dfcm addendum no - mscibuild.commscibuild.com › wp-content › uploads › 2020 › 01 ›...

5
DFCM ADDENDUM COVER PAGE, OCTOBER 2019 DFCM Addendum No.2 Date: November 6, 2019 To: Pre-Qualified General Contractors From: Lucas Davis – DFCM Project Manager Reference: DHS-DJJS Millcreek Youth Center Department of Human Services DFCM Project 19152430 Pages Content: Addendum Cover Page 1 Re-upload of Drawings from Addendum No. 1 4 Total Pages: 5 Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to Disqualification. Click here to enter text. 2.1 Schedule Changes: There are no project schedule changes within this addendum. 2.2 General Items: Re-upload of Drawings from Addendum No. 1 due to file corruption. 1.2 Enter text here Enter text here 1.2 Enter text here Enter text here 1.2 Enter text here Enter text here 1.2 Enter text here Enter text here

Upload: others

Post on 28-Jun-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DFCM Addendum No - mscibuild.commscibuild.com › wp-content › uploads › 2020 › 01 › DFCM... · 202 mech. 305 corridor 304 jan. 303 staff restroom 302 lg. open group therapy

DFCM ADDENDUM COVER PAGE, OCTOBER 2019

DFCM Addendum No.2

Date: November 6, 2019

To: Pre-Qualified General Contractors

From: Lucas Davis – DFCM Project Manager Reference: DHS-DJJS Millcreek Youth Center Department of Human Services DFCM Project 19152430

Pages Content: Addendum Cover Page 1 Re-upload of Drawings from Addendum No. 1 4 Total Pages: 5

Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to Disqualification.

Click here to enter text.

2.1 Schedule Changes: There are no project schedule changes within this addendum. 2.2 General Items: Re-upload of Drawings from Addendum No. 1 due to file corruption. 1.2 Enter text here Enter text here 1.2 Enter text here Enter text here 1.2 Enter text here Enter text here 1.2 Enter text here Enter text here

Page 2: DFCM Addendum No - mscibuild.commscibuild.com › wp-content › uploads › 2020 › 01 › DFCM... · 202 mech. 305 corridor 304 jan. 303 staff restroom 302 lg. open group therapy

FD FD

OFFICE

119

BD. RM.

118

BD. RM.

117

BD. RM.

116

BD. RM.

115

LINEN

112

BD. RM.

111

BD. RM.

110

BD. RM.

109

BD. RM.

108

BD. RM.

107

BD. RM.

106

MECH.

105

JAN.

104

STAFF RR

103

CORRIDOR

102

SPARK

TRAINING

AREA

101

STORAGE

121GROUP

RM.

120

SHWR

113

SHWR

114

CONTRACT LIMIT LINE

CONTRACT LIMIT LINE

CONTRACT LIMIT LINE

LIBRARY

201

CORRIDOR

205

MECH.

206

JAN.

204STAFF RR

203

INCENTIVE

SPACE

207

AV

STORAGE

208

MUSIC

ROOM

209

STORAGE

211

MUSIC

STORAGE

210

YOUTH RR

202

MECH.

305

CORRIDOR

304

JAN.

303

STAFF

RESTROOM

302

LG. OPEN

GROUP

THERAPY

301

SMALL

GROUP

THERAPY

ROOM

314

GROUP

THERAPY

ROOM

313

STAFF

THERAPY

ROOM

312

FUTURE

STAFF

THERAPY

ROOM

311

STORAGE

CLOSET

310

DE-ESCALATION

ROOM

309

STAFF

THERAPY

ROOM

308

STAFF

THERAPY

ROOM

307

STAFF

THERAPY

ROOM

306

STORAGE

315

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

12345

A

B

C

D

2345

DATE

PROJECT #:

REVISION

10/1

7/2

019 1

1:2

7:1

4 A

MC

:\U

sers

\chansen\D

ocum

ents

\18038 -

DJJS

Mill

cre

ek Y

outh

Cente

r R

enovation_v19_chansen.r

vt

AE131

COTTAGE

FURNISHINGS

PLANS

09/30/2019

DH

S D

JJS

MIL

LC

RE

EK

YO

UT

H C

EN

TE

R R

EN

OV

AT

ION

79

0 W

ES

T 1

2T

H S

TR

EE

T,

OG

DE

N,

UT

AH

84

40

4

DF

CM

PR

OJE

CT

NO

: 1

91

52

43

0

18038

CONSTRUCTION DOCUMENTS

NORTHPROJECT

16'8'0"

SCALE 1/8" = 1'-0"AE131

C5 COTTAGE A FURNISHINGS PLAN

KEY NOTES:

SCALE 1/8" = 1'-0"AE131

A4 COTTAGE B FURNISHINGS PLANSCALE 1/8" = 1'-0"AE131

A2 COTTAGE C FURNISHINGS PLAN

10/25/2

019

Addendum

GENERAL NOTES:

1. FURNITURE TO BE PROVIDED BY OWNER. LAYOUT IS FOR COORDINATION WITH ELECTRICAL PLANS & SPACE REQUIREMENTS.

3

1

1

1

1 1

Page 3: DFCM Addendum No - mscibuild.commscibuild.com › wp-content › uploads › 2020 › 01 › DFCM... · 202 mech. 305 corridor 304 jan. 303 staff restroom 302 lg. open group therapy

LIBRARY201

MECH.206

CORRIDOR205

JAN.204

STAFF RR203

YOUTH RR202

AVSTORAGE

208

STORAGE211

MUSICSTORAGE

210

MUSICROOM

209

INCENTIVESPACE

207

LG. OPENGROUP

THERAPY301

JAN.303

STAFFRESTROOM

302

MECH.305

STAFFTHERAPY

ROOM306

STAFFTHERAPY

ROOM307

STAFFTHERAPY

ROOM308

CORRIDOR304

DE-ESCALATIONROOM

309

STORAGECLOSET

310

FUTURESTAFF

THERAPYROOM

311

STAFFTHERAPY

ROOM312

GROUPTHERAPY

ROOM313

SMALLGROUP

THERAPYROOM

314

STORAGE315

YOUTH RR316

11 1615134 7 9 10

R

Q

P

O

R

Q

P

O

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111

577 South 200 East

jrcadesign.com

12345

A

B

C

D

DATE

PROJECT #:

REVISION

09/30/2019

DH

S D

JJS

MIL

LCR

EEK

YOU

TH C

ENTE

R R

ENO

VATI

ON

790

WES

T 12

TH S

TREE

TO

GDE

N, U

TAH

8440

4

18038

CONSTRUCTION DOCUMENTS

635 South State StreetSalt Lake City, Utah 84111

BNACONSULTING

SALT

LA

KE

S

T.G

EORG

E

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ã 2019 BNACONSULTING

10/25/19 Addendum1

DFCM

PRO

JECT

NO

: 191

5243

0

E202

COTTAGEPOWERPLANS

1

Page 4: DFCM Addendum No - mscibuild.commscibuild.com › wp-content › uploads › 2020 › 01 › DFCM... · 202 mech. 305 corridor 304 jan. 303 staff restroom 302 lg. open group therapy

AD3-5 FOR REFERENCE ONLY

Page 5: DFCM Addendum No - mscibuild.commscibuild.com › wp-content › uploads › 2020 › 01 › DFCM... · 202 mech. 305 corridor 304 jan. 303 staff restroom 302 lg. open group therapy

AD3-6 FOR REFERENCE ONLY