Building Cost
Ref. Tumer and Townsend, Construction and Management Consultants
Design Build Operate Dispose Total
3% 17%
Run/Maintain 40%
?%
100%
Cos
t of O
wne
rshi
p
Repair 30%
Periodic Replacement/ Refurbishment
10%
1Year 2 Years 25 Years 1 Year Total
“Rethinking Construction” by Sir John Egan - 1998. • 30% of construction is rework • 40% of the manpower used on construction sites can be wasted • At least 10% materials are wasted • Over 40% of projects are completed late or over budget.
Waste in the Construction Industry
The cost of inadequate interoperability in the U.S. capital facilities industry estimated at: $15.8 billion per year
Duplication of Work
Ø Improvement in quality Ø Reduction in production time Ø Reduction in cost
Waste & Inefficiency can be attributed to
Ø Overproduction Ø Waiting Ø Transportation Ø Processing Itself Ø Stock at Hand Ø Movement Ø Making Defective Products
Lean Manufacturing Primary focus is the elimination of waste & inefficiency
(Ref. Toyota Production System)
© eurocarnews
© eurocarnews
“The term ‘Total Architecture’ implies that all relevant design decisions have been considered together and have been integrated into a whole by a well organised team empowered to fix priori=es”
Sir Ove Arup – The Key Speech -‐ 1970
“This is an ideal which can never – or only very rarely – be fully realised in prac=se, but which is well worth, for striving for ar=s=c wholeness or excellence depends on it, and for our own sake we need the s=mula=on produced by excellence”
“This is an ideal which can never – or only very rarely – be fully realised in prac=se, but which is well worth
Ove Arup
Asset Management
Supply Chain
Management
Interior Design & Fit out
Façade Design
Building Services
Architectural
Design
Clash
detec=on &
coordina=on
Engineering
Op=misa=on
Quan==es Extrac=on
4D Modelling
Design Task in Construction Industry
Asset Management
Supply Chain Management 4D Modelling
Engineering Op=misa=on
Whole life cos=ng
Interior Design & Fit out
Façade Design
Quan==es Extrac=on
Building Informa=on Modelling/ Management
Building Services Architectural
Design
Clash detec=on & coordina=on
Structural Design
Adap=ve Survey & Drawing
Digital Fabrica=on
Real =me value Engineering
Real-‐=me progress repor=ng & RFI
Unified Approach to BIM
Building Service
Structural Engineering
Urban and City Modelling
GIS Fabrica=on
4D Site Planning
Environmental Performance
Crowd Simula=on (Traffic)
Ligh=ng Design
Fire Engineering
Facade Op=miza=on
Unified Approach to BIM
Asset Management
Quan=ty Takeoff
Building Service
Structural Engineering
Urban and City Modelling
GIS Fabrica=on
4D Site Planning
Environmental Performance
Crowd Simula=on (Traffic)
Ligh=ng Design
Fire Engineering
Facade Op=miza=on
Unified Approach to BIM
Asset Management
Quan=ty Takeoff
Building Service
Structural Engineering
Urban and City Modelling
GIS Fabrica=on
4D Site Planning
Environmental Performance
Crowd Simula=on (Traffic)
Ligh=ng Design
Fire Engineering
Facade Op=miza=on
Unified Approach to BIM
Asset Management
Quan=ty Takeoff
• Design options are well studied
• Efficient design coordination
• Integrated models – holistic design
• Delivery efficient
• Time saving
• Cost saving
BIM Application
©KKAA
Urban Planning / Design
Traffic Condition / Optimization Population Density Building Massing
Feasibility Pre-‐Construc=on Construc=on Opera=on Decommission
BIM Application
New Structure
Existing structure
Replace element
©KKAA
©KKAA
浦东金融新区二期开发项目
Feasibility Pre-‐Construc=on Construc=on Opera=on Decommission
BIM Application 重庆朝天门(建筑面积约1,000,000sqm)
© Safdie
• Total 6 towers • 300m long sky bridge • 250x250 footprint podium
Feasibility Pre-‐Construc3on Construc=on Opera=on Decommission
Architects geometry
Base lines and rails
Generate objects
Analy=cal Models
BIM Application 重庆朝天门(建筑面积约1,000,000sqm)
Revit Models Parametric Tools
• Apply digital tools for handling this colossal project. • Accurate model information transfer. • Deliver more than 500 drawings in tight schedule during PD stage.
Feasibility Pre-‐Construc3on Construc=on Opera=on Decommission
BIM Application Hangzhou Raffles
CFD Analysis
Louver Transparency Optimization
Environment Performance Analysis
Revit
Integrated MEP Digital Modelling
Feasibility Pre-‐Construc3on Construc=on Opera=on Decommission
© UN Studio
BIM Application 武汉万达 – 结构+幕墙
Feasibility Pre-‐Construc3on Construc=on Opera=on Decommission
© UN Studio
BIM Application
Mushroom Skylight Corridor Skylight
Steel Plates Center
Bar Glazing Facade
LED
Automated Node Generation for Fabrication
Feasibility Pre-‐Construc3on Construc=on Opera=on Decommission
BIM Application 徐家汇中心 – Quantity Takeoff
Feasibility Pre-‐Construc3on Construc=on Opera=on Decommission
© PCPA
BIM Application Hong Kong Sludge Treatment Facility – Mobility
Feasibility Pre-‐Construc=on Construc3on Opera=on Decommission
BIM Application Sydney Operation House
Feasibility Pre-‐Construc=on Construc=on Opera3on Decommission
On Going
Virtual Design Review Arup Real
Immersive – Wearable VR
Design Review, Visualization
Virtual Reality (VR)
Asset Management
CAVE System
Cloud system, big data, etc.