developing peru’s copper...
TRANSCRIPT
April 2015 CORPORATE PRESENTATION
DEVELOPING PERU’S COPPER POTENTIAL
This presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties. All statements within, other than statements of historical fact, are to be considered forward looking. Such forward-looking information and statements are based on current expectations, estimates and projections about global and regional economic conditions as well as industries that are major markets for Panoro Minerals Ltd. There can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. Further, to the best of management’s knowledge the information throughout the presentation is revised and up to date.
TSXV:PML 2
FORWARD LOOKING STATEMENTS
TSXV:PML 3
INVESTMENT HIGHLIGHTS • Key Copper Projects in Emerging District in Peru
• Cotabambas Cu/Au/Ag Project o Preliminary Economic Assessment Completed
• 80,000 tpd open pit mine, 19 year mine life,
• Cu/Au/Ag concentrate, clean and high value
• $627.5 M NPV, 14.4% IRR and 4 year payback, after tax
• $1.26 C1 cash cost, lower quartile
• Potential for growth and enhancement
o Indicated Resource 117.1 Mt @ 0.42% Cu, 0.23g/t Au, 2.74g/t Ag, 0.001% Mo
(@0.2% Cueq cutoff)
o Inferred Resource 605.3 Mt @ 0.31% Cu, 0.17g/t Au, 2.33g/t Ag, 0.002% Mo
(@ 0.20% Cueq cutoff)
• Antilla Copper/Molybdenum Project o Indicated Resource 188.5 Mt @ 0.40% Cu, 0.009% Mo (@ 0.20% Cueq cutoff)
o Inferred Resource 145.9 Mt @ 0.28% Cu, 0.009% Mo (@ 0.20% Cueq cutoff)
o Preliminary Economic Assessment underway
• Portfolio of attractive early stage projects in same copper/gold belt and in close proximity to other significant mining projects
Luis Vela, P. Geo., Vice President of Exploration for Panoro and a "qualified person" under National Instrument 43-101, has reviewed and approved the scientific and technical information
TSXV:PML 4
CAPITAL STRUCTURE & SHARE PERFORMANCE
Tickers
TSX-V:PML Lima:PML
Frankfurt:PZM
Share Price 52 Week Low-High
Shares Issued Fully Diluted Issued
220.6 million 237.8 million
$0.18 $0.15 - $0.60
Market Capitalization $40 million
Cash $5 million
(as of April 13, 2015)
TSXV:PML 5
MANAGEMENT&DIRECTORS – PERU EXPERIENCE Management • Luquman Shaheen, P.Eng., M.B.A │ President, CEO, Director
- Over 20 years experience in Mining Sector, 16 years experience in Peru and Latin America
• David W. Huber, C.A. │ CFO
- 13 years professional accounting experience, 7 years as CFO, Corporate Secretary
• Yves Barsimantov │ Vice President, Operations & Peru General Manager
- 14 years management experience with Peruvian banking, fishing and mining sectors
• Luis Vela │ Vice President Exploration
- Over 20 years exploration experience in Peru and Chile mining sectors
• Javier Falcon │ Environmental Manager
- 20 years exploration experience in Peru
Directors • Bill Boden│ Chairman
- Former Chairman of First Coal Corporation
• Anthony Laub│ Director
- Partner at Laub & Quijandria Consultores y Abogados
• Richard Mundie│ Director
- Director of Taseko, former advisor to President Teck, M&A in Peru, representative in China
• Christian Pilon│ Executive Director Peru, Director
- Over 30 years of experience in applied geophysics and mining sector, resident in Peru
• Christiaan Staargaard, P.Geo. │ Director
- President and CEO of Lithic resources Ltd
• Lorne Torjhelm│ Director
- President RNJ Ventures
TSXV:PML 6
P E R U A C O P P E R C O U N T R Y W I T H P O W E R
Corocohuayco, Xstrata
Trapiche, Buenaventura
Haquira, First Quantum
