Welding of rail
joints bet. BKI- KL
section
Open
tender
-
One
packet
system
09.0
6.0
3
3 1 2 Yes Dy.
CE(C)JP/CA/7
7 dated
07.10.03
M/s India
Thermit Corp
Ltd., Kanpur
1.02
Crore
08/3/04 12/10/0
3
30/06/04 Final bill is
awaited from field
office.
5
NW
R-J
P/R
E
yard
/11
Const./Exten of
station building at
RE yard
Open
tender
8.0
8.2
00
8 One
packet
system
29.0
8.2
008
01 - 01 Yes Dy CE/C-
JP/CA/221 dt.
17.02.09
M/s New
Everest Stone
Curshing Co.
Gurgaon
4.88
Crore
14/6/09 26/10/0
8
31/08/11 Work completed.
Final bill awaited.
6
HIS
-
RE
/Do
ub
ling/2
Const/ Extension of
FOB&PF shelter
shed bet. RE-HIS.
Open
tender
24.0
7.2
008
One
packet
system
25.0
8.2
008
03 - 01 Yes Dy CE/C-
JP/CA/224 dt.
19.03.09
M/S Sanjeev
Brothers,
Jaipur.
4.16
Lakhs
22/4/09 22/02/0
9
31/12/1
1
Work is in
progress, further
DOC is under
sanction
7
AW
R-H
SI D
ou
blin
g/5
Construction of
Minor Bridge
E/Work bet. HIS to
Km.57 to AWR
Open
tender
09.0
8.2
007
One
packet
system
12.0
9.2
007
02 01 01 Yes Dy.CE(C)/
JP/CA/213
dated
08.07.08
M/s Jugeundra
Singh Co., Etah
5.80
Crore
09/01/09 08/05/0
8
31/3/11 Work completed
final bill
technically
checked .Final
variation is to be
submitted for
adm. Approval of
competent
authority
8
HS
I-R
E/D
ou
blin
g/1
Construction of
Major Bridge minor
bridge R/wall earth
work station
building ballast
supply , track
linking etc.
Open
tender
21 &
22.0
7.2
008
One
packet
system
2
3.0
4.2
008
05 - 01 Yes NWR/S&C/CA
/101 dated
23.10.08-
M/s ARSS-
Triveni(JV)
Bhubaneshwar
50.81
Crore
24/2/10 03/11/0
8
31/05/1
2
Work is in
progress. Further
extension of DOC
is under for
sanction
competent
authority at H.Q.
9
AW
R-
HS
I/D
oub
ling/6
Construction
station building
Misc. structure
ballast supply track
linking etc.
Open
tender
21.0
2.2
008
One
packet
system
23.0
4.2
008
06 - 01 Yes NWR/S&C/CA
/102 dated
23.10.08
M/s ARSS Infra
structure project
Ltd.
Bhubaneshwar
(Orissa)
21.24
Crore
02/07/09 27/10/0
8
31/05/1
2
Work is in
progress. Further
extension of DOC
is awaited from
agency.
10
NW
R/S
&C
/R
OB
/11
1/9
Const of ROB at LC
No.111-C.
Open
tender
02.1
0.2
00
8
One
packet
system
05.1
1.2
008
03 - 01 Yes Dy.CE(C)/
JP/CA/230
dated
13.10.10
M/S Bharat
Spun Pipe &
Const.Co. JP
6.52 Cr. 04/05/10 25/08/0
9
31-12-
12
Work is in
progress.
11
NW
R/S
&C
/R
OB
/11
7/1
0
Const of ROB at LC
No.117.
Open
tender
29.1
.200
9 One
packet
system
04.0
3.2
009
04 - 01 Yes Dy.CE(C)/
JP/CA/229
dated
11.01.10
M/S Parul–
Const.Co.
MSH
2.35 Cr. 17/05/10 23/11/0
9
30/12/1
1
Negotiation for 3rd
& f/variation held
on 17-9-2012 and
TC to be held
12
WR
/S&
C/T
/13
Construction of 72
units Type-II, 108
units Type-
III, 36 units Type-IV
in Multistoried
Towers & HEALTH
Unit, shopping
complex
Open
tender
-
One bid
system
15/0
4/2
009
04 04 0 Yes CE/S&C/CA/2
7 dtd.
8.9..2009
M/s Balaji
Builders &
Developers (JV)
Jaipur
28.88
Crore
14.1.11 16.7.09 30.11.1
2
Work is in
progress
13
WR
/S&
C/T
/30
Residual complete
worked
Open
tender
One bid
system
06-0
3-1
2
06 1 5 yes NWR/S&C/CA
/117 dated 13-
07-12
M/s Infra
strictures Ltd.
New Delhi
27.25
Crore
07-11-13 7-11-13 Work not
completed due to
court stay.
Dy. CE/C/GC-JP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 NWR/S&C/JP-
SIKR-LHU & SIKR-
CUR /GC/T/3R
Construction of minor
bridges, wing / return
walls, earthwork in
formation, construction
including addition and
alteration of station
buildings, passenger
platforms & shelters,
FOB etc
Op
en t
end
er
Single
Packet
system
NWR/S&C/
CA /108 dt.
28.06.2011
M/s Giriraj Civil
Developers
Pvt. Ltd.,
B- 15, Paras
Dersan Socity,
S. V. Road,
Borivali (East),
Mumbai.
19
55
39
39
2.0
3
29.6.12
25.3.2011
Co
ntr
act
Term
inat
ed
.
2 DY.CE /C/GC/
NWR/ 2011/T-5
Transportation of
various type of BG PSC
sleepers from sleeper
factory such as Khatu,
Marwar Chapari,
Degana, Churu or any
other sleeper
factory/place and P.
way materials
Op
en t
end
er
08.04.11 Single
Packet
system
12.5.11 04 - - yes 02
/NWR/Dy.
CE/C-GC/JP
/2011-
12/JP-SIKR-
CUR & SIKR-
LHU dt.
07.09.2011.
M/s Hanuman
Construction
Company,
Bhootra Niwas,
new market
Nokha.
39
56
03
90
.62
07.05.12
Ext.
30.08.12
20.7.2011
3 DY.CE /C/GC/
NWR/ 2011/T-3
Supplying and stacking
65mm gauge stone ballast
machine crushed (hard
stone) conforming to
RDSO specifications
Op
en t
end
er
16.3.11 Single
Packet
system
21.4.11 08 01
M/s
CH
EV
RO
N M
INE
RA
LS
Ashok
Kum
ar
Bansal &
Associa
tes, N
ew
Delh
i
Not aw
ard
ed to L
1
03
/NWR/Dy.
CE/C-GC/JP
/2011-
12/JP-SIKR-
CUR & SIKR-
LHU dt.
23.09.2011.
M/s. Jai Mata
Construction
Co.
House No.
14169, Stree
No. 8A,
Ganesh Nagar,
Bhatinda
413
542
40
.00
15.08.12 17.08.2011
4 DY.CE /C/GC/
NWR/ 2011/T-2
Supplying and stacking
65mm gauge stone ballast
machine crushed (hard
stone) conforming to
RDSO specifications
Op
en t
end
er
16.3.11 Single
Packet
system
21.4.11 06 01
M/s
CH
EV
RO
N M
INE
RA
LS
Ashok K
um
ar
Ba
nsal &
Associa
tes, N
ew
Delh
i
Not aw
ard
ed to L
1
04
/NWR/Dy.
CE/C-GC/JP
/2011-
12/JP-SIKR-
CUR & SIKR-
LHU dt.
24.10.2011.
M/s Devender
Singh
Contractor, 7,
pratap nagar,
Saket Colony,
Rajgarh Raod,
Hissar
35
96
57
60
.00
01.09.12 17.09.2011
5 DY.CE /C/GC/
NWR/ 2011/T-10
Supplying and stacking
65mm gauge stone ballast
machine crushed (hard
stone) conforming to
RDSO specifications
between Km.0.000 to Km.
30.2718 (L. C. No. 29) on
Sikar - Churu section
Op
en t
end
er
09.8.11 Single
Packet
system
15.9.11 07 -
-
Yes.
09
/NWR/Dy.
CE/C-GC/JP
/2011-
12/JP-SIKR-
CUR & SIKR-
LHU dt.
05.05.2012.
M/s CHEVRON
MINERALS &
Mines Pvt. Ltd,
Flat No. 10,
3rd Floor,
Satyanikertan,
New Delhi
2,3
2,7
2,5
00.0
0
11.01.13. 14.02.2012
6 DY.CE /C/ GC/
NWR/ 2011/T-11
Supplying and stacking
65mm gauge stone ballast
machine crushed (hard
stone) conforming to
RDSO specifications
between Km. 30.2718 to
Km. 59.901 (L. C. No. 51)
on Sikar - Churu section
Op
en t
end
er
09.8.11 Single
Packet
system
15.9.11 09 02
1.M
/s J
BG
Co
nst
ruct
ion
Co
.29
07
, GH
GT
road
, Nea
r Zi
la
par
ish
ad, B
hat
ind
a
2. M
/s S
anto
sh C
on
st. C
o.,
Sad
ar B
azar
, New
Mar
ket,
No
kha
Not aw
ard
ed to L
1
10
/NWR/Dy.
CE/C-GC/JP
/2011-
12/JP-SIKR-
CUR & SIKR-
LHU dt.
05.05.2012.
M/s CHEVRON
MINERALS &
Mines Pvt. Ltd,
Flat No. 10,
3rd Floor,
Satyanikertan,
New Delhi
27
78
65
00
.00
24.01.13 14.02.2012
7 DY.CE /C/ GC/
NWR/ 2011/T-15
Supplying and stacking
65mm gauge stone ballast
machine crushed (hard
stone) conforming to
RDSO specifications at
jhunjhunu depot on-Sikar-
Loharu section
Op
en t
end
er
23.9.11 Single
Packet
system
24.10.11 08 01
M/s
San
tosh
Co
nst
. Co
.,
Sad
ar B
azar
, New
Mar
ket,
No
kha
Not aw
ard
ed to L
1
07
/NWR/Dy.
CE/C-GC/JP
/2011-
12/JP-SIKR-
CUR & SIKR-
LHU dt.
12.3.2012
M/s CHEVRON
MINERALS &
Mines Pvt. Ltd,
Flat No. 10,
3rd Floor,
Satyanikertan,
New Delhi
25
40
00
00
.00
20.7.12 30.01.2012
8 DY.CE /C/ GC/
NWR/ 2011/T-4R
Supplying and stacking
65mm gauge stone ballast
machine crushed (hard
stone) conforming to
RDSO specifications
between Km.325.415 to
Km. 360.900 (including
Loharu station) on Sikar -
Loharu section
Op
en t
end
er
28.9.11 Single
Packet
system
01.11.11 05 - - yes. 05
/NWR/Dy.
CE/C-GC/JP
/2011-
12/JP-SIKR-
CUR & SIKR-
LHU dt.
12.3.2012
M/s CHEVRON
MINERALS &
Mines Pvt. Ltd,
Flat No. 10,
3rd Floor,
Satyanikertan,
New Delhi
284
37
20
0.0
0
20.9.12 05.02.2012.
9 DY.CE /C/ GC/
NWR/ 2011/T-14
Construction of New Major Bridge of span 12 X
6.10 m (Km. 319/6-7) and strengthening of Bridge no. 165 (3x6.10 M at Km.
268/5-6) and PSC Slabs as super-structure including earth work in approaches
and other ancillary works in Sikar- Loharu section in connection with Jaipur-
Sikar-Loharu & Sikar-Churu Gauge conversion Project.
