Contents
I. ASME BPV III Code Activities II. Code Case Development Procedure III. Code Case Application IV. N-859 Development
-2-
I. ASME BPV III Code Activities
-2-
Board of Governors
Engineering & Technology Enterprises
Board on Nuclear Codes & Standards
Committees
Codes and Standards Board
of Directors
Strategic Management Centers Institutes
Board on Standardization and
Testing
Board on Safety Codes and Standards
Board on Pressure Technology Codes
& Standards
Board on Conformity Assessment
Board on Codes & Standards Operations
Board on New Development
Board on Hearings and Appeals
Knowledge & Community
Groups
SVR Committee on Design
Section Ⅱ
Section Ⅴ
Section Ⅸ
Section Ⅳ
Section Ⅰ
Section Ⅲ
Section ⅩII
Section Ⅹ
Section Ⅷ
SectionⅩI
Other Possible Standards Committees
Service Related Stds. Committees
Construction Related Stds. Committees
Non-Nuclear Nuclear
-3-
BNCS (Board on Nuclear Codes & Standards)
Responsible for strategic management of all ASME activities related to codes, standards, and accreditation programs.
Standards Committee
Subgroups
Working Groups & Task Groups
Vote on administrative and standards actions, and establish consensus for all standards actions related to their respective Sections. - e.g., Sec. III, Sec. XI, etc.
Responsible for a general technical area of the Code and have multiple Working/Task Groups. - e.g., SGCD(Component Design), SGMF&E(Material, Fabrication & Examination), etc.
Provide specific technical expertise and perform the majority of proposal development. - e.g., WGPD(Piping Design), WGV(Valve), etc.
I. ASME BPV III Code Activities
-4-
Approved during Las Vegas ASME Code Week(’11.05).
Composed of domestic nuclear industry-related organizations.
Function as both a technical committee and as a stakeholder committee reporting to the Executive Committee.
Initiate the process of developing Code Cases N-856 & N-859.
I. ASME BPV III Code Activities
-5-
Code A standard that is intended to be adopted by governmental bodies, either local, state,
or federal, or cited in a contractual agreement, such that the standard has the force of law.
Published ever two years since 2011.
Code Case Represent alternatives or additions to existing Code rules.
Written as a question and reply, and are usually intended to be incorporated into the Code at a later date.
When used, Code Cases prescribe mandatory requirements in the same sense as the text of the Code.
However, users are cautioned that not all jurisdictions or owners automatically accept Code Cases.
I. ASME BPV III Code Activities
-6-
Interpretation Provide clarification of the meaning of existing rules in the Code, and are also
presented in question and reply format.
Interpretations do not introduce new requirements.
Intent Interpretation In cases where existing Code text does not fully convey the meaning that was intended,
and revision of the rules is required to support an interpretation, an Intent Interpretation will be issued and the Code will be revised.
I. ASME BPV III Code Activities
-7-
II. Code Case Development Procedure
• Approval Criteria - Voting Rate : 50% or more - Approval Rate : At least 2/3, but determined by Chair
• Approval Criteria - Voting Rate : At least 2/3 - Approval Rate : 100% (If not approved, considered for recirculation ballot)
• Approval Criteria - Voting Rate : 50% or more - Approval Rate : At least 2/3, but determined by Chair
• Approval Criteria - Voting Rate : No requirement - Approval Rate : 100%
-8-
Required time :
At least one year
Required time : 47 days
II. Code Case Development Procedure
-9-
Reg. Guide 1.84: List of regulatory body-approved Code Cases
Table 1.8-7 of SAR, Applied Code Cases (SKN 3,4)
III. Code Case Application
-10-
SAR 5.2.1.2, Code Cases subject to be applied (SKN 3,4)
Code Cases not reviewed by the regulatory body can be used by special permission.
Application procedure of a Code Case not reviewed by the regulatory body
1) Develop a Code Case and be approved by ASME.
2) Explain the ASME-approved Code Case to the regulatory body.
3) Prepare a SCN(SAR Change Notice) for application of the Code Case and submit it to the regulatory body.
4) The SCN is approved by the regulatory body.
5) Be incorporated into SAR and revise the relevant design documents such as design report, piping design table, piping isometric drawings, etc.
III. Code Case Application
-11-
Prepare a draft Code Case in Korea
Finalize the draft Code Case with Walter Sperko (Expert of SB-366 UNS N04400 and SGMF&E committee member)
IV. N-859 Development
-12-
Draft Code Case N-859
Explain the draft Code Case
Discuss the Code Case development procedure
IV. N-859 Development
-13-
Ballot No. 15-3388 – View Component Ballot Form
IV. N-859 Development
-14-
Ballot No. 15-3388 – Comments Posted on the Ballot
IV. N-859 Development
-15-
Slagis G : ASME Sec. III, WGPD & SGCD Member
- Insufficient technical information for application to nuclear service.
Explain that Sec. III has approved the use of this alloy as piping, but not as pipe fittings.
Sills M : ASME Sec. III, WGPD Member
- SB-366 fittings seem to have been systematically excluded from Sec. III use of N04400.
Explain the background on how“NP” was first introduced into Sec. II, Part D.
Dennis D : ASME Sec. III, SGMF&E Member (Liaison of ASME Sec. II)
- Material Code Cases should have been approved by the appropriate Sec. II SGNFA 및 BPV II.
Respond to let next ballot be submitted to Sec. II SGNFA and BPV II to approve the Case.
Adams T : ASME Sec. III, WGPD Member & SGCD Chair
- The fittings must meet all the requirements of ASME B16.9 & B16.11, and the manufacturer has to formally document and certify to that.
IV. N-859 Development
-16-
Teleconference at ASME Headquarters (‘15.12.21)
Attendee
- ASME Member : Ralph Hill, John Minichiello, Tim Adams, Bob Jesse, Walter Sperko
- ASME Staff : Christian Sanna, Allyson Byk, Ryan Crane
- KEPCO E&C : Il-Kwun Nam (WGPD Member)
Teleconference results
- SGCD : Approved by chair Tim Adams who withdrew his negative during the teleconference, although Slagis G was still in negative position.
- SGMF&E : Approved by chair Bob Jesse, although Dennis D was still in negative position.
- WGPD : Approved by BPV III chair Ralph Hill for WGPD chair, George Antaki who was not able to attend the teleconference, although Sills M was still in negative position.
- Sec. III : Decided by chair Ralph Hill to have one more day to persuade the negative members, but move forward to Standards Committee level ballot regardless of the result.
IV. N-859 Development
-17-
Voting result by Subcommittee (15.12.22)
IV. N-859 Development
-18-
Ballot No. 15-3565
Ballot No. 16-31
IV. N-859 Development
-19-
IV. N-859 Development
-20-