Development of Retention Treatment Basin for
the Treatment of CSOs in Windsor, Ontario, Canada
Canada-Mexico Water Workshop
March 30, 2010
![Page 2: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/2.jpg)
2
Background:
![Page 3: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/3.jpg)
3
The Detroit River is about 51.5 km in length.
It drains 181,300 hectares in Michigan and Ontario; as well as sewer-shed areas.
Detroit River Basin:
![Page 4: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/4.jpg)
4
Detroit, Michigan (www.geology.com)
![Page 5: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/5.jpg)
5
Windsor, Ontario
![Page 6: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/6.jpg)
6
CSO in Windsor
The Riverfront Interceptor Sewer intercepts flows from combined sewers and conveys to the Lou Romano Water Reclamation Plant (LRWRP) for treatment.
BRIDGE ELM DOUGALL
WINDSOR RIVERFRONT STUDY AREA
LRWRP
LRWRPSewage Treatment Plant
Proposed Site for SatelliteTreatment Facilities
LRWRP
Windsor CSO Study Area
Riverfront Interceptor Sewer
![Page 7: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/7.jpg)
7
September 7/8, 2009
September 12, 2009 (Pelee Island, Westshore)
Summer 2002
![Page 8: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/8.jpg)
8
Pollution from CSOs
Annual Solids Load Discharged into the Detroit River
27%
CSO
Annual BOD5 Discharged into the Detroit River
14%CSO
5%
Annual Volume of Discharged Wa-ter into the Detroit River
![Page 9: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/9.jpg)
9
Steps and MOE Guideline
A Remedial Action Plan (RAP) has been developed to address water quality concerns in the Detroit River Basin.
One of the main priorities of RAP is to control and reduce pollution from CSOs.
The Ontario Ministry of the Environment (MOE) promulgated Procedure F-5-5 as a means of documenting its objectives for CSO control.( ~ Primary Treatment)
![Page 10: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/10.jpg)
10
MOE – Procedure F-5-5
Procedure F-5-5 specifies that: 90% of wet-weather flow is to be treated to primary
treatment equivalency, which is defined as a seasonal average of at least
» 50% removal of TSS and
» 30% removal of BOD5.
![Page 11: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/11.jpg)
11
A Conventional Retention Treatment basin (CRTB) or a Storage Chamber for controlling CSOs was suggested.
For the storage option (i.e., capture and store - no allowance for treatment), the Storage Chamber volume was calculated to be approximately 106 million gallons (400,000 m3).
Originally Proposed Solution
![Page 12: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/12.jpg)
12
Issues that Require Solutions
Not enough space for CRTB or Storage Chamber on the Windsor riverfront.
CSOs contained high proportion of solids with poor settleability.
CRTB or Vortex Separators were unable to meet MOE Procedure F-5-5.
Therefore, an effective treatment technology that requires a small foot-print is required for CSO control.
![Page 13: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/13.jpg)
13
MOE – Procedure F-5-5
Furthermore, the seasonal average TSS concentration in the effluent of a treatment system should not exceed 90 mg/L for more than 50% of the time for an average year during the seven-month period commencing within 15 days of April 1.
![Page 14: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/14.jpg)
14
Approach
A high-rate Retention Treatment Basin (RTB) with chemical coagulation was identified as the preferred approach for CSO treatment.
However, additional information were needed to determine if a high-rate RTB combined with chemical coagulation could be designed for the site that would: Have a small enough footprint, and Meet the requirements of the MOE Procedure F-5-5.
![Page 15: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/15.jpg)
15
Establish the feasibility of using a high-rate RTB in treating Windsor CSO employing coagulation ( with coagulants, such as polymers).
Establish the characteristics of CSOs Run batch and pilot plant studies Establish removal efficiencies for pollutants from the
CSOs at various surface overflow rates (SORs) Establish operating conditions and sludge management
Approach (contd..)
![Page 16: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/16.jpg)
16
Scope Settling Column Tests
Evaluate settling characteristics of solids with and without chemical addition
Determine appropriate type of polymer and its required dosage based on Jar Test results
Design and construct a Pilot-plant to be used as High Rate RTB
Verify performance characteristics Develop design parameters for the full scale RTB Carry out CFD Study to:
Determine the size and geometry of the RTB Finalize Inlet and Outlet arrangements
![Page 17: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/17.jpg)
17
Settling Column 2
With Polymer
Settling Column 1
Without Polymer
Drum with a capacity of 200 L with a mixerSample pumped from
upstream the grit chamber
CylindricalSettlingColumn
H = 3 mF = 200 mm
75 mm Flexible Hose
SCHEMATIC DIAGRAM OF THE SETTLING COLUMNS SET-UP
Settling Column Tests
JAR TEST
![Page 18: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/18.jpg)
18
The pilot plant of the RTB was constructed at the LRWRP. CSO was pumped from the influent channel of the grit chamber at the LRWRP.
Pilot-Scale Setup
![Page 19: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/19.jpg)
19
Pilot-Scale - Overview
![Page 20: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/20.jpg)
20
0.30
0.65
0.30.2
0.8
0.40
0.20
0.400.40
0.650.45
0.1
0.40
1.40
0.4
Perforated baffle
Movable baffle
Influent channelOutlet baffle
Influent
Adjustable weir plate(V-notches and launder)
Adjustable weir plate (V-notches)
Outlet zone
Outlet pipe
Effluent box (width 0.24)
Outlet pipe (200 mm)
Launder
B x H = 0.08 x 0.50
Settling zoneInlet zone
3.0
0.3
0.6
Flushing Box
Drain
Drain
Retention Treatment Basin (RTB)
The pilot plant including the RTB was designed to operate at high surface overflow rate, up to 1440 m3/m2.d (60 m/h).