Op
en t
end
er
16.12.11 Single
Packet
system
25.01.12 06 - - Yes Contractor
not yet
signed
agreement
M/s Surabhi
Maheshwar
rao,
C-58, Road
No. 1,
Film
Nagar,Jublee
Hills,
Hyderabad
2,7
6,4
7,1
51.4
7
15.08.12
30.3.2012. - -
10 DY.CE /C/ GC/
NWR/ 2011/T-18
Dismantling of existing
MG track, Laying and linking of Broad gauge main line, loop lines
including points and crossings in yards, spreading of ballast,
tamping of track, transportation of P. Way materials and other
ancillary works in Sikar -Loharu section Zone-II (Km. 267.50 to Km.
314.00) including Dundlod Mukundgarh, Nua & Jhunjhunu yards in
connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion
project
Op
en t
end
er
16.12.11 Single
Packet
system
20.01.12 02 - YES PG under
verified.
M/s Bharwal
Lal Bijarnia,
Villgae- Raipur,
Post- Prewari,
Distt. Nagour.
5,1
1,1
6,6
65.7
7
06.03.13
11 DY.CE /C/ GC/
NWR/ 2011/T-19
Dismantling of existing
MG track, Laying and linking of Broad gauge main line, loop lines
including points and crossings in yards, spreading of ballast,
tamping of track, transportation of P. Way materials and other
ancillary works in Sikar -Loharu section Zone-III (Km. 314.00 to Km.
360.70) including Ratan Shahar, Chirawa, Surajgarh & Loharu yards
in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion
project.
Op
en t
end
er
16.12.11 Single
Packet
system
18.01.12 05 - YES PG verified,
agreement
not yet
signed by
the
contractor.
M/s Laxyo
Energy Pvt.
Ltd.,
113,
Bakhatgarh
Tower, 10/A,
New Plasia,
Indore (MP)
4,7
3,9
4,3
38.3
7
06.03.13
12 DY.CE /C/ GC/
NWR/ 2011/T-17
Dismantling of existing MG track, Laying and linking of Broad gauge
main line, loop lines including points and crossings in yards,
spreading of ballast, tamping of track, transportation of P. Way
materials and other ancillary works in Sikar -Loharu section Zone-I (Km.
237.50 to Km. 267.50) including Sikar & Nawalgarh yards in
connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion
project.
Op
en t
end
er
16.12.11 Single
Packet
system
23.01.12 04 03 1. M/s Bhika ram Dev rath, VPO- Dhiarla, Distt. Churu.
2. M/s Goel Brothers Rail Infra PVT. Ltd., Bareilly.
3. Shri Nahar Const. Co., Jodhpur.
L-4 PG verified,
agreement
not yet
signed by
the
contractor.
M/s Shupal
Kumawat, Rly.
Contractor,
Village & Post.-
Badhal, Distt.-
Jaipur.
3,3
0,9
6,6
19.9
7
04.04.13
13 Dy.CE/C/GC/2012/T
-23
Transportation of various type of BG PSC sleepers from sleeper factory such as Khatu, Marwar Chapari, Degana, Churu or any other sleeper factory/place and P. way materials i.e. rails, switches & crossing and other P. Way fittings etc. from various locations including loading, unloading and and stacking at site in Sikar (inclusive) - Churu (inclusive) section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Op
en t
end
er
05.03.12 Single
Packet
system
09.04.12 04 - - Yes Under
preparation
as PG
verification
from bank.
M/s Hanuman
Construction
Company,
Bhootra Niwas,
new market
Nokha.
5,3
6,4
8,9
55.9
3
19.06.13
14 Dy.CE/C/GC/2011/T
-12R
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between 59.901 (L. C. 51) to Km. 90.46 (Churu Station) on Sikar – Churu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Op
en t
end
er
04.4.12 Single
Packet
system
07.5.12 05 - - yes Under
preparation
as PG Not
submitted.
M/s
Kamakhaya
Trading Co.
House No. 32,
Patel Nagar,
Bhiwani.
3191
076
0.0
0
23.01.13
-
15 Dy. CE/C/ GC/2012/T-
24
Construction including fabrication of FOBs and platform shelters in SIKAR-LOHARU section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project.
Op
en t
end
er
25.05.12 Single
Packet
system
28.06.12 03 - - yes Contractor
refuse to
execute
work hence
work
terminated.
M/s. Bharat
Spun Pipe &
Construction
Co.,
43, Industrial
Area,
Jhotwara,
Jaipur
6266
464
6.0
0
07.01.13
- -
Co
ntr
act
Term
inat
ed
.
16 Dy. CE/C/ GC/2012/T-
23
Transportation of various type of BG PSC sleepers from sleeper factory such as Khatu, Marwar Chapari, Degana, Churu or any other sleeper factory/place and P. way materials i.e. rails, switches & crossing and other P. Way fittings etc. from various locations, including loading, unloading and stacking at site in Sikar (inclusive) - Churu (inclusive) section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Op
en t
end
er
05.03.12 Single
Packet
system
09.04.12 03 - - yes 14/NWR/DY
CE/C-
GC/JP/2012-
13/JP-SIKR-
CUR&SIKR-
LHU
dt.16.08.12
M/s Hanuman
Construction
Co., Bhootra
Niwas, New
Market,
Nokha.
5364
895
5.9
3
19.06.13
15.07.12
- -
Dy. CE/C/II-JP
SrNo.
Tender No. Item / Nature of work.
Mode of tender
Date of Publication
of NIT
Types of bidding (Single/ two bid system)
Last date of receipt of tender.
No. of tenders
received.
Nos. & Name of parties
qualified after
technical evaluation
Nos. & Name of
parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer evaluate
d L1
Contract No. and Date.
Name of contractor
Value of contract.
Schedule date of
completion of supplies.
Actual date of start of
work.
Actual date of
completion
Reason for delay if any.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 JP-RGS/RUB/ Deposit/1RR
RUB in military cantt area
Open tender
- Single Packet System
31/8/07 4 M/s. P. J. Sood, BRC
3 NO Dy.CE(C)-II/JP/CA /13 dt. 27/12/07
M/s. P. J. Sood, BRC
355.269 24/9/08 12-04-2007
24/09/08 Extended upto 30/12/11
Final Variation under techinical check
3 NWR/S&C/KSG/ROB/28/1R-4
Constn. of ROB across Rly. track at LC No.28 in KSG yard at Km.266/8-9 on JP – AII section.
Open tender
Single Packet System
07-02-2008 3 Bharat Spun Pipe & Construction Co., Jaipur
YES Dy. CE(C)-II/JP/30 Dated 14/10/08
Bharat Spun Pipe& Const Co., JP
294.79 22/01/09 25/08/08 22/01/09 Extended upto 31/12/2011
Fiinal Bill Passed
Dausa-Jaipur Doubling Project.
4 DO-JP/ Doubling/3R
Earth work & minor bridge
Open tender
- Single Packet System
30/3/07 M/s B. P. Modi Jaipur
YES DyCE(C)II/JP/CA/14dt. 29/12/07
M/s B. P. Modi Jaipur
762.91 17/12/08 20/11/07 17/12/08 extended upto 31/12/2010
Work completed & F/bill under finance vetting
5 DO-JP/ Doubling/4RR
Earth work & minor bridge
Open tender
- Single Packet System
21/09/07 1 M/s B. P. Modi Jaipur
0 YES DyCE(C)II/JP/CA/15dt. 29/12/07
M/s B. P. Modi Jaipur
749.56 02-01-2009
20/11/07 1/2/2009 extended upto 31/12/2010
Work completed
6 JP-DO/ Doubling/8
Construction of FOB bet. DO-JP section
Open tender
- Single Packet System
29.11.06 2 M/s. Sanjeev Brothers Jaipur
1 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07
M/s. Sanjeev Brothers Jaipur
130.02 15.4.08 14.2.07 15/04/08 Extended upto 15/10/2010
Clearance required from Vig.
7 DO-JP/ Doubling/12RR
Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.
Open tender
- Single Packet System
30/11/07 2 M/s. B. M. Construction, GZB.
2 YES NWR/ S&C/ CA/100 dated 23/9/08
M/s. B. M. Construction, GZB.
846.08 27/04/2009 09-10-2008
27/04/2009 Exdtended upto 30/11/2010
Work completed & F/bill under tech. check.
8 DO-JP/ Doubling/14
Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.
Open tender
- Single Packet System
30.05.07 1 M/s. B. M. Construction, GZB.
0 YES NWR/ S&C/CA/99 dated 27/03/08
M/s. B. M. Construction, GZB.
1044.84 24.10.08 11-06-2007
24.10.08 extended upto 31/03/11.
Completed & final variation under techinical check
9 DO-JP-FL/ Doubling/16
Welding of 52Kg. /60Kg. Rails
Open tender
- Single Packet System
31/07/07 1 M/s. ITC, Kanpur.
0 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07
M/s. ITC, Kanpur.
341.22 18/02/09 20/06/09 18/02/09 Extended upto 30/04/2011
Physically completed.
10 T. No. DO-JP/ Doubling/21
Dismantling of existing BG track, laying & linking in Zone-I DO (Excl.) to JT (incl.) stn in DO-JP section
Open tender
- Single Packet System
19/12/08 1 M/s. B. S. Sangwan, Sonipat (Haryana)
0 YES Dy.CE(C)-II/JP/CA/34 dt. 20/06/09
M/s.B. S. Sangwan, Sonipat (Haryana)
206.44 22/09/09 04-10-2009 22/09/09 Extended upto 15/07/10
Final bill under Tech. check.
11 T. No. DO-JP/ Doubling/22
Dismantling of existing BG track, laying & linking in Zone-II DO (Excl.) to JT (incl.) stn in DO-JP section
Open tender
- Single Packet System
19/12/08 4 M/s. P. C. Sharma, Noida
3 YES Dy.CE(C)-II/JP/CA/33 dt. 05/06/09
M/s. P. C. Sharma, Noida
194.57 09-09-2009
04-01-2009 9/9/2009 Extended upto 31/08/10
Final bill under process with SE/C/PW/JP
12 T. No. DO-JP/ Doubling/23
Dismantling of existing BG track, laying & linking in Zone-III BAI (Excl.) to KWP (incl.) stn in DO-JP section
Open tender
- Single Packet System
19/12/08 3 M/s. P. C. Sharma, Noida
2 YES Dy.CE(C)-II/JP/CA/32 dt. 29/05/09
M/s. P. C. Sharma, Noida
187.06 09-09-2009
04-01-2009 9/9/2009 Extended upto 31/01/11
Final bill under process with SE/C/PW/JP
13 T. No. DO-JP/ Doubling/24
Dismantling of existing BG track, laying & linking in Zone-IV KWP (Excl.) to JP (incl.) stn in DO-JP section
Open tender
- Single Packet System
19/12/08 2 M/s. B. S. Sangwan, Sonipat (Haryana)
1 YES Dy.CE(C)-II/CA/35 dated 02/09/09
M/s.B. S. Sangwan, Sonipat (Haryana)
239.75 22/09/09 18/05/09 22/09/09 Extended upto 31/03/11
Finla bill under process
14 NWR/JP/C/2/ROB/DO-01 -
Construction of Road Over Bridge across the Railway track at Km.181/5-6 in between Dausa - Bhandana of Dausa-Jaipur section (Deposit work).
