diggers and dealers presentation - duketon...
TRANSCRIPT
Duketon Mining Limited |
DIGGERS AND DEALERS PRESENTATION
August 2016
Drilling for gold in the well endowed Duketon Belt -100% and in Joint Venture with Regis Resources
www.duketonmining.com.au
Duketon Mining Limited |
This presentation has been prepared by Duketon Mining Limited(“Duketon”). The information contained in this presentation is a professional opinion only
and is given in good faith. Certain information in this document has been derived from third parties and though Duketon has no reason to believe that it is
not accurate, reliable or complete, it has not been independently audited or verified by Duketon. Any forward-looking statements included in this document
involve subjective judgement and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and may be
unknown to, Duketon. In particular they refer only to the date of this document, they assume the success of Duketon’s strategies, and they are subject to
significant regulatory, business, competitive and economic risks and uncertainties. Actual future events may vary materially from those in the forward looking
statements. Recipients of this document are cautioned not to place undue reliance on such forward-looking statements. Duketon makes no representation
or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or
correcting any error or omission which may become apparent after this document has been issued. To the extent permitted by law, Duketon and its officer’s
employees, related corporations and agents disclaim all liability, whether direct, indirect or consequential for any loss or damage arising out of, or in
connection with, any use or reliance on this presentation or information. All amounts are in A$ unless otherwise stated.
Competent Person Statement:
The information in this report that relates to exploration results and exploration targets is based on information compiled by Mr Stuart Fogarty, Member of
the Australian Institute of Mining and Metallurgy and Employee of Duketon Mining Limited. Mr Fogarty has sufficient experience which is relevant to the
activity being undertaken to qualify as a “Competent Person”, as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves and consents to the inclusion in this report of the matters reviewed by him in the form and context in which they
appear.
The information in the announcement that relates to Mineral Resources for Rosie is extracted from the report entitled “Duketon Mining Prospectus” dated 19
June 2014 and is available to view on the Company’s website (www.duketonmining.com.au). The information in the announcement that relates to Mineral
Resources for C2 is extracted from ASX announcement 29 January 2015. The company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning
the estimates in the relevant market announcements continue to apply and have not materially changed. The company confirms that the form and context in
which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Cautionary Statement
2
Duketon Mining Limited |
Corporate Overview
Duketon Mining Limited ASX: DKM
Shares on Issue 82.5m
Options on Issue1 38.6m
Market Cap. @ 25.5c $21m
Cash + Listed Investments (Jun 16) $5.0m
Enterprise Value $16m
1. Volume weighted exercise price of 25.5 cents and volume weighted time to expiry 2.9 years
Board & Management
Seamus CorneliusNon-Executive
Chairman
Mr Cornelius brings to the Board 21 years of corporate experience in both legal and commercial negotiations. Mr Cornelius hasbeen living and working as a corporate lawyer in China for 17 years. He has been based in Shanghai and Beijing since 1993. From 2000 to 2010 he was an international partner with one of Australia’s leading law firms and specialized in dealing with cross border investments, particularly in energy and resources. Mr Cornelius has for many years advised large international companies on their investments in China and in recent years has advised Chinese state owned entities on their investments in natural resource projects outside of China including in Australia.
Stuart FogartyManaging
Director
Mr Fogarty has over 19 years of exploration experience with BHP Billiton and Western Mining Corporation. Until recently, he was BHP’s Senior Exploration Manager for North and South America. Mr Fogarty has a very strong background in nickel exploration, having commenced his career at Kambalda Nickel in 1994. He has held senior roles with BHP including Senior Geoscientist for nickel exploration in the Leinster and Mt Keith region, Project Manager WA Nickel Brownfields and Regional Manager Australia –Asia where he was responsible for a $100 million per annum exploration budget.
Heath HellewellNon Executive
Director
Mr Hellewell is an exploration geologist with over 20 years of experience in gold, base metals and diamond exploration predominantly in Australia and West Africa. Heath joined Independence Group NL in 2000 prior to the Company’s IPO and was part of the team that identified and acquired the Tropicana project area, eventually leading to the discovery of the Tropicana gold deposit. He was most recently the co-founding Executive Director of Doray Minerals Limited, where he was responsible for the Company’s exploration and new business activities. Following the discovery of the Andy Well gold deposits in 2010, DorayMinerals was named “Gold Explorer of the Year” in 2011 by The Gold Mining Journal and in 2014 Heath was the co-winner of the prestigious “Prospector of the Year” award, presented by the Association of Mining and Exploration Companies.