![Page 21: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/21.jpg)
21
The RTB and the Flushing Box arrangement
![Page 22: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/22.jpg)
22
Operating conditions
Two types of cationic polymers were tested (ZETAG) The RTB were tested for surface overflow rates (SOR)
ranged from 6 m/h to 57 m/h.
The performance of the RTB were evaluated by analysing
multiple samples for each run The samples were analyzed
for: TSS BOD TKN TP
![Page 23: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/23.jpg)
23
Polymer Dosage vs TSS removal
0 10 20 30 400
25
50
75
100
Regulation Limit (50% Removal Ef-ficiency) Optimum Dose, 5 mg/g TSS
Active Polymer Dosages, mg / g TSS
TSS
Rem
oval
Eff
icie
ncy,
%
![Page 24: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/24.jpg)
24
Polymer Dosage vs BOD removal
0 10 20 30 400
25
50
75
100
Observed Data for CSO Regulation Limit (30% Removal Ef-ficiency) Optimum Dose, 5 mg / g TSS Best Fit Regression Line for CSO
Active Polymer Dose, mg/g TSS
BO
D R
emov
al E
ffic
ienc
y, %
Opt. Poly dose of 1.5 mg/g
![Page 25: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/25.jpg)
25
Optimum Polymer Dose – Percentage of Time Effluent TSS < 90 mg/L
0 5 10 15 20 25 30 35 400
25
50
75
100
Observed Data for CSO
Regulation Limit (> 50%)
Optimum Dose, 5 mg / g TSS
Active Polymer Dose, mg / g TSS
Perc
enta
ges o
f Tim
e th
e T
SS in
the
RT
BE
fflue
nt is
Les
s tha
n 90
mg
/ L
Opt. Poly dose of 5 mg/g
![Page 26: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/26.jpg)
26
Predicted Flow and solids deposition patterns in model of pilot high-rate RTB with a steep bottom slope
![Page 27: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/27.jpg)
27
Comparison of Pilot RTB with CFD Model in TSS removal
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0 5 10 15 20 25 30 35 SOR (m3/ m2·h)
TSS
Rem
oval
(%)
CFD Test Results non- Pilot Test Results
![Page 28: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/28.jpg)
28
Full-Scale Design of the High Rate RTB
Based on the pilot-scale RTB tests and CFD simulation results, it is suggested to design the full-scale RTB facility using a design SOR of 12,000gpd/ft2 (20 m3/m2•hr). (Conventional RTB basin is typically sized with typical design SORs of 1,200-3,000gpd/ft2 (2-5 m3/m2•hr).
Therefore, the high-rate RTB will only need to be approximately 10-25% of the size of a conventional RTB.
![Page 29: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/29.jpg)
29
Schematic Flow Diagram
![Page 30: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/30.jpg)
30
High Rate RTB – General set up
![Page 31: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/31.jpg)
31
Top View of the High Rate RTB
![Page 32: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/32.jpg)
32
Proposed High Rate RTB Site
Proposed RTB Facilities Integrated with the Existing Riverfront Facilities
![Page 33: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/33.jpg)
33
Acknowledgement• Dr. Jian Li, Stantec• Dr. Ahmed El-Gendy, Assoc. Prof. Ain-Sham University , Egypt • Dr. Alex McCorquodale, Professor, UNO• Mr. Harold Hornec, Stantec• Mr. Ken Ferguson, Ontario Ministry of the Environment• Mr. Paul Drca. City of Windsor• Mr. Kit Woods, City of Windsor• Dr. Jerry Marsalek, Environment Canada• Mr. David Avril of Questor Veritas Inc• Many other graduate and undergraduate students
![Page 34: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/34.jpg)
34
THANK YOU
![Page 35: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/35.jpg)
35
The TSS concentration in the influent CSO ranged from
180 mg/L to 300 mg/L, compared to a mean value of 150
mg/L for raw sewage.
The average BOD concentration in the influent CSO was
found to be around 100 mg/L . This is compared to a
mean value ranged from 140 mg/L to 195 mg/L for raw
sewage.
Influent Characteristics
![Page 36: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/36.jpg)
36
Inlet Zone
Settling Zone
Outlet Zone
Sludge Zone
RECTANGULAR SETTLING BASIN
![Page 37: Development of Retention Treatment Basin for the Treatment of CSOs in Windsor, Ontario, Canada](https://reader033.vdocuments.net/reader033/viewer/2022051317/5681671e550346895ddb9ab2/html5/thumbnails/37.jpg)
37
L
L
H
B
Raw wastewater
Q
Q
L = lengthB = widthH = depth
1) inlet zone2) settling zone3) outlet zone4) sludge zone
sludge
Top View
Type 1 Settling
Vf = LVo H
Vf = Q .
Vo B H Vo
Q = LB H Vo H
Vo = Q .
B L
Surface loading rate = Q / A = Q / (B x L)= Vo
21 34
Vf
Vo
Clarified water
Sectional View