Open tender
_ Single Packet System
07-02-2008
Bharat Spun Pipe& Const Co., JP
YES Dy. CE(C)-CA/29 Dated 14/10/2008
Bharat Spun Pipe& Const Co., JP
547.26 02-10-2009
24/04/2008 Extended up to 15/03/2012
Final Bill passed
15 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/1 RR
Construction of minor bridges, wing/return walls , earthwork in formation ,construction including addition and altertation of station buildings, passanger platforms & shelters.FOB etc between Jaipur (incl) & Ringus (incl) stations of Jaipur -Ringus Section
Open tender
_ Single Packet System
18/01/2011 Giriraj Civil Developers Pvt Ltrd. BorivaliBombay
YES NWR/S&C/CA/110 Dated 16/08/2011
Giriraj Civil Developers Pvt Ltrd. BorivaliBombay
2141 08-10-2012
07/04/2011
_ contract terminated final measurment in progress.
16 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/5 RR
Construction of Minor Bridges , Wing /Return walls.E/work in formation construction including addition altretation of stn. Bldg. Passanger platforms etc.Bet RGS -SIKAR
Open tender
_ Single Packet System
16/09/2011 Modi Construction(JV) Jaipur
YES NWR/S&C/CA/116 Dated 27/03/2012
Modi Construction(JV) Jaipur
1724 26/04/2013 02.01.2012 Work in progress
17 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/ 01(geotech)
Staking out alignment , conducting geotechnical investigation design of the sun/super structure of minor & major bridges , prepration of GAD got minor &Major bridges etc
Open tender
Single Packet System
20.12.2011 M/S Surbhi Enterprises Jagatpura Jaipur.
YES NWR/S&C/CA/118 Dated 25/07/12
M/S Surbhi Enterprises Jagatpura Jaipur.
946 Lakhs
01.09.2012 08-01-2012
Work in progress
18 TENDER NO. NWR/S&C/JP- SIKR/GC/T-3
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Ringus Km. 189.00 to SIKAR Km 238.70 on Ringus - SIKAR section in connection with Jaipur-Ringus-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open tender
22.1.12 Single Packet System
24.2.12 7 M/s Rajsthan Mining Engineers Jaipur
NO M/s Rajsthan Mining Engineers Jaipur
4.66 crors
22.4.13 Work in progress
19 NWR/S&C/JP-SIKR/GC/T/2
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Jaipur Km.131.27 to Ringus Km. 189.00 on Jaipur - Ringus section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open tender
Single Packet System
24/02/2012 M/S Jai Mata Construction Co, H. No. 14169, Street No 8A Ganesh Nagar Bhatinda
M/S Jai Mata Construction Co, H. No. 14169, Street No 8A Ganesh Nagar Bhatinda
7.90 Crores
09-06-2013
PG Not submitted contract terminated by forfiting E/Money
20 NWR/S&C/ROB/Design-Drg/T/1
Carrying out Geotechnical investigation and consultancy work for Road Over/Under Bridge (ROB/RUB) for Railway span including detail design (foundation, sub structure and super structure), preparation of GAD and working drawing as desired in scope of work of 3 ROBs on LC No.C-149 (at Phulera in Ringus – Phulera section), LC No.323/A (Jodhpur- Samdari- Barmer section), LC No.61-A (at Rewari in Rewari – Alwar section) and 2 RUBs on LC No.232 & 234 (in Jaipur – Phulera section).
Open tender
Single Packet System
17.02.12 6 C.S.Engineers & consulants Delhi 12
no 19.30 lacs
Work in proggress
CE/C/II-JP
Dy. CE/C/I-UDZ
Dy. CE/C/DNPR-BANSWARA
--------------------------------------------- N I L ------------------------------------------------------
T.No Item/Nature of work Mode of
tender
Date of
publication of
NIT
Type of
bidding
(Single/Two
bid system)
Last date of
receipt of
tender
Nos of tenders
received
Nos& Names
of parties
qualified after
technical
evaluation
Nos & names
of parties
not qualified
after
technical
evaluation
Weather
contract
awarded to
lowest
tenderer/ev
aluated LI
Contract no &
date
Name of
contractor
Value of
contract (In Rs.
Lacs)
Scheduled
date of
completion
of supplies
Actual date of
start of work
Actual date of
completion
Reason for delay if any
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
T.NO.UDZ-
HMT/MB/T
/1
Construction of Major
bridges from DNRP-HMT in
connection with UDZ-HMT
section.
Open 19.11.10 Single 21.12.10 2 Yes NWR/S&C/
CA/111 dtd.
9.9.11
M/S Om
Prakash Goyal
& Co.,
Neemach
1568
29.11.12 10.08.11 Work in
Progress
T.NO.UDZ-
HMT/GC/
MB/T-2
Const., minor bridges from
Km. 160/0 to 187/0 in in
connection with UDZ-HMT
Section
Open 19.11.10 Single 21.12.10 3 Yes NWR/S&C/
CA/109 dtd.
16.8.11
M/s Braham
Prakash
ModiRavi
Constn.Co. (JV)
, Jaipur
1212.6
21.09.12 30.04.11 Work in
Progress
Extension application
is under consideration
T.NO.UDZ-
HMT/GC/E
W/T/3
Construction of Minor
bridges frm Km. 270/0 to
320/0 in connection with
UDZ-HMT section.
Open 08.12.10 Single 20.01.11 5 Yes NWR/S&C/
CA/112 dtd.
21.10.11
Amit-Mass (JV)
, Alkapuri,
VADODARA
1665.1
20.01.13 03.08.11 Work in
Progress
T.NO.UDZ-
HMT/GC/E
W/T/4
Construction of Minor
bridges frm Km. 207/0 to
250/0 in connection with
UDZ-HMT section.
Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/
CA/113 dtd.
21.10.11
M/s Rahee-
Triveni (J/V),
Kolkatta
3045.2
07.02.13 23.08.11 Work in
Progress
CE/C/III-JP
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication of NIT
Types of bidding ( single /two bid system )
Last date of receipt
of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of work
Actual date of completion
Remarks/ Reason for delay if
any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Dy. CE/C/I-AII
1 Aii/Const/ Loco/Mo
d/T/1
Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of Loco Workshop at Ajmer.
Open 25.08.09 Single 28-10-09 07 Nos. - - Yes NWR/S&C/ CA/31 Dt. 17-06-10
M/s Bharat Span- GPT (JV) 43 Industrial Area, Jhotwara, Jaipur
3829.48 Lakhs 22-04-2012 & 06-11-2012
27-03-10 - Work is in progress.
2 Aii/Const/ C&W/Mo
d. /T/3/R1
Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of C&W Workshop at Ajmer.
Open 14.06.10 Single 07-07-2010
- - - Yes Under execution
M/s Prem Fabricators 301 Meera Manon Arcude, Near Krupa Petrol Pump, Parimal Garden, Ellis Bridge, Ahmedabad.
1524.97 Lakhs 05/12/2012 05-09-2011 - Work is in progress.
3 AII/BNGM-RAS/ NL/T/2
Construction of major bridge including earth work on the approaches between BNGM (Excl.)-RAS (incl.) section in c/with BNGM-RAS New B.G. Rail Line Project.
Open 11.03.10 Single 12-10-2010
07 Nos. - - Yes Under execution
M/s SB-SHC-MCDPL (JV) C-10, Vaishali Nagar, Jaipur.
Rs. 1592.08 Lakhs
18-07-2012 23.07.2011 - Work is in progress.
4 AII/BNGM-RAS/
NL/T/3(R)
Earthwork in bank/cutting and construction of minor bridges between Km. 0.00 to 10.50
Open 12.07.11 Single 03.08.11 07 Nos. - - Yes Under execution
M/s Jandu Construction Co. 305, Model Town Mandi, 5Adampur Hisar
Rs. 1060.43 Lakhs
30-10-2012 10.11.2011 - Work is in progress.
5 AII/BNGM-RAS/ NL/T/4
Earthwork in bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 10.50 to 20.50) section in c/with Bangurgram-RAS new BG Rail Link Project.
Open 16.12.10 Single 24.01.11 10 Nos. - - Yes Under execution
M/s Jai Mata Di Energy System (JV) VPO-Narodara, Tehsil - Laxmangarh Sikar (Raj.)
Rs. 1103.49 Lakhs
16/06/2012, 31/12/2012
29.06.2011 - Work is in progress.
6 AII/BNGM-RAS/ NL/T/5
Earthwork in bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 20.50 to 28.50) section in c/with Bangurgram-RAS new BG Rail Link Project.
Open 16.12.10 Single 24.01.11 08 Nos. - - Yes Under execution
M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar
Rs. 825.62 Lacs 16/06/2012, 31/12/2012
04.07.2011 - Work is in progress.
7 AII/BNGM-RAS/ NL/T/8
Supplying and Stacking machine crushed stone track Ballast in stacks as per Railways’ specifications between Km. 0.00 to 28.50 [Bangurgram to Ras] in connection with Bangurgram ¬- Ras new rail line project.
Open 19.08.11 Single 27.09.11 4 Nos. - - Yes Under execution
M/s Rajesh Kumar Gupta, 54, Nehru Nagar, Kush Marg, Alwar(Raj.)
Rs. 406.50 Lacs 25-12-2012 08.02.2012 - Work is in progress.
Dy. CE/C/II-AII
S.No
Tender No. Item/Nature of work Mode of
Tender Inquiry
Dt. of Publica tion of NIT
Types of
bidding (single/ two-bid system)
Last date of receipt of tender
Nos. of tenders receive
d
Nos. & Name of Parties qualified after technical evaluation
Nos. & Name of Parties not qualified after technical evaluation
Whether tender
awarded to lowest
tenderer/ Evaluated
L1
Agreement No. & Date.
Name of Contractor Value of Contract
Scheduled date of completion of supplies
Actual Date of start of work
Actual date of completion
Reason for delay if any
1 T.No.AII/KVJ-KRJD/I/BG Doubling/T/3:
Earthwork in bank/cutting for formation between Keshavganj (incl.) – Swarupganj (Excl.) section in connection with Keshavganj– Swarupganj Patch Doubling Project.
Open 24.09.10 Single 01.11.10 14 Nos. Ist Lowest M/S
Varaha Infra Ltd., Umesh Smriti-6
Jalam Vilas Scheme, Poata B.
Road, Jodhpur
NIL Yes NWR/S&C/CA/32 Dt. 21.07.11
M/S Varaha Infra Ltd., Umesh Smriti-6 Jalam Vilas Scheme, Poata
B. Road, Jodhpur
`896.90 Lacs. 17.11.2011, 31.03.2012,
30.06.2012 & 30.11.2012
01.02.11 17.11.11 Work under progress
2 T.No.AII/KVJ-KRJD/I/BGD/T/2R
: Construction/Extension of Major/minor bridges including earthwork on the approaches between Keshavganj (incl.) – Swarupganj (Excl.) section with Railway’s design & drawing and construction of ORH at Abu Road in connection with Keshavganj-Swarupganj Patch Doubling Project.
Open 04.02.11 Single 03.03.11 04 Nos. Ist Lowest
M/s Tantia-YSCC-IV BPL (JV), 1304, 13th Floor, 17,
Vijaya Building,
Barakhamba Road,
Connaught Place, New
Delhi.
NIL Yes NWR/S&C/CA/33 Dt. 30.08.11
M/s Tantia-YSCC-IV BPL (JV), 1304, 13th
Floor, 17, Vijaya Building, Barakhamba
Road, Connaught Place, New Delhi.
`1095.38 Lacs. 20.02.2012, 30.06.2012 & 30.11.2012
-- 20.02.12 Work under progress
3 T.No.AII/KVJ-KRJD/I/BG Doubling/T/6–
Supplying and stacking 50mm machine crushed stone track ballast confirming to Railway specifications in stacks on cess along the track and in yards at various stations between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project
Open 04.04.2011 Single 10.05.11 05 Nos. Ist Lowest M/s
Bhaniyana Constructio
n, 28, Kanishka Resort,By
Pass Road, PAL,Distt. Jodhpur(R
aj.)