Share Price Chart (Last 12 Months)
3
Duketon Mining Limited |
$0.0
$0.5
$1.0
$1.5
$2.0
$2.5
$3.0
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
More Gold Will Be Found in the Duketon Belt
REGIS RESOURCES IN 2005
Regis Resources Mkt Cap $40m
Au Resource (Duketon Belt) Circa 1.0Moz
Operating Mines (Duketon Belt) Nil
Au Production (Duketon Belt) Nil
Duketon Belt Tenement Holding
~ 2,000km2
Gold Price A$340/oz
The Duketon Belt is highly prospective………..Duketon Mining is following the Regis Resources (ASX: RRL) success story……..
Re
gis
Re
sou
rce
s’ M
arke
t C
ap. A
$b
n
REGIS RESOURCES IN 2016
Regis Resources Mkt Cap ~$2bn
Au Resource (Duketon Belt) Circa 5.8Moz
Operating Mines (Duketon Belt) 3
Au Production (Duketon Belt) Circa 300kozpa
Duketon Belt Tenement Holding ~ 2,000km2
Gold Price ~A$1,800/oz
4
Duketon Mining Limited |
Timeline – Very Active
5
Lots of drilling in the next 6-12 mths!
Aug Sep Oct Nov Dec 2017
Hacks Bore
Davies Bore
Henrys Bore
Petra Nth #2
Hacks Bore #2
Lancefield Nth
Murphy Hills
Golden Star
Commonwealth
Other Geochem
Hootanui?
Bandya?
DKM 100%
Joint Venture
Duketon Mining Limited |
Tenements
6
Multiple Projects
Regional work by DKM in 2015
identified the Western Belt to be a
direct analogue for the southern
Laverton Belt (e.g. Wallaby, Sunrise
etc)
Commissioned independent
targeting
Generated multiple regional
targets +15 and counting
Duketon Mining Limited |
Davies Bore
7
1.2 km Long Anomaly
5 lines 200 - 500m apart
12m @ 0.9g/t Au (BOH)
Inc. 3m @ 2.7g/t Au
25m @ 0.7g/t Au (BOH)
Inc. 9m @ 1.6g/t Au
16m @ 1.5 g/t Au
Inc. 4m @ 5.2 g/t Au
Fresh, altn, qtz, suls
Felsic and mafic package
2nd Drill program completed
Duketon Mining Limited |
Ore Grade Intersection
Targeting the intersection of
two geochemical trends
5m @ 13.1g/t Au (BOH)
4m @ 3.3g/t Au
40m downhole
4m @ 1.6 g/t Au
4m @ 1.3 g/t Au
Felsic and mafic package
Drilling to extend anomaly
continuing
Henry’s Bore South
8
DRC00728m @ 0.8 g/t Au
Incl. 1m @ 11.8 g/t Au(Historic Drilling)
DMAC0395m @ 13.1 g/t Au
(BOH)
DR47032m @ 0.4 g/t Au(Historic Drilling)
DMAC0428m @ 0.6 g/t Au
OP
EN
0 250 500m
Broad Au + As
anomaly in
historic drilling
DR46712m @ 2.1 g/t Au(Historic Drilling)
DR45634m @ 0.4 g/t Au(Historic Drilling)
DR2714m @ 2.4 g/t Au(Historic Drilling)
HBAC0064m @ 1.6 g/t Au
HBAC0024m @ 1.3 g/t Au
HBAC0258m @ 1.8 g/t Au
Incl. 4m @ 3.3 g/t Au
HBAC0231m @ 0.5 g/t Au
HBAC0291m @ 1.1 g/t Au(BOH Basement)
Duketon Mining Limited |9
Lancefield North
Historical Project
Last drilled in the 1984 - 90
5km north of 1Moz Lancefield Mine
Laverton Tectonic Zone
3.5km strike of prospective sequence
RAB, RC and 2 x Diamond Holes
8m @ 11.01g/t Au,
8m @ 4.41g/t Au,
8m @ 4.02g/t Au & 1m @ 7.03g/t Au,
4m @ 4.25 g/t Au,
2m @ 13.18g/t Au,
1m @ 29.4g/t Au & 1m @ 7.05g/t Au,
1m @ 6.35g/t Au
Drill ready!
