detector cooling project wp2 co2 activities status report

15
DETECTOR COOLING PROJECT WP2 CO2 activities status report https:// espace.cern.ch/CO2/default.aspx https://espace.cern.ch/CO2-1kW/_layouts/viewlsts.aspx https://espace.cern.ch/CO2-100W/default.aspx https://espace.cern.ch/CO2-SR1/default.aspx 1 J.Godlewski DCP 2nd November 2011 On Behalf off all CO2 working team with copies of transparencies from: M.Battistin, B.Verlaat, L.Zwalinski

Upload: kostya

Post on 15-Feb-2016

55 views

Category:

Documents


0 download

DESCRIPTION

DETECTOR COOLING PROJECT WP2 CO2 activities status report. https:// espace.cern.ch/CO2/default.aspx https://espace.cern.ch/CO2-1kW/_layouts/viewlsts.aspx https://espace.cern.ch/CO2-100W/default.aspx https://espace.cern.ch/CO2-SR1/default.aspx. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: DETECTOR COOLING PROJECT WP2 CO2 activities status report

DETECTOR COOLING PROJECTWP2 CO2 activities status report

https://espace.cern.ch/CO2/default.aspxhttps://espace.cern.ch/CO2-1kW/_layouts/viewlsts.aspx https://espace.cern.ch/CO2-100W/default.aspxhttps://espace.cern.ch/CO2-SR1/default.aspx

1J.GodlewskiDCP 2nd November 2011

On Behalf off all CO2 working team with copies of transparencies from: M.Battistin, B.Verlaat, L.Zwalinski

Page 2: DETECTOR COOLING PROJECT WP2 CO2 activities status report

Cryolab test stand CORA Modifications and changes Future tests

SR1 2 kW unit Modular units

100 W units TRACI Two units commissioned New TRACI for Uni Geneva

1kW unit MARCO

DCP 2nd November 2011 J.Godlewski2

Page 3: DETECTOR COOLING PROJECT WP2 CO2 activities status report

Cryolab

New compressor installed Connection to condenser and

fridge piping to be done Changes to electrical supply and

control system on the way CMS long pipes installed on the

wall Pressure test done Leak tests on the way DAQ ready

IBL transfer line Tests of the IBL transfer line will

be done in parallel to CMS tests

DCP 2nd November 2011 J.Godlewski3

Page 4: DETECTOR COOLING PROJECT WP2 CO2 activities status report

SR1

DCP 2nd November 2011 J.Godlewski4

Page 5: DETECTOR COOLING PROJECT WP2 CO2 activities status report

DCP 2nd November 2011 J.Godlewski5

Page 6: DETECTOR COOLING PROJECT WP2 CO2 activities status report

DCP 2nd November 2011 J.Godlewski6

Page 7: DETECTOR COOLING PROJECT WP2 CO2 activities status report

DCP 2nd November 2011 J.Godlewski7

Page 8: DETECTOR COOLING PROJECT WP2 CO2 activities status report

DCP 2nd November 2011 J.Godlewski8

Page 9: DETECTOR COOLING PROJECT WP2 CO2 activities status report

TRACI – 100 W

DCP 2nd November 2011 J.Godlewski9

Page 10: DETECTOR COOLING PROJECT WP2 CO2 activities status report

TRACI commissioning

DCP 2nd November 2011 J.Godlewski10

Page 11: DETECTOR COOLING PROJECT WP2 CO2 activities status report

100 W - development

DCP 2nd November 2011 J.Godlewski11

Currently we are preparing the construction of the next TRACI unit for Geneva University. Modifications to 3D-model have been done and manufacturing drawings produced. Now we will start ordering the material. It was agreed that Geneva University will do Electrical and Control cabinets basing on delivered drawings and ordered by us materials. It is also discussed the possibility of building another unit and use it for all development needs

Page 12: DETECTOR COOLING PROJECT WP2 CO2 activities status report

(Multipurpose Apparatus for Research on CO2 - MARCO

DCP 2nd November 2011 J.Godlewski12

MARCO is a CO2 cooling unit based on the 2PACL concept developed for the LHCb-Velo. The capacity of MARCO is in the order of 1kW and the operational temperature range will be from room temperature down to -40°C. MARCO is designed for non-expert users, all the necessary handling is controlled by a PLC. MARCO is designed to support CO2 cooling development in general. The design of MARCO servers as a base for future CO2 cooling plants for experiments. The CO2 cooling for Atlas-IBL and KEKb-Belle 2 will be derived from the Marco design. The common design approach is named IBBeLle cooling plant as both IBL and Belle-2 have the same requirements.

This unit is built in collaboration with Max Planck Institute from Munich. Currently frame is ready and MPI is preparing piping.For the chiller we have got 25kCHF from ATLAS R&D budget and chiller with 2 stage, frequency controlled compressor is being ordered just now

Page 13: DETECTOR COOLING PROJECT WP2 CO2 activities status report

MARCO P@ID

DCP 2nd November 2011 J.Godlewski13

Page 14: DETECTOR COOLING PROJECT WP2 CO2 activities status report

MARCO control system

DCP 2nd November 2011 J.Godlewski14

Page 15: DETECTOR COOLING PROJECT WP2 CO2 activities status report

Summary

A lot of activities during this year Tests of the full scale CMS piping will start soon in the Cryolab SR1 2 kW unit is under commissioning Two TRACI 100 W units have been constructed and commissioned

LHCb one is at the beam test stand ATLAS IBL is being installed in SR1

1 kW MARCO unit is built in collaboration with MPI Munich Krakow students participate in CO2 activities

DCP 2nd November 2011 J.Godlewski15

There are 4 different share spaces for CO2 cooling systems.Maybe we should put them in one space and make more information in public area to allow people for access