NIL Yes Dy.CE(C)AII/KVJ-
SRPJ/BGD/CA/69 Dtd. 16.11.2011
Ist Lowest M/s Bhaniyana
Construction, 28, Kanishka Resort,By
Pass Road, PAL,Distt. Jodhpur(Raj.)
`371.12 Lacs. 17.05.2012 & 17.11.2012
-- 17.05.12 Work under progress
4 T.No.AII/KVJ-KRJD/I/BG Doubling/T/8-R:
Dismantling of existing BG track, laying and linking of Broad gauge main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works between Keshavganj – Swarupganj (both incl.) section in connection with
Open 27.07.11 Single 02.09.11 6 Nos. Ist Lowest
M/s Laxyo Energy Pvt. Ltd., 46/1, TIT Road,
Ratlam (M.P.)
NIL Yes Dy.CE(C)AII/KVJ-
SRPJ/BGD/CA/71 Dtd. 05.12.2011
Ist Lowest M/s Laxyo
Energy Pvt. Ltd., 46/1, TIT Road, Ratlam
(M.P.)
`371.12 Lacs. 14.04.2012 & 30.09.2012
-- 14.04.12 Work under progress
Keshavganj– Swarupganj BG Patch Doubling Project.
Dy. CE/C/Jodhpur
S N Tender No. Item/ Nature of
work
Mode of
tender
enquiry
Date of
publication of
NIT
Types of
bidding
(Single /
Two bid
system).
Last date of
receipt of
tender
No. of
tender
recei-ved.
Nos. & name of
parties qualified
after technical
evaluation
Nos. & name of
parties not qualified
after technical
evaluat-ion
Whether
contract
awarded to
lowest tender
/ evaluated
L.I.
Contract No. &
date
Name of
Contractor
Value of
contract (Rs)
Fig. in lacs. of
Rs.
Schedule date
of completion
Actual date of
start of work
Actual date
of complet-
ion
Reasons for
delays, if any.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1. JU/Const.-1/
19/2008-09,
Zone-I - Laying &
linking of BG track.
Open
Tender
24.03.09 Single 28.04.09 3 1 (M/s P.C.
Sharma, A-87,
Noida [UP])
1
(M/s Bhanwar Lal
Bijarnia)
Yes Dy.CE/C-I/JU
/16/2009-10
dtd.06.09.09
M/s P.C. Sharma,
A-87, Distt.
Gautam Budh
Nagar [UP]
236.35 212.22 05.11.09
31.03.10
15.02.10
31.03.10
30.04.10
23.07.09 30.04.10 Negotiation for
the items
executed
beyond 125%
of agreement
quantity held
on 23.08.12 &
now final
variation
sanction.
2. JU/Const.-1/
25/2008-09,
Depot supply of
Stone ballast
Open
Tender
06.05.09 Single 10.06.09 3 1 (M/s Vinayak
Const. Co.,
Jaswantgarh)
1 (M/s J.K. Const.
Co., Nokha)
Yes Dy.CE/C-I/JU
/21/2009-10
dtd.26.11.09
M/s Vinayak
Const. Co.,
Jaswantgarh
143.68 173.88 28.12.09
31.01.10
31.03.10
15.05.10
15.06.10
28.12.09 - Contractor has
been
instructed to
remove
rejected ballast
from Railway
Land & case is
also with Vig.
Branch.
3. T.No.JU/ Const.-
I/30 / 2009-10
AT Welding of rail
joint
Open
Tender
19.09.09 Single 22.10.09 1 1 (The India
Thermit Corp.
Kanpur)
- Yes Dy.CE/C
JU /22/2009-10
dt.29.3.10
The India
Thermit Corp.
Kanpur
103.63 77.31 22.04.10
31.08.10
15.11.10
31.03.11
30.05.11
28.11.09 - Final C&A
sanctioned &
final bill under
finalisation
4. JU/C/04/04-05
Bridge work No.
31 & 72 SMR-
BLDI
Open
tender
6.6.04 Single 6.7.04 08 Nos M/S Rachna Const.
Company
N/A L I NWR/S&C/CA/5
3 Dt. 20.1.05
M/S Rachna
Const. Comp.,.
TAL- Ankleshwar
Distt Bharuch
394.31 465.25
403.15
23.11.05 15.3.05 31.07.09
Final variation
will be
prepared after
sanction of NS
items which is
under
preparatio.
5. JU/C/08/04-05 Bridge work 30,56 Open Single 29.12.04 NWR/S&C/CA/ M/S Rachna 373.42 318.74 11.06.06 7.10.05 30.11.09 Final variation
vetted by HQ
S N Tender No. Item/ Nature of
work
Mode of
tender
enquiry
Date of
publication of
NIT
Types of
bidding
(Single /
Two bid
system).
Last date of
receipt of
tender
No. of
tender
recei-ved.
Nos. & name of
parties qualified
after technical
evaluation
Nos. & name of
parties not qualified
after technical
evaluat-ion
Whether
contract
awarded to
lowest tender
/ evaluated
L.I.
Contract No. &
date
Name of
Contractor
Value of
contract (Rs)
Fig. in lacs. of
Rs.
Schedule date
of completion
Actual date of
start of work
Actual date
of complet-
ion
Reasons for
delays, if any.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Dt.19.
11.04
& 76 SMR- BLDI tender 64 dt .14.9.05 Const. Company 254.22
finance &
sanctioned by
CA. Now, Final
bill under
preparation
6. JU/C-II/01/09-10 Const. of ROB at
LC 36-C( At MKN)
& 63-C (At NGO)
Open single 14.7,09 05 M/S Rachana
Const Co.
N/A L-I DyCE/C-
II/JU/29/2009-10
Dated 25.2.2010
M/S Rachana
Const Co.
Unjha
546.95 09.07.10
30.10.11
31.01.12
20.02..12
30.04.12
30.09.12
24.8.09 Work in
progress
7. JUConst-/
03/2010-11 E/work in cutting
in filling PLC – Bye
pas
Open
tender
02.07.2010 Single 03.08.10 01 M/S Bhanwar Lal
Bijarnia
N/A L-1 DyCE/C-
II/JU/30/2010-11
Dated
02.02.20110
M/S Bhanwar Lal 106.04 13.07.11
30.08.11
15.11.11
31.12.11
28.10.10 Work
completed.
-
8. JU/Const-6/10-11 Const of ROB at
L.C. No. C-325 at
(BME)
Open
tender
15.10.2010 Single 16.09.10 06 M/S Rachana
const. comp.
N/A L-1 Dy CE/C
/JU/34/2011-12
dt. 21.10.11
M/S Rachana
const. comp.
380.99 07.11.11
31.07.12
30.11.12
28.06.11 Work in
progress
-
9. JUConst-/
08/2010-11 Extension of Bay
No.4 inside Diesal
Shad BGKT
Open
temder
22.09.2010 Single 25.10.10 02 M/s Anil Trading
co. Sikar
M/S Jai Bala Ji
Const. co. Sri-
Gananagar
L-1 Dy CE/C
/JU/35/2011-12
dt. 21.10.11
M/s Anil Trading
co. Sikar
242.85 16.11.11
30.07.12
15.10.12
15.03.11 Work in
progress
-
10. JUConst-/
09.R/2010-11 MKN-BIDD
E/Work in cutting
& filling Const.of
ROB insted of LC
etc.
Open
temder
21.02.11 Single 07.06.11 01 M/s Bhanwar Lal
Briainiya Vill.
Rajpura Distt. NGO
- L-1 - M/s Bhanwar Lal
Briainiya
289.66 29.09.12 10.10.11 Work in
progress
-
11. T.NO.JU/CONST/
T-01/2012-13
(ROB)
Accepted on
10.09.12
Construction of
ROB at LC No.
C-323-A (at
Barmer),
Open 05.07.12 Single 07.08.12 02 Parul Construction
Co.,
Mehsana
M/s Vishnu Prakash
R Pungalia, Jodhpur.
L-1 - Parul
Construction
Co.,
Mehsana
329.43 09.07.13
12. T.No. JU/
CONST/ 15/2011-
12 Accepted on–
17.09.12
Work of
remodeling of
Jodhpur yard
Open 25.03.12 Single 26.04.12 04 Sh.Girdhari Ram
S/o Sh. Sajjan Ram,
M/s P.C. Sharma,
Noida (U.P.)
L-1 - Sh.Girdhari Ram
S/o Sh. Sajjan
132.02 16.06.12
S N Tender No. Item/ Nature of
work
Mode of
tender
enquiry
Date of
publication of
NIT
Types of
bidding
(Single /
Two bid
system).
Last date of
receipt of
tender
No. of
tender
recei-ved.
Nos. & name of
parties qualified
after technical
evaluation
Nos. & name of
parties not qualified
after technical
evaluat-ion
Whether
contract
awarded to
lowest tender
/ evaluated
L.I.
Contract No. &
date
Name of
Contractor
Value of
contract (Rs)
Fig. in lacs. of
Rs.
Schedule date
of completion
Actual date of
start of work
Actual date
of complet-
ion
Reasons for
delays, if any.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
including all work
related to P. way,
AT welding
JODHPUR
Ram,
JODHPUR
CE/C/IV-JP
Dy. CE/C/BKN
SN Tender No Item/Nature of work Mode of tender inquiry
Dt.of publication NIT
Type of bidding (Single/two bid system
Last date of receipt of tender
Nos.of tenders received
Nos & names of parties qualified after technical evaluation
Nos & names of parties not qualified after technical evaluation.
Contract No. & dt.
Name of contractor
Value of contract
Scheduled date of completion of supplies
Actual date of start of work
Actual date of completion/extended date of completion
Remarks/Reason for delay if any
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 Const/BKN/42/2009-10
Construction of RRI Building & Sick line office complex and construction & modification of station building, platforms, platform shelters, conversion of MG sick line shed into Track machine shelter and dismantling of MG AC maintenance shed, FOB landing and other miscellaneous works at Bikaner in connection with Sadulpur - Bikaner Gauge conversion project
open tender
29.03.09 single 29.04.09
08 Nos
Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
150-NWR/Dy CE/C-I/BKN Dt 24.12.09
M/S Govind Gupta, 5/99, Chopra Patti Narwana Distt Jind ( Haryana)
Rs 377.44 lakhs
02.09.09
21.09.09
15.03.12 Work since completed.
2 Const/BKN/02/2010-11
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-10 (Ch 435500 to Ch 462100 including Gadhwala, Bikaner Eaast and Bikaner station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project
Open tender
06.05.10 single 10.06.10
05 Nos
Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
161-NWR/Dy CE/C-I/BKn Dt 06.09.2010
M/S Shree Shyam Engineering Co., Poonia Colony Churu ( Raj)
Rs171.59 lakhs
07.03.11
08.07.10
31.12.11 Final bill passed.
3 Const/BKN/03/2010-11dated 19.06.2010
Const. of twenty four coach length BG washing line after dismantling of existing MG washing line and oher related miscellaneous works at Bikaner in connection with BKN-SDLP GC
Open tender
11.06.10 single 14.07.10
09 Nos
Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
163-NWR/Dy CE/C-I/BKN Dt 14.12.2010
M/S Jitender Singh , V&PO- Kakoda Distt. Jhujhunu
Rs 279.82 lakhs
16.10.10
12.11.10
31.03.12 Work since completed.
4 Const/BKN/18/2009-10/RE-HSR/Std-II dated 18.02.2010
Const. of Station biliding and other service buildimnngs etc. between Rewari ( excluiding ) to Hansi in c/with RE-HSR Std-II panel interlocking.