Los Chancas, Grupo Mexico
Quechua, Pan Pacific Copper
Zafranal, Teck / AQM
Cotabambas, Panoro Minerals
Antilla, Panoro Minerals
Projects in Construction / Expansion
Projects in Exploration
Soc Minera Cerro Verde
Double Cu Production 2013 - 2016
Towards World’s Top Cu Producer
Growing Power Supply
2013 – 2014 9,000 MW power capacity growth
2018 – 2024 3,000 MW power supply excess
Power Costs (¢/kWhr): Peru – 6.1 Chile – 12.1 Canada – 5.3 Australia – 8.9
Antapacay, Glencore
Antamina, Teck
Toromocho, Chinalco
Constancia, Hudbay Minerals
Las Bambas, MMG
Cerro Verde, Soc. Minera Cerro Verde
Toquepala, Grupo Mexico
Tia Maria, Grupo Mexico
Quellaveco, Anglo American
TSXV:PML 7
PANORO PROJECTS’ DISTRICT POTENTIAL
• Minmetal, Las Bambas o Acquired 2014, $5.85B o 50% + Completed
• Glencore, Antapaccay
o $1.5 development completed
• Grupo Mexico, Los Chancas
o Feasibility stage
• First Quantum Minerals, Haquira o Acquired Oct 2010
• 5 /¢lb Cueq
• Hudbay Minerals, Constancia
o Acquired Mar 2011
• 10 /¢lb Cueq
o Commercial production expected Q2 2015
Development of Prolific Copper Region to National Goal of No. 1 in Copper Mining
TSXV:PML 8
COTABAMBAS PROJECT P E A O V E R V I E W
• 80,000 tonne per day open pit mine throughput • 533 Mt mineralization, waste:ore ratio 1.03 • Mining with standard track & shovel methods
• Two open pits
o North Pit
o South Pit
• Standard crushing milling, floatation process • Process plant located next to main pit
o 27% Cu, 11.4 g/t Au, 133.7 g/t Ag concentrate grade
• Clean and high value concentrate
• Concentrate hauled to port via truck • Power supply via new 60 km power line from Abancay • Initial Capital Cost $1.4 B
• Operating Costs $8.22/tonne
o Mining $3.33/tonne
o Processing $4.47/tonne
o G/A Costs $0.41/tonne
Waste Rock Facility
North Pit
South Pit
Plant Site
Water Pond
Water Pond
Luis Vela, P. Geo., Vice President of Exploration for Panoro and a "qualified person" under National Instrument 43-101, has reviewed and approved the scientific and technical information
TSXV:PML 9
COTABAMBAS PROJECT D E P O S I T R E S O U R C E
• 24,400 m exploration program completed July 2012
- 18,000 m included in Sept. 2012 Resource
• 33,000 m drilling completed 2013
• Total +57,000 m drilled to date - Plus 9,900 m of legacy drilling
• Contained Metal
Pit Shell Cu (Blb)
Au (Moz)
Ag (Moz)
Mo (Mlb)
Indicated 1.1 0.9 10.3 3.3
Inferred 4.1 3.3 45.3 25.3
Pit Shell Resource (Mt)
Cu (%)
Au (g/t)
Ag (g/t)
Mo (%)
Cut-off
Indicated 117.1 0.42 0.23 2.74 0.001 0.20% Cueq
Inferred 605.3 0.31 0.17 2.33 0.002 0.20% Cueq
2013 Resource Update
Source October 2013 Press Release – NI43-101 Technical Report prepared by Tetra Tech, December 2013
Luis Vela, P. Geo., Vice President of Exploration for Panoro and a "qualified person" under National Instrument 43-101, has reviewed and approved the scientific and technical information
Ccalla Resource
Limits
TSXV:PML 10
COTABAMBAS PROJECT M I N E R A L I Z E D Z O N E S
(AU+Ag+Cu) Colluvium
(Au+Ag) Oxide Gold
(AU+Ag+Cu)
Cu+Ag; CuS<CuR Oxide
Cu+Ag+Au Cooper-Gold
Cu+Ag; CuS>CuR
CU+Au+Ag Supergene Sulphide
(Cu+Au+Ag)
Hypogene Sulphide (Ag+Mo+Cu)
(Cu+Ag)
Latite Dique
TSXV:PML 11
COTABAMBAS PROJECT S I G N I F I C A N T
• High chargeability anomalies identifying:
- pyrite halo around Ccalla Porphyry deposit
- lateral expansion potential of Ccalla deposit
- Target area for step-out drilling
• Five Areas of potential for exploration and step-out drilling
- Areas 1, 2, 3, 4 & 5
E X P A N S I O N P O T E N T I A L
