digital quality management from design to · pdf filedigital quality management from design to...

34
© PROSTEP AG 2017 | Alle Rechte vorbehalten / All rights reserved Digital quality management from design to production 18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) Torsten Schmied, Adient Ltd. & Co. KG Christian Emmer, PROSTEP AG

Upload: buitu

Post on 18-Mar-2018

231 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© PROSTEP AG 2017 | Alle Rechte vorbehalten /  All rights reserved

Digital quality management from design to production

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP)

Torsten Schmied, Adient Ltd. & Co. KGChristian Emmer, PROSTEP AG

Page 2: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© PROSTEP AG 2017 | Alle Rechte vorbehalten /  All rights reserved

AGENDA

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 2

Digital quality management from design to production

1 Introduction: Adient

2 Pain Points in current Quality Management Processes

3 Introduction: ProSTEP iViP/VDA Project „3D Measurement Data Management“

4 Outlook

5 Conclusion

Page 3: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

Introducing Adient

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 3

Page 4: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

Who we are.What we do.

Capabilities Presentation

Page 5: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

44% of market

Adient

Other

Lear

Faurecia

Toyota Boshoku

Magna

We are among the Top 10 Global OEM auto parts suppliers in the world.

Adient / Capabilities Presentation 5

Worldwide industry leadership

We enjoy a clear leadership position as the world’s largest automotive seating manufacturer, with twice the global shareof our nearest competitor.

Global sales in 2015

$23.9 BSeat systems per year

25 M+Leader in Chinese share of the seating business

Page 6: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

Adient / Capabilities Presentation 6

Located right where our customers need us most

Amount

Global locations

230+ 33Countries

Employees

Globally

75,000+

North America

Locations38

South America

Locations10

Europe

Locations91

Asia

Locations91

Africa

Locations6

Page 7: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

Adient / Capabilities Presentation 7

Working with the world’s largest auto manufacturers

We work with the world’s largest auto manufacturers,supplying parts for the most important automobile brands across the globe.

Automotive seating customers

Nissan

Toyota

Hyundai/Kia

Honda

Chinese OEMs

VW

Mercedes

Renault, Peugeot, Citroën

Chrysler

Ford

Fiat

Jaguar/Land Rover

Volvo

Other

GM

BMW

Page 8: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

The right products

Adient / Capabilities Presentation 8

Global market leader in complete seats and all the major components.

Page 9: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

Complete seatsOur complete seating systems excel in quality and craftsmanship. Every step of our process, from design to assembly, is completed in-house – so we can ensure our products are safe, stylish and comfortable for both our customers and their end-consumers. And with our easily adaptable core components, we can develop precisely right solutions that support multiple automotive makes and models.

Adient / Capabilities Presentation 9

Our reputation as the global leader in automotive seatingbegins with our products

Page 10: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© PROSTEP AG 2017 | Alle Rechte vorbehalten /  All rights reserved

AGENDA

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 10

Digital quality management between development and production

1 Introduction: Adient

2 Pain Points in current Quality Management Processes

3 Introduction: ProSTEP iViP/VDA Project „3D Measurement Data Management“

4 Outlook

5 Conclusion

Page 11: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 11 -

Motivation 2015

Page 12: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 12

Process and Pain Points 2016

Design Engineer

11 • Datums

22• Geometrical

Tolerances

33 • Dimensions

44 • Notes

• Bad GD&T quality.• Mismatching with FMEA,• Different CAD systems CATIA and NX

Pain Point

Pain PointThere is no standardavailable today.

The drawing-less process ("3D-Master“) and the exchange of 3D Measurement Data has not yet been sufficiently described for metrology.

Pain Point

Page 13: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 13

Process Status 2017

Design Engineer

11 • Datums

22• Geometrical

Tolerances

33 • Dimensions

44 • Notes

• Bad GD&T quality.• Mismatching with FMEA,• Different CAD systems CATIA and NX

Pain Point

Pain PointThere is no standardavailable today.

The drawing-less process ("3D-Master“) and the exchange of 3D Measurement Data has not yet been sufficiently described for metrology.