Open tender
18.02.10 single 26.03.10
05 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
102-NWR/Dy CE/C-II/BKN Dt 19.10.2010
M/S V.K.Const. Co. 2-D-37, Jawahar Nagar Sri Ganganagar
Rs 416.38 lakhs
15.05.11
15.06.10
30.10.12 Work is in progress
5 Const/BKN/08/HSR - RE/2010-11 dated 04.09.2010
Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track etc. at all stations in c/with Std-III and MACL Signaling work at Manheru, Bawani Khera, Jitakheri and Hansi on Rewari - Hisar section.
Open tender
04.09.10 single 13.10.10
03 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
106-NWR/Dy CE/C-II/BKN/2010-11 Dt 03.02.11
M/S Bhikha Ram Devrath PO- Dhigarla , Tehsil- Rajgarh ( Churu)
Rs216.41 lakhs
08.09.11
26.12.10
08.09.11 Contract closed on administrative grounds and final variation in process.
6 Const/BKN/07/HSR - RE/2010-11 dated 04.09.2010
Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track etc. at all stations in c/with Std-III and MACL Signaling work at Kishangarh Balawas, Jausana, Kosli, Jharli & Charkhi Dadari on Rewari - Hisar section.
Open tender
04.09.10 single 13.10.10
04 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
107-NWR/Dy CE/C-II/BKN/2010-11 Dt 04.02.11
M/S Bhikha Ram Devrath PO- Dhigarla , Tehsil- Rajgarh ( Churu)
Rs 230.69 lakhs
27.09.11
18.01.11
30.06.12 Work is in progress.Kishangarh Balawas,Jatusana,Kosli stations have been commissioned on 30.03.2012, 10.04.2012 & 10.06.2012.At Jharli, Pre NI work completed and the station is planned to be commissioned in the end of this month.
7 Const/BKN/09 ( R) /HSR - RE/2010-11 dated 24.12.2010
Supplying and stacking 47600 cum 65mm gauge stone ballast machine crushed ( hard stone) conforming to RDSO specificationsin connection with Std-III and MACL Signaling work in HSR-RE section.
Open tender
24.12.10 single 02.02.11
03 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
111-NWR/Dy CE/C-II/BKN/2011-12 Dt 04.05.11
Sh Devender Singh , H.No.7, Pratap Nagar , Saket Colony , Rajgarh Road , Hisar.
Rs 342.72 lakhs
14.12.11
21.03.11
14.12.11 Contract closed on administrative grounds and final variation in process.
8 Const/ BKN/02(R)/ SDRA/ 2010-11 Dated 05.06.10
Construction of station building , passenger platforms, staff quarters , duty huts for L-Xing, earthwork in embankment etc. in connection with Provision of B class station at Sudhrana .
Open tender
11.06.10 Single 14.07.10
09 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
103/NWR/Dy CE/C-II/BKN Dt 13.12.2010
M/S Jitender Singh , VPO- Kakoda Distt Jhunjhnu
RS 366.52 lakhs
18.10.11
01.11.10
30.09.12 Work is in progress.
9 Const/BKN/25/007-08
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe wall/retaining wall, stone pitching etc. I bet Km.323.50 to Km. 388.00 on BKN-SDLP section
Open tender
12.07.07 single 13.08.07
1 Nos. Tender awarded to evaluated L-1 further offers not discussed by TC
Tender awarded to lowest valid and eligible tenderer
91-NWR/DY CE/C-I/BKN /2007-08 dated 07.07.08
M/S Bharon Singh Rathore & Co. Survodya Basti near Narsingh Sagar Talab, Bikaner
2.40 Crores 24.12.08
30.01.08
31.03.11 Final bill under passing
10 Const/BKN/26(R )/2007-08
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, stone pitching etc, from Km.388.00 to Km 455.00 on BKN-SDLP section
open tender
18.12.07 single 23.01.08
1 Nos. Tender awarded to evaluated L-1 further offers not discuss
Yes, tender awarded to lowest valid and eligible tenderer
120 NWR/DY CE/C-I/BKN/ 2008-09 dt 16.02.09
M/S Bheron Singh Rathore & Co. Sarvoday Basti, Bikaner (Raj)
3.08 Crores 15.03.09
28.08.08
31.03.11 Final variation under preparation.
ed by TC
11 Const/BKN/26(R ) /2008-09
Earthwork (including Blanketing material) in formation in bank & cutting with mechanical compaction, construction of 2 Nos RUBs having spans 2x10.50m & 1 No. RUB having spans of 1x6.10m and 5 Nos RUBs cum balancing culverts of spans 1x 3.66m ( all RCC boxes) including other ancillary works for construction of Ratangarh Bye Pass in connection with Bikaner-Ratangarh-Sadulpur gauge conversion project
open tender
18.02.09 single 23.03.09
10 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
CE/S&C/CA/28 dated 12.10.09
M/S Maya Const. Co. Pvt. Ltd., A-20, Shyam Darshan Society, Harivila Road, New Naroda, Ahmedabad-382346.
Rs 829.25 lakhs
13.08.09
27.08.09
15.05.11 Final variation submitted to HQ for HQ finance vetting & sanction by competent authority.
12 Const/BKN/10 (R )/2009-10
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-6 (Ch 325500 to Ch 351500 including Rajaldesar station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.
open tender
07.08.09 single 07.09.09
05 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
162-NWR/Dy CE/C-I/BKN Dt 17.09.10
M/S Bhanwar Lal Bijarniya, Bhaiya Hotel, Bombay Motor Chouraha
Rs 139.06 lakhs
05.10.09
07.10.09
31.07.11 Final variation under finance vetting.
13 Const/BKN/11 (R )/2009-10
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-7 (Ch 351500to Ch 375500 including Persneu & Bigga station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.
open tender
07.08.09 single 07.09.09
07 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
158-NWR/Dy CE/C-I/BKN Dt 29.07.10
M/S Shree Nahar Agencies, A-328, Shastri Nagar Jodhpur
Rs 136.30 lakhs
05.10.09
07.10.09
31.05.11 Final bill under passing
14 Const/BKN/01/2010-11
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-09 (Ch 398500 to Ch 435500 including Benisar, Sudsar and Napasar station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.
Open tender
06.05.10 single 10.06.10
04 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
160-NWR/Dy CE/C-I/BKN dt 06.09.10
M/S P.C.Sharma, A-87, Sector- 49, Noida (UP)
Rs 208.29 lakhs
18.03.11
19.07.10
30.07.11 Final bill under passing
15 Const/BKN/04/2011-12/BKN-SDLP-RTGH-SRDR
Supplying and stacking 55000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between Ratangarh & Ratangarh West & Ratangarh West to km.19.00 on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
14.09.11 single 14.10.11
08 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
172-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S Jai Mata Const.Co. H.No.14169 Street no.8A Ganesh Nagar Bhatinda( Pb)
Rs 305.25 lakhs
25.05.12
10.01.12
31.12.12 Work is in progress. 40400 cum supplied.
16 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR
Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.
Open tender
17.09.311
single 17.10.11
2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
173-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat
Rs 534.82 lakhs
01.06.12
05.01.12
01.12.12. Work is in progress.
17 Const/BKN/05/2011-12/BKN-SDLP-RTGH-SRDR
Supplying and stacking 60000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between km 19 to Sardarshahar on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.
Open tender
14.09.11 single 14.10.11
07 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
174-NWR/Dy CE/C-I/BKN Dt 31.03.2012.
M/S Chevron Minerals & Mines Pvt Ltd.Flat No.10, 3rd Floor Satya Niketan , Opposite Venkateshaware College , Near Dhaula Kuan , New Delhi- 110021
Rs 364.20 lakhs
17.07.12
29.01.12
30.09.12 Work is in progress. 59000 cum supplied.
18 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh - Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project
Open tender
20.01.12 single 22.02.12
2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
PG submitted.
M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003
Rs 531.61 lakhs
25.12.12
24.05.12
25.12.2012 Work in progress.
19 Const/BKN/20 /2009-10
Construction and modification of station building, CC Apron,RRI building, platform, raising/shifting of existing platform shelter, providing & fixing AC sheet roof, linking of BG track on CC Apron, dismantling of MG tracks and points & crossings,etc. and other misc. works at Suratgarh station in connection with Sarupsar-Srigangar gauge project
Open tender
02.07.09 single 06.08.09
07 Nos
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
147-NWR/Dy CE/C-I/BKN Dt 16.11.09
M/S Inderjeet Chhouda Contractor ,8-A-17, Jawahar Nagar Sri Ganganagar
Rs 396.99 lakhs
01.08.10
24.10.09
29.02.12 Work completed.Final variation in process.
20 Const/BKN/02/2010-11
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-02 (Km. 50.00 to 81.00 including Rai Singhnagar & Gajsinghpur station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
Open tender
08.08.10 single 08.09.10
01 no. Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
3-NWR/Dy CE/C-III/BKN Dt 14.12.10
M/S Jhawar Sales Corporation, Rani Bazar Bikaner
Rs 194.62 lakhs
26.06.11
15.12.10
31.03.12 Work completed. Final bill is to be recorded by SSE/C/P.Way/SOG
21 Const/BKN/03/2010-11
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-03 ( Km.81.00 to 115.00 including Sri Karanpur & Keasri Singhpur station yard) on Suratgarh –Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
Open tender
08.08.10 single 08.09.10
03 Nos.
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
9-NWR/Dy CE/C-III/BKN Dt 09.03.2011.
M/S Bhanwar Lal Bijarnia Village-Rajpura Post-Parewadi Tehsil-Nawa Distt: Nagaur (Raj)
Rs 178.57lakhs
31.05.11
15.12.10
30.06.12 Work completed. Final bill is to be recorded by SSE/C/P.Way/SOG
22 Const/BKN/04/2010-11
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-04 (Km. 115.00 to 138.00 including Prithvirajpur & Sri Gangashahar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
Open tender
08.08.10 single 08.09.10
03 Nos.
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
7-NWR/Dy CE/C-III/BKN Dt 25.01.11
M/S Karnani Construction New Line Gangashahar, Bikaner(Raj)
Rs 138.34 lakhs
05.06.11
15.12.10
30.08.12 Work is in progress.
23 Const/BKN/01 (R)/2010-11
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-01 (Km. 20.500 to 50.00 including Bhagwansar, Sarupsar & Mohansar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
Open tender
07.10.10 single 08.11.10
02 Nos.
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
6-NWR/Dy CE/C-III/BKN Dt 19.01.11.
M/S P.C.Sharma, A-87, Sector-49, Nodia, Gautam Budh Nagar ( UP)
Rs 174.99 lakhs
21.07.11
15.12.10
31.07.12 work is in progress.
24 Const/BKN/12/2010-11/SGNR-HMH-SURP
Construction, Strengthening/extension of existing Minor bridges and placement of PSC slabs with RCC ballast retainers of span upto 6.10m including earthwork in approaches of bridges and other ancillary works in Diplana (excluding) to Suratpura (including) section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
09.10.10 single 10.11.10
04 nos Tender awarded to evaluated L-1 .
02 Nos (i) M/S Vikas Const. Co. Bhagina Road Near Water Works Pilani (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh
132-NWR/Dy CE/C-II/BKN dt 07.03.12
M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar
Rs 165.50 lakhs
23.02.12
05.10.11
30.12.12 work is in progress.
25 Const/BKN/10/2010-11/SGNR-HMH-SURP
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall etc, including supply of cement between Diplana (excluding) to Suratpura (including) to section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
09.10.10 single 10.11.10
06 nos Tender awarded to evaluated L-1 .