Duketon Mining Limited |10
Murphy Hills
+2km long gold trend
Multiple wide zones of
gold
4m @ 4.6 g/t Au
4m @ 2.0 g/t Au
2m @ 3.4 g/t Au
2m @ 3.1 g/t Au
+1g/t hits and broad low
grade gold everywhere
Drill ready!
Duketon Mining Limited |11
Murphy Hills
TOFR
Duketon Mining Limited |
Golden Star/ One Weight Wonder
12
Tenement Granted in July ‘16
GS Historical Intersections
44m @ 1.0g/t Au
Incl. 14m @ 2.7g/t Au
4m @ 7.2g/t Au
6m @ 2.5 g/t Au
2m @ 5.1 g/t Au
OWW (1.5km strike)
4m @ 1.7g/t Au (RAB)
12m @ 1.1g/t Au (RAB)
GS = redrill
OWW = AC drill
Duketon Mining Limited |
RRL JV - Multiple Soil Anomalies + Drilling
13
Significant Anomaly
Commonwealth
• 3km x 300m
• >75 ppb Au
• Core of + 250 ppb Au
• 2 samples + 1g/t Au
• 9,516 lag samples
• 400m x 100m
• Numerous +75 ppb Au
Infill sampling underway,
drilling?
Duketon Mining Limited |
RRL JV – Nth Petra
Extension of Petra Resource
Results include;
3m @ 8.77 g/t Au from 21m
2m @ 7.00 g/t Au from 30m
4m @ 6.00 g/t Au from 56m
4m @ 2.66 g/t Au from 40m
4m @ 2.49 g/t Au from 46m
1m @ 8.56 g/t Au from 54m
1m @ 8.08 g/t Au from 69m
1m @ 4.48 g/t Au from 44m
27 intersections of more than 1g/t Au
over 1m
Follow-up infill required
14
Duketon Mining Limited |
RRL JV – Hacks Bore
15
Garden Well Analogue
under transported cover (paleochannel).
lag geochemical support at the edge of the
paleochannel.
5km along strike from multi-million ounce
Garden Well Mine.
within the main north south structural
corridor that hosts Garden Well, Moolart
Well, and Tooheys Well.
Drilling
+57 holes + follow-up
Duketon Mining Limited |
Timeline – Very Active
16
Lots of drilling in the next 6-12 mths!
Aug Sep Oct Nov Dec 2017
Hacks Bore
Davies Bore
Henrys Bore
Petra Nth #2
Hacks Bore #2
Lancefield Nth
Murphy Hills
Golden Star
Commonwealth
Other Geochem
Hootanui?
Bandya?
DKM 100%
Joint Venture
Duketon Mining Limited |17
Expedited plan to bring success forward
Current spend rate circa $2M per annum
Rate limiting step is cash not projects
Multiple opportunities in the gold portfolio (and growing)
Accelerated plan would bring growth forward
Refer to RRL growth story
Significant endowment in the area
DKM tenements underexplored
Understanding depletion zone is a major knowledge breakthrough
Budget Vs. Accelerated Plan
17
Duketon Mining Limited |
Investment Highlights
Pillars to Add Value:
1. Gold exploration DRILLING CONTINUES
2. Regis spending on Gold Joint Venture DRILLING CONTINUES
3. Expand existing nickel resources ON HOLD
4. Discover new nickel deposits – ON HOLD
Cash (+ liquids) balance of ~$5.0 million end of June ‘16 Q – WELL FUNDED
Enterprise value of $16M (Market Cap. $21M) – LEVERAGED TO DISCOVERY
Managing Director ex-BHP Senior Exploration Manager for Americas – EXPERIENCED MANAGEMENT
100% owned Duketon Gold-Nickel Project located in WA near significant infrastructure – RIGHT LOCATION
18
Duketon Mining Limited | 19
Duketon Mining Ltd. Head Office
Phone +61 8 6315 1490 Ground Floor, 31 Ventnor
Fax +61 8 9486 7093 Avenue, West Perth
Web: www.duketonmining.com.au Western Australia 6005
Contact Details