digital & bim in total architecture

32
Digital & BIM in Total Architecture 2015-10-22 Green Drink

Upload: green-initiatives-

Post on 08-Apr-2017

351 views

Category:

Design


0 download

TRANSCRIPT

Digital & BIM in Total Architecture 2015-10-22 Green Drink

BIM & Sustainability

Building Cost

Ref. Tumer and Townsend, Construction and Management Consultants

Design Build Operate Dispose Total

3% 17%

Run/Maintain 40%

?%

100%

Cos

t of O

wne

rshi

p

Repair 30%

Periodic Replacement/ Refurbishment

10%

1Year 2 Years 25 Years 1 Year Total

Building Cost

Source: Paul Morrell BIM 2010 Presentation

-20% -40%

“Rethinking Construction” by Sir John Egan - 1998. •  30% of construction is rework •  40% of the manpower used on construction sites can be wasted •  At least 10% materials are wasted •  Over 40% of projects are completed late or over budget.

Waste in the Construction Industry

The cost of inadequate interoperability in the U.S. capital facilities industry estimated at: $15.8 billion per year

Duplication of Work

Ø  Improvement in quality Ø  Reduction in production time Ø  Reduction in cost

Waste & Inefficiency can be attributed to

Ø  Overproduction Ø  Waiting Ø  Transportation Ø  Processing Itself Ø  Stock at Hand Ø  Movement Ø  Making Defective Products

Lean Manufacturing Primary focus is the elimination of waste & inefficiency

(Ref. Toyota Production System)  

© eurocarnews

© eurocarnews

Digital & BIM in Total Architecture

“The  term  ‘Total  Architecture’  implies  that  all  relevant  design  decisions  have  been  considered  together  and  have  been  integrated  into  a  whole  by  a  well  organised  team  empowered  to  fix  priori=es”  

Sir  Ove  Arup  –  The  Key  Speech  -­‐  1970  

“This  is  an  ideal  which  can  never  –  or  only  very  rarely  –  be  fully  realised  in  prac=se,  but  which  is  well  worth,  for  striving  for  ar=s=c  wholeness  or  excellence  depends  on  it,  and  for  our  own  sake  we  need  the  s=mula=on  produced  by  excellence”  

“This  is  an  ideal  which  can  never  –  or  only  very  rarely  –  be  fully  realised  in  prac=se,  but  which  is  well  worth  

Ove  Arup  

Asset  Management  

Supply  Chain  

Management  

Interior  Design  &  Fit  out  

Façade  Design  

Building  Services  

Architectural  

Design  

Clash  

detec=on  &  

coordina=on  

Engineering  

Op=misa=on

 

Quan==es  Extrac=on  

4D  Modelling  

Design Task in Construction Industry

Asset  Management  

Supply  Chain  Management   4D  Modelling  

Engineering  Op=misa=on  

Whole  life  cos=ng  

Interior  Design  &  Fit  out  

Façade  Design  

Quan==es  Extrac=on  

Building  Informa=on  Modelling/  Management  

Building  Services   Architectural  

Design  

Clash  detec=on  &  coordina=on  

Structural  Design  

Adap=ve  Survey  &  Drawing  

Digital  Fabrica=on  

Real  =me  value  Engineering  

Real-­‐=me  progress  repor=ng  &  RFI  

Unified Approach to BIM

Building  Service  

Structural  Engineering  

Urban  and  City  Modelling    

GIS  Fabrica=on  

4D  Site  Planning  

Environmental  Performance  

Crowd  Simula=on  (Traffic)  

Ligh=ng  Design  

Fire  Engineering  

Facade  Op=miza=on  

Unified Approach to BIM

Asset  Management  

Quan=ty  Takeoff  

Building  Service  

Structural  Engineering  

Urban  and  City  Modelling    

GIS  Fabrica=on  

4D  Site  Planning  

Environmental  Performance  

Crowd  Simula=on  (Traffic)  