03 Nos (i) M/S Rajender Singh Contractor, 817, Sector-15A, Hisar (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh (iii) M/S Devender Singh Naveen (JV),7 Pratap Nagar , Saket Colony Rajgarh Road Hisar.
122-NWR/Dy CE/C-II/BKN dt 26.11.2011.
The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani
Rs 510.15 lakhs
23.03.12
26.07.11
30.12.12 work is in progress.
26 Const/BKN/23/2010-11/SGNR-HMH-SURP
Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 88.00 to 132.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
Open tender
11.12.10 single 12.01.11
04 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
14-NWR/Dy CE/C-2/BKN Dt 15.09.2011
M/S Gawar Const. Ltd. DDS 378, Sector 16-17, Hisar
Rs 653.23lakhs
06.05.12
01.07.11
31.10.12 Work is in progress
27 Const/BKN/11 ( R) /2009-10
Construction of Road Over Bridge in lieu of Level crossing No. 53-C at Km 82/13-14 on Delhi- Rewari – Bhatinda Railway Line Xing Bhiwani – Tosham Road at RD 85.04 in Bhiwani District.
Open tender
27.11.09 single 30.12.09
01 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No.99-NWR/Dy CE/C-II/BKN dated 03.06.2010.
Shree Gautam Construction Co. Ltd, A.T.Road, Opposite Pan Bazar , Over Bridge , Paltan Bazar Guwahati ( Assam)
Rs 653.23lakhs
31.01.12
05.08.10
31.07.12 Work completed.
28 Const/BKN/ 19/2008-09/SOG-BTI
Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and overruns, shifting of existing turnouts, leading of P.way material and other miscellaneous works at all stations in connection with Standard–III and MACL signaling work at Birangkhera, Mandi Dabwali, Bagwali, Sangat, Gurusar Sahnewala and Bhatinda A & B Cabins on Suratgarh-Bathinda section
Open tender
27.02.09 single 01.04.09
01 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No.78-NWR/Dy CE/C-II/BKN dated 17.08.2009
M/s Ganpati Const. Co., H.No. 430-B-1 Shant Nagar, Bathinda (Pb)
Rs174.63lakhs
31.08.11
24.07.09
31.12.11 Contract closed on administrative grounds and final variation in process.
29 Const/BKN/ 20/2008-09/SOG-BTI
Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and overruns, shifting of and other miscellaneous works at all stations in c/w Standard–III and MACL signaling work at Rangmahal, Pilibanga, Dabli Rathan, Maneksar, Sangaria and Dhaban stations on Suratgarh-Bathinda section.
Open tender
27.02.09 single 01.04.09
01 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No- 78-NWR/Dy CE/C-II/BKN dated 17.08.2009
M/s Karnani Const. New Line, Ganga Shahar, Bikaner
Rs 202.39 lakhs
14.06.11
12.06.09
31.03.12 Contract closed on administrative grounds and final variation in process.
30 Const/BKN/62/2007-08
Supplying and stacking 21900 cum 65mm gauge stone ballast machine between Suratgarh & Bathinda Railway stations in c/w Standard-III & MACL signaling work on Suratgarh-Bathinda section.
Open tender
17.12.07 single 18.01.08
02 nos Tender awarded to evaluated L-1 .
01 nos (i) M/S Ganpati Construction Co. H.No.430-B,/1 (22333) Shanti Nagar, Bhatinda
Agmt No 63/NWR/Dy CE/C-II/BKN dated 31.10.2008
M/s T.C. Const. Co, (JV), Nokha
Rs 211.38 lakhs
30.10.10
30.07.08
30.10.10 Contract closed on administrative grounds and final variation in process.
31 Const/BKN/ 13/2010-11
Supply of 52 kg /90 UTS SKV welding portions to the Railways for welding of rail joints from km 20.500 to 138.00 between Sarupsar (including) to Sri Ganganagar (including) in connection with Sarupsar to Sri Ganganagar Gauge conversion project.
Open tender
20.01.10 single 29.01.12
02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No17/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 28.02.2012
M/S India Thermit Corporation Ltd. 84/22, Fazal Ganj, Kanpur
Rs181.73 lakhs
29.01.12
28.08.11
30.06.12 Work in progress
32 Const/BKN/03 /2011-12/SRPR-SGNR
Widening & extension of High level platform No 3,4 & 5,providing hydrants for coach filling , Dismantling of old FOB, Shifting of PF shelters, Dismantling of MG washing line & goods platform, construction of road approach for BG goods platform at Suratgarh , Construction of type -II & III quarter at Sarupsar, Construction of duty hut & gate lodge at Suratgarh , Brick pitching for slope protection and other misc. work at Suratgarh and on Suratgarh -Sri Ganganagar ( excluding) section in connection with Sarupsar - Sri Ganaganagar gauge conversion project
Open tender
18.09.11 single 31.10.11
03 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No16/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 17.01.12
M/S Aditya Traders 38, Gurudawara Gali, Hanumangarh Jn
Rs 458.32 lakhs
28.08.12
12.12.11
28.08.12 Work in progress
33 Const/BKN/03/2011-12/SURP-HMH-SGNR Dt. 19.05.2011
Construction / modification of station building & structures i.e. S&T buildings, platforms, PF shelters , duty bunk and other ancillary works between Tehsil Bhadra ( excluding) to Sidhmukh (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project
Open tender
26.05.11 single 29.06.11
03 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
126-NWR/Dy CE/C-II/BKN dated 11.01.12
M/S Agarwal Const Co. Dudhwa Khara , Churu
Rs 418.60 lakhs
10.10.12
11.11.11
10.10.12 work in progress
34 Const/BKN/27®/2010-11/SGNR-HMH-SURP dated 28.06.2011
Transportation of BG PSC sleepers from sleepers factory at Manaksar, Khatu or any other sleeper factory / place including unloading and stacking /spreading at site from km 88.000 to 178.580 ( including Suratpura yard ) in connection with Sri Ganganagar – Hanumangarh – Suratpura gauge conversion project
Open tender
02.07.11 single 03.08.11
05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Contract Agmt No. 124/11-12 dated 19.12.2011. of /Dy CE/C-II/BKN
M/S Har Har Const. Co. Surender Nagar ).
Rs 192.38 lakhs
02.10.12
07.11.11
02.10.12 work in progress
35 Const/BKN/02/SURP-HMH-SGNR/11-12
Construction / modification of station building & structures i.e. S&T buildings, platforms, duty bunk and other ancillary works between Sidhmukh ( excluding) to Suratpura Jn. (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project
Open tender
26.05.11 single 29.06.11
05 nos Tender awarded to evaluated L-1 .
(i) M/S Ridhi Sidhi Construction Co. Sujangarh Road , Nokha , Bikaner ( Raj) (ii) M/S Sangam Construction Company C/O Nasar Latif S/O Abdul Khan Moh. Nardiyan Ward No.17, Rajgarh , Sadulpur ( Churu)
129-NWR/Dy CE/C-II/BKN Dt 02.02.12.
M/S Pyare Lal Dhaka Copnst. Co. Churu)
Rs 315.48 lakhs
04.11.12
23.11.11
04.11.12 work in progress
36 Const/BKN/09(R)/2011-12/BKN-SDLP-RTGH-SRDR Dt 13.01.2012.
Construction and modification of station buildings, platform, platform shelter level crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
20.01.12 single 28.03.12
04 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
PG submitted.
M/S Maheshwari Construction Co Bikaner Road, Nokha(Bikaner)
Rs 647.31 lakhs
03.03.13
Work is in progress
03.03.13 Work is in progress
37 Const/BKN/32(R)/2011-12/SURP-HMH-SGNR Dated 29.05.2012
Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 132.00 to 175.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
Open tender
01.06.12 single 09.07.12
2 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
PG since submitted.
M/S Jai Mata Const. Co, 14169, Street no.8-A, Ganesh Nagar , Bathinda
Rs 726.00 lakhs
03.04.13
Work is in progress
03.04.13 Work is in progress
38 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2012
Supplying and stacking 14000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project
Open tender
26.05.12 single 27.06.12
05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
PG yet to be submitted.
M/S R.K.Infrastructure, 407, Pink Tower, Tonk Road, Jaipur
Rs137.94 lakhs
28.12.12
Work is in progress
28.12.12 Work is in progress
39 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2013
Dismantling & reconstruction of parcel office, extension of waiting hall, construction of platform shelters, improvement of platform surfacing of Island platform and other ancillary works at Sri Gangsanagar in connection with Sarupsar -Sriganganagar Gauge Conversion Project.
Open tender
08.08.12 single 08.08.12
02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
PG yet to be submitted.
M/S V.K.Const Co, 2-D-37,Jawaharnagar Sri Ganganagar
Rs131.75 lakhs
06.05.13
Work is in progress
06.05.13 Work under mobilisation
Dy. CE/C/HMH
S. No
Tender No Item/ Nature of work
Mode of tender inquiry
Date of publication of NIT
Types of bidding (Single/ Two-old System)
Last date of receipt of tender
Nos. of tender received
Nos & name of parties qualified after technical evaluation
Nos & names of parties not qualified after technical evaluation
Whether contract awarded to lowest tenderer/ evaluated L-1
Contract No & date
Name of contractor
Value of contract
Schedule date of completion of supply
Actual date of start of work
Actual date of completion
Reason for delay if any
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Const/ BKN/11/10-11/ SGNR-HMH-SURP dt. 04.10.10
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc between Hanumangarh Jn (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
09.10.10 One packet system
10.11.10 7 1 6 Yes, L-1
Const/ BKN/ 11/10-11/ SGNR-HMH-SURP Dt: - 13.01.11
The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani
660.84 12.01.12 04.03.11
12.01.12 30.11.12
Work is in progress.
2 Const/ BKN/ SURP-HMH-SGNR/ 13/
2010-11 Dt. 04.10.10
Rebuilding, Construction, Strengthening/ extension of existing Minor bridges and upto 6.10m including earthwork in in Hanumangarh (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
09.10.10 One packet system
10.11.10 4 1 3 Yes, L-1
Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt: - 05.02.11
M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar
425.56 04.02.12 24.11.11
04.02.12 30.09.12
Work is in progress.
3 Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 02.12. 2010
Construction/modification of station buildings & structures i.e. S&T buildings, Platforms, P.F. Shelters/ FOB, between Sadul Shahar (excluding) to Hanumangarh Jn. (excluding) section in c/w SURP-HMH-SGNR GC project.
Open Tender
05.12.10 One packet system
12.01.11 8 1 7 Yes, L-1
Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 17.02.11
M/s Jai Matadi Energy System, VPO-Narodara, Tehsil-Laxmangarh, Distt-Sikar.)
402.09 16.02.12 30.03.11
16.02.12 31.10.12
Work is in progress.
4 Const/ BKN/ 21/2010-11 Dated 04.12.2010
Supplying and stacking 75000 cum 65mm gauge stone ballast between Km. 0.00 to 44.00 on Hanumangarh-Suratpura in c/w SURP-HMH-SGNR GC project.
Open Tender
11.12.10 One packet system
12.01.11 6 1 5 Yes, L-1
Const/ BKN/ 21/2010-11 Dated 17.02.11
Sh. Devender Singh, 7, Pratap Nagar, Saket Colony, Rajgarh Road, Hisar
617.25 16.02.12 10.05.11
16.02.12 31.08.12
Work is in progress.