Pain Point

User Training

POC/Pilot at Adient

VDA / ProSTEP iViP recommendation“3D Measurement Data Management”

Page 14: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© PROSTEP AG 2017 | Alle Rechte vorbehalten /  All rights reserved

AGENDA

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 14

Digital quality management from design to production

1 Introduction: Adient

2 Pain Points in current Quality Management Processes

3 Introduction: ProSTEP iViP/VDA Project „3D Measurement Data Management“

4 Outlook

5 Conclusion

Page 15: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 15 -

Motivation

• The technical drawing, which is still a key element within the measurement process, gets replaced by drawing-less concepts, being frequently referred to 3D-Master.

• The process needs to get ready for these modern technologies.

• The lack of standards at OEMs and suppliers leads to inefficient processes creating increasing costs.

Page 16: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 16 -

• The availability of one single interface format for all information required within the measurement process would enable the OEMs and suppliers to implement highly automated processes based on a common data model.

• Enable a central data-hub and modern IT architecture as an option.

Goal

Page 17: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 17 -

High level Scope

Page 18: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 18 -

3D Measurement Data Management Workflow Forum• Airbus• Adient (Chair)• BMW• Continental• Daimler• Ford• Opel

3D Measurement Data Management Implementor Forum• ATS• CENIT• DUWE 3D• Gigatronik• GOM• Hexagon Manufacturing Intelligence• Kronion• MAP VISION• Siemens PLM• WENZEL Software Solutions• Zeiss IMT

Participants

User Group of Automotive and Aerospace Companies

Group of Measurement Equipment and Software Vendors

Coordination for both groups is done by PROSTEP AG

Page 19: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 19 -

ACTIVITIES 2016

Page 20: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 20 -

Reference Process

A reference process was derived from the requirements collected in order to define the scope of the interface definition

Page 21: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 21 -

• The first step was taken in 2016 with user requirements relating to a data exchange format in the measurement process being collected and prioritized.

• The existing I++ DMS UML model was thoroughly revised with regard to readability and documentation to provide software houses and measurement equipment manufacturers with support when implementing the interface.

Improvement of Documentation

Page 22: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 22 -

CenitDUWE 3DEDAG FeynsinnGigatronikGOMHexagon PC-DMISHexagon Q-DASHexagon QuindosISRA VISIONKronionMetrologic GroupSiemens PLMWenzel MetromecZeiss IMT

20 participants 14 represented ToolsFrom 12 system vendors

An information event for system vendors was held in October 2016 in preparation for the Implementor Forum, which is launched in 2017 now. All the representatives of the software houses and measurement equipment manufacturers who attended the event recognized the great potential that a sector-wide activity for harmonizing the interfaces offers.

Implementor Awareness Meeting

Page 23: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 23 -

CURRENT WORK

Page 24: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 24 -

• In addition to increased focus on user requirements and use cases and the publication of an initial version of a PSI/PDA Recommendation, it is also planned that extensions be developed that provide support for additional measurement methods and application domains.

• Preparations for the launch of an Implementer Forum will also be made. The objectives are an exchange of experiences among the software vendors, harmonization of the implemented interfaces, creation of implementation guidelines for more efficient software development as well as internal testing "behind closed doors".

Project Plan 2017

• Workflow Forum– 4 Workshops– Update of PSI/VDA recommendation

• Implementor Forum– Kick-Off + 3 Workshops– Harmonization of I++ DMS implementations

• Public Work to boost 3D MDM– Conferences, Publications, …

Page 25: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 25 -

3D Measurement Data Management Workflow Forum

• Publication of Recommendation• Public Work: Booth @ Control May 9th -12th

• Publications

Page 26: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 26 -

May 4th: 3D MDM IF Kick-Off Meeting

3D Measurement Data Management Implementor Forum

ATSCENITDUWE 3DGigatronikGOMHexagon Manufacturing IntelligenceKronionMAP VISIONSiemens PLMWenzel Software SolutionsZeiss IMT

Upcoming Events:Phone Conference: August 3rd Face to Face Meeting: September 14thJoint Meeting with 3D MDM WF: November 15th

Page 27: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© PROSTEP AG 2017 | Alle Rechte vorbehalten /  All rights reserved