• Low chargeability anomalies identifying:
- NE-SW trend of Ccalla deposit
- Correspond to areas of high magnetic
TSXV:PML 12
COTABAMBAS PROJECT G R O W I N G P R O J E C T
1. Ccalla and Azulccaca Deposits
- Defined and expanding
S C A L E P O T E N T I A L PANORO CLAIMS
10 KM
16 KM
6
7
4
8 5
9
3 2
1
2. Maria Jose Target
- Newly defined - Systematic and channel sampling underway
3. Guacclle Porphyry – Buenavista Target
- Mapping underway - Limited historical drilling
4. Ccarayoc Target
5. Jean Louis PorphyryTarget
- Mapping underway
6. Anarqui Target
7. Chaupec Target
8. Chuyllollo Target
9. Cullusayhua Target
TSXV:PML 13
COTABAMBAS PROJECT P E A S u m m a r y
• $ 981.7 M NPV, 17.3% IRR, 3.6 year payback, before tax
• $ 627.5 M NPV, 14.4% IRR, 4.0 year payback, after tax
• Annual Payable Metals
o 143.4 M lbs Cu
o 88 k oz Au
o 967 k oz Ag
• Life of Mine Payable Metals
o 2.7 B lbs Cu
o 1.6 M oz Au
o 18.4 M oz Ag
• Cash Costs, net of by-product credits
o C1 $1.26 /lb Cu
o C2 $ 2.02 /lb Cu
Luis Vela, P. Geo., Vice President of Exploration for Panoro and a "qualified person" under National Instrument 43-101, has reviewed and approved the scientific and technical information
TSXV:PML 14
COTABAMBAS PROJECT
• 2010 – 2012 Completed Program
- 24,400 m, 39 Drill Hole Program
- Step out and infill drilling
- Primarily at Ccalla deposit
- Drilling almost complete
- $10 million investment
• 2012 – 2013 Expanded Program
- 24,400 m, 39 Drill Hole Program
- +33,000m drilling completed
1. Delineate high grade supergene and
oxide zones at Ccalla Deposit
2. Infill drill high grade pit
3. Test near surface high grade zones at
Ccalla East
4. Delineate Ccalla East Discovery
• 2015 PEA Completed, next step
• Infill and exploration drilling
• Metallurgical testing
• Mine plan optimization
• Leading to feasibility studies
- Indicated Resource 117.1 Mt @ 0.42% Cu, 0.23g/t
Au, 2.74g/t Ag, 0.001% Mo,
- Inferred Resources 605.3 Mt @ 0.31% Cu, 0.17g/t
- Au, 2.33g/t Ag, 0.002% Mo, (@ 0.20% Cueq cutoff)
- High value concentrate
- Significant exploration potential identified
- High grade pit
- Near surface oxide zone
• 2013 Resource Estimate Update
Luis Vela, P. Geo., Vice President of Exploration for Panoro and a "qualified person" under National Instrument 43-101, has reviewed and approved the scientific and technical information
TSXV:PML 15
ANTILLA PROJECT O V E R V I E W
• Advanced stage copper-molybdenum exploration project • Located 140 km southwest of the City of Cusco, Southern Peru • 12 mineral concessions covering 7,500 hectares • Indicated resource estimate of 188.5 million tonnes at an average grade of
0.40% Cu and 0.009% Mo
o Current resource only on the East Block o Higher grade near surface zones
• Some exploration potential around the perimeter of East Block and at West Block
• Potential starter pit with 27 million tonnes at an average grade of 0.69% Cu and 0.011% Mo
• Strip ratio less than 1.0 • Preliminary Economic Assessment underway
Luis Vela, P. Geo., Vice President of Exploration for Panoro and a "qualified person" under National Instrument 43-101, has reviewed and approved the scientific and technical information
TSXV:PML 16
ANTILLA PROJECT RESOURCE ESTIMATE SUUMARY
Zone Cut-Off Grade
Million Cu Mo Contained Cu
Contained Mo
% Cueq Tonnes (%) (%) (Blb) (Mlb)
Hypogene Sulphide
0.20 42.6 0.30 0.010 0.28 9.4
Supergene Sulphide
0.20 132.6 0.45 0.008 1.3 23.4
Leach Capping
0.20 8.7 0.28 0.010 0.027 0.99
Overburden 0.20 4.5 0.27 0.010 0.027 0.99