5 Const/ BKN/15/10-11/ SGNR-HMH-SURP dt. 02.12.10
“Rebuilding, Construction, Strengthening/extension of existing Minor bridges PSC slabs with RCC ballast retainers of span upto 6.10m in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
05.12.10 One packet system
12.01.11 3 1 2 Yes, L-1
Const/ BKN/15/ 10-11/ SGNR-HMH-SURP dt. 25.03.11
M/s G.K. Contractor, House No. 157, Sector No. 9, Extension, Hanumangarh Jn.
273.28 24.03.12 10.07.11
24.03.12 31.08.12
Work is in progress
6 Const/ BKN/ 22/2010-11 Dated 04.12.10
Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 44.00 to 88.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
Open Tender
11.12.10 One packet system
12.01.11 6 1 5 Yes, L-1
Const/ BKN/ 22/2010-11 Dated 07.05.11
M/s Jai Mata Const. Co. H.No. 14169 Street No. 8A, Bathinda
686.25 07.05.11 25.07.11
07.05.12 31.10.12
Work is in progress.
7 Const/BKN/ 22/2010-11 Dated 04.12.10
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc, including supply of cement between Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
01.01.11 One packet system
12.01.11 7 1 6 Yes, L-1
Const/BKN/ 14/2010-11 Dated 07.05.11
M/s Jaimatadi Energy Systems (JV),VPO Narodara,Teh. Laxmangarh, Dist. Sikar
416.61 06.05.12 01.07.11
31.10.12 Work is in progress.
8 Const/BKN/16/ 2010-11/ SGNR-HMH-SURP dt. 02.12.10
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, PF shelters / FOB, duty bunk and other ancillary works between Sri Ganganagar (excluding) to Sadul Sahar (including) section c/w SURP-HMH-SGNR GC project.
Open Tender
01.01.11 One packet system
12.01.11 6 1 5 Yes, L-1
Const/ BKN/16/ 2010-11/SGNR-HMH-SURP 07.05.11
M/s Surender Kumar Bansal, 59 P Block, Shri Ganga Nagar
547 17.05.12 27.05.11
30.9.12 Work is in progress.
9 Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 19.02.11
Construction/Rebuilding of substructure of Bridge No. 40 (1 x 45.70 m Open Web Girder) at km 141.515 on Gang Canal, Bridge No. 2-A (2 x 61.0 m Open Web Girder) at km 2.347 on Ghaggar River, Bridge No. 14-B (2 x 61.0 m Open Web Girder) at km 18.345 on Ghaggar River and Bridge No. 21-A (1 x 76.20 m Open Web Girder) at km 28.638 on Indira Gandhi Main Canal including other ancillary works in c/w SURP-HMH-SGNR GC project.
Open Tender
24.02.11 One packet system
30.03.11 5 1 4 Yes, L-1
Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 15.07.11
M/s Jaimatadi Energy System, JV, VPO Narodara, Teh. Laxmangarh, Dist. Sikar
13.34 Cr. 14.07.12 01.02.12
14.7.13 Work is in progress.
10 Const/ BKN/ 26 (R)/ 2010-11/ SGNR-HMH-SURP dt. 28.06.11
Transportation of BG PSC sleepers from sleepers factory at Manaksar, Khatu or any other sleeper factory/place including unloading and stacking/ spreading at site from km. 0.000 to 88.000 (Excluding Hanumangarh Yard) in connection with Sri Ganganagar-Hanumangarh-Suratpura Gauge Conversion Project.”
Open Tender
02.07.11 One packet system
03.08.11 6 1 5 Yes, L-1
CConst/ BKN/ 26 (R)/ 2010-11/SGNR-HMH-SURP Dated: - 03.10.11
M/s Har Har Company, Doshi Chambers, Mehta Market, Surenderanagar. (Guj)
152.19 lakh
02.10.12 11.11.11
02.10.12 Work is in progress.
11 Const/ BKN/ 16/2011-12/ SURP-HMH-SGNR Dated–16.08.2011
Construction of Foot Over Bridge and Platform Shelter at Hanumangarh Junction, Hanumangarh Town, Ellenabad and Nohar station in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project.””
Open Tender
28.08.11 One packet system
28.09..11 2 1 1 Yes, L-1
Const/BKN/16/2011-12/SURP-HMH-SGNR Dated: - 16.12.2011
M/s Sajneev Brothers, C-10, Vaishali Nagar, Jaipur
302.87 Lakh
15.12.12 20.03.12
15.12.12 work is in progress
12 Const/BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 10.10.2011
Supplying and stacking 40000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Banwali, Fateh Singhwala, Budh Singhwala & between Km.201.00 to 202.00 Depot on Sri Ganganagar–Diplana
Open Tender
14.10.11 One packet system
18.11.2011
4 1 3 Yes, L-1
Const/ BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 14.12.2011
M/s Jai Mata Const. Co., House No. 14169, Street No. 8A, Ganesh Nagar, Bathinda
439.70 LAKH
13.06.12 17.12.11
31.07.12 Work is in progress
section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.
13 Const/BKN/SURP-HMH-SGNR/19(R-1)/ 2010-11 dt.19. 10.11
Supplying and stacking 65000 cum 65mm gauge stone ballast between Km.137.250 to 171.00 (including Sri Ganganagar) on Sri Ganganagar–Hanumangarh section in c/w SURP-HMH-SGNR GC project..
Open Tender
25.10.11 One packet system
30.11.11 4 1 3 Yes, L-1
Const/BKN/SURP-HMH-SGNR/19(R-1)/ 2010-11 dt.14.12.11
M/S J.K.Const. Co. New Market, Nokha
719.90 LAKH
13.08.12 23.12.11
13.08.12 Work is in progress.
14 Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 05.12.2011
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in section & at LC’s of Zone-1 (Ch. 138.000 to 204.130) on Sri Ganganagar-Hanumangarh section c/w SURP-HMH-SGNR GC project.
Open Tender
10.12.11 One packet system
11.01.12 3 1 2 Yes, L-1
Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 22.01.12
M/s RAVI INFRABUILD PROJECTS PVT. LTD., 95, Hiran Magri Sector-11, Udaipur
904.54 21.01.13 01.02.12
21.01.13 Work is in progress
15 Const/HMH/ 20(R-2)/ SURP-HMH-SGNR/2010-11 Dated 22.12.2011
Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km.171.00 to 204.130 (including Hanumangarh) on Sri Ganganagar–Hanumangarh section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.
Open Tender
25.12.11 One packet system
25.01.12 5 1 4 Yes, L-1
Const/HMH/20(R-2)/SURP-HMH-SGNR/2010-11 Dated 24.02.12
M/s Sura Const. Co., Sector-13, 1323/1133, Hisar.
687.05 23.10.12 25.02.12
23.10.12 Work is in progress
16 Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12
Supplying and stacking 90000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications in various Depots i.e. near Hanumangarh Junction, Talwara Jhil, Ellenabad, Nohar, Diplana & any other location on Hanumangarh-Diplana section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.
Open Tender
13.01.12 One packet system
13.03.12 5 1 4 Yes, L-1
Const/HMH/25/SURP-HMH-SGNR/2011-12 Dated–09.05.12
(Sh. Devender Singh, 7, Pratap Nagar,Saket Colony, Rajgarh Road, Hisar).
874.71 08.05.13 01.06.12
08.05.13 work is in progress
17 Const/HMH/7/ 12-13/SURP-HMH-SGNR Dated 09.7.2012,
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Talwara Jhil (excluding) to Khinaniyan (including) section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project (M/s P.S. Infrabuild PVT. LTD 15. Jaat Dharmshala Complex G.T. Road Fatehabad ( Haryana)
Open Tender
11.7.12 One packet system
13.8.12 4 1 3 Yes, L-1
Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12
M/S P.S.Infra Build Pvt.Lited 15 jaat Dharmshala G.T.Road Fatehabad
779.3 12.7.13 - 12.7.13 Work yet to be started
18 Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,
Transportation, Assembling, Erection, Cambering, Riveting (with contractor’s rivets) painting and launching (as per contractor’s approved scheme) of open web through steel girders on Bridge No. 2-A (2 x 61.00m) at km. 2.347 on Ghaggar River, Bridge No. 14-B (2 x61.00m) at km. 18.345 on Ghaggar River and Bridge No. 21-A (1x 76.20m) at Km. 28.638 on Indira Gandhi Main Canal (Girder components will be supplied by Railway) with supplying & fixing of bearings and supplying, fabricating & fixing of galvanized steel channel sleepers along with matching fittings at site, on newly constructed top of pier/abutment to perfect level & alignment and other ancillary works in c/with SURP-HMH-SGNR GC project. (M/s Kiran Infra Engineers Ltd, Jaipur.
Open Tender
13.01.12 One packet system
30.7.12 4 1 3 Yes, L-1
Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,
M/S Kiran Infra engg.Lted B-141 Road no 9D VKI area JP
495.56 16.9.13 - 16.8.13 Work yet to be started
19 Const/HMH/ 03/2012-
13/SGNR-HMH-
SURP dt. 23.06.12
“Balance work of Rebuilding of existing Major & Minor bridges with RCC BOX of span upto 6.0 m including earthwork in approaches of bridges and other ancillary works in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.t.(
Open Tender
28.6.12 One packet system
30.7.12 5 1 4 Yes, L-1
Const/HMH/ 03/2012-13/SGNR-
HMH-SURP dt.
23.06.12
M/s. Shree Karni Traders, C-171, Kanta kathuria Colony,Bikaner
168.78 7.12.12 14.8.12 7.12.12 Work is in progress.
CE/C/V-JP
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication of NIT
Types of bidding ( single /two bid system )
Last date of receipt
of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of work
Actual date of completion
Remarks/ Reason for delay if
any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Dy. CE/C/DO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 DO/GG
C/NL/8
-
Construction of
minor bridges
from Chainage
00.00 to 30000
Between Dausa
and Lalsot in
connection with
DO-GGC new BG
Line
Op
en t
end
er
Single
Packet
system
07
/12
/20
05
Yes NWR/S&C/
CA/78
dated
27.06.06
M/s Jain
construction
Co.(JV) Ajmer
6.33 crore 20/05/07
Further
extension
granted
upto
31/12/2007
04/04/06 Contract
terminated.
Final bill is being
processed for keeping
in deposit.
2 DO/GG
C/NL/9
Construction of
BG formation
from Chainage
1150 to 15000
between Dausa
Kala-Shekhpura in
connection with
DO-GGC new BG
line project.
Op
en t
end
er
Single
Packet
system
04
/01
/20
06
Yes NWR/S&C/
CA/81date
d 06.09..06
M/s Kewai
Construction (JV)
Jodhpur
6.45 crore 26/09/07
Further
extension
granted up
to
30/11/2011
12/07/06 - contract terminate on
24/11/12. Final
measurements have
been recorded by
XEN/C/DO
3 DO/GG
C/NL/1
0
Construction of
BG formation
from Chainage
15000 to 28000
between Dausa
and Lalsot in
connection with
DO-GGC new BG
line project.
Op
en t
end
er
Single
Packet
system
16
/01
/20
06
Yes NWR/S&C/
CA/79
dated
30.06.06
M/s Parma Ram
Bhakar Jodhpur.
6.39 crore 17/07/07
extended
upto
30/11/2011
11/05/06 - Contract terminate on
24/11/12. Final
measurements have
been recorded
4 DO/GG
C/NL/1
4
Construction of
Major Bridges
with 1200mm dia
cast in situ board
piles & PSC girder
superstructure of
18.30 M between
DO-GGC in c/with
DO –GGC NLBG
Project
Op
en t
end
er
03
/10
/20
07
Single
Packet
system
14
/11
/20
07
Yes NWR/S&C/
CA/94
dated
18/02/200
8
M/s
Atlanta-ARSS
(JV) Bhubaneshwar
(Orissa).