Ligh=ng  Design  

Fire  Engineering  

Facade  Op=miza=on  

Unified Approach to BIM

Asset  Management  

Quan=ty  Takeoff  

Building  Service  

Structural  Engineering  

Urban  and  City  Modelling    

GIS  Fabrica=on  

4D  Site  Planning  

Environmental  Performance  

Crowd  Simula=on  (Traffic)  

Ligh=ng  Design  

Fire  Engineering  

Facade  Op=miza=on  

Unified Approach to BIM

Asset  Management  

Quan=ty  Takeoff  

•  Design options are well studied

•  Efficient design coordination

•  Integrated models – holistic design

•  Delivery efficient

•  Time saving

•  Cost saving

BIM Application

©KKAA

Urban  Planning  /  Design  

Traffic Condition / Optimization Population Density Building Massing

Feasibility   Pre-­‐Construc=on   Construc=on   Opera=on   Decommission  

BIM Application 浦东金融新区二期开发项目  

Feasibility   Pre-­‐Construc=on   Construc=on   Opera=on   Decommission  

BIM Application

©KKAA

浦东金融新区二期开发项目  

Feasibility   Pre-­‐Construc=on   Construc=on   Opera=on   Decommission  

BIM Application

New Structure

Existing structure

Replace element

©KKAA

©KKAA

浦东金融新区二期开发项目  

Feasibility   Pre-­‐Construc=on   Construc=on   Opera=on   Decommission  

BIM Application 重庆朝天门(建筑面积约1,000,000sqm)  

© Safdie

•  Total 6 towers •  300m long sky bridge •  250x250 footprint podium

Feasibility   Pre-­‐Construc3on   Construc=on   Opera=on   Decommission  

Architects  geometry  

Base  lines  and  rails  

Generate  objects  

Analy=cal  Models  

BIM Application 重庆朝天门(建筑面积约1,000,000sqm)  

Revit  Models  Parametric  Tools  

•  Apply digital tools for handling this colossal project. •  Accurate model information transfer. •  Deliver more than 500 drawings in tight schedule during PD stage.

Feasibility   Pre-­‐Construc3on   Construc=on   Opera=on   Decommission  

BIM Application Hangzhou Raffles

CFD Analysis

Louver Transparency Optimization

Environment Performance Analysis

Revit

Integrated MEP Digital Modelling

Feasibility   Pre-­‐Construc3on   Construc=on   Opera=on   Decommission  

© UN Studio

BIM Application 武汉万达 –  结构+幕墙  

Feasibility   Pre-­‐Construc3on   Construc=on   Opera=on   Decommission  

© UN Studio

BIM Application

Mushroom Skylight Corridor Skylight

Steel Plates Center

Bar Glazing Facade

LED

Automated Node Generation for Fabrication

Feasibility   Pre-­‐Construc3on   Construc=on   Opera=on   Decommission  

BIM Application 徐家汇中心 – Quantity Takeoff

Feasibility   Pre-­‐Construc3on   Construc=on   Opera=on   Decommission  

© PCPA

BIM Application Hong Kong Sludge Treatment Facility – Mobility

Feasibility   Pre-­‐Construc=on   Construc3on   Opera=on   Decommission  

BIM Application Sydney Operation House

Feasibility   Pre-­‐Construc=on   Construc=on   Opera3on   Decommission  

BIM Application MTR Station in HK

Feasibility   Pre-­‐Construc=on   Construc=on   Opera3on   Decommission  

BIM Application

Feasibility   Pre-­‐Construc=on   Construc=on   Opera=on   Decommission  

On Going

Virtual Design Review Arup Real

Immersive – Wearable VR

Design Review, Visualization

Virtual Reality (VR)

Asset Management

CAVE System

Cloud  system,  big  data,  etc.  

Summary

Summary •  Not  just  about  “Clash  Detec3on”  

•  Deliver  Total  Design  Solu3on  and  Documenta3on  •  Get  things  right  the  1st  3me  

•  Less  surprise  and  risk  in  construc=on  stage  •  Higher  performance,  beder  user  experiences  

•  Investment,  not  Expense