Total 188.5 0.40 0.009 1.66 35.71
Cut-Off Grade Million Cu Mo Contained Cu
Contained Mo
% Cueq Tonnes (%) (%) (Blb) (Mlb)
0.20 188.5 0.40 0.009 1.7 36
0.30 138.4 0.46 0.009 1.4 27
0.40 84.1 0.54 0.010 1.0 19
0.50 51.6 0.62 0.010 0.7 11
0.60 27.8 0.69 0.011 0.4 6.7
0.70 12.9 0.78 0.012 0.2 3.4
Antilla Easy Block Indicated Resource Estimate
• Sulphide Mineralization
• Clean concentrate with
90% Cu recovery
• Produce 27% - 30% Cu
concentrate grade
• Higher grade zones
• Blocks located together
• Mineable starter and
high grade pit potential
Luis Vela, P. Geo., Vice President of Exploration for Panoro and a "qualified person" under National Instrument 43-101, has reviewed and approved the scientific and technical information
TSXV:PML 17
ANTILLA PROJECT E A S T B O C K S E C T I O N S
Chalcocite
Primary Sulphides
~200m Maximum Pit Depths
0-0.1 0.1-0.3 0.3-0.5 0.5-1.0 >1.0
High Grade Zones At or Near Surface
TSXV:PML 18
ANTILLA PROJECT CONCEPTUAL SITE LAYOUT
• 15 km access road from Provincial
road to site
• 220 kV power line substation 30 Km
• Water supply from local water
coarse
• Mill and Plant site locations identified
• Tailings and Waste rock area
locations identified
• Infrastructure isolated from village of
Antilla
• Mapping and limited drilling at West
Block indicate potential to increase
resource
TSXV:PML 19
R E G I O N A L INFRASTRUCTURE DEVELOPMENT
Power
1. 220 kV Transmission Line
Cotaruse – Las Bambas
Road
2. Heavy Haul Road Antapaccay
– Las Bambas
3. Access Road
Cusco – Las Bambas
Railroads
4. Cusco – Marcona Port
5. Cotabambas – Marcona Port
6. Abancay - Marcona Port
7. Peru Rail 9Mt/yr Concentrate
Shipping Capacity
Port
8. Matarani 7 Mt/yr Concentrate
Shipping Capacity
Cotabambas Project
Las Bambas Project
Antilla Project
1
2
7
8
TSXV:PML 20
R E G I O N A L INFRASTRUCTURE DEVELOPMENT
Antilla Cotabambas
2016 - 2017
2015
Bankable Feasibility Study
Preliminary Economic Assessment
Cochasayhuas
Kusiorcco
Promesa
El Rosal Chap. - Chapi
Mineral IRL JV Utupara
Mineral IRL JV
Pistoro Norte
Sancapampa
Pataypampa
Humanantata
Morosayhuas
Anyo
Alicia
Checca
Development
Feasibility
Advanced Exploration
Early Exploration
Level 2 Prospects
Level 1 Prospects
2007 2009 2012 2013 2013
Cu Au Ag Mo
TSXV:PML 21
PANORO RESOURCE G R O W T H H I S T O R Y
400% GROWTH
Cotabambas at Acquisition
Antilla Resource Added
Cotabambas 2012 Resource Growth
Cotabambas 2013 Resource Growth
Antilla 2013 Resource Growth
75%
84%
77%
75%
76%
25%
14%
18%
19%
17%
4%
4%
4%
31 Mlb
1%
2%
3%
2%
1.6 MoZ
1.5 Blb
3.1 Blb
1.6 Moz
5.3 Blb
3.0 Moz
31 Mlb
37 Moz
1.1 Blb ind 5.7 Blb inf
0.9 Moz ind 3.3 Moz inf
3 Mlb ind 56 mlb inf 10 Moz ind 45 Moz inf
2.7 Blb ind 5.1 Blb inf
0.9 Moz ind 3.3 Moz inf
41 Mlb ind 54 mlb inf
10 Moz ind 45 Moz inf
TSXV:PML 22
GROWING ANALYSTS & INVESTMENT BANKING SUPPORT
TSXV:PML 23
CONCLUSION
COTABAMBAS PROJECT
Large scale copper project, greater potential, strategic location
ANTILLA PROJECT Moderate scale project, infrastructure ease
FINANCED 2014 plans financed Demonstrated success in raising capital as required
COPPER Principal commodity with supply constraints coming and demand strong
PERU Key copper producing nation with national goal to double copper production
GROWTH 2007 to 2013 a 400% increase of in-situ metal Cotabambas Preliminary Economic Assessment completed
24
TSXV:PML Frankfurt:PZM
BVL:PML
For further information, contact: Luquman Shaheen, President and CEO
Phone: 604.684.4246 Email: [email protected]