41.63 crore 16/09/09
Extended
upto
31/10/2012
20/02/08 - work completed
5 DO/GG
C/NL/1
5
Construction of
Minor Bridges
from chainage
30000.00 to
38500.00 &
Construction of
BG Formation
from chainage
28000.00 to
38500.00
between Dausa
and Lalsot in
connection with
DO-GGC New BG
line Project
Op
en t
end
er
0
3/1
0/2
00
7
Single
Packet
system
14
/11
/20
07
3 Yes Dy.
CE/C/I/JP/
CA/16
dated
29/02/200
8
M/s. ARSS
Infrastructure
Projects Limited,
Bhubaneshwar
(Orissa).
5.31Crores 09/06/09
Extended
upto
31/08/2011
24/01/08 - Work completed
6 DO/GG
C/NL/1
8
Construction of
Broad Gauge
Formation &
Minor Bridges
from Chainage
41000.00 to
45000.00
between Dausa
and Lalsot in
connection with
Dausa- Gangapur
City New Broad
Gauge line
project.
Op
en t
end
er
Single
packet
system
14
/11
/20
07
Yes NWR/S&C/
CA/97
dated
03/03/200
8
M/s Atlanta-ARSS
(JV) Bhubneshwar
(Orissa)
17.95 Crore 30/07/09
extended
upto
31/12/2012
14/03/0/8 - Work in progress
7 DO/GG
C/NL/2
1
Construction of
BG formation and
Minor Bridge
from chanaige
45000 to 60000
bet. Lalsot and
Gangapur City in
connection with
DO-GGC New B G
line Project
Op
en t
end
er
24
/09
/20
07
Single
Packet
system
02
/11
/20
07
3 Yes NWR/S&C/
CA/95
dated
18/02/200
8
M/s. ARSS
Infrastructure
Projects Limited,
Bhubaneshwar
8.41
Crores
20/03/09
Extended
upto
31/03/2013
15/03/08 - Work in progress
8 DO/GG
C/NL/2
2
Construction of
BG formation and
Minor Bridge
from chanaige
60000to 75000
bet. Lalsot and
Gangapur City in
connection with
DO-GGC New B G
line Project
Op
en t
end
er
2
4/0
9/2
00
7
Single
Packet
system
02
/11
/20
07
3 Yes Dy.
CE/C/I/JP/
CA/17
dated
29/02/200
8
M/s. ARSS
Infrastructure
Projects Limited,
Bhubaneshwar
6.71 Crores 10/03/09
Extended
upto
31/03/2013
10/03/08 - Work held up. 7 days
notice issued on
28/03/2012
9 DO/GG
C/NL/2
3
Construction of
BG formation and
Minor Bridge
from chanaige
75000 to 90000
bet. Lalsot and
Gangapur City in
connection with
DO-GGC New B G
line Project
Op
en t
end
er
2
4/0
9/2
00
7
Single
Packet
system
02
/11
/20
07
3 Yes NWR/S&C/
CA/96
dated
18/02/200
8
M/s. ARSS
Infrastructure
Projects Limited,
Bhubaneshwar
8.56
Crores
20/03/09
Extended
upto
30/06/2013
15/03/08 -
Work held up. 7 days
noticed issued on
28/03/2012
10 DO/GG
C/NL/8
(R&C)
Construction of
Minor Bridges
from Chainage
00.00 to 30000.00
between Dausa
and Lalsot in
connection with
Dausa Gangapur
city new Broad
gauge line
project.
Op
en t
end
er
17
/01
/20
08
Single
packet
system
20
/02
/20
08
1 Yes Dy.
CE/C//DO/
CA/20
Dated23/0
6/2008
M/s Kewai
Construction Co.
(J/V), Jodhpur
5.98 Crore 01/01/09
Extended
upto
31/08/2012
28/08/08 - Work has been
terminate on 12/07/12.
11 JP/C/W
/48RR/
ROB
Dausa
Construction of
Road Over Bridge
across the
Railway track in
Dausa Yard at
Level Crossing No.
181-B at Km.
179/10-11 on
Jaipur Bandikui
section.
Op
en t
end
er
16
/12
/20
07
Single
packet
system
18
/01
/20
08
1 - Yes NWR/S&
C/CA/94
dated
18/02/200
8.
M/s Bharat Spun
Pipe & Construction
Co., Jaipur
3.82 Crore 15/07/09
Extended
upto
15/10/2012
25/04/2009- - Work is on advance
stage of completion
12 DO/GG
C/NL/2
9
Construction of
platforms,
earthwork in
platform in
connection with
Dausa-
Gangapurcity new
BG line project.
Op
en t
end
er
27
/01
/20
09
Single
packet
system
02
/03
/20
09
9 - - Yes Dy.CE/C/D
O/CA/ 35
dated: 15
/10/2009
M/s Bharat- Kamal
(J/V), Jaipur
5.47 crore 04/08/10
Extended
upto
30/10/12
07/08/2009 - work in progress.
13 DO/GGC
/NL/36
Construction of
broad gauge
formation &
muior bridges
from Chainage
90000 to 92700
between Lalsot
and Gangapurcity
new Broad gauge
line project.
Op
en t
end
er
22
/11
/20
09
Single
packet
system
28
/12
/20
09
2 - - yes Dy.
CE/C/DO/C
A/43 dated
07/04/201
0
M/s Mohan Singh
Jat, Gangapurcity
1.50 crore 05/12/2010
Extended
upto
6/12/11
further
extension
under
process
07/04/2010 - Work held up.
Contractor has filed suit
in the court.
14 DO/GGC
/NL/31
Construction of
ROBs across
Railway track at
chainage
37034,83925 &
37925 and
drainage over
pass at chainage
36960 & 37520
between
salempura to
Udaikalan station
inconnection with
Dausa-
Gangapurcity new
BG line project
Op
en t
end
er
Single
packet
system
16
/02
/20
10
11 - - Yes NWR/S&C/
CA/105
dated
22/11/201
0
M/s Shree Ram
Kripa Construction
Jaipur
13.44 Crore 29/02/2012.
Extended up
to
15/11/2012
- - Work in progress
15 DO/GGC
/NL/32
Construction of
150unit type II, 7
units type-III staff
quarters & IOW
office and other
ancillary works
the water supply,
sewerage,
drinakge, roads,
parking, sanitary
and provision of
electrical//
communication
conduits & metal
boxes for NWR
residential colony
at various
stations between
Dausa-
Gangapurcity new
BG line project.
Op
en t
end
er
Single
packet
system
05
/07
/20
1
02 - - Yes NWR/S&C/
CA/107
dated
28/03/201
1
M/s L.N. Agrawal-
MCD Pvt. Ltd., (J/V)
Jaipur
15.65 Crore 31/03/2012.
Extended
upto
31/03/13
- - Work in progress.
16 DO/GGC
/NL/30
Construction of
single line 13
standard straight
alignment tunnel
in soil and rock
including cut and
cover portion
between
chainage 38/720
to 40/840
including side
drain and other
approaches of
tunnel between
Didwana- Lalsot
Railway station in
connection with
Dausa-
Gangapurcity new
BG line project.
Op
en t
end
er
Single
packet
system
27
/07
/20
09
12 - - Yes NWR/S&C/
CA/106
dated
29/12/10
M/s Valecha-
Transtonelstroey
(J/V) Mumbai
53.02 Crore 27/09/2012.
Further
extension
under
process.
- - Work in progress
17 DO/GGC
/NL/26
DO/GGC/NL/26-
Supplying and
stacking 50mm
gauge machine
crushed stone
track ballast in
stacks as per
Railway’s
specification
between Km. 1.00
to 41.00 (Dausa-
Lalsot) section in
connection with
Dausa-
Gangapurcity new
BG line project.
Op
en t
end
er
Single
packet
system
07
/01
/20
11
6 Yes
Dy.CE/C/D
O/CA/54
dated
22/07/11
M/s R.K. Infra (J/V),
Jaipur
7.74 Crore 05/04/2012
Extended
upto
05/04/2013
Work in progress
18 DO/GGC
/NL/28
Construction of
Broad gauge
formation in
cutting,
construction of
rail side drain,
catch water drain
& slope
protection work
from chainage
36000 to 38500
between Dausa
and Lalsot in
connection with
Dausa-
Gangapurcity new
BG line project
Op
en t
end
er
15
/03
/20
11
Single
packet
system
21
/04
/20
11
3 - - Yes
Dy.CE/C/D
O/CA/57
dated
30/11/201
1
M/s Jagdish Prasad
Agrawal, Alwar
6.03 Crore 26/04/12
Extended
upto
31/12/2012
17/10/11 work in progress
19 DO/GGC
/NL/40
Laying and
linking of BG track
and
transportation of
P.Way material,
PSC sleepers etc
between Dausa-
Deedwana
section in
connection with
Dausa-
Gangapurcity new
BG line project.
Op
en t
end
er
28
/03
/20
11
Single
packet
system
18
/05
/20
11
6 - - Yes
Dy.CE/C/D
O/CA/56
dated
18/10/11
M/s Goel Brothers
Rail Infra Pvt. Ltd.,
Bareilly.
5.66 Crore 01/08/2012.
Extended
upto
15/12/2012
13/09/11 Work in progress
20 DO/GGC
/NL/43 Construction of
duty bunk
miscellaneous
structures and
road work etc.
between Dausa
Gangapurcity
section in
connection with
Dausa
Gangapurcity
new BG line
project.
Op
en T
end
er
21
/05
/20
11
Single
packet
system
27
/06
/20
11
4 - - Yes - M/s Bharat –Kamal
(J/V), Udaipur
5.31 Crore 18/10/12 - - Contract proposed to
be closed vide letter
dated 19/03/2012
21 DO/GGC
/NL/39R
R
Construction of
station
buildings,
signaling
structures and
miscellaneous
structures etc.
at various
stations
between Dausa
(excl.) to
Gangapurcity
(excl.) in
connection with
Dausa
Gangapurcity
new BG line
project.
Op
en T
end
er
28
/06
/20
11
Single
packet
system
05
/08
/20
11
3 - - Yes NWR/S&C/
CA/115
dated
21/03/201
2
M/s Bharat-Kamal
(J/V), Udaipur
8.25 Crore 28/02/13 - - work in progress
For CAO/C/JP
22 DO/GGC
/NL/9
(R&C)
Construction of
Broad Gauge
Formation from
chainage 1150.00
to 15000.00
between Dausa
Kala and
Shekhpura
Villages in
connection with
Dausa-Gangapur
City New Broad
Gauge line
Project(Risk &
Cost tender).
Op
en t
end
er
25
/11
/20
11
Single
packet
system
28
/12
/20
11
7 - - Yes Dy.CE/C/D
O/CA/58
dated
21/02/201
12
M/s Jai Salasar
Balaji Construction
Co. (J/V) Jaipur
4.60 04/05/12
Extended
upto
04/09/2012
21/01/12 - Work terminate on
09/07/12.
23 DO/GGC
/NL/10
(R&C)
Construction of
Broad Gauge
Formation from
chainage
15000.00 to
28000.00
between Dausa
and Lalsot in
connection with
Dausa-Gangapur
City New Broad
Gauge line
Project(Risk &
Cost tender).
Op
en t
end
er
25
/11
/20
11
Single
packet
system
28
/12
/20
11
7 - - Yes Dy.CE/C/D
O/CA/59
dated
21/02/201
12
M/s Jai Salasar
Balaji Construction
Co. (J/V) Jaipur
2.95 04/05/12
Extended
upto
04/09/2012
21/01/12 - work terminated on
09/07/12