AGENDA

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 27

Digital quality management between development and production

1 Introduction: Adient

2 Pain Points in current Quality Management Processes

3 Introduction: ProSTEP iViP/VDA Project „3D Measurement Data Management“

4 Outlook

5 Conclusion

Page 28: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 28 -

3D Measurement Data Management Workflow Forum

• 3D MDM recommendation V1:– Core (I++ DMS) quality features, tolerances, meta data

• Public Work: Publication of White Paper & PDJ Article• Technical Work:

– Elaboration of further Use Cases– Extension of I++ DMS

1st Update of recommendation:– e.g. measurement strategies, measuring principles, evaluation rules

2nd Update of recommendation:– e.g. Measuring points, measurement procedures, evaluation layouts

Page 29: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 29 -

3D Measurement Data Management Implementor Forum

• Test of Implementations• Recommended Practises• Workshops

– to give Implementation support – to harmonize implementations

of I++ DMS

Processin

g / implem

entatio

n of 

requ

iremen

ts by vend

ors

Requirements gathering in JIRA

Assignment of requirements to use 

cases

Derivation ofrequirements

Use Case de

finition

Page 30: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© PROSTEP AG 2017 | Alle Rechte vorbehalten /  All rights reserved

AGENDA

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 30

Digital quality management from design to production

1 Introduction: Adient

2 Pain Points in current Quality Management Processes

3 Introduction: ProSTEP iViP/VDA Project „3D Measurement Data Management“

4 Outlook

5 Conclusion

Page 31: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© 2017, ProSTEP iViP / VDA , 17-03.13 - 31 -

I++ DMS support the Drawing less process

31

• One Single Master• Control plan digital available• Measurement results digital

available• Enable global reports and analysis• Visualization based on

international standards• Entry point for an automated

dimensional quality control in Industry 4.0 systems

• Translation into neutral formats• Translate CAD model into viewing

format (JT / 3DPDF)

• Based on ZLP and 3D MDM recommendations.

DigitalMaster

Engineering Manufacturing Service

• Specification

• Standards

• Change History

• Others

Page 32: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 32

Process Status 2017

Design Engineer

11 • Datums

22• Geometrical

Tolerances

33 • Dimensions

44 • Notes

• Bad GD&T quality.• Mismatching with FMEA,• Different CAD systems CATIA and NX

Pain Point

Pain PointThere is no standardavailable today.

The drawing-less process ("3D-Master“) and the exchange of 3D Measurement Data has not yet been sufficiently described for metrology.

Pain Point

User Training

POC/Pilot at Adient

VDA / ProSTEP iViP recommendations3D Measurement Data Management & Drawing Less Process (VDA 4953-2 ZLP)

Page 33: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© PROSTEP AG 2017 | Alle Rechte vorbehalten /  All rights reserved 33

Strategic PLM‐Themes

PLM Technologies

AmbiguityIndustry 4.0Challenges

Competitive DynamicsSecurity

Know‐How

Complexity

Plurality of Sources

Data Integration

Variety

Agile ProductDevelopment

Model Based Design

Complexity and Variant Management

IntegrationALM – PDM – ERP

Digital Master & Digital Twin

Cross‐Company Collaboration

Systems Engineering

Real‐Time Collaboration

Linked Data &Semantic Networks

Data and Interface Standards

Federated, Modular andOpen Architecture

Cloud and Platform Technologies

Role‐Based Functionality

Virtual Reality

18.05.2017, T. Schmied (Adient) / Ch. Emmer (PROSTEP) 33

Page 34: Digital quality management from design to · PDF fileDigital quality management from design to production ... Digital quality management from design to ... Digital quality management

© PROSTEP AG 2017 | Alle Rechte vorbehalten /  All rights reserved

Torsten SchmiedAdient Ltd. & Co. KGIndustriestraße 20‐3051399 BurscheidDeutschland

Telefon +49 2174 653045E‐Mail [email protected]

THANKYOU!

Christian EmmerPROSTEP AGDolivostraße 1164293 DarmstadtDeutschland

Telefon +49 6151 9287‐313E‐Mail [email protected]